Federal Budget Details of Demands for Grants and Appropriations 2018-19 Development Expenditure, part 6
The Federal Budget Details of Demands for Grants and Appropriations 2018-19 Development Expenditure is published as a ZIP archive of 57 PDF files. This page reproduces the text of all 612 pages, file by file, extracted automatically from the PDFs.
This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official ZIP archive before relying on any figure.
NO. 141.- FC22D84 DEVELOPMENT EXPENDITURE DEMANDS FOR GRANTS OF WATER RESOURCES DIVISION
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB-OFFICE, QUETTA-Contd. | |||||
| QA9060 | WAM TANGI DAM, DISTRICT HARNAI : | ||||
| 042202 - | A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 100,000,000 | |
| 042202 - | A052 | Grants-Domestic | 50,000,000 | 100,000,000 | |
| Total- | Wam Tangi Dam, District Harnai | 50,000,000 | 100,000,000 | ||
| QA9061 | PISSIJ KHUZ | AL DAM AND COMMAND AREA DEVELOPMENT, DAR : | |||
| 042202 - | A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 100,000,000 | |
| 042202 - | A052 | Grants-Domestic | 50,000,000 | 100,000,000 | |
| Total- | Pissijal Dam and Command Area Development, Khuzdar | 50,000,000 | 100,000,000 | ||
| ZB0017 | BADIN (FEAS | ZAI DAM, BALOCHISTAN IBILITY STUDY) : | |||
| 042202 - | A05 | Grants, Subsidies and Write off Loans | 30,000,000 | ||
| 042202 - | A052 | Grants-Domestic | 30,000,000 | ||
| Total- | Badin Zai Dam, Balochistan (Feasility Study) | 30,000,000 | |||
| 042202 | Total-Irrigation Dams | 3,563,000,000 | 6,525,568,000 | ||
| 042203 | CANAL IRRIGATION : | ||||
| QA9026 | PROVISION OF GROUND WATER FOR DEVELOPMENT OF INDUSTRIAL SECTOR, BALOCHISTAN : | ||||
| 042203 - | A05 | Grants, Subsidies and Write off Loans | 378,910,000 | 238,545,000 | |
| 042203 - | A052 | Grants-Domestic | 378,910,000 | 238,545,000 | |
| Total- | Provision of ground water for Development of Industrial Sector, Balochistan | 378,910,000 | 238,545,000 | ||
| QA9028 | EXTEN INDUS | SION OF PAT FEEDER CANAL FOR USE OF WATER IN BALOCHISTAN (PACKAGE-III) | |||
| 042203 - | A05 | Grants, Subsidies and Write off Loans | 50,000,000 |
| NO. 141.- | FC22D8 | 4 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVISION | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMAND | 2018-2019 Budget Estimate S FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB-OFFICE, QUETTA-Concld. | |||||
| 042203 - | A052 | Grants-Domestic | 50,000,000 | ||
| Total- | Extension of Pat feeder Canal for Use of Indus Water in Balochistan (Package-III) | 50,000,000 | |||
| QA9030 | TOIWA | R BATOZAI DAM, DISTRICT KILLA SAIFULLAH : | |||
| 042203 - | A05 | Grants, Subsidies and Write off Loans | 1,140,090,000 | 1,000,000,000 | |
| 042203 - | A052 | Grants-Domestic | 1,140,090,000 | 1,000,000,000 | |
| Total- | Toiwar Batozai Dam, District Killa Saifullah | 1,140,090,000 | 1,000,000,000 | ||
| QA9043 | SHORE BALOC | PROTECTION OF PASNI TOWN HISTAN : | |||
| 042203 - | A05 | Grants, Subsidies and Write off Loans | 396,000,000 | 198,000,000 | |
| 042203 - | A052 | Grants-Domestic | 396,000,000 | 198,000,000 | |
| Total- | Shore Protection of Pasni Town Balochistan. | 396,000,000 | 198,000,000 | ||
| 042203 | Total- Canal Irrigation | 1,915,000,000 | 1,486,545,000 | ||
| 0422 | Total- Irrigation | 5,478,000,000 | 8,012,113,000 | ||
| 042 | Total- Agri, Food, Irrigation, Forestry and Fishries | 5,478,000,000 | 8,012,113,000 | ||
| 04 | Total-Economic Affairs | 5,478,000,000 | 8,012,113,000 | ||
| 10 | SOCIAL | PROTECTION: | |||
| 107 | ADMINISTRATION: | ||||
| 1071 | ADMINISTRATION: | ||||
| 107105 | FLOOD | CONTROL: | |||
| QA9042 | NORMAL EMERGENT FLOOD PROGRAMME, BALOCHISTAN : | ||||
| 107105 - | A05 | Grants, Subsidies and Write off Loans | 40,000,000 | 80,000,000 | |
| 107105 - | A052 | Grants-Domestic | 40,000,000 | 80,000,000 | |
| Total- | Normal Emergent Flood Programme Balochistan | 40,000,000 | 80,000,000 | ||
| 107105 | Total- Flood Control | 40,000,000 | 80,000,000 | ||
| 1071 | Total- Administration | 40,000,000 | 80,000,000 | ||
| 107 | Total- Administration | 40,000,000 | 80,000,000 | ||
| 10 | Total-Social Protection | 40,000,000 | 80,000,000 | ||
| Total-Accountant General Pakistan | |||||
| Revenues, Sub-Office, Quetta | 5,518,000,000 | 8,092,113,000 |
NO. 141.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVISION
DEMANDS FOR GRANTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB-OFFICE, GILGIT. 04 ECONOMIC AFFAIRS: 042 AGRICULTURE, FOOD, IRRIGATION, FORESTRY AND FISHRIES: 0422 IRRIGATION: 042202 IRRIGATION DAMS:
GL7090 DIAMER BASHA DAM, PROJECT (DAM PART) :
| 042202 | - A05 | Grants, Subsidies and Write off Loans | 23,680,350,000 |
|---|---|---|---|
| 042202 | - A052 | Grants-Domestic | 23,680,350,000 |
| Total- | Diamer Basha Dam, Project (Dam Part) | 23,680,350,000 | |
| 042202 | Total- Canal Irrigation | 23,680,350,000 | |
| 0422 | Total- Irrigation | 23,680,350,000 | |
| 042 | Total- Agri, Food, Irrigation, Forestry and | ||
| Fishries | 23,680,350,000 | ||
| 04 | Total-Economic Affairs | 23,680,350,000 |
- 10 SOCIAL PROTECTION: 107 ADMINISTRATION: 1071 ADMINISTRATION: 107105 FLOOD CONTROL:
GL7055 NORMAL EMERGENT FLOOD PROGRAMME, GILGIT - BALTISTAN :
| 107105 | - A05 | Grants, Subsidies and Write off Loans | 5,000,000 | 10,000,000 |
|---|---|---|---|---|
| 107105 | - A052 | Grants-Domestic | 5,000,000 | 10,000,000 |
| Total- | Normal Emergent Flood | |||
| Programme, Gilgit - Baltistan | 5,000,000 | 10,000,000 | ||
| 107105 | Total- Flood Control | 5,000,000 | 10,000,000 | |
| 1071 | Total- Administration | 5,000,000 | 10,000,000 | |
| 107 | Total- Administration | 5,000,000 | 10,000,000 | |
| 10 | Total-Social Protection | 5,000,000 | 10,000,000 | |
| Total-Accountant General Pakistan | ||||
| Revenues, Sub-Office, Gilgit | 5,000,000 | 23,690,350,000 | ||
| TOTAL-DEMAND | 31,760,000,000 | 62,026,495,000 | ||
| (In Foreign Exchange) | (106,000,000) | (61,000,000) | ||
| (Own Resources) | ||||
| (Foreign Aid) | (106,000,000) | (61,000,000) | ||
| (In Local Currency) | (31,654,000,000) | (61,965,495,000) |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 142-CAPITAL-OUTLAY-ATOMIC-ENEERGY
SECTION I CABINET SECRETARIAT 2018-2019 Budget Estimate (Rupees in Thousand) Demand presented on behalf of the Cabinet Secretariat Development Expenditure on Capital Account 142. Capital Outlay on Development of Atomic Energy 28,639,890 Total: - 28,639,890
NO. 142.- CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY
DEMANDS FOR GRANTS
DEMAND NO. 142
(FC12C17)
CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 for CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY.
Voted Rs. 28,639,890,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the CABINET SECRETARIAT (CABINET DIVISION).
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| FUNCTIONAL CLASSIFICATION : | ||||
| 017 | Research and Development General Public Services | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 |
| Total- | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 | |
| OBJECT CLASSIFICATION : | ||||
| A03 | Operating Expenses | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 |
| Total- | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 | |
| (In Foreign Exchange) | (11,761,010,000) | (8,553,325,000) | (7,176,500,000) | |
| (Own Resources) | (4,804,000,000) | (1,350,433,000) | (7,176,500,000) | |
| (Foreign Aid) | (6,957,010,000) | (7,202,892,000) | ||
| (In Local Currency) | (3,645,520,000) | (3,933,983,000) | (21,463,390,000) |
NO. 142.- FC12C17 CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY
DEMANDS FOR GRANTS
III. - DETAILS are as follows : - 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs ACCOUNTANT GENERAL PAKISTAN REVENUES 01 GENERAL PUBLIC SERVICE : 017 RESEARCH AND DEVELOPMENT GENERAL PUBLIC SERVICES : 0171 RESEARCH AND DEVELOPMENT GENERAL PUBLIC SERVICES : 017101 ATOMIC ENERGY :
ID0021 PAKISTAN ATOMIC ENERGY COMMISSION :
| 017101 017101 | - A03 -A039 | Operating Expenses General | 15,085,000,000 15,085,000,000 | 12,200,778,000 12,200,778,000 | 28,339,890,000 28,339,890,000 |
|---|---|---|---|---|---|
| Total- | Pakistan Atomic Energy Commission | 15,085,000,000 | 12,200,778,000 | 28,339,890,000 | |
| (In Foreign Exchange) | (11,721,010,000) | (8,528,325,000) | (7,141,500,000) | ||
| (Own Resources) | (4,764,000,000) | (1,325,433,000) | (7,141,500,000) | ||
| (Foreign Aid) | (6,957,010,000) | (7,202,892,000) | |||
| (In Local Currency) | (3,363,990,000) | (3,672,453,000) | (21,198,390,000) | ||
| ID6854 | PNRA DISTRI | RESIDENTIAL COLONY AT CHASHMA, CT MIANWALI, KUNDIAN : | |||
| **017101 ** | - A03 | Operating Expenses | 56,530,000 | 109,000,000 | |
| 017101 | **-**A039 | General | 56,530,000 | 109,000,000 | |
| Total- | PNRA Residential Colony at Chashma, District Mianwali Kundian | 56,530,000 | 109,000,000 | ||
| ID7198 | ESTAB RADIO COORD | LISHMENT OF NATIONAL LOGICAL EMERGENCY INATION CENTRE : | |||
| **017101 ** | - A03 | Operating Expenses | 180,000,000 | 150,000,000 | 230,000,000 |
| 017101 | **-**A039 | General | 180,000,000 | 150,000,000 | 230,000,000 |
| Total- | Establishment of National Radiological Emergency | ||||
| Coordination Centre | 180,000,000 | 150,000,000 | 230,000,000 | ||
| (In Foreign Exchange) | (10,000,000) | (5,000,000) | (10,000,000) | ||
| (Own Resources) (Foreign Aid) | (10,000,000) | (5,000,000) | (10,000,000) | ||
| (In Local Currency) | (170,000,000) | (145,000,000) | (220,000,000) |
NO. 142.- FC12C17 CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY
DEMANDS FOR GRANTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES- Contd.
ID8127 CAPACITY BUILDING IN DESIGN ASSESSMENT AND ANALYSIS TO ENSURE SAFETY OF ADVANCE NUCLEAR POWER PLANTS :
| 017101 | - A03 | Operating Expenses | 50,000,000 | 27,530,000 | 40,000,000 |
|---|---|---|---|---|---|
| 017101 | **-**A039 | General | 50,000,000 | 27,530,000 | 40,000,000 |
| Total- | Capacity Building in Design Assessment and Analysis to ensure Safety of Advance Nuclear Power Plants | 50,000,000 | 27,530,000 | 40,000,000 | |
| (In Foreign Exchange) | (20,000,000) | (20,000,000) | (20,000,000) | ||
| (Own Resources) (Foreign Aid) | (20,000,000) | (20,000,000) | (20,000,000) | ||
| (In Local Currency) | (30,000,000) | (7,530,000) | (20,000,000) | ||
| ID9970 | RE-INF REGUL | ORCEMENT OF PNRA'S CAPACITY & ATORY OVERSIGHT AGAINST | |||
| VULNE AND C | RABILITIES OF DIGITIZED CONTROLS YBER THREATS : |
| 017101 | - A03 | Operating Expenses | 35,000,000 | 30,000,000 | |
|---|---|---|---|---|---|
| 017101 | **-**A039 | General | 35,000,000 | 30,000,000 | |
| Total- | Re-Inforcement of PNRA's Capacity & Regulatory Oversight Against Vulnerabilities of Digitized Controls | ||||
| and Cyber Threats | 35,000,000 | 30,000,000 | |||
| (In Foreign Exchange) | (10,000,000) | (5,000,000) | |||
| (Own Resources) | (10,000,000) | (5,000,000) | |||
| (Foreign | Aid) | ||||
| (In Local Currency) | (25,000,000) | (25,000,000) | |||
| 017101 | Total-Atomic Energy | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 | |
| 0171 | Total-Research and Development General | ||||
| Public Service | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 | ||
| 017 | Total-Research and Development General | ||||
| Public Service | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 | ||
| 01 | Total-General Public Service | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 | |
| Total- | Accountant General Pakistan | ||||
| Revenues | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 |
NO. 142.- FC12C17 CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY
DEMANDS FOR GRANTS
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |
|---|---|---|---|
| ACCOUNTANT GENE | Rs RAL PAKISTAN REVENUES- C | Rs oncld. | Rs |
| (In Foreign Exchange) | (11,761,010,000) | (8,553,325,000) | (7,176,500,000) |
| (Own Resources) | (4,804,000,000) | (1,350,433,000) | (7,176,500,000) |
| (Foreign Aid) | (6,957,010,000) | (7,202,892,000) | |
| (In Local Currency) | (3,645,520,000) | (3,933,983,000) | (21,463,390,000) |
| TOTAL- DEMAND | 15,406,530,000 | 12,487,308,000 | 28,639,890,000 |
| (In Foreign Exchange) | (11,761,010,000) | (8,553,325,000) | (7,176,500,000) |
| (Own Resources) | (4,804,000,000) | (1,350,433,000) | (7,176,500,000) |
| (Foreign Aid) | (6,957,010,000) | (7,202,892,000) | |
| (In Local Currency) | (3,645,520,000) | (3,933,983,000) | (21,463,390,000) |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 143. CAPITAL OUTLAY PETROLEUM Division
SECTION II
MINISTRY OF ENERGY
| 2018-2019 Budget Estimate (Rupees in Thousand) | |
|---|---|
| Demands presented on behalf of the | |
| Ministry of Energy | |
| Development Expenditure on Capital Account. | |
| 143. Capital Outlay on Petroleum Division | 943,175 |
| Total:- 943,175 |
NO. 143.- CAPITAL OUTLAY ON PETROLEUM DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 143 (FC12C50)
CAPITAL OUTLAY ON PETROLEUM DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June, 2019, to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON PETROLEUM DIVISION.
Voted Rs. 943,175,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF ENERGY.
| 2017-2018 Budget Estimate Rs | 2017-2018 Revised Estimate Rs | 2018-2019 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION : | ||||
| 041 | General Economic, Commercial and Labour Affairs | 485,001,000 | 573,175,000 | |
| 043 | Fuel and Energy | 16,033,835,000 | 370,000,000 | |
| Total- | 16,518,836,000 | 943,175,000 | ||
| OBJECT CLASSIFICATION : | ||||
| A01 | Employees Related Expenses | 14,602,000 | 16,226,000 | |
| A011 | Pay | 3,806,000 | 2,118,000 | |
| A011-1 | Pay of Officers | (2,306,000) | (2,118,000) | |
| A011-2 | Pay of other Staff | (1,500,000) | ||
| A012 | Allowances | 10,796,000 | 14,108,000 | |
| A012-1 | Regular Allowances | (7,510,000) | (8,830,000) | |
| A012-2 | Other Allowances (Excluding TA) | (3,286,000) | (5,278,000) | |
| A03 | Operating Expenses | 16,072,938,000 | 416,538,000 | |
| A06 | Transfers | 150,000 | ||
| A09 | Physical Assets | 426,117,000 | 485,111,000 | |
| A12 | Civil Works | 21,000,000 | ||
| A13 | Repairs and Maintenance | 5,179,000 | 4,150,000 | |
| Total- | 16,518,836,000 | 943,175,000 |
| NO. 143 III. - DE | .- FC12 TAILS ar | C50 CAPITAL OUTLAY ON PETROLEUM DIVISION e as follows :- | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|---|
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 04 | ECONOMIC AFFAIRS: | ||||
| 043 | FUEL AND ENERGY : | ||||
| 0432 | PETROLEUM AND NATURAL GAS : | ||||
| 043202 | PETROLEUM AND NATURAL GAS : | ||||
| ID9437 | UP-GR AT ISL QUETT TESTIN | ADATION OF HDIP POL TESTING FACILITIES AMABAD, LAHORE, MULTAN, PESHAWAR, A AND ISO CERTIFICATION OF PETROLEUM G LABORTORY AT ISLAMABAD : | |||
| 043202 | -A03 | Operating Expenses | 50,000,000 | ||
| 043202 | - A039 | General | 50,000,000 | ||
| Total- | Up-gradation of HDIP POL Testing Facilities at Islamabad, Lahore, Multan, Peshawar, Quetta and ISO Certification of Petroleum Testing Laboratory at Islamabad | 50,000,000 | |||
| ID9438 | STREN COMP | THENING & UPGRADATION OF KARACHI LABORITRIES LEX (KLC) AT HDIP OPERATIONS OFFICE, KARACHI : | |||
| 043202 | -A03 | Operating Expenses | 220,000,000 | ||
| 043202 | - A039 | General | 220,000,000 | ||
| Total- | Strenthning & Upgradation of Karachi Laboritries Complex (KLC) at HDIP Operations Office, Karachi | 220,000,000 | |||
| ID9439 | EXPAS COREH TO FA RESEA | ION AND UPGRADATION OF PAKISTAN PETROL OUSE (PETCORE) FOR ITS SUITABLE OPERATIO CILITATE OIL & GAS EXPLORATION RCH IN PAKISTAN : | EUM NS | ||
| 043202 | -A03 | Operating Expenses | 100,000,000 | ||
| 043202 | - A039 | General | 100,000,000 | ||
| Total- | Expasion and Upgradation od Pakistan Petroleum COREHOUSE (PETCORE) for its Suitable Operations to Facilitate Oil & Gas | ||||
| Exploration Research in Pakistan | 100,000,000 | ||||
| 043202 | Total-Petroleum and Natural Gas | 370,000,000 | |||
| 0432 | Total-Petroleum and Natural Gas | 370,000,000 | |||
| 043 | Total-Fuel and Energy | 370,000,000 | |||
| 04 | Total-Economic Affairs | 370,000,000 | |||
| Total-Accountant General Pakistan Revenue | 370,000,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISIO | N 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMAND | 2018-2019 Budget Estimate S FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, LAHORE | |||||
| 04 | ECONOMIC AFFAIRS : | ||||
| 043 | FUEL | AND ENERGY : | |||
| 0432 | PETROLEUM AND NATURAL GAS : | ||||
| 043202 | PETROLEUM AND NATURAL GAS : | ||||
| LO1203 | EXECU | TION OF GAS SCHEMES UNDER PRIME | |||
| MINISTER GLOBAL SUSTAINABLE GOAL (SDGs) ACHIEVEMENT : | |||||
| 043202 | -A03 | Operating Expenses | 2,120,000,000 | ||
| 043202 | - A039 | General | 2,120,000,000 | ||
| Total- | Execution Of Gas Schemes Under Prime Minister Global Sustainable Goal (Sdgs) | 2,120,000,000 | |||
| Achievement | |||||
| LO1204 | PROVISION OF GAS TO UC-DARYA GALI, TEHSIL MURREE, DISTRICT RAWALPINDI : | ||||
| 043202 | -A03 | Operating Expenses | 28,963,000 | ||
| 043202 | - A039 | General | 28,963,000 | ||
| Total- | Provision Of Gas To Uc-Darya Gali, Tehsil Murree, District Rawalpindi | 28,963,000 | |||
| LO1205 | PROVISION OF GAS TO LOCALITIES OF KAHUTA : | ||||
| 043202 | -A03 | Operating Expenses | 254,437,000 | ||
| 043202 | - A039 | General | 254,437,000 | ||
| Total- | Provision of Gas to Localities of Kahuta | 254,437,000 | |||
| LO1206 | PROVISION OF GAS TO UC-SIRKOT, DISTRICT HARIPUR : | ||||
| 043202 | -A03 | Operating Expenses | 614,304,000 | ||
| 043202 | - A039 | General | 614,304,000 | ||
| Total- | Provision Of Gas To Uc-Sirkot, District | ||||
| Haripur | 614,304,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISION | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO1230 | PROVI OF NA | SION OF SUI GAS TO VARIOUS VILLAGES -146, DISTRICT OKARA : ACCOUNTANT GENERAL PAKISTAN REVENUES, | SUB OFFICE, | LAHORE-.Contd. | |
| 043202 | -A03 | Operating Expenses | 237,610,000 | ||
| 043202 | - A039 | General | 237,610,000 | ||
| Total- | Provision Of Sui Gas To Various Villages of NA-146, District Okara | 237,610,000 | |||
| LO1231 | SUPPLY OF GAS TO VILLAGE OF NA-131, DISTRICT SHEIKHUPURA : | ||||
| 043202 | -A03 | Operating Expenses | 229,272,000 | ||
| 043202 | - A039 | General | 229,272,000 | ||
| Total- | Supply Of Gas To Village Of NA-131, District Sheikhupura | 229,272,000 | |||
| LO1232 | PROVISION OF GAS TO UC-NIMBAL, TEHSIL MURREE : | ||||
| 043202 | -A03 | Operating Expenses | 11,512,000 | ||
| 043202 | - A039 | General | 11,512,000 | ||
| Total- | Provision Of Gas To Uc-Nimbal, Tehsil Murree | 11,512,000 | |||
| LO1233 | PROVI OF NA | SION OF GAS TO VARIOUS LOCALLATIES -18, DISTRICT ABBOTTABAD : | |||
| 043202 | -A03 | Operating Expenses | 700,020,000 | ||
| 043202 | - A039 | General | 700,020,000 | ||
| Total- | Provision Of Gas To Various Locallaties Of NA-18, District Abbottabad | 700,020,000 | |||
| LO1234 | PROVI UC MA | SION OF GAS TO VARIOUS VILLAGES OF NGOWAL, NA-60, DISTRICT CHAKWAL : | |||
| 043202 | -A03 | Operating Expenses | 139,182,000 | ||
| 043202 | - A039 | General | 139,182,000 | ||
| Total- | Provision Of Gas To Various Villages Of | ||||
| UC Mangowal, NA-60, District Chakwal | 139,182,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISI | ON 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO1235 | SUPPL NA-87, | Y OF GAS TO VARIOUS VILLAGES OF DISTRICT JHANG : ACCOUNTANT GENERAL PAKISTAN REVENU | ES, SUB OFFICE, | LAHORE-.Contd. | |
| 043202 | -A03 | Operating Expenses | 100,000,000 | ||
| 043202 | - A039 | General | 100,000,000 | ||
| Total- | Provision Of Gas To Various Villages of NA-87, District Jhang | 100,000,000 | |||
| LO1236 | PROVI NA-16 | SION OF GAS TO VARIOUS VILLAGES OF 3, DISTRICT SAHIWAL : | |||
| 043202 | -A03 | Operating Expenses | 105,357,000 | ||
| 043202 | - A039 | General | 105,357,000 | ||
