Skip to content
Qanoon Digest

Details of Demands for Grants and Appropriations Vol-IV (Development Expenditure) 2021-22, part 4

FY 2021-22Details of demandsPages 301 to 400 of 528

The Details of Demands for Grants and Appropriations Vol-IV (Development Expenditure) 2021-22 is part of the federal budget for FY 2021-22. This page reproduces the text of its 528 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.

Page 301

NO. 113.- FC22D72 DEVELOPMENT EXPENDITURE OF NATIONAL FOOD SECURITY AND RESEARCH DIVISION No of Posts 2021-22

DEMANDS FOR GRANTS 2021-2022 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0646 NATIONAL PROGRAMME FOR ENHANCING COMMAND AREA OF SMALL AND MINI DAM IN BARANI AREAS OF PAKISTAN

042201- A01 Employees Related Expenses 17,660,000
042201- A011 Pay 41 12,360,000
042201- A011-1 Pay of Officers (12) (8,760,000)
042201- A011-2 Pay of Other Staff (29) (3,600,000)
042201- A012 Allowances 5,300,000
042201- A012-1 Regular Allowances (3,510,000)
042201- A012-2 Other Allowances (Excluding TA) (1,790,000)
042201- A03 Operating Expenses 223,890,000
042201- A032 Communications 140,000
042201- A034 Occupancy Costs 1,400,000
042201- A037 Consultancy and Contractual Work 191,000,000
042201- A038 Travel & Transportation 2,350,000
042201- A039 General 29,000,000
042201- A05 Grants, Subsidies and Write off Loans 450,000,000
042201- A052 Grants Domestic 450,000,000
042201- A09 Physical Assets 8,050,000
042201- A092 Computer Equipment 2,050,000
042201- A096 Purchase of Plant and Machinery 5,000,000
042201- A097 Purchase of Furniture and Fixture 1,000,000
042201- A13 Repairs and Maintenance 400,000
042201- A130 Transport 200,000
042201- A131 Machinery and Equipment 100,000
042201- A132 Furniture and Fixture 100,000
Total- NATIONAL PROGRAMME FOR 700,000,000
ENHANCING COMMAND AREA OF SMALL AND MINI DAM IN BARANI AREAS OF PAKISTAN
042201 Total- ADMINISTRATION 4,050,000,000
0422 Total- Irrigation 4,050,000,000
042 Total- Agriculture,Food,Irrigation,Forestry and Fishing 10,487,129,000
04 Total- Economic Affairs 10,487,129,000
Total- ACCOUNTANT GENERAL 10,487,129,000
PAKISTAN REVENUES
Page 302

NO. 113.- FC22D72 DEVELOPMENT EXPENDITURE OF NATIONAL FOOD SECURITY

DEMANDS FOR GRANTS

AND RESEARCH DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0421 Agriculture:
042101 ADMINISTRATION/LAND COMMISSION :
MN960 1 BETTER COTTON INITIATIVE FOR SUSTAIN COTTON PRODUCTION IN PAKISTAN
042101 - A01 Employees Related Expenses 63,619,000
042101 - A011 Pay 148 60,687,000
042101 - A011-1 Pay of Officers (148) (60,687,000)
042101 - A012 Allowances 2,932,000
042101 - A012-1 Regular Allowances (432,000)
042101 - A012-2 Other Allowances (Excluding TA) (2,500,000)
042101 - A03 Operating Expenses 39,620,000
042101 - A032 Communications 1,500,000
042101 - A033 Utilities 1,500,000
042101 - A034 Occupancy Costs 1,200,000
042101 - A038 Travel & Transportation 22,920,000
042101 - A039 General 12,500,000
042101 - A09 Physical Assets 8,127,000
042101 - A092 Computer Equipment 2,600,000
042101 - A096 Purchase of Plant and Machinery 5,027,000
042101 - A097 Purchase of Furniture and Fixture 500,000
042101 - A13 Repairs and Maintenance 2,530,000
042101 - A130 Transport 1,000,000
042101 - A131 Machinery and Equipment 1,000,000
042101 - A132 Furniture and Fixture 300,000
042101 - A137 Computer Equipment 230,000
Total- BETTER COTTON INITIATIVE FOR SUSTAIN COTTON PRODUCTION IN PAKISTAN 113,896,000
0 42101 Total- ADMINISTRATION/LAND 113,896,000
COMMISSION
Page 303

NO. 113.- FC22D72 DEVELOPMENT EXPENDITURE OF NATIONAL FOOD SECURITY DEMANDS FOR GRANTS AND RESEARCH DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE 042103 Agricultural Research and Extension Services :

MN3018 COTTON PRODUCTIVITY ENHANCEMENT TROUGH ECO FRIENDLY PINK BOLLWORM MANAGEMENT & CAPACITY BUILDING PM

042103- A01 Employees Related Expenses 15,128,000
042103- A011 Pay 17 8,796,000
042103- A011-1 Pay of Officers (17) (8,796,000)
042103- A012 Allowances 6,332,000
042103- A012-1 Regular Allowances (432,000)
042103- A012-2 Other Allowances (Excluding TA) (5,900,000)
042103- A03 Operating Expenses 31,370,000
042103- A032 Communications 250,000
042103- A038 Travel & Transportation 4,000,000
042103- A039 General 27,120,000
042103- A09 Physical Assets 226,209,000
042103- A092 Computer Equipment 2,050,000
042103- A094 Other Stores and Stocks 210,923,000
042103- A096 Purchase of Plant and Machinery 12,826,000
042103- A097 Purchase of Furniture and Fixture 410,000
042103- A13 Repairs and Maintenance 4,904,000
042103- A130 Transport 2,000,000
042103- A131 Machinery and Equipment 2,500,000
042103- A132 Furniture and Fixture 404,000
Total- COTTON PRODUCTIVITY ENHANCEMENT TROUGH ECO FRIENDLY PINK BOLLWORM MANAGEMENT & CAPACITY BUILDING PM 277,611,000
042103 Total- AGRICULTURE, RESEARCH AND EXTENSION SERV 277,611,000
042106 ANIMAL HUSBANDRY :
MN9602 UP-GR ADATION AND ESTABLISHMENT OF ANIMAL QUARANTINE STATION IN PAKISTAN PHASE-II
042106- A09 Physical Assets 1,352,000
042106- A092 Computer Equipment 260,000
042106- A096 Purchase of Plant and Machinery 802,000
Page 304

NO. 113.- FC22D72 DEVELOPMENT EXPENDITURE OF NATIONAL FOOD SECURITY DEMANDS FOR GRANTS

AND RESEARCH DIVISION

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE 2021-2022 Budget Estimate Rs
042106- A097 Purchase of Furniture and Fixture 290,000
042106- A12 Civil works 14,600,000
042106- A124 Building and Structures 14,600,000
Total- UP-GRADATION AND ESTABLISHMENT OF ANIMAL QUARANTINE STATION IN PAKISTAN PHASE-II 15,952,000
ST9601 UP-GR ADATION AND ESTABLISHMENT OF ANIMAL QUARANTINE STATION IN PAKISTAN PHASE-II
042106- A09 Physical Assets 1,352,000
042106- A092 Computer Equipment 260,000
042106- A096 Purchase of Plant and Machinery 802,000
042106- A097 Purchase of Furniture and Fixture 290,000
042106- A12 Civil works 5,881,000
042106- A124 Building and Structures 5,881,000
Total- UP-GRADATION AND ESTABLISHMENT OF ANIMAL QUARANTINE STATION IN PAKISTAN PHASE-II 7,233,000
042106 Total- ANIMAL HUSBANDRY 23,185,000
0421 Total- Agriculture 414,692,000
042 Total- Agriculture,Food,Irrigation,Forestry and Fishing 414,692,000
04 Total- Economic Affairs 414,692,000
Total- ACCOUNTANT GENERAL 414,692,000
PAKISTAN REVENUES
SUB-OFFICE, LAHORE
Page 305

NO. 113.- FC22D72 DEVELOPMENT EXPENDITURE OF NATIONAL FOOD SECURITY DEMANDS FOR GRANTS

AND RESEARCH DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0421 Agriculture:
042103 AGRICULTURE, RESEARCH AND EXTENSION SERV :
KA961 8 UPGRADATION OF ACREDITATION OF THE SEED TESTING LAB FSC AND RD KARACHI
042103 - A01 Employees Related Expenses 294,000
042103 - A012 Allowances 294,000
042103 - A012-1 Regular Allowances (144,000)
042103 - A012-2 Other Allowances (Excluding TA) (150,000)
042103 - A03 Operating Expenses 2,119,000
042103 - A038 Travel & Transportation 1,460,000
042103 - A039 General 659,000
042103 - A09 Physical Assets 32,435,000
042103 - A091 Purchase of Building 10,000,000
042103 - A092 Computer Equipment 700,000
042103 - A094 Other Stores and Stocks 2,000,000
042103 - A096 Purchase of Plant and Machinery 19,135,000
042103 - A097 Purchase of Furniture and Fixture 600,000
042103 - A13 Repairs and Maintenance 31,000
042103 - A131 Machinery and Equipment 25,000
042103 - A132 Furniture and Fixture 6,000
Total- UPGRADATION OF ACREDITATION OF 34,879,000
THE SEED TESTING LAB FSC AND RD KARACHI
0 42103 Total- AGRICULTURE, RESEARCH AND EXTENSION SERV 34,879,000
042104 Plants protection and locust control :
KA370 5 LOCUST EMERGENCY AND FOOD SECURITY (LEAFS)
042104 - A01 Employees Related Expenses 124,640,000
042104 - A011 Pay 124,640,000
042104 - A011-1 Pay of Officers (84,800,000)
042104 - A011-2 Pay of Other Staff (39,840,000)
Page 306

NO. 113.- FC22D72 DEVELOPMENT EXPENDITURE OF NATIONAL FOOD SECURITY DEMANDS FOR GRANTS AND RESEARCH DIVISION

No of Posts 2021-22 2021-2022 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
042104- A03 Operating Expenses 45,860,000
042104- A034 Occupancy Costs 38,500,000
042104- A038 Travel & Transportation 7,060,000
042104- A039 General 300,000
042104- A09 Physical Assets 825,000,000
042104- A095 Purchase of Transport 825,000,000
042104- A13 Repairs and Maintenance 4,500,000
042104- A130 Transport 4,500,000
Total- LOCUST EMERGENCY AND FOOD SECURITY (LEAFS) 1,000,000,000
(In Foreign Exchange) (1,000,000,000)
(Foreign Aid) (1,000,000,000)
042104 __________________________________ Total- Plants protection and locust control ________________ 1,000,000,000

042106 ANIMAL HUSBANDRY :

KA7149 CONS KARACHI TRUCTION OF OFFICE AND LABORATORY BUILDING OF ANIMAL QUARANTINE DEPARTMENT
042106- A03 Operating Expenses 1,720,000
042106- A032 Communications 70,000
042106- A036 Motor Vehicles 700,000
042106- A038 Travel & Transportation 350,000
042106- A039 General 600,000
042106- A09 Physical Assets 13,300,000
042106- A092 Computer Equipment 500,000
042106- A095 Purchase of Transport 12,000,000
042106- A096 Purchase of Plant and Machinery 600,000
042106- A097 Purchase of Furniture and Fixture 200,000
042106- A12 Civil works 48,000,000
042106- A124 Building and Structures 48,000,000
042106- A13 Repairs and Maintenance 280,000
042106- A130 Transport 120,000
042106- A131 Machinery and Equipment 60,000
Page 307

NO. 113.- FC22D72 DEVELOPMENT EXPENDITURE OF NATIONAL FOOD SECURITY DEMANDS FOR GRANTS

AND RESEARCH DIVISION

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 2021-2022 Budget Estimate Rs
042106- A132 Furniture and Fixture 100,000
Total- CONSTRUCTION OF OFFICE AND LABORATORY BUILDING OF ANIMAL QUARANTINE DEPARTMENT KARACHI 63,300,000
042106 Total- ANIMAL HUSBANDRY 63,300,000
0421 Total- Agriculture 1,098,179,000
042 Total- Agriculture,Food,Irrigation,Forestry and Fishing 1,098,179,000
04 Total- Economic Affairs 1,098,179,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 1,098,179,000
(In Foreign Exchange) (1,000,000,000)
(Own Resources)
(Foreign Aid) (1,000,000,000)
(In Local Currency) (98,179,000)
Page 308

NO. 113.- FC22D72 DEVELOPMENT EXPENDITURE OF NATIONAL FOOD SECURITY DEMANDS FOR GRANTS AND RESEARCH DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0421 Agriculture:
042103 Agricultural Research and Extension Services :
QA080 7 ESTABLISHMENT OF SEED CERTIFICATION LABORATORY IN KHUZDAR AND TURBAT
042103 - A01 Employees Related Expenses 4,326,000
042103 - A011 Pay 13 3,830,000
042103 - A011- 1 Pay of Officers (2) (1,800,000)
042103 - A011- 2 Pay of Other Staff (11) (2,030,000)
042103 - A012 Allowances 496,000
042103 - A012- 1 Regular Allowances (396,000)
042103 - A012- 2 Other Allowances (Excluding TA) (100,000)
042103 - A03 Operating Expenses 1,500,000
042103 - A038 Travel & Transportation 750,000
042103 - A039 General 750,000
042103 - A09 Physical Assets 11,454,000
042103 - A091 Purchase of Building 2,420,000
042103 - A092 Computer Equipment 150,000
042103 - A096 Purchase of Plant and Machinery 7,519,000
042103 - A097 Purchase of Furniture and Fixture 1,365,000
Total- ESTABLISHMENT OF SEED CERTIFICATION LABORATORY IN KHUZDAR AND TURBAT 17,280,000
0 42103 Total- AGRICULTURE, RESEARCH AND EXTENSION SERV 17,280,000
0 421 Total- Agriculture 17,280,000
0 42 Total- Agriculture,Food,Irrigation,Forestry and Fishing 17,280,000
0 4 Total- Economic Affairs 17,280,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 17,280,000
TOTAL - DEMAND 12,017,280,000
(In Foreign Exchange) (1,000,000,000)
(Own Resources)
(Foreign Aid) (1,000,000,000)
(In Local Currency) (11,017,280,000)
Page 309

SECTION XIX

MINISTRY OF NATIONAL HEALTH SERVICES, REGULATIONS AND COORDINATION

* 2021-2022 Budget Estimate (Rupees in Thousand) Demands Presented on behalf of the Ministry of National Health Services, Regulations and Coordination

Development Expenditure on Revenue Account

114. Development Expenditure of National Health Services, Regulations and Coordination Division 21,722,506
Total : 21,722,506
Page 311

NO. 114.- DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION DEMANDS FOR GRANTS DEMAND NO. 114 ( FC22D77 )

DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2022 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION.

Voted

Rs. 21,722,506,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF NATIONAL HEALTH SERVICES, REGULATIONS AND COORDINATION .

FUNCTIONAL CLASSIFICATION 2021-2022 Budget Estimate Rs
073 Hospital Services 12,791,229,000
074 Public Health Services 2,715,003,000
076 Health Administration 6,216,274,000
Total 21,722,506,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 603,243,000
A011 Pay 552,290,000
A011- 1 Pay of Officers (341,812,000)
A011- 2 Pay of Other Staff (210,478,000)
A012 Allowances 50,953,000
A012- 1 Regular Allowances (40,224,000)
A012- 2 Other Allowances (Excluding TA) (10,729,000)
A02 Project Pre-Investment Analysis 638,844,000
A03 Operating Expenses 1,130,209,000
A04 Employees Retirement Benefits 1,200,000
A05 Grants, Subsidies and Write off Loans 381,400,000
A06 Transfers 5,060,000,000
A09 Physical Assets 5,381,841,000
A12 Civil works 8,322,223,000
A13 Repairs and Maintenance 203,546,000
Total 21,722,506,000
(In Foreign Exchange) (500,000,000)
(Own Resources)
(Foreign Aid) (500,000,000)
(In Local Currency) (21,222,506,000)
Page 312

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

DEMANDS FOR GRANTS

III. - DETAILS are as follows :- No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

07 Health :
073 Hospital Services:
0731 General Hospital Services:
073101 IB0667 REGAR GENE PURCH D TO S RAL HOSPITAL SERVICES : . OF NEW ELCTRO- MEDICAL EQUP. TO REPLACEMENT THE OBSS&OLD FASI TREN & ONED MACH. WITH
073101 - A03 Operating Expenses 500,000
073101 - A039 General 500,000
073101 - A09 Physical Assets 19,500,000
073101 - A096 Purchase of Plant and Machinery 19,500,000
Total- PURCH. OF NEW ELCTRO- MEDICAL EQUP. TO REPLACEMENT THE OBSS&OLD FASIONED MACH. WITH REGARD TO STREN & 20,000,000
IB0710 UPGRADATION OF RADIOLOGY DEPARTMENT AT FGPC (PGMI) ISLAMBAD
073101 - A12 Civil works 32,000,000
073101 - A124 Building and Structures 32,000,000
Total- UPGRADATION OF RADIOLOGY DEPARTMENT AT FGPC (PGMI) ISLAMBAD 32,000,000
IB2007 ESTABLISHMENT OF 04 BHUS IN ICT ISLAMABAD
073101 - A03 Operating Expenses 7,062,000
073101 - A036 Motor Vehicles 1,500,000
073101 - A038 Travel & Transportation 2,662,000
073101 - A039 General 2,900,000
073101 - A09 Physical Assets 94,855,000
073101 - A095 Purchase of Transport 42,700,000
073101 - A096 Purchase of Plant and Machinery 31,766,000
073101 - A097 Purchase of Furniture and Fixture 20,389,000
073101 - A12 Civil works 318,423,000
073101 - A124 Building and Structures 318,423,000
Total- ESTABLISHMENT OF 04 BHUS IN ICT ISLAMABAD 420,340,000
Page 313

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2008 STREG THENING AND UP-GRADATION OF OPTHALMOLOGY DEPAR
073101- A09 Physical Assets 107,890,000
073101- A096 Purchase of Plant and Machinery 107,890,000
Total- STREGTHENING AND UP-GRADATION OF OPTHALMOLOGY DEPAR 107,890,000
IB2010 PC-II FOR ESTABLISHMENT OF FEDERAL GOVERNMENT POLYCLINIC (PGMI)-II ISLAMABAD
073101- A02 Project Pre-Investment Analysis 99,774,000
073101- A021 Feasibility Studies 99,774,000
073101- A12 Civil works 900,226,000
073101- A124 Building and Structures 900,226,000
Total- PC-II FOR ESTABLISHMENT OF 1,000,000,000
FEDERAL GOVERNMENT POLYCLINIC (PGMI)-II ISLAMABAD
IB2011 ESTABLISHMENT OF FEDERAL GOVERNMENT POLYCLINIC (PGMI)-II ISLAMABAD
073101- A09 Physical Assets 11,553,000
073101- A091 Purchase of Building 11,553,000
Total- ESTABLISHMENT OF FEDERAL 11,553,000
GOVERNMENT POLYCLINIC (PGMI)-II ISLAMABAD
IB2012 UPGRADATION OF NURSING SCHOOL AT POLYCLINIC ISLAMABAD
073101- A12 Civil works 25,450,000
073101- A124 Building and Structures 25,450,000
Total- UPGRADATION OF NURSING SCHOOL AT POLYCLINIC ISLAMABAD 25,450,000
IB2029 ESTABLISHMENT OF 200 BEDS ACCIDENT & EMERGENCY CENTRE AT PIMS (PC-II)
073101- A02 Project Pre-Investment Analysis 200,000,000
073101- A021 Feasibility Studies 200,000,000
073101- A12 Civil works 1,550,000,000
073101- A124 Building and Structures 1,550,000,000
Total- ESTABLISHMENT OF 200 BEDS 1,750,000,000
ACCIDENT & EMERGENCY CENTRE AT PIMS (PC-II)
Page 314

