Details of Demands for Grants & Appropriations (Development Budget Demands, Volume-V), part 6
The Details of Demands for Grants & Appropriations (Development Budget Demands, Volume-V) is part of the federal budget for FY 2020-21. This page reproduces the text of its 550 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.
This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.
Table of Content
Next
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| FROM CHACHAR SHARIF TO KOT PEHLWAN AND CONSTRUCTION OF METTALED ROAD FROM | ||||
| IB2256 CONST DERA HAKEE | RUCTION OF METALLED ROAD FROM BHAKHA M FAZAL | R BAR CHACHAR SHARIF ROAD DE | RA ZIADA TO | |
| 045702- A12 | Civil works | 10,396,000 | ||
| 045702- A124 | Building and Structures | 10,396,000 | ||
| Total- | CONSTRUCTION OF METALLED ROAD FROM BHAKHAR BAR CHACHAR SHARIF ROAD DERA ZIADA TO DERA HAKEEM FAZAL | 10,396,000 | ||
| IB2257 CONSTRUCTION OF OFFICER'S MESS AT NAB (L) | COMPLEX LAHORE | |||
| 045702- A12 | Civil works | 4,695,000 | ||
| 045702- A124 | Building and Structures | 4,695,000 | ||
| Total- | CONSTRUCTION OF OFFICER'S MESS | 4,695,000 | ||
| **AT NAB (L) | COMPLEX LAHORE** | |||
| IB2258 CONST DIFFERENT U | RUCTION OF M/ROAD / RCC ROAD / PCC / TUFF CS OF | TILES / CULVERTS / | NALLAH AND D | RAIN IN |
| 045702- A12 | Civil works | 500,000,000 | ||
| 045702- A124 | Building and Structures | 500,000,000 | ||
| Total- | CONSTRUCTION OF M/ROAD / RCC | 500,000,000 | ||
| ROAD / PCC / TUFF TILES / CULVERTS / NALLAH AND DRAIN IN DIFFERENT UCS OF | ||||
| IB2259 CONST BHIMER NALL | RUCTION OF INDUSTRIAL AREA ROAD FROM G AH | T ROAD TO GHAZI CH | AK INCLUDING BRIDGES ON | |
| 045702- A12 | Civil works | 938,967,000 | ||
| 045702- A124 | Building and Structures | 938,967,000 | ||
| Total- | CONSTRUCTION OF INDUSTRIAL AREA ROAD FROM GT ROAD TO GHAZI CHAK INCLUDING BRIDGES ON BHIMER NALLAH | 938,967,000 | ||
| IB2260 DUALI ZAHORR ELA | ZATION OF GUJRAT JALALPUR JATTAN ROAD HI PARK TO | (SUB-HEAD) : DUALIZATION OF ROAD FROM | ||
| 045702- A12 | Civil works | 469,484,000 |
Table of Content
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A124 | Building and Structures | 469,484,000 | ||
| Total- IB2261 CONST BAHAWALPU | DUALIZATION OF GUJRAT JALALPUR JATTAN ROAD (SUB-HEAD) : DUALIZATION OF ROAD FROM ZAHORR ELAHI PARK TO RUCTION OF METALLED ROAD AND BRIDGE IN R (32 NOS | DIFFERENT AREA OF TEHSIL YAZM | 469,484,000 AN DISTRICT | |
| 045702- A12 | Civil works | 485,446,000 | ||
| 045702- A124 | Building and Structures | 485,446,000 | ||
| Total- IB2262 CONST GREAVEYARD | CONSTRUCTION OF METALLED ROAD AND BRIDGE IN DIFFERENT AREA OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (32 NOS RUCTION OF BRICK PAVEMENTS IN STREETS AND | CONSTRUCTION OF BOUNDARY WAL | 485,446,000 LS OF | |
| 045702- A12 | Civil works | 230,361,000 | ||
| 045702- A124 | Building and Structures | 230,361,000 | ||
| Total- | CONSTRUCTION OF BRICK | 230,361,000 | ||
| PAVEMENTS IN STREETS CONSTRUCTION OF BOUNDARY WALLS OF GREAVEYARD AND | ||||
| IB2263 PROVI DISTRICT BAH | DING AND LAYING OF WATER SUPPLY AND SE AWALPUR | WERAGE IN DIFFERENT AREAS OF TEHSIL YAZMAN | ||
| 045702- A12 | Civil works | 223,474,000 | ||
| 045702- A124 | Building and Structures | 223,474,000 | ||
| Total- IB2264 CONST GUJRAT-II | PROVIDING AND LAYING OF WATER SUPPLY AND SEWERAGE IN DIFFERENT AREAS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR RUCTION OF SERVICE MORE FLYOVER AND IN | DUSTRIAL AREA LINK | ROAD GUJRA | 223,474,000 T DISTRICT |
| 045702- A12 | Civil works | 673,395,000 | ||
| 045702- A124 | Building and Structures | 673,395,000 | ||
| Total- | CONSTRUCTION OF SERVICE MORE | 673,395,000 | ||
| FLYOVER AND INDUSTRIAL AREA LINK ROAD GUJRAT DISTRICT GUJRAT-II |
Table of Content
Next
NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS DEMANDS FOR GRANTS No of Posts 2019-2020 2019-2020 2020-2021 2019-20 2020-21 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
IB2265 REHABLITION OF ROAD FROM LAHORE ROAD (ADA 10 MILE) TO FAISLABAD ROAD (46 ADA) VIA 29 JHALL 36 PULL
| 045702- A12 045702- A124 | Civil works Building and Structures | 281,690,000 281,690,000 |
|---|---|---|
| Total- | REHABLITION OF ROAD FROM LAHORE ROAD (ADA 10 MILE) TO FAISLABAD ROAD (46 ADA) VIA 29 JHALL 36 PULL | 281,690,000 |
| IB2266 DEVEL | POMENT SCHEME 21 NOS IN DISTRICT CHAKWAL NA-65 (ROAD SCHEMES) | |
| 045702- A12 | Civil works | 328,638,000 |
| 045702- A124 | Building and Structures | 328,638,000 |
| Total- | DEVELPOMENT SCHEME 21 NOS IN DISTRICT CHAKWAL NA-65 (ROAD SCHEMES) | 328,638,000 |
| IB2267 CONSTRUCTION OF 20 BEDDED HOSPITAL AT VILLAGE LATIFAL DISTRICT CHAKWAL | ||
| 045702- A12 | Civil works | 469,484,000 |
| 045702- A124 | Building and Structures | 469,484,000 |
| Total- | CONSTRUCTION OF 20 BEDDED HOSPITAL AT VILLAGE LATIFAL DISTRICT CHAKWAL | 469,484,000 |
| IB2268 WIDEN KHUSHAB | ING/REHABILITATION OF ROAD FROM QUAIDABAD TO WARCHHA VIA FATEHPUR DISTRICT | |
| 045702- A12 | Civil works | 274,742,000 |
| 045702- A124 | Building and Structures | 274,742,000 |
| Total- IB2269 FEASI GONDLAWAL | WIDENING/REHABILITATION OF ROAD FROM QUAIDABAD TO WARCHHA VIA FATEHPUR DISTRICT KHUSHAB BILITY STUDY FOR CONSTRUCTION OF DUAL ROAD FROM ALIPUR CHOWK TO KAL A BYPASS | 274,742,000 ASKY AND |
| 045702- A12 | Civil works | 7,746,000 |
| 045702- A124 | Building and Structures | 7,746,000 |
| Total- | FEASIBILITY STUDY FOR CONSTRUCTION OF DUAL ROAD FROM ALIPUR CHOWK TO KALASKY AND GONDLAWALA BYPASS | 7,746,000 |
IB2270 CONSTRUCTION / REHABILITATION / IMPROVEMENT OF ROADS AND SEWERAGE IN DIFFERENT AREAS
Table of Content
Next
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMANDS FOR GRANTS | |
|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate 2020-2021 Budget Estimate | |
| Rs | Rs Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| OF DISTRICT | |||
| 045702- A12 | Civil works | 207,782,000 | |
| 045702- A124 | Building and Structures | 207,782,000 | |
| Total- | CONSTRUCTION / REHABILITATION / IMPROVEMENT OF ROADS AND SEWERAGE IN DIFFERENT AREAS OF DISTRICT | 207,782,000 | |
| IB2271 CONSTRUCTION / REHABILITATION OF FLOOD AFFECTED ROAD DISTRICT | MUZAFFARGARH-I | ||
| 045702- A12 | Civil works | 158,699,000 | |
| 045702- A124 | Building and Structures | 158,699,000 | |
| Total- | CONSTRUCTION / REHABILITATION OF FLOOD AFFECTED ROAD DISTRICT MUZAFFARGARH-I | 158,699,000 | |
| IB2272 CONSTRUCTION OF 1ST FLOOR OF ACADEMIC BLOCK AT CIVIL SERVICES | ACADEMY WALTON LAHORE | ||
| 045702- A12 | Civil works | 94,503,000 23,474,000 | |
| 045702- A124 | Building and Structures | 94,503,000 23,474,000 | |
| Total- | CONSTRUCTION OF 1ST FLOOR OF | 94,503,000 23,474,000 | |
| ACADEMIC BLOCK AT CIVIL SERVICES ACADEMY WALTON LAHORE | |||
| IB2273 CONSTRUCTION OF 2ND FLOOR OF BOLAN HOSTEL A | T CIVIL SERVICES ACADEMY WALTON LAHORE | ||
| 045702- A12 | Civil works | 32,149,000 | |
| 045702- A124 | Building and Structures | 32,149,000 | |
| Total- | CONSTRUCTION OF 2ND FLOOR OF BOLAN HOSTEL AT CIVIL SERVICES ACADEMY WALTON LAHORE | 32,149,000 | |
| IB2274 UP-GR | ADATION OF AHK NCRD HOSTEL BUILDING ISLAMABAD | ||
| 045702- A12 | Civil works | 23,109,000 | |
| 045702- A124 | Building and Structures | 23,109,000 | |
| Total- IB2275 PROVI | UP-GRADATION OF AHK NCRD HOSTEL BUILDING ISLAMABAD SION OF SECURITY MEASURES AT CIVIL SERVI | CES ACADEMY (CSA) | 23,109,000 WALTON LAHORE |
| 045702- A12 | Civil works | 12,325,000 | |
| 045702- A124 | Building and Structures | 12,325,000 | |
| Total- | PROVISION OF SECURITY MEASURES | 12,325,000 |
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PA AT CIVIL SERVICES ACADEMY (CSA) WALTON LAHORE | KISTAN REVENUES | |||
| IB2276 REPLA G-9/4 ISLAMA | CEMENT OF OLD/OBSOLETS PASSENGER WITH BAD | NEW MRL PASSENGER LIFT AT FIA | HQ COMPLEX | |
| 045702- A12 | Civil works | 7,831,000 | ||
| 045702- A124 | Building and Structures | 7,831,000 | ||
| Total- | REPLACEMENT OF OLD/OBSOLETS | 7,831,000 | ||
| PASSENGER WITH NEW MRL PASSENGER LIFT AT FIA HQ COMPLEX G-9/4 ISLAMABAD | ||||
| IB2277 DEVELOPMENT SCHEMES IN DISTRICT MANSEHRA | ||||
| 045702- A12 | Civil works | 506,197,000 | 73,901,000 | |
| 045702- A124 | Building and Structures | 506,197,000 | 73,901,000 | |
| Total- | DEVELOPMENT SCHEMES IN DISTRICT | 506,197,000 | 73,901,000 | |
| MANSEHRA | ||||
| IB2278 CONSTRUCTION OF POLICE BARRACKS POLICE STAT NAB KPK HAYATABAD | ION CIVIL LINES INCLUDING PRISON | ER CELL AT | ||
| 045702- A12 | Civil works | 46,948,000 | ||
| 045702- A124 | Building and Structures | 46,948,000 | ||
| Total- | CONSTRUCTION OF POLICE | 46,948,000 | ||
| BARRACKS POLICE STATION CIVIL LINES INCLUDING PRISONER CELL AT NAB KPK HAYATABAD | ||||
| IB2279 CONST JHOKAN DIST | RUCTION OF NEW ROAD FROM CHANDORE SH MANSEHRA NA-21 | ARIF TO HARI PUR VIA LASSAN ADD | A PALSALA | |
| 045702- A12 | Civil works | 19,788,000 | ||
| 045702- A124 | Building and Structures | 19,788,000 | ||
| Total- IB2280 CONST | CONSTRUCTION OF NEW ROAD FROM CHANDORE SHARIF TO HARI PUR VIA LASSAN ADDA PALSALA JHOKAN DIST MANSEHRA NA-21 RUCTION OF OPERATION THEATRE AT CENTR | AL HOSPITAL AT MINGORA SWAT | 19,788,000 | |
| 045702- A12 | Civil works | 18,779,000 | ||
| 045702- A124 | Building and Structures | 18,779,000 | ||
| Total- | CONSTRUCTION OF OPERATION | 18,779,000 |
Table of Content