| Total- | Provision Of Gas To Various Villages Of NA-163, District Sahiwal | 105,357,000 | |||
| LO1237 | SUPPL NA-13 | Y OF GAS TO VARIOUS VILLAGES OF 2 : | |||
| 043202 | -A03 | Operating Expenses | 30,345,000 | ||
| 043202 | - A039 | General | 30,345,000 | ||
| Total- | Provision Of Gas To Various Villages Of NA-132 | 30,345,000 | |||
| LO1239 | SUPPLY OF GAS TO VARIOUS LOCALITIES- VILLAGES, DISTRICT NANKANA SAHIB : | ||||
| 043202 | -A03 | Operating Expenses | 250,000,000 | ||
| 043202 | - A039 | General | 250,000,000 | ||
| Total- | Supply Of Gas To Various Localities- Villages, District Nankana Sahib | 250,000,000 | |||
| LO1240 | SUPPL NA-14 | Y OF GAS TO VARIOUS VILLAGES OF 4, DISTRICT OKARA : | |||
| 043202 | -A03 | Operating Expenses | 171,242,000 | ||
| 043202 | - A039 | General | 171,242,000 | ||
| Total- | Supply Of Gas To Various Villages Of | ||||
| NA-144, District Okara | 171,242,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISIO | N 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO1243 | SUPPL DISTRI | Y OF GAS TO VARIOUS VILLAGES OF, CT GUJRANWALA : ACCOUNTANT GENERAL PAKISTAN REVENUE | S, SUB OFFICE, | LAHORE-.Contd. | |
| 043202 | -A03 | Operating Expenses | 96,905,000 | ||
| 043202 | - A039 | General | 96,905,000 | ||
| Total- | Supply Of Gas To Various Villages Of, District Gujranwala | 96,905,000 | |||
| LO1244 | SUPPL CHUTT | Y OF GAS TO VARIOUS VILLAGES OF, KOT A PAIGAH, DISTRICT DERA GHAZI KHAN : | |||
| 043202 | -A03 | Operating Expenses | 140,433,000 | ||
| 043202 | - A039 | General | 140,433,000 | ||
| Total- | Supply Of Gas To Various Villages Of, Kot Chutta Paigah, District Dera Ghazi Khan | 140,433,000 | |||
| LO1245 | SUPPLY OF GAS TO VARIOUS VILLAGES OF, TEHSIL MURREE : | ||||
| 043202 | -A03 | Operating Expenses | 199,499,000 | ||
| 043202 | - A039 | General | 199,499,000 | ||
| Total- | Supply Of Gas To Various Villages Of, Tehsil Murree | 199,499,000 | |||
| LO1246 | SUPPL NA-113 | Y OF GAS TO VARIOUS VILLAGES OF, , DISTRICT SIALKOT : | |||
| 043202 | -A03 | Operating Expenses | 430,426,000 | ||
| 043202 | - A039 | General | 430,426,000 | ||
| Total- | Supply Of Gas To Various Villages Of, NA-113, District Sialkot | 430,426,000 | |||
| LO1247 | PROVISION OF GAS TO DIFFERENT LOCALITIES IN DISTRICT KOHAT : | ||||
| 043202 | -A03 | Operating Expenses | 500,000,000 | ||
| 043202 | - A039 | General | 500,000,000 | ||
| Total- | Provision Of Gas To Different Localities | ||||
| in District Kohat | 500,000,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISI | ON 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO1248 | SUPPL DISTRI | Y OF GAS TO VARIOUS VILLAGES OF, CT JHANG : ACCOUNTANT GENERAL PAKISTAN REVENU | ES, SUB OFFICE, | LAHORE-.Contd. | |
| 043202 | -A03 | Operating Expenses | 69,702,000 | ||
| 043202 | - A039 | General | 69,702,000 | ||
| Total- | Supply Of Gas To Various Villages Of, District Jhang | 69,702,000 | |||
| LO1249 | SUPPLY OF GAS TO VARIOUS VILLAGES OF, DISTRICT MIANWALI : | ||||
| 043202 | -A03 | Operating Expenses | 347,000,000 | ||
| 043202 | - A039 | General | 347,000,000 | ||
| Total- | Supply Of Gas To Various Villages Of, District Mianwali | 347,000,000 | |||
| LO1251 | SUPPLY OF GAS TO VILLAGE SURJAL DISTRICT ABBOTABAD : | ||||
| 043202 | -A03 | Operating Expenses | 18,036,000 | ||
| 043202 | - A039 | General | 18,036,000 | ||
| Total- | Supply Of Gas To Village Surjal District Abbotabad | 18,036,000 | |||
| LO1252 | SUPPLY OF GAS TO VARIOUS VILLAGES IN, TEHSIL SHAKARGARH, DISTRICT NAROWAL : | ||||
| 043202 | -A03 | Operating Expenses | 32,160,000 | ||
| 043202 | - A039 | General | 32,160,000 | ||
| Total- | Supply Of Gas To Various Villages In, Tehsil Shakargarh, District Narowal | 32,160,000 | |||
| LO1253 | RELEASE OF FUNDS FOR SUPPLY OF GAS TO VARIOUS VILLAGES OF DISTRICT SIALKOT : | ||||
| 043202 | -A03 | Operating Expenses | 452,195,000 | ||
| 043202 | - A039 | General | 452,195,000 | ||
| Total- | Release Of Funds For Supply Of Gas To | ||||
| Various Villages Of District Sialkot | 452,195,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISIO | N 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO1255 | SUPPL DISTRI | Y OF GAS TO VARIOUS VILLAGES IN, CT BANNU : ACCOUNTANT GENERAL PAKISTAN REVENUE | S, SUB OFFICE, | LAHORE-.Contd. | |
| 043202 | -A03 | Operating Expenses | 38,238,000 | ||
| 043202 | - A039 | General | 38,238,000 | ||
| Total- | Supply Of Gas To Various Villages In, District Bannu | 38,238,000 | |||
| LO1256 | SUPPLY OF GAS TO VARIOUS VILLAGES IN, DISTRICT KHUSHAB : | ||||
| 043202 | -A03 | Operating Expenses | 136,788,000 | ||
| 043202 | - A039 | General | 136,788,000 | ||
| Total- | Supply Of Gas To Various Villages In, District Khushab | 136,788,000 | |||
| LO1257 | SUPPLY OF GAS TO VARIOUS VILLAGES IN, DISTRICT SARGODHA : | ||||
| 043202 | -A03 | Operating Expenses | 290,000,000 | ||
| 043202 | - A039 | General | 290,000,000 | ||
| Total- | Supply Of Gas To Various Villages In, District Sargodha | 290,000,000 | |||
| LO1258 | RELEASE OF FUNDS FOR SUPPLY OF GAS TO VARIOUS VILLAGES OF DISTRICT RAWALPINDI : | ||||
| 043202 | -A03 | Operating Expenses | 432,111,000 | ||
| 043202 | - A039 | General | 432,111,000 | ||
| Total- | Release Of Funds For Supply Of Gas To Various Villages Of District Rawalpindi | 432,111,000 | |||
| LO1259 | SUPPLY OF GAS TO VARIOUS VILLAGES IN, DISTRICT GUJRAT : | ||||
| 043202 | -A03 | Operating Expenses | 196,470,000 | ||
| 043202 | - A039 | General | 196,470,000 | ||
| Total- | Supply Of Gas To Various Villages In, | ||||
| District Gujrat | 196,470,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVIS | ION 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO1260 | SUPPL DISTRI | Y OF GAS TO VARIOUS VILLAGES IN, CT SAHIWAL : ACCOUNTANT GENERAL PAKISTAN REVENU | ES, SUB OFFICE, | LAHORE-.Contd. | |
| 043202 | -A03 | Operating Expenses | 150,000,000 | ||
| 043202 | - A039 | General | 150,000,000 | ||
| Total- | Supply Of Gas To Various Villages In, District Sahiwal | 150,000,000 | |||
| LO1261 | SUPPLY OF GAS IN DISTRICT TOBA TEK SING : | ||||
| 043202 | -A03 | Operating Expenses | 100,000,000 | ||
| 043202 | - A039 | General | 100,000,000 | ||
| Total- | Supply Of Gas In District Toba Tek Sing | 100,000,000 | |||
| LO1262 | SUPPLY OF GAS TO VARIOUS VILLAGES IN, CHICHAWATNI, DISTRICT SAHIWAL : | ||||
| 043202 | -A03 | Operating Expenses | 250,000,000 | ||
| 043202 | - A039 | General | 250,000,000 | ||
| Total- | Supply Of Gas To Various Villages In, Chichawatni, District Sahiwal | 250,000,000 | |||
| LO1265 | SUPPLY OF GAS TO VARIOUS VILLAGES OF, KHANEWAL : | ||||
| 043202 | -A03 | Operating Expenses | 250,000,000 | ||
| 043202 | - A039 | General | 250,000,000 | ||
| Total- | Supply Of Gas To Various Villages Of, Khanewal | 250,000,000 | |||
| LO1267 | PROVISION OF GAS SCHEMES IN SAMBRIAL, DISTRICT SIALKOT : | ||||
| 043202 | -A03 | Operating Expenses | 102,089,000 | ||
| 043202 | - A039 | General | 102,089,000 | ||
| Total- | Provision Of Gas Schemes In Sambrial, | ||||
| District Sialkot | 102,089,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVI | SION 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO1268 | SUPPL DISTRI | Y OF GAS TO VARIOUS VILLAGES IN, CT MANDI BAHAUDDIN : ACCOUNTANT GENERAL PAKISTAN REVEN | UES, SUB OFFICE, | LAHORE-.Contd. | |
| 043202 | -A03 | Operating Expenses | 100,000,000 | ||
| 043202 | - A039 | General | 100,000,000 | ||
| Total- | Supply Of Gas To Various Villages In, District Mandi Bahauddin | 100,000,000 | |||
| LO1269 | SUPPLY OF GAS TO VARIOUS VILLAGES IN, DISTRICT MIAN CHANNU : | ||||
| 043202 | -A03 | Operating Expenses | 371,000,000 | ||
| 043202 | - A039 | General | 371,000,000 | ||
| Total- | Supply Of Gas To Various Villages In, District Mian Channu | 371,000,000 | |||
| LO1270 | SUPPLY OF GAS TO VARIOUS VILLAGES IN, DISTRICT MANEHRA, (BMS-48) : | ||||
| 043202 | -A03 | Operating Expenses | 350,000,000 | ||
| 043202 | - A039 | General | 350,000,000 | ||
| Total- | Supply Of Gas To Various Villages In, District Manehra, (BMS-48) | 350,000,000 | |||
| LO5011 | SUPPL NA-129 | Y OF GAS TO VARIOUS VILLAGES IN, , DISTRICT LAHORE : | |||
| 043202 | -A03 | Operating Expenses | 300,402,000 | ||
| 043202 | - A039 | General | 300,402,000 | ||
| Total- | Supply Of Gas To Various Villages In, NA-128, District Lahore | 300,402,000 | |||
| LO5012 | SUPPLY OF GAS BADDHOMALI TOWN, DISTRICT NAROWAL : | ||||
| 043202 | -A03 | Operating Expenses | 387,421,000 | ||
| 043202 | - A039 | General | 387,421,000 | ||
| Total- | Supply Of Gas Baddhomali Town, | ||||
| District narowal | 387,421,000 |
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVI | SION 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO5013 | SUPPL NA-11 | Y OF GAS TO VARIOUS VILLAGES IN, 2, DISTRICT SIALKOT : ACCOUNTANT GENERAL PAKISTAN REVEN | UES, SUB OFFICE, | LAHORE-.Contd | |
| 043202 | -A03 | Operating Expenses | 238,786,000 | ||
| 043202 | - A039 | General | 238,786,000 | ||
| Total- | Supply Of Gas To Various Villages In, NA-112, District sialkot | 238,786,000 | |||
| LO6004 | MARDAN GASIFICATION : | ||||
| 043202 | -A03 | Operating Expenses | 142,882,000 | ||
| 043202 | - A039 | General | 142,882,000 | ||
| Total- | Mardan Gasification | 142,882,000 | |||
| LO6007 | SWAT | & SHANGLA GASIFICATION : | |||
| 043202 | -A03 | Operating Expenses | 252,317,000 | ||
| 043202 | - A039 | General | 252,317,000 | ||
| Total- | Swat & Shangla Gasification | 252,317,000 | |||
| LO6008 | PESHAWAR GASIFICATION : | ||||
| 043202 | -A03 | Operating Expenses | 250,000,000 | ||
| 043202 | - A039 | General | 250,000,000 | ||
| Total- | Peshawar Gasification | 250,000,000 | |||
| LO8264 | SHEIKHUPURA GASIFICATION : | ||||
| 043202 | -A03 | Operating Expenses | 340,466,000 | ||
| 043202 | - A039 | General | 340,466,000 | ||
| Total- | Sheikhupura Gasification | 340,466,000 | |||
| LO9625 | SUPPL OF DIS | Y OF GAS TO VARIOUS LOCALITIES TT. SHEIKHUPURA : | |||
| 043202 | -A03 | Operating Expenses | 134,908,000 | ||
| 043202 | - A039 | General | 134,908,000 | ||
| Total- | Supply of Gas to Various Localities | 134,908,000 | |||
| of Distt. Sheikhupura | |||||
| LO9626 | PROVI OF DIS | SION OF SUI GAS TO CHAKS/VILLAGES TT. FAISALABAD : | |||
| 043202 | -A03 | Operating Expenses | 77,121,000 | ||
| 043202 | - A039 | General | 77,121,000 | ||
| Total- | Provision of Sui Gas to Chaks/Villages | ||||
| of Distt. Faisalabad | 77,121,000 |
NO. 143.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
DEMANDS FOR GRANTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB | OFFICE, LAHORE-.Contd. | ||
|---|---|---|---|
| LO9627 | SUPPL IN DIST | Y OF GAS IN VARIOUS VILLAGES IN T. PAKPATAN : | |
| 043202 | -A03 | Operating Expenses | 214,587,000 |
| 043202 | - A039 | General | 214,587,000 |
| Total- | Supply Of Gas In Various Villages In In Distt. Pakpatan | 214,587,000 | |
| LO9628 | SUPPLY OF GAS IN VARIOUS LOCALITIES | ||
| OF DIS | TT. BAHAWALPUR : | ||
| 043202 | -A03 | Operating Expenses | 500,000,000 |
| 043202 | - A039 | General | 500,000,000 |
| Total- | Supply Of Gas In Various Localities Of Distt. Bahawalpur | 500,000,000 | |
| LO9629 | SUPPL OF DIS | Y OF GAS IN VARIOUS LOCALITIES TT. LAYYAH : | |
| 043202 | -A03 | Operating Expenses | 400,000,000 |
| 043202 | - A039 | General | 400,000,000 |
| Total- | Supply Of Gas In Various Localities Of Distt. Layyah | 400,000,000 | |
| LO9630 | SUPPLY OF GAS IN VARIOUS VILLAGES | ||
| OF DIS | TT. MULTAN : | ||
| 043202 | -A03 | Operating Expenses | 54,683,000 |
| 043202 | - A039 | General | 54,683,000 |
| Total- | Supply Of Gas In Various Villages Of Distt. Multan | 54,683,000 | |
| LO9631 | SUPPL KOT O | Y OF GAS TO DARYA KHAN AND KALUR F DISTT. BHAKKAR : |
043202 - A03 Operating Expenses 270,000,000
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISIO | N 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN REVENUE | Rs S, SUB OFFICE, | Rs LAHORE-.Contd. | Rs | ||
| 043202 | - A039 | General | 270,000,000 | ||
| Total- | Supply Of Gas To Darya Khan And Kalur Kot Of Distt. Bhakkar : | 270,000,000 | |||
| LO9632 | PROVI IN DIS | SION TO SUI GAS TO VARIOUS VILLAGES TT. SAHIWAL : | |||
| 043202 | -A03 | Operating Expenses | 248,828,000 | ||
| 043202 | - A039 | General | 248,828,000 | ||
| Total- | Provision To Sui Gas To Various Villages In Distt. Sahiwal | 248,828,000 | |||
| LO9633 | SUPPL OF DIS | Y OF GAS IN VARIOUS LOCALITIES TT. OKARA : | |||
| 043202 | -A03 | Operating Expenses | 200,000,000 | ||
| 043202 | - A039 | General | 200,000,000 | ||
| Total- | Supply Of Gas In Various Localities Of Distt. Okara | 200,000,000 | |||
| LO9634 | SUPPL OF DIS | Y OF GAS IN VARIOUS LOCALITIES TT. MARDAN : | |||
| 043202 | -A03 | Operating Expenses | 63,989,000 | ||
| 043202 | - A039 | General | 63,989,000 | ||
| Total- | Supply Of Gas In Various Localities Of Distt. Mardan | 63,989,000 | |||
| LO9635 | PROVI OF DIS | SION OF SUI GAS TO VARIOUS LOCALITIES TT. SHEIKHUPURA (SCH.35) : | |||
| 043202 | -A03 | Operating Expenses | 56,798,000 | ||
| 043202 | - A039 | General | 56,798,000 | ||
| Total- | Provision Of Sui Gas To Various Localities | ||||
| Of Distt. Sheikhupura (SCH.35) | 56,798,000 |
NO. 143.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISI | ON 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, | LAHORE-.Contd. | ||||
| LO9636 | SUPPL IN DIS | Y OF GAS TO VARIOUS VILLAGES TT. SARGODHA (SCH.36) : | |||
| 043202 | -A03 | Operating Expenses | 252,378,000 | ||
| 043202 | - A039 | General | 252,378,000 | ||
| Total- | Supply Of Gas To Various Villages In Distt. Sargodha (SCH.36) | 252,378,000 | |||
| LO9637 | SUPPL IN DIS | Y OF GAS TO VARIOUS VILLAGES TT. MULTAN (SCH.42) : | |||
| 043202 | -A03 | Operating Expenses | 304,962,000 | ||
| 043202 | - A039 | General | 304,962,000 | ||
| Total- | Supply Of Gas To Various Villages In Distt. Multan (SCH.42) | 304,962,000 | |||
| LO9638 | SUPPL IN DIS | Y OF GAS TO VARIOUS VILLAGES TT. KHUSHAB (SCH.40) : | |||
| 043202 | -A03 | Operating Expenses | 120,000,000 | ||
| 043202 | - A039 | General | 120,000,000 | ||
| Total- | Supply Of Gas To Various Villages In Distt. Khushab (SCH.40) | 120,000,000 | |||
| LO9639 | PROVI OF DIS | SION OF SUI GAS TO VARIOUS VILLAGES TT. GUJRANWALA (SCH.43) : | |||
| 043202 | -A03 | Operating Expenses | 45,510,000 | ||
| 043202 | - A039 | General | 45,510,000 | ||
| Total- | Provision Of Sui Gas To Various Villages Of Distt. Gujranwala (SCH.43) | 45,510,000 | |||
| LO9640 | SUPPL IN DIS | Y OF GAS TO VARIOUS VILLAGES TT. KHUSHAB (SCH.40) : | |||
| 043202 | -A03 | Operating Expenses | 200,000,000 | ||
| 043202 | - A039 | General | 200,000,000 | ||
| Total- | Supply Of Gas To Various Villages | ||||
| In Distt. Khushab (SCH.40) | 200,000,000 |
NO. 143.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
| NO. 143 | .- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISI | ON 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| LO9640 | SUPPLY OF GAS TO VARIOUS VILLAGES OF DISTRICT OKARA (BMS-47) : ACCOUNTANT GENERAL PAKISTAN REVENUE | S, SUB OFFICE, | LAHORE-.Concld. | ||
| 043202 | -A03 | Operating Expenses | 250,000,000 | ||
| 043202 | - A039 | General | 250,000,000 | ||
| Total- | Supply Of Gas To Various Villages Of District Okara (BMS-47) | 250,000,000 | |||
| 043202 | Total-Petroleum and Natural Gas | 15,351,334,000 | |||
| 0432 | Total-Petroleum and Natural Gas | 15,351,334,000 | |||
| 043 | Total-Fuel and Energy | 15,351,334,000 | |||
| 04 | Total-Economic Affairs | 15,351,334,000 | |||
| Total-Accountant General Pakistan | |||||
| Revenues, Sub Office, Lahore | 15,351,334,000 | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, KARACHI | |||||
| 04 | ECONOMIC AFFAIRS : | ||||
| 043 | FUEL AND ENERGY : | ||||
| 0432 | PETROLEUM AND NATURAL GAS : | ||||
| 043202 | PETROLEUM AND NATURAL GAS : | ||||
| **KA3097 ** | EXECU | TION OF GAS SCHEMES UNDER PRIME | |||
| MINISTER GLOBAL SUSTAINABLE GOAL (SDGs) ACHIEVEMENT : | |||||
| 043202 | -A03 | Operating Expenses | 70,000,000 | ||
| 043202 | - A039 | General | 70,000,000 | ||
| Total- | Execution Of Gas Schemes Under Prime | ||||
| Minister Global Sustainable Goal (Sdgs) | 70,000,000 | ||||
| Achievement | |||||
| **KA3099 ** | PROVISION OF GAS TO VARIOUS VILLAGES OF, DISTRICT NAUSHERO FEROZE : | ||||
| 043202 | -A03 | Operating Expenses | 500,000,000 | ||
| 043202 | - A039 | General | 500,000,000 | ||
| Total- | Provision Of Gas To Various Villages Of, | ||||
| District Naushero Feroze | 500,000,000 |
| NO. 143 | .- FC12C | 50 CAPITAL OUTLAY ON PETROLEUM DIVISION | DEMANDS | FOR GRANTS | |
|---|---|---|---|---|---|
| No.of Posts 2017-18 2018-19 | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, | SUB OFFICE, | KARACHI-.Concld. | |||
| **KA3115 ** | SUPPLY OF GAS TO VARIOUS VILLAGES OF, DISTRICT MASTUNG : | ||||
| 043202 | -A03 | Operating Expenses | 72,701,000 | ||
| 043202 | - A039 | General | 72,701,000 | ||
| Total- | Supply Of Gas To Various Villages Of, | ||||
| District Mastung | 72,701,000 | ||||
| **KA9612 ** | SUPPLY OF GAS TO VARIOUS LOCALITIES IN, DISTRICT SHIKARPUR : | ||||
| 043202 | -A03 | Operating Expenses | 39,800,000 | ||
| 043202 | - A039 | General | 39,800,000 | ||
| Total- | Supply Of Gas To Various Localities In, | ||||
| District Shikarpur | 39,800,000 | ||||
| 043202 | Total-Petroleum and Natural Gas | 682,501,000 | |||
| 0432 | Total-Petroleum and Natural Gas | 682,501,000 | |||
| 043 | Total-Fuel and Energy | 682,501,000 | |||
| 04 | Total-Economic Affairs | 682,501,000 | |||
| Total-Accountant General Pakistan | |||||
| Revenues, Sub Office, Karachi | 682,501,000 |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA 04 ECONOMIC AFFAIRS : 041 GENERAL ECONOMIC, COMMERCIAL AND LABOUR AFFAIRS : 0411 GENERAL ECONOMIC AFFAIRS : 041103 GEOLOGICAL SURVEY :
QA3981 UPGRADATION OF CHEM & PET MIN LAB AT GSP SZ, KARACHI : 041103 - A01 Employees Related Expenses. 7,148,000 041103 - A011 Pay 14 2,118,000 041103 - A011-1 Pay of Officer (14) (2,118,000) 041103 - A012 Allowances 5,030,000
| NO. 14 | 3.- FC12C | 50 CAPITAL OUTLAY ON PETROLEUM DIVISION | DEMANDS | FOR GRANTS | |
|---|---|---|---|---|---|
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, | SUB OFFICE, | QUETTA - Contd. | |||
| 041103 | - A012-1 | Regular Allowances | (3,530,000) | ||
| 041103 | - A012-2 | Other Allowances (Excluding T.A) | (1,500,000) | ||
| 041103 | -A03 | Operating Expenses | 2,352,000 | ||
| 041103 | - A032 | Communications | 73,000 | ||
| 041103 | - A034 | Occupancy Costs | 25,000 | ||
| 041103 | - A038 | Travel & Transportation | 1,054,000 | ||
| 041103 | - A039 | General | 1,200,000 | ||
| 041103 | -A09 | Physica Assets | 68,700,000 | ||
| 041103 | - A092 | Computer Equipment | 4,700,000 | ||
| 041103 | - A095 | Purchase of Transport | 10,000,000 | ||
| 041103 | - A096 | Purchase of Plant and machinery | 54,000,000 | ||
| 041103 | -A12 | Civil Works | 21,000,000 | ||
| 041103 | - A124 | Building and Structures | 21,000,000 | ||
| 041103 | -A13 | Repairs and Maintenance | 800,000 | ||
| 041103 | - A130 | Transport | 500,000 | ||
| 041103 | - A131 | Machinery and Equipment | 300,000 | ||
| Total- | Upgradation of Chem & Pet Min Lab at GSP SZ, Karachi | 100,000,000 | |||
| **QA3982 ** | GEOLOGICAL MAPING OF 5O TOPOSHEETS OF UN-MAPPED AREAS, BALOCHISTAN : | ||||
| 041103 | -A01 | Employees Related Expenses. | 1,250,000 | ||
| 041103 | - A012 | Allowances | 1,250,000 | ||
| 041103 | - A012-1 | Regular Allowances | (800,000) | ||
| 041103 | - A012-2 | Other Allowances (Excluding TA) | (450,000) | ||
| 041103 | -A03 | Operating Expenses | 7,600,000 | ||
| 041103 | - A032 | Communications | 35,000 | ||
| 041103 | - A033 | Utilities | 50,000 | ||
| 041103 | - A036 | Motor Vehicles | 10,000 | ||
| 041103 | - A038 | Travel & Transportation | 6,505,000 | ||
| 041103 | - A039 | General | 1,000,000 | ||
| 041103 | -A06 | Transfers | 50,000 | ||
| 041103 | - A063 | Entertainment & Gifts | 50,000 | ||