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2031 ESTABLISHMENT OF 200 BED CENTRE FOR EXCELLENCE FOR GYNAECOLOGYGY
073101- A01 Employees Related Expenses 19,550,000
073101- A011 Pay 11 9,000,000
073101- A011-1 Pay of Officers (5) (6,000,000)
073101- A011-2 Pay of Other Staff (6) (3,000,000)
073101- A012 Allowances 10,550,000
073101- A012-1 Regular Allowances (9,050,000)
073101- A012-2 Other Allowances (Excluding TA) (1,500,000)
073101- A03 Operating Expenses 3,350,000
073101- A032 Communications 250,000
073101- A034 Occupancy Costs 2,000,000
073101- A038 Travel & Transportation 650,000
073101- A039 General 450,000
073101- A09 Physical Assets 1,417,000,000
073101- A096 Purchase of Plant and Machinery 1,417,000,000
073101- A12 Civil works 200,000,000
073101- A124 Building and Structures 200,000,000
Total- ESTABLISHMENT OF 200 BED CENTRE FOR EXCELLENCE FOR GYNAECOLOGY 1,639,900,000
IB2315 CONSTRUCTION OF FEMALE DOCTOR HOSPITAL AT PIMS ISLAMABAD (REVISED PC-I)
073101- A09 Physical Assets 8,722,000
073101- A096 Purchase of Plant and Machinery 953,000
073101- A097 Purchase of Furniture and Fixture 7,769,000
073101- A12 Civil works 131,211,000
073101- A124 Building and Structures 131,211,000
Total- IB3470 UP-GRA CONSTRUCTION OF FEMALE DOCTOR HOSPITAL AT PIMS ISLAMABAD (REVISED PC-I) DATION OF EXISTING ELECTRIC SUPPLY / DISTRIBUTION SYSTEM OF FGPC ISLA 139,933,000 MABAD
073101- A12 Civil works 8,124,000
073101- A124 Building and Structures 8,124,000
Total- UP-GRADATION OF EXISTING ELECTRIC SUPPLY / DISTRIBUTION SYSTEM OF FGPC ISLAMABAD 8,124,000
Page 315

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3478 ESTABLISHMENT OF CHC AT BARI IMAM IN ICT ISLAMABAD
073101- A12 Civil works 150,000,000
073101- A124 Building and Structures 150,000,000
Total- ESTABLISHMENT OF CHC AT BARI IMAM IN ICT ISLAMABAD 150,000,000
IB3479 ESTABLISHMENT OF CHC AT BOKRA IN ICT ISLAMABAD
073101- A12 Civil works 100,000,000
073101- A124 Building and Structures 100,000,000
Total- ESTABLISHMENT OF CHC AT BOKRA IN ICT ISLAMABAD 100,000,000
IB3480 ESTABLISHMENT OF CHC AT BHADANA KALAN IN ICT ISLAMABAD
073101- A12 Civil works 100,000,000
073101- A124 Building and Structures 100,000,000
Total- ESTABLISHMENT OF CHC AT BHADANA KALAN IN ICT ISLAMABAD 100,000,000
IB3481 ESTABLISHMENT OF MNCHC ATGOHRA SHAHAN IN ICT ISLAMABAD
073101- A12 Civil works 100,000,000
073101- A124 Building and Structures 100,000,000
Total- ESTABLISHMENT OF MNCHC ATGOHRA SHAHAN IN ICT ISLAMABAD 100,000,000
IB3482 STREN GTHENING MOTHER AND CHILD HEALTH EMON 24/7 SERVICE AT BHARA KAHU ICT ISLAMABAD
073101- A12 Civil works 120,000,000
073101- A124 Building and Structures 120,000,000
Total- STRENGTHENING MOTHER AND CHILD 120,000,000
HEALTH EMON 24/7 SERVICE AT BHARA KAHU ICT ISLAMABAD
IB3612 UPGRADATION OF NEUROSURGERY DEPARTMENT AMD PROVSION OF ESSENTIAL EQUIPMENT IN PIMS
073101- A09 Physical Assets 500,000,000
073101- A096 Purchase of Plant and Machinery 500,000,000
Total- UPGRADATION OF NEUROSURGERY 500,000,000
DEPARTMENT AMD PROVSION OF
ESSENTIAL EQUIPMENT IN PIMS
Page 316

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5024 UPGRA FOR DTION OF THE RURAL HEALTH FACILITIES AND STRENGTHENING OF THE HEALTH DEPARTMENT
073101- A03 Operating Expenses 7,015,000
073101- A036 Motor Vehicles 3,500,000
073101- A038 Travel & Transportation 1,665,000
073101- A039 General 1,850,000
073101- A09 Physical Assets 494,578,000
073101- A095 Purchase of Transport 175,500,000
073101- A096 Purchase of Plant and Machinery 280,821,000
073101- A097 Purchase of Furniture and Fixture 38,257,000
073101- A12 Civil works 211,559,000
073101- A124 Building and Structures 211,559,000
Total- UPGRADTION OF THE RURAL HEALTH 713,152,000
FACILITIES AND STRENGTHENING OF THE HEALTH DEPARTMENT FOR
IB5025 ESTABLISHMENT OF 200BEDS HOSPITAL SW ISLAMABAD-FEASIBILITY
073101- A02 Project Pre-Investment Analysis 65,000,000
073101- A021 Feasibility Studies 65,000,000
073101- A12 Civil works 1,935,000,000
073101- A124 Building and Structures 1,935,000,000
Total- ESTABLISHMENT OF 200BEDS 2,000,000,000
HOSPITAL SW ISLAMABAD-FEASIBILITY
IB5030 THE PROJECT EXTENSION OF INTENSIVE CARE DEPARTMENT OF MCH AND CH PIMS
073101- A01 Employees Related Expenses 7,892,000
073101- A011 Pay 8 7,892,000
073101- A011- 1 Pay of Officers (3) (4,000,000)
073101- A011- 2 Pay of Other Staff (5) (3,892,000)
073101- A02 Project Pre-Investment Analysis 235,100,000
073101- A021 Feasibility Studies 235,100,000
073101- A03 Operating Expenses 46,057,000
073101- A031 Fees 46,057,000
073101- A09 Physical Assets 23,015,000
Page 317

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-22

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES 2021-2022 Budget Estimate Rs
073101- A096 Purchase of Plant and Machinery 23,015,000
073101- A12 Civil works 1,869,756,000
073101- A124 Building and Structures 1,869,756,000
073101- A13 Repairs and Maintenance 25,000,000
073101- A133 Buildings and Structure 25,000,000
Total- THE PROJECT EXTENSION OF 2,206,820,000
INTENSIVE CARE DEPARTMENT OF MCH AND CH PIMS
(In Foreign Exchange) (Foreign Aid)
(In Local Currency) (2,206,820,000)
IB5032 INSTA ___________________________________ LLATION OF MORTUARY REFRIGERATORS FOR MORTUARY AT PIMS ISLAMABAD _______________
073101- A03 Operating Expenses 1,450,000
073101- A039 General 1,450,000
073101- A09 Physical Assets 27,000,000
073101- A096 Purchase of Plant and Machinery 26,000,000
073101- A097 Purchase of Furniture and Fixture 1,000,000
073101- A13 Repairs and Maintenance 2,000,000
073101- A133 Buildings and Structure 2,000,000
Total- INSTALLATION OF MORTUARY 30,450,000
REFRIGERATORS FOR MORTUARY AT PIMS ISLAMABAD
IB5037 UPGRADATION OF DEPARTMENT OF NEPHROLOGY AT PIMS ISLAMABAD
073101- A09 Physical Assets 30,030,000
073101- A096 Purchase of Plant and Machinery 30,030,000
Total- UPGRADATION OF DEPARTMENT OF 30,030,000
NEPHROLOGY AT PIMS ISLAMABAD
ID9628 ISLAMABAD GENERAL HOSPITAL AT TARLAIISLAMABAD
073101- A12 Civil works 510,000,000
073101- A124 Building and Structures 510,000,000
Total- ISLAMABAD GENERAL HOSPITAL AT TARLAIISLAMABAD 510,000,000
(In Foreign Exchange) (500,000,000)
(Foreign Aid) (500,000,000)
(In Local Currency) ___________________________________ (10,000,000) _______________
Page 318

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION No of Posts 2021-22

DEMANDS FOR GRANTS 2021-2022 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

ID9629 HEALTH DISASES IN SYSTEM STRENTH. OF ICT HEALTHDEPT. TO PREVENT/CONT. EMERGINGCOMMUNICATIABLE
073101- A01 Employees Related Expenses 37,600,000
073101- A011 Pay 99 14,796,000
073101- A011-1 Pay of Officers (18) (4,910,000)
073101- A011-2 Pay of Other Staff (81) (9,886,000)
073101- A012 Allowances 22,804,000
073101- A012-1 Regular Allowances (20,654,000)
073101- A012-2 Other Allowances (Excluding TA) (2,150,000)
073101- A03 Operating Expenses 11,586,000
073101- A032 Communications 536,000
073101- A033 Utilities 1,502,000
073101- A034 Occupancy Costs 2,000
073101- A036 Motor Vehicles 1,545,000
073101- A038 Travel & Transportation 3,650,000
073101- A039 General 4,351,000
073101- A09 Physical Assets 33,310,000
073101- A092 Computer Equipment 2,000
073101- A095 Purchase of Transport 15,450,000
073101- A096 Purchase of Plant and Machinery 5,513,000
073101- A097 Purchase of Furniture and Fixture 12,345,000
073101- A13 Repairs and Maintenance 514,000
073101- A130 Transport 500,000
073101- A131 Machinery and Equipment 1,000
073101- A132 Furniture and Fixture 1,000
073101- A137 Computer Equipment 11,000
073101- A138 General 1,000
Total- HEALTH SYSTEM STRENTH. OF ICT HEALTHDEPT. TO PREVENT/CONT. 83,010,000
EMERGINGCOMMUNICATIABLE DISASES IN
Page 319

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

No of Posts 2021-22

DEMANDS FOR GRANTS 2021-2022 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

ID9636 REPLACEMENT & UPGRADATION OF HVAC PLANTROOM EQUIPMENT & ALLIED WORKS ATPIMS
073101 - A09 879,000,000 Physical Assets
073101 - A096 Purchase of Plant and Machinery 879,000,000
Total- REPLACEMENT & UPGRADATION OF HVAC PLANTROOM EQUIPMENT & ALLIED WORKS ATPIMS 879,000,000
ID9637 UPGRADATION OF NON RADIATION /MODERNEDOSCOPY DIAGNOSTIC SERVICE ATPIMS ISB.
073101 - A01 Employees Related Expenses 7,059,000
073101 - A011 Pay 35 3,996,000
073101 - A011-1 Pay of Officers (3) (1,496,000)
073101 - A011-2 Pay of Other Staff (32) (2,500,000)
073101 - A012 Allowances 3,063,000
073101 - A012-1 Regular Allowances (2,684,000)
073101 - A012-2 Other Allowances (Excluding TA) (379,000)
073101 - A09 Physical Assets 106,518,000
073101 - A096 Purchase of Plant and Machinery 106,518,000
Total- UPGRADATION OF NON RADIATION /MODERNEDOSCOPY DIAGNOSTIC SERVICE ATPIMS ISB. 113,577,000
0 73101 Total- GENERAL HOSPITAL SERVICES 12,791,229,000
0 731 Total- General Hospital Services 12,791,229,000
0 73 Total- Hospital Services 12,791,229,000
074 Public Health Services:
0741 Public Health Services:
074120 ADMINISTRATION :
IB0733 STREN THENING POINT OF ENTRIES & DTE. OF CENTRAL HEALTH ESTAB.
074120 - A03 Operating Expenses 23,084,000
074120 - A032 Communications 412,000
074120 - A038 Travel & Transportation 650,000
074120 - A039 General 22,022,000
074120 - A09 Physical Assets 96,301,000
074120 - A092 Computer Equipment 10,000,000
Page 320
NO. 114.- FC22 D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION DEMANDS FOR GRANTS
No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES 2021-2022 Budget Estimate Rs
074120- A095 Purchase of Transport 39,785,000
074120- A096 Purchase of Plant and Machinery 45,000,000
074120- A097 Purchase of Furniture and Fixture 1,516,000
074120- A12 Civil works 27,000,000
074120- A124 Building and Structures 27,000,000
074120- A13 Repairs and Maintenance 3,615,000
074120- A130 Transport 3,265,000
074120- A132 Furniture and Fixture 100,000
074120- A133 Buildings and Structure 200,000
074120- A137 Computer Equipment 50,000
Total- STRENTHENING POINT OF ENTRIES & DTE. OF CENTRAL HEALTH ESTAB. 150,000,000
IB2016 ANTI MI CROBIAL RESISTANCE (AMR) CONTAINMENT AMD INFECTION PREVENTION AND CONTROL (IPC)
074120- A01 Employees Related Expenses 60,154,000
074120- A011 Pay 59,154,000
074120- A011-1 Pay of Officers (47,154,000)
074120- A011-2 Pay of Other Staff (12,000,000)
074120- A012 Allowances 1,000,000
074120- A012-2 Other Allowances (Excluding TA) (1,000,000)
074120- A03 Operating Expenses 12,000,000
074120- A033 Utilities 3,000,000
074120- A038 Travel & Transportation 4,000,000
074120- A039 General 5,000,000
074120- A09 Physical Assets 56,546,000
074120- A092 Computer Equipment 1,000,000
074120- A094 Other Stores and Stocks 55,546,000
074120- A13 Repairs and Maintenance 21,300,000
074120- A133 Buildings and Structure 21,300,000
Total- ANTI MICROBIAL RESISTANCE (AMR) 150,000,000
CONTAINMENT AMD INFECTION
PREVENTION AND CONTROL (IPC)
Page 321
NO. 114.- FC22 D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION DEMANDS FOR GRANTS
No of Posts 2021-22 2021-2022 Budget
IB2017 ESTAB Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES LISHMENT OF ALLERGY CENTRE AT QUETTA
074120- A01 Employees Related Expenses 24,028,000
074120- A011 Pay 23,028,000
074120- A011-1 Pay of Officers (10,920,000)
074120- A011-2 Pay of Other Staff (12,108,000)
074120- A012 Allowances 1,000,000
074120- A012-2 Other Allowances (Excluding TA) (1,000,000)
074120- A03 Operating Expenses 8,552,000
074120- A032 Communications 200,000
074120- A033 Utilities 2,300,000
074120- A038 Travel & Transportation 1,500,000
074120- A039 General 4,552,000
074120- A09 Physical Assets 16,076,000
074120- A092 Computer Equipment 16,076,000
074120- A13 Repairs and Maintenance 380,000
074120- A133 Buildings and Structure 380,000
Total- ESTABLISHMENT OF ALLERGY CENTRE AT QUETTA 49,036,000
IB2019 ESTABLISHMENT OF RESEARCH AND DEVELOPMENT (R&D) LABORATORIES FOR NIH PC-II ISLAMABAD
074120- A02 Project Pre-Investment Analysis 7,800,000
074120- A021 Feasibility Studies 7,800,000
074120- A03 Operating Expenses 200,000
074120- A039 General 200,000
Total- ESTABLISHMENT OF RESEARCH AND DEVELOPMENT (R&D) LABORATORIES FOR NIH PC-II ISLAMABAD 8,000,000
IB3467 DEVELOPMENT OF INTEGRATED DISEASES SURVEILLANCE AND RESPONSE SYSTEM (IDSRS)
074120- A01 Employees Related Expenses 295,612,000
074120- A011 Pay 295,612,000
074120- A011-1 Pay of Officers (195,000,000)
074120- A011-2 Pay of Other Staff (100,612,000)
074120- A03 Operating Expenses 72,388,000
074120- A038 Travel & Transportation 6,000,000
Page 322
NO. 114.- FC2 2D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION DEMANDS FOR GRANTS
No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES 2021-2022 Budget Estimate Rs
074120- A039 General 66,388,000
074120- A09 Physical Assets 382,000,000
074120- A092 Computer Equipment 100,000,000
074120- A094 Other Stores and Stocks 250,000,000
074120- A095 Purchase of Transport 30,000,000
074120- A097 Purchase of Furniture and Fixture 2,000,000
Total- DEVELOPMENT OF INTEGRATED DISEASES SURVEILLANCE AND 750,000,000
RESPONSE SYSTEM (IDSRS)
IB3468 UP-GR DIVISIONS ADATION OF DRUGS TESTING FACILITIES IN DRUGS CONTROL AND TRADITIONAL MEDICINES
074120- A01 Employees Related Expenses 2,500,000
074120- A012 Allowances 2,500,000
074120- A012-2 Other Allowances (Excluding TA) (2,500,000)
074120- A03 Operating Expenses 7,500,000
074120- A039 General 7,500,000
074120- A09 Physical Assets 337,000,000
074120- A092 Computer Equipment 20,000,000
074120- A094 Other Stores and Stocks 300,000,000
074120- A096 Purchase of Plant and Machinery 14,000,000
074120- A097 Purchase of Furniture and Fixture 3,000,000
074120- A13 Repairs and Maintenance 30,000,000
074120- A133 Buildings and Structure 30,000,000
Total- UP-GRADATION OF DRUGS TESTING FACILITIES IN DRUGS CONTROL AND 377,000,000
TRADITIONAL MEDICINES DIVISIONS
IB3469 REVAMPING OF LABORATORY ANIMAL FACILITY AT NIH ISLAMABAD
074120- A03 Operating Expenses 2,150,000
074120- A039 General 2,150,000
074120- A09 Physical Assets 660,000
074120- A097 Purchase of Furniture and Fixture 660,000
074120- A13 Repairs and Maintenance 114,587,000
074120- A133 Buildings and Structure 114,587,000
Total- REVAMPING OF LABORATORY ANIMAL FACILITY AT NIH ISLAMABAD 117,397,000
Page 323

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3471 CONSTRUCTION OF OFFICE BUILDING FOR DRUG REGULATORY AUTHORITY (DRAP)