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| IB2281 CONST MANSEHRA | ACCOUNTANT GENERAL PA THEATRE AT CENTRAL HOSPITAL AT MINGORA SWAT RUCTION OF RCC PRESTRESSED BRIDGE AT | KISTAN REVENUES KAT GHAR U/C BAHAL | I TEHSIL AND | DISTRICT |
| 045702- A12 | Civil works | 14,778,000 | ||
| 045702- A124 | Building and Structures | 14,778,000 | ||
| Total- | CONSTRUCTION OF RCC | 14,778,000 | ||
| PRESTRESSED BRIDGE AT KAT GHAR U/C BAHALI TEHSIL AND DISTRICT MANSEHRA | ||||
| IB2282 CONST MANSEHRA | RUCTION OF RCC PRESTRESSED BRIDGE AT | DANNA / LUNG SHARIF U/C ANAYATABAD DISTRICT | ||
| 045702- A12 | Civil works | 18,779,000 | ||
| 045702- A124 | Building and Structures | 18,779,000 | ||
| Total- | CONSTRUCTION OF RCC | 18,779,000 | ||
| PRESTRESSED BRIDGE AT DANNA / LUNG SHARIF U/C ANAYATABAD DISTRICT MANSEHRA | ||||
| IB2283 CONST U/C KAGHAN | RUCTION OF JEEPABLE SUSPENSION BRIDGE | RATTA CHANGE OVER RIVER KUNHAR AT RAJWAL | ||
| 045702- A12 | Civil works | 13,822,000 | ||
| 045702- A124 | Building and Structures | 13,822,000 | ||
| Total- | CONSTRUCTION OF JEEPABLE | 13,822,000 | ||
| SUSPENSION BRIDGE RATTA CHANGE OVER RIVER KUNHAR AT RAJWAL U/C KAGHAN | ||||
| IB2284 FEASIBILITY STUDY FOR CONSTRUCTION OF RCC PR NEAR GOVERNMENT | E CAST BRIDGE AT H | ASSA OVER RIVER KUNHAR | ||
| 045702- A12 | Civil works | 2,347,000 | ||
| 045702- A124 | Building and Structures | 2,347,000 | ||
| Total- | FEASIBILITY STUDY FOR | 2,347,000 | ||
| CONSTRUCTION OF RCC PRE CAST BRIDGE AT HASSA OVER RIVER KUNHAR NEAR GOVERNMENT | ||||
| IB2285 CONST PESHAWAR | RUCTION OF AUDITORIUM BACHELOR HOSTEL AND OFFICER'S MESS FOR NAB (K | P) AT |
Table of Content
Next
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMANDS FOR GRANTS | |
|---|---|---|---|
| No of 2019-20 Posts 2020-21 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| 045702- A12 | Civil works | 18,779,000 | |
| 045702- A124 | Building and Structures | 18,779,000 | |
| Total- | CONSTRUCTION OF AUDITORIUM | 18,779,000 | |
| BACHELOR HOSTEL AND OFFICER'S MESS FOR NAB (KP) AT PESHAWAR | |||
| IB2286 CONST PARKHO AND | RUCTION OF BLACK TOP ROADS AND PCC ROADS IN UNION COUNC MAIN ESA | ILS MAKNORI | LUND KHAUR |
| 045702- A12 | Civil works | 426,883,000 | |
| 045702- A124 | Building and Structures | 426,883,000 | |
| Total- | CONSTRUCTION OF BLACK TOP | 426,883,000 | |
| IB2287 BORIN MACHINERY I | ROADS AND PCC ROADS IN UNION COUNCILS MAKNORI LUND KHAUR PARKHO AND MAIN ESA G FOR TUBEWELL AND INSTALLATION OF SOLAR ENERGY BASED S N DIFFERENT | UBMERSIBLE | PUMPING |
| 045702- A12 | Civil works | 311,630,000 | |
| 045702- A124 | Building and Structures | 311,630,000 | |
| Total- IB2288 CONST | BORING FOR TUBEWELL AND INSTALLATION OF SOLAR ENERGY BASED SUBMERSIBLE PUMPING MACHINERY IN DIFFERENT RUCTION OF ROAD OF PARD CAMPUS PESHAWAR | 311,630,000 | |
| 045702- A12 | Civil works | 46,948,000 | |
| 045702- A124 | Building and Structures | 46,948,000 | |
| Total- | CONSTRUCTION OF ROAD OF PARD | 46,948,000 | |
| CAMPUS PESHAWAR | |||
| IB2289 CONST PESHAWAR | RUCTION OF CLASSROOM AND OTHER TRAINING FACILITIES AT NIM | TRAINING COMPLEX | |
| 045702- A12 | Civil works | 24,328,000 | |
| 045702- A124 | Building and Structures | 24,328,000 | |
| Total- | CONSTRUCTION OF CLASSROOM AND OTHER TRAINING FACILITIES AT NIM TRAINING COMPLEX PESHAWAR | 24,328,000 | |
| IB2290 BUILD KHUZDAR | UP OF NUSERIUES FOR PLANTATIONS (GREEN BALUCHISTAN) IN DISTRICT NUSHKI CHAGAI AND |
Table of Content
Next
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| 045702- A12 | Civil works | 28,169,000 | |
| 045702- A124 | Building and Structures | 28,169,000 | |
| Total- | BUILD UP OF NUSERIUES FOR | 28,169,000 | |
| PLANTATIONS (GREEN BALUCHISTAN) IN DISTRICT NUSHKI CHAGAI AND KHUZDAR | |||
| IB2291 CONSTRUCTION OF BLACK TOP ROAD EXTENSION FROM NH-40 KARGOSHKHAN DISTRICT CHAGAI | |||
| 045702- A12 | Civil works | 18,779,000 | |
| 045702- A124 | Building and Structures | 18,779,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 18,779,000 | |
| IB2292 CONST CHAGAI (10 K | EXTENSION FROM NH-40 KARGOSHKHAN DISTRICT CHAGAI RUCTION OF BLACK TOP ROAD FROM BRAPC M) | HA -KARIAZ TO FC CHECK POST IN DISTRICT | |
| 045702- A12 | Civil works | 18,779,000 | |
| 045702- A124 | Building and Structures | 18,779,000 | |
| Total- IB2293 CONST | CONSTRUCTION OF BLACK TOP ROAD FROM BRAPCHA -KARIAZ TO FC CHECK POST IN DISTRICT CHAGAI (10 KM) RUCTION OF BLACK TOP ROAD FROM CHAGA | I ROAD TO PADI-GHEBAN-KARIAZ DI | 18,779,000 STRICT CHAGAI |
| 045702- A12 | Civil works | 14,085,000 | |
| 045702- A124 | Building and Structures | 14,085,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 14,085,000 | |
| IB2294 CONST | FROM CHAGAI ROAD TO PADI-GHEBAN-KARIAZ DISTRICT CHAGAI RUCTION OF BLACK TOP ROAD FROM NH-40 K | HUCHAKI WADH TO KHARAN ROAD | (30KM) |
| 045702- A12 | Civil works | 46,946,000 | |
| 045702- A124 | Building and Structures | 46,946,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD FROM NH-40 KHUCHAKI WADH TO KHARAN ROAD (30KM) | 46,946,000 | |
| IB2295 CONSTRUCTION OF BLACK TOP ROAD FROM NH-40 T SANGERY AND KILLI | O KILLI SHAREEF KHAN KAPOOR & | KILLION |
Table of Content
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A12 | Civil works | 14,085,000 | ||
| 045702- A124 | Building and Structures | 14,085,000 | ||
| Total- IB2296 CONST | CONSTRUCTION OF BLACK TOP ROAD FROM NH-40 TO KILLI SHAREEF KHAN KAPOOR & KILLION SANGERY AND KILLI RUCTION OF BUILDING FOR GIRLS COLLEGE AT | KACHI BAIG SARYAB ROAD QUETTA | 14,085,000 | |
| 045702- A12 | Civil works | 18,779,000 | ||
| 045702- A124 | Building and Structures | 18,779,000 | ||
| Total- | CONSTRUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA | 18,779,000 | ||
| IB2297 CONSTRUCTION OF LIBRARY SARYAB ROAD QUETTA | ||||
| 045702- A12 | Civil works | 18,779,000 | ||
| 045702- A124 | Building and Structures | 18,779,000 | ||
| Total- | CONSTRUCTION OF LIBRARY SARYAB ROAD QUETTA | 18,779,000 | ||
| IB2298 CONSTRUCTION OF ROAD FROM 3/T FROM N-65 TO GUANDAIN MASTUNG | ||||
| 045702- A12 | Civil works | 9,390,000 | ||
| 045702- A124 | Building and Structures | 9,390,000 | ||
| Total- | CONSTRUCTION OF ROAD FROM 3/T FROM N-65 TO GUANDAIN MASTUNG | 9,390,000 | ||
| IB2299 CONSTRUCTION OF ROAD FROM HAZRAT JAFT TO ESS | AH CHAH DISTRICT | NUSHKI | ||
| 045702- A12 | Civil works | 9,390,000 | ||
| 045702- A124 | Building and Structures | 9,390,000 | ||
| Total- IB2300 CONST | CONSTRUCTION OF ROAD FROM HAZRAT JAFT TO ESSAH CHAH DISTRICT NUSHKI RUCTION OF ROAD FROM MAIN RCD ROAD NUS | HKI TO ZANGIABAD | 9,390,000 | |
| 045702- A12 | Civil works | 9,390,000 | ||
| 045702- A124 | Building and Structures | 9,390,000 | ||
| Total- | CONSTRUCTION OF ROAD FROM MAIN RCD ROAD NUSHKI TO ZANGIABAD | 9,390,000 |
IB2301 CONSTRUCTION OF ROAD FROM UNION COUNCIL DAAK DISTRICT NUSHKI TO CHAGAI
Table of Content
Next
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A12 | Civil works | 9,390,000 | ||
| 045702- A124 | Building and Structures | 9,390,000 | ||
| Total- IB2303 MUSA | CONSTRUCTION OF ROAD FROM UNION COUNCIL DAAK DISTRICT NUSHKI TO CHAGAI KHAIL TANNSA ROAD (35-KM) STRETCH ROAD | TO CONSTRUCTED AND LINKS WITH | 9,390,000 ZHOB | |
| 045702- A12 | Civil works | 329,237,000 | ||
| 045702- A124 | Building and Structures | 329,237,000 | ||
| Total- | MUSA KHAIL TANNSA ROAD (35-KM) STRETCH ROAD TO CONSTRUCTED AND LINKS WITH ZHOB | 329,237,000 | ||
| IB2304 INSTALLATION OF FIREFIGHTING SYSTEM FOR OFFICE BUILDING AT NAB ( | B) QUETTA | |||
| 045702- A12 | Civil works | 9,390,000 | ||
| 045702- A124 | Building and Structures | 9,390,000 | ||
| Total- | INSTALLATION OF FIREFIGHTING SYSTEM FOR OFFICE BUILDING AT NAB (B) QUETTA | 9,390,000 | ||
| IB2305 INSTAL CHAGHI | LATION OF 1500 UNITS SOLAR ENERGY HOME | SYSTEM IN OFF GRID | AREA OF AAMIRI DISTRICT | |
| 045702- A12 | Civil works | 37,559,000 | ||
| 045702- A124 | Building and Structures | 37,559,000 | ||
| Total- | INSTALLATION OF 1500 UNITS SOLAR ENERGY HOME SYSTEM IN OFF GRID AREA OF AAMIRI DISTRICT CHAGHI | 37,559,000 | ||
| IB2306 INSTAL NOSHKI | LATION OF 1500 UNITS SOLAR ENERGY HOME | SYSTEM IN OFF GRID | AREA OF SUBURBS DISTRICT | |
| 045702- A12 | Civil works | 37,559,000 | ||
| 045702- A124 | Building and Structures | 37,559,000 | ||
| Total- | INSTALLATION OF 1500 UNITS SOLAR | 37,559,000 | ||
| ENERGY HOME SYSTEM IN OFF GRID AREA OF SUBURBS DISTRICT NOSHKI | ||||
| IB2307 INSTALLATION OF 1500 UNITS SOLAR ENERGY HOME DISTRICT NOSHKI | SYSTEM IN OFF GRID | AREA OF DAAK ESSAH CHAH | ||
| 045702- A12 | Civil works | 37,559,000 | ||
| 045702- A124 | Building and Structures | 37,559,000 |
Table of Content
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | INSTALLATION OF 1500 UNITS SOLAR ENERGY HOME SYSTEM IN OFF GRID AREA OF DAAK ESSAH CHAH DISTRICT NOSHKI | 37,559,000 | ||
| IB2308 PROVISION OF 2000 HOMES SOLAR KITS FOR NA-268 | ||||
| 045702- A12 | Civil works | 33,100,000 | ||
| 045702- A124 | Building and Structures | 33,100,000 | ||
| Total- | PROVISION OF 2000 HOMES SOLAR KITS FOR NA-268 | 33,100,000 | ||
| IB2309 FEASIBILITY STUDY FOR IMPROVEMENT / WIDENING OF SARYAB ROAD QUETTA | ||||
| 045702- A12 | Civil works | 17,744,000 | ||
| 045702- A124 | Building and Structures | 17,744,000 | ||
| Total- | FEASIBILITY STUDY FOR IMPROVEMENT / WIDENING OF SARYAB ROAD QUETTA | 17,744,000 | ||
| IB2310 INSTALLATION OF NEW TUBE WELL IN PREMISES OF S ROAD QUETTA | URVEY OF PAKISTAN COLONY AT | BREWERY | ||
| 045702- A12 | Civil works | 5,269,000 | ||
