Skip to content
Qanoon Digest

Details of Demands for Grants and Appropriations Vol-IV (Development), part 5

FY 2023-24Details of demandsPages 401 to 500 of 665

The Details of Demands for Grants and Appropriations Vol-IV (Development) is part of the federal budget for FY 2023-24. This page reproduces the text of its 665 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.

Page 401

DEMANDS FOR GRANTS

NO. 120.- DEVELOPMENT EXPENDITURE OF POVERTY ALLEVIATION DIVISION DEMAND NO. 120 ( FC22P01 )

DEVELOPMENT EXPENDITURE OF POVERTY ALLEVIATION DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF POVERTY ALLEVIATION DIVISION.

Voted

Rs. 500,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the Ministry of Poverty Alleviation & Social .

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
109 Social Protection (Not elsewhere class.) 500,000,000 421,659,000 500,000,000
Total 500,000,000 421,659,000 500,000,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 188,115,000 131,385,000 139,586,000
A011 Pay 188,065,000 131,385,000 139,536,000
A011-1 Pay of Officers (185,679,000) (130,708,000) (138,825,000)
A011-2 Pay of Other Staff (2,386,000) (677,000) (711,000)
A012 Allowances 50,000 50,000
A012-1 Regular Allowances
A012-2 Other Allowances (Excluding TA) (50,000) (50,000)
A03 Operating Expenses 14,905,000 8,887,000 33,348,000
A05 Grants, Subsidies and Write off Loans 280,655,000 270,077,000 310,666,000
A09 Physical Assets 14,525,000 10,708,000 15,700,000
A13 Repairs and Maintenance 1,800,000 602,000 700,000
Total 500,000,000 421,659,000 500,000,000
Page 402

NO. 120.- FC22P01 DEVELOPMENT EXPENDITURE OF POVERTY ALLEVIATION DIVISION

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
10 Social Protection:
109 Social Protection (Not elsewhere class.):
1091 Social Protection & Poverty Alleviation:
109101 Administration :
IB5278 SEHAT TAHAFUZ PROGRAM
109101 - A01 Employees Related Expenses 117,090,000 89,893,000 89,135,000
109101 - A011 Pay 117,040,000 89,893,000 89,085,000
109101 - A011-1 Pay of Officers (116,334,000) (89,216,000) (88,374,000)
109101 - A011-2 Pay of Other Staff (706,000) (677,000) (711,000)
109101 - A012 Allowances 50,000 50,000
109101 - A012-2 Other Allowances (Excluding TA) (50,000) (50,000)
109101 - A03 Operating Expenses 8,920,000 6,206,000 7,429,000
109101 - A032 Communications 3,620,000 859,000 1,379,000
109101 - A033 Utilities 50,000 4,010,000 50,000
109101 - A034 Occupancy Costs 50,000
109101 - A038 Travel & Transportation 2,350,000 545,000 1,860,000
109101 - A039 General 2,850,000 792,000 4,140,000
109101 - A05 Grants, Subsidies and Write off Loans 280,655,000 270,077,000 310,666,000
109101 - A052 Grants Domestic 280,655,000 270,077,000 310,666,000
109101 - A09 Physical Assets 14,125,000 10,708,000 11,200,000
109101 - A092 Computer Equipment 13,125,000 10,708,000 11,000,000
109101 - A096 Purchase of Plant and Machinery 500,000
109101 - A097 Purchase of Furniture and Fixture 500,000 200,000
109101 - A13 Repairs and Maintenance 600,000 95,000 700,000
109101 - A130 Transport 400,000 50,000 500,000
109101 - A131 Machinery and Equipment 100,000 45,000 100,000
109101 - A132 Furniture and Fixture 50,000 50,000
109101 - A137 Computer Equipment 50,000 50,000
Total- SEHAT TAHAFUZ PROGRAM 421,390,000 376,979,000 419,130,000
IB5279 SOCIAL PROTECTION DELIVERY UNIT (EDU)
109101 - A01 Employees Related Expenses 71,025,000 41,492,000 50,451,000
109101 - A011 Pay 71,025,000 41,492,000 50,451,000
Page 403