074120- A02 Project Pre-Investment Analysis 31,170,000
074120- A021 Feasibility Studies 31,170,000
Total- CONSTRUCTION OF OFFICE BUILDING FOR DRUG REGULATORY AUTHORITY (DRAP) 31,170,000
IB3472 PREVN TIVE AND CONTROL OF BLINDNESS (PCB) PROGRAM AJK
074120- A05 Grants, Subsidies and Write off Loans 23,600,000
074120- A052 Grants Domestic 23,600,000
Total- PREVNTIVE AND CONTROL OF 23,600,000
BLINDNESS (PCB) PROGRAM AJK
IB3474 IMPLEMENTATION OF NATIONAL ACTION PLAN ON POPULATION (2021-26)
074120- A03 Operating Expenses 248,810,000
074120- A038 Travel & Transportation 2,500,000
074120- A039 General 246,310,000
074120- A09 Physical Assets 1,190,000
074120- A092 Computer Equipment 1,130,000
074120- A096 Purchase of Plant and Machinery 60,000
Total- IMPLEMENTATION OF NATIONAL ACTION PLAN ON POPULATION (2021-26) 250,000,000
IB3476 PROGRAMME FOR FAMILY PLANNING AND PRIMARY HEALTH CARE GILGIT BALTISTAN
074120- A05 Grants, Subsidies and Write off Loans 250,000,000
074120- A052 Grants Domestic 250,000,000
Total- PROGRAMME FOR FAMILY PLANNING AND PRIMARY HEALTH CARE GILGIT BALTISTAN 250,000,000
IB3477 UP-GR LAHORE ADATIONOF RADIOLOGY DEPARTMENT AT SHAIKH ZAYED POST GRADUATE MEDICAL INSTITUTE
074120- A09 Physical Assets 399,000,000
074120- A096 Purchase of Plant and Machinery 399,000,000
Total- UP-GRADATIONOF RADIOLOGY 399,000,000
DEPARTMENT AT SHAIKH ZAYED POST GRADUATE MEDICAL INSTITUTE LAHORE
Page 324

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

No of Posts 2021-22

DEMANDS FOR GRANTS 2021-2022 Budget Estimate

Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5041 TREAT 074120- A03 MENT OF POOR CANCER PATIENTS FROM ICT-AJK AND GILGIT BALTISTAN Operating Expenses 59,800,000
074120- A039 General 59,800,000
Total- TREATMENT OF POOR CANCER PATIENTS FROM ICT-AJK AND GILGIT BALTISTAN 59,800,000
ID9625 SAFE BLOOD TRANSFUSION SERVICES PROJECT
074120- A01 Employees Related Expenses 20,100,000
074120- A011 Pay 55 17,500,000
074120- A011- 1 Pay of Officers (20) (10,000,000)
074120- A011- 2 Pay of Other Staff (35) (7,500,000)
074120- A012 Allowances 2,600,000
074120- A012- 1 Regular Allowances (2,500,000)
074120- A012- 2 Other Allowances (Excluding TA) (100,000)
074120- A03 Operating Expenses 14,100,000
074120- A032 Communications 250,000
074120- A034 Occupancy Costs 2,800,000
074120- A038 Travel & Transportation 900,000
074120- A039 General 10,150,000
074120- A04 Employees Retirement Benefits 200,000
074120- A041 Pension 200,000
074120- A09 Physical Assets 45,000,000
074120- A094 Other Stores and Stocks 15,000,000
074120- A096 Purchase of Plant and Machinery 30,000,000
074120- A12 Civil works 20,000,000
074120- A124 Building and Structures 20,000,000
074120- A13 Repairs and Maintenance 600,000
074120- A130 Transport 600,000
Total- SAFE BLOOD TRANSFUSION SERVICES 100,000,000 PROJECT
(In Foreign Exchange)
(Foreign Aid)
(In Local Currency) (100,000,000)
074120 __________________________________________________ Total- ADMINISTRATION 2,715,003,000
0741 Total- Public Health Services 2,715,003,000
074 Total- Public Health Services 2,715,003,000
Page 325

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

076 Health Administration:
0761 Administration:
076101 IB2005 ADMINI SEHAT STRATION : SAHILAT PROGRAMM (PRIME MINISTERS HEALTH PROGRAM PHASE-II)
076101- A01 Employees Related Expenses 59,440,000
076101- A011 Pay 88 55,800,000
076101- A011-1 Pay of Officers (34) (40,800,000)
076101- A011-2 Pay of Other Staff (54) (15,000,000)
076101- A012 Allowances 3,640,000
076101- A012-1 Regular Allowances (3,040,000)
076101- A012-2 Other Allowances (Excluding TA) (600,000)
076101- A03 Operating Expenses 474,131,000
076101- A032 Communications 800,000
076101- A033 Utilities 2,800,000
076101- A034 Occupancy Costs 4,201,000
076101- A036 Motor Vehicles 1,020,000
076101- A037 Consultancy and Contractual Work 31,000,000
076101- A038 Travel & Transportation 4,300,000
076101- A039 General 430,010,000
076101- A04 Employees Retirement Benefits 1,000,000
076101- A041 Pension 1,000,000
076101- A06 Transfers 5,035,000,000
076101- A064 Other Transfer Payments 5,035,000,000
076101- A09 Physical Assets 25,379,000
076101- A092 Computer Equipment 250,000
076101- A095 Purchase of Transport 7,100,000
076101- A096 Purchase of Plant and Machinery 7,029,000
076101- A097 Purchase of Furniture and Fixture 11,000,000
076101- A13 Repairs and Maintenance 5,050,000
076101- A130 Transport 800,000
076101- A131 Machinery and Equipment 500,000
076101- A132 Furniture and Fixture 500,000
076101- A133 Buildings and Structure 2,800,000
076101- A137 Computer Equipment 450,000
Total- SEHAT SAHILAT PROGRAMM (PRIME MINISTERS HEALTH PROGRAM PHASE-II) 5,600,000,000
Page 326

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH SERVICES,REGULATION AND COORDINATION DIVISION No of Posts 2021-22

DEMANDS FOR GRANTS 2021-2022 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3466 NEEDS ASSESSMENT OF HEALTH HUMAN RESOURCES FOR DRIVING INNOVATION & ACHIEVING SDGS HUMAN RESOURCES FOR

076101- A01 Employees Related Expenses 53,808,000
076101- A011 Pay 604 52,512,000
076101- A011-1 Pay of Officers (5) (11,532,000)
076101- A011-2 Pay of Other Staff (599) (40,980,000)
076101- A012 Allowances 1,296,000
076101- A012-1 Regular Allowances (1,296,000)
076101- A03 Operating Expenses 6,924,000
076101- A038 Travel & Transportation 2,500,000
076101- A039 General 4,424,000
076101- A09 Physical Assets 3,768,000
076101- A092 Computer Equipment 3,464,000
076101- A097 Purchase of Furniture and Fixture 304,000
076101- A13 Repairs and Maintenance 500,000
076101- A137 Computer Equipment 500,000
Total- NEEDS ASSESSMENT OF HEALTH HUMAN RESOURCES FOR DRIVING INNOVATION & ACHIEVING SDGS HUMAN RESOURCES FOR 65,000,000
IB3475 POPULATION WELFARE PROGRAM GB
076101- A05 Grants, Subsidies and Write off Loans 107,800,000
076101- A052 Grants Domestic 107,800,000
Total- POPULATION WELFARE PROGRAM GB 107,800,000
ID8870 SECUR ISLAMABAD B ING OF LAND THROUGHG.I WIRE NETTING MS STEEL GATES FOR ESTAB. OF KH Y UN&AL IN
076101- A01 Employees Related Expenses 2,000,000
076101- A011 Pay 2,000,000
076101- A011- 2 Pay of Other Staff (2,000,000)
076101- A12 Civil works 13,474,000
076101- A124 Building and Structures 13,474,000
Total- SECURING OF LAND THROUGHG.I WIRE NETTING MS STEEL GATES FOR 15,474,000
ESTAB. OF KHUN&AL IN ISLAMABAD BY
Page 327

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH DEMANDS FOR GRANTS SERVICES,REGULATION AND COORDINATION DIVISION

No of Posts 2021-2022
2021-22 Budget
Estimate
Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

ID8886 STRENTHENING OF HEALTH SERVICES ACADEMY ISLAMABAD

076101- A03 Operating Expenses 68,000,000
076101- A037 Consultancy and Contractual Work 53,700,000
076101- A038 Travel & Transportation 5,500,000
076101- A039 General 8,800,000
076101- A06 Transfers 25,000,000
076101- A061 Scholarship 25,000,000
076101- A09 Physical Assets 7,000,000
076101- A092 Computer Equipment 7,000,000
Total- STRENTHENING OF HEALTH SERVICES ACADEMY ISLAMABAD 100,000,000
(In Foreign Exchange)
(Foreign Aid)
(In Local Currency) (100,000,000)
ID9506 ENHANCEMENT OF M/O NHS R&C ICT INFRASTRUCTURE
076101- A01 Employees Related Expenses 13,500,000
076101- A011 Pay 7 11,000,000
076101- A011-1 Pay of Officers (2) (10,000,000)
076101- A011-2 (5) Pay of Other Staff (1,000,000)
076101- A012 Allowances 2,500,000
076101- A012-1 Regular Allowances (1,000,000)
076101- A012-2 Other Allowances (Excluding TA) (1,500,000)
076101- A03 Operating Expenses 55,550,000
076101- A032 Communications 2,650,000
076101- A038 Travel & Transportation 1,490,000
076101- A039 General 51,410,000
Page 328

NO. 114.- FC22D77 DEVELOPMENT EXPENDITURE OF NATIONAL HEALTH DEMANDS FOR GRANTS SERVICES,REGULATION AND COORDINATION DIVISION

No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES
076101- A09 Physical Assets 258,950,000
076101- A092 Computer Equipment 217,040,000
076101- A096 Purchase of Plant and Machinery 29,000,000
076101- A097 Purchase of Furniture and Fixture 12,910,000
Total- ENHANCEMENT OF M/O NHS R&C ICT INFRASTRUCTURE 328,000,000
076101 Total- ADMINISTRATION 6,216,274,000
0761 Total- Administration 6,216,274,000
076 Total- Health Administration 6,216,274,000
07 Total- Health 21,722,506,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 21,722,506,000
(In Foreign Exchange) (500,000,000)
(Own Resources)
(Foreign Aid) (500,000,000)
(In Local Currency) (21,222,506,000)
TOTAL - DEMAND 21,722,506,000
(In Foreign Exchange) (500,000,000)
(Own Resources)
(Foreign Aid) (500,000,000)
(In Local Currency) (21,222,506,000)
Page 329

SECTION XX

MINISTRY OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES *

2021-2022 Budget Estimates (Rupees in Thousand) Demand presented on behalf of the Ministry of Planning, Development and Special Initiatives

Development Expenditure on Revenue Account

115. Development Expenditure of Planning, Development and Special Initiatives Division 106,243,558
Total : 106,243,558
Page 331

NO. 115.- DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES DIVISION DEMANDS FOR GRANTS

DEMAND NO. 115 ( FC22D28 )

DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2022 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES DIVISION.

Voted Rs. 106,243,558,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES .

FUNCTIONAL CLASSIFICATION 2021-2022 Budget Estimate Rs
015 General Services 95,946,536,000
045 Construction and Transport 10,297,022,000
Total 106,243,558,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 392,367,000
A011 Pay 375,270,000
A011- 1 Pay of Officers (302,864,000)
A011- 2 Pay of Other Staff (72,406,000)
A012 Allowances 17,097,000
A012- 1 Regular Allowances (6,375,000)
A012- 2 Other Allowances (Excluding TA) (10,722,000)
A02 Project Pre-Investment Analysis 425,000,000
A03 Operating Expenses 10,270,135,000
A03 Operating Expenses 84,550,000,000
A05 Grants, Subsidies and Write off Loans 7,298,602,000
A06 Transfers 1,000
A09 Physical Assets 281,976,000
A12 Civil works 2,998,420,000
A13 Repairs and Maintenance 27,057,000
Total 106,243,558,000
Page 332

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES DIVISION

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

No of Posts 2021-22 2021-2022 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES
01 General Public Service:
015 General Services:
0152 Planning Services:
015201 Planning :
IB0738 INTEGRATED ENERGY PLANNING
015201 - A01 Employees Related Expenses 38,880,000
015201 - A011 Pay 20 37,930,000
015201 - A011-1 Pay of Officers (14) (35,725,000)
015201 - A011-2 Pay of Other Staff (6) (2,205,000)
015201 - A012 Allowances 950,000
015201 - A012-1 Regular Allowances (350,000)
015201 - A012-2 Other Allowances (Excluding TA) (600,000)
015201 - A03 Operating Expenses 30,051,000
015201 - A032 Communications 1,200,000
015201 - A033 Utilities 2,850,000
015201 - A034 Occupancy Costs 3,500,000
015201 - A038 Travel & Transportation 3,801,000
015201 - A039 General 18,700,000
015201 - A09 Physical Assets 30,900,000
015201 - A092 Computer Equipment 26,600,000
015201 - A096 Purchase of Plant and Machinery 1,500,000
015201 - A097 Purchase of Furniture and Fixture 2,800,000
015201 - A13 Repairs and Maintenance 4,580,000
015201 - A131 Machinery and Equipment 250,000
015201 - A132 Furniture and Fixture 200,000
015201 - A133 Buildings and Structure 4,000,000
015201 - A137 Computer Equipment 130,000
Total- INTEGRATED ENERGY PLANNING 104,411,000
IB0739 STRENTHENING OF MINISTRY OF PDR IN IT
015201 - A01 Employees Related Expenses 11,285,000
015201 - A011 Pay 30 10,100,000
015201 - A011-1 Pay of Officers (25) (8,200,000)
Page 333

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES 2021-2022 Budget Estimate Rs
015201- A011-2 Pay of Other Staff (5) (1,900,000)
015201- A012 Allowances 1,185,000
015201- A012-1 Regular Allowances (185,000)
015201- A012-2 Other Allowances (Excluding TA) (1,000,000)
015201- A03 Operating Expenses 69,440,000
015201- A032 Communications 140,000
015201- A037 Consultancy and Contractual Work 1,000,000
015201- A039 General 68,300,000
015201- A09 Physical Assets 119,200,000
015201- A092 Computer Equipment 114,200,000
015201- A096 Purchase of Plant and Machinery 3,000,000
015201- A097 Purchase of Furniture and Fixture 2,000,000
015201- A13 Repairs and Maintenance 75,000
015201- A131 Machinery and Equipment 30,000
015201- A132 Furniture and Fixture 20,000
015201- A137 Computer Equipment 25,000
Total- I STRENTHENING OF MINISTRY OF PDR N IT 200,000,000
IB2041 STRENGTHENING CIVIL REGISTERATION AND VITAL STATISTICS
015201- A01 Employees Related Expenses 28,260,000
015201- A011 Pay 12 28,260,000
015201- A011-1 Pay of Officers (10) (27,680,000)
015201- A011-2 Pay of Other Staff (2) (580,000)
Total- STRENGTHENING CIVIL 28,260,000
REGISTERATION AND VITAL STATISTICS
IB2318 COVID- 19 RESPONSIVE AND OTHER NATURAL CALIMITIES CONTROL PROGRAMME
015201- A03 Operating Expenses 5,000,000,000
015201- A039 General 5,000,000,000
Total- COVID-19 RESPONSIVE AND OTHER 5,000,000,000
NATURAL CALIMITIES CONTROL PROGRAMME
Page 334

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-22

DEMANDS FOR GRANTS 2021-2022 Budget Estimate

Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3700 VGF FOR PPP PROJECTS
015201- A03 Operating Expenses 61,500,000,000
015201- A039 General 61,500,000,000
Total- VGF FOR PPP PROJECTS 61,500,000,000
IB3703 SDGS SUPPLEMENTARY FUNDS
015201- A03 Operating Expenses 22,000,000,000
015201- A039 General 22,000,000,000
Total- SDGS SUPPLEMENTARY FUNDS 22,000,000,000
IB6032 STREN MONITORING GTHENING OF MINISTERY OF PLANNING DEVELOPMENT AND SPECIAL ENITIATIVES IN AND
015201- A01 Employees Related Expenses 118,000,000
015201- A011 Pay 90 115,000,000
015201- A011-1 Pay of Officers (41) (65,000,000)
015201- A011-2 Pay of Other Staff (49) (50,000,000)
015201- A012 Allowances 3,000,000
015201- A012-1 Regular Allowances (2,000,000)
015201- A012-2 Other Allowances (Excluding TA) (1,000,000)
015201- A03 Operating Expenses 40,220,000
015201- A032 Communications 1,600,000
015201- A033 Utilities 120,000
015201- A034 Occupancy Costs 1,500,000
015201- A037 Consultancy and Contractual Work 900,000
015201- A038 Travel & Transportation 8,100,000
015201- A039 General 28,000,000
015201- A09 Physical Assets 58,500,000
015201- A092 Computer Equipment 45,000,000
015201- A095 Purchase of Transport 500,000
015201- A096 Purchase of Plant and Machinery 5,000,000
015201- A097 Purchase of Furniture and Fixture 8,000,000
015201- A13 Repairs and Maintenance 13,280,000
015201- A130 Transport 4,200,000
015201- A131 Machinery and Equipment 5,000,000
015201- A132 Furniture and Fixture 1,000,000
Page 335

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-2022
2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES Budget Estimate Rs
015201- A133 Buildings and Structure 680,000
015201- A137 Computer Equipment 2,400,000
Total- STRENGTHENING OF MINISTERY OF PLANNING DEVELOPMENT AND SPECIAL ENITIATIVES IN MONITORING AND 230,000,000
IB6217 FEASIBILITY & CONSTRUCTION OF PAKISTAN INSTITUTE OF DEVELOPMENT ECON AT H-11/2 ISLAMABAD OMICS (PIDE) CAMPUS
015201- A03 Operating Expenses 4,545,488,000
015201- A039 General 4,545,488,000
Total- FEASIBILITY & CONSTRUCTION OF PAKISTAN INSTITUTE OF DEVELOPMENT ECONOMICS (PIDE) CAMPUS AT H-11/2 ISLAMABAD 4,545,488,000
IB6321 COMPETITIVE GRANTS PROGRAMM FOR POICY ORIENTED RESEARCH
015201- A01 Employees Related Expenses 11,760,000
015201- A011 Pay 6 11,760,000
015201- A011- 1 Pay of Officers (6) (11,760,000)
015201- A02 Project Pre-Investment Analysis 400,000,000
015201- A022 Research Survey & Exploratory Oper 400,000,000
015201- A03 Operating Expenses 172,864,000
015201- A032 Communications 2,100,000
015201- A038 Travel & Transportation 5,770,000
015201- A039 General 164,994,000
Total- COMPETITIVE GRANTS PROGRAMM FOR POICY ORIENTED RESEARCH 584,624,000
IB9098 CAPACITY BUILDING OF INST. STRENTHENING OF MINISTRYOF PD&SI
015201- A03 Operating Expenses 1,000,000,000
015201- A039 General 1,000,000,000
Total- CAPACITY BUILDING OF INST. 1,000,000,000
STRENTHENING OF MINISTRYOF PD&SI
Page 336

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-22 2021-2022 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9099 SOCIAL SECTOR ACCELERATOR(SSA) FOR HEALTH NUTRITION EDUCATION YOUTH & GENDER NATIONAL PRIORITY