| 041103 | -A09 | Physical Assets | 650,000 | ||
| 041103 | - A092 | Computer Equipment | 450,000 | ||
| 041103 | - A096 | Purchase of Plant & Machinery | 200,000 | ||
| **041103 ** | - A13 | Repairs and Maintenance | 450,000 | ||
| 041103 | - A130 | Transport | 250,000 | ||
| 041103 | - A131 | Machinery and Equipment | 50,000 |
NO. 143.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
| NO. 143 | .- FC12C | 50 CAPITAL OUTLAY ON PETROLEUM DIVISION 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, | QUETTA - Contd. | |||
| 041103 | - A132 | Furniture and Fixture | 50,000 | |
| 041103 | - A137 | Computer Equipment | 100,000 | |
| Total- | Geological Maping of 50 Toposheets of Un-Mapped Areas, Balochistan | 10,000,000 | ||
| **QA9063 ** | EXPLO BELA | RATION & EVALUATION OF METALLIC MINERALS IN & UTHAL AREAS, DISTRICT LASBELA, BALOCHISTAN: | ||
| 041103 | -A01 | Employees Related Expenses. | 1,392,000 | 1,800,000 |
| 041103 | - A012 | Allowances | 1,392,000 | 1,800,000 |
| 041103 | - A012-1 | Regular Allowances | (1,000,000) | (1,000,000) |
| 041103 | - A012-2 | Other Allowances (Excluding TA) | (392,000) | (800,000) |
| 041103 | -A03 | Operating Expenses | 4,132,000 | 9,857,000 |
| 041103 | - A033 | Utilities | 32,000 | 57,000 |
| 041103 | - A038 | Travel & Transportation | 2,600,000 | 5,500,000 |
| 041103 | - A039 | General | 1,500,000 | 4,300,000 |
| 041103 | -A06 | Transfers | 50,000 | |
| 041103 | - A063 | Entertainment & Gifts | 50,000 | |
| 041103 | -A09 | Physical Assets | 570,000 | 1,802,000 |
| 041103 | - A092 | Computer Equipment | 170,000 | 500,000 |
| 041103 | - A095 | Purchase of Transport | 2,000 | |
| 041103 | - A096 | Purchase of Plant & Machinery | 300,000 | 1,150,000 |
| 041103 | - A097 | Purchase of Furniture and Fixture | 100,000 | 150,000 |
| **041103 ** | - A13 | Repairs and Maintenance | 1,100,000 | 1,100,000 |
| 041103 | - A130 | Transport | 700,000 | 500,000 |
| 041103 | - A131 | Machinery and Equipment | 300,000 | 300,000 |
| 041103 | - A132 | Furniture and Fixture | 100,000 | 100,000 |
| 041103 | - A137 | Computer Equipment | 200,000 | |
| Total- | Exploration & Evaluation of Metallic Minerals in BELA & Uthal Areas, Districst Lasbela, Balochistan | 7,194,000 | 14,609,000 | |
| **QA9064 ** | APPRA IN BAD SOUTH | ISAL OF NEWLY DISCOVERED COAL RESOURCES IN AND ADJOING AREAS OF ERN SINDH : | ||
| 041103 | -A01 | Employees Related Expenses. | 7,600,000 | 3,200,000 |
| 041103 | - A011 | Pay | 1,846,000 | |
| 041103 | - A011-1 | Pay of Officers | (1,846,000) | |
| 041103 | - A012 | Allowances | 5,754,000 | 3,200,000 |
| NO. 14 | 3.- FC12C | 50 CAPITAL OUTLAY ON PETROLEUM DIVISION | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMANDS | 2018-2019 Budget Estimate FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, | SUB OFFICE, | QUETTA - Contd. | |||
| 041103 | - A012-1 | Regular Allowances | (4,154,000) | (2,000,000) | |
| 041103 | - A012-2 | Other Allowances (Excluding TA) | (1,600,000) | (1,200,000) | |
| 041103 | -A03 | Operating Expenses | 22,108,000 | 10,336,000 | |
| 041103 | - A032 | Communications | 40,000 | ||
| 041103 | - A034 | Occupancy Costs | 1,500,000 | 1,300,000 | |
| 041103 | - A036 | Motor Vehicles | 300,000 | ||
| 041103 | - A038 | Travel & Transportation | 16,960,000 | 7,872,000 | |
| 041103 | - A039 | General | 3,308,000 | 1,164,000 | |
| 041103 | -A09 | Physical Assets | 6,500,000 | ||
| 041103 | - A092 | Computer Equipment | 500,000 | ||
| 041103 | - A095 | Purchase of Transport | 3,700,000 | ||
| 041103 | - A096 | Purchase of Plant & Machinery | 1,800,000 | ||
| 041103 | - A097 | Purchase of Furniture & Fixture | 500,000 | ||
| **041103 ** | - A13 | Repairs and Maintenance | 1,769,000 | 200,000 | |
| 041103 | - A130 | Transport | 800,000 | 200,000 | |
| 041103 | - A131 | Machinery and Equipment | 969,000 | ||
| Total- | Appraisal of newly discovered coal Resources in Badin and adjoining areas of Southern Sindh | 37,977,000 | 13,736,000 | ||
| QA9065 | ACQUS | ITION OF FOUR DRILLING RIGNS | |||
| FOR TH OF PA | E GEOLOGICAL SURVEY KISTAN : | ||||
| 041103 | -A01 | Employees Related Expenses. | 728,000 | ||
| 041103 | - A012 | Allowances | 728,000 | ||
| 041103 | - A012-2 | Other Allowances (Excluding TA) | (728,000) | ||
| 041103 | -A03 | Operating Expenses | 2,700,000 | 2,700,000 | |
| 041103 | - A036 | Motor Vehicles | 250,000 | 250,000 | |
| 041103 | - A038 | Travel & Transportation | 2,150,000 | 2,150,000 | |
| 041103 | - A039 | General | 300,000 | 300,000 | |
| 041103 | -A09 | Physical Assets | 413,107,000 | 413,107,000 | |
| 041103 | - A095 | Purchase of Transport | 1,705,000 | 1,705,000 | |
| 041103 | - A096 | Purchase of Plant & Machinery | 411,402,000 | 411,402,000 | |
| Total- | Acqusition of Four Drilling Rigns for the Geological Survey | ||||
| of Pakistan | 415,807,000 | 416,535,000 |
| NO. 143.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION | DEMANDS | FOR GRANTS |
|---|---|---|
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, | QUETTA - Concld. |
QA9067 EXPLORATION & EVALUATION OF COAL IN NOSHAM AND BAHLOL AREAS OF BALOCHISTAN :
| 041103 | -A01 | Employees Related Expenses. | 5,610,000 | 2,100,000 |
|---|---|---|---|---|
| 041103 | - A011 | Pay | 1,960,000 | |
| 041103 | - A011-1 | Pay of Officers | (460,000) | |
| 041103 | - A011-2 | Pay of Other Staff | (1,500,000) | |
| 041103 | - A012 | Allowances | 3,650,000 | 2,100,000 |
| 041103 | - A012-1 | Regular Allowances | (2,356,000) | (1,500,000) |
| 041103 | - A012-2 | Other Allowances (Excluding TA) | (1,294,000) | (600,000) |
| 041103 | -A03 | Operating Expenses | 10,163,000 | 13,693,000 |
| 041103 | - A032 | Communications | 103,000 | 115,000 |
| 041103 | - A033 | Utilities | 155,000 | 868,000 |
| 041103 | - A034 | Occupancy Costs | 400,000 | |
| 041103 | - A036 | Motor Vehicles | 50,000 | 10,000 |
| 041103 | - A038 | Travel & Transportation | 5,530,000 | 9,400,000 |
| 041103 | - A039 | General | 3,925,000 | 3,300,000 |
| 041103 | -A06 | Transfers | 50,000 | |
| 041103 | - A063 | Entertainment & Gifts | 50,000 | |
| 041103 | -A09 | Physical Assets | 5,940,000 | 852,000 |
| 041103 | - A092 | Computer Equipment | 1,200,000 | 350,000 |
| 041103 | - A095 | Purchase of Transport | 1,900,000 | 2,000 |
| 041103 | - A096 | Purchase of Plant & Machinery | 2,840,000 | 300,000 |
| 041103 | - A097 | Purchase of Furniture & Fixture | 200,000 | |
| **041103 ** | - A13 | Repairs and Maintenance | 2,310,000 | 1,600,000 |
| 041103 | - A130 | Transport | 1,400,000 | 700,000 |
| 041103 | - A131 | Machinery and Equipment | 800,000 | 500,000 |
| 041103 | - A132 | Furniture and Fixture | 50,000 | 200,000 |
| 041103 | - A137 | Computer Equipment | 60,000 | 200,000 |
| Total- | Exploration and Evaluation of Coal in | |||
| Nosham and Bahlol Areas of Balochistan | 24,023,000 | 18,295,000 | ||
| 041103 | Total-Geological Survey | 485,001,000 | 573,175,000 | |
| 0411 | Total-General Economic Affairs | 485,001,000 | 573,175,000 | |
| 041 | Total-General Economic, Commercial | |||
| and Labour Affairs | 485,001,000 | 573,175,000 | ||
| 04 | Total-Economic Affairs | 485,001,000 | 573,175,000 | |
| Total-Accountant General Pakistan | ||||
| Revenues, Sub Office, Quetta | 485,001,000 | 573,175,000 | ||
| TOTAL-DEMAND | 16,518,836,000 | 943,175,000 |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 144- FEDERAL-INVESTMENT
SECTION III
MINISTRY OF FINANCE, REVENUE & ECONOMIC AFFAIRS
| (Rupee | 2018-2019 Budget Estimate s in Thousand) | ||
|---|---|---|---|
| Demands presented on behalf of the Ministry of Finance, | |||
| Revenue and Economic Affairs. | |||
| Development | Expenditure on Capital Account. | ||
| 144. | Capital Outlay on Federal Investments | 1,560,938 | |
| 145. | Development Loans and Advances by the Federal Government | 156,314,643 | |
| 146. | External Development Loans and Advances | ||
| by the Federal Government | 305,224,839 | ||
| Total:- | 463,100,420 |
NO. 144.- CAPITAL OUTLAY ON FEDERAL INVESTMENTS
DEMANDS FOR GRANTS
DEMAND NO. 144 (FC12C39)
CAPITAL OUTLAY ON FEDERAL INVESTMENTS
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 for CAPITAL OUTLAY ON FEDERAL INVESTMENTS.
Voted Rs. 1,560,938,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS (FINANCE DIVISION).
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| FUNCTIONAL CLASSIFICATION: | ||||
| 014 | Transfers | 329,835,000 | 81,581,000 | 1,560,938,000 |
| Total | 329,835,000 | 81,581,000 | 1,560,938,000 | |
| OBJECT CLASSIFICATION: | ||||
| A11 | Investments | 329,835,000 | 81,581,000 | 1,560,938,000 |
| Total | 329,835,000 | 81,581,000 | 1,560,938,000 | |
| (In Foreign Exchange) | (29,680,000) | (460,680,000) | ||
| (Own Resources) | (29,680,000) | (460,680,000) | ||
| (Foreign Aid) | ||||
| (In Local Currency) | (300,155,000) | (81,581,000) | (1,100,258,000) |
NO. 144.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| 2017-2018 | 2017-2018 | 2018-2019 | |||
|---|---|---|---|---|---|
| Budget Estimate | Revised Estimate | Budget Estimate | |||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES. | |||||
| 01 | GENERAL PUBLIC SERVICE : | ||||
| 014 | TRANSFERS : | ||||
| 0143 | INVESTMENTS : | ||||
| 014302 | NON-FINANCIAL INSTITUTIONS : | ||||
| ID2053 | REBROADCAST STATION, ZIARAT : | ||||
| **014302 ** | - A11 | Investments | 7,977,000 | 7,977,000 | |
| 014302 | **-**A111 | Investment- Domestic | 7,977,000 | 7,977,000 | |
| Total - | Rebroadcast Station, Ziarat | 7,977,000 | 7,977,000 | ||
| ID2055 | REBROADCAST STATION, SHAKARGARH: | ||||
| **014302 ** | - A11 | Investments | 19,000,000 | ||
| 014302 | **-**A111 | Investment- Domestic | 19,000,000 | ||
| Total - | Rebroadcast Station, Shakargarh | 19,000,000 | |||
| ID3219 | REBROADCAST STATION, KHARAN: | ||||
| **014302 ** | - A11 | Investments | 19,592,000 | 13,918,000 | 14,430,000 |
| 014302 | **-**A111 | Investment- Domestic | 19,592,000 | 13,918,000 | 14,430,000 |
| Total - | Rebroadcast Station, Kharan | 19,592,000 | 13,918,000 | 14,430,000 | |
| (In Foreign Exchange) | (4,540,000) | (4,540,000) | |||
| (Own Resources) | (4,540,000) | (4,540,000) | |||
| (Foreign Aid) (In Local Currency) | (15,052,000) | (13,918,000) | (9,890,000) | ||
| ID3220 | REBROADCAST STATION, BAR KHAN : | ||||
| **014302 ** | - A11 | Investments | 14,475,000 | 2,895,000 | 17,080,000 |
| 014302 | **-**A111 | Investment- Domestic | 14,475,000 | 2,895,000 | 17,080,000 |
| Total - | Rebroadcast Station, Bar Khan | 14,475,000 | 2,895,000 | 17,080,000 | |
| (In Foreign Exchange) | (5,140,000) | (5,140,000) | |||
| (Own Resources) | (5,140,000) | (5,140,000) | |||
| (Foreign Aid) | |||||
| (In Local Currency) | (9,335,000) | (2,895,000) | (11,940,000) |
NO. 144.- FC12C39 CAPITAL OUTLAY ON FEDERAL DEMANDS FOR GRANTS INVESTMENTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd.
ID3222 REBROADCAST STATION, JURA:
| 014302 | - A11 | Investments | 10,000,000 | 10,000,000 | |
|---|---|---|---|---|---|
| 014302 | **-**A111 | Investment- Domestic | 10,000,000 | 10,000,000 | |
| Total - | Rebroadcast Station, Jura | 10,000,000 | 10,000,000 | ||
| ID3223 | REBRO | ADCAST STATION, ATHMAQAM: | |||
| **014302 ** | - A11 | Investments | 10,000,000 | 10,000,000 | |
| 014302 | **-**A111 | Investment- Domestic | 10,000,000 | 10,000,000 | |
| Total - | Rebroadcast Station, Athmaqam | 10,000,000 | 10,000,000 | ||
| ID3224 | REBRO | ADCAST STATION, KARAN: | |||
| **014302 ** | - A11 | Investments | 10,000,000 | 2,000,000 | 10,000,000 |
| 014302 | **-**A111 | Investment- Domestic | 10,000,000 | 2,000,000 | 10,000,000 |
| Total - | Rebroadcast Station, Karan | 10,000,000 | 2,000,000 | 10,000,000 | |
| (In Foreign Exchange) | (5,000,000) | (5,000,000) | |||
| (Own Resources) (Foreign Aid) | (5,000,000) | (5,000,000) | |||
| (In Local Currency) | (5,000,000) | (2,000,000) | (5,000,000) | ||
| ID3225 | REBRO | ADCAST STATION, DHUDHNIAL: |
| 014302 | - A11 | Investments | 10,000,000 | 2,000,000 | 10,000,000 |
|---|---|---|---|---|---|
| 014302 | **-**A111 | Investment- Domestic | 10,000,000 | 2,000,000 | 10,000,000 |
| Total - | Rebroadcast Station, Dhudhnial | 10,000,000 | 2,000,000 | 10,000,000 | |
| (In Foreign Exchange) | (5,000,000) | (5,000,000) | |||
| (Own Resources) | (5,000,000) | (5,000,000) | |||
| (Foreign Aid) | |||||
| (In Local Currency) | (5,000,000) | (2,000,000) | (5,000,000) |
NO. 144.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS
DEMANDS FOR GRANTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd.
| ID3226 | REBRO | ADCAST STATION, SHARDA: | |||
|---|---|---|---|---|---|
| **014302 ** | - A11 | Investments | 10,000,000 | 10,000,000 | |
| 014302 | **-**A111 | Investment- Domestic | 10,000,000 | 10,000,000 | |
| Total - | Rebroadcast Station, Sharda | 10,000,000 | 10,000,000 | ||
| (In Foreign Exchange) | (5,000,000) | (5,000,000) | |||
| (Own Resources) | (5,000,000) | (5,000,000) | |||
| (Foreign Aid) | |||||
| (In Local Currency) | (5,000,000) | (5,000,000) | |||
| ID3227 | REBRO | ADCAST STATION, KEL: | |||
| **014302 ** | - A11 | Investments | 10,000,000 | 10,000,000 | |
| 014302 | **-**A111 | Investment- Domestic | 10,000,000 | 10,000,000 | |
| Total - | Rebroadcast Station, Kel | 10,000,000 | 10,000,000 | ||
| (In Foreign Exchange) | (5,000,000) | (5,000,000) | |||
| (Own Resources) | (5,000,000) | (5,000,000) | |||
| (Foreign Aid) | |||||
| (In Local Currency) | (5,000,000) | (5,000,000) | |||
| ID4130 | REBRO | ADCAST STATION, SHANGLA (SWAT) : | |||
| **014302 ** | - A11 | Investments | 45,000,000 | 26,000,000 | |
| 014302 | **-**A111 | Investment- Domestic | 45,000,000 | 26,000,000 | |
| Total - | Rebroadcast Station, Shangla (Swat) | 45,000,000 | 26,000,000 | ||
| ID7197 | DUBBI FOREI | NG OF PAKISTANI DRAMAS IN GN LANGUAGES: | |||
| **014302 ** | - A11 | Investments | 12,791,000 | 12,791,000 | 14,373,000 |
| 014302 | **-**A111 | Investment- Domestic | 12,791,000 | 12,791,000 | 14,373,000 |
| Total - | Dubbing of Pakistani Dramas | ||||
| in Foreign Languages | 12,791,000 | 12,791,000 | 14,373,000 |
| NO. 14 | 4.- FC12C | 39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate DEMAND | 2018-2019 Budget Estimate S FOR GRANTS |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd. | |||||
| ID9141 | UPGRA TRANS TRANS | DATION OF PRODUCTION AND MISSSION OF PTV NEWS TO HD STATELITE MISSION FROM PTV: | |||
| **014302 ** | - A11 | Investments | 20,000,000 | ||
| 014302 | **-**A111 | Investment- Domestic | 20,000,000 | ||
| Total - | Upgradation of Production and Transmission of PTV News to HD Statelite Transmission from PTV | 20,000,000 | |||
| ID9147 | REPLACEMENT OF EQUIPMENT OF STUDIO & CONTROL ROOM OF PTV ACADEMY: | ||||
| **014302 ** | - A11 | Investments | 50,000,000 | 30,000,000 | |
| 014302 | **-**A111 | Investment- Domestic | 50,000,000 | 30,000,000 | |
| Total - | Replacement of Equipment of Studio & Control Room of PTV Academy | 50,000,000 | 30,000,000 | ||
| ID9148 | MODERNIZATION OF CAMERA AND PRODUCTION EQUIPMENT OF PTV: | ||||
| **014302 ** | - A11 | Investments | 100,000,000 | 40,000,000 | 200,000,000 |
| 014302 | **-**A111 | Investment- Domestic | 100,000,000 | 40,000,000 | 200,000,000 |
| Total - | Modernization of Camera and Production Equipment of PTV | 100,000,000 | 40,000,000 | 200,000,000 | |
| (In Foreign Exchange) (Own Resources) (Foreign Aid) (In Local Currency) | (100,000,000) | (40,000,000) | (100,000,000) (100,000,000) (100,000,000) | ||
| ID9347 | PTV TE DEMO GRANT | RRESTERIAL DIGITALISATION DTMB NSTRATION PROJECT THROUGH -IN-AID : | |||
| **014302 ** | - A11 | Investments | 34,000,000 | ||
| 014302 | **-**A111 | Investment- Domestic | 34,000,000 | ||
| Total - | PTV Terresterial Digitalisation DTMB Demonstration Project Through Grant-in-Aid | 34,000,000 |
NO. 144.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS
DEMANDS FOR GRANTS
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES.- | Contd. | ||||
| ID9348 | REBRO BALOC | ADCAST STATION, MUSA KHEL, HISTAN : | |||
| **014302 ** | - A11 | Investments | 107,943,000 | ||
| 014302 | **-**A111 | Investment- Domestic | 107,943,000 | ||
| Total - | Rebroadcast Station, Musa Khel, Balochistan | 107,943,000 | |||
| ID9349 | REBRO BALOC | ADCAST STATION, MUSLIM BAGH, HISTAN : | |||
| **014302 ** | - A11 | Investments | 112,318,000 | ||
| 014302 | **-**A111 | Investment- Domestic | 112,318,000 | ||
| Total - | Rebroadcast Station, Muslim Bagh, Balochistan | 112,318,000 | |||
| ID9350 | REBRO BALOC | ADCAST STATION, KHAN MEHTERZAI, HISTAN : | |||
| **014302 ** | - A11 | Investments | 111,376,000 | ||
| 014302 | **-**A111 | Investment- Domestic | 111,376,000 | ||
| Total - | Rebroadcast Station, Khan Mehterzai, Balochistan | 111,376,000 | |||
| ID9351 | REBRO BALOC | ADCAST STATION, SHERANI, HISTAN : | |||
| **014302 ** | - A11 | Investments | 113,418,000 | ||
| 014302 | **-**A111 | Investment- Domestic | 113,418,000 | ||
| Total - | Rebroadcast Station, Sherani, Balochistan | 113,418,000 | |||
| ID9352 | PTV PARLIMENTARY CHANNEL : | ||||
| **014302 ** | - A11 | Investments | 331,000,000 | ||
| 014302 | **-**A111 | Investment- Domestic | 331,000,000 | ||
| Total - | PTV Parlimentary Channel | 331,000,000 | |||
| (In Foreign Exchange) (Own Resources) | (331,000,000) (331,000,000) | ||||
| (Foreign Aid) (In Local Currency) |
NO. 144.- FC12C39 CAPITAL OUTLAY ON FEDERAL DEMANDS FOR GRANTS INVESTMENTS
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES.- | Contd. | |||
| ID9571 | REBRA OFFICE | NDING/RENOVATION OF 485 POST S ALL OVER THE COUNTRY : | ||
| **014302 ** | - A11 | Investments | 200,000,000 | |
| 014302 | **-**A111 | Investment Local | 200,000,000 | |
| Total - | Rebranding/Renovation of 485 Post Offices all Over the Country | 200,000,000 | ||
| ID9572 | CONST OFFICE | RUCTION OF INTERNATIONAL MALL AT KARACHI : | ||
| **014302 ** | - A11 | Investments | 80,000,000 | |
| 014302 | **-**A111 | Investment Local | 80,000,000 | |
| Total - | Construction of International Mall Office at Karachi | 80,000,000 | ||
| ID9573 | CONSTRUCTION OF INTERNATIONAL STANDARD MAIL FACILITATION CENTRE AT GOLRA MORE, RAWALPINDI : | |||
| **014302 ** | - A11 | Investments | 50,000,000 | |
| 014302 | **-**A111 | Investment Local | 50,000,000 | |
| Total - | Construction of International Standard Mail Facilitation Centre at Golra More, Rawalpindi | 50,000,000 | ||
| ID9574 | CONSTRUCTION OF INTERNATIONAL MAIL | |||
| OFFICE | AT GWADAR : | |||
| **014302 ** | - A11 | Investments | 40,000,000 | |
| 014302 | **-**A111 | Investment Local | 40,000,000 | |
| Total - | Construction of International Mail | |||
| Office at Gwadar | 40,000,000 |
NO. 144.- FC12C39 CAPITAL OUTLAY ON FEDERAL DEMANDS FOR GRANTS
INVESTMENTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Concld.
| 014302 | Total-Non-Financial Institutions | 329,835,000 | 81,581,000 | 1,560,938,000 |
|---|---|---|---|---|
| 0143 | Total-Investments | 329,835,000 | 81,581,000 | 1,560,938,000 |
| 014 | Total-Transfers | 329,835,000 | 81,581,000 | 1,560,938,000 |
| 01 | Total-General Public Service | 329,835,000 | 81,581,000 | 1,560,938,000 |
| Total - | Accountant General Pakistan Revenues | 329,835,000 | 81,581,000 | 1,560,938,000 |
| (In Foreign Exchange) | (29,680,000) | (460,680,000) | ||
| (Own Resources) (Foreign Aid) | (29,680,000) | (460,680,000) | ||
| (In Local Currency) | (300,155,000) | (81,581,000) | (1,100,258,000) | |
| TOTAL- DEMAND | 329,835,000 | 81,581,000 | 1,560,938,000 | |
| (In Foreign Exchange) | (29,680,000) | (460,680,000) | ||
| (Own Resources) | (29,680,000) | (460,680,000) | ||
| (Foreign Aid) | ||||
| (In Local Currency) | (300,155,000) | (81,581,000) | (1,100,258,000) |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 145-DEV LOANS AND ADVNCES
NO. 145.- DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
DEMAND NO. 145 (FC12D36)
DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 for DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT.
