Details of Demands for Grants and Appropriations (Volume-IV) Development Expenditure, part 6
The Details of Demands for Grants and Appropriations (Volume-IV) Development Expenditure is part of the federal budget for FY 2019-20. This page reproduces the text of its 584 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.
This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.
| NO. 144.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER No of Posts | RESOURC ES DIV 2018-2019 | ISION DEMAND 2018-2019 | S FOR GRANTS 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| QA9028 EXTE | SECTO NSION | R BALOCHISTAN OF PAT FEEDER CANAL FOR USE OF I | NDUS WATER IN BALOCHISTAN PACKAGE-III | ||
|---|---|---|---|---|---|
| 042203- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | |||
| 042203- A052 | Grants Domestic | 50,000,000 | |||
| Total- QA9030 TOIW | EXTEN FOR U BALO AR BAT | SION OF PAT FEEDER CANAL SE OF INDUS WATER IN CHISTAN PACKAGE-III OZAI DAM DISTT KILLA SAIFULLAH | 50,000,000 | ||
| 042203- A05 | Grants, Subsidies and Write off Loans | 1,000,000,000 | 800,000,000 | 9,783,000 | |
| 042203- A052 | Grants Domestic | 1,000,000,000 | 800,000,000 | 9,783,000 | |
| Total- | TOIWA | R BATOZAI DAM DISTT KILLA | 1,000,000,000 | 800,000,000 | 9,783,000 |
| SAIFULLAH | |||||
| QA9043 SHOR | E PROTECTION OF PASNI TOWNS BALOCHIS | TAN | |||
| 042203- A05 | Grants, Subsidies and Write off Loans | 198,000,000 | 198,000,000 | ||
| 042203- A052 | Grants Domestic | 198,000,000 | 198,000,000 | ||
| Total- | SHOR BALO | E PROTECTION OF PASNI TOWNS CHISTAN | 198,000,000 | 198,000,000 | |
| 042203 | Total- | Canal irrigation | 1,486,545,000 | 1,236,545,000 | 256,648,000 |
| 0422 | Total- | Irrigation | 8,012,113,000 | 3,955,985,000 | 8,961,127,000 |
| 042 | Total- | Agriculture,Food,Irrigation,Forestry and Fishing | 8,012,113,000 | 3,955,985,000 | 8,961,127,000 |
| 04 | Total- | Economic Affairs | 8,012,113,000 | 3,955,985,000 | 8,961,127,000 |
| 10 Social | Protection: | ||||
| 107 Admin | istration: | ||||
| 1071 Admin 107105 Flood QA9042 NORM | istration: Control : AL EMERGENT FLOOD PROGRAMME BALOC | HISTAN | |||
| 107105- A05 | Grants, Subsidies and Write off Loans | 80,000,000 | 80,000,000 | 40,000,000 | |
| 107105- A052 | Grants Domestic | 80,000,000 | 80,000,000 | 40,000,000 | |
| Total- | NORM PROG | AL EMERGENT FLOOD RAMME BALOCHISTAN | 80,000,000 | 80,000,000 | 40,000,000 |
| 107105 | Total- | Flood Control | 80,000,000 | 80,000,000 | 40,000,000 |
| 1071 | Total- | Administration | 80,000,000 | 80,000,000 | 40,000,000 |
| 107 | Total- | Administration | 80,000,000 | 80,000,000 | 40,000,000 |
| NO. 144.- FC22D84 D | EVELOPMENT EXPENDITURE OF WATE No of 2018-19 Posts 2019-20 | R RESOURC ES DI 2018-2019 Budget Estimate Rs | VISION DEMAN 2018-2019 Revised Estimate Rs | DS FOR GRANTS 2019-2020 Budget Estimate Rs |
|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | ||||
| 10 Total- | Social Protection | 80,000,000 | 80,000,000 | 40,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 8,092,113,000 | 4,035,985,000 | 9,001,127,000 |
| NO. 144.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER No of Posts | RESOURC ES DIV 2018-2019 | ISION DEMAND 2018-2019 | S FOR GRANTS 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT
| 04 | Economic Affairs: | |||||
|---|---|---|---|---|---|---|
| 042 | Agriculture,Food,Irrigation,Forestry and Fishing: | |||||
| 0422 | Irrigation: | |||||
| GL117 042202 | 2 DIAMER BAS Irrigation dam | HA DAM (LAND s : ACQUISATION AND | RESETTLEMENT) CHILAS | |||
| 042202 | - A05 | Grants, Subsidies and Write off Loans | 4,000,000,000 | |||
| 042202 | - A052 | Grants Domestic | 4,000,000,000 | |||
| Total- | DIAMER BASHA DAM (LAND | 4000000000 | ||||
| ACQUISATION AND RESETTLEMENT) CHILAS | ,,, | |||||
| GL709 | 0 DIAMER BASHA DAM PROJECT (DAM PART) | |||||
| 042202 | - A05 | Grants, Subsidies and Write off Loans | 23,680,350,000 | 8,680,350,000 | 16,000,000,000 | |
| 042202 | - A052 | Grants Domestic | 23,680,350,000 | 8,680,350,000 | 16,000,000,000 | |
| Total- | DIAMER BASHA DAM PROJECT (DAM PART) | 23,680,350,000 | 8,680,350,000 | 16,000,000,000 | ||
| 0 | 42202 | Total- | Irrigation dams | 23,680,350,000 | 8,680,350,000 | 20,000,000,000 |
| 0 | 422 | Total- | Irrigation | 23,680,350,000 | 8,680,350,000 | 20,000,000,000 |
| 0 | 42 | Total- | Agriculture,Food,Irrigation,Forestry and Fishing | 23,680,350,000 | 8,680,350,000 | 20,000,000,000 |
| 0 | 4 | Total- | Economic Affairs | 23,680,350,000 | 8,680,350,000 | 20,000,000,000 |
| 10 | Social | Protection: | ||||
| 107 | Admin | istration: | ||||
| 1071 | Admin | istration: | ||||
| 107105 | Flood | Control : | ||||
| GL705 | 5 NORM | AL EMERGENT FLOOD PROGRAMME GILGIT BALTISTAN | ||||
| 107105 | - A05 | Grants, Subsidies and Write off Loans | 10,000,000 | 10,000,000 | 5,000,000 | |
| 107105 | - A052 | Grants Domestic | 10,000,000 | 10,000,000 | 5,000,000 | |
| Total- | NORM PROG | AL EMERGENT FLOOD RAMME GILGIT BALTISTAN | 10,000,000 | 10,000,000 | 5,000,000 | |
| 1 | 07105 | Total- | Flood Control | 10,000,000 | 10,000,000 | 5,000,000 |
| 1 | 071 | Total- | Administration | 10,000,000 | 10,000,000 | 5,000,000 |
| 1 | 07 | Total- | Administration | 10,000,000 | 10,000,000 | 5,000,000 |
| 1 | 0 | Total- | Social Protection | 10,000,000 | 10,000,000 | 5,000,000 |
| NO. 144.- FC22D84 DEVELOPMENT EXPENDITURE O No of 2018-19 P 20 | F WATER RESOURC ES osts 19-20 2018-2019 Budget Estimate Rs | DIVISION DEMAN 2018-2019 Revised Estimate Rs | DS FOR GRANTS 2019-2020 Budget Estimate Rs |
|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB- | OFFICE, GILGIT | ||
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT | 23,690,350,000 | 8,690,350,000 | 20,005,000,000 |
| TOTAL - DEMAND | 62,026,495,000 | 20,920,367,000 | 66,856,579,000 |
| (In Foreign Exchange) | (61,000,000) | (61,000,000) | (701,000,000) |
| (Own Resources) | |||
| (Foreign Aid) | (61,000,000) | (61,000,000) | (701,000,000) |
| (In Local Currency) | (61,965,495,000) _________________ | (20,859,367,000) __________________ | (66,155,579,000) _______________ |
NO. 145.- CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY
DEMANDS FOR GRANTS DEMAND NO. 145 ( FC12C17 )
CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 for CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY.
Voted
Rs. 24,758,726,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
CABINET SECRETARIAT .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 017 | Research and Development General Public | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 |
| Services | ||||
| Total | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 |
| Total | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 | |
| (In Foreign Exchange) | (7,176,500,000) | (7,166,500,000) | (10,036,000,000) | |
| (Own Resources) | (7,176,500,000) | (7,166,500,000) | (10,036,000,000) | |
| (Foreign Aid) | ||||
| (In Local Currency) | (21,463,390,000) _________________ | (15,808,981,000) __________________ | (14,722,726,000) _______________ |
NO. 145.- FC12C17 CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts 2018-2019 | 2018-2019 | 2019-2020 | ||
|---|---|---|---|---|
| 2018-19 2019-20 Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 01 | General Public Service: | |||
| 017 | Research and Development General Public Services: | |||
| 0171 | Research & Dev. General Public Services: | |||
| 017101 | Atomic Energy : | |||
| ID0021 | PAKISTAN ATOMIC ENERGY COMMISSION | |||
| 017101 | - A03 | Operating Expenses 28,339,890,000 | 22,711,481,000 | 24,457,256,000 |
| 017101 | - A039 | General 28,339,890,000 | 22,711,481,000 | 24,457,256,000 |
| Total- | PAKISTAN ATOMIC ENERGY COMMISSION 28,339,890,000 | 22,711,481,000 | 24,457,256,000 | |
| (In Foreign Exchange) (7,141,500,000) | (7,141,500,000) | (10,000,000,000) | ||
| (Own Resources) (7,141,500,000) | (7,141,500,000) | (10,000,000,000) | ||
| (In Local Currency) (21,198,390,000) | (15,569,981,000) | (14,457,256,000) | ||
| ID7198 | ESTAB | _________________ LISHMENT OF NATIONAL RADIOLOGICAL EMERGENCY COORD | _________________ INATION CENTER | |
| 017101 | - A03 | Operating Expenses 230,000,000 | 230,000,000 | 220,000,000 |
| 017101 | - A039 | General 230,000,000 | 230,000,000 | 220,000,000 |
| Total- | ESTABLISHMENT OF NATIONAL 230,000,000 | 230,000,000 | 220,000,000 | |
| RADIOLOGICAL EMERGENCY COORDINATION CENTER | ||||
| (In Foreign Exchange) (10,000,000) | (5,000,000) | |||
| (Own Resources) (10,000,000) | (5,000,000) | |||
| (In Local Currency) (220,000,000) | (230,000,000) | (215,000,000) | ||
| ID8127 POWE | CAPAC RPLAN | _________________ ITY BUILDING IN DESIGN ASSESSMENT & ANALYSIS TO ENSU TS | _________________ RE SAFETY OF ADV | ________________ ANCE NUCLEAR |
| 017101 | - A03 | Operating Expenses 40,000,000 | 28,000,000 | 51,470,000 |
| 017101 | - A039 | General 40,000,000 | 28,000,000 | 51,470,000 |
| Total- | CAPACITY BUILDING IN DESIGN 40,000,000 | 28,000,000 | 51,470,000 | |
| ASSESSMENT & ANALYSIS TO ENSURE SAFETY OF ADVANCE NUCLEAR POWERPLANTS | ||||
| (In Foreign Exchange) (20,000,000) | (25,000,000) | (26,000,000) | ||
| (Own Resources) (20,000,000) | (25,000,000) | (26,000,000) | ||
| (In Local Currency) (20,000,000) _________________ | (3,000,000) _________________ | (25,470,000) ________________ |
| NO. 145.- FC12C17 CAPITAL OUTLAY ON DEVELOPMENT OF | ATOMIC ENERGY | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
ID9970 RE-INFORCEMENT OF PNRA'S CAPACITY & REGULATORY OVERSIGHT AGAINST VULNERABILITIES OF DIGITIZED
| 017101- A03 | Operating Expenses | 30,000,000 | 6,000,000 | 30,000,000 | |
|---|---|---|---|---|---|
| 017101- A039 | General | 30,000,000 | 6,000,000 | 30,000,000 | |
| Total- | RE-INF CAPA OVER VULN | ORCEMENT OF PNRA'S CITY & REGULATORY SIGHT AGAINST ERABILITIES OF DIGITIZED | 30,000,000 | 6,000,000 | 30,000,000 |
| (In Foreign Exchange) | (5,000,000) | (5,000,000) | |||
| (Own Resources) | (5,000,000) | (5,000,000) | |||
| (In Loc | al Currency) | (25,000,000) _________________ | (6,000,000) _________________ | (25,000,000) ________________ | |
| 017101 | Total- | Atomic Energy | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 |
| 0171 | Total- | Research & Dev. General Public Services | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 |
| 017 | Total- | Research and Development General Public Services | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 |
| 01 | Total- | General Public Service | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 | |
| (In | Foreign Exchange) | (7,176,500,000) | (7,166,500,000) | (10,036,000,000) | |
| (Own Resources) | (7,176,500,000) | (7,166,500,000) | (10,036,000,000) | ||
| (Foreign Aid) | |||||
| (In | Local Currency) | (21,463,390,000) | (15,808,981,000) | (14,722,726,000) | |
| TOTAL | - DEMAND | 28,639,890,000 | 22,975,481,000 | 24,758,726,000 | |
| (In Foreign Exchange) | (7,176,500,000) | (7,166,500,000) | (10,036,000,000) | ||
| (Own Resources) | (7,176,500,000) | (7,166,500,000) | (10,036,000,000) | ||
| (Foreign Aid) | |||||
| (In Loc | al Currency) | (21,463,390,000) _________________ | (15,808,981,000) _________________ | (14,722,726,000) ________________ |
NO. 146.- CAPITAL OUTLAY ON PETROLEUM DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 146 ( FC12C50 )
CAPITAL OUTLAY ON PETROLEUM DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON PETROLEUM DIVISION. Voted
Rs. 581,812,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF ENERGY .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 041 | General Economic,Commercial & Labour Affairs | 573,175,000 | 463,175,000 | 433,852,000 |
| 043 | Fuel and Energy | 370,000,000 | 147,960,000 | |
| Total | 943,175,000 | 463,175,000 | 581,812,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 16,226,000 | 7,828,000 | 1,728,000 |
| A011 | Pay | 2,118,000 | ||
| A011-1 | Pay of Officers | (2,118,000) | ||
| A012 | Allowances | 14,108,000 | 7,828,000 | 1,728,000 |
| A012-1 | Regular Allowances | (8,830,000) | (4,500,000) | (500,000) |
| A012-2 | Other Allowances (Excluding TA) | (5,278,000) | (3,328,000) | (1,228,000) |
| A03 | Operating Expenses | 416,538,000 | 36,586,000 | 162,313,000 |
| A06 | Transfers | 150,000 | 100,000 | |
| A09 | Physical Assets | 485,111,000 | 415,761,000 | 414,107,000 |
| A12 | Civil works | 21,000,000 | ||
| A13 | Repairs and Maintenance | 4,150,000 | 2,900,000 | 3,664,000 |
| Total | 943,175,000 | 463,175,000 | 581,812,000 |
NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES 04 Economic Affairs: 043 Fuel and Energy: 0432 Petroleum and Natural Gas: 043202 PETROLEUM AND NATURAL GAS : ID9437 UP- GRADATION OF HDIP POL TESTING FACILITIES AT ISB LHR MTLN PSH QTTA AND ISO CERTIFICATION OF
| 043202- A03 | Operating Expenses | 50,000,000 |
|---|---|---|
| 043202- A039 | General | 50,000,000 |
| Total- | UP- GRADATION OF HDIP POL TESTING FACILITIES AT ISB LHR MTLN PSH QTTA AND ISO CERTIFICATION OF | 50,000,000 |
| ID9438 STREN OFFICE KARA | THENING & UPGRADATION OF KARACHI LA CHI | BORITRIES COMPLEX(KLC) AT HDIP OPERATION |
| 043202- A03 | Operating Expenses | 220,000,000 |
| 043202- A039 | General | 220,000,000 |
| Total- | STRENTHENING & UPGRADATION OF KARACHI LABORITRIES COMPLEX(KLC) AT HDIP OPERATION OFFICE KARACHI | 220,000,000 |
| ID9439 EXPAS OPERATOIN T | ION AND UPGRADATION OF PAKISTAN PETR O | OLEUM CREHOUSE(PETCORE) FOR ITS SUSTAIBALE |
| 043202- A03 | Operating Expenses | 100,000,000 |
| 043202- A039 | General | 100,000,000 |
| Total- | EXPASION AND UPGRADATION OF PAKISTAN PETROLEUM CREHOUSE(PETCORE) FOR ITS SUSTAIBALE OPERATOIN TO | 100,000,000 |
| ID9681 EXPAN OPERATIONS | . & UPGRADATION OF PAKISTAN PETROLEU TO | M COREHONE(PETCORE) FOR ITS SUSTAINABLE |
| 043202- A03 | Operating Expenses | 70,000,000 |
|---|---|---|
| 043202- A039 | General | 70,000,000 |
| Total- | EXPAN. & UPGRADATION OF PAKISTAN | 70,000,000 |
| PETROLEUM COREHONE(PETCORE) | ||
| FOR ITS SUSTAINABLE OPERATIONS |
NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
| PETROLEUM DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| ID9682 UPGR PETROLEUM | TO ADATIO | N OF HDIPS POL TESTING FACILITEIS | AT ISB.LHR. MNP.PSH.QTA A | N ISO CERTIFICATION OF |
|---|---|---|---|---|
| 043202- A03 | Operating Expenses | 77,960,000 | ||
| 043202- A039 | General | 77,960,000 | ||
| Total- | UPGR FACIL AN IS PETR | ADATION OF HDIPS POL TESTING ITEIS AT ISB.LHR. MNP.PSH.QTA O CERTIFICATION OF OLEUM | 77,960,000 | |
| 043202 | Total- | PETROLEUM AND NATURAL GAS | 370,000,000 | 147,960,000 |
| 0432 | Total- | Petroleum and Natural Gas | 370,000,000 | 147,960,000 |
| 043 | Total- | Fuel and Energy | 370,000,000 | 147,960,000 |
| 04 | Total- | Economic Affairs | 370,000,000 | 147,960,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 370,000,000 | 147,960,000 |
NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
| PETROLEUM DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
04 Economic Affairs: 041 General Economic,Commercial & Labour Affairs: 0411 General Economic Affairs:
| 041103 Geologi QA3981 UGRAD | cal Survey : ATION OF CHEM.& PET MIN LAB AT GSP S | Z KARACHI |
|---|---|---|
| 041103- A01 | Employees Related Expenses | 7,148,000 |
| 041103- A011 | Pay 14 | 2,118,000 |
| 041103- A011-1 | Pay of Officers (14) | (2,118,000) |
| 041103- A012 | Allowances | 5,030,000 |
| 041103- A012-1 | Regular Allowances | (3,530,000) |
| 041103- A012-2 | Other Allowances (Excluding TA) | (1,500,000) |
| 041103- A03 | Operating Expenses | 2,352,000 |
| 041103- A032 | Communications | 73,000 |
| 041103- A034 | Occupancy Costs | 25,000 |
| 041103- A038 | Travel & Transportation | 1,054,000 |
| 041103- A039 | General | 1,200,000 |
| 041103- A09 | Physical Assets | 68,700,000 |
| 041103- A092 | Computer Equipment | 4,700,000 |
| 041103- A095 | Purchase of Transport | 10,000,000 |
| 041103- A096 | Purchase of Plant and Machinery | 54,000,000 |
| 041103- A12 | Civil works | 21,000,000 |
| 041103- A124 | Building and Structures | 21,000,000 |
| 041103- A13 | Repairs and Maintenance | 800,000 |
| 041103- A130 | Transport | 500,000 |
| 041103- A131 | Machinery and Equipment | 300,000 |
| Total- U | GRADATION OF CHEM.& PET MIN LAB | 100000000 |
| A QA3982 GEOLO | T GSP SZ KARACHI GICAL MAPING OF 50 TOPOSHEETS OF UN | ,, MAPPED AREA BALOCHISTAN |
| 041103- A01 | Employees Related Expenses | 1,250,000 |
| 041103- A012 | Allowances | 1,250,000 |
| 041103- A012-1 | Regular Allowances | (800,000) |
| 041103- A012-2 | Other Allowances (Excluding TA) | (450,000) |
| NO. 146.- FC1 | 2C50 CAPITAL OUTLAY ON PETROLEUM DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | |
| Rs | Rs | Rs | ||
| 041103- A03 | ACCOUNTANT GENERAL PAKISTAN RE Operating Expenses | VENUES SUB-OFF 7,600,000 | ICE, QUETTA | |
| 041103- A032 | Communications | 35,000 | ||
| 041103- A033 | Utilities | 50,000 | ||
| 041103- A036 | Motor Vehicles | 10,000 | ||
| 041103- A038 | Travel & Transportation | 6,505,000 | ||
| 041103- A039 | General | 1,000,000 | ||
| 041103- A06 | Transfers | 50,000 | ||
| 041103- A063 | Entertainment & Gifts | 50,000 | ||
| 041103- A09 | Physical Assets | 650,000 | ||
| 041103- A092 | Computer Equipment | 450,000 | ||
| 041103- A096 | Purchase of Plant and Machinery | 200,000 | ||
| 041103- A13 | Repairs and Maintenance | 450,000 | ||
| 041103- A130 | Transport | 250,000 | ||
| 041103- A131 | Machinery and Equipment | 50,000 | ||
| 041103- A132 | Furniture and Fixture | 50,000 | ||