| 045702- A124 | Building and Structures | 5,269,000 | ||
| Total- | INSTALLATION OF NEW TUBE WELL IN PREMISES OF SURVEY OF PAKISTAN COLONY AT BREWERY ROAD QUETTA | 5,269,000 | ||
| IB2311 CONST BALOCHISTA | RUCTION OF BRIDGE OVER RIVER KOTIRA AND N | 17 KMS ROAD IN UC | LOHI DISTRICT LASBELA | |
| 045702- A12 | Civil works | 140,845,000 | ||
| 045702- A124 | Building and Structures | 140,845,000 | ||
| Total- IB2312 CONST ACCOMMODA | CONSTRUCTION OF BRIDGE OVER RIVER KOTIRA AND 17 KMS ROAD IN UC LOHI DISTRICT LASBELA BALOCHISTAN RUCTION OF STAGING / SAFE HOUSE FOR NAB TION FOR NAB AT | AT GWADAR AND CONSTRUCTION | 140,845,000 OF OFFICE | |
| 045702- A12 | Civil works | 8,421,000 | ||
| 045702- A124 | Building and Structures | 8,421,000 | ||
| Total- | CONSTRUCTION OF STAGING / SAFE | 8,421,000 |
Table of Content
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| IB2313 FEASI FROM LOOP T | ACCOUNTANT GENERAL HOUSE FOR NAB AT GWADAR AND CONSTRUCTION OF OFFICE ACCOMMODATION FOR NAB AT BILITY STUDY FOR CONSTRUCTION OF 4 NOS OWARDS | PAKISTAN REVENU BLACK TOP ROAD | ES FROM RCD TO HIN | AMI BENT |
| 045702- A12 | Civil works | 13,474,000 | ||
| 045702- A124 | Building and Structures | 13,474,000 | ||
| Total- | FEASIBILITY STUDY FOR | 13,474,000 | ||
| IB2314 CONST | CONSTRUCTION OF 4 NOS BLACK TOP ROAD FROM RCD TO HINAMI BENT FROM LOOP TOWARDS RUCTION OF FACILITATION CENTER AND RE | SIDENTIAL ACCOMMODATION FOR FIA | AT TAFTAN | |
| 045702- A12 | Civil works | 27,026,000 | ||
| 045702- A124 | Building and Structures | 27,026,000 | ||
| Total- | CONSTRUCTION OF FACILITATION CENTER AND RESIDENTIAL ACCOMMODATION FOR FIA AT TAFTAN | 27,026,000 | ||
| ID8076 ESTAB | LISHMENT CHARGES CREDITED TO OTHER G | OVERNMENT DEPARTMENTS (PAK. PWD SINDH) | ||
| 045702- A03 | Operating Expenses | 4,878,000 | 4,878,000 | 4,250,000 |
| 045702- A039 | General | 4,878,000 | 4,878,000 | 4,250,000 |
| Total- ID8077 TOOLS | ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH) AND PLANTS CHARGES CREDITED TO OTHE | 4,878,000 R GOVERNMENT D | 4,878,000 EPARTMENTS (PAK. | 4,250,000 PWD SINDH) |
| 045702- A03 | Operating Expenses | 1,463,000 | 1,463,000 | 1,275,000 |
| 045702- A039 | General | 1,463,000 | 1,463,000 | 1,275,000 |
| Total- | TOOLS AND PLANTS CHARGES | 1,463,000 | 1,463,000 | 1,275,000 |
| CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH) | ||||
| ID8079 CIVIL WORKS (PAK. PWD PUNJAB) | ||||
| 045702- A12 | Civil works | 1,915,502,000 | 1,915,502,000 | |
| 045702- A124 | Building and Structures | 1,915,502,000 | 1,915,502,000 | |
| Total- | CIVIL WORKS (PAK. PWD PUNJAB) | 1,915,502,000 | 1,915,502,000 | |
| ID8081 ESTABLISHMENT DIVISION (PAK. PWD PUNJAB) | ||||
| 045702- A12 | Civil works | 94,503,000 |
Table of Content
Next
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A124 | Building and Structures | 94,503,000 | ||
| Total- | ESTABLISHMENT DIVISION (PAK. PWD PUNJAB) | 94,503,000 | ||
| ID8082 ESTAB | LISHMENT CHARGES CREDITED TO OTHER G | OVERNMENT DEPARTMENTS (PAK. PWD PUNJAB) | ||
| 045702- A03 | Operating Expenses | 60,500,000 | 60,500,000 | 304,716,000 |
| 045702- A039 | General | 60,500,000 | 60,500,000 | 304,716,000 |
| Total- | ESTABLISHMENT CHARGES CREDITED | 60,500,000 | 60,500,000 | 304,716,000 |
| TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB) | ||||
| ID8083 TOOLS | AND PLANTS CHARGES CREDITED TO OTHER | GOVERNMENT DEPARTMENTS (PAK | . PWD PUNJAB) | |
| 045702- A03 | Operating Expenses | 18,274,000 | 18,151,000 | 91,415,000 |
| 045702- A039 | General | 18,274,000 | 18,151,000 | 91,415,000 |
| Total- | TOOLS AND PLANTS CHARGES | 18,274,000 | 18,151,000 | 91,415,000 |
| CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB) | ||||
| ID8085 ESTAB PAKHTUNKH | LISHMENT CHARGES CREDITED TO OTHER G WA). | OVERNMENT DEPARTMENTS (PAK. PWD KHYBER | ||
| 045702- A03 | Operating Expenses | 19,189,000 | 48,191,000 | |
| 045702- A039 | General | 19,189,000 | 48,191,000 | |
| 045702- A12 | Civil works | 47,050,000 | ||
| 045702- A124 | Building and Structures | 47,050,000 | ||
| Total- ID8086 TOOLS KHYBER PAK | ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD KHYBER PAKHTUNKHWA). AND PLANTS CHARGES CREDITED TO OTHER HTUNKHWA). | 19,189,000 GOVERNMENT D | EPARTMENTS (PAK | 95,241,000 . P.W.D., |
| 045702- A03 | Operating Expenses | 5,757,000 | 14,457,000 | |
| 045702- A039 | General | 5,757,000 | 14,457,000 | |
| Total- | TOOLS AND PLANTS CHARGES | 5,757,000 | 14,457,000 | |
| CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. P.W.D., KHYBER PAKHTUNKHWA). | ||||
| ID8087 INTERIOR (PAK. PWD BALOCHISTAN) | ||||
| 045702- A12 | Civil works | 36,416,000 | 36,416,000 |
Table of Content
Next
| NO. 188.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A124 | Building and Structures | 36,416,000 | 36,416,000 | |
| Total- | INTERIOR (PAK PWD BALOCHISTAN) | 36416000 | 36416000 | |
| . ID8088 ESTABLISHMENT CHARGES CREDITED TO OTHER G BALOCHISTAN) | ,, OVERNMENT DEPA | ,, RTMENTS (PAK. PW | D | |
| 045702- A03 | Operating Expenses | 3,323,000 | 1,502,000 | 27,843,000 |
| 045702- A039 | General | 3,323,000 | 1,502,000 | 27,843,000 |
| 045702- A12 | Civil works | 1,821,000 | 8,252,000 | |
| 045702- A124 | Building and Structures | 1,821,000 | 8,252,000 | |
| Total- | ESTABLISHMENT CHARGES CREDITED | 3,323,000 | 3,323,000 | 36,095,000 |
| ID8089 TOOLS BALOCHISTA | TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD BALOCHISTAN) AND PLANTS CHARGES CREDITED TO OTHER N) | GOVERNMENT DEPARTMENTS (PAK | . PWD | |
| 045702- A03 | Operating Expenses | 873,000 | 450,000 | 8,353,000 |
| 045702- A039 | General | 873,000 | 450,000 | 8,353,000 |
| 045702- A12 | Civil works | 546,000 | 405,000 | |
| 045702- A124 | Building and Structures | 546,000 | 405,000 | |
| Total- | TOOLS AND PLANTS CHARGES | 873,000 | 996,000 | 8,758,000 |
| CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD BALOCHISTAN) | ||||
| ID8092 CIVIL | WORKS (PAK.PWD KHYBER PAKHTUNKHWA) | |||
| 045702- A12 | Civil works | 481,251,000 | ||
| 045702- A124 | Building and Structures | 481,251,000 | ||
| Total- | CIVIL WORKS (PAK.PWD KHYBER PAKHTUNKHWA) | 481,251,000 | ||
| ID8095 CIVIL | WORKS (PAK.PWD BALOCHISTAN) | |||
| 045702- A12 | Civil works | 330,031,000 | 330,031,000 | |
| 045702- A124 | Building and Structures | 330,031,000 | 330,031,000 | |
| Total- | CIVIL WORKS (PAK.PWD BALOCHISTAN) | 330,031,000 | 330,031,000 | |
| ID8106 CIVIL | WORKS | |||
| 045702- A12 | Civil works | 97,546,000 | 97,546,000 |
NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| 045702- A124 | Building and Structures | 97,546,000 | 97,546,000 | ||
|---|---|---|---|---|---|
| Total- | CIVIL | WORKS | 97,546,000 | 97,546,000 | |
| 045702 | Total- | Buildings and Structures | 3,069,506,000 | 3,069,506,000 | 9,036,390,000 |
| 0457 | Total- | Construction (Works) | 3,069,506,000 | 3,069,506,000 | 9,036,390,000 |
| 045 | Total- | Construction and Transport | 3,069,506,000 | 3,069,506,000 | 9,036,390,000 |
| 04 | Total- | Economic Affairs | 3,069,506,000 | 3,069,506,000 | 9,036,390,000 |
| Total- | ACCOUNTANT GENERAL | 3,069,506,000 | 3,069,506,000 | 9,036,390,000 | |
| PAKISTAN REVENUES | |||||
| TOTAL | - DEMAND | 3,069,506,000 | 3,069,506,000 | 9,036,390,000 |
NO. ---.OTHER EXPENDITURE OF HOUSING & WORKS DIV DEMANDS FOR GRANTS DEMAND NO. --( FC12Y03 )
OTHER EXPENDITURE OF HOUSING & WORKS DIV
I. ESTIMATES of the Amount required in the year ending 30 June , 2021 for OTHER EXPENDITURE OF HOUSING & WORKS DIV.
Voted Rs.
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF HOUSING AND WORKS .
| 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| FUNCTIONAL CLASSIFICATION | ||||
| 045 | Construction and Transport | 5,000,000,000 | ||
| Total | 5,000,000,000 | |||
| OBJECT CLASSIFICATION | ||||
| A08 | Loans and Advances | 5,000,000,000 | ||
| Total | 5,000,000,000 |
Previous 4436
| NO. ---.- FC12 | Y03 OTHER EXPENDITURE OF HOUSIN | G & WORKS DIV | DEMANDS FOR GRAN | |
|---|---|---|---|---|
| III. - DETAILS | are as follows :- | |||
| No of 2019-20 Po 202 | sts 0-21 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 04 Econ | omic Affairs: | |||
| 045 Const | ruction and Transport: | |||
| 0457 Const | ruction (Works): | |||
| 045702 Buildings and Structures : IB0748 LOW COST SCHEMES | ||||
| 045702- A08 | Loans and Advances | 5,000,000,000 | ||
| 045702- A085 | Loans to Non Financial Institutions | 5,000,000,000 | ||
| Total- | LOW COST SCHEMES | 5,000,000,000 | ||
| 045702 | Total- Buildings and Structures | 5,000,000,000 | ||
| 0457 | Total- Construction (Works) | 5,000,000,000 | ||
| 045 | Total- Construction and Transport | 5,000,000,000 | ||
| 04 | Total- Economic Affairs | 5,000,000,000 | ||
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 5,000,000,000 | |||
| TOTAL - DEMAND | 5,000,000,000 |
DEMANDS FOR GRANTS
SECTION VI
MINISTRY OF INDUSTRIES AND PRODUCTION
2020-2021 Budget Estimate (Rupees in Thousand)
Demands presented on behalf of the Ministry of Industries and Production
Development Expendiutre on Capital Account. 189. Capital Outlay on Industrial Development 800,000 Total : 800,000
NO. 189.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT DEMANDS FOR GRANTS DEMAND NO. 189 ( FC12C32 )
CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2021 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.
Voted Rs. 800,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF INDUSTRIES AND PRODUCTION .