Voted Rs. 156,314,643,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS (FINANCE DIVISION).
| FUNCTIONAL CLASSIFICATION : | 2017-2018 Budget Estimate Rs | 2017-2018 Revised Estimate Rs | 2018-2019 Budget Estimate Rs | |
|---|---|---|---|---|
| 014 | Transfers | 264,273,608,000 | 265,620,679,000 | 156,314,643,000 |
| Total- | 264,273,608,000 | 265,620,679,000 | 156,314,643,000 | |
| OBJECT CLASSIFICATION : | ||||
| A08 | Loans and Advances | 264,273,608,000 | 265,620,679,000 | 156,314,643,000 |
| Total- | 264,273,608,000 | 265,620,679,000 | 156,314,643,000 | |
| (In Foreign Exchange) (Own Resources) | (10,000,000) | (37,656,000) | ||
| (Foreign Aid) (In Local Currency) | (10,000,000) (264,263,608,000) | (265,620,679,000) | (37,656,000) (156,276,987,000) |
NO. 145.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT III. - DETAILS are as follows : -
DEMANDS FOR GRANTS
| 2017-2018 | 2017-2018 | 2018-2019 | ||
|---|---|---|---|---|
| Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES. | ||||
| 01 | GENERAL PUBLIC SERVICE : | |||
| 014 | TRANSFERS : | |||
| 0141 | TRANSFERS (INTER-GOVERNMENTAL) : | |||
| 014102 | TO DISTRICT GOVERNMENTS : | |||
| **014102 ** | - A08 Loans and Advances | 233,837,337,000 | 239,654,337,000 | 125,980,656,000 |
| 014102 | - A083 District Governments/TMAs | 233,837,337,000 | 239,654,337,000 | 125,980,656,000 |
| ID0983 National Highway Authority | 233,570,337,000 | 239,570,337,000 | 125,783,000,000 | |
| Pakistan Broadcasting Corporation | ||||
| ID4138 100KW MW Transmitter Gwadar | 50,000,000 | 45,804,000 | 15,000,000 | |
| ID9149 Establishment of Saut-ul-Quran | ||||
| FM Network Phase-II | 50,000,000 | 40,000,000 | ||
| ID9150 Up-Gradation of Radio Station Multan | ||||
| Under ODA Programme Korea | 22,000,000 | 52,656,000 | ||
| (In Foreign Exchange) | (10,000,000) | (37,656,000) | ||
| (Own Resources) | ||||
| (Foreign Aid) | (10,000,000) | (37,656,000) | ||
| (In Local Currency) | (12,000,000) | (15,000,000) | ||
| ID9157 Rehabilitation of Medium Wave Service From Muzafarabad(AJK) & Rebuilt of BH | 45,000,000 | 18,000,000 | 40,000,000 | |
| ID9158 Replacement of Medium Wave | ||||
| Transmitter at Mirpur | 100,000,000 | 16,000,000 | 50,000,000 | |
| ID8766 Installation of FM 101 Transmitter at | ||||
| Narowal (PBC) | 4,196,000 | |||
| 014102 Total-District Governments | 233,837,337,000 | 239,654,337,000 | 125,980,656,000 |
NO. 145.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd. |
014110 OTHERS :
| 014110 | - A08 | Loans and Advances | 23,174,303,000 | 22,237,152,000 | 24,306,617,000 |
|---|---|---|---|---|---|
| 014110 | **-**A086 | Loans to Others | 23,174,303,000 | 22,237,152,000 | 24,306,617,000 |
| ID0979 | Azad Jummu and Kashmir | ||||
| PSDP (Block Allocation ) | 20,200,000,000 | 20,200,000,000 | 20,200,000,000 | ||
| ID3298 | Provision of Water Supply and Severage | ||||
| System to Mirpur City and Hamlets | 300,000,000 | 150,000,000 | 300,000,000 | ||
| ID3300 | Construction of Rathoua Haryam | ||||
| Bridge Across Reservoir Channel | |||||
| on Mirpur Islamgarh Road. | 700,000,000 | 700,000,000 | 1,955,617,000 | ||
| ID4584 | 48 MW Jagran Hydro Power Project | 30,000,000 | 15,000,000 | 30,000,000 | |
| ID7377 | Athmuqam -Keran Bypass Road | 485,653,000 | 242,827,000 | 100,000,000 | |
| ID7378 | Mir Waiz Muhammad Farooq Shaheed | ||||
| Medical College Muzaffarabad | 200,000,000 | 200,000,000 | 500,000,000 | ||
| ID7379 | Medical College Mirpur | 200,000,000 | 200,000,000 | 471,000,000 | |
| ID7380 | Noseri-Leswa Bypass Road | 558,650,000 | 279,325,000 | 100,000,000 | |
| ID8212 | Legislative Assembly AJ & K | 500,000,000 | 250,000,000 | 500,000,000 | |
| ID9447 | Establishment of Endowment Fund for | ||||
| Pakistan Red Crescent in AJK | 100,000,000 | ||||
| ID9448 | Improvement & Modeling of Link Road | ||||
| Konkan Panjoor Gali (13Km) | |||||
| District Muzaffarabad | 50,000,000 | ||||
| 014110 | Total-Others | 23,174,303,000 | 22,237,152,000 | 24,306,617,000 | |
| 0141 | Total-Transfers (Inter -Governmental) | 257,011,640,000 | 261,891,489,000 | 150,287,273,000 |
NO. 145.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES.-Concld. |
| 0142 014202 | TRANSFERS (OTHERS) : TRANSFER TO NON- FINANCIAL INSTITUTION | S : | |||
|---|---|---|---|---|---|
| **014202 ** | - A08 | Loans and Advances | 5,161,968,000 | 1,629,190,000 | 3,427,370,000 |
| 014202 | **-**A085 | Loans to Non-Financial Institutions | 5,161,968,000 | 1,629,190,000 | 3,427,370,000 |
| ID0999 | WAPDA (Power Wing) | 2,000,000,000 | 700,000,000 | ||
| ID8219 | Cash Development Loan to | ||||
| QESCO | 2,502,190,000 | 902,190,000 | 2,684,430,000 | ||
| ID9258 | Cash Development Loan to PESCO | 500,000,000 | 500,000,000 | ||
| ID9259 | Cash Development Loan to M/O Water | ||||
| and Power | 5,000,000 | 5,000,000 | |||
| ID9260 | Cash Development Loan to PPIB | 4,778,000 | 5,000,000 | ||
| ID8446 | Cash Development Loan to TESCO | 150,000,000 | 27,000,000 | 107,940,000 | |
| ID9557 | Cash Development Loan to SEPCO | 125,000,000 | |||
| Total- | 5,161,968,000 | 1,629,190,000 | 3,427,370,000 | ||
| 014202 | Total- Transfer to Non- Financial | ||||
| Institutions | 74,775,770,000 | 1,629,190,000 | 3,427,370,000 | ||
| 0142 | Total-Transfers (Others) | 5,161,968,000 | 1,629,190,000 | 3,427,370,000 | |
| 014 | Total- Transfers | 262,173,608,000 | 263,520,679,000 | 153,714,643,000 | |
| 01 | Total-General Public Service | 262,173,608,000 | 263,520,679,000 | 153,714,643,000 | |
| Total- | Accountant General Pakistan | ||||
| Revenues | 262,173,608,000 | 263,520,679,000 | 153,714,643,000 | ||
| (In Foreign Exchange) | (10,000,000) | (37,656,000) | |||
| (Own Resources) | |||||
| (Foreign | Aid) | (10,000,000) | (37,656,000) | ||
| (In Local Currency) | (262,163,608,000) | (263,520,679,000) | (153,676,987,000) |
NO. 145.- FC12D36 DEVELOPMENT LOANS AND DEMANDS FOR GRANTS ADVANCES BY THE FEDERAL GOVERNMENT 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, LAHORE 01 GENERAL PUBLIC SERVICE : 014 TRANSFERS : 0142 TRANSFERS (OTHERS) : 014202 TRANSFERS TO NON FINANCIAL INSTITUTIONS :
LO0822 LOWER INDUS RIGHT BANK IRRIGATION AND DRAINAGE PROJECT (RBOD-I) :
| 014202 | - A08 | Loans and Advances | 900,000,000 | 180,000,000 |
|---|---|---|---|---|
| 014202 | **-**A085 | Loans to Non-Financial Institutions | 900,000,000 | 180,000,000 |
| Total- | Lower Indus Right Bank Irrigation and Drainage Project (RBOD-I) | 900,000,000 | 180,000,000 | |
| LO0823 | BALOCHISTAN EFFLUENT DISPOSAL IN RBOD (RBOD-III) : |
| 014202 | - A08 | Loans and Advances | 1,200,000,000 | 240,000,000 |
|---|---|---|---|---|
| 014202 | **-**A085 | Loans to Non-Financial Institutions | 1,200,000,000 | 240,000,000 |
| Total- | Balochistan Effluent Disposal in RBOD (RBOD-III) | 1,200,000,000 | 240,000,000 | |
| 014202 | Total- Transfer to Non- Financial Institutions | 2,100,000,000 | 420,000,000 | |
| 0142 | Total-Transfers (Others) | 2,100,000,000 | 420,000,000 | |
| 014 | Total- Transfers | 2,100,000,000 | 420,000,000 | |
| 01 | Total-General Public Service | 2,100,000,000 | 420,000,000 | |
| Total- | Accountant General Pakistan | |||
| Revenues, Sub Office, Lahore | 2,100,000,000 | 420,000,000 |
NO. 145.- FC12D36 DEVELOPMENT LOANS AND DEMANDS FOR GRANTS ADVANCES BY THE FEDERAL GOVERNMENT 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
| ACCOUNTANT GENERAL PAKISTAN | REVENUES, SUB | OFFICE, KARACHI | |||
|---|---|---|---|---|---|
| 01 | GENERAL PUBLIC SERVICE : | ||||
| 014 | TRANSFERS : | ||||
| 0142 | TRANSFERS (OTHERS) : | ||||
| 014202 | TRANSFERS TO NON FINANCIAL INSTITUTIONS : | ||||
| SK0178 | LOWER DRAINA | INDUS RIGHT BANK IRRIGATION AND GE PROJECT (RBOD-I) : | |||
| **014202 ** | - A08 | Loans and Advances | 720,000,000 | 1,000,000,000 | |
| 014202 | **-**A085 | Loans to Non-Financial Institutions | 720,000,000 | 1,000,000,000 | |
| Total- | Lower Indus Right Bank Irrigation and Drainage Project (RBOD-I) | 720,000,000 | 1,000,000,000 | ||
| SK0179 | BALOCHISTAN EFFLUENT DISPOSAL | ||||
| IN RBOD (RBOD-III) : | |||||
| **014202 ** | - A08 | Loans and Advances | 960,000,000 | 1,600,000,000 | |
| 014202 | **-**A085 | Loans to Non-Financial Institutions | 960,000,000 | 1,600,000,000 | |
| Total- | Balochistan Effluent Disposal in RBOD (RBOD-III) | 960,000,000 | 1,600,000,000 | ||
| 014202 | Total- Transfer to Non- Financial | ||||
| Institutions | 1,680,000,000 | 2,600,000,000 | |||
| 0142 | Total-Transfers (Others) | 1,680,000,000 | 2,600,000,000 | ||
| 014 | Total- Transfers | 1,680,000,000 | 2,600,000,000 | ||
| 01 | Total-General Public Service | 1,680,000,000 | 2,600,000,000 | ||
| Total- | Accountant General Pakistan | ||||
| Revenues, Sub Office, Karachi | 1,680,000,000 | 2,600,000,000 | |||
| TOTAL- DEMAND | 264,273,608,000 | 265,620,679,000 | 156,314,643,000 | ||
| (In Foreign Exchange) (Own Resources) | (10,000,000) | (37,656,000) | |||
| (Foreign Aid) | (10,000,000) | (37,656,000) | |||
| (In Local Currency) | (264,263,608,000) | (265,620,679,000) | (156,276,987,000) |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 146-EXTERNAL-DEV-LOANS
NO. 146- EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
DEMAND NO. 146 (FC12E14/FC15E14)
EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 for EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT. Total. Rs 305,224,839,000 (Charged) Rs. 171,866,704,000 (Voted) Rs. 133,358,135,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS (ECONOMIC AFFAIRS DIVISION).
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION: | Rs | Rs | Rs | |
| 014 | Transfers | 330,938,692,000 | 331,064,988,000 | 305,224,839,000 |
| Total- | 330,938,692,000 | 331,064,988,000 | 305,224,839,000 | |
| (Charged) (Voted) | 186,871,299,000 144,067,393,000 | 160,288,350,000 170,776,638,000 | 171,866,704,000 133,358,135,000 | |
| OBJECT CLASSIFICATION : | ||||
| A08 | Loans and Advances | 330,938,692,000 | 331,064,988,000 | 305,224,839,000 |
| Total- | 330,938,692,000 | 331,064,988,000 | 305,224,839,000 | |
| (Charged) | 186,871,299,000 | 160,288,350,000 | 171,866,704,000 | |
| (Voted) | 144,067,393,000 | 170,776,638,000 | 133,358,135,000 | |
| (In Foreign Exchange) (Own Resources) | (330,938,692,000) | (331,064,988,000) | (305,224,839,000) | |
| (Foreign Aid) (In Local Currency) | (330,938,692,000) | (331,064,988,000) | (305,224,839,000) |
NO. 146.- FC12E14 EXTERNAL DEVELOPMENT LOANS
DEMANDS FOR GRANTS
AND ADVANCES BY THE FEDERAL GOVERNMENT
III. - DETAILS are as follows :- 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs ACCOUNTANT GENERAL PAKISTAN REVENUES. 01 GENERAL PUBLIC SERVICE : 014 TRANSFERS : 0141 TRANSFERS (INTER-GOVERNMENTAL) : 014101 TO PROVINCES :
| ID8871 | PUNJAB PROGRAMME LOAN : | ||||
|---|---|---|---|---|---|
| _014101 _ | - A08 | Loans and Advances | 8,503,300,000 | 20,875,859,000 | 24,809,329,000 |
| 014101 | -A082 | Provinces | 8,503,300,000 | 20,875,859,000 | 24,809,329,000 |
| Total | Punjab Programme Loan | 8,503,300,000 | 20,875,859,000 | 24,809,329,000 | |
| Charged | 8,503,300,000 | 20,875,859,000 | 24,809,329,000 | ||
| (In Foreign Exchange) | (8,503,300,000) | (20,875,859,000) | (2,480,329,000) | ||
| (Foreign Aid) | (8,503,300,000) | (20,875,859,000) | (2,480,329,000) | ||
| ID8872 | SINDH | PROGRAMME LOAN : | |||
| _014101 _ | - A08 | Loans and Advances | 527,500,000 | 921,900,000 | 1,404,000,000 |
| 014101 | -A082 | Provinces | 527,500,000 | 921,900,000 | 1,404,000,000 |
| Total | Sindh Programme Loan | 527,500,000 | 921,900,000 | 1,404,000,000 | |
| Charged | 527,500,000 | 921,900,000 | 1,404,000,000 | ||
| (In Foreign Exchange) | (527,500,000) | (921,900,000) | (1,404,000,000) | ||
| (Foreign Aid) | (527,500,000) | (921,900,000) | (1,404,000,000) | ||
| ID8873 | KPK PROGRAMME LOAN : | ||||
| _014101 _ | - A08 | Loans and Advances | 5,376,652,000 | 8,218,140,000 | |
| 014101 | -A082 | Provinces | 5,376,652,000 | 8,218,140,000 | |
| Total | KPK Programme Loan | 5,376,652,000 | 8,218,140,000 | ||
| Charged | 5,376,652,000 | 8,218,140,000 | |||
| (In Foreign Exchange) | (5,376,652,000) | (8,218,140,000) | |||
| (Foreign Aid) | (5,376,652,000) | (8,218,140,000) |
NO. 146.- FC12E14 EXTERNAL DEVELOPMENT LOANS
DEMANDS FOR GRANTS
| AND GOV | ADVANCES BY THE FEDERAL ERNMENT | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ID8986 | SINDH | : ACCOUNTANT GENERA | L PAKISTAN REVENUES.-Contd. | ||
| **014101 ** | - A08 | Loans and Advances | 37,315,030,000 | 24,606,412,000 | 39,906,009,000 |
| 014101 | **-**A082 | Provinces | 37,315,030,000 | 24,606,412,000 | 39,906,009,000 |
| Total | Sindh | 37,315,030,000 | 24,606,412,000 | 39,906,009,000 | |
| Charged | 37,315,030,000 | 24,606,412,000 | 39,906,009,000 | ||
| (In Foreign Exchange) | (37,315,030,000) | (24,606,412,000) | (39,906,009,000) | ||
| (Foreign Aid) | (37,315,030,000) | (24,606,412,000) | (39,906,009,000) | ||
| ID8987 | PUNJAB : | ||||
| _014101 _ | - A08 | Loans and Advances | 117,100,909,000 | 89,350,215,000 | 62,993,131,000 |
| 014101 | -A082 | Provinces | 117,100,909,000 | 89,350,215,000 | 62,993,131,000 |
| Total | Punjab | 117,100,909,000 | 89,350,215,000 | 62,993,131,000 | |
| Charged | 117,100,909,000 | 89,350,215,000 | 62,993,131,000 | ||
| (In Foreign Exchange) | (117,100,909,000) | (89,350,215,000) | (62,993,131,000) | ||
| (Foreign Aid) | (117,100,909,000) | (89,350,215,000) | (62,993,131,000) | ||
| ID8988 | KHYBER PAKHTUNKHWA : | ||||
| _014101 _ | - A08 | Loans and Advances | 20,797,560,000 | 17,765,062,000 | 30,457,095,000 |
| 014101 | -A082 | Provinces | 20,797,560,000 | 17,765,062,000 | 30,457,095,000 |
| Total | khyber Pakhtunkhwa | 20,797,560,000 | 17,765,062,000 | 30,457,095,000 | |
| Charged | 20,797,560,000 | 17,765,062,000 | 30,457,095,000 | ||
| (In Foreign Exchange) | (20,797,560,000) | (17,765,062,000) | (30,457,095,000) | ||
| (Foreign Aid) | (20,797,560,000) | (17,765,062,000) | (30,457,095,000) | ||
| ID8989 | BALOCHISTAN : | ||||
| _014101 _ | - A08 | Loans and Advances | 2,627,000,000 | 1,392,250,000 | 4,079,000,000 |
| 014101 | -A082 | Provinces | 2,627,000,000 | 1,392,250,000 | 4,079,000,000 |
| Total | Balochistan | 2,627,000,000 | 1,392,250,000 | 4,079,000,000 | |
| Charged | 2,627,000,000 | 1,392,250,000 | 4,079,000,000 | ||
| (In Foreign Exchange) | (2,627,000,000) | (1,392,250,000) | (4,079,000,000) | ||
| (Foreign Aid) | (2,627,000,000) | (1,392,250,000) | (4,079,000,000) | ||
| 014101 | Total- To Provinces | 186,871,299,000 | 160,288,350,000 | 171,866,704,000 | |
| Total- Charged | 186,871,299,000 | 160,288,350,000 | 171,866,704,000 |
NO. 146.- FC12E14 EXTERNAL DEVELOPMENT LOANS
DEMANDS FOR GRANTS
AND ADVANCES BY THE FEDERAL GOVERNMENT
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd.
014110 OTHERS:
ID8222 48 MW JAGRAN HYDRO POWER PROJECT, AJK :
| 014110 | - A08 | Loans and Advances | 370,000,000 | 500,000,000 | 270,000,000 |
|---|---|---|---|---|---|
| 014110 | **-**A086 | Loans to Others | 370,000,000 | 500,000,000 | 270,000,000 |
| Total- | 48 MW Jagran Hydro Power | ||||
| Project, AJK | 370,000,000 | 500,000,000 | 270,000,000 | ||
| (In Foreign Exchange) | (370,000,000) | (500,000,000) | (270,000,000) | ||
| (Foreign Aid) | (370,000,000) | (500,000,000) | (270,000,000) | ||
| ID8994 | AZAD JAMMU AND KASHMIR : | ||||
| **014110 ** | - A08 | Loans and Advances | 1,800,000,000 | 3,147,822,000 | 1,800,000,000 |
| 014110 | **-**A086 | Loans to Others | 1,800,000,000 | 3,147,822,000 | 1,800,000,000 |
| Total- | Azad Jammu and Kashmir | 1,800,000,000 | 3,147,822,000 | 1,800,000,000 | |
| (In Foreign Exchange) | (1,800,000,000) | (3,147,822,000) | (1,800,000,000) | ||
| (Foreign Aid) | (1,800,000,000) | (3,147,822,000) | (1,800,000,000) | ||
| 014110 | Total- Others | 2,170,000,000 | 3,647,822,000 | 2,070,000,000 | |
| 0141 | Total-Transfers (Inter Governmental) | 189,041,299,000 | 163,936,172,000 | 173,936,704,000 |
0142 TRANSFERS ( OTHERS) : 014202 TRANSFER TO NON-FINANCIAL INSTITUTIONS :
ID7337 DASU HYDRO POWER PROJECT :
| 014202 | - A08 | Loans and Advances | 3,500,000,000 | 9,582,195,000 | 3,000,000,000 |
|---|---|---|---|---|---|
| 014202 | **-**A085 | Loans to Non Financial Institutions | 3,500,000,000 | 9,582,195,000 | 3,000,000,000 |
| Total- | DASU Hydro Power Project | 3,500,000,000 | 9,582,195,000 | 3,000,000,000 | |
| (In Foreign Exchange) | (3,500,000,000) | (9,582,195,000) | (3,000,000,000) | ||
| (Foreign Aid) | (3,500,000,000) | (9,582,195,000) | (3,000,000,000) |
NO. 146.- FC12E14 EXTERNAL DEVELOPMENT LOANS DEMANDS FOR GRANTS
AND ADVANCES BY THE FEDERAL GOVERNMENT
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd.
| ID7338 | ESTABLISHMENT OF HYDRO POWER PROJECT TRAINING INSTITUTE, MANGLA : | ||||
|---|---|---|---|---|---|
| **014202 ** | - A08 | Loans and Advances | 50,000,000 | 40,000,000 | 50,000,000 |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 50,000,000 | 40,000,000 | 50,000,000 |
| Total- | Establishment of Hydro Power Training Institute, Mangla | 50,000,000 | 40,000,000 | 50,000,000 | |
| (In Foreign Exchange) | (50,000,000) | (40,000,000) | (50,000,000) | ||
| (Foreign Aid) | (50,000,000) | (40,000,000) | (50,000,000) | ||
| ID7339 | GOLAN | GOL HYDRO POWER PROJECT : | |||
| **014202 ** | - A08 | Loans and Advances | 2,407,000,000 | 3,256,120,000 | 600,000,000 |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 2,407,000,000 | 3,256,120,000 | 600,000,000 |
| Total- | Golan Gol Hydro Power Project | 2,407,000,000 | 3,256,120,000 | 600,000,000 | |
| (In Foreign Exchange) | (2,407,000,000) | (3,256,120,000) | (600,000,000) | ||
| (Foreign Aid) | (2,407,000,000) | (3,256,120,000) | (600,000,000) | ||
| ID7341 | HEYAL | KHAWAR HYDRO POWER PROJECT | : | ||
| **014202 ** | - A08 | Loans and Advances | 800,000,000 | 50,000,000 | 171,000,000 |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 800,000,000 | 50,000,000 | 171,000,000 |
| Total- | Heyal Khawar Hydro Power Project | 800,000,000 | 50,000,000 | 171,000,000 | |
| (In Foreign Exchange) | (800,000,000) | (50,000,000) | (171,000,000) | ||
| (Foreign Aid) | (800,000,000) | (50,000,000) | (171,000,000) | ||
| ID7342 | NEELUM JHELUM POWER PROJECT : | ||||
| **014202 ** | - A08 | Loans and Advances | 4,834,000,000 | 18,502,585,000 | 5,000,000,000 |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 4,834,000,000 | 18,502,585,000 | 5,000,000,000 |
| Total- | Neelum Jhelum Power Project | 4,834,000,000 | 18,502,585,000 | 5,000,000,000 | |
| (In Foreign Exchange) | (4,834,000,000) | (18,502,585,000) | (5,000,000,000) | ||
| (Foreign Aid) | (4,834,000,000) | (18,502,585,000) | (5,000,000,000) |
NO. 146.- FC12E14 EXTERNAL DEVELOPMENT LOANS
DEMANDS FOR GRANTS
AND ADVANCES BY THE FEDERAL GOVERNMENT 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd.