NO. 120.- FC22P01 DEVELOPMENT EXPENDITURE OF POVERTY ALLEVIATION DEMANDS FOR GRANTS DIVISION

2022-2023 Budget Estimate 2022-2023 Revised Estimate 2023-2024 Budget Estimate
ACCOUNTANT GENERA Rs L PAKISTAN REVENU Rs ES Rs
109101- A011- 1 Pay of Officers (69,345,000) (41,492,000) (50,451,000)
109101- A011- 2 Pay of Other Staff (1,680,000)
109101- A03 Operating Expenses 5,985,000 2,681,000 25,919,000
109101- A032 Communications 950,000
109101- A037 Consultancy and Contractual Work 7,000,000
109101- A038 Travel & Transportation 3,464,000 182,000 2,650,000
109101- A039 General 2,521,000 2,499,000 15,319,000
109101- A09 Physical Assets 400,000 4,500,000
109101- A092 Computer Equipment 200,000 3,000,000
109101- A096 Purchase of Plant and Machinery 200,000 1,000,000
109101- A097 Purchase of Furniture and Fixture 500,000
109101- A13 Repairs and Maintenance 1,200,000 507,000
109101- A131 Machinery and Equipment 100,000 21,000
109101- A132 Furniture and Fixture 100,000
109101- A133 Buildings and Structure 1,000,000 486,000
Total- SOCIA (EDU) L PROTECTION DELIVERY UNIT 78,610,000 44,680,000 80,870,000
109101 Total- Administration 500,000,000 421,659,000 500,000,000
1091 Total- Social Protection & Poverty Alleviation 500,000,000 421,659,000 500,000,000
109 Total- Social Protection (Not elsewhere class.) 500,000,000 421,659,000 500,000,000
10 Total- Social Protection 500,000,000 421,659,000 500,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 500,000,000 421,659,000 500,000,000
TOTAL - DEMAND 500,000,000 421,659,000 500,000,000
Page 405

SECTION XXII

MINISTRY OF SCIENCE AND TECHNOLOGY

* 2023-2024 Budget Estimate (Rupees in Thousand)

Demand presented on behalf of the Ministry of Science and Technology

Development Expenditure on Revenue Account:

121 Development Expenditure of Science
and Technology Division 8,000,000
Total : 8,000,000
Page 407

DEMANDS FOR GRANTS

NO. 121.- DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION DEMAND NO. 121 ( FC22D31 )

DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DIVISION.

Voted

Rs. 8,000,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF SCIENCE AND TECHNOLOGY .

FUNCTIONAL CLASSIFICATION 2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
016 Basic Research 4,729,394,000 2,993,262,000 6,646,782,000
042 Agriculture,Food,Irrigation,Forestry and Fishing 300,000,000 69,721,000 200,000,000
095 Subsidiary Services to Education 687,000,000 313,310,000 1,153,218,000
Total 5,716,394,000 3,376,293,000 8,000,000,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 599,738,000 365,283,000 703,965,000
A011 Pay 557,653,000 333,126,000 621,630,000
A011-1 Pay of Officers (380,511,000) (215,073,000) (427,127,000)
A011-2 Pay of Other Staff (177,142,000) (118,053,000) (194,503,000)
A012 Allowances 42,085,000 32,157,000 82,335,000
A012-1 Regular Allowances (32,948,000) (24,661,000) (62,381,000)
A012-2 Other Allowances (Excluding TA) (9,137,000) (7,496,000) (19,954,000)
A02 Project Pre-Investment Analysis 382,426,000 201,629,000 263,500,000
A03 Operating Expenses 1,086,109,000 995,176,000 1,817,940,000
A06 Transfers 315,820,000 100,876,000 415,360,000
A09 Physical Assets 2,425,321,000 1,160,189,000 2,833,771,000
A12 Civil works 588,460,000 465,084,000 1,780,873,000
A13 Repairs and Maintenance 318,520,000 88,056,000 184,591,000
Total 5,716,394,000 3,376,293,000 8,000,000,000
(In Foreign Exchange) (278,015,000)
(Own Resources) (278,015,000)
(Foreign Aid)
(In Local Currency) (5,438,379,000) __________________ (3,376,293,000) _________________ (8,000,000,000) _______________
Page 408