| 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| FUNCTIONAL CLASSIFICATION | ||||
| 044 | Mining and Manufacturing | 2,343,293,000 | 726,206,000 | 800,000,000 |
| Total | 2,343,293,000 | 726,206,000 | 800,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 305,405,000 | 77,882,000 | 113,773,000 |
| A011 | Pay | 304,325,000 | 77,882,000 | 113,773,000 |
| A011-1 | Pay of Officers | (283,075,000) | (57,882,000) | (81,267,000) |
| A011-2 | Pay of Other Staff | (21,250,000) | (20,000,000) | (32,506,000) |
| A012 | Allowances | 1,080,000 | ||
| A012-1 | Regular Allowances | (1,080,000) | ||
| A03 | Operating Expenses | 282,470,000 | 70,740,000 | 112,975,000 |
| A05 | Grants, Subsidies and Write off Loans | 306,335,000 | 180,448,000 | 213,675,000 |
| A09 | Physical Assets | 894,753,000 | 121,242,000 | 214,980,000 |
| A12 | Civil works | 538,430,000 | 275,894,000 | 138,397,000 |
| A13 | Repairs and Maintenance | 15,900,000 | 6,200,000 | |
| Total | 2,343,293,000 | 726,206,000 | 800,000,000 |
| NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| 04 044 0441 044101 LO077 | Econo Mining Manufa Suppor 2 HYDER | mic Affairs: and Manufacturing: cturing: t for Industrial Developme ABAD ENGINEERING SUP | nt : PORT CE | NTRE (HE | SC) (ADB FUNDED) | ||
|---|---|---|---|---|---|---|---|
| 044101 | - A01 | Employees Related Expenses | 9,500,000 | 9,500,000 | 15,000,000 | ||
| 044101 | - A011 | Pay | 31 | 31 | 9,500,000 | 9,500,000 | 15,000,000 |
| 044101 | - A011-1 | Pay of Officers | (10) | (7) | (4,000,000) | (4,000,000) | (7,000,000) |
| 044101 | - A011-2 | Pay of Other Staff | (21) | (24) | (5,500,000) | (5,500,000) | (8,000,000) |
| 044101 | - A03 | Operating Expenses | 6,226,000 | 3,226,000 | 9,200,000 | ||
| 044101 | - A039 | General | 6,226,000 | 3,226,000 | 9,200,000 | ||
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 4,000,000 | ||||
| 044101 | - A052 | Grants Domestic | 4,000,000 | ||||
| 044101 | - A09 | Physical Assets | 4,830,000 | 30,000 | 9,600,000 | ||
| 044101 | - A095 | Purchase of Transport | 4,800,000 | 9,600,000 | |||
| 044101 | - A096 | Purchase of Plant and Machinery | 30,000 | 30,000 | |||
| 044101 | - A12 | Civil works | 2,200,000 | ||||
| 044101 | - A124 | Building and Structures | 2,200,000 | ||||
| Total- | HYDERABAD ENGINEERIN CENTRE (HESC) (ADB FUN | G SUPP DED) | ORT | 20,556,000 | 12,756,000 | 40,000,000 | |
| LO077 | 4 PESHAWAR LIGHT ENGINEERING SUPPORT CENTRE (PESC) (ADB FUN | DED) KHYBER PAKHTUNKHWA | |||||
| 044101 | - A01 | Employees Related Expenses | 13,500,000 | 10,700,000 | 14,000,000 | ||
| 044101 | - A011 | Pay | 31 | 31 | 13,500,000 | 10,700,000 | 14,000,000 |
| 044101 | - A011-1 | Pay of Officers | (10) | (10) | (6,000,000) | (3,200,000) | (6,000,000) |
| 044101 | - A011-2 | Pay of Other Staff | (21) | (21) | (7,500,000) | (7,500,000) | (8,000,000) |
| 044101 | - A03 | Operating Expenses | 15,238,000 | 3,138,000 | 8,200,000 | ||
| 044101 | - A039 | General | 15,238,000 | 3,138,000 | 8,200,000 | ||
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 1,000 | 1,000 | 4,500,000 | ||
| 044101 | - A052 | Grants Domestic | 1,000 | 1,000 | 4,500,000 | ||
| 044101 | - A09 | Physical Assets | 4,801,000 | 5,301,000 | 18,300,000 | ||
| 044101 | - A095 | Purchase of Transport | 4,800,000 | 3,300,000 | |||
| 044101 | - A096 | Purchase of Plant and Machinery | 1,000 | 5,301,000 | 15,000,000 | ||
| Total- | PESHAWAR LIGHT ENGINEERING | 33,540,000 | 19,140,000 | 45,000,000 |
| NO. 189.- FC12 | C32 CAPITAL OUTLAY ON | INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | ||
| Rs | Rs | Rs | |||
| LO1076 LIGHT | ACCOUNTANT GEN SUPPORT CENTRE (PESC FUNDED) KHYBER PAKHT ENGINEERING UPGRADA | ERAL PAKISTAN R ) (ADB UNKHWA TION CENTER FOR S | EVENUES SUB-OFFICE, LAHORE MES IN BALOCHISTAN (HUB) | ||
| 044101- A01 | Employees Related Expenses | 11,500,000 | 10,700,000 | 16,000,000 | |
| 044101- A011 | Pay | 39 39 | 11,500,000 | 10,700,000 | 16,000,000 |
| 044101- A011-1 | Pay of Officers | (9) (9) | (4,500,000) | (3,700,000) | (7,000,000) |
| 044101- A011-2 | Pay of Other Staff | (30) (30) | (7,000,000) | (7,000,000) | (9,000,000) |
| 044101- A03 | Operating Expenses | 8,865,000 | 2,465,000 | 10,400,000 | |
| 044101- A039 | General | 8,865,000 | 2,465,000 | 10,400,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 303,000 | 303,000 | 4,000,000 | |
| 044101- A052 | Grants Domestic | 303,000 | 303,000 | 4,000,000 | |
| 044101- A09 | Physical Assets | 2,400,000 | 9,600,000 | ||
| 044101- A095 | Purchase of Transport | 2,400,000 | 9,600,000 | ||
| Total- ( LO1175 NATIO | LIGHT ENGINEERING UPG CENTER FOR SMES IN BA HUB) NAL BUSSINESS DEVELO | RADATION LOCHISTAN PMENT PROGRAMM | 23,068,000 FOR SME'S | 13,468,000 | 40,000,000 |
| 044101- A01 | Employees Related Expenses | 44,915,000 | 34,045,000 | 40,296,000 | |
| 044101- A011 | Pay | 38 38 | 44,915,000 | 34,045,000 | 40,296,000 |
| 044101- A011-1 | Pay of Officers | (38) (31) | (44,915,000) | (34,045,000) | (38,081,000) |
| 044101- A011-2 | Pay of Other Staff | (7) | (2,215,000) | ||
| 044101- A03 | Operating Expenses | 33,740,000 | 9,006,000 | 6,265,000 | |
| 044101- A037 | Consultancy and Contractual Work | 24,000,000 | |||
| 044101- A039 | General | 9,740,000 | 9,006,000 | 6,265,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 145,122,000 | 80,891,000 | 80,000,000 | |
| 044101- A052 | Grants Domestic | 145,122,000 | 80,891,000 | 80,000,000 | |
| 044101- A09 | Physical Assets | 22,223,000 | 9,500,000 | 13,430,000 | |
| 044101- A092 | Computer Equipment | 3,500,000 | 3,500,000 | ||
| 044101- A095 | Purchase of Transport | 12,723,000 | 12,723,000 | ||
| 044101- A097 | Purchase of Furniture and | Fixture | 1,000,000 | 1,000,000 | 707,000 |
| 044101- A098 | Purchase of Other Assets | 5,000,000 | 5,000,000 | ||
| 044101- A12 | Civil works | 4,000,000 | 4,000,000 | 1,017,000 | |
| 044101- A124 | Building and Structures | 4,000,000 | 4,000,000 | 1,017,000 |
NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| APITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE |
| Total- | NATIONAL BUSSINESS DEVELOPM PROGRAMM FOR SME'S | ENT | 250,000,000 | 137,442,000 | 141,008,000 |
|---|---|---|---|---|---|
| LO1176 FRUIT | DEHYDRATION UNIT SWAT | ||||
| 044101- A01 | Employees Related Expenses | 10,487,000 | 5,232,000 | 6,367,000 | |
| 044101- A011 | Pay 16 | 16 | 10,487,000 | 5,232,000 | 6,367,000 |
| 044101- A011-1 | Pay of Officers (16) | (4) | (10,487,000) | (5,232,000) | (3,756,000) |
| 044101- A011-2 | Pay of Other Staff | (12) | (2,611,000) | ||
| 044101- A03 | Operating Expenses | 9,601,000 | 3,026,000 | 5,450,000 | |
| 044101- A032 | Communications | 110,000 | 48,000 | ||
| 044101- A033 | Utilities | 2,975,000 | 844,000 | 1,500,000 | |
| 044101- A037 | Consultancy and Contractual Work | 500,000 | 70,000 | ||
| 044101- A038 | Travel & Transportation | 1,750,000 | 448,000 | 820,000 | |
| 044101- A039 | General | 4,266,000 | 1,616,000 | 3,130,000 | |
| 044101- A09 | Physical Assets | 1,856,000 | 1,694,000 | 175,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 917,000 | 917,000 | ||
| 044101- A098 | Purchase of Other Assets | 939,000 | 777,000 | 175,000 | |
| 044101- A12 | Civil works | 3,950,000 | 3,950,000 | ||
| 044101- A124 | Building and Structures | 3,950,000 | 3,950,000 | ||
| Total- | FRUIT DEHYDRATION UNIT SWAT | 25,894,000 | 13,902,000 | 11,992,000 | |
| LO1180 PRODU | CT DEV.CENTRE FOR COMPOSITS | BASED | SPORTS GOOD SIALKOT | ||
| 044101- A01 | Employees Related Expenses | 1,800,000 | 1,800,000 | 2,800,000 | |
| 044101- A011 | Pay 7 | 11 | 1,800,000 | 1,800,000 | 2,800,000 |
| 044101- A011-1 | Pay of Officers (7) | (2) | (1,800,000) | (1,800,000) | (900,000) |
| 044101- A011-2 | Pay of Other Staff | (9) | (1,900,000) | ||
| 044101- A03 | Operating Expenses | 1,300,000 | 1,300,000 | 2,800,000 | |
| 044101- A037 | Consultancy and Contractual Work | 1,600,000 | |||
| 044101- A039 | General | 1,300,000 | 1,300,000 | 1,200,000 | |
| 044101- A09 | Physical Assets | 96,900,000 | 579,000 | 69,400,000 | |
| 044101- A092 | Computer Equipment | 250,000 | 250,000 | 110,000 | |
| 044101- A095 | Purchase of Transport | 2,700,000 | 2,700,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 93,950,000 | 329,000 | 66,490,000 | |
| 044101- A097 | Purchase of Furniture and Fixture | 90,000 | |||
| 044101- A098 | Purchase of Other Assets | 10,000 |
| NO. 189.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | ||
|---|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | ||
| ACCOUNTANT GENERAL PAKISTAN R | Rs EVENUES SUB-OFFIC | Rs E, LAHORE | Rs | ||
| 044101- A12 | Civil works | 70,000,000 | |||
| 044101- A124 | Building and Structures | 70,000,000 | |||
| Total- | PRODUCT DEV.CENTRE | FOR | 100,000,000 | 73,679,000 | 75,000,000 |
| COMPOSITS BASED SPO SIALKOT LO1182 BUSSINESS SKILL DEV. CENTR | RTS GOOD E FOR WOMEN AT V | ARIOUS LOCATION | |||
| 044101- A01 | Employees Related Expenses | 450,000 | 520,000 | ||
| 044101- A011 | Pay | 11 3 | 450,000 | 520,000 | |
| 044101- A011-1 | Pay of Officers | (11) (1) | (450,000) | (280,000) | |
| 044101- A011-2 | Pay of Other Staff | (2) | (240,000) | ||
| 044101- A03 | Operating Expenses | 550,000 | 100,000 | 2,300,000 | |
| 044101- A032 | Communications | 10,000 | |||
| 044101- A037 | Consultancy and Contractual Work | 1,000,000 | |||
| 044101- A038 | Travel & Transportation | 260,000 | 1,000,000 | ||
| 044101- A039 | General | 280,000 | 100,000 | 300,000 | |
| 044101- A09 | Physical Assets | 14,000,000 | 14,000,000 | ||
| 044101- A091 | Purchase of Building | 14,000,000 | 14,000,000 | ||
| 044101- A12 | Civil works | 3,180,000 | |||
| 044101- A124 | Building and Structures | 3,180,000 | |||
| Total- | BUSSINESS SKILL DEV. WOMEN AT VARIOUS LO | CENTRE FOR CATION | 15,000,000 | 100,000 | 20,000,000 |
| LO1280 INDUSTRIAL DESIGN AND AUTO | MATION CENRE | ||||
| 044101- A01 | Employees Related Expenses | 4,590,000 | 4,590,000 | 7,650,000 | |
| 044101- A011 | Pay | 2 4 | 4,590,000 | 4,590,000 | 7,650,000 |
| 044101- A011-1 | Pay of Officers | (2) (4) | (4,590,000) | (4,590,000) | (7,650,000) |
| 044101- A03 | Operating Expenses | 2,479,000 | 2,479,000 | 1,500,000 | |
| 044101- A039 | General | 2,479,000 | 2,479,000 | 1,500,000 | |
| 044101- A05 | Grants, Subsidies and | Write off Loans | 11,256,000 | 11,256,000 | 28,075,000 |
| 044101- A052 | Grants Domestic | 11,256,000 | 11,256,000 | 28,075,000 | |
| 044101- A09 | Physical Assets | 81,675,000 | 81,675,000 | 775,000 | |
| 044101- A091 | Purchase of Building | 81,675,000 | 81,675,000 | ||
| 044101- A092 | Computer Equipment | 625,000 | |||
| 044101- A097 | Purchase of Furniture and | Fixture | 150,000 |
| NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE |
| 044101- A12 044101- A124 | Civil works Building and Structures | 42,000,000 42,000,000 | |||
|---|---|---|---|---|---|
| Total- INDUSTRIAL DESIGN AND AUTOMATION CENRE | 100,000,000 | 100,000,000 | 80,000,000 | ||
| LO3121 SME BUSSINESS FACILITATION CENTRE (SMEBFC | ) MULTAN | ||||
| 044101- A01 | Employees Related Expenses | 4,919,000 | 115,000 | 5,000,000 | |
| 044101- A011 | Pay | 9 8 | 4,919,000 | 115,000 | 5,000,000 |
| 044101- A011-1 | Pay of Officers | (9) (8) | (4,919,000) | (115,000) | (5,000,000) |
| 044101- A03 | Operating Expenses | 7,518,000 | 1,000,000 | 4,300,000 | |
| 044101- A039 | General | 7,518,000 | 1,000,000 | 4,300,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 7,853,000 | 97,000 | 700,000 | |
| 044101- A052 | Grants Domestic | 7,853,000 | 97,000 | 700,000 | |
| 044101- A09 | Physical Assets | 7,200,000 | 2,777,000 | ||
| 044101- A092 | Computer Equipment | 1,800,000 | 858,000 | ||
| 044101- A097 | Purchase of Furniture and Fixture | 2,400,000 | 1,913,000 | ||
| 044101- A098 | Purchase of Other Assets | 3,000,000 | 6,000 | ||
| 044101- A12 | Civil works | 2,400,000 | 1,944,000 | ||
| 044101- A125 | Other Works | 2,400,000 | 1,944,000 | ||
| Total- | SME BUSSINESS FACILITATION | 29,890,000 | 5,933,000 | 10,000,000 | |
| CENTRE (SMEBFC) MULTAN | |||||
| LO9644 NATIO KNOWLEDGE | NAL STRATEGIC PROGRAM | FPR ACQUISTIO | N OF IND TECH-NSP | AIT INCLUDING FEASIBILITY- | |