ID7343 REFURBISHMENT AND UP GRADATION OF GENERATION UNIT POWER STATION OF MANGLA :
| 014202 | - A08 | Loans and Advances | 800,000,000 | 1,350,000,000 | 840,000,000 |
|---|---|---|---|---|---|
| 014202 | **-**A085 | Loans to Non Financial Institutions | 800,000,000 | 1,350,000,000 | 840,000,000 |
| Total- | Refurbishment and up Gradation of Generation Unit Power Station of Mangla | 800,000,000 | 1,350,000,000 | 840,000,000 | |
| (In Foreign Exchange) | (800,000,000) | (1,350,000,000) | (840,000,000) | ||
| (Foreign Aid) | (800,000,000) | (1,350,000,000) | (840,000,000) | ||
| ID7344 | TARBELA FOURTH & FIFTH EXTENSION HY POWER PROJECT : | DRO | |||
| **014202 ** | - A08 | Loans and Advances | 6,628,000,000 | 19,414,100,000 | 3,363,505,000 |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 6,628,000,000 | 19,414,100,000 | 3,363,505,000 |
| Total- | Tarbela fourth & Fifth extension | ||||
| Hydro Power Project | 6,628,000,000 | 19,414,100,000 | 3,363,505,000 | ||
| (In Foreign Exchange) | (6,628,000,000) | (19,414,100,000) | (3,363,505,000) | ||
| (Foreign Aid) | (6,628,000,000) | (19,414,100,000) | (3,363,505,000) | ||
| ID7345 | WARSAK HYDROELECTRIC POWER STATION 2ND REHABILITATION : | ||||
| **014202 ** | - A08 | Loans and Advances | 500,000,000 | 70,000,000 | 70,000,000 |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 500,000,000 | 70,000,000 | 70,000,000 |
| Total- | Warsak Hydroelectric Power Station 2nd Rehabilitation | 500,000,000 | 70,000,000 | 70,000,000 | |
| (In Foreign Exchange) | (500,000,000) | (70,000,000) | (70,000,000) | ||
| (Foreign Aid) | (500,000,000) | (70,000,000) | (70,000,000) |
NO. 146.- FC12E14 EXTERNAL DEVELOPMENT LOANS
DEMANDS FOR GRANTS
AND ADVANCES BY THE FEDERAL GOVERNMENT
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd. |
| ID8440 | CHITRAL HYDAL POWER STATION CAPACIT ENHANCEMENT : | Y | |||
|---|---|---|---|---|---|
| **014202 ** | - A08 | Loans and Advances | 40,000,000 | 5,000,000 | |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 40,000,000 | 5,000,000 | |
| Total- | Chitral Hydal Power Station Capacity Enhancement | 40,000,000 | 5,000,000 | ||
| (In Foreign Exchange) | (40,000,000) | (5,000,000) | |||
| (Foreign Aid) | (40,000,000) | (5,000,000) | |||
| ID8992 | NATIONAL HIGHWAYS AUTHORITY : | ||||
| **014202 ** | - A08 | Loans and Advances | 86,150,000,000 | 86,150,000,000 | 84,217,000,000 |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 86,150,000,000 | 86,150,000,000 | 84,217,000,000 |
| Total- | National Highways Authority | 86,150,000,000 | 86,150,000,000 | 84,217,000,000 | |
| (In Foreign Exchange) | (86,150,000,000) | (86,150,000,000) | (84,217,000,000) | ||
| (Foreign Aid) | (86150000000) | (86150000000) | (84217000000) | ||
| ID8993 | P E P C | O : | ,,, | ,,, | ,,, |
| **014202 ** | - A08 | Loans and Advances | 35,924,393,000 | 28,668,816,000 | 32,697,630,000 |
| 014202 | **-**A085 | Loans to Non Financial Institutions | 35,924,393,000 | 28,668,816,000 | 32,697,630,000 |
| Total- | PEPCO | 35,924,393,000 | 28,668,816,000 | 32,697,630,000 | |
| (In Foreign Exchange) | (35,924,393,000) | (28,668,816,000) | (32,697,630,000) | ||
| (Foreign Aid) | (35,924,393,000) | (28,668,816,000) | (32,697,630,000) | ||
| ID9410 | TARBELA 5TH EXTENTION HYDRO POWER PROJECT : | ||||
| **014202 ** | - A08 | Loans and Advances | 1,224,000,000 | ||
| 014202 | **-**A085 | Loans to Non Financial Institutions | 1,224,000,000 | ||
| Total- | Tarbela 5th Extention Hydro Power Project | 1,224,000,000 | |||
| (In Foreign Exchange) | (1,224,000,000) | ||||
| (Foreign Aid) | (1,224,000,000) |
NO. 146.- FC12E14 EXTERNAL DEVELOPMENT LOANS
DEMANDS FOR GRANTS
AND ADVANCES BY THE FEDERAL GOVERNMENT
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Concld.
ID9961 ESTABLISHMENT OF PAKISTAN GLACIER MONITORING NETWORK, UPPER INDUS BASIN AREA FALLING WITHIN KPK :
| 014202 | - A08 | Loans and Advances | 64,000,000 | 45,000,000 | 50,000,000 |
|---|---|---|---|---|---|
| 014202 | **-**A085 | Loans to Non Financial Institutions | 64,000,000 | 45,000,000 | 50,000,000 |
| Total- | Establishment of Pakistan Glacier Monitoring Network, Upper Indus | ||||
| Basin Area Falling Within KPK | 64,000,000 | 45,000,000 | 50,000,000 | ||
| (In Foreign Exchange) | (64,000,000) | (45,000,000) | (50,000,000) | ||
| (Foreign Aid) | (64,000,000) | (45,000,000) | (50,000,000) |
ID9963 CONSTRUCTION OF MOHMAND DAM :
| 014202 | - A08 | Loans and Advances | 200,000,000 | ||
|---|---|---|---|---|---|
| 014202 | **-**A085 | Loans to Non Financial Institutions | 200,000,000 | ||
| Total- | Construction of Mohmand Dam | 200,000,000 | |||
| (In Foreign Exchange) (Foreign Aid) | (200,000,000) (200,000,000) | ||||
| 014202 | Total-Transfer To Non-Financial | ||||
| Institutions | 141,897,393,000 | 167,128,816,000 | 131,288,135,000 | ||
| 0142 | Total-Transfers (Others) | 141,897,393,000 | 167,128,816,000 | 131,288,135,000 | |
| 014 | Total- Transfers | 330,938,692,000 | 331,064,988,000 | 305,224,839,000 | |
| 01 | Total-General Public Service | 330,938,692,000 | 331,064,988,000 | 305,224,839,000 | |
| Total- | Accountant General Pakistan | ||||
| Revenues | 330,938,692,000 | 331,064,988,000 | 305,224,839,000 | ||
| TOTAL- DEMAND | 330,938,692,000 | 331,064,988,000 | 305,224,839,000 | ||
| (Charged) | 186,871,299,000 | 160,288,350,000 | 171,866,704,000 | ||
| (Voted) | 144,067,393,000 | 170,776,638,000 | 131,358,135,000 | ||
| (In Foreign Exchange) (Own Resources) | (330,938,692,000) | (331,064,988,000) | (305,224,839,000) | ||
| (Foreign Aid) | (330,938,692,000) | (331,064,988,000) | (305,224,839,000) | ||
| (In Foreign Exchange) |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 147-CAPITAL-OUTLAY-FOREIGN AFFAIRS
SECTION IV
MINISTRY OF FOREIGN AFFAIRS
| resented on behalf of the Foreign Affairs ent Expenditure on Capital Account | (Rupee | 2018-2019 Budget Estimate s in Thousand) |
|---|---|---|
| 147. Capital Outlay on Works of | ||
| Foreign Affairs Division | 199,774 | |
| Total : - | 199,774 |
Demand presented on behalf of the Ministry of Foreign Affairs Development Expenditure on Capital Account
NO. 147. - CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 147 (FC12C15)
CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 to defray the Salaries and other Expenses of the CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION.
Voted Rs. 199,774,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FOREIGN AFFAIRS.
| 2017-2018 Budget Estimate Rs | 2017-2018 Revised Estimate Rs | 2018-2019 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION : | ||||
| 011 | Executive & Legislative Organs, Financial and Fiscal Affairs, External Affairs | 200,000,000 | 199,774,000 | |
| Total- | 200,000,000 | 199,774,000 | ||
| OBJECT CLASSIFICATION : | ||||
| A01 | Employees Related Expenses | 4,360,000 | 4,360,000 | |
| A011 | Pay | 3,608,000 | 3,608,000 | |
| A011-1 | Pay of Officers | (3,048,000) | (3,048,000) | |
| A011-2 | Pay of Other Staff | (560,000) | (560,000) | |
| A012 | Allowances | 752,000 | 752,000 | |
| A012-1 | Regular Allowances | (201,000) | (201,000) | |
| A012-2 | Other Allowances (Excluding TA) | (551,000) | (551,000) | |
| A03 | Operating Expenses | 1,214,000 | 92,942,000 | |
| A09 | Physical Assets | 5,000 | 12,560,000 | |
| A12 | Civil Works | 194,218,000 | 89,709,000 | |
| A13 | Repairs and Maintenance | 203,000 | 203,000 | |
| Total- | 200,000,000 | 199,774,000 |
NO. 147.- FC12C15 CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows : -
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES 01 GENERAL PUBLIC SERVICE : 011 EXECUTIVE & LEGISLALTIVE ORGANS, FINANCIAL AND FISCAL AFFAIRS, EXTERNAL AFFAIRS : 0113 EXTERNAL AFFAIRS : 011301 ADMINISTRATION :
HQ3698 CONSULTANCY SERVICES FOR STATE GUEST HOUSE & CONFERENCE CENTRE, ISLAMABAD :
| 011301 | - A03 | Operating Expenses | 12,000 | 90,012,000 |
|---|---|---|---|---|
| 011301 | - A032 | Communications | 4,000 | 4,000 |
| 011301 | - A038 | Travel & Transportation | 4,000 | 4,000 |
| 011301 | - A039 | General | 4,000 | 90,004,000 |
| **011301 ** | - A09 | Physical Assets | 2,000 | 2,000 |
| 011301 | - A092 | Computer Equipment | 1,000 | 1,000 |
| 011301 | - A095 | Purchase of Transport | 1,000 | 1,000 |
| **011301 ** | - A12 | Civil Works | 99,983,000 | 9,983,000 |
| 011301 | **-**A124 | Building and Structures | 99,983,000 | 9,983,000 |
| **011301 ** | - A13 | Repairs and Maintenance | 3,000 | 3,000 |
| 011301 | **-**A137 | Computer Equipment | 3,000 | 3,000 |
| Total- | Consultancy Services for State Guest | |||
| House & Conference Centre, Islamabad | 100,000,000 | 100,000,000 | ||
| 011301 | Total-Administration | 100,000,000 | 100,000,000 | |
| 0113 | Total-External Affairs | 100,000,000 | 100,000,000 | |
| 011 | Total- Executive & Legislativre Organs, | |||
| Financial and Fiscal Affairs, External | ||||
| Affairs | 100,000,000 | 100,000,000 | ||
| 01 | Total-General Public Service | 100,000,000 | 100,000,000 | |
| Total- | Accountant General Pakistan Revenues | 100,000,000 | 100,000,000 |
NO. 147.- FC12C15 CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION
DEMANDS FOR GRANTS
| No. of Posts | 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|---|
| 2017-18 2018-19 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
CHIEF ACCOUNTS OFFICER ( MINISTRY OF FOREIGN AFFAIRS)
01 GENERAL PUBLIC SERVICE : 011 EXECUTIVE & LEGISLALTIVE ORGANS, FINANCIAL AND FISCAL AFFAIRS, EXTERNAL AFFAIRS : 0113 EXTERNAL AFFAIRS : 011301 ADMINISTRATION :
HQ3581 RENOVATION OF ISSI BUILDING INCLUDING PROCUREMENT & INSTALLATION OF LIFT-ELEVATOR, ISLAMABAD:
| 011301 | - A03 | Operating Expenses | 1,728,000 |
|---|---|---|---|
| 011301 | - A039 | General | 1,728,000 |
| **011301 ** | - A09 | Physical Assets | 12,555,000 |
| 011301 | - A096 | Purchase of Plant and Machinery | 10,175,000 |
| 011301 | - A097 | Purchase of Furniture and Fixture | 2,380,000 |
| **011301 ** | - A12 | Civil Works | 15,491,000 |
| 011301 | **-**A124 | Building and Structures | 15,491,000 |
| Total- | Renovation of ISSI Building Including | ||
| Procurement & Installation of | |||
| Lift-Elevator, Islamabad | 29,774,000 |
HQ3685 CONSTRUCTION OF STATE GUEST HOUSE :
| 011301 | - A01 | Employees Related Expenses | 4,360,000 | 4,360,000 | ||
|---|---|---|---|---|---|---|
| 011301 | - A011 | Pay | 10 | 10 | 3,608,000 | 3,608,000 |
| 011301 | - A011-1 | Pay of Officers | (4) | (4) | (3,048,000) | (3,048,000) |
| 011301 | - A011-2 | Pay of Other Staff | (6) | (6) | (560,000) | (560,000) |
| 011301 | - A012 | Allowances | 752,000 | 752,000 | ||
| 011301 | - A012-1 | Regular Allowances | (201,000) | (201,000) | ||
| 011301 | - A012-2 | Other Allowances (Excluding TA) | (551,000) | (551,000) | ||
| **011301 ** | - A03 | Operating Expenses | 1,202,000 | 1,202,000 | ||
| 011301 | - A032 | Communications | 401,000 | 401,000 | ||
| 011301 | - A038 | Travel & Transportation | 301,000 | 301,000 | ||
| 011301 | - A039 | General | 500,000 | 500,000 | ||
| **011301 ** | - A09 | Physical Assets | 3,000 | 3,000 | ||
| 011301 | - A092 | Computer Equipment | 2,000 | 2,000 |
NO. 147.- FC12C15 CAPITAL OUTLAY ON WORKS DEMANDS FOR GRANTS OF FOREIGN AFFAIRS DIVISION
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| CHIEF ACCOUNTS OFFICER ( MINISTRY OF FOREIGN AFFAIRS)-.Concld. | |||||
| 011301 | - A095 | Purchase of Transport | 1,000 | 1,000 | |
| **011301 ** | - A12 | Civil Works | 94,235,000 | 64,235,000 | |
| 011301 | **-**A124 | Building and Structures | 94,235,000 | 64,235,000 | |
| **011301 ** | - A13 | Repairs and Maintenance | 200,000 | 200,000 | |
| 011301 | **-**A137 | Computer Equipment | 200,000 | 200,000 | |
| Total- | Construction of State Guest House | 100,000,000 | 70,000,000 | ||
| 011301 | Total-Administration | 100,000,000 | 99,774,000 | ||
| 0113 | Total-External Affairs | 100,000,000 | 99,774,000 | ||
| 011 | Total- Executive & Legislativre Organs, | ||||
| Financial and Fiscal Affairs, External | |||||
| Affairs | 100,000,000 | 99,774,000 | |||
| 01 | Total-General Public Service | 100,000,000 | 99,774,000 | ||
| Total- | Chief Accounts Officer ( Ministry | ||||
| of Foreign Affairs) | 100,000,000 | 99,774,000 | |||
| TOTAL- DEMAND | 200,000,000 | 199,774,000 |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 148-CAPITAL-OUTLAY-CIVIL-WORKS
SECTION V
MINISTRY OF HOUSING AND WORKS
| 2018-2019 Budget Estimate (Rupees in Thousand) | |
|---|---|
| Demand presented on behalf of the Ministry of Housing and Works | |
| Development Expenditure on Capital Account | |
| 148. Capital Outlay on Civil Works | 5,940,464 |
| Total:- 5,940,464 |
NO. 148.- CAPITAL OUTLAY ON CIVIL WORKS
DEMANDS FOR GRANTS
DEMAND NO. 148
(FC12C28)
CAPITAL OUTLAY ON CIVIL WORKS
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 for CAPITAL OUTLAY ON CIVIL WORKS.
Voted Rs. 5,940,464,000
II FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF HOUSING AND WORKS.
| 2017-2018 Budget Estimate Rs | 2017-2018 Revised Estimate Rs | 2018-2019 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION : | ||||
| 045 | Construction and Transport | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 |
| Total- | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 | |
| OBJECT CLASSIFICATION : | ||||
| A03 | Operating Expenses | 147,378,000 | 493,897,000 | 154,062,000 |
| A12 | Civil Works | 10,504,686,000 | 7,598,427,000 | 5,786,402,000 |
| Total- | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 |
NO. 148.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
(PAKISTAN PUBLIC WORKS DEPARTMENT, SINDH)
04 ECONOMIC AFFAIRS : 045 CONSTRUCTION AND TRANSPORT : 0457 CONSTRUCTION (WORKS) : 045702 BUILDINGS AND STRUCTURE :
ORIGINAL WORKS BUILDINGS:
| 045702 | - A03 | Operating Expenses | 8,329,000 | 8,329,000 | 10,223,000 |
|---|---|---|---|---|---|
| 045702 | **-**A039 | General | 8,329,000 | 8,329,000 | 10,223,000 |
| ID8076 | Establishment Charges Credited to Other | ||||
| Government Departments (Pak.PWD Sindh) | 6,407,000 | 6,407,000 | 7,864,000 | ||
| ID8077 | Tools and Plants Charges credited to Other | ||||
| Government Departments (Pak.PWD Sindh) | 1,922,000 | 1,922,000 | 2,359,000 | ||
| Total- | Pakistan Public Works Department Sindh | 8,329,000 | 8,329,000 | 10,223,000 |
(PAKISTAN PUBLIC WORKS DEPARTMENT, PUNJAB)
ORIGINAL WORKS BUILDINGS:
| 045702 | - A03 | Operating Expenses | 102,854,000 | 411,315,000 | 118,791,000 |
|---|---|---|---|---|---|
| 045702 | **-**A039 | General | 102,854,000 | 411,315,000 | 118,791,000 |
| ID8082 | Establishment Charges Credited to Other | ||||
| Govt. Departments (Pak.PWD Punjab) | 79,118,000 | 316,396,000 | 91,378,000 | ||
| ID8083 | Tools and Plants Charges Credited to Other Govt. Departments (Pak.PWD Punjab) | 23,736,000 | 94,919,000 | 27,413,000 | |
| **045702 ** | - A12 | Civil Works | 9,132,302,000 | 6,327,926,000 | 4,503,924,000 |
| 045702 | **-**A124 | Buildings and Structure | 9,132,302,000 | 6,327,926,000 | 4,503,924,000 |
| ID8078 | Interior (Pak. PWD Punjab) | 268,929,000 | |||
| ID8079 | Civil Works (Pak.PWD Punjab) | 8,924,971,000 | 6,226,783,000 | 4,093,739,000 | |
| ID8081 | Establishment Division (Pak PWD Punjab) | 207,331,000 | 101,143,000 | 141,256,000 | |
| Total- | Pakistan Public Works Department | ||||
| Punjab | 9,235,156,000 | 6,739,241,000 | 4,622,715,000 |
NO. 148.- FC12C28 CAPITAL OUTLAY ON DEMANDS FOR GRANTS CIVIL WORKS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Contd.
(PAKISTAN PUBLIC WORKS DEPARTMENT, KHYBER PAKHTUNKHWA)
ORIGINAL WORKS BUILDINGS:
| 045702 | - A03 | Operating Expenses | 31,226,000 | 39,911,000 | 18,816,000 |
|---|---|---|---|---|---|
| 045702 | **-**A039 | General | 31,226,000 | 39,911,000 | 18,816,000 |
| ID8085 | Establishment Charges Credited to Other | ||||
| Govt. Departments (Pak.PWD Khyber Pakhtunkhwa) | 24,020,000 | 30,701,000 | 14,473,000 | ||
| ID8086 | Tools and Plants Charges Credited to Other | ||||
| Govt. Departments (Pak.PWD Khyber Pakhtunkhwa) | 7,206,000 | 9,210,000 | 4,343,000 | ||
| Total- | Pakistan Public Works Department Khyber Pakhtunkhwa | 31,226,000 | 39,911,000 | 18,816,000 | |
| ORIGIN | AL WORKS BUILDINGS: (PAKISTAN PUBLIC WORKS DEPAR | TMENT, BALOCHISTAN) | |||
| **045702 ** | - A03 | Operating Expenses | 4,969,000 | 34,342,000 | 6,232,000 |
| 045702 | **-**A039 | General | 4,969,000 | 34,342,000 | 6,232,000 |
| ID8088 | Establishment Charges Credited to Other Govt. Departments (Pak.PWD Balochistan) | 3,823,000 | 26,417,000 | 4,794,000 | |
| ID8089 | Tools and Plants Charges Credited to Other | ||||
| Govt. Departments (Pak.PWD Balochistan) | 1,146,000 | 7,925,000 | 1,438,000 | ||
| **045702 ** | - A12 | Civil Works | 42,254,000 | 24,648,000 | 66,188,000 |
| 045702 | **-**A124 | Buildings and Structure | 42,254,000 | 24,648,000 | 66,188,000 |
| ID8087 | Interior (Pak PWD Balochistan) | 42,254,000 | 24,648,000 | 66,188,000 | |
| Total- | Pakistn Public Works Department | ||||
| Balochistan | 47,223,000 | 58,990,000 | 72,420,000 |
NO. 148.- FC12C28 CAPITAL OUTLAY ON DEMANDS FOR GRANTS CIVIL WORKS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES.-Concld.
(PAKISTAN PUBLIC WORKS DEPARTMENT )
| 045702 | - A12 | Civil Works | 1,330,130,000 | 1,245,853,000 | 1,216,290,000 |
|---|---|---|---|---|---|
| 045702 | **-**A124 | Buildings and Structure | 1,330,130,000 | 1,245,853,000 | 1,216,290,000 |
| ID8092 | Civil Works (Pak.PWD Khyber | ||||
| Pakhtunkhwa) | 667,784,000 | 614,023,000 | 529,332,000 | ||
| ID8095 | Civil Works (Pak.PWD Balochistan) | 534,201,000 | 503,685,000 | 529,682,000 | |
| ID8106 | Civil Works | 128,145,000 | 128,145,000 | 157,276,000 | |
| Total- | Pakistan Public Works Department | 1,330,130,000 | 1,245,853,000 | 1,216,290,000 | |
| 045702 | Total-Buildings and Structure | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 | |
| 0457 | Total- Construction (Works) | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 | |
| 045 | Total-Construction and Transport | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 | |
| 04 | Total-Economic Affairs | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 | |
| Total- | Accountant General Pakistan Revenues | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 | |
| TOTAL- DEMAND | 10,652,064,000 | 8,092,324,000 | 5,940,464,000 |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 149-CAP-OUT-INDUSTRIAL-DEVE.