015201- A03 Operating Expenses 50,000,000
015201- A039 General 50,000,000
Total- ID3516 INSTITU SOCIAL SECTOR ACCELERATOR(SSA) FOR HEALTH NUTRITION EDUCATION YOUTH & GENDER NATIONAL PRIORITY TIONAL STRENGTHING & EFFICIENCY ENHANCEMENT (IS&EF) 50,000,000
015201- A01 Employees Related Expenses 14,630,000
015201- A011 Pay 30 14,520,000
015201- A011-1 Pay of Officers (18) (12,799,000)
015201- A011-2 Pay of Other Staff (12) (1,721,000)
015201- A012 Allowances 110,000
015201- A012-1 Regular Allowances (40,000)
015201- A012-2 Other Allowances (Excluding TA) (70,000)
015201- A03 Operating Expenses 355,000
015201- A038 Travel & Transportation 280,000
015201- A039 General 75,000
015201- A09 Physical Assets 200,000
015201- A092 Computer Equipment 200,000
015201- A13 Repairs and Maintenance 4,815,000
015201- A130 Transport 50,000
015201- A133 Buildings and Structure 4,750,000
015201- A137 Computer Equipment 15,000
Total- INSTITUTIONAL STRENGTHING & EFFICIENCY ENHANCEMENT (IS&EF) 20,000,000
ID4857 REFORM AND INNOVATION IN GOVERNMENT FOR HIGH PERFORMANCE
015201- A03 Operating Expenses 40,000,000
015201- A039 General 40,000,000
Total- REFORM AND INNOVATION IN GOVERNMENT FOR HIGH 40,000,000
PERFORMANCE
ID7370 DEVELOPMENT COMMUNICATION PROJECT
015201- A01 Employees Related Expenses 34,152,000
015201- A011 Pay 22 34,000,000
Page 337

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-2022
2021-22 Budget
Estimate
Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
015201- A011-1 Pay of Officers (9) (29,000,000)
015201- A011-2 Pay of Other Staff (13) (5,000,000)
015201- A012 Allowances 152,000
015201- A012-1 Regular Allowances (100,000)
015201- A012-2 Other Allowances (Excluding TA) (52,000)
015201- A03 Operating Expenses 63,047,000
015201- A032 Communications 50,000
015201- A038 Travel & Transportation 1,800,000
015201- A039 General 61,197,000
015201- A06 Transfers 1,000
015201- A063 Entertainment & Gifts 1,000
015201- A09 Physical Assets 2,400,000
015201- A092 Computer Equipment 2,200,000
015201- A096 Purchase of Plant and Machinery 100,000
015201- A097 Purchase of Furniture and Fixture 100,000
015201- A13 Repairs and Maintenance 400,000
015201- A131 Machinery and Equipment 100,000
015201- A137 Computer Equipment 300,000
Total- DEVELOPMENT COMMUNICATION PROJECT 100,000,000
ID7371 CHINA-PAK CORRIDOR SUPPORT PROJECT
015201- A01 Employees Related Expenses 34,700,000
015201- A011 Pay 31 23,500,000
015201- A011-1 Pay of Officers (18) (17,500,000)
015201- A011-2 Pay of Other Staff (13) (6,000,000)
015201- A012 Allowances 11,200,000
015201- A012-1 Regular Allowances (3,700,000)
015201- A012-2 Other Allowances (Excluding TA) (7,500,000)
015201- A03 Operating Expenses 54,550,000
015201- A032 Communications 5,100,000
015201- A033 Utilities 3,000
015201- A034 Occupancy Costs 100,000
Page 338
NO. 115.- FC2 2D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES DIVISION DEMANDS FOR GRANTS
No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES 2021-2022 Budget Estimate Rs
015201- A036 Motor Vehicles 250,000
015201- A038 Travel & Transportation 6,600,000
015201- A039 General 42,497,000
015201- A09 Physical Assets 9,100,000
015201- A092 Computer Equipment 1,600,000
015201- A095 Purchase of Transport 5,000,000
015201- A096 Purchase of Plant and Machinery 1,000,000
015201- A097 Purchase of Furniture and Fixture 1,500,000
015201- A13 Repairs and Maintenance 1,650,000
015201- A130 Transport 800,000
015201- A131 Machinery and Equipment 400,000
015201- A132 Furniture and Fixture 200,000
015201- A137 Computer Equipment 250,000
Total- CHINA-PAK CORRIDOR SUPPORT PROJECT 100,000,000
ID8140 NATIONAL INITIATIVE FOR SDGS/NUTRITION NATIONAL INITIATIVE FOR SDGS/NUTRITION
015201- A03 Operating Expenses 120,000,000
015201- A039 General 120,000,000
Total- NATIONAL INITIATIVE FOR 120,000,000
SDGS/NUTRITION NATIONAL INITIATIVE FOR SDGS/NUTRITION
ID8441 PAK-CHINA FRIENDLY EXCHANGE PROGRAMME(CPEC)
015201- A03 Operating Expenses 10,000,000
015201- A039 General 10,000,000
Total- PAK-CHINA FRIENDLY EXCHANGE PROGRAMME(CPEC) 10,000,000
ID8443 CENTRE FOR EXCELLENCE FOR CHINA-PAKISTAN ECONOMIC CORIDOR
015201- A01 Employees Related Expenses 57,600,000
015201- A011 Pay 37 57,600,000
015201- A011- 1 Pay of Officers (13) (53,600,000)
015201- A011- 2 Pay of Other Staff (24) (4,000,000)
015201- A02 Project Pre-Investment Analysis 25,000,000
015201- A022 Research Survey & Exploratory Oper 25,000,000
Page 339

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES 2021-2022 Budget Estimate Rs
015201- A03 Operating Expenses 67,387,000
015201- A032 Communications 4,100,000
015201- A033 Utilities 2,100,000
015201- A034 Occupancy Costs 10,000,000
015201- A038 Travel & Transportation 10,000,000
015201- A039 General 41,187,000
015201- A09 Physical Assets 6,000
015201- A091 Purchase of Building 3,000
015201- A092 Computer Equipment 3,000
015201- A13 Repairs and Maintenance 7,000
015201- A130 Transport 1,000
015201- A131 Machinery and Equipment 1,000
015201- A132 Furniture and Fixture 1,000
015201- A133 Buildings and Structure 1,000
015201- A137 Computer Equipment 3,000
Total- CENTRE FOR EXCELLENCE FOR CHINA-PAKISTAN ECONOMIC CORIDOR 150,000,000
015201 Total- Planning 95,782,783,000
0152 Total- Planning Services 95,782,783,000

0153 Statistics:

015301 Statistics :

ID9674 UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS H/Q ISLAMABAD

015301- A01 Employees Related Expenses 36,500,000
015301- A011 Pay 24 36,000,000
015301- A011-1 Pay of Officers (35,000,000)
015301- A011-2 Pay of Other Staff (24) (1,000,000)
015301- A012 Allowances 500,000
015301- A012-2 Other Allowances (Excluding TA) (500,000)
015301- A03 Operating Expenses 33,700,000
015301- A032 Communications 8,100,000
015301- A038 Travel & Transportation 6,500,000
015301- A039 General 19,100,000
Page 340

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-2022
2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES Budget Estimate Rs
015301- A09 Physical Assets 61,670,000
015301- A092 Computer Equipment 61,170,000
015301- A096 Purchase of Plant and Machinery 500,000
015301- A13 Repairs and Maintenance 2,250,000
015301- A130 Transport 150,000
015301- A131 Machinery and Equipment 500,000
015301- A137 Computer Equipment 1,600,000
Total- UPDATION OF RURAL AREA FRAME 134,120,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS H/Q ISLAMABAD
ID9675 UPDAT ION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/SURVEY R .O MUZAFFARABAD
015301- A03 Operating Expenses 210,000
015301- A038 Travel & Transportation 210,000
Total- ID9676 UPDAT UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/SURVEY R.O MUZAFFARABAD ION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS 210,000 R/O RAWALPINDI
015301- A03 Operating Expenses 450,000
015301- A038 Travel & Transportation 450,000
Total- UPDATION OF RURAL AREA FRAME 450,000
FOR THE CONDUCT OF CENSUSES/
SURVEYS R/O RAWALPINDI
015301 Total- Statistics 134,780,000
0153 Total- Statistics 134,780,000
015 Total- General Services 95,917,563,000
01 Total- General Public Service 95,917,563,000
Total- ACCOUNTANT GENERAL 95,917,563,000
PAKISTAN REVENUES
Page 341

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
01 General Public Service:
015 General Services:
0153 015301 BH008 Statist Statist 1 UPDA ics: ics : TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O BAHAWAL NAGAR
015301 - A03 Operating Expenses 60,000
015301 - A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME 60,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O BAHAWALNAGAR
BR009 7 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O BAHAWAL PUR
015301 - A03 Operating Expenses 86,000
015301 - A038 Travel & Transportation 86,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O BAHAWALPUR 86,000
DG016 3 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O DG KHAN
015301 - A03 Operating Expenses 60,000
015301 - A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME 60,000
FD0270 UPDA FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O DG KHAN TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O FAISALAB AD
015301 - A03 Operating Expenses 60,000
015301 - A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME 60,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O FAISALABAD
GA016 1 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O GUJRANWALA
015301 - A03 Operating Expenses 60,000
015301 - A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME 60,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O GUJRANWALA
Page 342

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

JG0091 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O JHANG
015301- A03 60,000 Operating Expenses
015301- A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O JHANG 60,000
LO1298 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O LAHORE
015301- A01 Employees Related Expenses 1,080,000
015301- A011 Pay 2 1,080,000
015301- A011- 1 Pay of Officers (2) (1,080,000)
015301- A03 Operating Expenses 370,000
015301- A038 Travel & Transportation 370,000
Total- MI0081 UPDAT UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O LAHORE 1,450,000 ION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O MIANWALI
015301- A03 Operating Expenses 60,000
015301- A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O MIANWALI 60,000
MN0320 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O MULTAN
015301- A01 Employees Related Expenses 1,080,000
015301- A011 Pay 2 1,080,000
015301- A011- 1 Pay of Officers (2) (1,080,000)
015301- A03 Operating Expenses 510,000
015301- A038 Travel & Transportation 510,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O MULTAN 1,590,000
RN0093 UPDA 015301- A03 TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O R.Y.KHAN Operating Expenses 60,000
Page 343

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES DIVISION

DEMANDS FOR GRANTS

No of Posts

No of Posts 2021-2022
2021-22 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
015301- A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O R.Y.KHAN 60,000
SG0161 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O SARGODHA
015301- A03 Operating Expenses 130,000
015301- A038 Travel & Transportation 130,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O SARGODHA 130,000
SL0161 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O SAHIWAL
015301- A03 Operating Expenses 20,000
015301- A038 Travel & Transportation 20,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O SAHIWAL 20,000
ST0161 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O SIALKOT
015301- A03 Operating Expenses 60,000
015301- A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O SIALKOT 60,000
VR0162 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O VEHARI
015301- A03 Operating Expenses 60,000
015301- A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O VEHARI 60,000
015301 Total- Statistics 3,816,000
0153 Total- Statistics 3,816,000
015 Total- General Services 3,816,000
01 Total- General Public Service 3,816,000
Total- ACCOUNTANT GENERAL 3,816,000
PAKISTAN REVENUES
SUB-OFFICE, LAHORE
Page 344

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-2022
2021-22 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
01 General Public Service:
015 General Services:
0153 Statistics:
015301 AD009 Statist 4 UPDA ics : TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O ABOTTABAD
015301 - A03 Operating Expenses 2,350,000
015301 - A038 Travel & Transportation 2,350,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ 2,350,000
SURVEYS R/O ABOTTABAD
BU022 3 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O BANNU
015301 - A03 Operating Expenses 1,250,000
015301 - A038 Travel & Transportation 1,250,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O BANNU 1,250,000
DI0307 UPDAT ION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O D.I. KHAN
015301 - A03 Operating Expenses 2,110,000
015301 - A038 Travel & Transportation 2,110,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O D.I. KHAN 2,110,000
PR3122 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O PESHAWAR
015301 - A01 Employees Related Expenses 1,080,000
015301 - A011 Pay 2 1,080,000
015301 - A011- 1 Pay of Officers (2) (1,080,000)
015301 - A03 Operating Expenses 3,650,000
015301 - A038 Travel & Transportation 3,650,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O PESHAWAR 4,730,000
SW016 1 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O MINGORA
015301 - A03 Operating Expenses 1,280,000
Page 345

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR 2021-2022 Budget Estimate Rs
015301- A038 Travel & Transportation 1,280,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O MINGORA 1,280,000
015301 Total- Statistics 11,720,000
0153 Total- Statistics 11,720,000
015 Total- General Services 11,720,000
01 Total- General Public Service 11,720,000
Total- ACCOUNTANT GENERAL 11,720,000
PAKISTAN REVENUES
SUB-OFFICE, PESHAWAR
Page 346

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
01 General Public Service:
015 General Services:
0153 Statistics:
015301 DU006 Statist 2 UPDA ics : TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O DADU
015301 - A03 Operating Expenses 91,000
015301 - A038 Travel & Transportation 91,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O DADU 91,000
HD019 7 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O HYDERABAD
015301 - A03 Operating Expenses 410,000
015301 - A038 Travel & Transportation 410,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O HYDERABAD 410,000
JD0062 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O JACOBABAD
015301 - A03 Operating Expenses 348,000
015301 - A038 Travel & Transportation 348,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O JACOBABAD 348,000
KA312 8 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS PBS KARACHI
015301 - A01 Employees Related Expenses 2,280,000
015301 - A011 Pay 3 2,280,000
015301 - A011- 1 Pay of Officers (3) (2,280,000)
015301 - A03 Operating Expenses 110,000
015301 - A038 Travel & Transportation 110,000
Total- UPDATION OF RURAL AREA FRAME 2,390,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS PBS KARACHI
LA0081 015301 UPDA - A03 TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O LARKANA Operating Expenses 60,000
Page 347

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT AND SPECIAL INITIATIVES DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-22

No of Posts 2021-2022
2021-22 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
015301 - A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O LARKANA 60,000
MS006 1 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O MIRPURKHAS
015301 - A03 Operating Expenses 60,000
015301 - A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O MIRPURKHAS 60,000
NH005 1 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O NAWABSHAH
015301 - A03 Operating Expenses 72,000
015301 - A038 Travel & Transportation 72,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O NAWABSHAH 72,000
SK0191 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O SUKKUR
015301 - A03 Operating Expenses 7,400,000
015301 - A038 Travel & Transportation 7,400,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O SUKKUR 7,400,000
0 15301 Total- Statistics 10,831,000
0 153 Total- Statistics 10,831,000
0 15 Total- General Services 10,831,000
0 1 Total- General Public Service 10,831,000
04 Economic Affairs:
045 Construction and Transport:
0452 Road Transport:
045202 ROAD S, HIGHWAYS AND BRIDGES :
KA135 5 CONSTRUCTION OF INTERCHANGE OVER MALIR LINK ROAD AT M-9 MOTORWAY
045202 - A05 Grants, Subsidies and Write off Loans 1,000,000,000
045202 - A052 Grants Domestic 1,000,000,000
Total- CONSTRUCTION OF INTERCHANGE OVER MALIR LINK ROAD AT M-9 MOTORWAY 1,000,000,000
Page 348

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7173 GREEN LINE BUS RAPID TRANSPORT SYSTEM (GLBRTS) KARACHI
045202- A12 Civil works 2,998,420,000
045202- A121 Roads Highways and Bridges 2,998,420,000
Total- GREEN LINE BUS RAPID TRANSPORT SYSTEM (GLBRTS) KARACHI 2,998,420,000
KA7174 RECONSTRUCTION OF MANGOPIR ROAD FROM JAM CHAKRO TO BANARAS KARACHI
045202- A05 Grants, Subsidies and Write off Loans 555,524,000
045202- A052 Grants Domestic 555,524,000
Total- RECONSTRUCTION OF MANGOPIR ROAD FROM JAM CHAKRO TO BANARAS KARACHI 555,524,000
KA7175 RECONSTRUCTION OF NINSHTAR & MANGHOPIR ROAD KARACHI
045202- A05 Grants, Subsidies and Write off Loans 446,000,000
045202- A052 Grants Domestic 446,000,000
Total- RECONSTRUCTION OF NINSHTAR & MANGHOPIR ROAD KARACHI 446,000,000
KA7176 REHABILITATION UPGRADING OF EXISTING FIRE FIGHTING OF KMC KARACHI
045202- A05 Grants, Subsidies and Write off Loans 86,239,000
045202- A052 Grants Domestic 86,239,000
Total- REHABILITATION UPGRADING OF EXISTING FIRE FIGHTING OF KMC KARACHI 86,239,000
KA7177 OPER SYSTEM ATIONLIZATION GREENLINE BRTS & INSTALATION OF INTEGRATED INTELLIGENT TRANSPORT
045202- A05 Grants, Subsidies and Write off Loans 4,300,000,000
045202- A052 Grants Domestic 4,300,000,000
Total- OPERATIONLIZATION GREENLINE BRTS & INSTALATION OF INTEGRATED INTELLIGENT TRANSPORT SYSTEM 4,300,000,000
KA7178 CONS MEHRAN TRUCTION OF ROAD OVER MALIR BUND FRONM DAD PHOY TOWN EXPRESSWAY UP TO PNS
045202- A05 Grants, Subsidies and Write off Loans 22,019,000
Page 349

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-22 2021-2022 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
045202- A052 Grants Domestic 22,019,000
Total- CONSTRUCTION OF ROAD OVER MALIR BUND FRONM DAD PHOY TOWN EXPRESSWAY UP TO PNS MEHRAN 22,019,000
KA7179 INSTA THARPARKA LALATION OF RO PLANTS IN TALUKA DAHLI CHACHRO AND TALUKA NAGARPARK OF R DISTRICT
045202- A05 Grants, Subsidies and Write off Loans 888,820,000
045202- A052 Grants Domestic 888,820,000
Total- INSTALALATION OF RO PLANTS IN TALUKA DAHLI CHACHRO AND TALUKA NAGARPARK OF THARPARKAR DISTRICT 888,820,000
045202 Total- ROADS, HIGHWAYS AND BRIDGES 10,297,022,000
0452 Total- Road Transport 10,297,022,000
045 Total- Construction and Transport 10,297,022,000
04 Total- Economic Affairs 10,297,022,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 10,307,853,000
SUB-OFFICE, KARACHI
Page 350

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION

No of Posts 2021-2022
2021-22 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
01 General Public Service:
015 General Services:
0153 Statistics:
015301 Statistics :
KR0061 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O KHUZDAR
015301 - A03 Operating Expenses 60,000
015301 - A038 Travel & Transportation 60,000
Total- UPDATION OF RURAL AREA FRAME 60,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O KHUZDAR
LI0061 UPDAT ION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O LORALAI
015301 - A03 Operating Expenses 310,000
015301 - A038 Travel & Transportation 310,000
Total- UPDATION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ 310,000
SURVEYS F/O LORALAI
QA310 4 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O QUETTA
015301 - A01 Employees Related Expenses 1,080,000
015301 - A011 Pay 3 1,080,000
015301 - A011- 1 Pay of Officers (3) (1,080,000)
015301 - A03 Operating Expenses 476,000
015301 - A038 Travel & Transportation 476,000
Total- UPDATION OF RURAL AREA FRAME 1,556,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS R/O QUETTA
TB0261 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O TURBAT
015301 - A03 Operating Expenses 310,000
015301 - A038 Travel & Transportation 310,000
Total- UPDATION OF RURAL AREA FRAME 310,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O TURBAT
0 15301 Total- Statistics 2,236,000
0 153 Total- Statistics 2,236,000
0 15 Total- General Services 2,236,000
0 1 Total- General Public Service 2,236,000
Total- ACCOUNTANT GENERAL 2,236,000
PAKISTAN REVENUES
SUB-OFFICE, QUETTA
Page 351

NO. 115.- FC22D28 DEVELOPMENT EXPENDITURE OF PLANNING, DEVELOPMENT DEMANDS FOR GRANTS AND SPECIAL INITIATIVES DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

01 General Public Service:
015 General Services:
0153 Statistics:
015301 Statistics :
GL033 5 UPDA TION OF RURAL AREA FRAME FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O GILGIT
015301 - A03 Operating Expenses 370,000
015301 - A038 Travel & Transportation 370,000
Total- UPDA TION OF RURAL AREA FRAME 370,000
FOR THE CONDUCT OF CENSUSES/ SURVEYS F/O GILGIT
0 15301 Total- Statistics 370,000
0 153 Total- Statistics 370,000
0 15 Total- General Services 370,000
0 1 Total- General Public Service 370,000
Total- ACCOUNTANT GENERAL 370,000
PAKISTAN REVENUES
SUB-OFFICE, GILGIT
TOTAL - DEMAND 106,243,558,000
Page 353

SECTION XXI

MINISTRY OF SCIENCE AND TECHNOLOGY

* 2021-2022 Budget Estimate (Rupees in Thousand)

Demand presented on behalf of the Ministry of Science and Technology

Development Expenditure on Revenue Account:

116. Development Expenditure of Science and Technology Division 8,341,000
Total : 8,341,000
Page 355

NO. 116.- DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION DEMANDS FOR GRANTS

DEMAND NO. 116 ( FC22D31 )

DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2022 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION.