| 044101- A01 | Employees Related Expenses | 169,268,000 | 3,300,000 | ||
| 044101- A011 | Pay | 81 81 | 169,268,000 | 3,300,000 | |
| 044101- A011-1 | Pay of Officers | (76) (81) | (168,018,000) | (3,300,000) | |
| 044101- A011-2 | Pay of Other Staff | (5) | (1,250,000) | ||
| 044101- A03 | Operating Expenses | 48,669,000 | 900,000 | ||
| 044101- A039 | General | 48,669,000 | 900,000 | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 118,746,000 | 84,970,000 | 92,000,000 | |
| 044101- A052 | Grants Domestic | 118,746,000 | 84,970,000 | 92,000,000 | |
| 044101- A09 | Physical Assets | 622,747,000 | 68,600,000 | ||
| 044101- A092 | Computer Equipment | 43,208,000 | 2,000,000 | ||
| 044101- A095 | Purchase of Transport | 16,200,000 | 2,500,000 |
| NO. 189.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| ACCOUNTANT GENERAL PAKISTAN R | Rs EVENUES SUB-OF | Rs FICE, LAHORE | Rs | |
| 044101- A096 | Purchase of Plant and Machinery | 551,758,000 | 62,800,000 | |
| 044101- A097 | Purchase of Furniture and Fixture | 9,781,000 | 1,300,000 | |
| 044101- A098 | Purchase of Other Assets | 1,800,000 | ||
| 044101- A13 | Repairs and Maintenance | 11,900,000 | 2,200,000 | |
| 044101- A133 | Buildings and Structure | 11,900,000 | 2,200,000 | |
| Total- | NATIONAL STRATEGIC PROGRAM FPR | 971,330,000 | 84,970,000 | 167,000,000 |
| ACQUISTION OF IND TECH-NSPAIT INCLUDING FEASIBILITY- KNOWLEDGE LO9645 FOOTWEAR CLUSTER DEV THROUGH CAD CAM AN | D CNC MACHINING | LAHORE | ||
| 044101- A01 | Employees Related Expenses | 1,800,000 | 1,200,000 | 2,840,000 |
| 044101- A011 | Pay 2 5 | 1,800,000 | 1,200,000 | 2,840,000 |
| 044101- A011-1 | Pay of Officers (2) (3) | (1,800,000) | (1,200,000) | (2,300,000) |
| 044101- A011-2 | Pay of Other Staff (2) | (540,000) | ||
| 044101- A03 | Operating Expenses | 1,584,000 | 1,000,000 | 1,660,000 |
| 044101- A039 | General | 1,584,000 | 1,000,000 | 1,660,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 2,930,000 | 2,930,000 | 400,000 |
| 044101- A052 | Grants Domestic | 2,930,000 | 2,930,000 | 400,000 |
| 044101- A09 | Physical Assets | 19,686,000 | 19,686,000 | 11,100,000 |
| 044101- A092 | Computer Equipment | 16,843,000 | 16,843,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 2,843,000 | 2,843,000 | 11,100,000 |
| 044101- A13 | Repairs and Maintenance | 4,000,000 | 4,000,000 | |
| 044101- A133 | Buildings and Structure | 4,000,000 | 4,000,000 | |
| Total- | FOOTWEAR CLUSTER DEV THROUGH | 30,000,000 | 24,816,000 | 20,000,000 |
| AD CAM AND CNC MACHINING | ||||
| LO9646 HANDI | LAHORE CRAFT DEV AND PROMOTION IN LESS DEVEL | OPED AREAS OF PAKISTAN | ||
| 044101- A01 | Employees Related Expenses | 3,264,000 | ||
| 044101- A011 | Pay 41 | 2,184,000 | ||
| 044101- A011-1 | Pay of Officers (41) | (2,184,000) | ||
| 044101- A012 | Allowances | 1,080,000 | ||
| 044101- A012-1 | Regular Allowances | (1,080,000) | ||
| 044101- A03 | Operating Expenses | 21,500,000 | ||
| 044101- A033 | Utilities | 1,000,000 |
NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| 044101- A034 044101- A038 | Occupancy Costs Travel & Transportation | 4,423,000 1,512,000 | ||
|---|---|---|---|---|
| 044101- A039 | General | 14,565,000 | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 5,236,000 | ||
| 044101- A052 | Grants Domestic | 5,236,000 | ||
| Total- LO9647 HAND | HANDICRAFT DEV AND PROMOTION IN LESS DEVELOPED AREAS OF PAKISTAN ICRAFT EXPORT DEVELOPMENT PROJECT | 30,000,000 ALL OVER PAKISTAN | ||
| 044101- A01 | Employees Related Expenses | 29,412,000 | ||
| 044101- A011 | Pay 48 | 29,412,000 | ||
| 044101- A011- | 1 Pay of Officers (48) | (29,412,000) | ||
| 044101- A03 | Operating Expenses | 24,400,000 | ||
| 044101- A032 | Communications | 540,000 | ||
| 044101- A033 | Utilities | 2,700,000 | ||
| 044101- A034 | Occupancy Costs | 7,500,000 | ||
| 044101- A037 | Consultancy and Contractual Work | 1,500,000 | ||
| 044101- A038 | Travel & Transportation | 848,000 | ||
| 044101- A039 | General | 11,312,000 | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 4,888,000 | ||
| 044101- A052 | Grants Domestic | 4,888,000 | ||
| 044101- A09 | Physical Assets | 1,300,000 | ||
| 044101- A097 | Purchase of Furniture and Fixture | 1,300,000 | ||
| Total- | HANDICRAFT EXPORT DEVELOPMENT PROJECT ALL OVER PAKISTAN | 60,000,000 | ||
| 044101 | Total- Support for Industrial Development | 1,689,278,000 | 486,206,000 | 650,000,000 |
| 0441 | Total- Manufacturing | 1,689,278,000 | 486,206,000 | 650,000,000 |
| 044 | Total- Mining and Manufacturing | 1,689,278,000 | 486,206,000 | 650,000,000 |
| 04 | Total- Economic Affairs | 1,689,278,000 | 486,206,000 | 650,000,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | 1,689,278,000 | 486,206,000 | 650,000,000 |
Previous Next 4446
| NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 04 Econo 044 Mining | mic Affairs: and Manufacturing: | |||
|---|---|---|---|---|
| 0441 Manuf | acturing: | |||
| 044101 Support for Industrial Development : LS0109 ESTABLISHMENT OF HUB SPECIAL ECONOMIC Z | ONE LASBELA | |||
| 044101- A03 | Operating Expenses | 10,800,000 | 4,000,000 | 10,000,000 |
| 044101- A032 | Communications | 100,000 | 100,000 | |
| 044101- A037 | Consultancy and Contractual Work | 8,500,000 | 2,500,000 | 7,500,000 |
| 044101- A038 | Travel & Transportation | 1,000,000 | 300,000 | 1,200,000 |
| 044101- A039 | General | 1,200,000 | 1,200,000 | 1,200,000 |
| 044101- A09 | Physical Assets | 15,135,000 | ||
| 044101- A091 | Purchase of Building | 10,000,000 | ||
| 044101- A095 | Purchase of Transport | 5,135,000 | ||
| 044101- A12 | Civil works | 374,065,000 | 196,000,000 | 90,000,000 |
| 044101- A121 | Roads Highways and Bridges | 100,636,000 | 100,636,000 | 60,000,000 |
| 044101- A123 | Embankment and Drainage Works | 100,000,000 | 50,000,000 | 10,000,000 |
| 044101- A124 | Building and Structures | 11,606,000 | 5,000,000 | 20,000,000 |
| 044101- A125 | Other Works | 161,823,000 | 40,364,000 | |
| Total- | ESTABLISHMENT OF HUB SPECIAL | 400,000,000 | 200,000,000 | 100,000,000 |
| ECONOMIC ZONE LASBELA | ||||
| QA0419 PROVISION OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING | ESTATE (PHASE-I | V) | ||
| 044101- A12 | Civil works | 18,255,000 | ||
| 044101- A121 | Roads Highways and Bridges | 1,687,000 | ||
| 044101- A125 | Other Works | 16,568,000 | ||
| Total- QA0420 ESTA | PROVISION OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING ESTATE (PHASE-IV) BLISHMENT OF INFRASTRUCTURE IN QUET | 18,255,000 TA INDUSTRIAL & TR | ADING ESTATE (PHASE-II) | |
| 044101- A12 | Civil works | 24,889,000 | ||
| 044101- A121 | Roads Highways and Bridges | 12,819,000 | ||
| 044101- A125 | Other Works | 12,070,000 | ||
| Total- | ESTABLISHMENT OF INFRASTRUCTURE IN QUETTA | 24,889,000 |
Previous Next 4447
Table of Content
| NO. 189.- FC1 | 2C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| QA0536 ESTA | ACCOUNTANT GENERAL PAKISTAN INDUSTRIAL & TRADING ESTATE (PHASE-II) BLISHMENT OF BOSTAN INDUSTRIAL ESTAT | REVENUES SUB-OF E PHASE-I | FICE, QUETTA | |
| 044101- A12 | Civil works | 110,871,000 | ||
| 044101- A125 | Other Works | 110,871,000 | ||
| Total- QA9175 FEAS | ESTABLISHMENT OF BOSTAN INDUSTRIAL ESTATE PHASE-I IBILITY FOR ESTABLISHMENT OF METAL PAR | 110,871,000 K IN CHAGAI | ||
| 044101- A03 | Operating Expenses | 90,000,000 | 40,000,000 | 50,000,000 |
| 044101- A037 | Consultancy and Contractual Work | 90,000,000 | 40,000,000 | 40,000,000 |
| 044101- A038 | Travel & Transportation | 4,000,000 | ||
| 044101- A039 | General | 6,000,000 | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 10,000,000 | ||
| 044101- A052 | Grants Domestic | 10,000,000 | ||
| Total- | FEASIBILITY FOR ESTABLISHMENT OF METAL PARK IN CHAGAI | 100,000,000 | 40,000,000 | 50,000,000 |
| 044101 | Total- Support for Industrial Development | 654,015,000 | 240,000,000 | 150,000,000 |
| 0441 | Total- Manufacturing | 654,015,000 | 240,000,000 | 150,000,000 |
| 044 | Total- Mining and Manufacturing | 654,015,000 | 240,000,000 | 150,000,000 |
| 04 | Total- Economic Affairs | 654,015,000 | 240,000,000 | 150,000,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 654,015,000 | 240,000,000 | 150,000,000 | |
| TOTAL - DEMAND | 2,343,293,000 | 726,206,000 | 800,000,000 |
SECTION VII
CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
2020-2021 Budget Estimate (Rupees in Thousand)
Demand presented on behalf of the Capital Outlay on Maritime Affairs Division
Development Expenditure on Capital Account.
| 190. | Capital Outlay on Maritime Affairs Division | Total : | 2,683,314 2,683,314 |
|---|
NO. 190.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION DEMANDS FOR GRANTS DEMAND NO. 190 ( FC12C51 )
CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION
I. ESTIMATES of the Amount required in the year ending 30 June , 2021 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION.
Voted Rs. 2,683,314,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF MARITIME AFFAIRS .
| FUNCTIONAL CLASSIFICATION | 2019-2020 Budget Estimate Rs | 2019-2020 Revised Estimate Rs | 2020-2021 Budget Estimate Rs | |
|---|---|---|---|---|
| 019 | General Public Service Not Elsewhere Defined | 79,514,000 | ||
| 045 | Construction and Transport | 64,848,000 | 17,141,000 | 1,187,990,000 |
| 046 | Communications | 3,535,395,000 | 4,306,459,000 | 1,415,810,000 |
| Total | 3,600,243,000 | 4,323,600,000 | 2,683,314,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 12,872,000 | 12,113,000 | 4,166,000 |
| A011 | Pay | 12,872,000 | 12,113,000 | 3,566,000 |
| A011-1 | Pay of Officers | (5,372,000) | (4,613,000) | (1,870,000) |
| A011-2 | Pay of Other Staff | (7,500,000) | (7,500,000) | (1,696,000) |
| A012 | Allowances | 600,000 | ||
| A012-1 | Regular Allowances | (600,000) | ||
| A02 | Project Pre-Investment Analysis | 27,156,000 | 27,156,000 | 233,779,000 |
| A03 | Operating Expenses | 24,857,000 | 6,300,000 | 4,301,000 |
| A06 | Transfers | 1,000 | 1,000 | |
| A09 | Physical Assets | 45,194,000 | 16,802,000 | 514,326,000 |
| A12 | Civil works | 3,489,329,000 | 4,260,393,000 | 1,746,627,000 |
| A13 | Repairs and Maintenance | 834,000 | 835,000 | 180,115,000 |
| Total | 3,600,243,000 | 4,323,600,000 | 2,683,314,000 | |
| (In Foreign Exchange) (Own Resources) | (2,550,000,000) | (7,272,040,000) | (1,050,000,000) | |
| (Foreign Aid) | (2,550,000,000) | (7,272,040,000) | (1,050,000,000) | |
| (In Local Currency) | (1,050,243,000) | (2,948,440,000-) | (1,633,314,000) |
NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No o 2019-20 | f Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | ||
|---|---|---|---|---|---|---|
| ACCOUNTANT G | ENERAL P | Rs AKISTAN REVENUES | Rs | Rs | ||
| 04 | Economic Affairs: | |||||
| 045 | Construction and Transport: | |||||
| 0453 045301 IB0715 | Water PORT DEV. O | Transport: AND SHIPPPING : F IT INFR. FOR IMP. OF E OFFICE M/ | O MARITIM | E AFFAIRS | ||
| 045301 | - A01 | Employees Related Expenses | 11,000,000 | 6,911,000 | 2,166,000 | |
| 045301 | - A011 | Pay 6 | 4 | 11,000,000 | 6,911,000 | 1,566,000 |
| 045301 | - A011- | 1 Pay of Officers (2) | (3) | (5,000,000) | (911,000) | (1,470,000) |
| 045301 | - A011- | 2 Pay of Other Staff (4) | (1) | (6,000,000) | (6,000,000) | (96,000) |
| 045301 | - A012 | Allowances | 600,000 | |||
| 045301 | - A012- | 1 Regular Allowances | (600,000) | |||
| 045301 | - A03 | Operating Expenses | 500,000 | 500,000 | ||
| 045301 | - A039 | General | 500,000 | 500,000 | ||
| 045301 | - A09 | Physical Assets | 9,730,000 | 9,730,000 | 1,924,000 | |
| 045301 | - A092 | Computer Equipment | 9,080,000 | 9,080,000 | 924,000 | |
| 045301 | - A096 | Purchase of Plant and Machinery | 500,000 | 500,000 | 500,000 | |
| 045301 | - A097 | Purchase of Furniture and Fixture | 150,000 | 150,000 | 500,000 | |
| Total- | DEV. OF IT INFR. FOR IMP. OF E OF M/O MARITIME AFFAIRS | FICE | 21,230,000 | 17,141,000 | 4,090,000 | |
| 0 | 45301 | Total- PORT AND SHIPPPING | 21,230,000 | 17,141,000 | 4,090,000 | |
| 0 | 453 | Total- Water Transport | 21,230,000 | 17,141,000 | 4,090,000 | |