SECTION VI
MINISTRY OF INDUSTRIES AND PRODUCTION
2018-2019 Budget Estimate (Rupees in Thousand) Demands presented on behalf of the Ministry of Industries and Production Development Expendiutre on Capital Account. 149. Capital Outlay on Industrial Development 1,775,205 Total:1,775,205
NO. 149 .- CAPITAL OUTLAY ON INDUSTRIAL DEMANDS FOR GRANTS DEVELOPMENT
DEMAND NO. 149 (FC12C32)
CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
Voted Rs. 1,775,205,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF INDUSTRIES AND PRODUCTION.
| 2017-2018 Budget Estimate Rs | 2017-2018 Revised Estimate Rs | 2018-2019 Budget Estimate Rs | ||
|---|---|---|---|---|
| 044 | FUNCTIONAL CLASSIFICATION : Mining and Manufacturing | 2,737,270,000 | 568,906,000 | 1,775,205,000 |
| Total- | 2,737,270,000 | 568,906,000 | 1,775,205,000 | |
| OBJECT CLASSIFICATION : | ||||
| A01 | Employees Related Expenses | 79,681,000 | 42,578,000 | 150,612,000 |
| A011 | Pay | 77,833,000 | 42,578,000 | 150,612,000 |
| A011-1 | Pay of Officers | (56,239,000) | (21,578,000) | (129,212,000) |
| A011-2 | Pay of Other Staff | (21,594,000) | (21,000,000) | (21,400,000) |
| A012 | Allowances | 1,848,000 | ||
| A012-1 | Regular Allowances | (1,848,000) | ||
| A03 | Operating Expenses | 178,991,000 | 71,812,000 | 156,181,000 |
| A05 | Grants, Subsidies and Write off Loans | 200,032,000 | 88,032,000 | 342,856,000 |
| A09 | Physical Assets | 552,277,000 | 330,242,000 | 750,842,000 |
| A12 | Civil Works | 1,726,289,000 | 36,242,000 | 370,014,000 |
| A13 | Repairs and Maintenance | 4,700,000 | ||
| Total- | 2,737,270,000 | 568,906,000 | 1,775,205,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No. of Posts | 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|---|
| 2017-18 2018-19 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES 04 ECONOMIC AFFAIRS : 044 MINING AND MANUFACTURING : 0441 MANUFACTURING : 044101 SUPPORT FOR INDUSTRIAL DEVELOPMENT :
1D9364 DEVELOPMENT OF MARBLE AND GRANITE SECTOR :
| 044101 | - A01 | Employees Related Expenses | 39,041,000 |
|---|---|---|---|
| 044101 | **-**A011 | Pay 114 | 39,041,000 |
| 044101 | **-**A011-1 | Pay of Officers (114) | (39,041,000) |
| **044101 ** | - A03 | Operating Expenses | 14,669,000 |
| 044101 | - A032 | Communications | 300,000 |
| 044101 | - A033 | Utilities | 300,000 |
| 044101 | - A037 | Consultancy and Contractual Work | 9,000,000 |
| 044101 | - A039 | General | 5,069,000 |
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 18,590,000 |
| 044101 | **-**A052 | Grants Domestic | 18,590,000 |
| **044101 ** | - A09 | Physical Assets | 196,300,000 |
| 044101 | **-**A091 | Purchase of Building | 24,000,000 |
| 044101 | **-**A092 | Computer Equipment | 2,000,000 |
| 044101 | **-**A096 | Purchase of Plant and Machinery | 168,000,000 |
| 044101 | **-**A097 | Purchase of Furniture and Fixture | 2,300,000 |
| **044101 ** | - A12 | Civil Works | 26,700,000 |
| 044101 | **-**A124 | Building and Structures | 26,700,000 |
| **044101 ** | - A13 | Repairs and Maintenance | 4,700,000 |
| 044101 | **-**A131 | Machinery and Equipment | 4,700,000 |
| Total- | Development of Marble and Granite Sector | 300,000,000 | |
| 1D9365 | DEVEL INSTITU | OPMENT NATIONAL PRODUCTIVITY TES IN PAKISTAN : | |
| **044101 ** | - A01 | Employees Related Expenses | 9,960,000 |
| 044101 | **-**A011 | Pay 18 | 9,960,000 |
| 044101 | **-**A011-1 | Pay of Officers (18) | (9,960,000) |
| **044101 ** | - A03 | Operating Expenses | 600,000 |
| 044101 | - A033 | Utilities | 600,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
| No. of Posts 2017-18 2018-19 | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN | Rs REVENUES.-C | Rs oncld. | Rs | ||
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 3,920,000 | ||
| 044101 | **-**A052 | Grants Domestic | 3,920,000 | ||
| **044101 ** | - A09 | Physical Assets | 151,800,000 | ||
| 044101 | **-**A091 | Purchase of Building | 151,800,000 | ||
| **044101 ** | - A12 | Civil Works | 33,720,000 | ||
| 044101 | **-**A124 | Building and Structures | 33,720,000 | ||
| Total- | Development National Productivity Institutes in Pakistan | 200,000,000 | |||
| 044101 | Total-Support for Industrial Development | 500,000,000 | |||
| 0441 | Total- Manufacturing | 500,000,000 | |||
| 044 | Total-Mining and Manufacturing | 500,000,000 | |||
| 04 | Total-Economic Affairs | 500,000,000 | |||
| Total- | Accountant General Pakistan Revenues | 500,000,000 |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, LAHORE 04 ECONOMIC AFFAIRS : 044 MINING AND MANUFACTURING : 0441 MANUFACTURING : 044101 SUPPORT FOR INDUSTRIAL DEVELOPMENT :
LO0772 HYDERABAD ENGINEERING SUPPORT
CENTRE (HESC) (ADB FUNDED) :
| 044101 | - A01 | Employees Related Expenses | 13,000,000 | 13,000,000 | 9,500,000 | ||
|---|---|---|---|---|---|---|---|
| 044101 | **-**A011 | Pay | 23 | 31 | 13,000,000 | 13,000,000 | 9,500,000 |
| 044101 | **-**A011-1 | Pay of Oficers | (10) | (7) | (6,000,000) | (6,000,000) | (4,000,000) |
| 044101 | **-**A011-2 | Pay of Other Staff | (13) | (24) | (7,000,000) | (7,000,000) | (5,500,000) |
| **044101 ** | - A03 | Operating Expenses | 19,000,000 | 19,000,000 | 2,491,000 | ||
| 044101 | - A039 | General | 19,000,000 | 19,000,000 | 2,491,000 | ||
| **044101 ** | - A05 | Grants, Subsidies and Write off | Loans | 1,032,000 | 1,032,000 | 3,663,000 | |
| 044101 | **-**A052 | Grants-Domestic | 1,032,000 | 1,032,000 | 3,663,000 | ||
| **044101 ** | - A09 | Physical Assets | 17,495,000 | 17,495,000 | |||
| 044101 | **-**A092 | Computer Equipment | 15,000 | 15,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
| No. of Posts | 2017-2018 | 2017-2018 | 2018-2019 | |||
|---|---|---|---|---|---|---|
| 2017-18 20 | 18-19 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | , SUB OFFICE, | LAHORE.-Contd. | ||||
| 044101 | **-**A095 | Purchase of Transport | 4,800,000 | 4,800,000 | ||
| 044101 | **-**A096 | Purchase of Plant and Machinery | 12,670,000 | 12,670,000 | ||
| 044101 | **-**A097 | Purchase of Furniture and Fixture | 10,000 | 10,000 | ||
| Total- | Hyderabad Engineering Support Centre (HESC) (ADB FUNDED) | 50,527,000 | 50,527,000 | 15,654,000 | ||
| LO0774 | PESHAWAR LIGHT ENGINEERING SUPPORT | |||||
| CENTR PAKHT | E (PESC) (ADB FUNDED), KHYBER UNKHWA : | |||||
| **044101 ** | - A01 | Employees Related Expenses | 13,000,000 | 13,000,000 | 12,500,000 | |
| 044101 | **-**A011 | Pay 23 | 31 | 13,000,000 | 13,000,000 | 12,500,000 |
| 044101 | **-**A011-1 | Pay of Officers (10) | (10) | (6,000,000) | (6,000,000) | (6,000,000) |
| 044101 | **-**A011-2 | Pay of Other Staff (13) | (21) | (7,000,000) | (7,000,000) | (6,500,000) |
| **044101 ** | - A03 | Operating Expenses | 18,971,000 | 18,971,000 | 2,508,000 | |
| 044101 | - A039 | General | 18,971,000 | 18,971,000 | 2,508,000 | |
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 6,000,000 | 6,000,000 | 1,634,000 | |
| 044101 | **-**A052 | Grants-Domestic | 6,000,000 | 6,000,000 | 1,634,000 | |
| **044101 ** | - A09 | Physical Assets | 59,144,000 | 59,144,000 | 12,078,000 | |
| 044101 | **-**A092 | Computer Equipment | 2,845,000 | 2,845,000 | ||
| 044101 | **-**A095 | Purchase of Transport | 4,800,000 | 4,800,000 | ||
| 044101 | **-**A096 | Purchase of Plant and Machinery | 48,949,000 | 48,949,000 | 12,040,000 | |
| 044101 | **-**A097 | Purchase of Furniture and Fixture | 1,472,000 | 1,472,000 | 38,000 | |
| 044101 | **-**A098 | Purchase of Other Assets | 1,078,000 | 1,078,000 | ||
| Total- | Peshawar Light Engineering Support Pakhtunkhwa Centre (PESC) (ADB FUNDED), Khyber | 97,115,000 | 97,115,000 | 28,720,000 | ||
| LO1076 | LIGHT FOR S | ENGINEERING UPGRADATION CENTRE MES IN BALOCHISTAN (HUB) : | ||||
| **044101 ** | - A01 | Employees Related Expenses | 13,000,000 | 13,000,000 | 12,500,000 | |
| 044101 | **-**A011 | Pay 23 | 39 | 13,000,000 | 13,000,000 | 12,500,000 |
| 044101 | **-**A011-1 | Pay of Officers (10) | (9) | (6,000,000) | (6,000,000) | (5,500,000) |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
| No. of Posts | 2017-2018 | 2017-2018 | 2018-2019 | |||
|---|---|---|---|---|---|---|
| 2017-18 20 | 18-19 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | , SUB OFFICE, | LAHORE.-Contd. | ||||
| 044101 | **-**A011-2 | Pay of Other Staff (13) | (30) | (7,000,000) | (7,000,000) | (7,000,000) |
| **044101 ** | - A03 | Operating Expenses | 24,504,000 | 24,504,000 | 7,682,000 | |
| 044101 | - A039 | General | 24,504,000 | 24,504,000 | 7,682,000 | |
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 1,000,000 | 1,000,000 | ||
| 044101 | **-**A052 | Grants-Domestic | 1,000,000 | 1,000,000 | ||
| **044101 ** | - A09 | Physical Assets | 4,110,000 | 4,110,000 | ||
| 044101 | **-**A092 | Computer Equipment | 1,360,000 | 1,360,000 | ||
| 044101 | **-**A095 | Purchase of Transport | 2,400,000 | 2,400,000 | ||
| 044101 | **-**A098 | Purchase of Other Assets | 350,000 | 350,000 | ||
| Total- | Light Engineering Upgradation Centre for SMES in Balochistan (HUB) | 42,614,000 | 42,614,000 | 20,182,000 | ||
| LO1175 | NATIO PROGR | NAL BUSSINESS DEVELOPMENT AMME FOR SME'S : | ||||
| **044101 ** | - A01 | Employees Related Expenses | 20,000,000 | 2,200,000 | 40,000,000 | |
| 044101 | **-**A011 | Pay 24 | 38 | 20,000,000 | 2,200,000 | 40,000,000 |
| 044101 | **-**A011-1 | Pay of Officers (24) | (38) | (20,000,000) | (2,200,000) | (40,000,000) |
| **044101 ** | - A03 | Operating Expenses | 49,642,000 | 7,727,000 | 49,587,000 | |
| 044101 | - A037 | Consultancy and Contractual Work | 39,000,000 | 5,727,000 | 39,000,000 | |
| 044101 | - A039 | General | 10,642,000 | 2,000,000 | 10,587,000 | |
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 102,000,000 | 199,921,000 | ||
| 044101 | **-**A052 | Grants-Domestic | 102,000,000 | 199,921,000 | ||
| **044101 ** | - A09 | Physical Assets | 56,758,000 | 24,223,000 | 38,892,000 | |
| 044101 | **-**A092 | Computer Equipment | 11,500,000 | 11,500,000 | 3,500,000 | |
| 044101 | **-**A095 | Purchase of Transport | 12,723,000 | 12,723,000 | ||
| 044101 | **-**A097 | Purchase of Furniture and Fixture | 19,850,000 | 19,850,000 | ||
| 044101 | **-**A098 | Purchase of Other Aset | 12,685,000 | 15,542,000 | ||
| **044101 ** | - A12 | Civil Works | 21,600,000 | 21,600,000 | ||
| 044101 | **-**A124 | Building and Structures | 21,600,000 | 21,600,000 | ||
| Total- | National Bussiness Development | |||||
| Programme for SME's | 250,000,000 | 34,150,000 | 350,000,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
| No. of Posts | 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|---|
| 2017-18 2018-19 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, LAHORE.-Contd.
LO1176 FRUIT DEHYDRATION UNIT, SWAT :
| 044101 | - A01 | Employees Related Expenses | 1,278,000 | 1,278,000 | 5,710,000 | ||
|---|---|---|---|---|---|---|---|
| 044101 | **-**A011 | Pay | 16 | 16 | 1,278,000 | 1,278,000 | 5,710,000 |
| 044101 | **-**A011-1 | Pay of Officers | (16) | (16) | (1,278,000) | (1,278,000) | (5,710,000) |
| **044101 ** | - A03 | Operating Expenses | 1,210,000 | 1,210,000 | 3,956,000 | ||
| 044101 | - A032 | Communications | 55,000 | 55,000 | 55,000 | ||
| 044101 | - A033 | Utilities | 75,000 | 75,000 | 135,000 | ||
| 044101 | - A037 | Consultancy and Contractual Work | 200,000 | 200,000 | 226,000 | ||
| 044101 | - A038 | Travel & Transportation | 500,000 | 500,000 | 1,670,000 | ||
| 044101 | - A039 | General | 380,000 | 380,000 | 1,870,000 | ||
| **044101 ** | - A09 | Physical Assets | 13,270,000 | 13,270,000 | 8,360,000 | ||
| 044101 | **-**A091 | Purchase of Building | 9,930,000 | 9,930,000 | |||
| 044101 | **-**A092 | Computer Equipment | 450,000 | 450,000 | |||
| 044101 | **-**A096 | Purchase of Plant and Machinery | 2,700,000 | 2,700,000 | 7,220,000 | ||
| 044101 | **-**A097 | Purchase of Furniture and Fixture | 190,000 | 190,000 | |||
| 044101 | **-**A098 | Purchase of Other Aset | 1,140,000 | ||||
| **044101 ** | - A12 | Civil Works | 4,242,000 | 4,242,000 | 1,914,000 | ||
| 044101 | **-**A124 | Building and Structures | 4,242,000 | 4,242,000 | 1,914,000 | ||
| Total- | Fruit Dehydration Unit, Swat | 20,000,000 | 20,000,000 | 19,940,000 |
LO1180 PRODUCT DEVELOPMENT CENTRE FOR COMPOSITS BASED SPORTS GOOD, SIALKOT
| 044101 | - A01 | Employees Related Expenses | 100,000 | 1,500,000 | |
|---|---|---|---|---|---|
| 044101 | **-**A011 | Pay | 9 | 100,000 | 1,500,000 |
| 044101 | **-**A011-1 | Pay of Officers | (9) | (100,000) | (1,500,000) |
| **044101 ** | - A03 | Operating Expenses | 5,770,000 | 400,000 | 24,240,000 |
| 044101 | - A037 | Consultancy and Contractual Work | 22,040,000 | ||
| 044101 | - A039 | General | 5,770,000 | 400,000 | 2,200,000 |
| **044101 ** | - A09 | Physical Assets | 147,000,000 | 125,000,000 | 48,180,000 |
| 044101 | **-**A092 | Computer Equipment | 5,000,000 | ||
| 044101 | **-**A095 | Purchase of Transport | 2,700,000 | ||
| 044101 | **-**A096 | Purchase of Plant and Machinery | 147,000,000 | 125,000,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
| 2017-18 2018-19 No. of Posts | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | , SUB OFFICE, | LAHORE.-Contd. | |||
| 044101 | **-**A097 | Purchase of Furniture and Fixture | 2,570,000 | ||
| 044101 | **-**A098 | Purchase of Other Aset | 37,910,000 | ||
| **044101 ** | - A12 | Civil Works | 135,000,000 | 9,000,000 | 126,080,000 |
| 044101 | **-**A124 | Building and Structures | 135,000,000 | 9,000,000 | 126,080,000 |
| Total- | Product development Centre for Composits Based Sports Good, Sialkot | 287,770,000 | 134,500,000 | 200,000,000 | |
| LO1182 | BUSSI WOME | NESS SKILL DEVELOPMENT CENTRE FOR N AT VARIOUS LOCATIONS : |
| 044101 | - A01 | Employees Related Expenses | 1,000,000 | 3,240,000 | ||
|---|---|---|---|---|---|---|
| 044101 | **-**A011 | Pay 3 | 33 | 1,000,000 | 3,240,000 | |
| 044101 | **-**A011-1 | Pay of Officers (3) | (33) | (1,000,000) | (3,240,000) | |
| **044101 ** | - A03 | Operating Expenses | 2,000,000 | 6,770,000 | ||
| 044101 | - A039 | General | 2,000,000 | 6,770,000 | ||
| **044101 ** | - A09 | Physical Assets | 20,000,000 | 50,310,000 | ||
| 044101 | **-**A091 | Purchase of Building | 20,000,000 | 48,000,000 | ||
| 044101 | **-**A092 | Computer Equipment | 2,310,000 | |||
| **044101 ** | - A12 | Civil Works | 5,000,000 | 30,000,000 | ||
| 044101 | **-**A124 | Building and Structures | 5,000,000 | 30,000,000 | ||
| Total- | Bussiness Skill Development Centre For Women at Various Locations | 28,000,000 | 90,320,000 | |||
| LO1190 | FRUITS PROCE | , VEGETABLES & CONDIMENTS SSING CENTRE, NAUSHEROFEROZE : | ||||
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 80,000,000 | 80,000,000 | 80,000,000 | |
| 044101 | **-**A052 | Grants-Domestic | 80,000,000 | 80,000,000 | 80,000,000 | |
| **044101 ** | - A09 | Physical Assets | 218,500,000 | 87,000,000 | 20,000,000 | |
| 044101 | **-**A091 | Purchase of Building | 20,800,000 | |||
| 044101 | **-**A092 | Computer Equipment | 2,500,000 | 1,485,000 | ||
| 044101 | **-**A096 | Purchase of Plant and Machinery | 195,200,000 | 85,515,000 | 20,000,000 | |
| **044101 ** | - A12 | Civil Works | 23,000,000 | 23,000,000 | 100,000,000 | |
| 044101 | **-**A124 | Building and Structures | 23,000,000 | 23,000,000 | 100,000,000 | |
| Total- | Fruits, Vegetables & Condiments | |||||
| Processing Centre, Nausheroferoze | 321,500,000 | 190,000,000 | 200,000,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
| No. of Posts | 2017-2018 | 2017-2018 | 2018-2019 | ||
|---|---|---|---|---|---|
| 2017-18 2018-19 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | , SUB OFFICE, | LAHORE.-Concld. | |||
| LO1279 | DATES | PROCESSING PLANT AT VARIOUS | |||
| LOCAT | ION (PUNJAR, KHAIRPUR & DHARKI) : | ||||
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 17,389,000 | ||
| 044101 | **-**A052 | Grants-Domestic | 17,389,000 | ||
| **044101 ** | - A09 | Physical Assets | 33,000,000 | ||
| 044101 | **-**A091 | Purchase of Building | 30,000,000 | ||
| 044101 | **-**A092 | Computer Equipment | 3,000,000 | ||
| Total- | Dates Processing Plant at Various Location (Punjar, Khairpur & Dharki) | 50,389,000 | |||
| LO1280 | INDUSTRIAL DESIGN AND AUTOMATION | ||||
| CENTR | E : | ||||
| **044101 ** | - A01 | Employees Related Expenses | 5,400,000 | ||
| 044101 | **-**A011 | Pay 3 | 5,400,000 | ||
| 044101 | **-**A011-1 | Pay of Officers (1) | (3,000,000) | ||
| 044101 | **-**A011-2 | Pay of Other Staff (2) | (2,400,000) | ||
| **044101 ** | - A03 | Operating Expenses | 1,600,000 | ||
| 044101 | - A039 | General | 1,600,000 | ||
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 15,000,000 | ||
| 044101 | **-**A052 | Grants-Domestic | 15,000,000 | ||
| **044101 ** | - A09 | Physical Assets | 78,000,000 | ||
| 044101 | **-**A091 | Purchase of Building | 23,000,000 | ||
| 044101 | **-**A096 | Purchase of Plant and Machinery | 55,000,000 | ||
| Total- | Industrial Design and Automation Centre | 100,000,000 | |||
| 044101 | Total-Support for Industrial Development | 1,097,526,000 | 568,906,000 | 1,075,205,000 | |
| 0441 | Total- Manufacturing | 1,097,526,000 | 568,906,000 | 1,075,205,000 | |
| 044 | Total-Mining and Manufacturing | 1,097,526,000 | 568,906,000 | 1,075,205,000 | |
| 04 | Total-Economic Affairs | 1,097,526,000 | 568,906,000 | 1,075,205,000 | |
| Total- | Accountant General Pakistan Revenues, | ||||
| Sub Office, Lahore. | 1,097,526,000 | 568,906,000 | 1,075,205,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
| No. of Posts | 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|---|
| 2017-18 2018-19 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, KARACHI
04 ECONOMIC AFFAIRS : 044 MINING AND MANUFACTURING : 0441 MANUFACTURING :
| 044101 SUPPORT FOR INDUSTRIAL DEVELOPMENT : |
|---|
KA1295 UPGRADATION OF PMTF FACILITIES AND DESIGN CENTRE :
| 044101 | - A03 | Operating Expenses | 2,078,000 |
|---|---|---|---|
| 044101 | - A038 | Travel & Transportation | 2,078,000 |
| **044101 ** | - A09 | Physical Assets | 97,922,000 |
| 044101 | **-**A096 | Purchase of Plant and Machinery | 91,164,000 |
| 044101 | **-**A097 | Purchase of Furniture and Fixture | 1,000,000 |
| 044101 | **-**A098 | Purchase of Other Aset | 5,758,000 |
| Total- | Upgradation of PMTF Facilities and | ||
| Design Centre | 100,000,000 |
KA3065 INFRASTRUCTURE DEVELOPMENT OF
EXPORT PROCESSING ZONE AT
GAWADAR (CPEC) :
| 044101 | - A01 | Employees Related Expenses | 15,961,000 | 11,261,000 | |
|---|---|---|---|---|---|
| 044101 | **-**A011 | Pay 18 | 18 | 15,961,000 | 11,261,000 |
| 044101 | **-**A011-1 | Pay of Officers (18) | (18) | (15,961,000) | (11,261,000) |
| **044101 ** | - A03 | Operating Expenses | 55,000,000 | 40,000,000 | |
| 044101 | - A037 | Consultancy and Contractual Work | 50,000,000 | 35,000,000 | |
| 044101 | - A039 | General | 5,000,000 | 5,000,000 | |
| **044101 ** | - A05 | Grants, Subsidies and Write off Loans | 10,000,000 | 2,739,000 | |
| 044101 | **-**A052 | Grants-Domestic | 10,000,000 | 2,739,000 | |
| **044101 ** | - A09 | Physical Assets | 16,000,000 | 16,000,000 | |
| 044101 | **-**A092 | Computer Equipment | 2,000,000 | 2,000,000 | |
| 044101 | **-**A095 | Purchase of Transport | 10,000,000 | 10,000,000 | |
| 044101 | **-**A097 | Purchase of Furniture and Fixture | 3,000,000 | 3,000,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEMANDS FOR GRANTS DEVELOPMENT
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, | KARACHI - concld. | ||||
| 044101 | **-**A098 | Purchase of Other Assets | 1,000,000 | 1,000,000 | |
| **044101 ** | - A12 | Civil Works | 1,020,000,000 | 30,000,000 | |
| 044101 | **-**A121 | Roads, Highways and Bridges | 300,000,000 | ||
| 044101 | - A123 | Embankment and Drainage Works | 250,000,000 | ||
| 044101 | - A124 | Building and Structures | 470,000,000 | 30,000,000 | |
| Total- | Infrastructure Development of Export Processing Zone at | ||||
| Gawadar (CPEC) | 1,116,961,000 | 100,000,000 | |||
| 044101 | Total-Support for Industrial Development | 1,116,961,000 | 200,000,000 | ||
| 0441 | Total- Manufacturing | 1,116,961,000 | 200,000,000 | ||
| 044 | Total-Mining and Manufacturing | 1,116,961,000 | 200,000,000 | ||
| 04 | Total-Economic Affairs | 1,116,961,000 | 200,000,000 | ||
| Total- | Accountant General Pakistan Revenues, | ||||
| Sub Office, Karachi. | 1,116,961,000 | 200,000,000 |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA
| 04 | ECONOMIC AFFAIRS : | ||
|---|---|---|---|
| 044 | MINING | AND MANUFACTURING : | |
| 0441 | MANUFACTURING : | ||
| 044101 | SUPPORT FOR INDUSTRIAL DEVELOPMENT : | ||
| **QA0419 ** | PROVI INDUS | SION OF INFRASTRUCTURE IN QUETTA TRIAL AND TRADING ESTATE (PHASE-IV) : | |
| **044101 ** | - A12 | Civil Works | 76,567,000 |
| 044101 | **-**A121 | Roads Highways and Bridge | 13,500,000 |
| 044101 | **-**A123 | Embankment and Drainage Works | 9,062,000 |
| 044101 | **-**A125 | Other Works | 54,005,000 |
| Total- | Provision of Infrastructure in Quetta Industrial and Trading Estate (Phase-IV) | 76,567,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEMANDS FOR GRANTS DEVELOPMENT
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA.-Contd.
QA0420 ESTABLISHMENT OF INFRASTRUCTURE IN QUETTA INDUSTRIAL AND TRADING ESTATE (PHAS-II):
| 044101 | - A12 | Civil Works | 122,625,000 |
|---|---|---|---|
| 044101 | **-**A123 | Embankment and Drinage Works | 48,115,000 |
| 044101 | **-**A125 | Others Works | 74,510,000 |
| Total- | Establishment of Infrastructure | ||
| in Quetta Industrial and Trading | |||
| Estate (Phase-II) | 122,625,000 |
QA0524 WATER SUPPLY SCHEME FOR HUB INDUSTRIAL
| TRADIN | G ESTATE PHASE-II (EXTENSION) : | ||
|---|---|---|---|
| **044101 ** | - A01 | Employees Related Expenses | 2,442,000 |
| 044101 | **-**A011 | Pay | 594,000 |
| 044101 | **-**A011-2 | Pay of Other Staff | (594,000) |
| 044101 | **-**A012 | Allowances | 1,848,000 |
| 044101 | **-**A012-1 | Regular Allowances | (1,848,000) |
| **044101 ** | - A03 | Operating Expenses | 2,894,000 |
| 044101 | - A037 | Consultany and Contractual Work | 2,294,000 |
| 044101 | - A038 | Travel & Transportation | 500,000 |
| 044101 | - A039 | General | 100,000 |
| **044101 ** | - A12 | Civil Works | 106,519,000 |
| 044101 | **-**A124 | Building and Structures | 106,519,000 |
| Total- | Water Supply Scheme for HUB Industrial Trading Estate Phase II (Extension) | 111,855,000 | |
| **QA0536 ** | ESTAB ESTATE | LISHMENT OF BOSTAN INDUSTRIAL PHASE-I : | |
| **044101 ** | - A12 | Civil Works | 211,736,000 |
| 044101 | **-**A121 | Roads Highways and Bridge | 38,418,000 |
NO. 149.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
| 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|
| Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA.-Concld. | |||
|---|---|---|---|
| 044101 | **-**A123 | Embankment and Drinage Works | 46,534,000 |
| 044101 | **-**A125 | Other Works | 126,784,000 |
| Total- | Establishment of Bostan Industrial Estate Phase-I | 211,736,000 | |
| 044101 | Total-Support for Industrial Development | 522,783,000 | |
| 0441 | Total- Manufacturing | 522,783,000 | |
| 044 | Total-Mining and Manufacturing | 522,783,000 | |
| 04 | Total-Economic Affairs | 522,783,000 | |
| Total- | Accountant General Pakistan Revenues, | ||
| Sub Office, Quetta | 522,783,000 | ||
| TOTAL- DEMAND | 2,737,270,000 568,906,000 1,775,205,000 |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 150.-Maritime Affairs Division,
SECTION VII
CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
| 2018-2019 Budget Estimate (Rupees in Thousand) | |
|---|---|
| Demand presented on behalf of the | |
| Capital Outlay on Maritime Affairs Division | |
| Development Expenditure on Capital Account. | |
| 150 Capital Outlay on Maritime Affairs Division | 10,118,683 |
| Total:- 10,118,683 |
NO. 150.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 150 (FC12C51)
CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 to defray the Salaries and other expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION.