Voted Rs. 8,341,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF SCIENCE AND TECHNOLOGY .

FUNCTIONAL CLASSIFICATION 2021-2022 Budget Estimate Rs
016 Basic Research 7,471,000,000
042 Agriculture,Food,Irrigation,Forestry and Fishing 195,000,000
095 Subsidiary Services to Education 675,000,000
Total 8,341,000,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 560,289,000
A011 Pay 427,921,000
A011-1 Pay of Officers (279,731,000)
A011-2 Pay of Other Staff (148,190,000)
A012 Allowances 132,368,000
A012-1 Regular Allowances (96,636,000)
A012-2 Other Allowances (Excluding TA) (35,732,000)
A02 Project Pre-Investment Analysis 577,526,000
A03 Operating Expenses 1,421,951,000
A06 Transfers 187,017,000
A09 Physical Assets 2,204,944,000
A12 Civil works 3,039,685,000
A13 Repairs and Maintenance 349,588,000
Total 8,341,000,000
(In Foreign Exchange) (406,408,000)
(Own Resources) (306,408,000)
(Foreign Aid) (100,000,000)
(In Local Currency) ________________ (7,934,592,000) __________________________________
Page 356

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

DEMANDS FOR GRANTS

III. - DETAILS are as follows :- No of Posts 2021-2022 2021-22 Budget Estimate Rs

01 Gener ACCOUNTANT GENERAL PAKISTAN REVENUES al Public Service:
016 Basic Research:
0161 Basic Research:
016101 Administration :
IB3452 ESTABLISHMENT OF CENTRE FOR INTERNATIONAL PEACE AND STABILITY (CIPS) AT NUST
016101 - A12 Civil works 125,000,000
016101 - A124 Building and Structures 125,000,000
Total- ESTABLISHMENT OF CENTRE FOR INTERNATIONAL PEACE AND STABILITY (CIPS) AT NUST 125,000,000
IB3454 "ESTABLISHMENT OF #NATIONAL CENTRE OF FAILURE ANALYSIS (NCFA)# - IST#"
016101 - A01 Employees Related Expenses 15,270,000
016101 - A011 Pay 15 15,270,000
016101 - A011-1 Pay of Officers (10) (11,971,000)
016101 - A011-2 Pay of Other Staff (5) (3,299,000)
016101 - A03 Operating Expenses 290,000
016101 - A032 Communications 90,000
016101 - A039 General 200,000
016101 - A06 Transfers 50,000
016101 - A063 Entertainment & Gifts 50,000
016101 - A09 Physical Assets 22,240,000
016101 - A092 Computer Equipment 720,000
016101 - A095 Purchase of Transport 7,500,000
016101 - A096 Purchase of Plant and Machinery 12,700,000
016101 - A097 Purchase of Furniture and Fixture 1,320,000
016101 - A12 Civil works 31,670,000
016101 - A124 Building and Structures 31,670,000
016101 - A13 Repairs and Maintenance 480,000
016101 - A131 Machinery and Equipment 480,000
Total- "ESTABLISHMENT OF #NATIONAL 70,000,000
CENTRE OF FAILURE ANALYSIS (NCFA)# - IST#"
Page 357

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

IB3457 RESEA No of Posts 2021-22 2021-2022 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES RCH DEVELOPMENT AND INNOVATION IN PCSIR
016101- A01 Employees Related Expenses 1,100,000
016101- A012 Allowances 1,100,000
016101- A012-1 Regular Allowances (1,100,000)
016101- A03 Operating Expenses 87,900,000
016101- A038 Travel & Transportation 1,000,000
016101- A039 General 86,900,000
016101- A06 Transfers 111,000,000
016101- A064 Other Transfer Payments 111,000,000
Total- I RESEARCH DEVELOPMENT AND NNOVATION IN PCSIR 200,000,000
IB3458 ESTABL TECHNOLOGY ISHMENT OF PLANNING MONITORING & EVALUATION (PM&E) CELL IN MINISTRY OF SCIENCE &
016101- A01 Employees Related Expenses 35,500,000
016101- A011 Pay 25 32,000,000
016101- A011-1 Pay of Officers (11) (20,000,000)
016101- A011-2 Pay of Other Staff (14) (12,000,000)
016101- A012 Allowances 3,500,000
016101- A012-1 Regular Allowances (1,000,000)
016101- A012-2 Other Allowances (Excluding TA) (2,500,000)
016101- A03 Operating Expenses 7,700,000
016101- A032 Communications 400,000
016101- A034 Occupancy Costs 100,000
016101- A038 Travel & Transportation 4,000,000
016101- A039 General 3,200,000
016101- A09 Physical Assets 5,700,000
016101- A092 Computer Equipment 500,000
016101- A095 Purchase of Transport 5,000,000
016101- A096 Purchase of Plant and Machinery 100,000
016101- A097 Purchase of Furniture and Fixture 100,000
016101- A13 Repairs and Maintenance 1,100,000
016101- A130 Transport 1,000,000
016101- A131 Machinery and Equipment 100,000
Total- ESTABLISHMENT OF PLANNING 50,000,000
MONITORING & EVALUATION (PM&E) CELL IN MINISTRY OF SCIENCE & TECHNOLOGY
Page 358

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5020 ADVANCED SKILLS DEVELOPMENT THROUGH INTERNATIONAL SCHOLARSHIPS-KNOWLEDGE ECONOMY
016101- A01 Employees Related Expenses 10,000,000
016101- A012 Allowances 10,000,000
016101- A012-1 Regular Allowances (10,000,000)
016101- A03 Operating Expenses 185,000,000
016101- A032 Communications 650,000
016101- A038 Travel & Transportation 10,000,000
016101- A039 General 174,350,000
016101- A13 Repairs and Maintenance 5,000,000
016101- A131 Machinery and Equipment 5,000,000
Total- T ADVANCED SKILLS DEVELOPMENT HROUGH INTERNATIONAL 200,000,000
SCHOLARSHIPS-KNOWLEDGE ECONOMY
IB5021 PAK-CH INITIATIVE INA UNIVERSITY OF ENGINEERING AND EMERGING TECHNOLOGIES-KNOWLEDGE ECONOMY
016101- A01 Employees Related Expenses 201,400,000
016101- A011 Pay 35 148,000,000
016101- A011-1 Pay of Officers (15) (85,000,000)
016101- A011-2 Pay of Other Staff (20) (63,000,000)
016101- A012 Allowances 53,400,000
016101- A012-1 Regular Allowances (27,900,000)
016101- A012-2 Other Allowances (Excluding TA) (25,500,000)
016101- A03 Operating Expenses 379,600,000
016101- A032 Communications 9,000,000
016101- A033 Utilities 9,500,000
016101- A034 Occupancy Costs 15,000,000
016101- A038 Travel & Transportation 50,000,000
016101- A039 General 296,100,000
Page 359

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-2022
2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES Budget Estimate Rs
016101- A06 Transfers 1,000,000
016101- A063 Entertainment & Gifts 1,000,000
016101- A09 Physical Assets 291,000,000
016101- A091 Purchase of Building 1,000,000
016101- A092 Computer Equipment 100,000,000
016101- A095 Purchase of Transport 40,000,000
016101- A096 Purchase of Plant and Machinery 50,000,000
016101- A097 Purchase of Furniture and Fixture 100,000,000
016101- A12 Civil works 2,550,000,000
016101- A124 Building and Structures 2,550,000,000
016101- A13 Repairs and Maintenance 77,000,000
016101- A130 Transport 10,000,000
016101- A131 Machinery and Equipment 10,000,000
016101- A132 Furniture and Fixture 10,000,000
016101- A133 Buildings and Structure 25,000,000
016101- A137 Computer Equipment 20,000,000
016101- A138 General 2,000,000
Total- PAK-CHINA UNIVERSITY OF 3,500,000,000
ENGINEERING AND EMERGING
TECHNOLOGIES-KNOWLEDGE ECONOMY INITIATIVE
IB5022 ESTABLISHMENT OF CENTER FOR ADVANCED TECHNOLOGIES IN BIOMEDICAL MATERIALS-KNOWLEDGE ECONOMY
016101- A01 Employees Related Expenses 3,278,000
016101- A011 Pay 3 3,278,000
016101- A011-1 Pay of Officers (2) (2,988,000)
016101- A011-2 Pay of Other Staff (1) (290,000)
016101- A02 Project Pre-Investment Analysis 77,314,000
016101- A022 Research Survey & Exploratory Oper 77,314,000
016101- A03 Operating Expenses 22,408,000
016101- A038 Travel & Transportation 22,408,000
Total- ESTABLISHMENT OF CENTER FOR ADVANCED TECHNOLOGIES IN BIOMEDICAL MATERIALS- KNOWLEDGE ECONOMY 103,000,000
Page 360

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES Budget Estimate Rs
( In Foreign Exchange) (12,408,000)
( ( Own Resources) In Local Currency) (12,408,000) (90,592,000)
ID7268 CERTIFI ______________________________________ CATION INCENTIVE PROGRAM FOR SMES
016101- A01 Employees Related Expenses 20,900,000
016101- A011 Pay 41 16,000,000
016101- A011-1 Pay of Officers (19) (8,000,000)
016101- A011-2 Pay of Other Staff (22) (8,000,000)
016101- A012 Allowances 4,900,000
016101- A012-1 Regular Allowances (3,500,000)
016101- A012-2 Other Allowances (Excluding TA) (1,400,000)
016101- A03 Operating Expenses 126,422,000
016101- A032 Communications 432,000
016101- A034 Occupancy Costs 100,000
016101- A038 Travel & Transportation 22,690,000
016101- A039 General 103,200,000
016101- A09 Physical Assets 300,000
016101- A092 Computer Equipment 100,000
016101- A096 Purchase of Plant and Machinery 100,000
016101- A097 Purchase of Furniture and Fixture 100,000
016101- A13 Repairs and Maintenance 2,378,000
016101- A130 Transport 1,878,000
016101- A131 Machinery and Equipment 500,000
Total- CERTIFICATION INCENTIVE PROGRAM FOR SMES 150,000,000
016101 Total- Administration 4,398,000,000
016120 Others :
IB2026 CLOUD ENABLED INFRASTRUCTURE FOR RESEARCH AND INNOVATION NUST ISLAMABAD
016120- A09 Physical Assets 37,000,000
016120- A092 Computer Equipment 37,000,000
Total- CLOUD ENABLED INFRASTRUCTURE 37,000,000
FOR RESEARCH AND INNOVATION NUST ISLAMABAD
Page 361

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES 2021-2022 Budget Estimate Rs
IB2027 SEMICO NDUCTOR CHIP DESIGN FACILITATION CENTER NIE ISLAMABAD
016120- A01 Employees Related Expenses 6,300,000
016120- A011 Pay 6 6,300,000
016120- A011-1 Pay of Officers (5) (5,820,000)
016120- A011-2 Pay of Other Staff (1) (480,000)
016120- A03 Operating Expenses 8,500,000
016120- A032 Communications 400,000
016120- A033 Utilities 600,000
016120- A039 General 7,500,000
016120- A09 Physical Assets 29,000,000
016120- A092 Computer Equipment 21,980,000
016120- A096 Purchase of Plant and Machinery 2,520,000
016120- A097 Purchase of Furniture and Fixture 4,500,000
Total- I SEMICONDUCTOR CHIP DESIGN FACILITATION CENTER NIE SLAMABAD 43,800,000
IB2028 UPGRADATION OF PRINTED CIRCUIT BOARD (PCB) FACILITY NIE ISLAMABAD
016120- A01 Employees Related Expenses 3,240,000
016120- A011 Pay 7 2,940,000
016120- A011-2 Pay of Other Staff (7) (2,940,000)
016120- A012 Allowances 300,000
016120- A012-1 Regular Allowances (300,000)
016120- A03 Operating Expenses 860,000
016120- A039 General 860,000
016120- A09 Physical Assets 47,900,000
016120- A096 Purchase of Plant and Machinery 47,200,000
016120- A097 Purchase of Furniture and Fixture 700,000
016120- A12 Civil works 500,000
016120- A124 Building and Structures 500,000
016120- A13 Repairs and Maintenance 2,500,000
016120- A133 Buildings and Structure 2,500,000
Total- UPGRADATION OF PRINTED CIRCUIT 55,000,000
BOARD (PCB) FACILITY NIE ISLAMABAD
Page 362

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3448 UPGRD KARACHI AND ATION OF HALAL AUTHENTICATION LABS AT PCSIR LABORATORIES COMPLEX LAH PESHAWAR ORE
016120- A01 Employees Related Expenses 24,738,000
016120- A011 Pay 58 21,570,000
016120- A011-1 Pay of Officers (30) (14,220,000)
016120- A011-2 Pay of Other Staff (28) (7,350,000)
016120- A012 Allowances 3,168,000
016120- A012-1 Regular Allowances (3,168,000)
016120- A03 Operating Expenses 7,492,000
016120- A038 Travel & Transportation 1,920,000
016120- A039 General 5,572,000
016120- A09 Physical Assets 162,500,000
016120- A094 Other Stores and Stocks 1,500,000
016120- A096 Purchase of Plant and Machinery 158,000,000
016120- A097 Purchase of Furniture and Fixture 3,000,000
016120- A13 Repairs and Maintenance 5,270,000
016120- A132 Furniture and Fixture 1,270,000
016120- A133 Buildings and Structure 4,000,000
Total- UPGRDATION OF HALAL 200,000,000
AUTHENTICATION LABS AT PCSIR LABORATORIES COMPLEX LAHORE KARACHI AND PESHAWAR
(In Foreign Exchange) (138,000,000)
(Own Resources) (138,000,000)
(In Local Currency) (62,000,000)
IB3450 STREN ACCREDITATIO ______________________________________ GTHENING AND UPGRADATION OF RESEARCH AND DEVELOPMENT FACILITIES AND N OF
016120- A13 Repairs and Maintenance 40,000,000
016120- A131 Machinery and Equipment 40,000,000
Total- STRENGTHENING AND UPGRADATION OF RESEARCH AND DEVELOPMENT FACILITIES AND ACCREDITATION OF 40,000,000
Page 363

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES IB3451 ESTABLISHMENT OF ADDITIONAL PRODUCTION LINES FOR RESEARCH AND DEVELOPMENT OF INDIGENOUS ELECTROMEDICAL

016120- A01 Employees Related Expenses 19,764,000
016120- A011 Pay 34 19,764,000
016120- A011-1 Pay of Officers (12) (17,040,000)
016120- A011-2 Pay of Other Staff (22) (2,724,000)
016120- A03 Operating Expenses 8,036,000
016120- A038 Travel & Transportation 3,400,000
016120- A039 General 4,636,000
016120- A09 Physical Assets 32,200,000
016120- A092 Computer Equipment 700,000
016120- A095 Purchase of Transport 6,000,000
016120- A096 Purchase of Plant and Machinery 25,000,000
016120- A097 Purchase of Furniture and Fixture 500,000
016120- A12 Civil works 40,000,000
016120- A124 Building and Structures 40,000,000
Total- ESTABLISHMENT OF ADDITIONAL PRODUCTION LINES FOR RESEARCH AND DEVELOPMENT OF INDIGENOUS ELECTROMEDICAL 100,000,000
( In Foreign Exchange) (28,000,000)
( Own Resources) (28,000,000)
( In Local Currency) _______________________________ (72,000,000) ___________________
IB3455 DIGITAL TRANSFORMATION STRENGTHENING AND AUTOMATION OF PCSIR
016120- A01 Employees Related Expenses 17,436,000
016120- A011 Pay 41 13,980,000
016120- A011-1 Pay of Officers (16) (10,740,000)
016120- A011-2 Pay of Other Staff (25) (3,240,000)
016120- A012 Allowances 3,456,000
016120- A012-1 Regular Allowances (3,456,000)
Page 364

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-2022
2021-22 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
016120- A03 Operating Expenses 21,245,000
016120- A038 Travel & Transportation 450,000
016120- A039 General 20,795,000
016120- A09 Physical Assets 303,219,000
016120- A092 Computer Equipment 296,119,000
016120- A095 Purchase of Transport 1,700,000
016120- A096 Purchase of Plant and Machinery 5,000,000
016120- A097 Purchase of Furniture and Fixture 400,000
016120- A13 Repairs and Maintenance 8,100,000
016120- A130 Transport 50,000
016120- A132 Furniture and Fixture 50,000
016120- A133 Buildings and Structure 8,000,000
Total- DIGITAL TRANSFORMATION 350,000,000
STRENGTHENING AND AUTOMATION OF PCSIR
IB3456 ESTABLISHMENT OF MATERIAL RESOURCE CENTRE AND DEVELOPMENT OF ADDITIVE MANUFACTURING AND REVERSE
016120- A01 Employees Related Expenses 11,236,000
016120- A011 Pay 86 8,380,000
016120- A011-1 Pay of Officers (17) (5,880,000)
016120- A011-2 Pay of Other Staff (69) (2,500,000)
016120- A012 Allowances 2,856,000
016120- A012-1 Regular Allowances (2,856,000)
016120- A03 Operating Expenses 17,500,000
016120- A033 Utilities 1,500,000
016120- A038 Travel & Transportation 5,000,000
016120- A039 General 11,000,000
016120- A09 Physical Assets 211,264,000
016120- A095 Purchase of Transport 26,000,000
016120- A096 Purchase of Plant and Machinery 175,264,000
016120- A097 Purchase of Furniture and Fixture 10,000,000
016120- A12 Civil works 35,000,000
Page 365