| 041103- A137 | Computer Equipment | 100,000 | ||
| Total- | GEOLOGICAL MAPING OF 50 TOPOSHEETS OF UN MAPPED AREA | 10,000,000 |
BALOCHISTAN
QA9063 EXPLORATION & EVALUATION OF METLIC MINERALS IN BELA & UTHAL AREAS DIST. LASBELA BALOCHISTAN
| 041103- A01 | Employees Related Expenses | 1,800,000 | 1,800,000 | 200,000 |
|---|---|---|---|---|
| 041103- A012 | Allowances | 1,800,000 | 1,800,000 | 200,000 |
| 041103- A012-1 | Regular Allowances | (1,000,000) | (1,000,000) | |
| 041103- A012-2 | Other Allowances (Excluding TA) | (800,000) | (800,000) | (200,000) |
| 041103- A03 | Operating Expenses | 9,857,000 | 9,857,000 | 2,450,000 |
| 041103- A033 | Utilities | 57,000 | 57,000 | |
| 041103- A038 | Travel & Transportation | 5,500,000 | 5,500,000 | 1,900,000 |
| 041103- A039 | General | 4,300,000 | 4,300,000 | 550,000 |
| 041103- A06 | Transfers | 50,000 | 50,000 | |
| 041103- A063 | Entertainment & Gifts | 50,000 | 50,000 | |
| 041103- A09 | Physical Assets | 1,802,000 | 1,802,000 |
| NO. 146.- FC1 | 2C50 CAPITAL OUTLAY ON PETROLEUM DIVISI No of 2018-19 Posts 2019-20 ACCOUNTANT GENERAL PAKISTAN RE | ON 2018-2019 Budget Estimate Rs VENUES SUB-OF | DEMAND 2018-2019 Revised Estimate Rs FICE, QUETTA | S FOR GRANTS 2019-2020 Budget Estimate Rs |
|---|---|---|---|---|
| 041103- A092 | Computer Equipment | 500,000 | 500,000 | |
| 041103- A095 | Purchase of Transport | 2,000 | 2,000 | |
| 041103- A096 | Purchase of Plant and Machinery | 1,150,000 | 1,150,000 | |
| 041103- A097 | Purchase of Furniture and Fixture | 150,000 | 150,000 | |
| 041103- A13 | Repairs and Maintenance | 1,100,000 | 1,100,000 | 459,000 |
| 041103- A130 | Transport | 500,000 | 500,000 | 359,000 |
| 041103- A131 | Machinery and Equipment | 300,000 | 300,000 | |
| 041103- A132 | Furniture and Fixture | 100,000 | 100,000 | 100,000 |
| 041103- A137 | Computer Equipment | 200,000 | 200,000 | |
| Total- | EXPLORATION & EVALUATION OF METLIC MINERALS IN BELA & UTHAL AREAS DIST. LASBELA BALOCHISTAN | 14,609,000 | 14,609,000 | 3,109,000 |
QA9064 APPRASIAL OF NEWLY DISCOVERED COAL RESOURCES OF BADIN COAL FIELD & ITS ADJOING AREAS OF SOUTHERN
| 041103- A01 | Employees Related Expenses | 3,200,000 | 3,200,000 | 800,000 |
|---|---|---|---|---|
| 041103- A012 | Allowances | 3,200,000 | 3,200,000 | 800,000 |
| 041103- A012-1 | Regular Allowances | (2,000,000) | (2,000,000) | (500,000) |
| 041103- A012-2 | Other Allowances (Excluding TA) | (1,200,000) | (1,200,000) | (300,000) |
| 041103- A03 | Operating Expenses | 10,336,000 | 10,336,000 | 600,000 |
| 041103- A034 | Occupancy Costs | 1,300,000 | 1,300,000 | |
| 041103- A038 | Travel & Transportation | 7,872,000 | 7,872,000 | 600,000 |
| 041103- A039 | General | 1,164,000 | 1,164,000 | |
| 041103- A13 | Repairs and Maintenance | 200,000 | 200,000 | 2,255,000 |
| 041103- A130 | Transport | 200,000 | 200,000 | 500,000 |
| 041103- A131 | Machinery and Equipment | 1,755,000 | ||
| Total- | APPRASIAL OF NEWLY DISCOVERED COAL RESOURCES OF BADIN COAL FIELD & ITS ADJOING AREAS OF SOUTHERN | 13,736,000 | 13,736,000 | 3,655,000 |
| QA9065 ACQUI PAKISTAN | STION OF FOUR DRILLING RIGNS WITH ACCESSORIES FOR THE | GEOLOGICAL SURVEY OF | ||
| 041103- A01 | Employees Related Expenses | 728,000 | 728,000 | 728,000 |
| 041103- A012 | Allowances | 728,000 | 728,000 | 728,000 |
| NO. 146.- FC12 | C50 CAPITAL OUTLAY ON PETROLEUM DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | ||||
| 041103- A012-2 | Other Allowances (Excluding TA) | (728,000) | (728,000) | (728,000) |
| 041103- A03 | Operating Expenses | 2,700,000 | 2,700,000 | 2,700,000 |
| 041103- A036 | Motor Vehicles | 250,000 | 250,000 | 250,000 |
| 041103- A038 | Travel & Transportation | 2,150,000 | 2,150,000 | 2,150,000 |
| 041103- A039 | General | 300,000 | 300,000 | 300,000 |
| 041103- A09 | Physical Assets | 413,107,000 | 413,107,000 | 413,107,000 |
| 041103- A095 | Purchase of Transport | 1,705,000 | 1,705,000 | 1,705,000 |
| 041103- A096 | Purchase of Plant and Machinery | 411,402,000 | 411,402,000 | 411,402,000 |
| Total- | ACQUISTION OF FOUR DRILLING RIGNS WITH ACCESSORIES FOR THE GEOLOGICAL SURVEY OF PAKISTAN | 416,535,000 | 416,535,000 | 416,535,000 |
| QA9067 EXPLORATION & EVALUATION OF COAL IN NOSHAM | AND BAHLOL AREAS OF BALOCHISTAN | |||
| 041103- A01 | Employees Related Expenses | 2,100,000 | 2,100,000 | |
| 041103- A012 | Allowances | 2,100,000 | 2,100,000 | |
| 041103- A012-1 | Regular Allowances | (1,500,000) | (1,500,000) | |
| 041103- A012-2 | Other Allowances (Excluding TA) | (600,000) | (600,000) | |
| 041103- A03 | Operating Expenses | 13,693,000 | 13,693,000 | 8,603,000 |
| 041103- A032 | Communications | 115,000 | 115,000 | 50,000 |
| 041103- A033 | Utilities | 868,000 | 868,000 | 1,000,000 |
| 041103- A036 | Motor Vehicles | 10,000 | 10,000 | |
| 041103- A038 | Travel & Transportation | 9,400,000 | 9,400,000 | 7,253,000 |
| 041103- A039 | General | 3,300,000 | 3,300,000 | 300,000 |
| 041103- A06 | Transfers | 50,000 | 50,000 | |
| 041103- A063 | Entertainment & Gifts | 50,000 | 50,000 | |
| 041103- A09 | Physical Assets | 852,000 | 852,000 | 1,000,000 |
| 041103- A092 | Computer Equipment | 350,000 | 350,000 | |
| 041103- A095 | Purchase of Transport | 2,000 | 2,000 | |
| 041103- A096 | Purchase of Plant and Machinery | 300,000 | 300,000 | 1,000,000 |
| 041103- A097 | Purchase of Furniture and Fixture | 200,000 | 200,000 | |
| 041103- A13 | Repairs and Maintenance | 1,600,000 | 1,600,000 | 950,000 |
| 041103- A130 | Transport | 700,000 | 700,000 | 150,000 |
| 041103- A131 | Machinery and Equipment | 500,000 | 500,000 | 800,000 |
| NO. 146.- FC1 | 2C50 CAPITAL OUTLAY ON PETROLEUM DIVIS No of 2018-19 Posts 2019-20 ACCOUNTANT GENERAL PAKISTAN R | ION 2018-2019 Budget Estimate Rs EVENUES SUB-OF | DEMAND 2018-2019 Revised Estimate Rs FICE, QUETTA | S FOR GRANTS 2019-2020 Budget Estimate Rs |
|---|---|---|---|---|
| 041103- A132 | Furniture and Fixture | 200,000 | 200,000 | |
| 041103- A137 | Computer Equipment | 200,000 | 200,000 | |
| Total- | EXPLORATION & EVALUATION OF COAL IN NOSHAM AND BAHLOL AREAS OF BALOCHISTAN | 18,295,000 | 18,295,000 | 10,553,000 |
| 041103 | Total- Geological Survey | 573,175,000 | 463,175,000 | 433,852,000 |
| 0411 | Total- General Economic Affairs | 573,175,000 | 463,175,000 | 433,852,000 |
| 041 | Total- General Economic,Commercial & Labour Affairs | 573,175,000 | 463,175,000 | 433,852,000 |
| 04 | Total- Economic Affairs | 573,175,000 | 463,175,000 | 433,852,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 573,175,000 | 463,175,000 | 433,852,000 | |
| TOTAL - DEMAND | 943,175,000 | 463,175,000 | 581,812,000 |
NO. 147.- CAPITAL OUTLAY ON FEDERAL INVESTMENTS
DEMANDS FOR GRANTS
DEMAND NO. 147 ( FC12C39 )
CAPITAL OUTLAY ON FEDERAL INVESTMENTS
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 for CAPITAL OUTLAY ON FEDERAL INVESTMENTS. Voted Rs. 684,480,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 1,560,938,000 | 96,500,000 | 684,480,000 |
| Total | 1,560,938,000 | 96,500,000 | 684,480,000 | |
| OBJECT CLASSIFICATION | ||||
| A11 | Investments | 1,560,938,000 | 96,500,000 | 684,480,000 |
| Total | 1,560,938,000 | 96,500,000 | 684,480,000 | |
| (In Foreign Exchange) | (460,680,000) | (91,500,000) | (250,000,000) | |
| (Own Resources) | (460,680,000) | (91,500,000) | (200,000,000) | |
| (Foreign Aid) | (50,000,000) | |||
| (In Local Currency) | (1,100,258,000) ___________________ | (5,000,000) _________________ | (434,480,000) ______________ |
NO. 147.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | ||
|---|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0143 | Investments: | ||||
| 014302 ID2055 | Non-Financial Institutions : RBS SHAKARGARH | ||||
| 014302 | - A11 | Investments | 19,000,000 | ||
| 014302 | - A111 | Investment Local | 19,000,000 | ||
| Total- | RBS SHAKARGARH | 19,000,000 | |||
| ID3219 | REBRO | ADCAST STATION, KHARAN | |||
| 014302 | - A11 | Investments | 14,430,000 | ||
| 014302 | - A111 | Investment Local | 14,430,000 | ||
| Total- | REBROADCAST STATION, KHARAN | 14,430,000 | |||
| (In Foreign Exchange) | (4,540,000) | ||||
| (Own Resources) | (4,540,000) | ||||
| (In Local Currency) | (9,890,000) | ||||
| ID3220 | REBRO | ___ ADCAST STATION, BAR KHAN | ___________________ | ||
| 014302 | - A11 | Investments | 17,080,000 | ||
| 014302 | - A111 | Investment Local | 17,080,000 | ||
| Total- | REBROADCAST STATION, BAR KHAN | 17,080,000 | |||
| (In Foreign Exchange) | (5,140,000) | ||||
| (Own Resources) | (5,140,000) | ||||
| (In Local Currency) | (11,940,000) | ||||
| ID3222 | REBRO | ___ ADCAST STATION, JURA | ___________________ | ||
| 014302 | - A11 | Investments | 10,000,000 | ||
| 014302 | - A111 | Investment Local | 10,000,000 | ||
| Total- | REBROADCAST STATION, JURA | 10,000,000 | |||
| ID3223 | REBRO | ADCAST STATION, ATHMAQAM | |||
| 014302 | - A11 | Investments | 10,000,000 | ||
| 014302 | - A111 | Investment Local | 10,000,000 | ||
| Total- | REBROADCAST STATION, ATHMAQAM | 10,000,000 | |||
| ID3224 | REBRO | ADCAST STATION, KARAN |
| NO. 147.- FC1 | 2C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 014302- A11 | Investments | 10,000,000 | ||
| 014302- A111 | Investment Local | 10,000,000 | ||
| Total- | REBROADCAST STATION, KARAN | 10,000,000 | ||
| (In Foreign Exchange) | (5,000,000) | |||
| (Own Resources) | (5,000,000) | |||
| (In Local Currency) ___ | (5,000,000) ___________________ | _____________ | _____________ | |
| ID3225 REBR | OADCAST STATION, DHUDHNIAL | |||
| 014302- A11 | Investments | 10,000,000 | ||
| 014302- A111 | Investment Local | 10,000,000 | ||
| Total- | REBROADCAST STATION, DHUDHNIAL | 10,000,000 | ||
| (In Foreign Exchange) | (5,000,000) | |||
| (Own Resources) | (5,000,000) | |||
| (In Local Currency) | (5,000,000) | |||
| ID3226 REBR | ___ OADCAST STATION, SHARDA | ___________________ | _____________ | |
| 014302- A11 | Investments | 10,000,000 | ||
| 014302- A111 | Investment Local | 10,000,000 | ||
| Total- | REBROADCAST STATION, SHARDA | 10,000,000 | ||
| (In Foreign Exchange) | (5,000,000) | |||
| (Own Resources) | (5,000,000) | |||
| (In Local Currency) | (5,000,000) | |||
| ID3227 REBR | ___ OADCAST STATION, KEL | ___________________ | ||
| 014302- A11 | Investments | 10,000,000 | ||
| 014302- A111 | Investment Local | 10,000,000 | ||
| Total- | REBROADCAST STATION, KEL | 10,000,000 | ||
| (In Foreign Exchange) | (5,000,000) | |||
| (Own Resources) | (5,000,000) | |||
| (In Local Currency) | (5,000,000) | |||
| ID4130 REBR | ___ OADCAST STATION, SHANGLA (SWAT). | ___________________ | ||
| 014302- A11 | Investments | 26,000,000 | ||
| 014302- A111 | Investment Local | 26,000,000 | ||
| Total- | REBROADCAST STATION, SHANGLA | 26,000,000 |
| NO. 147.- FC1 | 2C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS | DEMANDS FOR GRANTS | |
|---|---|---|---|
| No of 2018-19 Posts 2019-20 2018-2019 Budget | 2018-2019 Revised | 2019-2020 Budget | |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ID7197 DUBBI | ACCOUNTANT GENERAL PAKISTAN REVENUES (SWAT). NG OF PAKISTANI DRAMAS IN FOREIGN LANGUAGES | ||
| 014302- A11 | Investments 14,373,000 | 5,000,000 | |
| 014302- A111 | Investment Local 14,373,000 | 5,000,000 | |
| Total- | DUBBING OF PAKISTANI DRAMAS IN 14,373,000 | 5,000,000 | |
| ID9147 REPLA | FOREIGN LANGUAGES CEMNET OF EQUIPMENT OF STUDIO & CONTROL ROOM OF PTV AC | ADEMY | |
| 014302- A11 | Investments 30,000,000 | ||
| 014302- A111 | Investment Local 30,000,000 | ||
| Total- | REPLACEMNET OF EQUIPMENT OF STUDIO & CONTROL ROOM OF PTV ACADEMY 30,000,000 | ||
| ID9148 MODERNIZATION OF CAMERA AND PRODUCTION EQUIPMENT OF PTV | |||
| 014302- A11 | Investments 200,000,000 | 91,500,000 | 200,000,000 |
| 014302- A111 | Investment Local 200,000,000 | 91,500,000 | 200,000,000 |
| Total- | MODERNIZATION OF CAMERA AND PRODUCTION EQUIPMENT OF PTV 200,000,000 | 91,500,000 | 200,000,000 |
| (In Foreign Exchange) (100,000,000) | (91,500,000) | (200,000,000) | |
| (Own Resources) (100,000,000) | (91,500,000) | (200,000,000) | |
| (In Local Currency) (100,000,000) | |||
| ID9347 PTV TE | ______________________ RRESTERIAL DIGITALISATION DTMB DEMONSTRATION PROJECT T | _____________ HROUGH GRAN | _______________ T-IN-AID |
| 014302- A11 | Investments 34,000,000 | 84,480,000 | |
| 014302- A111 | Investment Local 34,000,000 | 84,480,000 | |
| Total- | PTV TERRESTERIAL DIGITALISATION DTMB DEMONSTRATION PROJECT THROUGH GRANT-IN-AID 34,000,000 | 84,480,000 | |
| (In Foreign Exchange) | (50,000,000) | ||
| (Foreign Aid) | (50,000,000) | ||
| (In Local Currency) (34,000,000) | (34,480,000) | ||
| ID9348 REBRO | ______________________ ADCAST STATION MUSA KHEL BALOCHISTAN | _____________ | _______________ |
| 014302- A11 | Investments 107,943,000 | ||
| 014302- A111 | Investment Local 107,943,000 |
| NO. 147.- FC1 | 2C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | REBROADCAST STATION MUSA KHEL BALOCHISTAN | 107,943,000 | ||
| ID9349 REBRO | ADCAST STATION MUSLIM BAGH BALOCHISTAN | |||
| 014302- A11 | Investments | 112,318,000 | ||
| 014302- A111 | Investment Local | 112,318,000 | ||
| Total- | REBROADCAST STATION MUSLIM BAGH BALOCHISTAN | 112,318,000 | ||
| ID9350 REBRO | ADCAST STATION KHAN MEHTERZAI BALOCHISTAN | |||
| 014302- A11 | Investments | 111,376,000 | ||
| 014302- A111 | Investment Local | 111,376,000 | ||
| Total- | REBROADCAST STATION KHAN MEHTERZAI BALOCHISTAN | 111,376,000 | ||
| ID9351 REBRO | ADCAST STATION SHERANI BALOCHISTAN | |||
| 014302- A11 | Investments | 113,418,000 | ||
| 014302- A111 | Investment Local | 113,418,000 | ||
| Total- | REBROADCAST STATION SHERANI BALOCHISTAN | 113,418,000 | ||
| ID9352 PTV PARLIAMENTRY CHANNEL | ||||
| 014302- A11 | Investments | 331,000,000 | ||
| 014302- A111 | Investment Local | 331,000,000 | ||
| Total- | PTV PARLIAMENTRY CHANNEL | 331,000,000 | ||
| (In Foreign Exchange) | (331,000,000) | |||
| (Own Resources) | (331,000,000) | |||
| ID9571 REBRA | ___ NDING/ RENOVATI REBRANDING/485 POST OF | ___________________ FICESS ALL OVER TH | ______________ E COUNTRY | |
| 014302- A11 | Investments | 200,000,000 | ||
| 014302- A111 | Investment Local | 200,000,000 | ||
| Total- | REBRANDING/ RENOVATI REBRANDING/485 POST OFFICESS ALL OVER THE COUNTRY | 200,000,000 | ||
| ID9572 CONSTRUCTION OF INTERNATIONAL MAIL OFFIC E A | T KARACHI | |||
| 014302- A11 | Investments | 80,000,000 | ||
| 014302- A111 | Investment Local | 80,000,000 | ||
| Total- | CONSTRUCTION OF INTERNATIONAL | 80,000,000 |
| NO. 147.- FC1 | 2C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of 2018-19 Posts 2019-20 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | |
| Rs | Rs | Rs | |
| ID9573 CONST RAWALPINDI | ACCOUNTANT GENERAL PAKISTAN REVENUES MAIL OFFIC E AT KARACHI RUCTION OF INTERNATIONAL STANDARD MAIL FACILITATION CENT | RE AT GOLRA | M ORE |
| 014302- A11 | Investments 50,000,000 | ||
| 014302- A111 | Investment Local 50,000,000 | ||
| Total- | CONSTRUCTION OF INTERNATIONAL 50,000,000 | ||
| ID9574 CONST | STANDARD MAIL FACILITATION CENTRE AT GOLRA M ORE RAWALPINDI RUCTION OF INTERNATIONAL MAIL OFFIC E AT GAWADAR | ||
| 014302- A11 | Investments 40,000,000 | ||
| 014302- A111 | Investment Local 40,000,000 | ||
| Total- | CONSTRUCTION OF INTERNATIONAL MAIL OFFIC E AT GAWADAR 40,000,000 | ||
| 014302 | Total- Non-Financial Institutions 1,560,938,000 | 96,500,000 | 284,480,000 |
| 0143 | Total- Investments 1,560,938,000 | 96,500,000 | 284,480,000 |
| 014 | Total- Transfers 1,560,938,000 | 96,500,000 | 284,480,000 |
| 01 | Total- General Public Service 1,560,938,000 | 96,500,000 | 284,480,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 1,560,938,000 | 96,500,000 | 284,480,000 | |
| (In Foreign Exchange) (460,680,000) | (91,500,000) | (250,000,000) | |
| (Own Resources) (460,680,000) | (91,500,000) | (200,000,000) | |
| (Foreign Aid) | (50,000,000) | ||
| (In Local Currency) (1,100,258,000) | (5,000,000) | (34,480,000) |
| NO. 147.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE |
| 01 | General Public Service: | ||||
|---|---|---|---|---|---|
| 014 | Transfers: | ||||
| 0143 | Investments: | ||||
| 014302 | Non-Financial Institutions : | ||||
| LO312 | 2 PAKISTAN EXPO CENTRE QUETTA | ||||
| 014302 | - A11 | Investments | 100,000,000 | ||
| 014302 | - A111 | Investment Local | 100,000,000 | ||
| Total- | PAKISTAN EXPO CENTRE QUETTA | 100,000,000 | |||
| LO312 | 3 PAKISTAN EXPO CENTRE PESHAWAR | ||||
| 014302 | - A11 | Investments | 300,000,000 | ||
| 014302 | - A111 | Investment Local | 300,000,000 | ||
| Total- | PAKISTAN EXPO CENTRE PESHAWAR | 300,000,000 | |||
| 0 | 14302 | Total- Non-Financial Institutions | 400,000,000 | ||
| 0 | 143 | Total- Investments | 400,000,000 | ||
| 0 | 14 | Total- Transfers | 400,000,000 | ||
| 0 | 1 | Total- General Public Service | 400,000,000 | ||
| Total- ACCOUNTANT GENERAL | 400,000,000 | ||||
| PAKISTAN REVENUES | |||||
| SUB-OFFICE, LAHORE | |||||
| TOTAL - DEMAND | 1,560,938,000 | 96,500,000 | 684,480,000 | ||
| (In Foreign Exchange) | (460,680,000) | (91,500,000) | (250,000,000) | ||
| (Own Resources) | (460,680,000) | (91,500,000) | (200,000,000) | ||
| (Foreign Aid) | (50,000,000) | ||||
| (In Local Currency) | (1,100,258,000) ___________________ | (5,000,000) _________________ | (434,480,000) ______________ |
NO. 148.- DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
DEMAND NO. 148 ( FC12D36 )
DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 for DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT.