| 0 | 45 | Total- Construction and Transport | 21,230,000 | 17,141,000 | 4,090,000 | |
| 0 | 4 | Total- Economic Affairs | 21,230,000 | 17,141,000 | 4,090,000 | |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 21,230,000 | 17,141,000 | 4,090,000 |
| NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS | DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 019 | General Public Service: General Public Service Not Elsewhere Defined: | |||
|---|---|---|---|---|
| 0191 | Gen Public Service Not Elsewhere Defined: | |||
| 019101 | ADMINISTRATIVE TRAINING : | |||
| KA710 | 6 PAKISTAN MARINE ACADEMY KARACHI | |||
| 019101 | - A13 | Repairs and Maintenance | 79,514,000 | |
| 019101 | - A133 | Buildings and Structure | 56,698,000 | |
| 019101 | - A139 | Telecommunication Works | 22,816,000 | |
| Total- | PAKISTAN MARINE ACADEMY KARACHI | 79,514,000 | ||
| 0 | 19101 | Total- ADMINISTRATIVE TRAINING | 79,514,000 | |
| 0 | 191 | Total- Gen Public Service Not Elsewhere Defined | 79,514,000 | |
| 0 | 19 | Total- General Public Service Not Elsewhere Defined | 79,514,000 | |
| 0 | 1 | Total- General Public Service | 79,514,000 | |
| 04 | Economic Affairs: | |||
| 045 | Construction and Transport: | |||
| 0453 | Water | Transport: | ||
| 045301 KA131 CARD | PORT 4 ENHA PRINTE | AND SHIPPPING : NCEMENT OF SEAFARER REPORTING MODU R | LE & INSTALLATION ON NEW COM | PUTER HARD/IC |
| 045301 | - A03 | Operating Expenses | 18,556,000 | |
| 045301 | - A039 | General | 18,556,000 | |
| Total- | ENHANCEMENT OF SEAFARER | 18,556,000 | ||
| KA708 | 3 MODI | REPORTING MODULE & INSTALLATION ON NEW COMPUTER HARD/IC CARD PRINTER FICATION OF AUCTION HALL KORANGI FISH | ERIES HARBOUR KARACHI | |
| 045301 | - A12 | Civil works | 94,500,000 | |
| 045301 | - A124 | Building and Structures | 94,500,000 | |
| Total- | MODIFICATION OF AUCTION HALL KORANGI FISHERIES HARBOUR KARACHI | 94,500,000 |
KA7084 ESTABLISHMENT OF COLD STORAGE AND FREEZING TUNNELS AT KORANGI FISHERIES HARBOUR
NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION
| MARITIME AFFAIRS | DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| KARACHI 045301- A12 | Civil works | 40,000,000 | |
|---|---|---|---|
| 045301- A124 | Building and Structures | 40,000,000 | |
| Total- KA7085 ESTA | ESTABLISHMENT OF COLD STORAGE AND FREEZING TUNNELS AT KORANGI FISHERIES HARBOUR KARACHI BLISHMENT OF BUSINESS PARK AT KORAN | GI FISHERIES HARBOUR KARACHI | 40,000,000 |
| 045301- A12 | Civil works | 100,000,000 | |
| 045301- A124 | Building and Structures | 100,000,000 | |
| Total- | ESTABLISHMENT OF BUSINESS PARK | 100,000,000 | |
| KA9623 PROV | AT KORANGI FISHERIES HARBOUR KARACHI IDING AND INSTALLATION OF SECURITY AN | D STREET LIGHTS IN PREMISES | |
| 045301- A09 | Physical Assets | 25,062,000 | |
| 045301- A092 | Computer Equipment | 2,207,000 | |
| 045301- A096 | Purchase of Plant and Machinery | 2,101,000 | |
| 045301- A097 | Purchase of Furniture and Fixture | 20,754,000 | |
| Total- | PROVIDING AND INSTALLATION OF SECURITY AND STREET LIGHTS IN PREMISES | 25,062,000 | |
| 045301 | Total- PORT AND SHIPPPING | 43,618,000 | 234,500,000 |
| 0453 | Total- Water Transport | 43,618,000 | 234,500,000 |
| 045 | Total- Construction and Transport | 43,618,000 | 234,500,000 |
| 04 | Total- Economic Affairs | 43,618,000 | 234,500,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 43,618,000 | 314,014,000 |
| NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS | DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 04 Econo 045 Const | mic Affairs: ruction and Transport: | |
|---|---|---|
| 0453 Water | Transport: | |
| 045301 PORT GR9010 FEAS TERMINALS | AND SHIPPPING : IBILITY STUDY OF CAPITAL DREDGING OF BERTHING AREAS & CHANNEL FOR AD | DITIONAL |
| 045301- A02 | Project Pre-Investment Analysis | 148,000,000 |
| 045301- A021 | Feasibility Studies | 148,000,000 |
| Total- | FEASIBILITY STUDY OF CAPITAL DREDGING OF BERTHING AREAS & CHANNEL FOR ADDITIONAL TERMINALS | 148,000,000 |
| GR9011 EQUIPMENT FOR SAFETY OF NAVIGATION | ||
| 045301- A09 | Physical Assets | 14,000,000 |
| 045301- A094 | Other Stores and Stocks | 14,000,000 |
| Total- | EQUIPMENT FOR SAFETY OF NAVIGATION | 14,000,000 |
| GR9012 SUPPLY INSTALLATION & COMMISSIONING OF FLOATING JETTY AT GWADAR PORT | ||
| 045301- A09 | Physical Assets | 56,650,000 |
| 045301- A098 | Purchase of Other Assets | 56,650,000 |
| Total- | SUPPLY INSTALLATION & | 56,650,000 |
| GR9013 ACQU | COMMISSIONING OF FLOATING JETTY AT GWADAR PORT ISITION OF MOBILE CRANES & FORK LIFTERS FOR GAWADAR PORT | |
| 045301- A09 | Physical Assets | 111,450,000 |
| 045301- A096 | Purchase of Plant and Machinery | 111,450,000 |
| Total- | ACQUISITION OF MOBILE CRANES & FORK LIFTERS FOR GAWADAR PORT | 111,450,000 |
| GR9014 UPGRADATION OF BERTHING FACILITIES FOR BOATS AT GWADAR MINI PORT | ||
| 045301- A13 | Repairs and Maintenance | 100,000,000 |
| 045301- A133 | Buildings and Structure | 100,000,000 |
| Total- | UPGRADATION OF BERTHING FACILITIES FOR BOATS AT GWADAR MINI PORT | 100,000,000 |
Next
NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION
| PITAL OUTLAY ON MARITIME AFFAIRS | DIVIS ION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA |
| GR9015 ACQUISITION OF MARINE SERVICES VESSEL FOR GWADAR PORT | ||
|---|---|---|
| 045301- A09 | Physical Assets | 319,300,000 |
| 045301- A096 | Purchase of Plant and Machinery | 319,300,000 |
| Total- | ACQUISITION OF MARINE SERVICES VESSEL FOR GWADAR PORT | 319,300,000 |
| GR9018 CONS GWADAR | TRUCTION OF GROYNE WALL/BREAK WATER & ALLIED WORKS AT EAST | BAY (DEMI ZER) |
| 045301- A12 | Civil works | 200,000,000 |
| 045301- A125 | Other Works | 200,000,000 |
| Total- | CONSTRUCTION OF GROYNE | 200,000,000 |
| WALL/BREAK WATER & ALLIED WORKS AT EAST BAY (DEMI ZER) GWADAR | ||
| 045301 | Total- PORT AND SHIPPPING | 949,400,000 |
| 0453 | Total- Water Transport | 949,400,000 |
| 045 | Total- Construction and Transport | 949,400,000 |
046 Communications:
| 0461 Communications: |
|---|
046101 ADMINISTRATION :
GR2015 CONSTRUCTION OF EAST BAY EXPRESSWAY TO LINK GWADAR PORT WITH NATIONAL ROAD NETWORK GWADAR.
| 046101- A12 | Civil works | 2,400,000,000 | 3,834,540,000 | 1,000,000,000 |
|---|---|---|---|---|
| 046101- A121 | Roads Highways and Bridges | 2,400,000,000 | 3,834,540,000 | 1,000,000,000 |
| Total- | CONSTRUCTION OF EAST BAY EXPRESSWAY TO LINK GWADAR PORT WITH NATIONAL ROAD NETWORK GWADAR. | 2,400,000,000 | 3,834,540,000 | 1,000,000,000 |
| (In Foreign Exchange) | (2,200,000,000) | (3,772,040,000) | (800,000,000) | |
| (Foreign Aid) | (2,200,000,000) | (3,772,040,000) | (800,000,000) | |
| (In Local Currency) | (200,000,000) | (62,500,000) | (200,000,000) | |
| GR2016 UP G | RADATION OF GPA HOUSING COMPLEX | _________________ | _______________ | |
| 046101- A12 | Civil works | 91,638,000 | ||
| 046101- A124 | Building and Structures | 91,638,000 | ||
| Total- | UP GRADATION OF GPA HOUSING COMPLEX | 91,638,000 |
| NO. 190.- FC12 | C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| GR2018 FEASI | ACCOUNTANT GENERAL PAKISTAN R BILITY STUDY FOR CONSTRUCTION OF BR EA | EVENUES SUB-O K WATERS | FFICE, QUETTA | |
| 046101- A02 | Project Pre-Investment Analysis | 27,156,000 | 27,156,000 | 85,779,000 |
| 046101- A021 | Feasibility Studies | 27,156,000 | 27,156,000 | 85,779,000 |
| Total- | FEASIBILITY STUDY FOR | 27,156,000 | 27,156,000 | 85,779,000 |
| CONSTRUCTION OF BR EAK WATERS | ||||
| GR2020 PAK-CHINA TECHNICAL & VOCATIONAL INSTITUTE | AT GWADAR | |||
| 046101- A12 | Civil works | 425,583,000 | 425,853,000 | 312,127,000 |
| 046101- A124 | Building and Structures | 425,583,000 | 425,853,000 | 312,127,000 |
| Total- | PAK-CHINA TECHNICAL & VOCATIONAL INSTITUTE AT GWADAR | 425,583,000 | 425,853,000 | 312,127,000 |
| (In Foreign Exchange) | (350,000,000) | (3,500,000,000) | (250,000,000) | |
| (Foreign Aid) | (350,000,000) | (3,500,000,000) | (250,000,000) | |
| (In Local Currency) | (75,583,000) | (3,074,147,000-) | (62,127,000) | |
| GR2021 ESTAB | __ LISHMENT OF CPEC SUPPORT UNIT(CSU) FO | _______________ R PROJECTS AN | ____________________ D ACTIVITES IN GPA | _____________ |
| 046101- A01 | Employees Related Expenses | 1,872,000 | 5,202,000 | 2,000,000 |
| 046101- A011 | Pay 7 10 | 1,872,000 | 5,202,000 | 2,000,000 |
| 046101- A011-1 | Pay of Officers (3) | (372,000) | (3,702,000) | (400,000) |
| 046101- A011-2 | Pay of Other Staff (7) (7) | (1,500,000) | (1,500,000) | (1,600,000) |
| 046101- A03 | Operating Expenses | 5,801,000 | 5,800,000 | 4,301,000 |
| 046101- A036 | Motor Vehicles | 2,000,000 | 2,000,000 | 1,000,000 |
| 046101- A038 | Travel & Transportation | 2,001,000 | 2,000,000 | 1,300,000 |
| 046101- A039 | General | 1,800,000 | 1,800,000 | 2,001,000 |
| 046101- A06 | Transfers | 1,000 | 1,000 | |
| 046101- A063 | Entertainment & Gifts | 1,000 | 1,000 | |
| 046101- A09 | Physical Assets | 10,402,000 | 7,072,000 | 11,002,000 |
| 046101- A092 | Computer Equipment | 400,000 | 400,000 | 1,000 |
| 046101- A095 | Purchase of Transport | 10,000,000 | 6,670,000 | 11,000,000 |
| 046101- A096 | Purchase of Plant and Machinery | 1,000 | 1,000 | |
| 046101- A097 | Purchase of Furniture and Fixture | 1,000 | 1,000 | 1,000 |
| 046101- A13 | Repairs and Maintenance | 834,000 | 835,000 | 601,000 |
| 046101- A130 | Transport | 831,000 | 831,000 | 600,000 |
| 046101- A131 | Machinery and Equipment | 2,000 | 2,000 | |
| 046101- A137 | Computer Equipment | 1,000 | 2,000 | 1,000 |
Table of Content
| NO. 190.- FC1 | 2C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION No of 2019-20 Posts 2020-21 2019-2020 Budget Estimate | DEMAN 2019-2020 Revised Estimate | DS FOR GRANTS 2020-2021 Budget Estimate |
|---|---|---|---|
| Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-O | Rs FFICE, QUETTA | Rs | |
| Total- | ESTABLISHMENT OF CPEC SUPPORT 18,910,000 | 18,910,000 | 17,904,000 |
| GR2024 BUSS | UNIT(CSU) FOR PROJECTS AND ACTIVITES IN GPA INESS COMPLEX R.O PLANT(0.2M/G/D Capicity) | ||
| 046101- A12 | Civil works 279,808,000 | ||
| 046101- A124 | Building and Structures 279,808,000 | ||
| Total- | BUSSINESS COMPLEX R.O PLANT(0.2M/G/D Capicity) 279,808,000 | ||
| GR2026 DEVELOPMENT & CONSTRUCTION OF PORT ALLIED STRUCTURES IN MULLAH BAND AREA | |||
| 046101- A12 | Civil works 292,300,000 | ||
| 046101- A124 | Building and Structures 292,300,000 | ||
| Total- | DEVELOPMENT & CONSTRUCTION OF PORT ALLIED STRUCTURES IN MULLAH BAND AREA 292,300,000 | ||
| 046101 | Total- ADMINISTRATION 3,535,395,000 | 4,306,459,000 | 1,415,810,000 |
| 0461 | Total- Communications 3,535,395,000 | 4,306,459,000 | 1,415,810,000 |
| 046 | Total- Communications 3,535,395,000 | 4,306,459,000 | 1,415,810,000 |
| 04 | Total- Economic Affairs 3,535,395,000 | 4,306,459,000 | 2,365,210,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 3,535,395,000 | 4,306,459,000 | 2,365,210,000 | |
| (In Foreign Exchange) (2,550,000,000) (Own Resources) | (7,272,040,000) | (1,050,000,000) | |
| (Foreign Aid) (2,550,000,000) | (7,272,040,000) | (1,050,000,000) | |
| (In Local Currency) (985,395,000) | (2,965,581,000-) | (1,315,210,000) | |
| TOTAL - DEMAND 3,600,243,000 | 4,323,600,000 | 2,683,314,000 | |
| (In Foreign Exchange) (2,550,000,000) | (7,272,040,000) | (1,050,000,000) | |
| (Own Resources) | |||
| (Foreign Aid) (2,550,000,000) | (7,272,040,000) | (1,050,000,000) | |
| (In Local Currency) (1,050,243,000) _________________ | (2,948,440,000-) __________________ | (1,633,314,000) _______________ |
Table of Content
SECTION VIII
MINISTRY OF RAILWAYS
2020-2021 Budget Estimate (Rupees in Thousand)
Demand presented on behalf of the Ministry of Railways
Development Expenditure on Capital Account. 191. Capital Outlay on Pakistan Railways 24,000,000 Total : 24,000,000
NO. 191.- CAPITAL OUTLAY ON PAKISTAN RAILWAYS DEMANDS FOR GRANTS DEMAND NO. 191 ( FC12C33 )
CAPITAL OUTLAY ON PAKISTAN RAILWAYS
I. ESTIMATES of the Amount required in the year ending 30 June , 2021 for CAPITAL OUTLAY ON PAKISTAN RAILWAYS.
Voted
Rs. 24,000,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF RAILWAYS .