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES 2021-2022 Budget Estimate Rs
016120- A124 Building and Structures 35,000,000
016120- A13 Repairs and Maintenance 25,000,000
016120- A133 Buildings and Structure 25,000,000
Total- ESTABLISHMENT OF MATERIAL RESOURCE CENTRE AND 300,000,000
DEVELOPMENT OF ADDITIVE
MANUFACTURING AND REVERSE
IB3459 DATA R EPOSITORY OF SCIENTIFIC INSTRUMENTATION
016120- A01 Employees Related Expenses 2,880,000
016120- A011 Pay 7 2,880,000
016120- A011-1 Pay of Officers (1) (720,000)
016120- A011-2 Pay of Other Staff (6) (2,160,000)
016120- A03 Operating Expenses 46,820,000
016120- A039 General 46,820,000
016120- A09 Physical Assets 300,000
016120- A092 Computer Equipment 300,000
Total- I DATA REPOSITORY OF SCIENTIFIC NSTRUMENTATION 50,000,000
ID9233 FIRST NATIONAL INDUSTRIAL INNOVATION SURVEY
016120- A01 Employees Related Expenses 5,499,000
016120- A011 Pay 6 4,634,000
016120- A011-1 Pay of Officers (3) (3,667,000)
016120- A011-2 Pay of Other Staff (3) (967,000)
016120- A012 Allowances 865,000
016120- A012-1 Regular Allowances (1,000)
016120- A012-2 Other Allowances (Excluding TA) (864,000)
016120- A02 Project Pre-Investment Analysis 9,888,000
016120- A022 Research Survey & Exploratory Oper 9,888,000
016120- A03 Operating Expenses 2,700,000
016120- A032 Communications 150,000
016120- A033 Utilities 180,000
016120- A038 Travel & Transportation 800,000
016120- A039 General 1,570,000
Total- FIRST NATIONAL INDUSTRIAL INNOVATION SURVEY 18,087,000
Page 366

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

ID9238 NEED ASSESMENT OF S&T HUMAN RESOURCES FOR DERIVING INNOVATION AND ACHIEVING VISION

2050
016120- A01 Employees Related Expenses 1,117,000
016120- A011 Pay 5 1,009,000
016120- A011-1 Pay of Officers (2) (825,000)
016120- A011-2 Pay of Other Staff (3) (184,000)
016120- A012 Allowances 108,000
016120- A012-2 Other Allowances (Excluding TA) (108,000)
016120- A02 Project Pre-Investment Analysis 6,624,000
016120- A022 Research Survey & Exploratory Oper 6,624,000
016120- A03 Operating Expenses 105,000
016120- A038 Travel & Transportation 1,000
016120- A039 General 104,000
016120- A09 Physical Assets 4,000
016120- A097 Purchase of Furniture and Fixture 4,000
016120- A13 Repairs and Maintenance 1,000
016120- A137 Computer Equipment 1,000
Total- I 2 NEED ASSESMENT OF S&T HUMAN RESOURCES FOR DERIVING NNOVATION AND ACHIEVING VISION 050 7,851,000
ID9368 ETAB. OF PAK-KOREA TESTING FACILITY FOR SOLAR & ALLIED EQUIPMENT PCRET
016120- A01 Employees Related Expenses 3,750,000
016120- A011 Pay 17 2,800,000
016120- A011-1 Pay of Officers (2) (1,900,000)
016120- A011-2 Pay of Other Staff (15) (900,000)
016120- A012 Allowances 950,000
016120- A012-1 Regular Allowances (950,000)
016120- A02 Project Pre-Investment Analysis 500,000
016120- A021 Feasibility Studies 500,000
016120- A03 Operating Expenses 5,620,000
Page 367

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES Budget Estimate Rs
016120 - A032 Communications 400,000
016120 - A033 Utilities 3,250,000
016120 - A034 Occupancy Costs 450,000
016120 - A039 General 1,520,000
016120 - A09 Physical Assets 100,000
016120 - A092 Computer Equipment 100,000
016120 - A12 Civil works 100,000,000
016120 - A124 Building and Structures 100,000,000
Total- ETAB. OF PAK-KOREA TESTING 109,970,000
FACILITY FOR SOLAR & ALLIED EQUIPMENT PCRET
(In Foreign Exchange) (100,000,000)
(Foreign Aid) (100,000,000)
(In Local Currency) _____________________________ (9,970,000) _____________________
0 16120 Total- Others 1,311,708,000
0 161 Total- Basic Research 5,709,708,000
0 16 Total- Basic Research 5,709,708,000
0 1 Total- General Public Service 5,709,708,000
04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042205 Equipment machinery workshops :
IB3449 LAUNCHING OF STEM IN PAKISTAN PHASE-I
042205 - A01 Employees Related Expenses 25,750,000
042205 - A011 Pay 12 10,000,000
042205 - A011- 1 Pay of Officers (9) (9,000,000)
042205 - A011- 2 Pay of Other Staff (3) (1,000,000)
042205 - A012 Allowances 15,750,000
042205 - A012- 1 Regular Allowances (15,750,000)
042205 - A03 Operating Expenses 72,150,000
042205 - A032 Communications 500,000
042205 - A038 Travel & Transportation 21,000,000
042205 - A039 General 50,650,000
Page 368

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

DEMANDS FOR GRANTS

No of Posts 2021-2022
2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES Budget Estimate Rs
042205 - A09 Physical Assets 2,100,000
042205 - A092 Computer Equipment 1,100,000
042205 - A097 Purchase of Furniture and Fixture 1,000,000
042205 - A13 Repairs and Maintenance 80,000,000
042205 - A131 Machinery and Equipment 80,000,000
Total- LAUNCHING OF STEM IN PAKISTAN PHASE-I 180,000,000
0 42205 Total- Equipment machinery workshops 180,000,000
0 422 Total- Irrigation 180,000,000
0 42 Total- Agriculture,Food,Irrigation,Forestry and Fishing 180,000,000
0 4 Total- Economic Affairs 180,000,000
09 Education Affairs and Services:
095 Subsidiary Services to Education:
0951 Subsidiary Services to Education:
095101 Archives Library and Museums :
IB2025 NATIONAL DIGITAL ARCHIVE OF RESEARCH PUBLISHED IN PAKISTAN JOURNALS
095101 - A01 Employees Related Expenses 1,524,000
095101 - A012 Allowances 1,524,000
095101 - A012-1 Regular Allowances (144,000)
095101 - A012-2 Other Allowances (Excluding TA) (1,380,000)
095101 - A03 Operating Expenses 3,726,000
095101 - A032 Communications 20,000
095101 - A038 Travel & Transportation 1,306,000
095101 - A039 General 2,400,000
095101 - A06 Transfers 50,000
095101 - A063 Entertainment & Gifts 50,000
095101 - A09 Physical Assets 4,600,000
095101 - A092 Computer Equipment 4,300,000
095101 - A096 Purchase of Plant and Machinery 100,000
095101 - A097 Purchase of Furniture and Fixture 200,000
095101 - A13 Repairs and Maintenance 100,000
095101 - A133 Buildings and Structure 100,000
Total- NATIONAL DIGITAL ARCHIVE OF 10,000,000
RESEARCH PUBLISHED IN PAKISTAN JOURNALS
Page 369

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES IB3453 "NATIONAL TECHNOLOGY INNOVATION THROUGH INDUSTRY-RESEARCH CENTRE AND OTHER STAKEHOLDERS COLLABORATION###"

095101- A01 Employees Related Expenses 13,332,000
095101- A011 Pay 12 12,900,000
095101- A011-1 Pay of Officers (9) (11,700,000)
095101- A011-2 Pay of Other Staff (3) (1,200,000)
095101- A012 Allowances 432,000
095101- A012-1 Regular Allowances (432,000)
095101- A02 Project Pre-Investment Analysis 319,000,000
095101- A022 Research Survey & Exploratory Oper 319,000,000
095101- A03 Operating Expenses 51,463,000
095101- A038 Travel & Transportation 30,000,000
095101- A039 General 21,463,000
095101- A06 Transfers 9,840,000
095101- A062 Technical Assistance 9,840,000
095101- A09 Physical Assets 6,365,000
095101- A092 Computer Equipment 3,900,000
095101- A096 Purchase of Plant and Machinery 300,000
095101- A097 Purchase of Furniture and Fixture 2,165,000
Total- " T NATIONAL TECHNOLOGY INNOVATION HROUGH INDUSTRY-RESEARCH CENTRE AND OTHER STAKEHOLDERS 400,000,000
COLLABORATION###"
ID8319 SCIENCE TALENT FARMING SCHEME(STFS) 1800 YOUNG STUDENTS
095101- A01 Employees Related Expenses 4,250,000
095101- A011 Pay 25 4,250,000
095101- A011-1 Pay of Officers (9) (3,500,000)
095101- A011-2 Pay of Other Staff (16) (750,000)
095101- A02 Project Pre-Investment Analysis 200,000
095101- A022 Research Survey & Exploratory Oper 200,000
Page 370

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
095101- A03 Operating Expenses 32,159,000
095101- A032 Communications 200,000
095101- A038 Travel & Transportation 10,200,000
095101- A039 General 21,759,000
095101- A06 Transfers 63,391,000
095101- A061 Scholarship 63,391,000
Total- SCIENCE TALENT FARMING SCHEME(STFS) 1800 YOUNG 100,000,000
STUDENTS
ID9234 FINANCIAL SUPPORT TO SCIENTIFIC SOCIETIES IN PAKISTAN(PHASE-II)
095101- A01 Employees Related Expenses 1,200,000
095101- A012 Allowances 1,200,000
095101- A012- 1 Regular Allowances (1,200,000)
095101- A03 Operating Expenses 12,300,000
095101- A032 Communications 30,000
095101- A038 Travel & Transportation 920,000
095101- A039 General 11,350,000
095101- A06 Transfers 550,000
095101- A061 Scholarship 500,000
095101- A063 Entertainment & Gifts 50,000
095101- A09 Physical Assets 950,000
095101- A092 Computer Equipment 950,000
Total- FINANCIAL SUPPORT TO SCIENTIFIC SOCIETIES IN PAKISTAN(PHASE-II) 15,000,000
ID9239 COMPETITIVE RESEARCH PROGRAMME
095101- A01 Employees Related Expenses 864,000
095101- A012 Allowances 864,000
095101- A012- 1 Regular Allowances (864,000)
095101- A02 Project Pre-Investment Analysis 140,000,000
095101- A022 Research Survey & Exploratory Oper 140,000,000
095101- A03 Operating Expenses 8,000,000
095101- A038 Travel & Transportation 900,000
Page 371

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-22 2021-2022 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
095101- A039 General 7,100,000
095101- A06 Transfers 1,136,000
095101- A062 Technical Assistance 1,136,000
Total- COMPETITIVE RESEARCH PROGRAMME 150,000,000
095101 Total- Archives Library and Museums 675,000,000
0951 Total- Subsidiary Services to Education 675,000,000
095 Total- Subsidiary Services to Education 675,000,000
09 Total- Education Affairs and Services 675,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 6,564,708,000
(In Foreign Exchange) (278,408,000)
(Own Resources) (178,408,000)
(Foreign Aid) (100,000,000)
(In Local Currency) (6,286,300,000)
Page 372

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 Budget
Estimate
Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

01 General Public Service:
016 Basic Research:
0161 Basic Research:
016101 Administration :
LO1637 ESTABLISHMENT OF PCSIR LABORATORIES COMPLEX MULTAN (FEASILBILITY STUDY)
016101 - A01 Employees Related Expenses 1,500,000
016101 - A012 Allowances 1,500,000
016101 - A012-2 Other Allowances (Excluding TA) (1,500,000)
016101 - A03 Operating Expenses 28,000,000
016101 - A032 Communications 100,000
016101 - A038 Travel & Transportation 1,000,000
016101 - A039 General 26,900,000
016101 - A09 Physical Assets 500,000
016101 - A092 Computer Equipment 500,000
Total- ESTABLISHMENT OF PCSIR 30,000,000
( LABORATORIES COMPLEX MULTAN FEASILBILITY STUDY)
0 16101 Total- Administration 30,000,000
016120 Others :
LO1638 GENE EDITING OF BIOLOGICAL AGENTS FOR NUTRITIONAL BIOCHEMICAL AND THERAPEUTICAL
PURPOSE
016120 - A01 Employees Related Expenses 39,816,000
016120 - A011 Pay 18 24,252,000
016120 - A011-1 Pay of Officers (12) (18,420,000)
016120 - A011-2 Pay of Other Staff (6) (5,832,000)
016120 - A012 Allowances 15,564,000
016120 - A012-1 Regular Allowances (15,564,000)
016120 - A02 Project Pre-Investment Analysis 24,000,000
016120 - A022 Research Survey & Exploratory Oper 24,000,000
016120 - A03 Operating Expenses 22,790,000
016120 - A032 Communications 2,400,000
016120 - A033 Utilities 2,400,000
Page 373

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE 2021-2022 Budget Estimate Rs
016120- A038 Travel & Transportation 8,400,000
016120- A039 General 9,590,000
016120- A09 Physical Assets 276,000,000
016120- A092 Computer Equipment 22,000,000
016120- A094 Other Stores and Stocks 30,000,000
016120- A096 Purchase of Plant and Machinery 220,000,000
016120- A097 Purchase of Furniture and Fixture 4,000,000
016120- A12 Civil works 24,000,000
016120- A124 Building and Structures 24,000,000
016120- A13 Repairs and Maintenance 13,394,000
016120- A133 Buildings and Structure 13,394,000
Total- GENE EDITING OF BIOLOGICAL AGENTS FOR NUTRITIONAL BIOCHEMICAL AND THERAPEUTICAL PURPOSE 400,000,000
(In Foreign Exchange) (50,000,000)
(Own Resources) (50,000,000)
(In Local Currency) ___________________________________ (350,000,000) _______________
LO1639 CULTIV FIELDS AND ATION AND PROCESSING OF MEDICINAL AND INDUSTRIAL CANNABIS ON EXPERIMENTAL
016120- A01 Employees Related Expenses 15,500,000
016120- A011 Pay 152 15,500,000
016120- A011-1 Pay of Officers (35) (2,400,000)
016120- A011-2 Pay of Other Staff (117) (13,100,000)
016120- A03 Operating Expenses 26,810,000
016120- A033 Utilities 24,500,000
016120- A039 General 2,310,000
016120- A09 Physical Assets 177,690,000
016120- A094 Other Stores and Stocks 8,000,000
016120- A096 Purchase of Plant and Machinery 169,690,000
016120- A12 Civil works 80,000,000
016120- A124 Building and Structures 80,000,000
Total- CULTIVATION AND PROCESSING OF MEDICINAL AND INDUSTRIAL CANNABIS ON EXPERIMENTAL FIELDS AND 300,000,000
(In Foreign Exchange) (63,000,000)
(Own Resources) (63,000,000)
(In Local Currency) ___________________ (237,000,000) _______________________________
Page 374

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO1640 DEVELOPMENT OF COMPUTER CONTROLLED FERMENTORS AND PRODUCTION OF BIOC BIOPRODUCTS HEMICALS &
016120- A01 Employees Related Expenses 25,260,000
016120- A011 Pay 26 23,964,000
016120- A011-1 Pay of Officers (11) (18,540,000)
016120- A011-2 Pay of Other Staff (15) (5,424,000)
016120- A012 Allowances 1,296,000
016120- A012-1 Regular Allowances (1,296,000)
016120- A03 Operating Expenses 11,030,000
016120- A038 Travel & Transportation 5,000,000
016120- A039 General 6,030,000
016120- A09 Physical Assets 263,000,000
016120- A094 Other Stores and Stocks 15,000,000
016120- A096 Purchase of Plant and Machinery 246,000,000
016120- A097 Purchase of Furniture and Fixture 2,000,000
016120- A12 Civil works 2,000,000
016120- A124 Building and Structures 2,000,000
016120- A13 Repairs and Maintenance 34,015,000
016120- A133 Buildings and Structure 34,015,000
Total- DEVELOPMENT OF COMPUTER CONTROLLED FERMENTORS AND PRODUCTION OF BIOCHEMICALS & BIOPRODUCTS 335,305,000
LO9650 UPGRADATION OF POLYMERS AND PLASTICS LAB AT PCSIR LAB COMPLEX LAHORE
016120- A01 Employees Related Expenses 445,000
016120- A012 Allowances 445,000
Page 375

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
016120- A012- 1 Regular Allowances (445,000)
016120- A03 Operating Expenses 12,830,000
016120- A038 Travel & Transportation 6,500,000
016120- A039 General 6,330,000
016120- A09 Physical Assets 20,170,000
016120- A094 Other Stores and Stocks 5,170,000
016120- A096 Purchase of Plant and Machinery 15,000,000
016120- A13 Repairs and Maintenance 1,250,000
016120- A133 Buildings and Structure 1,250,000
Total- UPGRADATION OF POLYMERS AND PLASTICS LAB AT PCSIR LAB COMPLEX LAHORE 34,695,000
016120 Total- Others 1,070,000,000
0161 Total- Basic Research 1,100,000,000
016 Total- Basic Research 1,100,000,000
01 Total- General Public Service 1,100,000,000
Total- ACCOUNTANT GENERAL 1,100,000,000
PAKISTAN REVENUES
SUB-OFFICE, LAHORE
(In Foreign Exchange) (113,000,000)
(Own Resources) (113,000,000)
(Foreign Aid)
(In Local Currency) (987,000,000)
Page 376

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION No of Posts 2021-2022 2021-22 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01 General Public Service:
016 Basic Research:
0161 Basic Research:
016120 PR1245 Others YPGR : ADATION OF MEDICINAL BOTANIC CENTRE AS ANTIONAL CENTRE FOR HERBAL MEDICINE PCSIR
LAB COMP. PESHAWAR
016120 - A01 Employees Related Expenses 100,000
016120 - A011 Pay 6 100,000
016120 - A011-1 Pay of Officers (6) (100,000)
016120 - A03 Operating Expenses 500,000
016120 - A034 Occupancy Costs 100,000
016120 - A038 Travel & Transportation 300,000
016120 - A039 General 100,000
016120 - A09 Physical Assets 17,986,000
016120 - A094 Other Stores and Stocks 17,886,000
016120 - A095 Purchase of Transport 100,000
016120 - A13 Repairs and Maintenance 5,100,000
016120 - A130 Transport 100,000
016120 - A133 Buildings and Structure 5,000,000
Total- YPGRADATION OF MEDICINAL 23,686,000
BOTANIC CENTRE AS ANTIONAL
CENTRE FOR HERBAL MEDICINE PCSIR LAB COMP. PESHAWAR
(In Foreign Exchange) (15,000,000)
(Own Resources) (15,000,000)
(In Local Currency) (8,686,000)
PR1399 UP GR __________________________________ ADATION OF CALIBRATION CENTRE CAPABILITIES AT PCSIR PESHAWAR
016120 - A01 Employees Related Expenses 560,000
016120 - A012 Allowances 560,000
016120 - A012-1 Regular Allowances (560,000)
016120 - A03 Operating Expenses 700,000
016120 - A038 Travel & Transportation 600,000
Page 377