Voted Rs. 10,118,683,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION.
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| FUNCTIONAL CLASSIFICATION : | ||||
| 017 | Research and Development General Public | 27,196,000 | ||
| 019 | General Public Service Not Elsewhere Defined | 109,419,000 | ||
| 042 | Agriculture, Food, Irrigation, Forestry and Fisheries | 120,000,000 | ||
| 045 | Construction and Transport | 18,556,000 | ||
| 046 | Communication | 9,843,512,000 | ||
| Total:- | 10,118,683,000 | |||
| OBJECT CLASSIFICATION : | ||||
| A01 | Employees Related Expenses | 20,752,000 | ||
| A011 | Pay | 19,920,000 | ||
| A011-1 | Pay of Officers | (14,104,000) | ||
| A011-2 | Pay of Other Staff | (5,816,000) | ||
| A012 | Allowances | 832,000 | ||
| A012-2 | Other Allowances (Excluding TA) | (832,000) | ||
| A02 | Project Pre-Investment Analysis | 953,525,000 | ||
| A03 | Operating Expenses | 27,951,000 | ||
| A06 | Transfers | 2,000,000 | ||
| A09 | Physical Assets | 932,840,000 | ||
| A12 | Civil Works | 8,032,068,000 | ||
| A13 | Repairs and Maintenance | 149,547,000 | ||
| Total:- | 10,118,683,000 | |||
| ` | (In Foreign Exchange) (Own Resources) | (6,335,260,000) | ||
| (Foreign Aid) | (6,335,260,000) | |||
| (In Local Currency) | (3,783,423,000) |
NO. 150.- CAPITAL OUTLAY ON MARITIME DEMANDS FOR GRANTS AFFAIRS DIVISION
III. - DETAILS are as follows :- No. of Posts 2017-2018 2017-2018 2018-2019 2017-18 2018-19 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, KARACHI --Contd. 01 GENERAL PUBLIC SERVICES : 017 RESEARCH AND DEVELOPMENT GENERAL PUBLIC : 0171 RESEARCH AND DEVELOPMENT GENERAL PUBLIC SERVICES : 017103 MARINE/BIOLOGY/ZOOLOGY :
| KA1310 | SURVE MANAG OF THE | YS TO FIND POPULATION DYNAMICS & EMENT OF VERTEBRATE DIVERSITY COASTAL AREA OF SINDH & BALOCHISTAN | |
|---|---|---|---|
| **017103 ** | - A01 | Employees Related Expenses | 17,066,000 |
| 017103 | **-**A011 | Pay 15 | 16,234,000 |
| 017103 | **-**A011-1 | Pay of Officers (10) | (11,930,000) |
| 017103 | **-**A011-2 | Pay of Other Staff (5) | (4,304,000) |
| 017103 | **-**A012 | Allowances | 832,000 |
| 017103 | **-**A012-2 | Other Allowances (Excluding T.A) | (832,000) |
| **017103 ** | - A03 | Operating Expenses | 3,095,000 |
| 017103 | **-**A032 | Communications | 45,000 |
| 017103 | **-**A034 | Occupancy Costs | 100,000 |
| 017103 | **-**A038 | Travel & Transportation | 2,000,000 |
| 017103 | **-**A039 | General | 950,000 |
| **017103 ** | - A09 | Physical Assets | 6,485,000 |
| 017103 | **-**A092 | Computer Equipment | 900,000 |
| 017103 | **-**A095 | Purchase of Transport | 2,900,000 |
| 017103 | **-**A096 | Purchase of Plant and Machinery | 2,500,000 |
| 017103 | **-**A097 | Purchase of Furniture and Fixture | 185,000 |
| **017103 ** | - A13 | Repair and Maintenance | 550,000 |
| 017103 | - A130 | Transport | 250,000 |
| 017103 | **-**A131 | Machinery and Equipment | 100,000 |
| 017103 | **-**A132 | Furniture & Fixture | 100,000 |
| 017103 | **-**A137 | Computer Equipment | 100,000 |
| Total- | Survey To Find Population Dynamics & | ||
| Management Of Vertebrate Diversity | |||
| Of The Coastal Area Of Sindh | 27,196,000 | ||
| 017103 | Total-Marine/Biology/Zoology | 27,196,000 | |
| 0171 | Total-Research and Development | ||
| General Public Services | 27,196,000 | ||
| 017 | Total-Research and Development | ||
| General Public | 27,196,000 |
| NO. 150 | .- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION | DEMANDS | FOR GRANTS | |
|---|---|---|---|---|
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, KARACHI --Contd. | ||||
| 019 | GENERAL PUBLIC SERVICES NOT ELSEWHERE DEFINED : | |||
| 0191 | GENERAL PUBLIC SERVICES NOT ELSEWHERE DEFINED : | |||
| 019101 | ADMINISTRATIVE TRAINING : | |||
| KA1312 | PURCHASE OF ECDIS-RADAR-ARPA GMDSS | |||
| AND HI PMA A | GH VOLTAGE SIMULATOR FOR T MAURIPUR, KARACHI : | |||
| **019101 ** | - A09 | Physical Assets | 30,000,000 | |
| 019101 | **-**A096 | Purchase of Plant and Machinery | 30,000,000 | |
| Total- | Purchase of ECDIS-RADAR-ARPA GMDSS and High Voltage Simulator for PMA at Mauripur, Karachi | 30,000,000 | ||
| KA1316 | REHAB AUDOT MESS I | ILITATION OF ADMIN BLOCK ORIUM QUARTER DECK OFFICER N PREMISES OF PMA : | ||
| **019101 ** | - A13 | Repairs and Maintenance | 59,566,000 | |
| 019101 | **-**A133 | Buildings and Structure | 59,566,000 | |
| Total- | Rehabilitation of Admin Block Audotorium Quarter Deck Officer Mess In Premises Of PMA | 59,566,000 | ||
| KA1317 | CONST OF SEA | RUCTION / RENOVATION / REHABILITATION MEN HOSTEL KEMARI (PMA CITY CAMPUS) : | ||
| **019101 ** | - A13 | Repairs and Maintenance | 19,853,000 | |
| 019101 | **-**A133 | Buildings and Structure | 19,853,000 | |
| Total- | Construction / Renovation / Rehabilitation Of Seamen Hostel Kemari (PMA City Campus) | 19,853,000 | ||
| 019101 | Total-Administrative Training | 109,419,000 | ||
| 0191 | Total-General Public Service Not | |||
| Elsewhere Defined | 109,419,000 | |||
| 019 | Total-General Public Service Not | |||
| Elsewhere Defined | 109,419,000 | |||
| 01 | Total-General Public Service | 136,615,000 |
NO. 150.- CAPITAL OUTLAY ON MARITIME DEMANDS FOR GRANTS AFFAIRS DIVISION 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, KARACHI --Contd. | |||
|---|---|---|---|
| 04 | ECONOMIC AFFAIRS : | ||
| 042 | AGRICULTURE, FOOD, IRRIGATION, FORESTRY& FISHERIES : | ||
| 0425 | FISHING : | ||
| 042501 | ADMINISTRATION : | ||
| KA1313 | CONSTRUCTION OF PORT BOUNDARY WALL OF | ||
| KOFHA | , KARACHI, SINDH : | ||
| **042501 ** | - A12 | Civil Works | 60,000,000 |
| 042501 | **-**A124 | Building and Structures | 60,000,000 |
| Total- | Construction of Port Boundary Wall Of | ||
| Kofha Karachi, Sindh | 60,000,000 | ||
| KA1315 | REPAIR KOFHA | OF JETTY STRUCTURE & PORT INSTALLATION , KARACHI, SINDH : | |
| **042501 ** | - A13 | Repairs and Maintenance | 60,000,000 |
| 042501 | **-**A133 | Buildings and Structure | 60,000,000 |
| Total- | Repair Of Jetty Structure & Port | ||
| Installation Kofha, Karachi, Sindh | 60,000,000 | ||
| 042501 | Total-Administration | 120,000,000 | |
| 0425 | Total-Fishing | 120,000,000 | |
| 042 | Total-Agriculture, Food, Irrigation, | ||
| Forestry and Fisheries | 120,000,000 | ||
| 045 | CONSTRUCTION AND TRANSPORT : | ||
| 0453 | WATER | TRANSPORT : | |
| 045301 | PORTS | AND SHIPPING: | |
| KA1314 | ENHANCEMENT OF SEAFARER REPORTING | ||
| MODULE & INSTALLATION ON NEW | |||
| COMPUTER HARD/IC CARD PRINTER : | |||
| **045301 ** | - A03 | Operating Expenses | 18,556,000 |
| 045301 | **-**A039 | General | 18,556,000 |
| Total- | Computer Hard /IC Card Printer Enhancement Of Seafarer Reporting Module & Installation On New | 18,556,000 |
| NO. 150 | .- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION | DEMAND | S FOR GRANTS | ||
|---|---|---|---|---|---|
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
| Rs | Rs | Rs | |||
| A | CCOUNTANT GENERAL PAKISTAN REVEN | UES, SUB OFFICE | , KARACHI --Concld. | ||
| 045301 | Total-Ports and Shipping | 18,556,000 | |||
| 0453 | Total-Water Transport | 18,556,000 | |||
| 045 | Total-Construction and Transport | 18,556,000 | |||
| 046 | COMMUNICATIONS | ||||
| 0461 | COMMUNICATIONS | ||||
| 046101 | ADMIN | STRATION | |||
| KA1311 | FEASIBILITY STUDY FOR OIL STORAGE CONSTRUCTION AT OIA KEMARI, KARACHI : | ||||
| **046101 ** | - A02 | Project Pre-Investment Analysis | 702,025,000 | ||
| 046101 | **-**A021 | Feasibility Study | 702,025,000 | ||
| Total- | Feasibility Study For Oil Storage Construction At Oil Kemari, Karachi | 702,025,000 | |||
| 046101 | Total-Administration | 702,025,000 | |||
| 0461 | Total-Communications | 702,025,000 | |||
| 046 | Total-Communications | 702,025,000 | |||
| 04 | Total-Economic Affairs | 840,581,000 | |||
| Total- | Accountant General Pakistan Revenues, Sub Office, Karachi | 977,196,000 | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB-OFFICE, QUETTA | |||||
| 04 | ECONOMIC AFFAIRS : | ||||
| 046 | COMMUNICATIONS: | ||||
| 0461 | COMMUNICATIONS: | ||||
| 046101 | ADMIN | STRATION: | |||
| **GR2015 ** | CONST TO LIN ROAD | RUCTION OF EAST BAY EXPRESSWAY K GWADAR PORT WITH NATIONAL NETWORK, GAWDAR : | |||
| **046101 ** | - A12 | Civil Works | 6,035,260,000 | ||
| 046101 | **-**A121 | Roads Highways and Bridges | 6,035,260,000 | ||
| Total- | Construction of East Way Expressway To Gwadar Port with National road network, Gawdar | 6,035,260,000 |
| NO. 150.- CAPITAL OUTLAY ON MARITIME | DEMANDS FOR GRANTS | ||
|---|---|---|---|
| AFFAIRS DIVISION | |||
| 2017-2018 | 2017-2018 | 2018-2019 | |
| Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB-OFFICE, QUETTA --Contd.
| ` | (In Foreign Exchange) | (5,835,260,000) | |
|---|---|---|---|
| (Own Resources) (Foreign Aid) (In Local Currency) | (5,835,260,000) (200,000,000) | ||
| **GR2016 ** | UP GR | ADATION OF GPA HOUSING COMPLEX : | |
| **046101 ** | - A12 | Civil Works | 209,000,000 |
| 046101 | **-**A124 | Building and Structures | 209,000,000 |
| Total- | Up Gradation of GPA Housing Complex | 209,000,000 | |
| **GR2018 ** | FEASIBILITY STUDY OF CONSTRUCTION | ||
| OF BREAK WATERS : | |||
| **046101 ** | - A02 | Project Pre-Investment Analysis | 194,000,000 |
| 046101 | **-**A021 | Feasibility Study | 194,000,000 |
| Total- | Feasibility Study of Construction of Break Waters | 194,000,000 | |
| **GR2019 ** | CAPITAL DREDGING OF BERTHING AREAS AND CHANNEL FOR ADDITIONAL TERMINAL : | ||
| **046101 ** | - A12 | Civil Works | 100,000,000 |
| 046101 | **-**A123 | Embankment and Drainage Works | 100,000,000 |
| Total- | Capital Dredging of Berthing Areas and Channel for Additional Terminal | 100,000,000 | |
| **GR2020 ** | PAK CHINA TECHNICAL & VOCATIONAL : INSTITUTE AT GAWADAR : | ||
| **046101 ** | - A12 | Civil Works | 625,583,000 |
| 046101 | **-**A124 | Building and Structures | 625,583,000 |
| Total- | Pak China Technical & Vocational Institute At Gawadar | 625,583,000 | |
| (In Foreign Exchange) (Own Resources) | (500,000,000) | ||
| (Foreign Aid) | (500,000,000) | ||
| (In Local Currency) | (125,583,000) |
NO. 150.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
DEMANDS FOR GRANTS
| No of Posts | 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|---|
| 2017-18 2018-19 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB-OFFICE, QUETTA --Contd.
GR2021 ESTABLISHMENT OF CPEC SUPPORT
| UNIT (C IN GPA | SO) FOR PROJECTS AND ACTIVITIES : | ||
|---|---|---|---|
| **046101 ** | - A01 | Employees Related Expenses | 3,686,000 |
| 046101 | **-**A011 | Pay 10 | 3,686,000 |
| 046101 | **-**A011-1 | Pay of Officers (3) | (2,174,000) |
| 046101 | **-**A011-2 | Pay of Other Staff (7) | (1,512,000) |
| **046101 ** | - A03 | Operating Expenses | 6,300,000 |
| 046101 | A036 | Motor Vehicles | 1,000,000 |
| 046101 | **-**A038 | Travel & Transportation | 2,700,000 |
| 046101 | **-**A039 | General | 2,600,000 |
| **046101 ** | - A06 | Transfers | 2,000,000 |
| 046101 | **-**A063 | Entertainment & Gifts | 2,000,000 |
| **046101 ** | - A09 | Physical Assets | 502,000 |
| 046101 | **-**A092 | Computer Equipment | 500,000 |
| 046101 | **-**A095 | Purchase of Transport | 1,000 |
| 046101 | **-**A096 | Purchase of Plant and Machinery | 1,000 |
| **046101 ** | - A13 | Repairs and Maintenance | 1,000,000 |
| 046101 | **-**A130 | Transport | 1,000,000 |
| Total- | Establishment Of CPEC SUPPORT Unit (CSU) For Project And Activities In GPA | 13,488,000 | |
| **GR2022 ** | REHABILITATION OF AUCTION HALL OF | ||
| GAWADAR MINI PORT : | |||
| **046101 ** | - A13 | Repairs and Maintenance | 8,578,000 |
| 046101 | **-**A133 | Buildings and Structure | 8,578,000 |
| Total- | Rehabilitation of Auction Hall of Gawadar Mini Port | 8,578,000 | |
| **GR2023 ** | LAND ACUISITION AS PER GAWADAR PORT | ||
| MASTER PLAN : | |||
| **046101 ** | - A09 | Physical Assets | 895,853,000 |
| 046101 | **-**A091 | Purchase of Building | 895,853,000 |
| Total- | Land Acuisition As Per Gawadar | ||
| Port Master Plan | 895,853,000 |
| NO. 150 | .- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION | DEMANDS FOR GRANTS | |||
|---|---|---|---|---|---|
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB-OFFICE, | QUETTA --Contd. | ||||
| **GR2024 ** | BUSSINESS COMPLEX R. O PLANT (0.2m/g/d CAPACITY) : | ||||
| **046101 ** | - A12 | Civil Works | 319,441,000 | ||
| 046101 | **-**A124 | Buildings and Structure | 319,441,000 | ||
| Total- | Bussiness Complex R. O Plant (0.2m/g/d Capacity) | 319,441,000 | |||
| **GR2025 ** | FEASIBILITY STUDY OF PETROLEUM/PETRO CHEMICAL TERMINAL DIRTY DRY BULK | ||||
| TERMINAL : | |||||
| **046101 ** | - A02 | Project Pre-Investment Analysis | 57,500,000 | ||
| 046101 | **-**A021 | Feasibility Studies | 57,500,000 | ||
| Total- | Feasibility Study of Petroleum/Petro Chemical Terminal Dirty Dry Bulk Terminal | 57,500,000 | |||
| **GR2026 ** | DEVEL ALLIED | OPMENT AND CONSTRUCTION OF PORT STRUCTURES IN MULLAH BAND AREA : | |||
| **046101 ** | - A12 | Civil Works | 682,784,000 | ||
| 046101 | **-**A124 | Building and Structures | 682,784,000 | ||
| Total- | Development and Construction of Port | ||||
| Allied Structures in Mullah Band Area | 682,784,000 | ||||
| 046101 | Total-Administration | 9,141,487,000 | |||
| 0461 | Total-Communications | 9,141,487,000 | |||
| 046 | Total-Communications | 9,141,487,000 | |||
| 04 | Total-Economic Affairs | 9,141,487,000 | |||
| Total- | Accountant General Pakistan | ||||
| Revenues, Sub Office, Quetta | 9,141,487,000 | ||||
| (In Foreign Exchange) | (6,335,260,000) | ||||
| (Own Resources) | |||||
| (Foreign Aid) | (6,335,260,000) | ||||
| (In Local Currency) | (2,806,227,000) | ||||
| TOTAL - DEMAND | 10,118,683,000 | ||||
| (In Foreign Exchange) | (6,335,260,000) | ||||
| (Own Resources) | |||||
| (Foreign Aid) | (6,335,260,000) | ||||
| (In Local Currency) | (3,783,423,000) |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 150Un no. CAPITAL-OUTLAY-PORT & SHIPPIN
SECTION --
MINISTRY OF PORTS AND SHIPPING 2018-2019 Budget Estimate (Rupees in Thousand) Demand presented on behalf of the Ministry of Ports and Shipping Development Expenditure on Capital Account. -Capital Outlay on Ports and Shipping Division Total:-
.-- CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS
DEMAND NO. -- (FC12C43)
CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June, 2019 to defray the Salaries and other expenses of the CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION Voted Rs.
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF PORTS AND SHIPPING.