Voted
Rs. 136,113,059,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 156,314,643,000 | 100,156,052,000 | 136,113,059,000 |
| Total | 156,314,643,000 | 100,156,052,000 | 136,113,059,000 | |
| OBJECT CLASSIFICATION | ||||
| A08 | Loans and Advances | 156,314,643,000 | 100,156,052,000 | 136,113,059,000 |
| Total | 156,314,643,000 | 100,156,052,000 | 136,113,059,000 | |
| (In Foreign Exchange) | (37,656,000) | |||
| (Own Resources) | ||||
| (Foreign Aid) | (37,656,000) | |||
| (In Local Currency) | (156,276,987,000) _________________ | (100,156,052,000) _________________ | (136,113,059,000) ________________ |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts 2018-2019 | 2018-2019 | 2019-2020 | ||
|---|---|---|---|---|
| 2018-19 2019-20 Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 01 | General Public Service: | |||
| 014 | Transfers: | |||
| 0141 | Transfers (Inter-Governmental): | |||
| 014102 ID0983 | To district governments : NATIONAL HIGHWAY AUTHORITY | |||
| 014102 | - A08 | Loans and Advances 125,783,000,000 | 77,997,800,000 | 98,554,919,000 |
| 014102 | - A083 | District Government / TMAs 125,783,000,000 | 77,997,800,000 | 98,554,919,000 |
| Total- | NATIONAL HIGHWAY AUTHORITY 125,783,000,000 | 77,997,800,000 | 98,554,919,000 | |
| ID4138 | 100KW | MW TRANSMITTER GWADAR | ||
| 014102 | - A08 | Loans and Advances 15,000,000 | 40,146,000 | |
| 014102 | - A083 | District Government / TMAs 15,000,000 | 40,146,000 | |
| Total- | 100KW MW TRANSMITTER GWADAR 15,000,000 | 40,146,000 | ||
| ID9149 | ESTABLISHMENT OF SAUTUL QURAN FM NETWORK PHASE-II | |||
| 014102 | - A08 | Loans and Advances 40,000,000 | 7,300,000 | |
| 014102 | - A083 | District Government / TMAs 40,000,000 | 7,300,000 | |
| Total- | ESTABLISHMENT OF SAUTUL QURAN 40,000,000 | 7,300,000 | ||
| FM NETWORK PHASE-II | ||||
| ID9150 | UP-GR | ADTION OF RADIO STATION MULTAN UNDER ODA PROGRAMM | E KOREA | |
| 014102 | - A08 | Loans and Advances 52,656,000 | 36,087,000 | 14,384,000 |
| 014102 | - A083 | District Government / TMAs 52,656,000 | 36,087,000 | 14,384,000 |
| Total- | UP-GRADTION OF RADIO STATION 52,656,000 | 36,087,000 | 14,384,000 | |
| MULTAN UNDER ODA PROGRAMME KOREA | ||||
| (In Foreign Exchange) (37,656,000) | ||||
| (Foreign Aid) (37,656,000) | ||||
| (In Local Currency) (15,000,000) | (36,087,000) | (14,384,000) | ||
| ID9157 | RAHAB | _________________ ILTATION OF MEDIUM WAVE SERVICE FROM MUZAFARABAD( | __________________ AJK) & REBUILT OF | _______________ BH |
| 014102 | - A08 | Loans and Advances 40,000,000 | 25,519,000 | 41,500,000 |
| 014102 | - A083 | District Government / TMAs 40,000,000 | 25,519,000 | 41,500,000 |
| Total- | RAHABILTATION OF MEDIUM WAVE SERVICE FROM MUZAFARABAD(AJK) & REBUILT OF BH 40,000,000 | 25,519,000 | 41,500,000 |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|---|
| 2018-19 2019-2 | 0 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ID9158 REPLA | ACCOUNTANT GENERA CEMENT OF MEDIUM WAVE TRANSMITTER | L PAKISTAN REVEN AT MIRPUR | UES | |
| 014102- A08 | Loans and Advances | 50,000,000 | 60,000,000 | |
| 014102- A083 | District Government / TMAs | 50,000,000 | 60,000,000 | |
| Total- | REPLACEMENT OF MEDIUM WAVE TRANSMITTER AT MIRPUR | 50,000,000 | 60,000,000 | |
| 014102 | Total- To district governments | 125,980,656,000 | 78,066,706,000 | 98,710,949,000 |
| 014110 Others IB5026 REHAB | : ILITATION OF AFFECTED POPULATION RE | SIDING ALONG LOC | PHASE-I | |
| 014110- A08 | Loans and Advances | 300,000,000 | ||
| 014110- A086 | Loans to Others | 300,000,000 | ||
| Total- | REHABILITATION OF AFFECTED | 300,000,000 | ||
| ID0979 AZAD | POPULATION RESIDING ALONG LOC PHASE-I GOVERNMENT OF THE STATE OF JAMMU A | ND KASHMIR.(NON- | SAP) | |
| 014110- A08 | Loans and Advances | 20,200,000,000 | 15,200,000,000 | 22,000,000,000 |
| 014110- A086 | Loans to Others | 20,200,000,000 | 15,200,000,000 | 22,000,000,000 |
| Total- | AZAD GOVERNMENT OF THE STATE OF | 20,200,000,000 | 15,200,000,000 | 22,000,000,000 |
| JAMMU AND KASHMIR.(NON-SAP) | ||||
| ID3298 PROVI | SION OF WATER SUPPLY AND SEVERAGE | TO MIRPUR CITYAND | HAMLETS | |
| 014110- A08 | Loans and Advances | 300,000,000 | 300,000,000 | 50,000,000 |
| 014110- A086 | Loans to Others | 300,000,000 | 300,000,000 | 50,000,000 |
| Total- | PROVISION OF WATER SUPPLY AND | 300,000,000 | 300,000,000 | 50,000,000 |
| ID3300 CONST | SEVERAGE TO MIRPUR CITYAND HAMLETS RUCTION OF RATHUA HARYAM BRIDGE A | CCROS RESERVOIR | MIRPUR. | |
| 014110- A08 | Loans and Advances | 1,955,617,000 | 1,955,617,000 | 407,260,000 |
| 014110- A086 | Loans to Others | 1,955,617,000 | 1,955,617,000 | 407,260,000 |
| Total- | CONSTRUCTION OF RATHUA HARYAM BRIDGE ACCROS RESERVOIR MIRPUR. | 1,955,617,000 | 1,955,617,000 | 407,260,000 |
| ID4584 48 MW | JAGRAN HYDRO POWER PROJECT | |||
| 014110- A08 | Loans and Advances | 30,000,000 | 30,000,000 | 200,000,000 |
| 014110- A086 | Loans to Others | 30,000,000 | 30,000,000 | 200,000,000 |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL DEMANDS FOR GRANTS GOVERNMENT
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | |
| ACCOUNTANT GENERAL P | Rs AKISTAN REVENUES | Rs | Rs | |
| Total- | 48 MW JAGRAN HYDRO POWER PROJECT | 30,000,000 | 30,000,000 | 200,000,000 |
| ID7377 ATHMUQAM-KERAN BYPASS ROAD | ||||
| 014110- A08 | Loans and Advances | 100,000,000 | 100,000,000 | 227,815,000 |
| 014110- A086 | Loans to Others | 100,000,000 | 100,000,000 | 227,815,000 |
| Total- | ATHMUQAM-KERAN BYPASS ROAD | 100,000,000 | 100,000,000 | 227,815,000 |
| ID7378 MIR W | AIZ MUHAMMAD FAROOQ SHAHEED MEDICAL | COLLEGE MUZAFFARABAD | ||
| 014110- A08 | Loans and Advances | 500,000,000 | 500,000,000 | 350,000,000 |
| 014110- A086 | Loans to Others | 500,000,000 | 500,000,000 | 350,000,000 |
| Total- | MIR WAIZ MUHAMMAD FAROOQ SHAHEED MEDICAL COLLEGE MUZAFFARABAD | 500,000,000 | 500,000,000 | 350,000,000 |
| ID7379 MEDICAL COLLEGE MIRPUR | ||||
| 014110- A08 | Loans and Advances | 471,000,000 | 471,000,000 | 350,000,000 |
| 014110- A086 | Loans to Others | 471,000,000 | 471,000,000 | 350,000,000 |
| Total- | MEDICAL COLLEGE MIRPUR | 471,000,000 | 471,000,000 | 350,000,000 |
| ID7380 NOSER | I-LESWA BYPASS ROAD | |||
| 014110- A08 | Loans and Advances | 100,000,000 | 100,000,000 | 179,325,000 |
| 014110- A086 | Loans to Others | 100,000,000 | 100,000,000 | 179,325,000 |
| Total- | NOSERI-LESWA BYPASS ROAD | 100,000,000 | 100,000,000 | 179,325,000 |
| ID8212 LEGIST | ATIVE ASSEMBLY AJ&K | |||
| 014110- A08 | Loans and Advances | 500,000,000 | 400,000,000 | 400,000,000 |
| 014110- A086 | Loans to Others | 500,000,000 | 400,000,000 | 400,000,000 |
| Total- | LEGISTATIVE ASSEMBLY AJ&K | 500,000,000 | 400,000,000 | 400,000,000 |
| ID9447 ESTAB | . OF ENDOWMENT FUND FOR PAKISTAN RED | CRESCENT IN AJK | ||
| 014110- A08 | Loans and Advances | 100,000,000 | ||
| 014110- A086 | Loans to Others | 100,000,000 | ||
| Total- ID9448 IMPRO | ESTAB. OF ENDOWMENT FUND FOR PAKISTAN RED CRESCENT IN AJK VEMENT & MODELING OF LINK ROAD KONKA | 100,000,000 N PANJOOR GALI (13 | KM) DISTT. MUZAFFARABAD | |
| 014110- A08 | Loans and Advances | 50,000,000 | ||
| 014110- A086 | Loans to Others | 50,000,000 |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|
| 2018-19 2019-20 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES IMPROVEMENT & MODELING OF LINK ROAD KONKAN PANJOOR GALI (13 KM) DISTT. MUZAFFARABAD 50,000,000 | ||
| 014110 | Total- Others 24,306,617,000 19, | 056,617,000 | 24,464,400,000 |
| 0141 | Total- Transfers (Inter-Governmental) 150,287,273,000 97, | 123,323,000 | 123,175,349,000 |
| 0142 Transf | ers (Others): | ||
| 014202 Trasfe IB0703 SUPPL | r To Non-Financial Institutions : Y OF ELECTRICITY TO SPECIAL Economic zones | ||
| 014202- A08 | Loans and Advances | 1,210,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 1,210,000,000 | |
| Total- | SUPPLY OF ELECTRICITY TO SPECIAL Economic zones | 1,210,000,000 | |
| IB0705 OFF-GRID SOLUTIONS (MERGED DISTRICTS & Balochistan) (Feasiblity) | |||
| 014202- A08 | Loans and Advances | 20,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 20,000,000 | |
| Total- | OFF-GRID SOLUTIONS (MERGED DISTRICTS & Balochistan) (Feasiblity) | 20,000,000 | |
| IB0706 DISTRI | . GENERATION SCHEMES THROUGH RENEW ABLE ENERGY | ||
| 014202- A08 | Loans and Advances | 100,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | |
| Total- | DISTRI. GENERATION SCHEMES THROUGH RENEW ABLE ENERGY | 100,000,000 | |
| ID8219 CASH | DEVELOPMENT LOAN TO QESCO | ||
| 014202- A08 | Loans and Advances 2,684,430,000 | ||
| 014202- A085 | Loans to Non Financial Institutions 2,684,430,000 | ||
| Total- | CASH DEVELOPMENT LOAN TO QESCO 2,684,430,000 | ||
| ID8446 CASH | DEVELOPMENT LOAN TO TESCO | ||
| 014202- A08 | Loans and Advances 107,940,000 | ||
| 014202- A085 | Loans to Non Financial Institutions 107,940,000 | ||
| Total- | CASH DEVELOPMENT LOAN TO TESCO 107,940,000 |
ID9258 CASH DEVELOPMENT LOAN TO PESCO
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| 014202- A08 | Loans and Advances | 500,000,000 | ||
|---|---|---|---|---|
| 014202- A085 | Loans to Non Financial Institutions | 500,000,000 | ||
| Total- | CASH DEVELOPMENT LOAN TO PESCO | 500,000,000 | ||
| ID9259 CASH | DEVELOPMENT LOAN TO M/O WATER & POWER | |||
| 014202- A08 | Loans and Advances | 5,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 5,000,000 | ||
| Total- | CASH DEVELOPMENT LOAN TO M/O WATER & POWER | 5,000,000 | ||
| ID9260 CASH | DEVELOPMENT LOAN TO PPIB | |||
| 014202- A08 | Loans and Advances | 5,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 5,000,000 | ||
| Total- | CASH DEVELOPMENT LOAN TO PPIB | 5,000,000 | ||
| ID9557 CASH | DEVELOPMENT LOAN TO SEPCO | |||
| 014202- A08 | Loans and Advances | 125,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 125,000,000 | ||
| Total- | CASH DEVELOPMENT LOAN TO SEPCO | 125,000,000 | ||
| 014202 | Total- Trasfer To Non-Financial Institutions | 3,427,370,000 | 1,330,000,000 | |
| 0142 | Total- Transfers (Others) | 3,427,370,000 | 1,330,000,000 | |
| 014 | Total- Transfers | 153,714,643,000 | 97,123,323,000 | 124,505,349,000 |
| 01 | Total- General Public Service | 153,714,643,000 | 97,123,323,000 | 124,505,349,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 153,714,643,000 | 97,123,323,000 | 124,505,349,000 | |
| (In Foreign Exchange) | (37,656,000) | |||
| (Own Resources) | ||||
| (Foreign Aid) | (37,656,000) | |||
| (In Local Currency) | (153,676,987,000) | (97,123,323,000) | (124,505,349,000) |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL
DEMANDS FOR GRANTS
GOVERNMENT
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
| 01 | General Public Service: | ||
|---|---|---|---|
| 014 | Transfers: | ||
| 0142 | Transfers (Others): | ||
| 014202 | Trasfe | r To Non-Financial Institutions : | |
| PR312 | 8 ABC CABLES FOR PESHAWAR KHAYBER & BANNU Circles (PESCO) | ||
| 014202 | - A08 | Loans and Advances | 350,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 350,000,000 |
| Total- | ABC CABLES FOR PESHAWAR | 350,000,000 | |
| KHAYBER & BANNU Circles (PESCO) | |||
| PR312 | 9 ELECTRIFICATION WORKS AT DIFFERENT valleys of District Chitral (PESCO) | ||
| 014202 | - A08 | Loans and Advances | 150,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 150,000,000 |
| Total- | ELECTRIFICATION WORKS AT | 150,000,000 | |
| DIFFERENT valleys of District Chitral (PESCO) | |||
| PR313 CHITR | 0 ESTA AL (PES | B. OF 132 KV GRID SYS. ALONGWITH UPG RADATION OF EXTG. 33KV GRID SYS CO) | . TO 132KV IN DISTT. |
| 014202 | - A08 | Loans and Advances | 150,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 150,000,000 |
| Total- | ESTAB. OF 132 KV GRID SYS. | 150,000,000 | |
| PR313 | 1 EVAC | ALONGWITH UPG RADATION OF EXTG. 33KV GRID SYS. TO 132KV IN DISTT. CHITRAL (PESCO) UATION OF POWER FROM 220-KV/ 132-KV Grid Station Sawabi (PESCO) | |
| 014202 | - A08 | Loans and Advances | 300,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 300,000,000 |
| Total- | EVACUATION OF POWER FROM 220-KV/ 132-KV Grid Station Sawabi (PESCO) | 300,000,000 | |
| 0 | 14202 | Total- Trasfer To Non-Financial Institutions | 950,000,000 |
| 0 | 142 | Total- Transfers (Others) | 950,000,000 |
| 0 | 14 | Total- Transfers | 950,000,000 |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL DEMANDS FOR GRANTS
GOVERNMENT
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | |
|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | ||||
| 01 | Total- General Public Service | 950,000,000 | ||
| Total- ACCOUNTANT GENERAL | 950,000,000 | |||
| PAKISTAN REVENUES | ||||
| SUB-OFFICE, PESHAWAR |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 | General Public Service: | |||||
|---|---|---|---|---|---|---|
| 014 | Transfers: | |||||
| 0142 | Transfers (Others): | |||||
| 014202 SK017 | Trasfe 8 LOWR | r To No E INDU | n-Financial Institutions : S RIGHT BANK IRRIGATION & DRAI | NAGE PROJECT(RBOD-I) | ||
| 014202 | - A08 | Loans and Advances | 1,000,000,000 | 1,000,000,000 | 1,321,780,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 1,000,000,000 | 1,000,000,000 | 1,321,780,000 | |
| Total- | LOWR | E INDUS RIGHT BANK | 1000000000 | 1000000000 | 1321780000 | |
| SK017 | 9 BALO | IRRIGATION & DRAINAGE PROJECT(RBOD-I) CHISTAN EFFLUENT DISPOSAL INT RBOD( | ,,, RBOD-III) | ,,, | ,,, | |
| 014202 | - A08 | Loans and Advances | 1,600,000,000 | 1,600,000,000 | 1,500,000,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 1,600,000,000 | 1,600,000,000 | 1,500,000,000 | |
| Total- | BALOCHISTAN EFFLUENT DISPOSAL INT RBOD(RBOD-III) | 1,600,000,000 | 1,600,000,000 | 1,500,000,000 | ||
| 0 | 14202 | Total- | Trasfer To Non-Financial Institutions | 2,600,000,000 | 2,600,000,000 | 2,821,780,000 |
| 0 | 142 | Total- | Transfers (Others) | 2,600,000,000 | 2,600,000,000 | 2,821,780,000 |
| 0 | 14 | Total- | Transfers | 2,600,000,000 | 2,600,000,000 | 2,821,780,000 |
| 0 | 1 | Total- | General Public Service | 2,600,000,000 | 2,600,000,000 | 2,821,780,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 2,600,000,000 | 2,600,000,000 | 2,821,780,000 |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 01 | General Public Service: | ||
|---|---|---|---|
| 014 | Transfers: | ||
| 0142 | Transfers (Others): | ||
| 014202 | Trasfe | r To Non-Financial Institutions : | |
| QA311 | 2 CONSTRUCTION OF 132-KV MASHKAY G/S WITH Allied 132-KV Nai-Mashkay T/Line (QESCO) | ||
| 014202 | - A08 | Loans and Advances | 600,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 600,000,000 |
| QA311 | Total- 3 CONS | CONSTRUCTION OF 132-KV MASHKAY G/S WITH Allied 132-KV Nai-Mashkay T/Line (QESCO) TRUCTION SERVICES FOR FEASIBILITY Study of Solar Water Pumping in Balochistan A | 600,000,000 rea |
| 014202 | - A08 | Loans and Advances | 90,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 90,000,000 |
| Total- | CONSTRUCTION SERVICES FOR FEASIBILITY Study of Solar Water Pumping in Balochistan Area | 90,000,000 | |
| QA311 | 4 CONSTRUCTION OF LT LINES INTO ABC WORKS in Khazzdar City (QESCO) | ||
| 014202 | - A08 | Loans and Advances | 27,350,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 27,350,000 |
| Total- | CONSTRUCTION OF LT LINES INTO ABC WORKS in Khazzdar City (QESCO) | 27,350,000 | |
| QA410 | 0 ELECTRIFICATION OF VILLAGES DERABUGTI(DERABUGTI PACKAGE) | ||
| 014202 | - A08 | Loans and Advances | 270,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 270,000,000 |
| Total- | ELECTRIFICATION OF VILLAGES DERABUGTI(DERABUGTI PACKAGE) | 270,000,000 | |
| QA410 | 1 CONSTRUCTION OF 132 KV GRID STATION ATKHAN MEHTERZAI WITH ALLIED T/LINE | ||
| 014202 | - A08 | Loans and Advances | 149,770,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 149,770,000 |
| Total- | CONSTRUCTION OF 132 KV GRID | 149,770,000 | |
| STATION ATKHAN MEHTERZAI WITH ALLIED T/LINE |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| QA4102 CONS LINE | ACCOUNTANT GENERAL PAKISTAN RE TRUCTION OF 132 KV GRID STATIONDEEP SEA | VENUES SUB-OFFICE, QUETTA PORT AND ASSOCIATED 132KV D/C | TRANSMISSION | |
| 014202- A08 | Loans and Advances | 102,729,000 | 215,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 102,729,000 | 215,000,000 | |
| Total- | CONSTRUCTION OF 132 KV GRID | 102,729,000 | 215,000,000 | |