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR Budget Estimate Rs
016120- A039 General 100,000
016120- A09 Physical Assets 12,940,000
016120- A092 Computer Equipment 330,000
016120- A094 Other Stores and Stocks 12,210,000
016120- A097 Purchase of Furniture and Fixture 400,000
016120- A13 Repairs and Maintenance 800,000
016120- A133 Buildings and Structure 800,000
Total- UP GRADATION OF CALIBRATION CENTRE CAPABILITIES AT PCSIR PESHAWAR 15,000,000
PR1400 "MEDICAL EQUIPMENT & DEVICES INNOVATION CENTER (MEDICEN)###"
016120- A01 Employees Related Expenses 15,480,000
016120- A011 Pay 38 15,480,000
016120- A011- 1 Pay of Officers (25) (12,600,000)
016120- A011- 2 Pay of Other Staff (13) (2,880,000)
016120- A03 Operating Expenses 16,320,000
016120- A033 Utilities 950,000
016120- A039 General 15,370,000
016120- A09 Physical Assets 67,000,000
016120- A092 Computer Equipment 4,500,000
016120- A096 Purchase of Plant and Machinery 62,000,000
016120- A097 Purchase of Furniture and Fixture 500,000
016120- A13 Repairs and Maintenance 1,200,000
016120- A133 Buildings and Structure 1,200,000
Total- "MEDICAL EQUIPMENT & DEVICES INNOVATION CENTER (MEDICEN)###" 100,000,000
016120 Total- Others 138,686,000
0161 Total- Basic Research 138,686,000
016 Total- Basic Research 138,686,000
01 Total- General Public Service 138,686,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR 138,686,000
(In Foreign Exchange) (15,000,000)
(Own Resources) (15,000,000)
(Foreign Aid)
(In Local Currency) (123,686,000)
Page 378

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 Budget
Estimate
Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01 General Public Service:
016 Basic Research:
0161 Basic Research:
016101 Administration :
KA1372 STRENGTHENING OF OCEANOGRAPHIC RESEARCH SUB STATION GWADAR PAKISTAN
016101 - A01 Employees Related Expenses 2,950,000
016101 - A011 Pay 24 2,950,000
016101 - A011-1 Pay of Officers (9) (1,750,000)
016101 - A011-2 Pay of Other Staff (15) (1,200,000)
016101 - A03 Operating Expenses 1,050,000
016101 - A038 Travel & Transportation 1,050,000
016101 - A09 Physical Assets 2,000,000
016101 - A096 Purchase of Plant and Machinery 2,000,000
016101 - A13 Repairs and Maintenance 19,000,000
016101 - A132 Furniture and Fixture 1,000,000
016101 - A133 Buildings and Structure 18,000,000
Total- STRENGTHENING OF 25,000,000
OCEANOGRAPHIC RESEARCH SUB STATION GWADAR PAKISTAN
KA3148 ESTAB . OF POST GRADUATE CENTRE FOR AI IN AGRI. & HEALTH SCI.(KNOWLEDGE ECONOMY INITIAVE)
016101 - A01 Employees Related Expenses 3,540,000
016101 - A011 Pay 4 3,540,000
016101 - A011-1 Pay of Officers (2) (2,580,000)
016101 - A011-2 Pay of Other Staff (2) (960,000)
016101 - A03 Operating Expenses 25,000,000
016101 - A038 Travel & Transportation 23,000,000
016101 - A039 General 2,000,000
016101 - A09 Physical Assets 49,696,000
016101 - A092 Computer Equipment 39,000,000
016101 - A097 Purchase of Furniture and Fixture 10,696,000
Total- ESTAB. OF POST GRADUATE CENTRE FOR AI IN AGRI. & HEALTH SCI.( 78,236,000
KNOWLEDGE ECONOMY INITIATIVE)
Page 379

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 Budget
Estimate
Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA9622 ESTA EBRAHIM BLISHMENT OF FACILITIES FOR INDUSTRAIL PRODUCTION OF NANOMATERIALS IN LATIF
016101- A01 Employees Related Expenses 3,120,000
016101- A011 Pay 10 3,120,000
016101- A011-1 Pay of Officers (1) (1,500,000)
016101- A011-2 Pay of Other Staff (9) (1,620,000)
016101- A03 Operating Expenses 20,500,000
016101- A038 Travel & Transportation 5,500,000
016101- A039 General 15,000,000
016101- A09 Physical Assets 76,380,000
016101- A096 Purchase of Plant and Machinery 74,380,000
016101- A097 Purchase of Furniture and Fixture 2,000,000
Total- ESTABLISHMENT OF FACILITIES FOR INDUSTRAIL PRODUCTION OF NANOMATERIALS IN LATIF EBRAHIM 100,000,000
016101 Total- Administration 203,236,000
016120 Others :
KA3066 MONITO CREEK SYSTEM RING SEA LEVEL RISE SEA WAT WITH ER INTRUSION AND LAND SUBSIDENCE IN INDUS DELTAIN
016120- A01 Employees Related Expenses 11,490,000
016120- A011 Pay 11 11,090,000
016120- A011-1 Pay of Officers (6) (8,570,000)
016120- A011-2 Pay of Other Staff (5) (2,520,000)
016120- A012 Allowances 400,000
016120- A012-1 Regular Allowances (400,000)
016120- A03 Operating Expenses 125,310,000
016120- A032 Communications 210,000
016120- A038 Travel & Transportation 3,900,000
016120- A039 General 121,200,000
016120- A09 Physical Assets 54,200,000
016120- A092 Computer Equipment 6,000,000
016120- A095 Purchase of Transport 6,200,000
Page 380

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI Budget Estimate Rs
016120- A096 Purchase of Plant and Machinery 42,000,000
016120- A12 Civil works 9,000,000
016120- A124 Building and Structures 9,000,000
Total- MONITORING SEA LEVEL RISE SEA WATER INTRUSION AND LAND SUBSIDENCE IN INDUS DELTAIN CREEK SYSTEM WITH 200,000,000
KA3069 EXTERNAL DEV. OF PSQCA BUILDING GUISTAN-E-JOHAR COMPLEX AT KARACHI
016120- A01 Employees Related Expenses 3,040,000
016120- A011 Pay 1 540,000
016120- A011-1 Pay of Officers (1) (300,000)
016120- A011-2 Pay of Other Staff (240,000)
016120- A012 Allowances 2,500,000
016120- A012-1 Regular Allowances (2,500,000)
016120- A03 Operating Expenses 1,750,000
016120- A038 Travel & Transportation 400,000
016120- A039 General 1,350,000
016120- A12 Civil works 28,115,000
016120- A124 Building and Structures 28,115,000
Total- EXTERNAL DEV. OF PSQCA BUILDING GUISTAN-E-JOHAR COMPLEX AT KARACHI 32,905,000
KA7086 UPGRA KARACHI DATION OF MACHINERY EQUIPMENT AND RENOVATION OF BUILDING OF IIEEE AND PSTC
016120- A01 Employees Related Expenses 2,600,000
016120- A011 Pay 12 600,000
016120- A011-2 Pay of Other Staff (12) (600,000)
016120- A012 Allowances 2,000,000
016120- A012-1 Regular Allowances (1,500,000)
016120- A012-2 Other Allowances (Excluding TA) (500,000)
016120- A03 Operating Expenses 1,960,000
016120- A038 Travel & Transportation 200,000
016120- A039 General 1,760,000
Page 381
NO. 116.- FC2 2D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION DEMANDS FOR GRANTS
No of Posts 2021-22 2021-2022 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
016120- A09 Physical Assets 19,040,000
016120- A096 Purchase of Plant and Machinery 15,400,000
016120- A097 Purchase of Furniture and Fixture 3,640,000
016120- A13 Repairs and Maintenance 26,400,000
016120- A133 Buildings and Structure 26,400,000
Total- UPGRADATION OF MACHINERY 50,000,000
EQUIPMENT AND RENOVATION OF BUILDING OF IIEEE AND PSTC KARACHI
KA7087 ASSE KARACHI SSMENT OF TIDAL ENERGY POTENIAL ALONG INDUS DELTAIC CREEKS SINDH COAST NIO
016120- A01 Employees Related Expenses 1,900,000
016120- A012 Allowances 1,900,000
016120- A012- 1 Regular Allowances (400,000)
016120- A012- 2 Other Allowances (Excluding TA) (1,500,000)
016120- A03 Operating Expenses 14,200,000
016120- A032 Communications 550,000
016120- A038 Travel & Transportation 8,300,000
016120- A039 General 5,350,000
016120- A09 Physical Assets 7,800,000
016120- A092 Computer Equipment 4,600,000
016120- A096 Purchase of Plant and Machinery 2,200,000
016120- A097 Purchase of Furniture and Fixture 1,000,000
016120- A13 Repairs and Maintenance 1,100,000
016120- A131 Machinery and Equipment 800,000
016120- A132 Furniture and Fixture 300,000
Total- ASSESSMENT OF TIDAL ENERGY POTENIAL ALONG INDUS DELTAIC CREEKS SINDH COAST NIO KARACHI 25,000,000
016120 Total- Others 307,905,000
0161 Total- Basic Research 511,141,000
016 Total- Basic Research 511,141,000
01 Total- General Public Service 511,141,000
Total- ACCOUNTANT GENERAL 511,141,000
PAKISTAN REVENUES
SUB-OFFICE, KARACHI
Page 382

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 Budget
Estimate
Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
01 General Public Service:
016 Basic Research:
0161 Basic Research:
016120 Others :
GR003 TECH. 3 ESTABLISHMENT OF TECHNICAL TRAINING CENTRE FOR PRESISION MACHANICS AND INSTRUMENT GAWADAR, BAL
016120 - A01 Employees Related Expenses 830,000
016120 - A011 Pay 14 830,000
016120 - A011-2 Pay of Other Staff (9) (830,000)
016120 - A03 Operating Expenses 2,325,000
016120 - A034 Occupancy Costs 625,000
016120 - A038 Travel & Transportation 800,000
016120 - A039 General 900,000
016120 - A09 Physical Assets 2,310,000
016120 - A095 Purchase of Transport 500,000
016120 - A096 Purchase of Plant and Machinery 1,610,000
016120 - A097 Purchase of Furniture and Fixture 200,000
016120 - A12 Civil works 1,000,000
016120 - A124 Building and Structures 1,000,000
Total- ESTABLISHMENT OF TECHNICAL TRAINING CENTRE FOR PRESISION MACHANICS AND INSTRUMENT TECH. GAWADAR, BAL 6,465,000
QA301 1 CONS T PSQCA LABS OFFICES AT QUETTA
016120 - A01 Employees Related Expenses 200,000
016120 - A012 Allowances 200,000
016120 - A012-1 Regular Allowances (200,000)
016120 - A03 Operating Expenses 300,000
016120 - A038 Travel & Transportation 100,000
016120 - A039 General 200,000
016120 - A12 Civil works 4,500,000
016120 - A124 Building and Structures 4,500,000
Total- CONST PSQCA LABS OFFICES AT 5,000,000 QUETTA
0 16120 Total- Others 11,465,000
0 161 Total- Basic Research 11,465,000
0 16 Total- Basic Research 11,465,000
0 1 Total- General Public Service 11,465,000
Page 383

NO. 116.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

No of Posts 2021-2022
2021-22 Budget
Estimate
Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042205 Equipment machinery workshops :
QA080 MANAG 6 REHABILITATION AND CONSERVATION OF KAREZES FOR SUSTAINABLE GROUNDWATER EMENT AND
042205 - A01 Employees Related Expenses 1,630,000
042205 - A012 Allowances 1,630,000
042205 - A012- 1 Regular Allowances (1,150,000)
042205 - A012- 2 Other Allowances (Excluding TA) (480,000)
042205 - A03 Operating Expenses 2,580,000
042205 - A032 Communications 70,000
042205 - A033 Utilities 180,000
042205 - A038 Travel & Transportation 1,600,000
042205 - A039 General 730,000
042205 - A09 Physical Assets 1,490,000
042205 - A092 Computer Equipment 350,000
042205 - A096 Purchase of Plant and Machinery 1,140,000
042205 - A12 Civil works 8,900,000
042205 - A124 Building and Structures 8,900,000
042205 - A13 Repairs and Maintenance 400,000
042205 - A130 Transport 400,000
Total- REHABILITATION AND CONSERVATION OF KAREZES FOR SUSTAINABLE GROUNDWATER MANAGEMENT AND 15,000,000
0 42205 Total- Equipment machinery workshops 15,000,000
0 422 Total- Irrigation 15,000,000
0 42 Total- Agriculture,Food,Irrigation,Forestry 15,000,000 and Fishing
0 4 15,000,000 Total- Economic Affairs
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 26,465,000 SUB-OFFICE, QUETTA
8,341,000,000 TOTAL - DEMAND
(In Foreign Exchange) (406,408,000)
(Own Resources) (306,408,000)
(Foreign Aid) (100,000,000)
(In Local Currency) (7,934,592,000) __________________________________________________
Page 385

SECTION XXII

MINISTRY OF WATER RESOURCES

*

2021-2022 Budget Estimate
(Rupees in Thousand)

Demand presented on behalf of the Ministry of Water Resources

Development Expenditure on Revenue Account.

117. Development Expenditure of
Water Resources Division 92,472,692
Total : 92,472,692
Page 387

NO. 117.- DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION

DEMANDS FOR GRANTS

DEMAND NO. 117

( FC22D84 )

DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2022 for DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION.

Voted Rs. 92,472,692,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF WATER RESOURCES .

FUNCTIONAL CLASSIFICATION 2021-2022 Budget Estimate Rs
042 Agriculture,Food,Irrigation,Forestry and Fishing 90,470,692,000
043 Fuel and Energy 402,000,000
107 Administration 1,600,000,000
Total 92,472,692,000
OBJECT CLASSIFICATION
A05 Grants, Subsidies and Write off Loans 92,472,692,000
Total 92,472,692,000
(In Foreign Exchange) (760,000,000)
(Own Resources)
(Foreign Aid) (760,000,000)
(In Local Currency) _______________ (91,712,692,000) ___________________________________
Page 388

NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

No of Posts 2021-2022
2021-22 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042203 Canal irrigation :
IB3447 HPP## "PC-II " FOR ENVIRONMENTAL STUDY AND DETERMINATION OF ENVIRONMENTAL FLOW NEELUM JHELUM
042203 - A05 Grants, Subsidies and Write off Loans 100,000,000
042203 - A052 Grants Domestic 100,000,000
Total- "PC-II FOR ENVIRONMENTAL STUDY AND DETERMINATION OF 100,000,000
ENVIRONMENTAL FLOW NEELUM JHELUM HPP##"
0 42203 Total- Canal irrigation 100,000,000
0 422 Total- Irrigation 100,000,000
0 42 Total- Agriculture,Food,Irrigation,Forestry 100,000,000
and Fishing
043 Fuel and Energy:
0438 Other s:
043820 Other s :
IB3445 "PROJECT PLANNING & DEVELOPMENT UNIT (PPDU) MOWR#"
043820 - A05 Grants, Subsidies and Write off Loans 50,000,000
043820 - A052 Grants Domestic 50,000,000
Total- "PROJECT PLANNING & 50,000,000
DEVELOPMENT UNIT (PPDU) MOWR#"
IB3446 "CAPACITY BUILDING OF OFFICE OF PCIW#"
043820 - A05 Grants, Subsidies and Write off Loans 100,000,000
043820 - A052 Grants Domestic 100,000,000
Total- "CAPACITY BUILDING OF OFFICE OF PCIW#" 100,000,000
0 43820 Total- Others 150,000,000
0 438 Total- Others 150,000,000
0 43 Total- Fuel and Energy 150,000,000
0 4 Total- Economic Affairs 250,000,000
10 Social Protection:
Page 389
NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS
No of Posts 2021-2022
2021-22 Budget
Estimate
Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

10 Social Protection:
107 Admi nistratio n:
1071 Admi nistratio n:
10710 5 Flood Control :
ID918 1 NORM AL EMERGENT FLOOD PROGRAMME AZAD JAMMU & KASHMIR SECTOR
10710 5- A05 Grants, Subsidies and Write off Loans 15,000,000
10710 5- A052 Grants Domestic 15,000,000
Total- NORM AL EMERGENT FLOOD 15,000,000
PROGRAMME AZAD JAMMU & KASHMIR SECTOR
107105 Total- Flood Control 15,000,000
1071 Total- Administration 15,000,000
107 Total- Administration 15,000,000
10 Total- Social Protection 15,000,000
Total- ACCOUNTANT GENERAL 265,000,000
PAKISTAN REVENUES
Page 390
NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS
No of Posts 2021-2022
2021-22 Budget
Estimate
Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042202 Irrigation dams :
JM0031 RAISING OF MANGLA DAM MIRPUR AJK
042202 - A05 Grants, Subsidies and Write off Loans 1,000,000
042202 - A052 Grants Domestic 1,000,000
Total- RAISING OF MANGLA DAM MIRPUR 1,000,000
AJK
LO1213 LININ G OF IRRIGATION CHANNELS IN PUNJAB
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000
042202 - A052 Grants Domestic 100,000,000
Total- LINING OF IRRIGATION CHANNELS IN PUNJAB 100,000,000
LO1214 IRRIGATION SYSTEMS REHABILITATION PUNJAB PHASE-I
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000
042202 - A052 Grants Domestic 100,000,000
Total- IRRIGATION SYSTEMS 100,000,000
REHABILITATION PUNJAB PHASE-I
LO1217 GHAB IR DAM CHAKWAL PUNJAB
042202 - A05 Grants, Subsidies and Write off Loans 2,000,000,000
042202 - A052 Grants Domestic 2,000,000,000
Total- GHABIR DAM CHAKWAL PUNJAB 2,000,000,000
LO1218 PAPIN DAM RAWALPINDI
042202 - A05 Grants, Subsidies and Write off Loans 1,654,000,000
042202 - A052 Grants Domestic 1,654,000,000
Total- PAPIN DAM RAWALPINDI 1,654,000,000
LO1635 "DETAILED ENGINEERING DESIGN PREPARATION OF TENDER DOCUMENT S & PC-I OF HINGOL DAM #"
042202 - A05 Grants, Subsidies and Write off Loans 50,000,000
042202 - A052 Grants Domestic 50,000,000
Total- "DETAILED ENGINEERING DESIGN 50,000,000
PREPARATION OF TENDER
DOCUMENTS & PC-I OF HINGOL DAM #"
Page 391
NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS
No of Posts 2021-2022
2021-22 Budget
Estimate
Rs
LO1636 "DETA ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE ILED ENGINEERING DESIGN PREPARATION OF TENDER DOCUMENTS & PC-I OF CHINIOT DAM##"
042202- A05 Grants, Subsidies and Write off Loans 50,000,000
042202- A052 Grants Domestic 50,000,000
Total- "DETAILED ENGINEERING DESIGN PREPARATION OF TENDER DOCUMENTS & PC-I OF CHINIOT DAM##" 50,000,000
LO3128 FEASIBILITY STUDY OF MURUNJ DAM AT NILA KUND ON KAHAL HILL TORRENT PROJECT (PUNJAB) RAJANPUR PUNJAB (SP)
042202- A05 Grants, Subsidies and Write off Loans 254,236,000
042202- A052 Grants Domestic 254,236,000
Total- FEASIBILITY STUDY OF MURUNJ DAM AT NILA KUND ON KAHAL HILL TORRENT PROJECT (PUNJAB) RAJANPUR PUNJAB (SP) 254,236,000
042202 Total- Irrigation dams 4,209,236,000
042203 Canal DG0081 REME ADDU DISTT irrigation : DIAL MEASURES TO CONTROL WATER LOGGING DUE TO MUZAFFARGARH &TP LINK CANAL KOT
042203- A05 Grants, Subsidies and Write off Loans 875,289,000
042203- A052 Grants Domestic 875,289,000
Total- REMEDIAL MEASURES TO CONTROL WATER LOGGING DUE TO MUZAFFARGARH &TP LINK CANAL KOT ADDU DISTT 875,289,000
DG0161 KACH HI CANAL PROJECT PHASE-I DERA BUGHTI JHAL MAGSI
042203- A05 Grants, Subsidies and Write off Loans 2,000,000,000
042203- A052 Grants Domestic 2,000,000,000
Total- KACHHI CANAL PROJECT PHASE-I DERA BUGHTI JHAL MAGSI 2,000,000,000
DG0169 "KACHHI CANAL PROJECT (REMAINING WORKS) PHASE-I DISTRICT DERA BUGTI#"
042203- A05 Grants, Subsidies and Write off Loans 2,000,000,000
042203- A052 Grants Domestic 2,000,000,000
Total- "KACHHI CANAL PROJECT (REMAINING 2,000,000,000
WORKS) PHASE-I DISTRICT DERA BUGTI#"
Page 392

NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO1208 WATER RESE IWAS ARCH STUDIES ON DRAINAE LAND RECLAMATION WATER MANAGEMENT A RI MONA ND USE OF DRAINAGE
042203 - A05 Grants, Subsidies and Write off Loans 161,949,000
042203 - A052 Grants Domestic 161,949,000
Total- RESEARCH STUDIES ON DRAINAE 161,949,000
LAND RECLAMATION WATER MANAGEMENT AND USE OF DRAINAGE WATER IWASRI MONA
LO1391 FEASI BILTY STUDY OF SINDH BARRAGE
042203 - A05 Grants, Subsidies and Write off Loans 202,528,000
042203 - A052 Grants Domestic 202,528,000
Total- FEASIBILTY STUDY OF SINDH 202,528,000
BARRAGE
LO2122 CANAL REVIEW OF FEASIBILITY STUDY ENGINEERING DESIGN TENDER DOC. & PC-1 CHA (LIFT-CUM-GRAVITY) SHMA RIGHT BANK
042203 - A05 Grants, Subsidies and Write off Loans 427,853,000
042203 - A052 Grants Domestic 427,853,000
Total- REVIEW OF FEASIBILITY STUDY 427,853,000
ENGINEERING DESIGN TENDER DOC. & PC-1 CHASHMA RIGHT BANK CANAL(LIFT-CUM-GRAVITY)
0 42203 Total- Canal irrigation 5,667,619,000
0 422 Total- Irrigation 9,876,855,000
0 42 Total- Agriculture,Food,Irrigation,Forestry 9,876,855,000
and Fishing
043 Fuel and Energy:
0438 Other s:
043820 Other s :
LO1219 LAND AND WATER MONITORING/ EVALUATION OF INDUS PLAINS (SMO)
043820 - A05 Grants, Subsidies and Write off Loans 252,000,000
043820 - A052 Grants Domestic 252,000,000
Total- LAND AND WATER MONITORING/ 252,000,000
EVALUATION OF INDUS PLAINS (SMO)
0 43820 Total- Others 252,000,000
Page 393
NO. 117.- FC2 2D84 D EVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMAND No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE S FOR GRANTS 2021-2022 Budget Estimate Rs
0438 Total- Others 252,000,000
043 Total- Fuel and Energy 252,000,000
04 Total- Economic Affairs 10,128,855,000
10 Social Protection:
107 Admin istration:
1071 Admin istration:
107105 Flood Control :
LO1216 NORM AL /EMERGENT FLOOD PROGRAMME PUNJAB
107105- A05 Grants, Subsidies and Write off Loans 675,000,000
107105- A052 Grants Domestic 675,000,000
Total- NORM AL /EMERGENT FLOOD 675000000
PROGRAMME PUNJAB ,,
MH0083 "PC-I MUZAFFARG FOR CHECKING EROSIVE ACTION OF RIVER INDUS AREA OF LUNDI PITAFI DISTRIT ARH PUNJAB##"
107105- A05 Grants, Subsidies and Write off Loans 100,000,000
107105- A052 Grants Domestic 100,000,000
Total- "PC-I OF RI PITAF PUNJ FOR CHECKING EROSIVE ACTION VER INDUS AREA OF LUNDI I DISTRIT MUZAFFARGARH AB##" 100,000,000
107105 Total- Flood Control 775,000,000
1071 Total- Administration 775,000,000
107 Total- Administration 775,000,000
10 Total- Social Protection 775,000,000
Total- ACCOUNTANT GENERAL 10,903,855,000
PAKISTAN REVENUES
SUB-OFFICE, LAHORE
Page 394

NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042202 Irrigation dams :
BU0220 KURRAM TANGI (KAITU WEIR) NORTH WAZIRSTAN AGENCY
042202 - A05 Grants, Subsidies and Write off Loans 3,000,000,000
042202 - A052 Grants Domestic 3,000,000,000
Total- KURRAM TANGI (KAITU WEIR) NORTH WAZIRSTAN AGENCY 3,000,000,000
(In Foreign Exchange) (200,000,000)
(Foreign Aid) (200,000,000)
(In Local Currency) __________________________________ (2,800,000,000) ________________
KT0157 CONSTRUCTION OF 20SMALL DAMS IN KHYBER PAKHTUNKHWA
042202 - A05 Grants, Subsidies and Write off Loans 601,877,000
042202 - A052 Grants Domestic 601,877,000
Total- CONSTRUCTION OF 20SMALL DAMS IN KHYBER PAKHTUNKHWA 601,877,000
PR1203 CONSTRUCTION OF SMALL DAMS IN DISTRICT MANSEHRA KHYBER PAKHTUNKHWA
042202 - A05 Grants, Subsidies and Write off Loans 855,644,000
042202 - A052 Grants Domestic 855,644,000
Total- CONSTRUCTION OF SMALL DAMS IN 855,644,000
DISTRICT MANSEHRA KHYBER PAKHTUNKHWA
PR1209 RAISING OF BARAN DAM BANNU
042202 - A05 Grants, Subsidies and Write off Loans 400,000,000
042202 - A052 Grants Domestic 400,000,000
Total- RAISING OF BARAN DAM BANNU 400,000,000
PR3133 CHANN CONS ELS R T & IMPROVEMENT OF IRRIGATION INFRASTRUCTURE INCLUDING FLOOD PROTE OAD CTION WORK
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000
042202 - A052 Grants Domestic 100,000,000
Total- CONST & IMPROVEMENT OF 100,000,000
IRRIGATION INFRASTRUCTURE INCLUDING FLOOD PROTECTION WORK CHANNELS ROAD
Page 395

NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

PR3134 INCREASING STORAGE CAPACITY AND IMPROVEMENT IN COMMAND AREA OF TANDA DAM
042202- A05 300,000,000 Grants, Subsidies and Write off Loans
042202- A052 Grants Domestic 300,000,000
Total- PR3135 CONS INCREASING STORAGE CAPACITY AND IMPROVEMENT IN COMMAND AREA OF TANDA DAM 300,000,000 TRUCTION OF CHASHMA AKHOR KEHL DAM DISTRICT KARAK
042202- A05 Grants, Subsidies and Write off Loans 200,000,000
042202- A052 Grants Domestic 200,000,000
Total- CONSTRUCTION OF CHASHMA AKHOR KEHL DAM DISTRICT KARAK 200,000,000
PR3136 CONSTRUCTION OF SAROZI DAM DISTRICT HANGU
042202- A05 Grants, Subsidies and Write off Loans 200,000,000
042202- A052 Grants Domestic 200,000,000
Total- CONSTRUCTION OF SAROZI DAM DISTRICT HANGU 200,000,000
PR3137 CONSTRUCTION OF MAKH BANDA DAM DISTRICT KARAK
042202- A05 Grants, Subsidies and Write off Loans 350,000,000
042202- A052 Grants Domestic 350,000,000
Total- CONSTRUCTION OF MAKH BANDA DAM DISTRICT KARAK 350,000,000
PR3138 CONSTRUCTION OF KHATTAK BANDA DAM SHAKAR DARA DISTRICT KOHAT
042202- A05 Grants, Subsidies and Write off Loans 300,000,000
042202- A052 Grants Domestic 300,000,000
Total- CONSTRUCTION OF KHATTAK BANDA DAM SHAKAR DARA DISTRICT KOHAT 300,000,000
PR3139 CONSTRUCTION OF PEZU DAM PROJECT DISTRICT LAKKI MARWAT
042202- A05 Grants, Subsidies and Write off Loans 602,192,000
042202- A052 Grants Domestic 602,192,000
Total- CONSTRUCTION OF PEZU DAM PROJECT DISTRICT LAKKI MARWAT 602,192,000
PR6190 MOHMAND DAM HYDROPOWER PROJECT FUNDING GRNT FOR DAM
Page 396
NO. 117.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMAN No of Posts 2021-22 ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR DS FOR GRANTS 2021-2022 Budget Estimate Rs
042202- A05 Grants, Subsidies and Write off Loans 5,507,012,000
042202- A052 Grants Domestic 5,507,012,000
Total- MOHMAND DAM HYDROPOWER PROJECT FUNDING GRNT FOR DAM 5,507,012,000
042202 Total- Irrigation dams 12,416,725,000
042203 Canal irrigation :
KT0156 CONSTRUCTION OF SANAM/PALAI & KUNDAL DAM KHYBER PAKHTUNKHWA
042203- A05 Grants, Subsidies and Write off Loans 400,000,000
042203- A052 Grants Domestic 400,000,000
Total- CONSTRUCTION OF SANAM/PALAI & KUNDAL DAM KHYBER PAKHTUNKHWA 400,000,000
PR1208 REHABILITATION OF IRRIGATION SYSTEM IN KHYBER PAKHTUNKHWA
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- REHABILITATION OF IRRIGATION SYSTEM IN KHYBER PAKHTUNKHWA 100,000,000
PR1211 REMO DELING OF WARSAK CANAL SYSTEM
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- REMODELING OF WARSAK CANAL SYSTEM 100,000,000
PR7097 CONSTRUCTION OF TORAWARAI DAM PROJECT DISTRICT HANGU
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- CONSTRUCTION OF TORAWARAI DAM PROJECT DISTRICT HANGU 100,000,000
PR7098 CONSTRUCTION OF PANJKORA RIVER LEFT AND RIGHT BANK CANAL DISTRICT DIR
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- CONSTRUCTION OF PANJKORA RIVER LEFT AND RIGHT BANK CANAL DISTRICT DIR 100,000,000
Page 397

NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS

No of Posts 2021-22 2021-2022 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

SU0049 "UPDATION OF SUPPLEMENTARY ENVIRONMENTAL & SOCIAL STUDY OF INDUS RIVER REACH B/W

GHAZI

042203- A05 Grants, Subsidies and Write off Loans 112,000,000
042203- A052 Grants Domestic 112,000,000
Total- "UPDA TION OF SUPPLEMENTARY 112,000,000
ENVIR INDUS ONMENTAL & SOCIAL STUDY OF RIVER REACH B/W GHAZI
042203 Total- Canal irrigation 912,000,000
0422 Total- Irrigation 13,328,725,000
042 Total- Agriculture,Food,Irrigation,Forestry and Fishing 13,328,725,000
04 Total- Economic Affairs 13,328,725,000
10 Social Protection:
107 Admin istration:
1071 Admin istration:
107105 Flood Control :
PR1201 NORM AL EMERGENT FLOOD PROGRAMME KHYBER PAKHTUNKHWA
107105- A05 Grants, Subsidies and Write off Loans 165,000,000
107105- A052 Grants Domestic 165,000,000
Total- NORM AL EMERGENT FLOOD 165,000,000
PROGRAMME KHYBER PAKHTUNKHWA
PR1202 NORA ML EMERGENT FLOOD PROGRAMME FATA
107105- A05 Grants, Subsidies and Write off Loans 45,000,000
107105- A052 Grants Domestic 45,000,000
Total- NORA PROG ML EMERGENT FLOOD RAMME FATA 45,000,000
107105 Total- Flood Control 210,000,000
1071 Total- Administration 210,000,000
107 Total- Administration 210,000,000
10 Total- Social Protection 210,000,000
Total- ACCOUNTANT GENERAL 13,538,725,000
PAKISTAN REVENUES
SUB-OFFICE, PESHAWAR
(In Foreign Exchange) (200,000,000)
(Own Resources)
(Foreign Aid) (200,000,000)
(In Local Currency) (13,338,725,000)
Page 398

NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042202 Irrigation dams :
HD010 5 DARW AT DAM JAMSHORO THATTA
042202 - A05 Grants, Subsidies and Write off Loans 678,173,000
042202 - A052 Grants Domestic 678,173,000
Total- DARWAT DAM JAMSHORO THATTA 678,173,000
0 42202 Total- Irrigation dams 678,173,000
042203 Canal irrigation :
DU003 2 NAI G AJ DAM DADU SINDH
042203 - A05 Grants, Subsidies and Write off Loans 5,000,000,000
042203 - A052 Grants Domestic 5,000,000,000
Total- NAI GAJ DAM DADU SINDH 5,000,000,000
GH001 7 RAIN EE CANAL GHOTKI SUKKAR & KHAIRPUR
042203 - A05 Grants, Subsidies and Write off Loans 1,672,236,000
042203 - A052 Grants Domestic 1,672,236,000
Total- RAINEE CANAL GHOTKI SUKKAR & KHAIRPUR 1,672,236,000
KA137 1 K-IV GREATER WATER SUPPLY SCHEME
042203 - A05 Grants, Subsidies and Write off Loans 15,112,000,000
042203 - A052 Grants Domestic 15,112,000,000
Total- K-IV GREATER WATER SUPPLY 15112000000
SCHEME ,,,
KA310 SHARE 3 REHA GOP) BILITATION AND MODERNIZATION OF SUKKUR BARRAGE (WORLD BANK FUNDING WITH 10%
042203 - A05 Grants, Subsidies and Write off Loans 50,000,000
042203 - A052 Grants Domestic 50,000,000
Total- REHABILITATION AND MODERNIZATION OF SUKKUR 50,000,000
BARRAGE (WORLD BANK FUNDING
WITH 10% SHARE GOP)
Page 399

NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA3104 CONSTRUCTION OF SMALL STORAGE DAMS DELAY ACTION DAMS RETENTION WEIRS AND ISSO BARRIERS IN SINDH

042203- A05 Grants, Subsidies and Write off Loans 3,000,000,000
042203- A052 Grants Domestic 3,000,000,000
Total- CONSTRUCTION OF SMALL STORAGE DAMS DELAY ACTION DAMS RETENTION WEIRS AND ISSO BARRIERS IN SINDH 3,000,000,000
KA3105 MAKH I FARASH LINK CANAL PROJECT (PH-II) FOR WATER SUPPLY TO THAR COAL
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- MAKHI FARASH LINK CANAL PROJECT (PH-II) FOR WATER SUPPLY TO THAR COAL 100,000,000
KA3108 LININ G OF DISTRIBUTARIES & MINORS IN SINDH
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- LINING OF DISTRIBUTARIES & MINORS IN SINDH 100,000,000
KA3109 EXTE SINDH(RBOD) NSION OF RIGHT BANK OUT FALL DRAIN FROM SEHWAN TO SEA DAGU & THATHA DISTRICT OF
042203- A05 Grants, Subsidies and Write off Loans 500,000,000
042203- A052 Grants Domestic 500,000,000
Total- EXTENSION OF RIGHT BANK OUT FALL DRAIN FROM SEHWAN TO SEA DAGU & THATHA DISTRICT OF SINDH(RBOD) 500,000,000
KA3110 REVAMPING/REHABILITATION OF IRRIGATION AND DRAINAGE SYSTEM OF SINDH
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- REVAMPING/REHABILITATION OF IRRIGATION AND DRAINAGE SYSTEM OF SINDH 100,000,000
SK0066 FEASIBILITY STUDY OF THAR CANAL PROJECT
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- FEASIBILITY STUDY OF THAR CANAL PROJECT 100,000,000
Page 400

NO. 117.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION DEMANDS FOR GRANTS No of Posts 2021-2022 2021-22 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI SK0067 "FEASIBILITY STUDY CONSTRUCTION OF DRAINAGE NETWORK TALUKA UBAURO DAHARKI KHANGAR MIRPUR MATHELO 042203- A05 Grants, Subsidies and Write off Loans 450,000,000 042203- A052 Grants Domestic 450,000,000 Total- "FEASIBILITY STUDY CONSTRUCTION 450,000,000 OF DRAINAGE NETWORK TALUKA UBAURO DAHARKI KHANGAR MIRPUR MATHELO SK0068 "FEASIBILITY STUDY DETAILED ENGINEERING DESIGN PC-I OF JACOBABAD SHIKARPUR & KASHMORE DRAINAGE PROJECT##" 042203- A05 Grants, Subsidies and Write off Loans 250,000,000 042203- A052 Grants Domestic 250,000,000 Total- "FEASIBILITY STUDY DETAILED 250,000,000 ENGINEERING DESIGN PC-I OF JACOBABAD SHIKARPUR & KASHMORE DRAINAGE PROJECT##" 042203 Total- Canal irrigation 26,434,236,000 0422 Total- Irrigation 27,112,409,000 042 Total- Agriculture,Food,Irrigation,Forestry 27,112,409,000 and Fishing 04 Total- Economic Affairs 27,112,409,000 10 Social Protection: 107 Administration: 1071 Administration: 107105 Flood Control : KA3100 NORMAL EMERGENT FLOOD PROGRAMME SINDH 107105- A05 Grants, Subsidies and Write off Loans 465,000,000 107105- A052 Grants Domestic 465,000,000 Total- NORMAL EMERGENT FLOOD 465,000,000 PROGRAMME SINDH 107105 Total- Flood Control 465,000,000 1071 Total- Administration 465,000,000 107 Total- Administration 465,000,000 10 Total- Social Protection 465,000,000 Total- ACCOUNTANT GENERAL 27,577,409,000 PAKISTAN REVENUES SUB-OFFICE, KARACHI