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

III. - DETAILS are as follows :-

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
01 General Public Service:
016 Basic Research:
0161 Basic Research:
016101 Administration :
IB3452 ESTABLISHMENT OF CENTRE FOR INTERNATIONAL PEACE AND STABILITY (CIPS) AT NUST
016101 - A03 Operating Expenses 35,000,000
016101 - A039 General 35,000,000
016101 - A09 Physical Assets 15,000,000
016101 - A097 Purchase of Furniture and Fixture 15,000,000
016101 - A12 Civil works 150,000,000 150,000,000 300,000,000
016101 - A124 Building and Structures 150,000,000 150,000,000 300,000,000
Total- ESTABLISHMENT OF CENTRE FOR INTERNATIONAL PEACE AND STABILITY (CIPS) AT NUST 150,000,000 150,000,000 350,000,000
IB3454 ESTABLISHMENT OF NATIONAL CENTRE OF FAILURE ANALYSIS (NCFA) ISLAMABAD
016101 - A01 Employees Related Expenses 33,144,000 26,732,000 26,844,000
016101 - A011 Pay 33,000,000 26,641,000 26,700,000
016101 - A011-1 Pay of Officers (24,400,000) (19,241,000) (19,300,000)
016101 - A011-2 Pay of Other Staff (8,600,000) (7,400,000) (7,400,000)
016101 - A012 Allowances 144,000 91,000 144,000
016101 - A012-1 Regular Allowances (144,000) (91,000) (144,000)
016101 - A09 Physical Assets 68,506,000 48,156,000
016101 - A095 Purchase of Transport 13,700,000
016101 - A096 Purchase of Plant and Machinery 54,806,000 48,156,000
016101 - A12 Civil works 68,350,000 13,036,000 75,000,000
016101 - A124 Building and Structures 68,350,000 13,036,000 75,000,000
Total- ESTABLISHMENT OF NATIONAL 170,000,000 39,768,000 150,000,000
CENTRE OF FAILURE ANALYSIS (NCFA) ISLAMABAD
IB3457 RESEARCH DEVELOPMENT AND INNOVATION IN PCSIR
016101 - A01 Employees Related Expenses 1,008,000 2,519,000 1,008,000
016101 - A012 Allowances 1,008,000 2,519,000 1,008,000
016101 - A012-1 Regular Allowances (1,008,000) (929,000) (1,008,000)
Page 409