| QA4103 CONS | STATIONDEEP SEA PORT AND ASSOCIATED 132KV D/C TRANSMISSION LINE TRUCTION OF 132 KV GRID STATION ATDHADA | R & 132 KV GRID | SDTSIBBI-DHADAR | T/LINE |
| 014202- A08 | Loans and Advances | 200,000,000 | 183,810,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 200,000,000 | 183,810,000 | |
| Total- | CONSTRUCTION OF 132 KV GRID | 200,000,000 | 183,810,000 | |
| STATION ATDHADAR & 132 KV GRID SDTSIBBI-DHADAR T/LINE | ||||
| QA4104 INTER G/STATION | CONNECTION OF ISOLATED NETWORK ATBASIMA VIA NAG G/STATION FROMPANJGOOR | |||
| 014202- A08 | Loans and Advances | 30,000,000 | 6,000,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 30,000,000 | 6,000,000,000 | |
| Total- | INTERCONNECTION OF ISOLATED NETWORK ATBASIMA VIA NAG G/STATION FROMPANJGOOR G/STATION | 30,000,000 | 6,000,000,000 | |
| QA4105 CONSTRUCTION OF 132 KV G/S AT ISPLINJIDISTRICT | MASTUNG | |||
| 014202- A08 | Loans and Advances | 100,000,000 | 300,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | 300,000,000 | |
| Total- | CONSTRUCTION OF 132 KV G/S AT ISPLINJIDISTRICT MASTUNG | 100,000,000 | 300,000,000 | |
| 014202 | Total- Trasfer To Non-Financial Institutions | 432,729,000 | 7,835,930,000 | |
| 0142 | Total- Transfers (Others) | 432,729,000 | 7,835,930,000 | |
| 014 | Total- Transfers | 432,729,000 | 7,835,930,000 | |
| 01 | Total- General Public Service | 432,729,000 | 7,835,930,000 | |
| Total- ACCOUNTANT GENERAL | 432,729,000 | 7,835,930,000 |
NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL DEMANDS FOR GRANTS
GOVERNMENT
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| PAKISTAN REVENUES SUB-OFFICE, QUETTA | |||
|---|---|---|---|
| TOTAL - DEMAND | 156,314,643,000 | 100,156,052,000 | 136,113,059,000 |
| (In Foreign Exchange) | (37,656,000) | ||
| (Own Resources) | |||
| (Foreign Aid) | (37,656,000) | ||
| (In Local Currency) | (156,276,987,000) ________________ | (100,156,052,000) __________________ | (136,113,059,000) ________________ |
NO. 149.- EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE FEDERAL GOVERNMENT DEMANDS FOR GRANTS
DEMAND NO. 149
( FC12E14 / FC15E14 )
EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE FEDERAL GOVERNMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 for EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE FEDERAL GOVERNMENT. Total Rs. 270,335,121,000 (Charged) Rs. 163,103,905,000 (Voted) Rs. 107,231,216,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 305,224,839,000 | 321,552,965,000 | 270,335,121,000 |
| Total | 305,224,839,000 | 321,552,965,000 | 270,335,121,000 | |
| (Charged) | 171,866,704,000 | 166,751,290,000 | 163,103,905,000 | |
| (Voted) | 133,358,135,000 ________________ | 154,801,675,000 _________________ | 107,231,216,000 _______________ | |
| OBJECT CLASSIFICATION | ||||
| A08 | Loans and Advances | 305,224,839,000 | 321,552,965,000 | 270,335,121,000 |
| (Charged) | 171,866,704,000 | 166,751,290,000 | 163,103,905,000 | |
| (Voted) | 133,358,135,000 | 154,801,675,000 | 107,231,216,000 | |
| Total | 305,224,839,000 | 321,552,965,000 | 270,335,121,000 | |
| (Charged) | 171,866,704,000 | 166,751,290,000 | 163,103,905,000 | |
| (Voted) | 133,358,135,000 | 154,801,675,000 | 107,231,216,000 | |
| (In Foreign Exchange) | _________________ (305,224,839,000) | _________________ (321,552,965,000) | ________________ (270,335,121,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (305,224,839,000) _________________ | (321,552,965,000) _________________ | (270,335,121,000) ________________ |
NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of | Posts | 2018-2019 | 2018-2019 | 2019-2020 | ||
|---|---|---|---|---|---|---|
| 2018-19 2 | 019-20 | Budget | Revised | Budget | ||
| Estimate | Estimate | Estimate | ||||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||||
| 01 | General Public Service: | |||||
| 014 | Transfers: | |||||
| 0141 | Transfers (Inter-Governmental): | |||||
| 014101 | TO PROVINCES : | |||||
| IB0682 | BALOCHISTAN | |||||
| 014101 | - A08 | Loans and Advances | 543,000,000 | 1,032,000,000 | ||
| (Charged) | 543,000,000 | 1,032,000,000 | ||||
| 014101 | - A082 | Provinces | 543,000,000 | 1,032,000,000 | ||
| (Charged) | 543,000,000 | 1,032,000,000 | ||||
| Total- | BALOCHISTAN | 543,000,000 | 1,032,000,000 | |||
| (In Foreign Exchange) | (543,000,000) | (1,032,000,000) | ||||
| (Foreign Aid) | (543,000,000) | (1,032,000,000) | ||||
| ID8871 | PUNJA | B PROGRAMME LOAN | _ | _________________ | ||
| 014101 | - A08 | Loans and Advances | 24,809,329,000 | 34,503,877,000 | 35,840,040,000 | |
| (Charged) | 24,809,329,000 | 34,503,877,000 | 35,840,040,000 | |||
| 014101 | - A082 | Provinces | 24,809,329,000 | 34,503,877,000 | 35,840,040,000 | |
| (Charged) | 24,809,329,000 | 34,503,877,000 | 35,840,040,000 | |||
| Total- | PUNJAB PROGRAMME LOAN | 24,809,329,000 | 34,503,877,000 | 35,840,040,000 | ||
| (In Foreign Exchange) | (24,809,329,000) | (34,503,877,000) | (35,840,040,000) | |||
| (Foreign Aid) | (24,809,329,000) | (34,503,877,000) | (35,840,040,000) | |||
| ID8872 | SINDH | PROGRAMME LOAN | _ | _________________ | ||
| 014101 | - A08 | Loans and Advances | 1,404,000,000 | 2,232,520,000 | 825,000,000 | |
| (Charged) | 1,404,000,000 | 2,232,520,000 | 825,000,000 | |||
| 014101 | - A082 | Provinces | 1,404,000,000 | 2,232,520,000 | 825,000,000 | |
| (Charged) | 1,404,000,000 | 2,232,520,000 | 825,000,000 | |||
| Total- | SINDH PROGRAMME LOAN | 1,404,000,000 | 2,232,520,000 | 825,000,000 | ||
| (In Foreign Exchange) | (1,404,000,000) | (2,232,520,000) | (825,000,000) | |||
| (Foreign Aid) | (1,404,000,000) | (2,232,520,000) | (825,000,000) | |||
| ID8873 | KPK P | ROGRAMME LOAN | _ | _________________ | ||
| 014101 | - A08 | Loans and Advances | 8,218,140,000 | 15,482,535,000 | 12,965,500,000 | |
| (Charged) | 8,218,140,000 | 15,482,535,000 | 12,965,500,000 |
NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No o | f Posts | 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|---|---|
| 2018-19 | 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | |
| ACCOUNTANT GENERAL | Rs PAKISTAN REVEN | Rs UES | Rs | ||
| 014101- A082 | Provinces | 8,218,140,000 | 15,482,535,000 | 12,965,500,000 | |
| (Charged) | 8,218,140,000 | 15,482,535,000 | 12,965,500,000 | ||
| Total- | KPK PROGRAMME LOAN | 8,218,140,000 | 15,482,535,000 | 12,965,500,000 | |
| (In Foreign Exchange) | (8,218,140,000) | (15,482,535,000) | (12,965,500,000) | ||
| (Foreign Aid) | (8,218,140,000) | (15,482,535,000) | (12,965,500,000) | ||
| ID8986 SINDH | _ | _________________ | |||
| 014101- A08 | Loans and Advances | 39,906,009,000 | 28,706,770,000 | 51,133,030,000 | |
| (Charged) | 39,906,009,000 | 28,706,770,000 | 51,133,030,000 | ||
| 014101- A082 | Provinces | 39,906,009,000 | 28,706,770,000 | 51,133,030,000 | |
| (Charged) | 39,906,009,000 | 28,706,770,000 | 51,133,030,000 | ||
| Total- | SINDH | 39,906,009,000 | 28,706,770,000 | 51,133,030,000 | |
| (In Foreign Exchange) | (39,906,009,000) | (28,706,770,000) | (51,133,030,000) | ||
| (Foreign Aid) | (39,906,009,000) | (28,706,770,000) | (51,133,030,000) | ||
| ID8987 PUNJA | B | _ | _________________ | ||
| 014101- A08 | Loans and Advances | 62,993,131,000 | 52,094,197,000 | 27,680,002,000 | |
| (Charged) | 62,993,131,000 | 52,094,197,000 | 27,680,002,000 | ||
| 014101- A082 | Provinces | 62,993,131,000 | 52,094,197,000 | 27,680,002,000 | |
| (Charged) | 62,993,131,000 | 52,094,197,000 | 27,680,002,000 | ||
| Total- | PUNJAB | 62,993,131,000 | 52,094,197,000 | 27,680,002,000 | |
| (In Foreign Exchange) | (62,993,131,000) | (52,094,197,000) | (27,680,002,000) | ||
| (Foreign Aid) | (62,993,131,000) | (52,094,197,000) | (27,680,002,000) | ||
| ID8988 KHYBE | R PAKHTUNKHWA | _ | _________________ | ||
| 014101- A08 | Loans and Advances | 30,457,095,000 | 27,477,701,000 | 26,600,333,000 | |
| (Charged) | 30,457,095,000 | 27,477,701,000 | 26,600,333,000 | ||
| 014101- A082 | Provinces | 30,457,095,000 | 27,477,701,000 | 26,600,333,000 | |
| (Charged) | 30,457,095,000 | 27,477,701,000 | 26,600,333,000 | ||
| Total- | KHYBER PAKHTUNKHWA | 30,457,095,000 | 27,477,701,000 | 26,600,333,000 | |
| (In Foreign Exchange) | (30,457,095,000) | (27,477,701,000) | (26,600,333,000) | ||
| (Foreign Aid) | _ | (30,457,095,000) ________________ | (27,477,701,000) _________________ | (26,600,333,000) ________________ |
ID8989 BALOCHISTAN
NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | ||
|---|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | ||||
| 014101- A08 | Loans and Advances | 4,079,000,000 | 5,710,690,000 | 7,028,000,000 | |
| (Charged) | 4,079,000,000 | 5,710,690,000 | 7,028,000,000 | ||
| 014101- A082 | Provinces | 4,079,000,000 | 5,710,690,000 | 7,028,000,000 | |
| (Charged) | 4,079,000,000 | 5,710,690,000 | 7,028,000,000 | ||
| Total- | BALOCHISTAN | 4,079,000,000 | 5,710,690,000 | 7,028,000,000 | |
| (In Foreign Exchange) | (4,079,000,000) | (5,710,690,000) | (7,028,000,000) | ||
| (Foreign Aid) | (4,079,000,000) _________________ | (5,710,690,000) __________________ | (7,028,000,000) _______________ | ||
| 014101 | Total- TO PROVINCES | 171,866,704,000 | 166,751,290,000 | 163,103,905,000 | |
| 014110 OTHERS : | |||||
| IB0687 35 MW | NAGDAR HPP | ||||
| 014110- A08 | Loans and Advances | 40,000,000 | |||
| 014110- A086 | Loans to Others | 40,000,000 | |||
| Total- | 35 MW NAGDAR HPP | 40,000,000 | |||
| (In Foreign Exchange) | (40,000,000) | ||||
| (Foreign Aid) | (40,000,000) | ||||
| IB0688 40 MW | DOWARIAN | _________________ | _______________ | ||
| 014110- A08 | Loans and Advances | 30,000,000 | |||
| 014110- A086 | Loans to Others | 30,000,000 | |||
| Total- | 40 MW DOWARIAN | 30,000,000 | |||
| (In Foreign Exchange) | (30,000,000) | ||||
| (Foreign Aid) | (30,000,000) | ||||
| ID8222 48 MW | JAGRAN HYDRO POWER | PROJECT AJK | _________________ | _______________ | |
| 014110- A08 | Loans and Advances | 270,000,000 | 1,500,000,000 | 300,000,000 | |
| 014110- A086 | Loans to Others | 270,000,000 | 1,500,000,000 | 300,000,000 | |
| Total- | 48 MW JAGRAN HYDRO PROJECT AJK | POWER | 270,000,000 | 1,500,000,000 | 300,000,000 |
| (In Foreign Exchange) | (270,000,000) | (1,500,000,000) | (300,000,000) | ||
| (Foreign Aid) | (270,000,000) | (1,500,000,000) | (300,000,000) | ||
| ID8994 AJK | _________________ | _______________ | |||
| 014110- A08 | Loans and Advances | 1,800,000,000 | 5,924,738,000 | 2,430,000,000 |
NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE DEMANDS FOR GRANTS FEDERAL GOVERNMENT
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | |
| ACCOUNTANT GENERAL | Rs PAKISTAN REVEN | Rs UES | Rs | |
| 014110- A086 | Loans to Others | 1,800,000,000 | 5,924,738,000 | 2,430,000,000 |
| Total- | AJK | 1,800,000,000 | 5,924,738,000 | 2,430,000,000 |
| (In Foreign Exchange) | (1,800,000,000) | (5,924,738,000) | (2,430,000,000) | |
| (Foreign Aid) | (1,800,000,000) | (5,924,738,000) | (2,430,000,000) | |
| 014110 | Total- OTHERS | ________________ 2,070,000,000 | _________________ 7,424,738,000 | ________________ 2,800,000,000 |
| 0141 | Total- Transfers (Inter-Governmental) | 173,936,704,000 | 174,176,028,000 | 165,903,905,000 |
| 0142 Transf | ers (Others): | |||
| 014202 TRANSFER TO NON-FINANCIAL INSTITUTIONS : IB0689 CHITRAL HYDRO POWER | ||||
| 014202- A08 | Loans and Advances | 925,790,000 | 228,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 925,790,000 | 228,000,000 | |
| Total- | CHITRAL HYDRO POWER | 925,790,000 | 228,000,000 | |
| (In Foreign Exchange) | (925,790,000) | (228,000,000) | ||
| (Foreign Aid) | (925,790,000) | (228,000,000) | ||
| IB0690 DARGI | HYDROPOWER PROJECT | _________________ | _________________ | |
| 014202- A08 | Loans and Advances | 50,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 50,000,000 | ||
| Total- | DARGI HYDROPOWER PROJECT | 50,000,000 | ||
| (In Foreign Exchange) | (50,000,000) | |||
| (Foreign Aid) | (50,000,000) | |||
| ID7337 DASU | HYDRO POWER PROJECT | _________________ | _______________ | |
| 014202- A08 | Loans and Advances | 3,000,000,000 | 3,000,000,000 | 4,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 3,000,000,000 | 3,000,000,000 | 4,500,000,000 |
| Total- | DASU HYDRO POWER PROJECT | 3,000,000,000 | 3,000,000,000 | 4,500,000,000 |
| (In Foreign Exchange) | (3,000,000,000) | (3,000,000,000) | (4,500,000,000) | |
| (Foreign Aid) | (3,000,000,000) | (3,000,000,000) | (4,500,000,000) | |
| ID7338 ESTAB | _________________ LISHMENT OF HYDRO POWER TRAINING INSTITUTE | _________________ | ||
| 014202- A08 | Loans and Advances | 50,000,000 | 137,100,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 50,000,000 | 137,100,000 | |
| Total- | ESTABLISHMENT OF HYDRO POWER TRAINING INSTITUTE | 50,000,000 | 137,100,000 |
| NO. 149.- FC1 | 2E14 EXTERNAL DEVELOPMENT LONAS AND FEDERAL GOVERNMENT | ADVANCES BY T | HE DEMAN | DS FOR GRANTS |
|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget | 2018-2019 Revised | 2019-2020 Budget | |
| Estimate | Estimate | Estimate | ||
| R | R | R | ||
| ACCOUNTANT GENERAL | s PAKISTAN REVEN | s UES | s | |
| (In Foreign Exchange) | (50,000,000) | (137,100,000) | ||
| (Foreign Aid) | (50,000,000) | (137,100,000) | ||
| ID7339 GOLAN | _ GOL HYDRO POWER PROJECT | _______________ | ||
| 014202- A08 | Loans and Advances | 600,000,000 | 1,153,875,000 | 500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 600,000,000 | 1,153,875,000 | 500,000,000 |
| Total- | GOLAN GOL HYDRO POWER PROJECT | 600,000,000 | 1,153,875,000 | 500,000,000 |
| (In Foreign Exchange) | (600,000,000) | (1,153,875,000) | (500,000,000) | |
| (Foreign Aid) | (600,000,000) | (1,153,875,000) | (500,000,000) | |
| ID7341 HEYAL | _ KHAWAR HYDRO POWER PROJECT | _______________ | ||
| 014202- A08 | Loans and Advances | 171,000,000 | 32,660,000 | 65,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 171,000,000 | 32,660,000 | 65,000,000 |
| Total- | HEYAL KHAWAR HYDRO POWER PROJECT | 171,000,000 | 32,660,000 | 65,000,000 |
| (In Foreign Exchange) | (171,000,000) | (32,660,000) | (65,000,000) | |
| (Foreign Aid) | (171,000,000) | (32,660,000) | (65,000,000) | |
| ID7342 NEELU | _ M JHELUM POWER PROJECT | _______________ | ||
| 014202- A08 | Loans and Advances | 5,000,000,000 | 5,308,602,000 | 2,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 5,000,000,000 | 5,308,602,000 | 2,000,000,000 |
| Total- | NEELUM JHELUM POWER PROJECT | 5,000,000,000 | 5,308,602,000 | 2,000,000,000 |
| (In Foreign Exchange) | (5,000,000,000) | (5,308,602,000) | (2,000,000,000) | |
| (Foreign Aid) | (5,000,000,000) | (5,308,602,000) | (2,000,000,000) | |
| ID7343 REFUR | _ BISHMENT & UP GRADATION OF GENERATIO | ________________ N UNIT | _______________ | |
| 014202- A08 | Loans and Advances | 840,000,000 | 150,500,000 | 1,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 840,000,000 | 150,500,000 | 1,500,000,000 |
| Total- | REFURBISHMENT & UP GRADATION OF GENERATION UNIT | 840,000,000 | 150,500,000 | 1,500,000,000 |
| (In Foreign Exchange) | (840,000,000) | (150,500,000) | (1,500,000,000) | |
| (Foreign Aid) | (840,000,000) | (150,500,000) | (1,500,000,000) | |
| ID7344 TARBE | _ LA FOURTH & FIFTH EXTENTION HYDRO PO | ________________ WER PROJECT | _______________ | |
| 014202- A08 | Loans and Advances | 3,363,505,000 | 3,055,975,000 | 3,000,000,000 |
NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE DEMANDS FOR GRANTS FEDERAL GOVERNMENT
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | |
| ACCOUNTANT GENERAL | Rs PAKISTAN REVEN | Rs UES | Rs | |
| 014202- A085 | Loans to Non Financial Institutions | 3,363,505,000 | 3,055,975,000 | 3,000,000,000 |
| Total- | TARBELA FOURTH & FIFTH EXTENTION HYDRO POWER PROJECT | 3,363,505,000 | 3,055,975,000 | 3,000,000,000 |
| (In Foreign Exchange) | (3,363,505,000) | (3,055,975,000) | (3,000,000,000) | |
| (Foreign Aid) | (3,363,505,000) | (3,055,975,000) | (3,000,000,000) | |
| ID7345 WARS | _ AK HYDROELECTRIC POWER STATION 2ND | ________________ REHABALITATION | _________________ | |
| 014202- A08 | Loans and Advances | 70,000,000 | 112,925,000 | 1,800,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 70,000,000 | 112,925,000 | 1,800,000,000 |
| Total- | WARSAK HYDROELECTRIC POWER STATION 2ND REHABALITATION | 70,000,000 | 112,925,000 | 1,800,000,000 |
| (In Foreign Exchange) | (70,000,000) | (112,925,000) | (1,800,000,000) | |