| 2019-2020 Budget Estimate Rs | 2019-2020 Revised Estimate Rs | 2020-2021 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 13,500,000,000 | 9,016,128,000 | 23,500,000,000 |
| 045 | Construction and Transport | 2,500,000,000 | 500,000,000 | |
| Total | 16,000,000,000 | 9,016,128,000 | 24,000,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 2,500,000,000 | 500,000,000 | |
| A11 | Investments | 13,500,000,000 | 9,016,128,000 | 23,500,000,000 |
| Total | 16,000,000,000 | 9,016,128,000 | 24,000,000,000 | |
| (In Foreign Exchange) | (7,850,000,000) | (1,862,709,000) | (7,825,000,000) | |
| (Own Resources) | (5,350,000,000) | (1,862,709,000) | (7,325,000,000) | |
| (Foreign Aid) | (2,500,000,000) | (500,000,000) | ||
| (In Local Currency) | (8,150,000,000) __________________ | (7,153,419,000) _________________ | (16,175,000,000) _______________ |
The above estimates do not include recoveries shown below which are adjusted in the accounts in reduction of Expenditure:
045 Construction and Transport -2,500,000,000 __________________________________________________ Total - Recoveries -2,500,000,000 __________________________________________________
NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS DEMANDS FOR GRANTS No of Posts 2019-2020 2019-2020 2020-2021 2019-20 2020-21 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 014 | General Public Service: Transfers: | |||
|---|---|---|---|---|
| 0143 | Investments: | |||
| 014302 | Non-Financial Institutions : | |||
| KA221 | 6 PAKISTAN RAILWAYS, (LOCAL CURRENCY) | |||
| 014302 | - A11 | Investments 13,500,000,000 | 9,016,128,000 | |
| 014302 | - A111 | Investment Local 13,500,000,000 | 9,016,128,000 | |
| Total- | PAKISTAN RAILWAYS, (LOCAL CURRENCY) 13,500,000,000 | 9,016,128,000 | ||
| (In Foreign Exchange) (5,350,000,000) | (1,862,709,000) | |||
| (Own Resources) (5,350,000,000) | (1,862,709,000) | |||
| (In Local Currency) (8,150,000,000) | (7,153,419,000) | |||
| KA710 OPERA | 8 ACQU TIONA | _________________ ISITION OF LAND FOR RAILWAY CORRIDOR FROM SEA PORT K L | __________________ M:525 TO KM:9:00 A | _______________ ND RAILWAY |
| 014302 | - A11 | Investments | 2,500,000,000 | |
| 014302 | - A111 | Investment Local | 2,500,000,000 | |
| Total- | ACQUISITION OF LAND FOR RAILWAY CORRIDOR FROM SEA PORT KM:525 TO KM:9:00 AND RAILWAY OPERATIONAL | 2,500,000,000 | ||
| KA710 | 9 CHINA | -PAKISTAN ECONOMIC CORRIDOR SUPPORT PROJECT (CPEC | SP) AT MINISTRY OF RAILWAYS | |
| 014302 | - A11 | Investments | 50,000,000 | |
| 014302 | - A111 | Investment Local | 50,000,000 | |
| Total- | CHINA-PAKISTAN ECONOMIC | 50,000,000 | ||
| CORRIDOR SUPPORT PROJECT | ||||
| (CPECSP) AT MINISTRY OF RAILWAYS | ||||
| KA711 | 0 CONSTRUCTION OF STAFF QUARTERS (REVISED) | |||
| 014302 | - A11 | Investments | 5,000,000 | |
| 014302 | - A111 | Investment Local | 5,000,000 | |
| Total- | CONSTRUCTION OF STAFF QUARTERS (REVISED) | 5,000,000 | ||
| KA711 ESTAB | 1 PRELI LISHME | MINARY DESIGN / DRAWINGS FOR UPGRADATION/REHABILITA NT OF | TION OF MAIN LINE | (ML-1) AND |
| 014302 | - A11 | Investments | 1,500,000,000 | |
| 014302 | - A111 | Investment Local | 1,500,000,000 |
Table of Content
Next
| NO. 191.- FC1 | 2C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMANDS FOR GRANTS | |
|---|---|---|---|
| No of 2019-20 Posts 2020-21 ACCOUNTANT GENERAL PAKISTAN RE | 2019-2020 Budget Estimate Rs VENUES SUB-OFF | 2019-2020 Revised Estimate Rs 2020-2021 Budget Estimate Rs ICE, KARACHI | |
| Total- | PRELIMINARY DESIGN / DRAWINGS | 1,500,000,000 | |
| KA7112 PROC LOCOMOTIVE | FOR UPGRADATION/REHABILITATION OF MAIN LINE (ML-1) AND ESTABLISHMENT OF UREMENT OF 75 NOS(55 NOS 4000-4500HP & 20 S (DELS) | NOS 2000-2500 H | P) DIESEL ELECTRIC |
| 014302- A11 | Investments | 700,000,000 | |
| 014302- A111 | Investment Local | 700,000,000 | |
| Total- KA7113 PROC | PROCUREMENT OF 75 NOS(55 NOS 4000-4500HP & 20 NOS 2000-2500 HP) DIESEL ELECTRIC LOCOMOTIVES (DELS) UREMENT OF EQUIPMENT FOR IMPROVED SEC | URITY AND ANTI-T | 700,000,000 ERRORSIM MEASURES |
| 014302- A11 | Investments | 100,000,000 | |
| 014302- A111 | Investment Local | 100,000,000 | |
| Total- | PROCUREMENT OF EQUIPMENT FOR IMPROVED SECURITY AND ANTI-TERRORSIM MEASURES | 100,000,000 | |
| KA7114 PROC COACHES | URMENT/MANUFACTURE OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER | ||
| 014302- A11 | Investments | 3,250,000,000 | |
| 014302- A111 | Investment Local | 3,250,000,000 | |
| Total- | PROCURMENT/MANUFACTURE OF 820 | 3,250,000,000 | |
| HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER COACHES | |||
| (In Foreign Exchange) | (2,275,000,000) | ||
| (Own Resources) | (2,275,000,000) | ||
| (In Local Currency) | (975,000,000) | ||
| KA7115 PROJ | ___ ECT MANAGEMENT UNIT (PMU) IN MINISTRY OF | ________________ RAILWAYS (2ND | _______________________________ REVISED) |
| 014302- A11 | Investments | 100,000,000 | |
| 014302- A111 | Investment Local | 100,000,000 | |
| Total- | PROJECT MANAGEMENT UNIT (PMU) IN MINISTRY OF RAILWAYS (2ND REVISED) | 100,000,000 |
Next
NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS
| PAKISTAN RAILWAYS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
| KA7116 RECO SUKKUR | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI NSTRUCION AND EXTENSION OF CONCRETE SLEEPER FACTORIES (CSF)AT KHANEWAL AND |
|---|---|
| 014302- A11 | Investments 10,000,000 |
| 014302- A111 | Investment Local 10,000,000 |
| Total- KA7117 RECO | RECONSTRUCION AND EXTENSION OF CONCRETE SLEEPER FACTORIES (CSF)AT KHANEWAL AND SUKKUR 10,000,000 NSTRUCTION/REHABILITATION OF ASSETS DAMAGED DURING THE FLOOD 2010 (REVISED) |
| 014302- A11 | Investments 100,000,000 |
| 014302- A111 | Investment Local 100,000,000 |
| Total- KA7118 REHA FOLLOWED B | RECONSTRUCTION/REHABILITATION OF ASSETS DAMAGED DURING THE FLOOD 2010 (REVISED) 100,000,000 BILITATION OF RAILWAY ASSETS DAMAGED AT SINDH DURING RIOTS OF 27-28 DECEMBER 2007 Y |
| 014302- A11 | Investments 70,000,000 |
| 014302- A111 | Investment Local 70,000,000 |
| Total- KA7119 REHA | REHABILITATION OF RAILWAY ASSETS DAMAGED AT SINDH DURING RIOTS OF 27-28 DECEMBER 2007 FOLLOWED BY 70,000,000 BILITATION/PROCUREMENT OF RE-MANUFACTURED OF 300 TRACTION MOTORS (REVISED) |
| 014302- A11 | Investments 20,000,000 |
| 014302- A111 | Investment Local 20,000,000 |
| Total- KA7120 REPL -SHAHDARA B | REHABILITATION/PROCUREMENT OF RE-MANUFACTURED OF 300 TRACTION MOTORS (REVISED) 20,000,000 ACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL AGH MAINLINE SECTION OF |
| 014302- A11 | Investments 100,000,000 |
| 014302- A111 | Investment Local 100,000,000 |
| Total- | REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL -SHAHDARA BAGH MAINLINE SECTION OF 100,000,000 |
Table of Content
Next
NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS
| PAKISTAN RAILWAYS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | ||
|---|---|---|
| KA7121 STRENGTHENING OF PLANNING DEVELOPMENT MONITORING AND EVALUATION (PD&ME) DIRECTORATE MINISTRY OF MINISTRY | ||
| 014302- A11 | Investments | 50,000,000 |
| 014302- A111 | Investment Local | 50,000,000 |
| Total- | STRENGTHENING OF PLANNING DEVELOPMENT MONITORING AND EVALUATION (PD&ME) DIRECTORATE MINISTRY OF MINISTRY | 50,000,000 |
| KA7122 TRACK REHABILITATION ON KHANPUR-LODHRAN SECTION | ||
| 014302- A11 | Investments | 330,616,000 |
| 014302- A111 | Investment Local | 330,616,000 |
| Total- | TRACK REHABILITATION ON KHANPUR-LODHRAN SECTION | 330,616,000 |
| KA7123 UP-GR SAHIB AND | ADATION OF RAILWAY STATIONS TO ATTRACT SIKH TOURISM AT HASSANABADAL NANKANA | |
| 014302- A11 | Investments | 50,000,000 |
| 014302- A111 | Investment Local | 50,000,000 |
| Total- | UP-GRADATION OF RAILWAY | 50,000,000 |
| STATIONS TO ATTRACT SIKH TOURISM AT HASSANABADAL NANKANA SAHIB AND | ||
| KA7124 UP-GR | ADATION OF TERMINAL FACILITIES AND DRYPORTS (REVISED) | |
| 014302- A11 | Investments | 105,359,000 |
| 014302- A111 | Investment Local | 105,359,000 |
| Total- | UP-GRADATION OF TERMINAL | 105,359,000 |
| FACILITIES AND DRYPORTS (REVISED) | ||
| KA7125 UP-GR | ADATION/RENOVATION OF RAILWAY STATIONS | |
| 014302- A11 | Investments | 50,000,000 |
| 014302- A111 | Investment Local | 50,000,000 |
| Total- | UP-GRADATION/RENOVATION OF RAILWAY STATIONS | 50,000,000 |
| KA7126 FEASIBILITY STUDY FOR RESTORATION/UP-GRADATION OF JACOBABAD-SILRA SHAHDAD | ||
| 014302- A11 | Investments | 15,500,000 |
| 014302- A111 | Investment Local | 15,500,000 |
Next
| NO. 191.- FC1 | 2C33 CAPITAL OUTLAY ON PAKISTAN RAILWA | YS DEMAN | DS FOR GRANTS |
|---|---|---|---|
| No of Posts | 2019-2020 2019-2020 | 2020-2021 | |
| 2019-20 2020-21 | Budget Estimate Revised Estimate | Budget Estimate | |
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | |||
| Total- | FEASIBILITY STUDY FOR | 15,500,000 | |
| RESTORATION/UP-GRADATION OF JACOBABAD-SILRA SHAHDAD | |||
| KA7127 FEASIBILITY STUDY FOR UP-GRADATION/REHABILITATION OF KHANEWAL-SHORKOT-CHAK | |||
| 014302- A11 | Investments | 14,000,000 | |
| 014302- A111 | Investment Local | 14,000,000 | |
| Total- KA7128 FEAS | FEASIBILITY STUDY FOR UP-GRADATION/REHABILITATION OF KHANEWAL-SHORKOT-CHAK IBILITY STUDY FOR UP-GRADATION/REHABILIT | ATION OF SHAHDARA-SANGLA HIL | 14,000,000 L-CHAK |
| 014302- A11 | Investments | 18,000,000 | |
| 014302- A111 | Investment Local | 18,000,000 | |
| Total- | FEASIBILITY STUDY FOR | 18,000,000 | |
| UP-GRADATION/REHABILITATION OF SHAHDARA-SANGLA HILL-CHAK | |||
| KA7129 SPEC RUNNING | IAL REPAIR OF 100 NOS DE LOCOMOTIVES FOR IMPROVING THE REABILITY/AVAILABILITY OF | ||
| 014302- A11 | Investments | 2,700,000,000 | |
| 014302- A111 | Investment Local | 2,700,000,000 | |
| Total- | SPECIAL REPAIR OF 100 NOS DE | 2,700,000,000 | |
| LOCOMOTIVES FOR IMPROVING THE REABILITY/AVAILABILITY OF RUNNING | |||
| (In Foreign Exchange) | (1,890,000,000) | ||
| (Own Resources) | (1,890,000,000) | ||
| (In Local Currency) | (810,000,000) | ||
| KA7130 SPEC | ___ IAL REPAIR OF 600 PASSENGER COACHES AN | ________________________________ D 1200 BOGIE WAGONS | _______________ |
| 014302- A11 | Investments | 1,000,000,000 | |
| 014302- A111 | Investment Local | 1,000,000,000 | |
| Total- | SPECIAL REPAIR OF 600 PASSENGER COACHES AND 1200 BOGIE WAGONS | 1,000,000,000 | |
| (In Foreign Exchange) | (600,000,000) | ||
| (Own Resources) | (600,000,000) | ||
| (In Local Currency) | (400,000,000) |
KA7131 CONSULTANCY SERVICE REGARDING REVISION OF BRIDGE RULES AND CODES OF PRACTICE
Table of Content
| NO. 191.- FC1 | 2C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| PRESCRIBED | ACCOUNTANT GENERAL PAKISTAN RE FOR DESIGN OF | VENUES SUB-OFFICE, KARACHI | ||