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| FUNCTIONAL CLASSIFICATION : | ||||
| 017 | Research and Development General Public | 11,286,000 | 5,904,000 | |
| 019 | General Public Service Not Elsewhere Defined | 55,000,000 | 25,000,000 | |
| 042 | Agriculture, Food, Irrigation, Forestry and Fisheries | 92,828,000 | 37,104,000 | |
| 045 | Construction and Transport | 12,616,556,000 | 2,620,372,000 | |
| Total- | 12,775,670,000 | 2,688,380,000 | ||
| OBJECT CLASSIFICATION : | ||||
| A01 | Employees Related Expenses | 37,073,000 | 5,736,000 | |
| A011 | Pay | 14,522,000 | 3,964,000 | |
| A011-1 | Pay of Officers | (10,311,000) | (1,265,000) | |
| A011-2 | Pay of Other Staff | (4,211,000) | (2,699,000) | |
| A012 | Allowances | 22,551,000 | 1,772,000 | |
| A012-1 | Regular Allowances . | (21,851,000) | (1,202,000) | |
| A012-2 | Other Allowances (Excluding TA) | (700,000) | (570,000) | |
| A02 | Project Pre-Investment Analysis | 240,000,000 | 14,350,000 | |
| A03 | Operating Expenses | 523,529,000 | 6,898,000 | |
| A06 | Transfers | 1,800,000 | 1,800,000 | |
| A09 | Physical Assets | 5,769,094,000 | 153,107,000 | |
| A12 | Civil Works | 6,151,921,000 | 2,455,796,000 | |
| A13 | Repairs and Maintenance | 52,253,000 | 50,693,000 | |
| Total- | 12,775,670,000 | 2,688,380,000 | ||
| ` | (In Foreign Exchange) (Own Resources) | (1,450,000,000) | (1,050,000,000) | |
| (Foreign Aid) | (1,450,000,000) | (1,050,000,000) | ||
| (In Local Currency) | (11,325,670,000) | (1,638,380,000) |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No. of Posts | 2017-2018 | 2017-2018 | 2018-2019 |
|---|---|---|---|
| 2017-18 2018-19 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, PESHAWAR 04 ECONOMIC AFFAIRS : 042 AGRICULTURE, FOOD, IRRIGATION, FORESTRY AND FISHERIES : 0425 FISHING : 042501 ADMINISTRATION :
PR0773 ESTABLISHMENT OF REGIONAL OFFICES AND TESTING
LAB. OF MARINE FISHERIES DEPARTMENT AT
PESHAWAR, KHYBER PAKHTUNKHWA :
| 042501 | - A01 | Employees Related Expenses | 6,882,000 | 1,308,000 |
|---|---|---|---|---|
| 042501 | **-**A011 | Pay 11 | 3,000,000 | 726,000 |
| 042501 | **-**A011-1 | Pay of Officers (4) | (1,500,000) | |
| 042501 | **-**A011-2 | Pay of Other Staff (7) | (1,500,000) | (726,000) |
| 042501 | **-**A012 | Allowances | 3,882,000 | 582,000 |
| 042501 | **-**A012-1 | Regular Allowances | (3,882,000) | (582,000) |
| **042501 ** | - A03 | Operating Expenses | 5,145,000 | 569,000 |
| 042501 | **-**A032 | Communications | 215,000 | 17,000 |
| 042501 | **-**A033 | Utilities | 500,000 | 103,000 |
| 042501 | **-**A034 | Occupancy Costs | 1,750,000 | 300,000 |
| 042501 | **-**A038 | Travel & Transportation | 700,000 | |
| 042501 | **-**A039 | General | 1,980,000 | 149,000 |
| **042501 ** | - A09 | Physical Assets | 15,173,000 | 6,173,000 |
| 042501 | **-**A091 | Purchase of Building | 9,000,000 | |
| 042501 | **-**A092 | Computer Equipment | 200,000 | 200,000 |
| 042501 | **-**A095 | Purchase of Transport | 100,000 | 100,000 |
| 042501 | **-**A096 | Purchase of Plant and Machinery | 5,373,000 | 5,373,000 |
| 042501 | **-**A097 | Purchase of Furniture and Fixture | 500,000 | 500,000 |
| **042501 ** | - A13 | Repair and Maintenance | 600,000 | |
| 042501 | **-**A131 | Machinery and Equipment | 500,000 | |
| 042501 | **-**A137 | Computer Equipment | 100,000 | |
| Total- | Establishment of Regional Offices and Testing Lab. of Marine Fisheries Department at | |||
| Peshawar, Khyber Pakhtunkhwa | 27,800,000 | 8,050,000 | ||
| 042501 | Total-Administration | 27,800,000 | 8,050,000 | |
| 0425 | Total-Fishing | 27,800,000 | 8,050,000 | |
| 042 | Total-Agriculture, Food, Irrigation, | |||
| Forestry and Fisheries | 27,800,000 | 8,050,000 | ||
| 04 | Total-Economic Services | 27,800,000 | 8,050,000 | |
| Total- | Accountant General Pakistan | |||
| Revenues, Sub Office, Peshawar | 27,800,000 | 8,050,000 |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS No. of Posts 2017-2018 2017-2018 2018-2019 2017-18 2018-19 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, KARACHI
01 GENERAL PUBLIC SERVICES :
017 RESEARCH AND DEVELOPMENT GENERAL PUBLIC :
0171 RESEARCH AND DEVELOPMENT GENERAL PUBLIC SERVICES : 017103 MARINE/BIOLOGY/ZOOLOGY :
KA3062 SURVEYS TO FIND POPULATION DYNAMICS & MANAGEMENT OF VERTEBRATE DIVERSITY OF THE COASTAL AREA OF SINDH & BALOCHISTAN :
| 017103 | - A01 | Employees Related Expenses | 3,671,000 | 270,000 |
|---|---|---|---|---|
| 017103 | **-**A011 | Pay 10 | 1,750,000 | |
| 017103 | **-**A011-1 | Pay of Officers (5) | (1,300,000) | |
| 017103 | **-**A011-2 | Pay of Other Staff (5) | (450,000) | |
| 017103 | **-**A012 | Allowances | 1,921,000 | 270,000 |
| 017103 | **-**A012-1 | Regular Allowances . | (1,521,000) | |
| 017103 | **-**A012-2 | Other Allowances (Excluding TA) | (400,000) | (270,000) |
| **017103 ** | - A03 | Operating Expenses | 2,765,000 | 884,000 |
| 017103 | **-**A032 | Communications | 15,000 | |
| 017103 | **-**A034 | Occupancy Costs | 300,000 | 100,000 |
| 017103 | **-**A038 | Travel & Transportation | 1,400,000 | 500,000 |
| 017103 | **-**A039 | General | 1,050,000 | 284,000 |
| **017103 ** | - A09 | Physical Assets | 4,700,000 | 4,700,000 |
| 017103 | **-**A092 | Computer Equipment | 300,000 | 300,000 |
| 017103 | **-**A095 | Purchase of Transport | 3,300,000 | 3,300,000 |
| 017103 | **-**A096 | Purchase of Plant and Machinery | 1,000,000 | 1,000,000 |
| 017103 | **-**A097 | Purchase of Furniture and Fixture | 100,000 | 100,000 |
| **017103 ** | - A13 | Repairs and Maintenance | 150,000 | 50,000 |
| 017103 | **-**A130 | Transport | 50,000 | |
| 017103 | **-**A131 | Machinery and Equipment | 50,000 | |
| 017103 | **-**A132 | Furniture & Fixture | 50,000 | 50,000 |
| Total- | Surveys to Find Population Dynamics & Management of Vertebrate Diversity of the Coastal Area of Sindh & Balochistan | 11,286,000 | 5,904,000 | |
| 017103 | Total-Marine/Biology/Zoology | 11,286,000 | 5,904,000 | |
| 0171 | Total-Research and Development | |||
| General Public Services | 11,286,000 | 5,904,000 | ||
| 017 | Total-Research and Development | |||
| General Public | 11,286,000 | 5,904,000 |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS No. of Posts 2017-2018 2017-2018 2018-2019 2017-18 2018-19 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, KARACHI.-Contd 01 GENERAL PUBLIC SERVICES :
019 GENERAL PUBLIC SERVICES NOT ELSEWHERE DEFINED : 0191 GENERAL PUBLIC SERVICES NOT ELSEWHERE DEFINED : 019101 ADMINISTRATIVE TRAINING :
KA3064 PURCHASE OF ECDIS-RADAR-ARPA GMDSS
AND HIGH VOLTAGE SIMULATOR FOR PMA AT MAURIPUR, KARACHI :
| 019101 | - A09 | Physical Assets | 55,000,000 | 25,000,000 |
|---|---|---|---|---|
| 019101 | **-**A096 | Purchase of Plant and Machinery | 55,000,000 | 25,000,000 |
| Total- | Purchase of ECDIS-RADAR-ARPA GMDSS | |||
| and High Voltage Simulator for | ||||
| PMA at Mauripur, Karachi | 55,000,000 | 25,000,000 | ||
| 019101 | Total-Administrative Training | 55,000,000 | 25,000,000 | |
| 0191 | Total-General Public Service Not | |||
| Elsewhere Defined | 55,000,000 | 25,000,000 | ||
| 019 | Total-General Public Service Not | |||
| Elsewhere Defined | 55,000,000 | 25,000,000 | ||
| 01 | Total-General Public Service | 66,286,000 | 30,904,000 |
04 ECONOMIC AFFAIRS : 042 AGRICULTURE, FOOD, IRRIGATION, FORESTRY& FISHERIES : 0425 FISHING : 042501 ADMINISTRATION :
KA1237 UP-GRADATION AND ACCREDITATION OF QUALITY CONTROL LAB. OF MARINE FISHERIES DEPARTMENT FOR ENVIRONMENTAL
CONTAMINANTS :
| 042501 - A01 | Employees Related Expenses | 9,300,000 | 269,000 |
|---|---|---|---|
| 042501 **-**A011 | Pay 12 | 2,000,000 | 155,000 |
| 042501 **-**A011-1 | Pay of Officers (12) | (2,000,000) | (155,000) |
| 042501 **-**A012 | Allowances | 7,300,000 | 114,000 |
| 042501 **-**A012-1 | Regular Allowances . | (7,300,000) | (114,000) |
.-- FC12C43 CAPITAL OUTLAY ON PORTS DEMANDS FOR GRANTS AND SHIPPING DIVISION
| 2017-18 2018-19 No. of Posts | 2017-2018 Budget Estimate Rs | 2017-2018 Revised Estimate Rs | 2018-2019 Budget Estimate Rs | ||
|---|---|---|---|---|---|
| **042501 ** | - A03 | Operating Expenses ACCOUNTANT GENERAL PAKISTAN REVEN | 2,988,000 UES, SUB OFFIC | 837,000 E, KARACHI.-Contd | |
| 042501 | **-**A032 | Communications | 60,000 | 6,000 | |
| 042501 | **-**A033 | Utilities | 500,000 | 200,000 | |
| 042501 | **-**A038 | Travel & Transportation | 500,000 | 200,000 | |
| 042501 | **-**A039 | General | 1,928,000 | 431,000 | |
| **042501 ** | - A09 | Physical Assets | 23,740,000 | 18,334,000 | |
| 042501 | **-**A092 | Computer Equipment | 100,000 | 40,000 | |
| 042501 | **-**A096 | Purchase of Plant and Machinery | 23,640,000 | 18,294,000 | |
| **042501 ** | - A13 | Repairs and Maintenance | 600,000 | 240,000 | |
| 042501 | **-**A131 | Machinery and Equipment | 500,000 | 200,000 | |
| 042501 | **-**A137 | Computer Equipment | 100,000 | 40,000 | |
| Total- | Up-Gradation and Accreditation of Quality Control Lab. of Marine | ||||
| Fisheries Deptartment for Enviromental | |||||
| Contaminants | 36,628,000 | 19,680,000 | |||
| 042501 | Total-Administration | 36,628,000 | 19,680,000 | ||
| 0425 | Total-Fishing | 36,628,000 | 19,680,000 | ||
| 042 | Total-Agriculture, Food, Irrigation, | ||||
| Forestry and Fisheries | 36,628,000 | 19,680,000 |
045 CONSTRUCTION AND TRANSPORT : 0453 WATER TRANSPORT : 045301 PORTS AND SHIPPING:
KA3028 PROVISION OF COAL CONEYING SYSTEM FROM PAKISTAN INTERNATIONAL BULK
TERMINAL (PITB) TO RAILWAY NETWORK AT PORT QASIM :
| 045301 - A01 | Employees Related Expenses | 3,998,000 | |
|---|---|---|---|
| 045301 **-**A011 | Pay | 10 | 2,000 |
| 045301 **-**A011-1 | Pay of Officers | (6) | (1,000) |
| 045301 **-**A011-2 | Pay of Other Staff | (4) | (1,000) |
| 045301 **-**A012 | Allowances | 3,996,000 | |
| 045301 **-**A012-1 | Regular Allowances . | (3,996,000) |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, | KARACHI.-Concld. | ||||
| **045301 ** | - A03 | Operating Expenses | 501,001,000 | ||
| 045301 | **-**A034 | Occupancy Costs | 500,000,000 | ||
| 045301 | **-**A039 | General | 1,001,000 | ||
| **045301 ** | - A09 | Physical Assets | 2,564,810,000 | ||
| 045301 | **-**A096 | Purchase of Plant and Machinery | 2,564,810,000 | ||
| **045301 ** | - A12 | Repairs and Maintenance | 500,000,000 | ||
| 045301 | **-**A124 | Machinery and Equipment | 500,000,000 | ||
| Total- | Provision of Coal Coneying System from Pakistan International Buik Terminal | ||||
| (PITB) to Railway Network at Port Qasim | 3,569,809,000 | ||||
| KA3063 | OIL STORAGE CONSTRUCTION AT | ||||
| OIA KE | MARI, KARACHI : | ||||
| **045301 ** | - A12 | Civil Works | 1,750,000,000 | ||
| 045301 | - A124 | Building & Structures | 1,750,000,000 | ||
| Total- | Oil Storage Construction at OIA | ||||
| Kemari, Karachi | 1,750,000,000 | ||||
| 045301 | Total-Ports and Shipping | 5,319,809,000 | |||
| 0453 | Total-Water Transport | 5,319,809,000 | |||
| 045 | Total-Construction and Transport | 5,319,809,000 | |||
| 04 | Total-Economic Affairs | 5,356,437,000 | 19,680,000 | ||
| Total- | Accountant General Pakistan | ||||
| Revenues, Sub Office, Karachi | 5,422,723,000 | 50,584,000 |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS No. of Posts 2017-2018 2017-2018 2018-2019 2017-18 2018-19 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA 04 ECONOMIC AFFAIRS : 042 AGRICULTURE, FOOD, IRRIGATION FORESTRY AND FISHERIES : 0425 FISHING : 042501 ADMINISTRATION :
GR0076 ESTABLISHMENT. OF REGIONAL OFFICES AND TESTING LAB. OF MARINE FISHERIES DEPARTMENT AT GWADAR (BALOCHISTAN) :
| 042501 | - A01 | Employees Related Expenses | 7,152,000 | 1,219,000 | |
|---|---|---|---|---|---|
| 042501 | **-**A011 | Pay | 13 | 2,000,000 | 713,000 |
| 042501 | **-**A011-1 | Pay of Officers | (4) | (1,000,000) | |
| 042501 | **-**A011-2 | Pay of Other Staff | (9) | (1,000,000) | (713,000) |
| 042501 | **-**A012 | Allowances | 5,152,000 | 506,000 | |
| 042501 | **-**A012-1 | Regular Allowances | (5,152,000) | (506,000) | |
| **042501 ** | - A03 | Operating Expenses | 6,748,000 | 926,000 | |
| 042501 | **-**A032 | Communications | 265,000 | 66,000 | |
| 042501 | **-**A033 | Utilities | 1,500,000 | 50,000 | |
| 042501 | **-**A034 | Occupancy Costs | 1,500,000 | 250,000 | |
| 042501 | **-**A038 | Travel & Transportation | 750,000 | 100,000 | |
| 042501 | **-**A039 | General | 2,733,000 | 460,000 | |
| **042501 ** | - A09 | Physical Assets | 14,000,000 | 7,229,000 | |
| 042501 | **-**A092 | Computer Equipment | 200,000 | 81,000 | |
| 042501 | **-**A095 | Purchase of Transport | 100,000 | ||
| 042501 | **-**A096 | Purchase of Plant and Machinery | 13,200,000 | 6,948,000 | |
| 042501 | **-**A097 | Purchase of Furniture and Fixture | 500,000 | 200,000 | |
| **042501 ** | - A13 | Repairs and Maintenance | 500,000 | ||
| 042501 | **-**A130 | Transport | 100,000 | ||
| 042501 | **-**A131 | Machinery and Equipment | 300,000 | ||
| 042501 | **-**A137 | Computer Equipment | 100,000 | ||
| Total- | Establishment Of Regional Offic | es and Testing | |||
| Lab. Of Marine Fisheries Department at | |||||
| Gwadar (Balochistan) | 28,400,000 | 9,374,000 | |||
| 042501 | Total-Administration | 28,400,000 | 9,374,000 | ||
| 0425 | Total-Fishing | 28,400,000 | 9,374,000 | ||
| 042 | Total-Agriculture, Food, Irrigation | ||||
| Forestry and Fisheries | 28,400,000 | 9,374,000 |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA.-Contd. 045 CONSTRUCTION AND TRANSPORT : 0453 WATER TRANSPORT : 045301 PORTS AND SHIPPING :
GR0036 CONSTRUCTION OF EXPRESSWAY ON
EAST BAY OF GWADAR PORT WITH NATIONAL ROAD NETWORK, GAWDAR :
| 045301 | - A12 | Civil Works | 1,450,000,000 | 1,163,000,000 |
|---|---|---|---|---|
| 045301 | **-**A121 | Roads Highways and Bridges | 1,450,000,000 | 1,163,000,000 |
| Total- | Construction of Expressway on | |||
| East Bay of Gwadar Port with National road network, Gawdar | 1,450,000,000 | 1,163,000,000 | ||
| ` | (In Foreign Exchange) | (1,050,000,000) | (1,050,000,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (1,050,000,000) | (1,050,000,000) | ||
| **GR0064 ** | UP GR | (In Local Currency) ADATION OF GPA HOUSING COMPLEX : | (400,000,000) | (113,000,000) |
| **045301 ** | - A12 | Civil Works | 366,921,000 | 237,796,000 |
| 045301 | **-**A124 | Building and Structures | 366,921,000 | 237,796,000 |
| Total- | Up Gradation of GPA Housing Complex | 366,921,000 | 237,796,000 | |
| **GR0068 ** | DEVEL ALLIED | OPMENT AND CONSTRUCTION OF PORT STRUCTURES IN MULLAH BAND AREA : | ||
| **045301 ** | - A12 | Civil Works | 1,235,000,000 | 1,035,000,000 |
| 045301 | **-**A124 | Building and Structures | 1,235,000,000 | 1,035,000,000 |
| Total- | Development and Construction of Port Allied Structures in Mullah Band Area | 1,235,000,000 | 1,035,000,000 |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS
| No. of Posts 2017-18 2018-19 | 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | ||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, | QUETTA.-Contd. | ||||
| **GR0071 ** | FEASIBILITY STUDY OF CONSTRUCTION OF BREAK WATERS : | ||||
| **045301 ** | - A02 | Project Pre-Investment Analysis | 180,000,000 | 14,350,000 | |
| 045301 | **-**A021 | Feasibility Study | 180,000,000 | 14,350,000 | |
| Total- | Feasibility Study of Construction of Break Waters | 180,000,000 | 14,350,000 | ||
| **GR0073 ** | DREDGING OF BERTHING AREAS AND CHANNEL FOR ADDITIONAL TERMINAL : | ||||
| **045301 ** | - A12 | Civil Works | 300,000,000 | ||
| 045301 | **-**A123 | Embankment and Drainage Works | 300,000,000 | ||
| Total- | Dredging of Berthing Areas and Channel for Additional Terminal | 300,000,000 | |||
| **GR0075 ** | PAK-CHINA TECHNICAL AND VOCATIONAL INSTITUTE AT GWADAR : | ||||
| **045301 ** | - A12 | Civil Works | 450,000,000 | 10,000,000 | |
| 045301 | **-**A124 | Buildings and Structure | 450,000,000 | 10,000,000 | |
| Total- | Pak-China Technical and Vocational Institute at Gwadar | 450,000,000 | 10,000,000 | ||
| ` | (In Foreign Exchange) | (400,000,000) | |||
| (Own Resources) | |||||
| (Foreign Aid) | (400,000,000) | ||||
| (In Local Currency) | (50,000,000) | (10,000,000) | |||
| **GR9004 ** | ESTAB (CSU) | LISHMENT OF CPEC SUPPORT UNIT FOR PROJECTS AND ACTIVITIES IN GPA : | |||
| **045301 ** | - A01 | Employees Related Expenses | 6,070,000 | 2,670,000 | |
| 045301 | **-**A011 | Pay 10 | 5,770,000 | 2,370,000 | |
| 045301 | **-**A011-1 | Pay of the Officers (6) | (4,510,000) | (1,110,000) | |
| 045301 | **-**A011-2 | Pay of Other Staff (4) | (1,260,000) | (1,260,000) |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA.-Contd. | |||||
| 045301 | **-**A012 | Allowances | 300,000 | 300,000 | |
| 045301 | **-**A012-2 | Other Allowances (Excluding TA) | (300,000) | (300,000) | |
| **045301 ** | - A03 | Operating Expenses | 4,882,000 | 3,682,000 | |
| 045301 | **-**A032 | Communications | 50,000 | 50,000 | |
| 045301 | **-**A036 | Motor Vehicles | 600,000 | 600,000 | |
| 045301 | **-**A038 | Travel & Transportation | 2,501,000 | 1,301,000 | |
| 045301 | **-**A039 | General | 1,731,000 | 1,731,000 | |
| **045301 ** | - A06 | Transfers | 1,800,000 | 1,800,000 | |
| 045301 | **-**A063 | Entertainment & Gifts | 1,800,000 | 1,800,000 | |
| **045301 ** | - A09 | Physical Assets | 16,001,000 | 16,001,000 | |
| 045301 | **-**A092 | Computer Eaquipment | 500,000 | 500,000 | |
| 045301 | **-**A095 | Purchase of Transport | 15,000,000 | 15,000,000 | |
| 045301 | **-**A096 | Purchase of plant and Machinery | 1,000 | 1,000 | |
| 045301 | **-**A097 | Purchase of Furniture & Fixture | 500,000 | 500,000 | |
| **045301 ** | - A13 | Repairs and Maintenance | 403,000 | 403,000 | |
| 045301 | **-**A130 | Transport | 300,000 | 300,000 | |
| 045301 | **-**A131 | Machinery and Equipment | 3,000 | 3,000 | |
| 045301 | **-**A137 | Computer Equipment | 100,000 | 100,000 | |
| Total- | Establishment of CPEC Support Unit (CSU) for Projects and activities in GPA | 29,156,000 | 24,556,000 | ||
| QA3072 | REHABILITATION OF AUCTION HALL OF | ||||
| GAWADAR MINI PORT : | |||||
| **045301 ** | - A13 | Repairs and Maintenance | 50,000,000 | 50,000,000 | |
| 045301 | **-**A133 | Buildings and Structure | 50,000,000 | 50,000,000 | |
| Total- | Rehabilitation of Auction Hall of | ||||
| Gawadar Mini Port | 50,000,000 | 50,000,000 |
.-- FC12C43 CAPITAL OUTLAY ON PORTS DEMANDS FOR GRANTS AND SHIPPING DIVISION
| 2017-2018 Budget Estimate | 2017-2018 Revised Estimate | 2018-2019 Budget Estimate | |||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA.-Contd. | |||||
| **QA3073 ** | LAND SHIPS | ACUISITION AND CONSTRUCTION OF WORKSHOP AT GAWADAR : | |||
| **045301 ** | - A09 | Physical Assets | 17,550,000 | 17,550,000 | |
| 045301 | **-**A091 | Purchase of Building | 17,550,000 | 17,550,000 | |
| Total- | Land Acuisition and Construction of Ships Workshop at Gawadar | 17,550,000 | 17,550,000 | ||
| **QA3074 ** | LAND AT GA | FOR OIL STORAGE CONSTRUCTION WADAR : | |||
| **045301 ** | - A09 | Physical Assets | 58,120,000 | 58,120,000 | |
| 045301 | **-**A091 | Purchase of Building | 58,120,000 | 58,120,000 | |
| Total- | Land for Oil Storage Construction at Gawadar | 58,120,000 | 58,120,000 | ||
| **QA3075 ** | LAND MASTE | ACUISITION AS PER GAWADAR PORT R PLAN : | |||
| **045301 ** | - A09 | Physical Assets | 3,000,000,000 | ||
| 045301 | **-**A091 | Purchase of Building | 3,000,000,000 | ||
| Total- | Land Acuisition as Per Gawadar Port Master Plan | 3,000,000,000 | |||
| **QA3076 ** | BUSSINESS COMPLEX R. O PLANT (0.2m/g/d | ||||
| CAPACITY) : | |||||
| **045301 ** | - A12 | Civil Works | 100,000,000 | 10,000,000 | |
| 045301 | **-**A124 | Buildings and Structure | 100,000,000 | 10,000,000 | |
| Total- | Bussiness Complex R. O Plant (0.2m/g/d | ||||
| Capacity) | 100,000,000 | 10,000,000 |
.-- FC12C43 CAPITAL OUTLAY ON PORTS AND SHIPPING DIVISION
DEMANDS FOR GRANTS 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA.-Concld.
QA3077 FEASIBILITY STUDY OF PETROLEUM/PETRO CHEMICAL TERMINAL DIRTY DRY BULK TERMINAL :
| 045301 | - A02 | Project Pre-Investment Analysis | 60,000,000 | |
|---|---|---|---|---|
| 045301 | **-**A021 | Feasibility Studies | 60,000,000 | |
| Total- | Feasibility Study of Petroleum/Petro Chemical Terminal Dirty Dry Bulk Terminal | 60,000,000 | ||
| 045301 | Total-Ports and Shipping | 7,296,747,000 | 2,620,372,000 | |
| 0453 | Total-Water Transport | 7,296,747,000 | 2,620,372,000 | |
| 045 | Total-Construction and Transport | 7,296,747,000 | 2,620,372,000 | |
| 04 | Total-Economic Affairs | 7,325,147,000 | 2,629,746,000 | |
| Total- | Accountant General Pakistan | |||
| Revenues, Sub Office, Quetta | 7,325,147,000 | 2,629,746,000 | ||
| ` | (In Foreign Exchange) | (1,450,000,000) | (1,050,000,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (1,450,000,000) | (1,050,000,000) | ||
| (In Local Currency) | (5,875,147,000) | (1,579,746,000) | ||
| TOTAL- DEMAND | 12,775,670,000 | 2,688,380,000 | ||
| ` | (In Foreign Exchange) | (1,450,000,000) | (1,050,000,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (1,450,000,000) | (1,050,000,000) | ||
| (In Local Currency) | (11,325,670,000) | (1,638,380,000) |
(B) DEVELOPMENT EXPENDITURE ON CAPITAL ACCOUNT / 150un No.CAPITAL-OUTLAY-PETROLEUM-NR
SECTION --
MINISTRY OF PETROLEUM AND NATURAL RESOURCES
2018-2019 Budget Estimate (Rupees in Thousand) Demands presented on behalf of the Ministry of Petroleum and Natural Resources. Development Expenditure on Capital Account. -Capital Outlay on Petroleum and Natural Resources Total:-
.-- CAPITAL OUTLAY ON PETROLEUM AND NATURAL RESOURCES
DEMANDS FOR GRANTS
DEMAND NO. --
(FC12C30)
CAPITAL OUTLAY ON PETROLEUM AND NATURAL RESOURCES
I. ESTIMATES of the Amount required in the year ending 30 June, 2019, to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON PETROLEUM AND NATURAL RESOURCES.
Voted Rs.
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF PETROLEUM AND NATURAL RESOURCES.
| FUNCTIONAL CLASSIFICATION : | 2017-2018 Budget Estimate Rs | 2017-2018 Revised Estimate Rs | 2018-2019 Budget Estimate Rs | |
|---|---|---|---|---|
| 041 | General Economic, Commercial and Labour Affairs | 554,291,000 | 2,496,000 | |
| Total- | 554,291,000 | 2,496,000 | ||
| OBJECT CLASSIFICATION : | ||||
| A01 | Employees Related Expenses | 27,536,000 | 125,000 | |
| A011 | Pay | 14,812,000 | ||
| A011-1 | Pay of Officers | (7,811,000) | ||
| A011-2 | Pay of other Staff | (7,001,000) | ||
| A012 | Allowances | 12,724,000 | 125,000 | |
| A012-1 | Regular Allowances | (8,581,000) | (100,000) | |
| A012-2 | Other Allowances (Excluding TA) | (4,143,000) | (25,000) | |
| A03 | Operating Expenses | 43,919,000 | 1,986,000 | |
| A09 | Physical Assets | 476,384,000 | 155,000 | |
| A13 | Repairs and Maintenance | 6,452,000 | 230,000 | |
| Total- | 554,291,000 | 2,496,000 |
.-- FC12C30 CAPITAL OUTLAY ON PETROLEUM AND NATURAL RESOURCES III. - DETAILS are as follows :-
DEMANDS FOR GRANTS 2017-2018 2017-2018 2018-2019 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs ACCOUNTANT GENERAL PAKISTAN REVENUES, SUB OFFICE, QUETTA
| 04 041 | ECONOMIC AFFAIRS: GENERAL ECONOMIC, COMMERCIAL AND LABOUR AFFAIRS: | |||
|---|---|---|---|---|
| 0411 | GENERAL ECONOMIC AFFAIRS: | |||
| 041103 | GEOLOGICAL SURVEY: | |||
| **QA0313 ** | EXPLORATION AND EVALUATION OF | |||
| METAL UTHAL BALOC | LIC MINERALS IN BEALA AND AREAS, DISTT LASBELA HISTAN : | |||
| 041103 | -A01 | Employees Related Expenses. | 1,392,000 | 125,000 |
| 041103 | - A012 | Allowances | 1,392,000 | 125,000 |
| 041103 | - A012-1 | Regular Allowances | (1,000,000) | (100,000) |
| 041103 | - A012-2 | Other Allowances (Excluding T.A) | (392,000) | (25,000) |
| 041103 | -A03 | Operating Expenses | 5,600,000 | 1,986,000 |
| 041103 | - A033 | Utilities | 50,000 | 18,000 |
| 041103 | - A034 | Occupancy Costs | 50,000 | |
| 041103 | - A038 | Travel & Transportation | 3,700,000 | 1,468,000 |
| 041103 | - A039 | General | 1,850,000 | 450,000 |
| 041103 | -A09 | Physica Assets | 700,000 | 155,000 |
| 041103 | - A092 | Computer Equipment | 300,000 | 130,000 |
| 041103 | - A096 | Purchase of Plant and machinery | 300,000 | 25,000 |
| 041103 | - A097 | Purchase of Furniture and Fixture | 100,000 | |
| 041103 | -A13 | Repairs and Maintenance | 1,300,000 | 230,000 |
| 041103 | - A130 | Transport | 900,000 | 230,000 |
| 041103 | - A131 | Machinery and Equipment | 300,000 | |
| 041103 | - A132 | Furniture and Fixture | 100,000 | |
| Total- | Exploration and evaluation of metallic mineral in Bela and Uthal | |||
| areas, Distt Lasbela, Balochistan | 8,992,000 | 2,496,000 |