| (Foreign Aid) | (70,000,000) | (112,925,000) | (1,800,000,000) | |
| ID8440 CHITR | _ AL HYDAL POWER STATION CAPACITY ENH | ________________ ANCEMENT | _________________ | |
| 014202- A08 | Loans and Advances | 5,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 5,000,000 | ||
| Total- | CHITRAL HYDAL POWER STATION CAPACITY ENHANCEMENT | 5,000,000 | ||
| (In Foreign Exchange) | (5,000,000) | |||
| (Foreign Aid) | (5,000,000) | |||
| ID8992 NHA | _ | _________________ | ||
| 014202- A08 | Loans and Advances | 84,217,000,000 | 112,152,546,000 | 57,411,916,000 |
| 014202- A085 | Loans to Non Financial Institutions | 84,217,000,000 | 112,152,546,000 | 57,411,916,000 |
| Total- | NHA | 84,217,000,000 | 112,152,546,000 | 57,411,916,000 |
| (In Foreign Exchange) | (84,217,000,000) | (112,152,546,000) | (57,411,916,000) | |
| (Foreign Aid) | (84,217,000,000) | (112,152,546,000) | (57,411,916,000) | |
| ID8993 PEPCO | _ | _________________ | ||
| 014202- A08 | Loans and Advances | 32,697,630,000 | 20,850,164,000 | 31,676,300,000 |
| 014202- A085 | Loans to Non Financial Institutions | 32,697,630,000 | 20,850,164,000 | 31,676,300,000 |
| Total- | PEPCO | 32,697,630,000 | 20,850,164,000 | 31,676,300,000 |
| (In Foreign Exchange) | (32,697,630,000) | (20,850,164,000) | (31,676,300,000) | |
| (Foreign Aid) | (32,697,630,000) | (20,850,164,000) | (31,676,300,000) |
NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE DEMANDS FOR GRANTS FEDERAL GOVERNMENT
| No of Post | s 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|---|
| 2018-19 2019- | 20 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| ID9410 TARBE | _________________ LA 5TH EXTENTION HYDRO POWER PROJECT | _________________ | ||
| 014202- A08 | Loans and Advances | 1,224,000,000 | 496,800,000 | 1,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,224,000,000 | 496,800,000 | 1,500,000,000 |
| Total- | TARBELA 5TH EXTENTION HYDRO POWER PROJECT | 1,224,000,000 | 496,800,000 | 1,500,000,000 |
| (In Foreign Exchange) | (1,224,000,000) | (496,800,000) | (1,500,000,000) | |
| (Foreign Aid) | (1,224,000,000) | (496,800,000) | (1,500,000,000) | |
| ID9961 ESTAB WITHIN KPK | _________________ LISHMENT OF PAKISTAN GLACIER MONITORING NETWORK U | _________________ PPER INDUS BASIN | ________________ AREA FALLING | |
| 014202- A08 | Loans and Advances | 50,000,000 | 200,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 50,000,000 | 200,000,000 | |
| Total- | ESTABLISHMENT OF PAKISTAN GLACIER MONITORING NETWORK UPPER INDUS BASIN AREA FALLING WITHIN KPK | 50,000,000 | 200,000,000 | |
| (In Foreign Exchange) | (50,000,000) | (200,000,000) | ||
| (Foreign Aid) | (50,000,000) | (200,000,000) | ||
| 014202 | Total- TRANSFER TO NON-FINANCIAL INSTITUTIONS | _________________ 131,288,135,000 | _________________ 147,376,937,000 | ________________ 104,431,216,000 |
| 0142 | Total- Transfers (Others) | 131,288,135,000 | 147,376,937,000 | 104,431,216,000 |
| 014 | Total- Transfers | 305,224,839,000 | 321,552,965,000 | 270,335,121,000 |
| 01 | Total- General Public Service | 305,224,839,000 | 321,552,965,000 | 270,335,121,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 305,224,839,000 | 321,552,965,000 | 270,335,121,000 | |
| (Charged) | 171,866,704,000 | 166,751,290,000 | 163,103,905,000 | |
| (Voted) | 133,358,135,000 | 154,801,675,000 | 107,231,216,000 | |
| (In Foreign Exchange) | (305,224,839,000) | (321,552,965,000) | (270,335,121,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (305,224,839,000) | (321,552,965,000) | (270,335,121,000) | |
| TOTAL - DEMAND | 305,224,839,000 | 321,552,965,000 | 270,335,121,000 | |
| (Charged) | 171,866,704,000 | 166,751,290,000 | 163,103,905,000 |
NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
(Voted) 133,358,135,000 154,801,675,000 107,231,216,000 __________________________________________________ (In Foreign Exchange) (305,224,839,000) (321,552,965,000) (270,335,121,000) (Own Resources) (Foreign Aid) (305,224,839,000) (321,552,965,000) (270,335,121,000) __________________________________________________
NO. 150.- CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 150 ( FC12C15 )
CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION.
Voted Rs. 29,774,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FOREIGN AFFAIRS .
| FUNCTIONAL CLASSIFICATION | 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | |
|---|---|---|---|---|
| 011 | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs | 199,774,000 | 29,774,000 | |
| Total | 199,774,000 | 29,774,000 | ||
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 4,360,000 | ||
| A011 | Pay | 3,608,000 | ||
| A011-1 | Pay of Officers | (3,048,000) | ||
| A011-2 | Pay of Other Staff | (560,000) | ||
| A012 | Allowances | 752,000 | ||
| A012-1 | Regular Allowances | (201,000) | ||
| A012-2 | Other Allowances (Excluding TA) | (551,000) | ||
| A03 | Operating Expenses | 92,942,000 | 1,728,000 | |
| A09 | Physical Assets | 12,560,000 | 12,555,000 | |
| A12 | Civil works | 89,709,000 | 15,491,000 | |
| A13 | Repairs and Maintenance | 203,000 | ||
| Total | 199,774,000 | 29,774,000 |
NO. 150.- FC12C15 CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | |||
|---|---|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | |||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||||
| 01 | General Public Service: | |||||
| 011 | Executive & | Legislative Organs,Financial and Fiscal Affairs, External Affairs: | ||||
| 0113 | External Affairs: | |||||
| 011301 HQ369 | Admin 8 CONS | istratio ULTAN | n : CY SERVICES FOR STATE GUEST HOU | SE & CONFERENCE CENTRE ISLAMABAD | ||
| 011301 | - A03 | Operating Expenses | 90,012,000 | |||
| 011301 | - A032 | Communications | 4,000 | |||
| 011301 | - A038 | Travel & Transportation | 4,000 | |||
| 011301 | - A039 | General | 90,004,000 | |||
| 011301 | - A09 | Physical Assets | 2,000 | |||
| 011301 | - A092 | Computer Equipment | 1,000 | |||
| 011301 | - A095 | Purchase of Transport | 1,000 | |||
| 011301 | - A12 | Civil | works | 9,983,000 | ||
| 011301 | - A124 | Building and Structures | 9,983,000 | |||
| 011301 | - A13 | Repairs and Maintenance | 3,000 | |||
| 011301 | - A137 | Computer Equipment | 3,000 | |||
| Total- | CONSULTANCY SERVICES FOR STATE GUEST HOUSE & CONFERENCE CENTRE ISLAMABAD | 100,000,000 | ||||
| 0 | 11301 | Total- | Administration | 100,000,000 | ||
| 0 | 113 | Total- | External Affairs | 100,000,000 | ||
| 0 | 11 | Total- | Executive & Legislative | 100,000,000 | ||
| Organs,Financial and Fiscal Affairs, External Affairs | ||||||
| 0 | 1 | Total- | General Public Service | 100,000,000 | ||
| Total- | ACCOUNTANT GENERAL | 100,000,000 | ||||
| PAKISTAN REVENUES |
| NO. 150.- FC12C15 CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISIO | N DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
CHIEF ACCOUNTS OFFICER (MINISTRY OF FOREIGN AFFAIRS)
| 01 | General | Public Service: | ||
|---|---|---|---|---|
| 011 | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs: | |||
| 0113 | External Affairs: | |||
| 011301 | Administration : | |||
| HQ358 | 1 REHAB | . OF ISS SECTOR F-5/2 ISB. | ||
| 011301 | - A03 | Operating Expenses | 1,728,000 | 1,728,000 |
| 011301 | - A039 | General | 1,728,000 | 1,728,000 |
| 011301 | - A09 | Physical Assets | 12,555,000 | 12,555,000 |
| 011301 | - A096 | Purchase of Plant and Machinery | 10,175,000 | 10,175,000 |
| 011301 | - A097 | Purchase of Furniture and Fixture | 2,380,000 | 2,380,000 |
| 011301 | - A12 | Civil works | 15,491,000 | 15,491,000 |
| 011301 | - A124 | Building and Structures | 15,491,000 | 15,491,000 |
| Total- REHAB. OF ISS SECTOR F-5/2 ISB. | 29,774,000 | 29,774,000 | ||
| HQ368 | 5 CONSTRUCTION OF STATE GUEST HOUSE | |||
| 011301 | - A01 | Employees Related Expenses | 4,360,000 | |
| 011301 | - A011 | Pay 10 | 3,608,000 | |
| 011301 | - A011-1 | Pay of Officers (4) | (3,048,000) | |
| 011301 | - A011-2 | Pay of Other Staff (6) | (560,000) | |
| 011301 | - A012 | Allowances | 752,000 | |
| 011301 | - A012-1 | Regular Allowances | (201,000) | |
| 011301 | - A012-2 | Other Allowances (Excluding TA) | (551,000) | |
| 011301 | - A03 | Operating Expenses | 1,202,000 | |
| 011301 | - A032 | Communications | 401,000 | |
| 011301 | - A038 | Travel & Transportation | 301,000 | |
| 011301 | - A039 | General | 500,000 | |
| 011301 | - A09 | Physical Assets | 3,000 | |
| 011301 | - A092 | Computer Equipment | 2,000 | |
| 011301 | - A095 | Purchase of Transport | 1,000 | |
| 011301 | - A12 | Civil works | 64,235,000 | |
| 011301 | - A124 | Building and Structures | 64,235,000 | |
| 011301 | - A13 | Repairs and Maintenance | 200,000 | |
| 011301 | - A137 | Computer Equipment | 200,000 |
| NO. 150.- FC12C15 CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISIO | N DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
CHIEF ACCOUNTS OFFICER (MINISTRY OF FOREIGN AFFAIRS)
| Total- | CONSTRUCTION OF STATE GUEST HOUSE | 70,000,000 | ||
|---|---|---|---|---|
| 011301 | Total- | Administration | 99,774,000 | 29,774,000 |
| 0113 | Total- | External Affairs | 99,774,000 | 29,774,000 |
| 011 | Total- | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs | 99,774,000 | 29,774,000 |
| 01 | Total- | General Public Service | 99,774,000 | 29,774,000 |
| Total- | CHIEF ACCOUNTS OFFICER (MINISTRY OF FOREIGN AFFAIRS) | 99,774,000 | 29,774,000 | |
| TOTAL | - DEMAND | 199,774,000 | 29,774,000 |
NO. 151.- CAPITAL OUTLAY ON CIVIL WORKS
DEMANDS FOR GRANTS
DEMAND NO. 151 ( FC12C28 )
CAPITAL OUTLAY ON CIVIL WORKS
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 for CAPITAL OUTLAY ON CIVIL WORKS.
Voted
Rs. 3,069,506,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HOUSING AND WORKS .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 045 | Construction and Transport | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 |
| Total | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 154,062,000 | 248,314,000 | 114,257,000 |
| A12 | Civil works | 5,786,402,000 | 3,820,216,000 | 2,955,249,000 |
| Total | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 |
NO. 151.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | |
|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||
| 04 Econo | mic Affairs: | |||
| 045 Const | ruction and Transport: | |||
| 0457 Const | ruction (Works): | |||
| 045702 Buildi ID8076 ESTAB | ngs and Structures : LISHMENT CHARGES CREDITED TO OTHER G | OVERNMENT DEPARTMENTS (PAK. PWD SINDH) | ||
| 045702- A03 | Operating Expenses | 7,864,000 | 4,840,000 | 4,878,000 |
| 045702- A039 | General | 7,864,000 | 4,840,000 | 4,878,000 |
| Total- | ESTABLISHMENT CHARGES CREDITED | 7,864,000 | 4,840,000 | 4,878,000 |
| TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH) | ||||
| ID8077 TOOLS | AND PLANTS CHARGES CREDITED TO OTHE | R GOVERNMENT DEPARTMENTS (PAK. | PWD SINDH) | |
| 045702- A03 | Operating Expenses | 2,359,000 | 1,452,000 | 1,463,000 |
| 045702- A039 | General | 2,359,000 | 1,452,000 | 1,463,000 |
| Total- | TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH) | 2,359,000 | 1,452,000 | 1,463,000 |
| ID8078 INTERIOR (PAK. PWD PUNJAB) | ||||
| 045702- A12 | Civil works | 268,929,000 | ||
| 045702- A124 | Building and Structures | 268,929,000 | ||
| Total- | INTERIOR (PAK. PWD PUNJAB) | 268,929,000 | ||
| ID8079 CIVIL | WORKS (PAK. PWD PUNJAB) | |||
| 045702- A12 | Civil works | 4,093,739,000 | 2,856,043,000 | 1,915,502,000 |
| 045702- A124 | Building and Structures | 4,093,739,000 | 2,856,043,000 | 1,915,502,000 |
| Total- | CIVIL WORKS (PAK. PWD PUNJAB) | 4,093,739,000 2, | 856,043,000 | 1,915,502,000 |
| ID8081 ESTABLISHMENT DIVISION (PAK. PWD PUNJAB) | ||||
| 045702- A12 | Civil works | 141,256,000 | 94,503,000 | |
| 045702- A124 | Building and Structures | 141,256,000 | 94,503,000 | |
| Total- | ESTABLISHMENT DIVISION (PAK. PWD | 141,256,000 | 94,503,000 | |
| ID8082 ESTAB | PUNJAB) LISHMENT CHARGES CREDITED TO OTHER G | OVERNMENT DEPART | MENTS (PAK. PW | D PUNJAB) |
| 045702- A03 | Operating Expenses | 91,378,000 | 142,802,000 | 60,500,000 |
| 045702- A039 | General | 91,378,000 | 142,802,000 | 60,500,000 |
| NO. 151.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | DEMAND 2018-2019 Revised Estimate | S FOR GRANTS 2019-2020 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | ESTABLISHMENT CHARGES CREDITED | 91,378,000 | 142,802,000 | 60,500,000 |
| ID8083 TOOLS | TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB) AND PLANTS CHARGES CREDITED TO OTHER | GOVERNMENT DEPARTMENTS (PAK. | PWD PUNJAB) | |
| 045702- A03 | Operating Expenses | 27,413,000 | 42,841,000 | 18,274,000 |
| 045702- A039 | General | 27,413,000 | 42,841,000 | 18,274,000 |
| Total- | TOOLS AND PLANTS CHARGES | 27,413,000 | 42,841,000 | 18,274,000 |
| CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB) | ||||
| ID8085 ESTABLISHMENT CHARGES CREDITED TO OTHER G PAKHTUNKHWA). | OVERNMENT DEPARTMENTS (PAK. PWD KHYBER | |||
| 045702- A03 | Operating Expenses | 14,473,000 | 18,410,000 | 19,189,000 |
| 045702- A039 | General | 14,473,000 | 18,410,000 | 19,189,000 |
| Total- | ESTABLISHMENT CHARGES CREDITED | 14,473,000 | 18,410,000 | 19,189,000 |
| TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD KHYBER PAKHTUNKHWA). | ||||
| ID8086 TOOLS KHYBER PAK | AND PLANTS CHARGES CREDITED TO OTHER HTUNKHWA). | GOVERNMENT DEPARTMENTS (PAK. | P.W.D., | |
| 045702- A03 | Operating Expenses | 4,343,000 | 5,523,000 | 5,757,000 |
| 045702- A039 | General | 4,343,000 | 5,523,000 | 5,757,000 |
| Total- | TOOLS AND PLANTS CHARGES | 4,343,000 | 5,523,000 | 5,757,000 |
| CREDITED TO OTHER GOVERNMENT | ||||
| DEPARTMENTS (PAK. P.W.D., KHYBER PAKHTUNKHWA). | ||||
| ID8087 INTERIOR (PAK. PWD BALOCHISTAN) | ||||
| 045702- A12 | Civil works | 66,188,000 | 36,416,000 | |
| 045702- A124 | Building and Structures | 66,188,000 | 36,416,000 | |
| Total- | INTERIOR (PAK. PWD BALOCHISTAN) | 66,188,000 | 36,416,000 | |
| ID8088 ESTABLISHMENT CHARGES CREDITED TO OTHER G BALOCHISTAN) | OVERNMENT DEPARTMENTS (PAK. PWD | |||
| 045702- A03 | Operating Expenses | 4,794,000 | 24,958,000 | 3,323,000 |
| 045702- A039 | General | 4,794,000 | 24,958,000 | 3,323,000 |
| Total- | ESTABLISHMENT CHARGES CREDITED | 4,794,000 | 24,958,000 | 3,323,000 |
| NO. 151.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | |
| Rs | Rs | Rs | ||
| ID8089 TOOLS BALOCHISTA | ACCOUNTANT GENERAL P TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD BALOCHISTAN) AND PLANTS CHARGES CREDITED TO OTHE N) | AKISTAN REVENUES R GOVERNMENT DEPARTMENTS (PAK | . PWD | |
| 045702- A03 | Operating Expenses | 1,438,000 | 7,488,000 | 873,000 |
| 045702- A039 | General | 1,438,000 | 7,488,000 | 873,000 |
| Total- | TOOLS AND PLANTS CHARGES | 1,438,000 | 7,488,000 | 873,000 |
| ID8092 CIVIL | CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD BALOCHISTAN) WORKS (PAK.PWD KHYBER PAKHTUNKHWA) | |||
| 045702- A12 | Civil works | 529,332,000 | 368,202,000 | 481,251,000 |
| 045702- A124 | Building and Structures | 529,332,000 | 368,202,000 | 481,251,000 |
| Total- | CIVIL WORKS (PAK.PWD KHYBER | 529,332,000 | 368,202,000 | 481,251,000 |
| PAKHTUNKHWA) | ||||
| ID8095 CIVIL | WORKS (PAK.PWD BALOCHISTAN) | |||
| 045702- A12 | Civil works | 529,682,000 | 499,165,000 | 330,031,000 |
| 045702- A124 | Building and Structures | 529,682,000 | 499,165,000 | 330,031,000 |
| Total- | CIVIL WORKS (PAK.PWD BALOCHISTAN) | 529,682,000 | 499,165,000 | 330,031,000 |
| ID8106 CIVIL | WORKS | |||
| 045702- A12 | Civil works | 157,276,000 | 96,806,000 | 97,546,000 |
| 045702- A124 | Building and Structures | 157,276,000 | 96,806,000 | 97,546,000 |
| Total- | CIVIL WORKS | 157,276,000 | 96,806,000 | 97,546,000 |
| 045702 | Total- Buildings and Structures | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 |
| 0457 | Total- Construction (Works) | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 |
| 045 | Total- Construction and Transport | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 |
| 04 | Total- Economic Affairs | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 | |
| TOTAL - DEMAND | 5,940,464,000 | 4,068,530,000 | 3,069,506,000 |
NO. 152.- OTHER EXPENDITURE OF HOUSING & WORKS DIV
DEMANDS FOR GRANTS
DEMAND NO. 152 ( FC12Y03 )
OTHER EXPENDITURE OF HOUSING & WORKS DIV
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 for OTHER EXPENDITURE OF HOUSING & WORKS DIV.