| 014302- A11 | Investments | 26,585,000 | ||
| 014302- A111 | Investment Local | 26,585,000 | ||
| Total- | CONSULTANCY SERVICE REGARDING REVISION OF BRIDGE RULES AND CODES OF PRACTICE PRESCRIBED FOR DESIGN OF | 26,585,000 | ||
| KA7132 PC-II PROJECT | FOR COMMERCIAL AND FINANCIAL FEASIBILITY STUDY FOR THE | SUB-PROJECT UNDER ML-I | ||
| 014302- A11 | Investments | 70,000,000 | ||
| 014302- A111 | Investment Local | 70,000,000 | ||
| Total- | PC-II FOR COMMERCIAL AND | 70,000,000 | ||
| KA7133 UP-G DRYPORT NE | FINANCIAL FEASIBILITY STUDY FOR THE SUB-PROJECT UNDER ML-I PROJECT RADATION OF PAKISTAN RAILWAYS EXISTING AR | MAINLINE-1 (ML-I) | AND ESTABLISHMENT OF | |
| 014302- A11 | Investments | 5,500,000,000 | ||
| 014302- A111 | Investment Local | 5,500,000,000 | ||
| Total- | UP-GRADATION OF PAKISTAN | 5,500,000,000 | ||
| RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF DRYPORT NEAR | ||||
| (In Foreign Exchange) | (500,000,000) | |||
| (Own Resources) | (500,000,000) | |||
| (In Local Currency) | (5,000,000,000) | |||
| KA7134 OPER | ___ ATIONALIZATION OF TRAIN ON EXISTING KCR | ________________ ALLIGNMENT | _______________ | |
| 014302- A11 | Investments | 1,500,000,000 | ||
| 014302- A111 | Investment Local | 1,500,000,000 | ||
| Total- | OPERATIONALIZATION OF TRAIN ON EXISTING KCR ALLIGNMENT | 1,500,000,000 | ||
| (In Foreign Exchange) | (250,000,000) | |||
| (Own Resources) | (250,000,000) | |||
| (In Local Currency) ___ | _______________ | (1,250,000,000) ________________ |
| NO. 191.- FC1 | 2C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 | |
| 2019-20 2020-21 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| KA7135 PROV DEVELOPMEN | ACCOUNTANT GENERAL PAKISTAN RE ISION OF TRAIN APPROACHING WARNING SYS T OF LED BASED | VENUES SUB-OFFICE, KARACHI TEM FOR LEVEL CROSSING AND INH | OUSE | |
| 014302- A11 | Investments | 30,000,000 | ||
| 014302- A111 | Investment Local | 30,000,000 | ||
| Total- | PROVISION OF TRAIN APPROACHING WARNING SYSTEM FOR LEVEL CROSSING AND INHOUSE DEVELOPMENT OF LED BASED | 30,000,000 | ||
| KA7136 UMBR | ELLA PCII FOR FEASIBITY STUDIES AND TRANSACTION ADVISORY SERVICES | |||
| 014302- A11 | Investments | 300,000,000 | ||
| 014302- A111 | Investment Local | 300,000,000 | ||
| Total- KA7137 ESTA | UMBRELLA PCII FOR FEASIBITY STUDIES AND TRANSACTION ADVISORY SERVICES BLISHMENT OF BUSINESS DEVELOPMENT AND | HR SUPPORT UNIT AT PAKISTAN R | 300,000,000 AILWAYS | |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | ESTABLISHMENT OF BUSINESS | 50,000,000 | ||
| KA7138 COLL MODEL) | DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS ABORATION OF PAKISTAN RAILWAYS WITH DIF | FERENT ACADEMIC INSTITUTES (TRIPLE HELIX | ||
| 014302- A11 | Investments | 100,000,000 | ||
| 014302- A111 | Investment Local | 100,000,000 | ||
| Total- | COLLABORATION OF PAKISTAN | 100,000,000 | ||
| RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX MODEL) | ||||
| KA7139 PROCUREMENT AND INSTALLATION OF MACHINERY | AT SIGNAL WORKSHOP | |||
| 014302- A11 | Investments | 84,940,000 | ||
| 014302- A111 | Investment Local | 84,940,000 | ||
| Total- | PROCUREMENT AND INSTALLATION OF MACHINERY AT SIGNAL WORKSHOP | 84,940,000 |
KA7140 REHABILITATION OF CHINA CREEK BRIDGE NO 4 ON KEMARI - KARACHI SECTION
Table of Content
| NO. 191.- FC1 | 2C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | ||||
| 014302- A11 | Investments | 350,000,000 | ||
| 014302- A111 | Investment Local | 350,000,000 | ||
| Total- | REHABILITATION OF CHINA CREEK BRIDGE NO 4 ON KEMARI - KARACHI SECTION | 350,000,000 | ||
| (In Foreign Exchange) | (245,000,000) | |||
| (Own Resources) | (245,000,000) | |||
| (In Local Currency) | (105,000,000) | |||
| KA7141 REHA | ___ BILITATION OF KPT AND RAIL CONNECTIVITY ( | ________________ PHASE-1) | _________________ | |
| 014302- A11 | Investments | 400,000,000 | ||
| 014302- A111 | Investment Local | 400,000,000 | ||
| Total- | REHABILITATION OF KPT AND RAIL CONNECTIVITY (PHASE-1) | 400,000,000 | ||
| (In Foreign Exchange) | (280,000,000) | |||
| (Own Resources) | (280,000,000) | |||
| (In Local Currency) | (120,000,000) | |||
| KA7142 REHA SECTION (SU | ___ BILITATION OF TRACK BETWEEN REHMANI NA KKUR DIVISION PH-4) | ________________ GAR - BAKRANI R | _________________ OAD ON DADU-HA | ______________ BIB KOT |
| 014302- A11 | Investments | 400,000,000 | ||
| 014302- A111 | Investment Local | 400,000,000 | ||
| Total- | REHABILITATION OF TRACK BETWEEN | 400,000,000 | ||
| REHMANI NAGAR - BAKRANI ROAD ON DADU-HABIB KOT SECTION (SUKKUR DIVISION PH-4) | ||||
| (In Foreign Exchange) | (350,000,000) | |||
| (Own Resources) | (350,000,000) | |||
| (In Local Currency) | (50,000,000) | |||
| KA7143 REHA (PESHAWAR | ___ BILITATION OF TRACK BETWEEN BARULI-SOH | ________________ AN BRIDGE ON KU | _________________ NDIAN - ATTOCK | ______________ CITY SECTION |
| 014302- A11 | Investments | 300,000,000 | ||
| 014302- A111 | Investment Local | 300,000,000 | ||
| Total- | REHABILITATION OF TRACK BETWEEN | 300,000,000 | ||
| BARULI-SOHAN BRIDGE ON KUNDIAN - | ||||
| ATTOCK CITY SECTION (PESHAWAR |
| NO. 191.- FC1 | 2C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMANDS FOR GRANTS | |
|---|---|---|---|
| No of Posts 2019-2020 | 2019-2020 | 2020-2021 | |
| 2019-20 2020-21 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | |||
| (In Foreign Exchange) | (210,000,000) | ||
| (Own Resources) | (210,000,000) | ||
| (In Local Currency) | (90,000,000) | ||
| KA7144 REVIV | _____________________ AL OF KARACHI CIRCULAR RAILWAYS (KCR) - PHASE2 | _______________ | |
| 014302- A11 | Investments | 300,000,000 | |
| 014302- A111 | Investment Local | 300,000,000 | |
| Total- | REVIVAL OF KARACHI CIRCULAR RAILWAYS (KCR) - PHASE2 | 300,000,000 | |
| KA7145 RECO | MMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES | ||
| 014302- A11 | Investments | 400,000,000 | |
| 014302- A111 | Investment Local | 400,000,000 | |
| Total- | RECOMMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES | 400,000,000 | |
| (In Foreign Exchange) | (350,000,000) | ||
| (Own Resources) | (350,000,000) | ||
| (In Local Currency) | (50,000,000) | ||
| KA7146 IMPR RAILWAYS | _____________________ OVEMENT OF TERMINAL FACILITIES (MUGHALPURA AND QILA SAT | ______________ TAR SHAH) ON P | _______________ AKISTAN |
| 014302- A11 | Investments | 200,000,000 | |
| 014302- A111 | Investment Local | 200,000,000 | |
| Total- | IMPROVEMENT OF TERMINAL | 200,000,000 | |
| FACILITIES (MUGHALPURA AND QILA SATTAR SHAH) ON PAKISTAN | |||
| KA7147 IMPR | RAILWAYS OVEMENT OF ISLAMABAD DRYPORTS ON PAKISTAN RAILWAYS | ||
| 014302- A11 | Investments | 200,000,000 | |
| 014302- A111 | Investment Local | 200,000,000 | |
| Total- | IMPROVEMENT OF ISLAMABAD | 200,000,000 | |
| DRYPORTS ON PAKISTAN RAILWAYS | |||
| KA7148 REHA SECTION | BILITATION OF TRACK BETWEEN SAMA SATTA AND BAHAWALNA | GAR ON SAMA S | ATTA AMRUKA |
| 014302- A11 | Investments | 450,000,000 | |
| 014302- A111 | Investment Local | 450,000,000 |
Table of Content
| NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2019-2020 | 2019-2020 | 2020-2021 |
| 2019-20 2020-21 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| Total- | REHABILITATION OF TRACK BETWEEN SAMA SATTA AND BAHAWALNAGAR ON SAMA SATTA AMRUKA SECTION (In Foreign Exchange) | 450,000,000 (375,000,000) | ||
|---|---|---|---|---|
| (Own Resources) | (375,000,000) | |||
| (In Local Currency) | (75,000,000) | |||
| 014302 | Total- Non-Financial Institutions | __________________ 13,500,000,000 | _________________ 9,016,128,000 | _______________ 23,500,000,000 |
| 0143 | Total- Investments | 13,500,000,000 | 9,016,128,000 | 23,500,000,000 |
| 014 | Total- Transfers | 13,500,000,000 | 9,016,128,000 | 23,500,000,000 |
| 01 | Total- General Public Service | 13,500,000,000 | 9,016,128,000 | 23,500,000,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 13,500,000,000 | 9,016,128,000 | 23,500,000,000 | |
| (In Foreign Exchange) | (5,350,000,000) | (1,862,709,000) | (7,325,000,000) | |
| (Own Resources) | (5,350,000,000) | (1,862,709,000) | (7,325,000,000) | |
| (Foreign Aid) | ||||
| (In Local Currency) COMMERCIAL | (8,150,000,000) DEPARTMENTS | (7,153,419,000) | (16,175,000,000) |
| NO. 191.- FC1 | 2C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2019-20 Posts 2020-21 | 2019-2020 Budget Estimate | 2019-2020 Revised Estimate | 2020-2021 Budget Estimate | |
| COMMERCIAL D | Rs EPARTMENTS | Rs | Rs | |
| 04 Econo | mic Affairs: | |||
| 045 Const | ruction and Transport: | |||
| 0454 Railw 045401 Railw HQ1763 PAKI | ay Trasport: ay Trasport : STAN RAILWAYS -(FOREIGN AID PORTION) | |||
| 045401- A03 | Operating Expenses | 2,500,000,000 | 500,000,000 | |
| 045401- A039 | General | 2,500,000,000 | 500,000,000 | |
| Total- | PAKISTAN RAILWAYS -(FOREIGN AID PORTION) | 2,500,000,000 | 500,000,000 | |
| (In Foreign Exchange) | (2,500,000,000) | (500,000,000) | ||
| (Foreign Aid) | (2,500,000,000) | (500,000,000) | ||
| 045401 | _ Total- Railway Trasport | ________________ 2,500,000,000 | _________________ | ________________ 500,000,000 |
| 0454 | Total- Railway Trasport | 2,500,000,000 | 500,000,000 | |
| 045 | Total- Construction and Transport | 2,500,000,000 | 500,000,000 | |
| 04 | Total- Economic Affairs | 2,500,000,000 | 500,000,000 | |
| Total- COMMERCIAL DEPARTMENTS | 2,500,000,000 | 500,000,000 | ||
| (In Foreign Exchange) (Own Resources) | (2,500,000,000) | (500,000,000) | ||
| (Foreign Aid) | (2,500,000,000) | (500,000,000) | ||
| TOTAL - DEMAND | 16,000,000,000 | 9,016,128,000 | 24,000,000,000 | |
| (In Foreign Exchange) | (7,850,000,000) | (1,862,709,000) | (7,825,000,000) | |
| (Own Resources) | (5,350,000,000) | (1,862,709,000) | (7,325,000,000) | |
| (Foreign Aid) | (2,500,000,000) | (500,000,000) | ||
| (In Local Currency) _ | (8,150,000,000) ________________ | (7,153,419,000) _________________ | (16,175,000,000) ________________ |
______________________________________________________________________________________________________________ Detail of recoveries adjusted in the accounts in Reduction of Expenditure:-
COMMERCIAL DEPARTMENTS
| 04 | Economic Affairs | ||
|---|---|---|---|
| 045 | Construction and Transport | ||
| 0454 | Railway Trasport | ||
| 04540 | 1 Railway Trasport | ||
| 90001 | AMOUNT MET FROM RAILWAYS FOREIGN AID DEPOSIT ACCOUNTS | -2,500,000,000 __________________________________________________ | |
| 045401 | Railway Trasport | -2,500,000,000 __________________________________________________ | |
| Total - | COMMERCIAL DEPARTMENTS | -2,500,000,000 __________________________________________________ |