Voted Rs. 5,000,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HOUSING AND WORKS .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 045 | Construction and Transport | 5,000,000,000 | ||
| Total | 5,000,000,000 | |||
| OBJECT CLASSIFICATION | ||||
| A08 | Loans and Advances | 5,000,000,000 | ||
| Total | 5,000,000,000 |
NO. 152.- FC12Y03 OTHER EXPENDITURE OF HOUSING & WORKS DIV DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | |||
|---|---|---|---|---|---|---|
| ACCOUNTANT GENERAL PA | KISTAN REVENUES | |||||
| 04 | Economic Affairs: | |||||
| 045 | Construction | and Transport: | ||||
| 0457 | Construction | (Works): | ||||
| 04570 IB074 | 2 Buildings and Structures : 8 LOW COST SCHEMES | |||||
| 04570 | 2- A08 | Loans and Advances | 5,000,000,000 | |||
| 04570 | 2- A085 | Loans to Non Financial Institutions | 5,000,000,000 | |||
| Total- | LOW COST SCHEMES | 5,000,000,000 | ||||
| 045702 | Total- | Buildings and Structures | 5,000,000,000 | |||
| 0457 | Total- | Construction (Works) | 5,000,000,000 | |||
| 045 | Total- | Construction and Transport | 5,000,000,000 | |||
| 04 | Total- | Economic Affairs | 5,000,000,000 | |||
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 5,000,000,000 | ||||
| TOTAL | - DEMAND | 5,000,000,000 |
NO. 153.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS DEMAND NO. 153 ( FC12C32 )
CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.
Voted
Rs. 2,343,293,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INDUSTRIES AND PRODUCTION .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 044 | Mining and Manufacturing | 1,775,205,000 | 685,289,000 | 2,343,293,000 |
| Total | 1,775,205,000 | 685,289,000 | 2,343,293,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 150,612,000 | 53,699,000 | 305,405,000 |
| A011 | Pay | 150,612,000 | 53,699,000 | 304,325,000 |
| A011-1 | Pay of Officers | (129,212,000) | (34,699,000) | (283,075,000) |
| A011-2 | Pay of Other Staff | (21,400,000) | (19,000,000) | (21,250,000) |
| A012 | Allowances | 1,080,000 | ||
| A012-1 | Regular Allowances | (1,080,000) | ||
| A03 | Operating Expenses | 156,181,000 | 64,447,000 | 282,470,000 |
| A05 | Grants, Subsidies and Write off Loans | 342,856,000 | 141,090,000 | 306,335,000 |
| A09 | Physical Assets | 750,842,000 | 155,518,000 | 894,753,000 |
| A12 | Civil works | 370,014,000 | 270,535,000 | 538,430,000 |
| A13 | Repairs and Maintenance | 4,700,000 | 15,900,000 | |
| Total | 1,775,205,000 | 685,289,000 | 2,343,293,000 |
NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|
| 2018-19 2019-20 Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| 04 Econom | ic Affairs: | |
|---|---|---|
| 044 Mining | and Manufacturing: | |
| 0441 Manufa | cturing: | |
| 044101 Suppor ID9364 DEV. OF | t for Industrial Development : MARBLE AND GRANITE SECTOR | |
| 044101- A01 | Employees Related Expenses | 39,041,000 |
| 044101- A011 | Pay 114 | 39,041,000 |
| 044101- A011-1 | Pay of Officers (114) | (39,041,000) |
| 044101- A03 | Operating Expenses | 14,669,000 |
| 044101- A032 | Communications | 300,000 |
| 044101- A033 | Utilities | 300,000 |
| 044101- A037 | Consultancy and Contractual Work | 9,000,000 |
| 044101- A039 | General | 5,069,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 18,590,000 |
| 044101- A052 | Grants Domestic | 18,590,000 |
| 044101- A09 | Physical Assets | 196,300,000 |
| 044101- A091 | Purchase of Building | 24,000,000 |
| 044101- A092 | Computer Equipment | 2,000,000 |
| 044101- A096 | Purchase of Plant and Machinery | 168,000,000 |
| 044101- A097 | Purchase of Furniture and Fixture | 2,300,000 |
| 044101- A12 | Civil works | 26,700,000 |
| 044101- A124 | Building and Structures | 26,700,000 |
| 044101- A13 | Repairs and Maintenance | 4,700,000 |
| 044101- A131 | Machinery and Equipment | 4,700,000 |
| Ttl | EV OF MARBLE AND GRANITE | 300000000 |
| oa- ID9365 DEV. NA | . SECTOR TIONAL PRODUCTIVITY INSTITUTS IN PAKI | ,, STAN |
| 044101- A01 | Employees Related Expenses | 9,960,000 |
| 044101- A011 | Pay 18 | 9,960,000 |
| 044101- A011-1 | Pay of Officers (18) | (9,960,000) |
| 044101- A03 | Operating Expenses | 600,000 |
| 044101- A033 | Utilities | 600,000 |
| NO. 153.- FC1 | 2C32 CAPITAL OUTLAY ON INDUSTRIAL DEVE No of 2018-19 Posts 2019-20 ACCOUNTANT GENERAL P | LOPMENT 2018-2019 Budget Estimate Rs AKISTAN REVENUES | DEMAND 2018-2019 Revised Estimate Rs | S FOR GRANTS 2019-2020 Budget Estimate Rs |
|---|---|---|---|---|
| 044101- A05 | Grants, Subsidies and Write off Loans | 3,920,000 | ||
| 044101- A052 | Grants Domestic | 3,920,000 | ||
| 044101- A09 | Physical Assets | 151,800,000 | ||
| 044101- A091 | Purchase of Building | 151,800,000 | ||
| 044101- A12 | Civil works | 33,720,000 | ||
| 044101- A124 | Building and Structures | 33,720,000 | ||
| Total- | DEV. NATIONAL PRODUCTIVITY INSTITUTS IN PAKISTAN | 200,000,000 | ||
| 044101 | Total- Support for Industrial Development | 500,000,000 | ||
| 0441 | Total- Manufacturing | 500,000,000 | ||
| 044 | Total- Mining and Manufacturing | 500,000,000 | ||
| 04 | Total- Economic Affairs | 500,000,000 | ||
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 500,000,000 |
NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| 04 | Economic Affairs: | ||||||
|---|---|---|---|---|---|---|---|
| 044 | Mining | and Manufacturing: | |||||
| 0441 | Manufacturing: | ||||||
| 044101 LO077 | Support for Industrial Developme 2 HYDERABAD ENGINEERING SUP | nt : PORT CE | NTRE (HE | SC) (ADB FUNDED) | |||
| 044101 | - A01 | Employees Related Expenses | 9,500,000 | 9,500,000 | 9,500,000 | ||
| 044101 | - A011 | Pay | 31 | 31 | 9,500,000 | 9,500,000 | 9,500,000 |
| 044101 | - A011-1 | Pay of Officers | (7) | (10) | (4,000,000) | (4,000,000) | (4,000,000) |
| 044101 | - A011-2 | Pay of Other Staff | (24) | (21) | (5,500,000) | (5,500,000) | (5,500,000) |
| 044101 | - A03 | Operating Expenses | 2,491,000 | 2,491,000 | 6,226,000 | ||
| 044101 | - A039 | General | 2,491,000 | 2,491,000 | 6,226,000 | ||
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 3,663,000 | 3,663,000 | |||
| 044101 | - A052 | Grants Domestic | 3,663,000 | 3,663,000 | |||
| 044101 | - A09 | Physical Assets | 4,830,000 | ||||
| 044101 | - A095 | Purchase of Transport | 4,800,000 | ||||
| 044101 | - A096 | Purchase of Plant and Machinery | 30,000 | ||||
| LO077 | Total- 4 PESHA | HYDERABAD ENGINEERING SUPPO CENTRE (HESC) (ADB FUNDED) WAR LIGHT ENGINEERING SUPPO | RT RT CENTR | 15,654,000 E (PESC) (ADB FUNDE | 15,654,000 D) KHYBER PAK | 20,556,000 HTUNKHWA | |
| 044101 | - A01 | Employees Related Expenses | 12,500,000 | 12,500,000 | 13,500,000 | ||
| 044101 | - A011 | Pay | 31 | 31 | 12,500,000 | 12,500,000 | 13,500,000 |
| 044101 | - A011-1 | Pay of Officers | (10) | (10) | (6,000,000) | (6,000,000) | (6,000,000) |
| 044101 | - A011-2 | Pay of Other Staff | (21) | (21) | (6,500,000) | (6,500,000) | (7,500,000) |
| 044101 | - A03 | Operating Expenses | 2,508,000 | 2,508,000 | 15,238,000 | ||
| 044101 | - A039 | General | 2,508,000 | 2,508,000 | 15,238,000 | ||
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 1,634,000 | 1,634,000 | 1,000 | ||
| 044101 | - A052 | Grants Domestic | 1,634,000 | 1,634,000 | 1,000 | ||
| 044101 | - A09 | Physical Assets | 12,078,000 | 12,078,000 | 4,801,000 | ||
| 044101 | - A095 | Purchase of Transport | 4,800,000 | ||||
| 044101 | - A096 | Purchase of Plant and Machinery | 12,040,000 | 12,040,000 | 1,000 | ||
| 044101 | - A097 | Purchase of Furniture and | Fixture | 38,000 | 38,000 | ||
| Total- | PESHAWAR LIGHT ENGINEERING | 28,720,000 | 28,720,000 | 33,540,000 |
| NO. 153.- FC12 | C32 CAPITAL OUTLAY ON | INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | ||
| Rs | Rs | Rs | |||
| LO1076 LIGHT | ACCOUNTANT GEN SUPPORT CENTRE (PESC FUNDED) KHYBER PAKHT ENGINEERING UPGRADA | ERAL PAKISTAN RE ) (ADB UNKHWA TION CENTER FOR S | VENUES SUB-OFFICE, LAHORE MES IN BALOCHISTAN (HUB) | ||
| 044101- A01 | Employees Related Expenses | 12,500,000 | 12,500,000 | 11,500,000 | |
| 044101- A011 | Pay | 39 39 | 12,500,000 | 12,500,000 | 11,500,000 |
| 044101- A011-1 | Pay of Officers | (9) (9) | (5,500,000) | (5,500,000) | (4,500,000) |
| 044101- A011-2 | Pay of Other Staff | (30) (30) | (7,000,000) | (7,000,000) | (7,000,000) |
| 044101- A03 | Operating Expenses | 7,682,000 | 7,682,000 | 8,865,000 | |
| 044101- A039 | General | 7,682,000 | 7,682,000 | 8,865,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 303,000 | |||
| 044101- A052 | Grants Domestic | 303,000 | |||
| 044101- A09 | Physical Assets | 2,400,000 | |||
| 044101- A095 | Purchase of Transport | 2,400,000 | |||
| Total- ( LO1175 NATIO | LIGHT ENGINEERING UPG CENTER FOR SMES IN BA HUB) NAL BUSSINESS DEVELO | RADATION LOCHISTAN PMENT PROGRAMM | 20,182,000 FOR SME'S | 20,182,000 | 23,068,000 |
| 044101- A01 | Employees Related Expenses | 40,000,000 | 12,147,000 | 44,915,000 | |
| 044101- A011 | Pay | 38 38 | 40,000,000 | 12,147,000 | 44,915,000 |
| 044101- A011-1 | Pay of Officers | (38) (38) | (40,000,000) | (12,147,000) | (44,915,000) |
| 044101- A03 | Operating Expenses | 49,587,000 | 20,153,000 | 33,740,000 | |
| 044101- A037 | Consultancy and Contractual Work | 39,000,000 | 15,000,000 | 24,000,000 | |
| 044101- A039 | General | 10,587,000 | 5,153,000 | 9,740,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 199,921,000 | 38,404,000 | 145,122,000 | |
| 044101- A052 | Grants Domestic | 199,921,000 | 38,404,000 | 145,122,000 | |
| 044101- A09 | Physical Assets | 38,892,000 | 31,570,000 | 22,223,000 | |
| 044101- A092 | Computer Equipment | 3,500,000 | 3,500,000 | 3,500,000 | |
| 044101- A095 | Purchase of Transport | 12,723,000 | |||
| 044101- A097 | Purchase of Furniture and | Fixture | 19,850,000 | 14,147,000 | 1,000,000 |
| 044101- A098 | Purchase of Other Assets | 15,542,000 | 13,923,000 | 5,000,000 | |
| 044101- A12 | Civil works | 21,600,000 | 15,373,000 | 4,000,000 | |
| 044101- A124 | Building and Structures | 21,600,000 | 15,373,000 | 4,000,000 |
| NO. 153.- FC12 | C32 CAPITAL OUTLAY ON INDUST No o 2018-19 | RIAL DEVE f Posts 2019-20 | LOPMENT 2018-2019 Budget Estimate | DEMAND 2018-2019 Revised Estimate | S FOR GRANTS 2019-2020 Budget Estimate |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | |||||
| Total- | NATIONAL BUSSINESS DEVELOPM PROGRAMM FOR SME'S | ENT | 350,000,000 | 117,647,000 | 250,000,000 |
| LO1176 FRUIT | DEHYDRATION UNIT SWAT | ||||
| 044101- A01 | Employees Related Expenses | 5,710,000 | 3,382,000 | 10,487,000 | |
| 044101- A011 | Pay 16 | 16 | 5,710,000 | 3,382,000 | 10,487,000 |
| 044101- A011-1 | Pay of Officers | (16) | (5,710,000) | (3,382,000) | (10,487,000) |
| 044101- A03 | Operating Expenses | 3,956,000 | 1,721,000 | 9,601,000 | |
| 044101- A032 | Communications | 55,000 | 35,000 | 110,000 | |
| 044101- A033 | Utilities | 135,000 | 2,975,000 | ||
| 044101- A037 | Consultancy and Contractual Work | 226,000 | 226,000 | 500,000 | |
| 044101- A038 | Travel & Transportation | 1,670,000 | 760,000 | 1,750,000 | |
| 044101- A039 | General | 1,870,000 | 700,000 | 4,266,000 | |
| 044101- A09 | Physical Assets | 8,360,000 | 8,360,000 | 1,856,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 7,220,000 | 7,220,000 | 917,000 | |
| 044101- A098 | Purchase of Other Assets | 1,140,000 | 1,140,000 | 939,000 | |
| 044101- A12 | Civil works | 1,914,000 | 1,914,000 | 3,950,000 | |
| 044101- A124 | Building and Structures | 1,914,000 | 1,914,000 | 3,950,000 | |
| Total- | FRUIT DEHYDRATION UNIT SWAT | 19,940,000 | 15,377,000 | 25,894,000 | |
| LO1180 PRODU | CT DEV.CENTRE FOR COMPOSITS | BASED SPORTS GOOD SIALKOT | |||
| 044101- A01 | Employees Related Expenses | 1,500,000 | 430,000 | 1,800,000 | |
| 044101- A011 | Pay 9 | 7 | 1,500,000 | 430,000 | 1,800,000 |
| 044101- A011-1 | Pay of Officers (9) | (7) | (1,500,000) | (430,000) | (1,800,000) |
| 044101- A03 | Operating Expenses | 24,240,000 | 23,122,000 | 1,300,000 | |
| 044101- A037 | Consultancy and Contractual Work | 22,040,000 | 22,040,000 | ||
| 044101- A039 | General | 2,200,000 | 1,082,000 | 1,300,000 | |
| 044101- A09 | Physical Assets | 48,180,000 | 200,000 | 96,900,000 | |
| 044101- A092 | Computer Equipment | 5,000,000 | 200,000 | 250,000 | |
| 044101- A095 | Purchase of Transport | 2,700,000 | 2,700,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 93,950,000 | |||
| 044101- A097 | Purchase of Furniture and Fixture | 2,570,000 | |||
| 044101- A098 | Purchase of Other Assets | 37,910,000 | |||
| 044101- A12 | Civil works | 126,080,000 | 123,248,000 |
| NO. 153.- FC1 | 2C32 CAPITAL OUTLAY ON INDUSTRIAL DEVE No of 2018-19 Posts 2019-20 | LOPMENT 2018-2019 Budget Estimate | DEMAND 2018-2019 Revised Estimate | S FOR GRANTS 2019-2020 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | ||||
| 044101- A124 | Building and Structures | 126,080,000 | 123,248,000 | |
| Total- | PRODUCT DEV.CENTRE FOR COMPOSITS BASED SPORTS GOOD SIALKOT | 200,000,000 | 147,000,000 | 100,000,000 |
| LO1182 BUSSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION | ||||
| 044101- A01 | Employees Related Expenses | 3,240,000 | 3,240,000 | 450,000 |
| 044101- A011 | Pay 33 11 | 3,240,000 | 3,240,000 | 450,000 |
| 044101- A011- | 1 Pay of Officers (33) (11) | (3,240,000) | (3,240,000) | (450,000) |
| 044101- A03 | Operating Expenses | 6,770,000 | 6,770,000 | 550,000 |
| 044101- A032 | Communications | 10,000 | ||
| 044101- A038 | Travel & Transportation | 260,000 | ||
| 044101- A039 | General | 6,770,000 | 6,770,000 | 280,000 |
| 044101- A09 | Physical Assets | 50,310,000 | 50,310,000 | 14,000,000 |
| 044101- A091 | Purchase of Building | 48,000,000 | 48,000,000 | 14,000,000 |
| 044101- A092 | Computer Equipment | 2,310,000 | 2,310,000 | |
| 044101- A12 | Civil works | 30,000,000 | 30,000,000 | |
| 044101- A124 | Building and Structures | 30,000,000 | 30,000,000 | |
| Total- | BUSSINESS SKILL DEV. CENTRE FOR | 90,320,000 | 90,320,000 | 15,000,000 |
| WOMEN AT VARIOUS LOCATION | ||||
| LO1190 FRUIT | S VEGETABLES & CONDIMENTS PROCESSING | CENTRE NAUSHEROFEROZE | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 80,000,000 | 80,000,000 | |
| 044101- A052 | Grants Domestic | 80,000,000 | 80,000,000 | |
| 044101- A09 | Physical Assets | 20,000,000 | 20,000,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 20,000,000 | 20,000,000 | |
| 044101- A12 | Civil works | 100,000,000 | 100,000,000 | |
| 044101- A124 | Building and Structures | 100,000,000 | 100,000,000 | |
| Total- | FRUITS VEGETABLES & CONDIMENTS | 200,000,000 | 200,000,000 | |
| LO1279 DATE | PROCESSING CENTRE NAUSHEROFEROZE S PROCESSING PLANT AT VARIOUS LOCATIO | N (PUNJGUR KHAIRPUR & DHARKI) | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 17,389,000 | 17,389,000 | |
| 044101- A052 | Grants Domestic | 17,389,000 | 17,389,000 | |
| 044101- A09 | Physical Assets | 33,000,000 | 33,000,000 |
| NO. 153.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVE No of 2018-19 Posts 2019-20 | LOPMENT 2018-2019 Budget Estimate | DEMAND 2018-2019 Revised Estimate | S FOR GRANTS 2019-2020 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN R | EVENUES SUB-OFFICE, LAHORE | |||
| 044101- A091 | Purchase of Building | 30,000,000 | 30,000,000 | |
| 044101- A092 | Computer Equipment | 3,000,000 | 3,000,000 | |
| Total- | DATES PROCESSING PLANT AT VARIOUS LOCATION (PUNJGUR KHAIRPUR & DHARKI) | 50,389,000 | 50,389,000 | |
| LO1280 INDUSTRIAL DESIGN AND AUTOMATION CENRE | ||||
| 044101- A01 | Employees Related Expenses | 5,400,000 | 4,590,000 | |
| 044101- A011 | Pay 3 2 | 5,400,000 | 4,590,000 | |
| 044101- A011-1 | Pay of Officers (1) (2) | (3,000,000) | (4,590,000) | |
| 044101- A011-2 | Pay of Other Staff (2) | (2,400,000) | ||
| 044101- A03 | Operating Expenses | 1,600,000 | 2,479,000 | |
| 044101- A039 | General | 1,600,000 | 2,479,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 15,000,000 | 11,256,000 | |
| 044101- A052 | Grants Domestic | 15,000,000 | 11,256,000 | |
| 044101- A09 | Physical Assets | 78,000,000 | 81,675,000 | |
| 044101- A091 | Purchase of Building | 23,000,000 | 81,675,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 55,000,000 | ||
| Total- INDUSTRIAL DESIGN AND AUTOMATION CENRE | 100,000,000 | 100,000,000 | ||
| LO3121 SME BUSSINESS FACILITATION CENTRE (SMEBFC) | MULTAN | |||
| 044101- A01 | Employees Related Expenses | 4,919,000 | ||
| 044101- A011 | Pay 9 | 4,919,000 | ||
| 044101- A011-1 | Pay of Officers (9) | (4,919,000) | ||
| 044101- A03 | Operating Expenses | 7,518,000 | ||
| 044101- A039 | General | 7,518,000 | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 7,853,000 | ||
| 044101- A052 | Grants Domestic | 7,853,000 | ||
| 044101- A09 | Physical Assets | 7,200,000 | ||
| 044101- A092 | Computer Equipment | 1,800,000 | ||
| 044101- A097 | Purchase of Furniture and Fixture | 2,400,000 | ||
| 044101- A098 | Purchase of Other Assets | 3,000,000 | ||
| 044101- A12 | Civil works | 2,400,000 |
| NO. 153.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVEL No of 2018-19 Posts 2019-20 | OPMENT DEMAN 2018-2019 Budget Estimate 2018-2019 Revised Estimate | DS FOR GRANTS 2019-2020 Budget Estimate |
|---|---|---|---|
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | |||
| 044101- A125 | Other Works | 2,400,000 | |
| Total- | SME BUSSINESS FACILITATION CENTRE (SMEBFC) MULTAN | 29,890,000 | |
| LO9644 NATIO KNOWLEDGE | NAL STRATEGIC PROGRAM FPR ACQUISTION | OF IND TECH-NSPAIT INCLUDING FEASIBILITY- | |
| 044101- A01 | Employees Related Expenses | 169,268,000 | |
| 044101- A011 | Pay 81 | 169,268,000 | |
| 044101- A011-1 | Pay of Officers (76) | (168,018,000) | |
| 044101- A011-2 | Pay of Other Staff (5) | (1,250,000) | |
| 044101- A03 | Operating Expenses | 48,669,000 | |
| 044101- A039 | General | 48,669,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 118,746,000 | |
| 044101- A052 | Grants Domestic | 118,746,000 | |
| 044101- A09 | Physical Assets | 622,747,000 | |
| 044101- A092 | Computer Equipment | 43,208,000 | |
| 044101- A095 | Purchase of Transport | 16,200,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 551,758,000 | |
| 044101- A097 | Purchase of Furniture and Fixture | 9,781,000 | |
| 044101- A098 | Purchase of Other Assets | 1,800,000 | |
| 044101- A13 | Repairs and Maintenance | 11,900,000 | |
| 044101- A133 | Buildings and Structure | 11,900,000 | |
| Total- | NATIONAL STRATEGIC PROGRAM FPR ACQUISTION OF IND TECH-NSPAIT INCLUDING FEASIBILITY- KNOWLEDGE | 971,330,000 | |
| LO9645 FOOTWEAR CLUSTER DEV THROUGH CAD CAM AND | CNC MACHINING LAHORE | ||
| 044101- A01 | Employees Related Expenses | 1,800,000 | |
| 044101- A011 | Pay 2 | 1,800,000 | |
| 044101- A011-1 | Pay of Officers (2) | (1,800,000) | |
| 044101- A03 | Operating Expenses | 1,584,000 | |
| 044101- A039 | General | 1,584,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 2,930,000 | |
| 044101- A052 | Grants Domestic | 2,930,000 | |
| 044101- A09 | Physical Assets | 19,686,000 |
| NO. 153.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVEL No of 2018-19 Posts 2019-20 | OPMENT 2018-2019 Budget Estimate | DEMAND 2018-2019 Revised Estimate | S FOR GRANTS 2019-2020 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | ||||
| 044101- A092 | Computer Equipment | 16,843,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 2,843,000 | ||
| 044101- A13 | Repairs and Maintenance | 4,000,000 | ||
| 044101- A133 | Buildings and Structure | 4,000,000 | ||
| Total- | FOOTWEAR CLUSTER DEV THROUGH CAD CAM AND CNC MACHINING LAHORE | 30,000,000 | ||
| LO9646 HANDI | CRAFT DEV AND PROMOTION IN LESS DEVELOPED AREAS OF PAKISTAN | |||
| 044101- A01 | Employees Related Expenses | 3,264,000 | ||
| 044101- A011 | Pay 41 | 2,184,000 | ||
| 044101- A011-1 | Pay of Officers (41) | (2,184,000) | ||
| 044101- A012 | Allowances | 1,080,000 | ||
| 044101- A012-1 | Regular Allowances | (1,080,000) | ||
| 044101- A03 | Operating Expenses | 21,500,000 | ||
| 044101- A033 | Utilities | 1,000,000 | ||
| 044101- A034 | Occupancy Costs | 4,423,000 | ||
| 044101- A038 | Travel & Transportation | 1,512,000 | ||
| 044101- A039 | General | 14,565,000 | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 5,236,000 | ||
| 044101- A052 | Grants Domestic | 5,236,000 | ||
| Total- | HANDICRAFT DEV AND PROMOTION IN LESS DEVELOPED AREAS OF | 30,000,000 | ||
| PAKISTAN | ||||
| LO9647 HANDI | CRAFT EXPORT DEVELOPMENT PROJECT ALL | OVER PAKISTAN | ||
| 044101- A01 | Employees Related Expenses | 29,412,000 | ||
| 044101- A011 | Pay 48 | 29,412,000 | ||
| 044101- A011-1 | Pay of Officers (48) | (29,412,000) | ||
| 044101- A03 | Operating Expenses | 24,400,000 | ||
| 044101- A032 | Communications | 540,000 | ||
| 044101- A033 | Utilities | 2,700,000 | ||
| 044101- A034 | Occupancy Costs | 7,500,000 | ||
| 044101- A037 | Consultancy and Contractual Work | 1,500,000 | ||
| 044101- A038 | Travel & Transportation | 848,000 |
| NO. 153.- FC1 | 2C32 C | APITAL OUTLAY ON INDUSTRIAL DEVE No of 2018-19 Posts 2019-20 ACCOUNTANT GENERAL PAKISTAN R | LOPMENT 2018-2019 Budget Estimate Rs EVENUES SUB-OF | DEMAN 2018-2019 Revised Estimate Rs FICE, LAHORE | DS FOR GRANTS 2019-2020 Budget Estimate Rs |
|---|---|---|---|---|---|
| 044101- A039 | General | 11,312,000 | |||
| 044101- A05 | Grants, Subsidies and Write off Loans | 4,888,000 | |||
| 044101- A052 | Grants Domestic | 4,888,000 | |||
| 044101- A09 | Physical Assets | 1,300,000 | |||
| 044101- A097 | Purchase of Furniture and Fixture | 1,300,000 | |||
| Total- | HAND PROJ | ICRAFT EXPORT DEVELOPMENT ECT ALL OVER PAKISTAN | 60,000,000 | ||
| 044101 | Total- | Support for Industrial Development | 1,075,205,000 | 685,289,000 | 1,689,278,000 |
| 0441 | Total- | Manufacturing | 1,075,205,000 | 685,289,000 | 1,689,278,000 |
| 044 | Total- | Mining and Manufacturing | 1,075,205,000 | 685,289,000 | 1,689,278,000 |
| 04 | Total- | Economic Affairs | 1,075,205,000 | 685,289,000 | 1,689,278,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | 1,075,205,000 | 685,289,000 | 1,689,278,000 |
| NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 04 | Economic Affairs: | ||
|---|---|---|---|
| 044 | Mining | and Manufacturing: | |
| 0441 | Manufacturing: | ||
| 044101 KA1295 | Support for Industrial Development : UPGRADATION OF PMTF FACILITIES AND DESIGN | CENTRE | |
| 044101 | - A03 | Operating Expenses | 2,078,000 |
| 044101 | - A038 | Travel & Transportation | 2,078,000 |
| 044101 | - A09 | Physical Assets | 97,922,000 |
| 044101 | - A096 | Purchase of Plant and Machinery | 91,164,000 |
| 044101 | - A097 | Purchase of Furniture and Fixture | 1,000,000 |
| 044101 | - A098 | Purchase of Other Assets | 5,758,000 |
| KA3065 | Total- INFRA | UPGRADATION OF PMTF FACILITIES AND DESIGN CENTRE STRUCTURE DEV. OF EXPORT PROCESSIN | 100,000,000 G ZONE AT GAWADAR(CPEC) |
| 044101 | - A01 | Employees Related Expenses | 11,261,000 |
| 044101 | - A011 | Pay 18 | 11,261,000 |
| 044101 | - A011-1 | Pay of Officers (18) | (11,261,000) |
| 044101 | - A03 | Operating Expenses | 40,000,000 |
| 044101 | - A037 | Consultancy and Contractual Work | 35,000,000 |
| 044101 | - A039 | General | 5,000,000 |
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 2,739,000 |
| 044101 | - A052 | Grants Domestic | 2,739,000 |
| 044101 | - A09 | Physical Assets | 16,000,000 |
| 044101 | - A092 | Computer Equipment | 2,000,000 |
| 044101 | - A095 | Purchase of Transport | 10,000,000 |
| 044101 | - A097 | Purchase of Furniture and Fixture | 3,000,000 |
| 044101 | - A098 | Purchase of Other Assets | 1,000,000 |
| 044101 | - A12 | Civil works | 30,000,000 |
| 044101 | - A124 | Building and Structures | 30,000,000 |
| Total- | INFRASTRUCTURE DEV. OF EXPORT PROCESSING ZONE AT GAWADAR(CPEC) | 100,000,000 |
| NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 044101 Total- | Support for Industrial Development | 200,000,000 |
|---|---|---|
| 0441 Total- | Manufacturing | 200,000,000 |
| 044 Total- | Mining and Manufacturing | 200,000,000 |
| 04 Total- | Economic Affairs | 200,000,000 |
| Total- | ACCOUNTANT GENERAL | 200,000,000 |
| PAKISTAN REVENUES | ||
| SUB-OFFICE, KARACHI |
NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 04 Econo | mic Affairs: | |
|---|---|---|
| 044 Minin | g and Manufacturing: | |
| 0441 Manuf | acturing: | |
| 044101 Support for Industrial Development : | ||
| LS0109 ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA | ||
| 044101- A03 | Operating Expenses | 10,800,000 |
| 044101- A032 | Communications | 100,000 |
| 044101- A037 | Consultancy and Contractual Work | 8,500,000 |
| 044101- A038 | Travel & Transportation | 1,000,000 |
| 044101- A039 | General | 1,200,000 |
| 044101- A09 | Physical Assets | 15,135,000 |
| 044101- A091 | Purchase of Building | 10,000,000 |
| 044101- A095 | Purchase of Transport | 5,135,000 |
| 044101- A12 | Civil works | 374,065,000 |
| 044101- A121 | Roads Highways and Bridges | 100,636,000 |
| 044101- A123 | Embankment and Drainage Works | 100,000,000 |
| 044101- A124 | Building and Structures | 11,606,000 |
| 044101- A125 | Other Works | 161,823,000 |
| Total- | ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA | 400,000,000 |
| QA0419 PROVISION OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING ESTATE (PHASE-IV) | ||
| 044101- A12 | Civil works | 18,255,000 |
| 044101- A121 | Roads Highways and Bridges | 1,687,000 |
| 044101- A125 | Other Works | 16,568,000 |
| Total- | PROVISION OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING ESTATE (PHASE-IV) | 18,255,000 |
| QA0420 ESTABLISHMENT OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING ESTATE (PHASE-II) | ||
| 044101- A12 | Civil works | 24,889,000 |
| 044101- A121 | Roads Highways and Bridges | 12,819,000 |
| 044101- A125 | Other Works | 12,070,000 |
| Total- | ESTABLISHMENT OF | 24,889,000 |
| NO. 153.- FC1 | 2C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | ||
| Rs | Rs | Rs | ||
| INFRA INDUS (PHAS | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OF STRUCTURE IN QUETTA TRIAL & TRADING ESTATE E-II) | FICE, QUETTA | ||
| QA0536 ESTA | BLISHMENT OF BOSTAN INDUSTRIAL ESTATE PHASE-I | |||
| 044101- A12 | Civil | works | 110,871,000 | |
| 044101- A125 | Other Works | 110,871,000 | ||
| Total- | ESTABLISHMENT OF BOSTAN INDUSTRIAL ESTATE PHASE-I | 110,871,000 | ||
| QA9175 FEASIBILITY | FOR ESTABLISHMENT OF METAL PARK IN CHAGAI | |||
| 044101- A03 | Operating Expenses | 90,000,000 | ||
| 044101- A037 | Consultancy and Contractual Work | 90,000,000 | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 10,000,000 | ||
| 044101- A052 | Grants Domestic | 10,000,000 | ||
| Total- | FEASIBILITY FOR ESTABLISHMENT OF METAL PARK IN CHAGAI | 100,000,000 | ||
| 044101 | Total- | Support for Industrial Development | 654,015,000 | |
| 0441 | Total- | Manufacturing | 654,015,000 | |
| 044 | Total- | Mining and Manufacturing | 654,015,000 | |
| 04 | Total- | Economic Affairs | 654,015,000 | |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 654,015,000 | ||
| TOTAL | - DEMAND 1,775,205,000 | 685,289,000 | 2,343,293,000 |
NO. 154.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION
DEMANDS FOR GRANTS
DEMAND NO. 154 ( FC12C51 )
CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION.
Voted Rs. 3,600,243,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF MARITIME AFFAIRS .
| 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| FUNCTIONAL CLASSIFICATION | ||||
| 017 | Research and Development General Public Services | 27,196,000 | ||
| 019 | General Public Service Not Elsewhere Defined | 109,419,000 | ||
| 042 | Agriculture,Food,Irrigation,Forestry and Fishing | 120,000,000 | ||
| 045 | Construction and Transport | 18,556,000 | 18,556,000 | 64,848,000 |
| 046 | Communications | 9,843,512,000 | 2,436,838,000 | 3,535,395,000 |
| Total | 10,118,683,000 | 2,455,394,000 | 3,600,243,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 20,752,000 | 4,681,000 | 12,872,000 |
| A011 | Pay | 19,920,000 | 4,681,000 | 12,872,000 |
| A011-1 | Pay of Officers | (14,104,000) | (3,169,000) | (5,372,000) |
| A011-2 | Pay of Other Staff | (5,816,000) | (1,512,000) | (7,500,000) |
| A012 | Allowances | 832,000 | ||
| A012-1 | Regular Allowances | |||
| A012-2 | Other Allowances (Excluding TA) | (832,000) | ||
| A02 | Project Pre-Investment Analysis | 953,525,000 | 69,420,000 | 27,156,000 |
| A03 | Operating Expenses | 27,951,000 | 23,857,000 | 24,857,000 |
| A06 | Transfers | 2,000,000 | 2,000,000 | 1,000 |
| A09 | Physical Assets | 932,840,000 | 503,000 | 45,194,000 |
| A12 | Civil works | 8,032,068,000 | 2,353,930,000 | 3,489,329,000 |
| A13 | Repairs and Maintenance | 149,547,000 | 1,003,000 | 834,000 |
| Total | 10,118,683,000 | 2,455,394,000 | 3,600,243,000 | |
| (In Foreign Exchange) | (6,335,260,000) | (1,509,316,000) | (2,550,000,000) |
| (Own Resources) | |||
|---|---|---|---|
| (Foreign Aid) | (6,335,260,000) | (1,509,316,000) | (2,550,000,000) |
| (In Local Currency) | (3,783,423,000) __________________ | (946,078,000) _________________ | (1,050,243,000) _______________ |
NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 | |||
|---|---|---|---|---|---|---|
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate | |||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||||
| 04 | Economic Affairs: | |||||
| 045 | Construction | and Transport: | ||||
| 0453 | Water | Transport: | ||||
| 045301 | PORT | AND SHIPPPING : | ||||
| IB0715 | DEV. OF IT IN | FR. FOR IMP. OF E OFFICE M/O MARITIME | AFFAIRS | |||
| 045301 | - A01 | Employees Related Expenses | 11,000,000 | |||
| 045301 | - A011 | Pay | 6 | 11,000,000 | ||
| 045301 | - A011- | 1 Pay | of Officers (2) | (5,000,000) | ||
| 045301 | - A011- | 2 Pay | of Other Staff (4) | (6,000,000) | ||
| 045301 | - A03 | Operating Expenses | 500,000 | |||
| 045301 | - A039 | General | 500,000 | |||
| 045301 | - A09 | Physical Assets | 9,730,000 | |||
| 045301 | - A092 | Computer Equipment | 9,080,000 | |||
| 045301 | - A096 | Purchase of Plant and Machinery | 500,000 | |||
| 045301 | - A097 | Purchase of Furniture and Fixture | 150,000 | |||
| Total- | DEV. OF IT INFR. FOR IMP. OF E OFFICE M/O MARITIME AFFAIRS | 21,230,000 | ||||
| 0 | 45301 | Total- | PORT AND SHIPPPING | 21,230,000 | ||
| 0 | 453 | Total- | Water Transport | 21,230,000 | ||
| 0 | 45 | Total- | Construction and Transport | 21,230,000 | ||
| 0 | 4 | Total- | Economic Affairs | 21,230,000 | ||
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 21,230,000 |
NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION
| MARITIME AFFAIRS | DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
01 General Public Service: 017 Research and Development General Public Services: 0171 Research & Dev. General Public Services: 017103 MARINE/ BIOLOGY/ ZOOLOGY :
KA1310 SURVEYS TO FIND POPULATION DYNAMICS & MANGEMENT OF VERTEBRATE DIVERSITY OF THE COASTAL AREA OF SINDH&
| 017103- A01 | Employees Related Expenses | 17,066,000 |
|---|---|---|
| 017103- A011 | Pay 15 | 16,234,000 |
| 017103- A011-1 | Pay of Officers (10) | (11,930,000) |
| 017103- A011-2 | Pay of Other Staff (5) | (4,304,000) |
| 017103- A012 | Allowances | 832,000 |
| 017103- A012-2 | Other Allowances (Excluding TA) | (832,000) |
| 017103- A03 | Operating Expenses | 3,095,000 |
| 017103- A032 | Communications | 45,000 |
| 017103- A034 | Occupancy Costs | 100,000 |
| 017103- A038 | Travel & Transportation | 2,000,000 |
| 017103- A039 | General | 950,000 |
| 017103- A09 | Physical Assets | 6,485,000 |
| 017103- A092 | Computer Equipment | 900,000 |
| 017103- A095 | Purchase of Transport | 2,900,000 |
| 017103- A096 | Purchase of Plant and Machinery | 2,500,000 |
| 017103- A097 | Purchase of Furniture and Fixture | 185,000 |
| 017103- A13 | Repairs and Maintenance | 550,000 |
| 017103- A130 | Transport | 250,000 |
| 017103- A131 | Machinery and Equipment | 100,000 |
| 017103- A132 | Furniture and Fixture | 100,000 |
| 017103- A137 | Computer Equipment | 100,000 |
| Total- | SURVEYS TO FIND POPULATION DYNAMICS & MANGEMENT OF | 27,196,000 |
| VERTEBRATE DIVERSITY OF THE COASTAL AREA OF SINDH& | ||
| 017103 | Total- MARINE/ BIOLOGY/ ZOOLOGY | 27,196,000 |
| NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS | DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI |
| 0 | 171 | Total- | Research & Dev. General Public Services | 27,196,000 |
|---|---|---|---|---|
| 0 | 17 | Total- | Research and Development General Public Services | 27,196,000 |
| 019 | General Public Service Not Elsewhere Defined: | |||
| 0191 019101 KA131 | Gen P ADMIN 2 PURC | ublic S ISTRA HASE | ervice Not Elsewhere Defined: TIVE TRAINING : OF ECDIS-RADAR- ARPA GMDSS & HIG | H VOLTAGE SMULATOR FOR PMA KARACHI |
| 019101 | - A09 | Physical Assets | 30,000,000 | |
| 019101 | - A096 | Purchase of Plant and Machinery | 30,000,000 | |
| Total- | PURC GMDS FOR P | HASE OF ECDIS-RADAR- ARPA S & HIGH VOLTAGE SMULATOR MA KARACHI | 30,000,000 | |
| KA131 PMA | 6 REHABILITATION OF ADMIN BLOCK AUDOTORIUM | QUARTER DECK OFFICER MESS IN PREMISES OF | ||
| 019101 | - A13 | Repairs and Maintenance | 59,566,000 | |
| 019101 | - A133 | Buildings and Structure | 59,566,000 | |
| KA131 | Total- 7 CONS | REHA AUDO OFFIC TRUCT | BILITATION OF ADMIN BLOCK TORIUM QUARTER DECK ER MESS IN PREMISES OF PMA ION/REVNOVATION/REHABILITATION | 59,566,000 OF SEAMEN HOSTEL KEMARI(PMA CITY CAMPUS |
| 019101 | - A13 | Repairs and Maintenance | 19,853,000 | |
| 019101 | - A133 | Buildings and Structure | 19,853,000 | |
| Total- | CONSTRUCTION/REVNOVATION/REHAB ILITATION OF SEAMEN HOSTEL KEMARI(PMA CITY CAMPUS | 19,853,000 | ||
| 0 | 19101 | Total- | ADMINISTRATIVE TRAINING | 109,419,000 |
| 0 | 191 | Total- | Gen Public Service Not Elsewhere Defined | 109,419,000 |
| 0 | 19 | Total- | General Public Service Not Elsewhere Defined | 109,419,000 |
| 0 | 1 | Total- | General Public Service | 136,615,000 |
| 04 | Economic Affairs: | |||
| 042 | Agriculture,Food,Irrigation,Forestry and Fishing: | |||
| 0425 | Fishing: |
| NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS | DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 042501 ADMINISTRATION : KA1313 CONSTRUCTION OF PORT BOUNDRY WALL OF KO | FHA KARACHI SINDH | |
|---|---|---|
| 042501- A12 | Civil works | 60,000,000 |
| 042501- A124 | Building and Structures | 60,000,000 |
| Total- KA1315 REPA | CONSTRUCTION OF PORT BOUNDRY WALL OF KOFHA KARACHI SINDH IR OF JETTY STRUCTURE & PORT INSTALLA | 60,000,000 TION KoFHA KARACHI SINDH |
| 042501- A13 | Repairs and Maintenance | 60,000,000 |
| 042501- A133 | Buildings and Structure | 60,000,000 |
| Total- | REPAIR OF JETTY STRUCTURE & PORT INSTALLATION KoFHA KARACHI SINDH | 60,000,000 |
| 042501 | Total- ADMINISTRATION | 120,000,000 |
| 0425 | Total- Fishing | 120,000,000 |
| 042 | Total- Agriculture,Food,Irrigation,Forestry and Fishing | 120,000,000 |
| 045 Const | ruction and Transport: | |
| 0453 Water | Transport: | |
| 045301 PORT | AND SHIPPPING : |
KA1314 ENHANCEMENT OF SEAFARER REPORTING MODULE & INSTALLATION ON NEW COMPUTER HARD/IC CARD PRINTER
| 045301- A03 | Operating Expenses | 18,556,000 | 18,556,000 | 18,556,000 |
|---|---|---|---|---|
| 045301- A039 | General | 18,556,000 | 18,556,000 | 18,556,000 |
| Total- | ENHANCEMENT OF SEAFARER REPORTING MODULE & INSTALLATION ON NEW COMPUTER HARD/IC CARD PRINTER | 18,556,000 | 18,556,000 | 18,556,000 |
| KA9623 PROVIDING AND INSTALLATION OF SECURITY AND STREET LIGHTS IN | PREMISES | |||
| 045301- A09 | Physical Assets | 25,062,000 | ||
| 045301- A092 | Computer Equipment | 2,207,000 | ||
| 045301- A096 | Purchase of Plant and Machinery | 2,101,000 | ||
| 045301- A097 | Purchase of Furniture and Fixture | 20,754,000 | ||
| Total- | PROVIDING AND INSTALLATION OF SECURITY AND STREET LIGHTS IN | 25,062,000 |
| NO. 154.- FC1 | 2C51 C | APITAL OUTLAY ON MARITIME AFFAIR | S DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
| PREM | ACCOUNTANT GENERAL PAKISTAN RE ISES | VENUES SUB-OFFICE, KARACHI | |||
| 045301 | Total- | PORT AND SHIPPPING | 18,556,000 | 18,556,000 | 43,618,000 |
| 0453 | Total- | Water Transport | 18,556,000 | 18,556,000 | 43,618,000 |
| 045 | Total- | Construction and Transport | 18,556,000 | 18,556,000 | 43,618,000 |
| 046 Comm | unications: | ||||
| 0461 Comm 046101 ADMI KA1311 FEAS | unicati NISTRA IBILITY | ons: TION : STUDY FOR OIL STORAGE CONSTR TIO | N AT OIA KEMARI | KARACHI | |
| 046101- A02 | Project Pre-Investment Analysis | 702,025,000 | |||
| 046101- A021 | Feasibility Studies | 702,025,000 | |||
| Total- | FEASI CONS KARA | BILITY STUDY FOR OIL STORAGE TR TION AT OIA KEMARI CHI | 702,025,000 | ||
| 046101 | Total- | ADMINISTRATION | 702,025,000 | ||
| 0461 | Total- | Communications | 702,025,000 | ||
| 046 | Total- | Communications | 702,025,000 | ||
| 04 | Total- | Economic Affairs | 840,581,000 | 18,556,000 | 43,618,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 977,196,000 | 18,556,000 | 43,618,000 |
NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION
| MARITIME AFFAIRS | DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
04 Economic Affairs: 046 Communications: 0461 Communications: 046101 ADMINISTRATION : GR2015 CONSTRUCTION OF EAST BAY EXPRESSWAY TO LINK GWADAR PORT WITH NATIONAL ROAD NETWORK GWADAR.
| 046101- A12 046101- A121 | Civil works Roads Highways and Bridges | 6,035,260,000 6,035,260,000 | 1,508,816,000 1,508,816,000 | 2,400,000,000 2,400,000,000 |
|---|---|---|---|---|
| Total- | CONSTRUCTION OF EAST BAY EXPRESSWAY TO LINK GWADAR PORT WITH NATIONAL ROAD NETWORK GWADAR. | 6,035,260,000 | 1,508,816,000 | 2,400,000,000 |
| (In Foreign Exchange) | (5,835,260,000) | (1,508,816,000) | (2,200,000,000) | |
| (Foreign Aid) | (5,835,260,000) | (1,508,816,000) | (2,200,000,000) | |
| (In Local Currency) | (200,000,000) _________________ | _________________ | (200,000,000) _______________ | |
| GR2016 UP G | RADATION OF GPA HOUSING COMPLEX | |||
| 046101- A12 | Civil works | 209,000,000 | 209,000,000 | 91,638,000 |
| 046101- A124 | Building and Structures | 209,000,000 | 209,000,000 | 91,638,000 |
| Total- | UP GRADATION OF GPA HOUSING COMPLEX | 209,000,000 | 209,000,000 | 91,638,000 |
| GR2018 FEASIBILITY STUDY FOR CONSTRUCTION OF BREAK WATERS | ||||
| 046101- A02 | Project Pre-Investment Analysis | 194,000,000 | 69,420,000 | 27,156,000 |
| 046101- A021 | Feasibility Studies | 194,000,000 | 69,420,000 | 27,156,000 |
| Total- | FEASIBILITY STUDY FOR | 194,000,000 | 69,420,000 | 27,156,000 |
| CONSTRUCTION OF BR EAK WATERS | ||||
| GR2019 CAPITAL DREDGING OF BERTHING AREA & CHA | N EL FOR ADDITION | AL TERMINAL | ||
| 046101- A12 | Civil works | 100,000,000 | ||
| 046101- A123 | Embankment and Drainage Works | 100,000,000 | ||
| Total- | CAPITAL DREDGING OF BERTHING AREA & CHAN EL FOR ADDITIONAL TERMINAL | 100,000,000 | ||
| GR2020 PAK- | CHINA TECHNICAL & VOCATIONAL INSTITUTE AT GWADAR | |||
| 046101- A12 | Civil works | 625,583,000 | 7,541,000 | 425,583,000 |
| NO. 154.- FC1 | 2C51 CAPITAL OUTLAY ON MARITIME AFFAIR | S DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN R | EVENUES SUB-OFFICE, QUETTA | |||
| 046101- A124 | Building and Structures | 625,583,000 | 7,541,000 | 425,583,000 |
| Total- | PAK-CHINA TECHNICAL & VOCATIONAL INSTITUTE AT GWADAR | 625,583,000 | 7,541,000 | 425,583,000 |
| (In Foreign Exchange) | (500,000,000) | (500,000) | (350,000,000) | |
| (Foreign Aid) | (500,000,000) | (500,000) | (350,000,000) | |
| (In Local Currency) | (125,583,000) | (7,041,000) | (75,583,000) | |
| GR2021 ESTA | __ BLISHMENT OF CPEC SUPPORT UNIT(CSU) FO | _________________ R PROJECTS AND | __________________ ACTIVITES IN GPA | _____________ |
| 046101- A01 | Employees Related Expenses | 3,686,000 | 4,681,000 | 1,872,000 |
| 046101- A011 | Pay 10 7 | 3,686,000 | 4,681,000 | 1,872,000 |
| 046101- A011-1 | Pay of Officers (3) | (2,174,000) | (3,169,000) | (372,000) |
| 046101- A011-2 | Pay of Other Staff (7) (7) | (1,512,000) | (1,512,000) | (1,500,000) |
| 046101- A03 | Operating Expenses | 6,300,000 | 5,301,000 | 5,801,000 |
| 046101- A036 | Motor Vehicles | 1,000,000 | 1,000,000 | 2,000,000 |
| 046101- A038 | Travel & Transportation | 2,700,000 | 2,501,000 | 2,001,000 |
| 046101- A039 | General | 2,600,000 | 1,800,000 | 1,800,000 |
| 046101- A06 | Transfers | 2,000,000 | 2,000,000 | 1,000 |
| 046101- A063 | Entertainment & Gifts | 2,000,000 | 2,000,000 | 1,000 |
| 046101- A09 | Physical Assets | 502,000 | 503,000 | 10,402,000 |
| 046101- A092 | Computer Equipment | 500,000 | 500,000 | 400,000 |
| 046101- A095 | Purchase of Transport | 1,000 | 1,000 | 10,000,000 |
| 046101- A096 | Purchase of Plant and Machinery | 1,000 | 1,000 | 1,000 |
| 046101- A097 | Purchase of Furniture and Fixture | 1,000 | 1,000 | |
| 046101- A13 | Repairs and Maintenance | 1,000,000 | 1,003,000 | 834,000 |
| 046101- A130 | Transport | 1,000,000 | 1,000,000 | 831,000 |
| 046101- A131 | Machinery and Equipment | 2,000 | 2,000 | |
| 046101- A137 | Computer Equipment | 1,000 | 1,000 | |
| Total- | ESTABLISHMENT OF CPEC SUPPORT | 13,488,000 | 13,488,000 | 18,910,000 |
| GR2022 REHA | UNIT(CSU) FOR PROJECTS AND ACTIVITES IN GPA BILITATION OF AUCTION HALL OF GAWADAR | MINI PORT | ||
| 046101- A13 | Repairs and Maintenance | 8,578,000 | ||
| 046101- A133 | Buildings and Structure | 8,578,000 |
| NO. 154.- FC1 | 2C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION | DEMANDS FOR GRANTS | |
|---|---|---|---|
| No of 2018-19 Posts 2019-20 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | |||
| Total- GR2023 LAND | REHABILITATION OF AUCTION HALL OF GAWADAR MINI PORT 8,578,000 ACUISITION AS PER GAWADAR PORT MASTER PLAN | ||
| 046101- A09 | Physical Assets 895,853,000 | ||
| 046101- A091 | Purchase of Building 895,853,000 | ||
| Total- GR2024 BUSS | LAND ACUISITION AS PER GAWADAR PORT MASTER PLAN 895,853,000 INESS COMPLEX R.O PLANT(0.2M/G/D Capicity) | ||
| 046101- A12 | Civil works 319,441,000 | 5,789,000 | 279,808,000 |
| 046101- A124 | Building and Structures 319,441,000 | 5,789,000 | 279,808,000 |
| Total- | BUSSINESS COMPLEX R.O 319,441,000 | 5,789,000 | 279,808,000 |
| GR2025 FEAS | PLANT(0.2M/G/D Capicity) IBILITY STUDY OF PERTROLIUM/PETRO CHEMICAL TERMINAL D | IRTY DRY BULK TERMINAL | |
| 046101- A02 | Project Pre-Investment Analysis 57,500,000 | ||
| 046101- A021 | Feasibility Studies 57,500,000 | ||
| Total- GR2026 DEVE | FEASIBILITY STUDY OF PERTROLIUM/PETRO CHEMICAL TERMINAL DIRTY DRY BULK TERMINAL 57,500,000 LOPMENT & CONSTRUCTION OF PORT ALLIED STRUCTURES IN | MULLAH BAND AREA | |
| 046101- A12 | Civil works 682,784,000 | 622,784,000 | 292,300,000 |
| 046101- A124 | Building and Structures 682,784,000 | 622,784,000 | 292,300,000 |
| Total- | DEVELOPMENT & CONSTRUCTION OF PORT ALLIED STRUCTURES IN MULLAH BAND AREA 682,784,000 | 622,784,000 | 292,300,000 |
| 046101 | Total- ADMINISTRATION 9,141,487,000 | 2,436,838,000 | 3,535,395,000 |
| 0461 | Total- Communications 9,141,487,000 | 2,436,838,000 | 3,535,395,000 |
| 046 | Total- Communications 9,141,487,000 | 2,436,838,000 | 3,535,395,000 |
| 04 | Total- Economic Affairs 9,141,487,000 | 2,436,838,000 | 3,535,395,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 9,141,487,000 | 2,436,838,000 | 3,535,395,000 | |
| (In Foreign Exchange) (6,335,260,000) | (1,509,316,000) | (2,550,000,000) | |
| (Own Resources) |
| NO. 154.- FC12C51 CAPITAL OUTLAY O | N MARITIME AFFAIRS DIVIS ION No of 2018-19 Posts 2019-20 2018-2019 Budget Estimate Rs | DEMAN 2018-2019 Revised Estimate Rs | DS FOR GRANTS 2019-2020 Budget Estimate Rs |
|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | |||
| (Foreign Aid) | (6,335,260,000) | (1,509,316,000) | (2,550,000,000) |
| (In Local Currency) | (2,806,227,000) | (927,522,000) | (985,395,000) |
| TOTAL - DEMAND | 10,118,683,000 | 2,455,394,000 | 3,600,243,000 |
| (In Foreign Exchange) | (6,335,260,000) | (1,509,316,000) | (2,550,000,000) |
| (Own Resources) | |||
| (Foreign Aid) | (6,335,260,000) | (1,509,316,000) | (2,550,000,000) |
| (In Local Currency) | (3,783,423,000) _________________ | (946,078,000) __________________ | (1,050,243,000) _______________ |
NO. 155.- CAPITAL OUTLAY ON PAKISTAN RAILWAYS
DEMANDS FOR GRANTS
DEMAND NO. 155 ( FC12C33 )
CAPITAL OUTLAY ON PAKISTAN RAILWAYS
I. ESTIMATES of the Amount required in the year ending 30 June , 2020 for CAPITAL OUTLAY ON PAKISTAN RAILWAYS.
Voted
Rs. 16,000,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF RAILWAYS .
| 2018-2019 Budget Estimate Rs | 2018-2019 Revised Estimate Rs | 2019-2020 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 |
| 045 | Construction and Transport | 4,000,000,000 | 2,500,000,000 | |
| Total | 34,411,473,000 | 22,792,870,000 | 16,000,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 4,000,000,000 | 2,500,000,000 | |
| A11 | Investments | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 |
| Total | 34,411,473,000 | 22,792,870,000 | 16,000,000,000 | |
| (In Foreign Exchange) | (22,498,000,000) | (12,345,000,000) | (7,850,000,000) | |
| (Own Resources) | (18,498,000,000) | (12,345,000,000) | (5,350,000,000) | |
| (Foreign Aid) | (4,000,000,000) | (2,500,000,000) | ||
| (In Local Currency) | (11,913,473,000) _________________ | (10,447,870,000) __________________ | (8,150,000,000) _______________ | |
| _____ Expen | ______________________________________ The above estimates do not include recoverie diture: | ________________________ s shown below which are adjus | __________________ ted in the accounts in | _______________ reduction of |
| 045 | Construction and Transport | -4,000,000,000 | -2,500,000,000 | |
| Total - Recoveries | _________________ -4,000,000,000 _________________ | _______________ -2,500,000,000 _______________ |
NO. 155.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
|---|---|---|---|
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
| NO. 155.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2018-2019 | 2018-2019 | 2019-2020 |
| 2018-19 2019-20 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 | General Public Service: | |||||
|---|---|---|---|---|---|---|
| 014 | Transfers: | |||||
| 0143 | Investments: | |||||
| 01430 | 2 Non-Financial Institutions : | |||||
| KA221 | 6 PAKISTAN RAILWAYS, (LOCAL CURRENCY) | |||||
| 01430 | 2- A11 | Investments | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 | |
| 01430 | 2- A111 | Investment Local | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 | |
| Total- | PAKISTAN RAILWAYS, (LOCAL CURRENCY) | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 | ||
| (In Foreign Exchange) | (18,498,000,000) | (12,345,000,000) | (5,350,000,000) | |||
| (Own Resources) | (18,498,000,000) | (12,345,000,000) | (5,350,000,000) | |||
| (In Loc | al Currency) | (11,913,473,000) | (10,447,870,000) | (8,150,000,000) | ||
| 014302 | Total- | Non-Financial Institutions | _________________ 30,411,473,000 | __________________ 22,792,870,000 | _______________ 13,500,000,000 | |
| 0143 | Total- | Investments | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 | |
| 014 | Total- | Transfers | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 | |
| 01 | Total- | General Public Service | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 | |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 30,411,473,000 | 22,792,870,000 | 13,500,000,000 | ||
| (In | Foreign Exchange) | (18,498,000,000) | (12,345,000,000) | (5,350,000,000) | ||
| (Own Resources) | (18,498,000,000) | (12,345,000,000) | (5,350,000,000) | |||
| (Foreign Aid) | ||||||
| (In | Local Currency) COMMERCIA | (11,913,473,000) L DEPARTMENTS | (10,447,870,000) | (8,150,000,000) |
| NO. 1 | 55.- FC1 | 2C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|---|
| No of 2018-19 Posts 2019-20 | 2018-2019 Budget Estimate | 2018-2019 Revised Estimate | 2019-2020 Budget Estimate | ||
| Rs | Rs | Rs | |||
| COMMERCIAL DEPARTMENTS | |||||
| 04 | Economic Affairs: | ||||
| 045 | Construction and Transport: | ||||
| 0454 | Railway Trasport: | ||||
| 04540 | 1 Railway Trasport : | ||||
| HQ17 | 63 PAKISTAN RAILWAYS -(FOREIGN AID PORTION) | ||||
| 04540 | 1- A03 | Operating Expenses | 4,000,000,000 | 2,500,000,000 | |
| 04540 | 1- A039 | General | 4,000,000,000 | 2,500,000,000 | |
| Total- | PAKISTAN RAILWAYS -(FOREIGN AID PORTION) | 4,000,000,000 | 2,500,000,000 | ||
| (In Foreign Exchange) | (4,000,000,000) | (2,500,000,000) | |||
| (Foreign Aid) | (4,000,000,000) | (2,500,000,000) | |||
| 045401 | _ Total- Railway Trasport | ________________ 4,000,000,000 | _______________ 2,500,000,000 | ||
| 0454 | Total- Railway Trasport | 4,000,000,000 | 2,500,000,000 | ||
| 045 | Total- Construction and Transport | 4,000,000,000 | 2,500,000,000 | ||
| 04 | Total- Economic Affairs | 4,000,000,000 | 2,500,000,000 | ||
| Total- COMMERCIAL DEPARTMENTS | 4,000,000,000 | 2,500,000,000 | |||
| (In Foreign Exchange) | (4,000,000,000) | (2,500,000,000) | |||
| (Own Resources) | |||||
| (Foreign Aid) | (4,000,000,000) | (2,500,000,000) | |||
| TOTAL - DEMAND | 34,411,473,000 | 22,792,870,000 | 16,000,000,000 | ||
| (In Foreign Exchange) | (22,498,000,000) | (12,345,000,000) | (7,850,000,000) | ||
| (Own Resources) | (18,498,000,000) | (12,345,000,000) | (5,350,000,000) | ||
| (Foreign Aid) | (4,000,000,000) | (2,500,000,000) | |||
| (In Local Currency) _ | (11,913,473,000) ________________ | (10,447,870,000) __________________ | (8,150,000,000) _______________ | ||
| ___________________________________________ Detail of recoveries adjusted in the ac | ___________________ counts in Reduction o | ___________________ f Expenditure:- | _________________ |
COMMERCIAL DEPARTMENTS
| 04 | Economic Affairs | ||
|---|---|---|---|
| 045 | Construction and Transport | ||
| 0454 | Railway Trasport | ||
| 04540 | 1 Railway Trasport | ||
| 90001 AMOUNT MET FROM RAILWAYS | -4,000,000,000 | -2,500,000,000 |
| NO. 155.- FC12 | C33 CAPITAL OUTLAY FOREIGN AID DEPO | ON PAKISTAN RAILW No of 2018-19 Posts 2019-20 COMMERCIAL DE SIT ACCOUNTS | AYS 2018-2019 Budget Estimate Rs PARTMENTS | DEMAN 2018-2019 Revised Estimate Rs | DS FOR GRANTS 2019-2020 Budget Estimate Rs |
|---|---|---|---|---|---|
| 045401 | Railway Trasport | _ | __________________ -4,000,000,000 | _______________ -2,500,000,000 | |
| Total - | _ COMMERCIAL DEPARTMENTS _ | __________________ -4,000,000,000 __________________ | _______________ -2,500,000,000 _______________ |