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Estimate Rs Revised Estimate Rs Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
016101- A012-2 Other Allowances (Excluding TA) (1,590,000)
016101- A02 Project Pre-Investment Analysis 74,000,000 29,495,000 75,000,000
016101- A022 Research Survey & Exploratory Oper 74,000,000 29,495,000 75,000,000
016101- A03 Operating Expenses 13,992,000 3,863,000 12,092,000
016101- A038 Travel & Transportation 2,500,000 463,000 900,000
016101- A039 General 11,492,000 3,400,000 11,192,000
016101- A06 Transfers 111,000,000 111,800,000
016101- A064 Other Transfer Payments 111,000,000 111,800,000
016101- A13 Repairs and Maintenance 100,000
016101- A137 Computer Equipment 100,000
Total- RESEARCH DEVELOPMENT AND INNOVATION IN PCSIR 200,000,000 35,877,000 200,000,000
IB3458 ESTABL TECHNOLOGY ISHMENT OF PLANNING MONITORING & EVALUATION (PM&E) CELL IN MINISTRY OF SCIENCE &
016101- A01 Employees Related Expenses 26,000,000 26,000,000
016101- A011 Pay 24,000,000 24,000,000
016101- A011-1 Pay of Officers (12,000,000) (12,000,000)
016101- A011-2 Pay of Other Staff (12,000,000) (12,000,000)
016101- A012 Allowances 2,000,000 2,000,000
016101- A012-1 Regular Allowances (1,000,000) (1,000,000)
016101- A012-2 Other Allowances (Excluding TA) (1,000,000) (1,000,000)
016101- A03 Operating Expenses 8,100,000 8,100,000
016101- A032 Communications 300,000 300,000
016101- A034 Occupancy Costs 100,000 100,000
016101- A038 Travel & Transportation 3,500,000 3,500,000
016101- A039 General 4,200,000 4,200,000
016101- A09 Physical Assets 14,200,000 14,200,000
016101- A092 Computer Equipment 6,100,000 6,100,000
016101- A095 Purchase of Transport 5,000,000 5,000,000
016101- A096 Purchase of Plant and Machinery 3,000,000 3,000,000
016101- A097 Purchase of Furniture and Fixture 100,000 100,000
016101- A13 Repairs and Maintenance 1,700,000 1,700,000
Page 410
NO. 121.- FC22 D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOG DIVISION Y DEMAND S FOR GRANTS
2022-2023 Budget Estimate 2022-2023 Revised Estimate 2023-2024 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
016101- A130 Transport 200,000 200,000
016101- A131 Machinery and Equipment 100,000 100,000
016101- A133 Buildings and Structure 1,400,000 1,400,000
Total- ESTABLISHMENT OF PLANNING MONITORING & EVALUATION (PM&E) CELL IN MINISTRY OF SCIENCE & TECHNOLOGY 50,000,000 50,000,000
IB9351 ESTABLISHMENT OF KHUZDAR SCIENCE & TECHNOLOGY BLOCK AT NBC QUETTA
016101- A01 Employees Related Expenses 3,000,000
016101- A011 Pay 3,000,000
016101- A011-1 Pay of Officers (3,000,000)
016101- A03 Operating Expenses 22,000,000
016101- A039 General 22,000,000
016101- A12 Civil works 175,000,000
016101- A124 Building and Structures 175,000,000
Total- ESTABLISHMENT OF KHUZDAR SCIENCE & TECHNOLOGY BLOCK AT NBC QUETTA 200,000,000
ID7268 CERTIFICATION INCENTIVE PROGRAM FOR SMES
016101- A01 Employees Related Expenses 24,700,000 18,706,000 33,700,000
016101- A011 Pay 18,000,000 15,552,000 26,000,000
016101- A011-1 Pay of Officers (12,000,000) (10,207,000) (18,000,000)
016101- A011-2 Pay of Other Staff (6,000,000) (5,345,000) (8,000,000)
016101- A012 Allowances 6,700,000 3,154,000 7,700,000
016101- A012-1 Regular Allowances (5,000,000) (2,335,000) (5,000,000)
016101- A012-2 Other Allowances (Excluding TA) (1,700,000) (819,000) (2,700,000)
016101- A03 Operating Expenses 171,900,000 80,598,000 112,900,000
016101- A032 Communications 600,000 194,000 600,000
016101- A034 Occupancy Costs 100,000 100,000
016101- A038 Travel & Transportation 21,800,000 9,446,000 17,800,000
016101- A039 General 149,400,000 70,958,000 94,400,000
016101- A09 Physical Assets 800,000 800,000
016101- A092 Computer Equipment 300,000 300,000
Page 411
NO. 121.- FC2 2D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOG DIVISION Y DEMAND S FOR GRANTS
2022-2023 Budget Estimate 2022-2023 Revised Estimate 2023-2024 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
016101- A096 Purchase of Plant and Machinery 200,000 200,000
016101- A097 Purchase of Furniture and Fixture 300,000 300,000
016101- A13 Repairs and Maintenance 2,600,000 697,000 2,600,000
016101- A130 Transport 2,000,000 592,000 2,000,000
016101- A131 Machinery and Equipment 600,000 105,000 600,000
Total- CERTIFICATION INCENTIVE PROGRAM FOR SMES 200,000,000 100,001,000 150,000,000
016101 Total- Administration 770,000,000 325,646,000 1,100,000,000
016120 Others IB2026 CLOUD : ENABLED INFRASTRUCTURE FOR RESEAR CH AND INNOVATION NUST ISLAMABAD
016120- A09 Physical Assets 14,817,000 139,000 14,817,000
016120- A092 Computer Equipment 14,817,000 139,000 14,817,000
Total- CLOUD ENABLED INFRASTRUCTURE FOR RESEARCH AND INNOVATION NUST ISLAMABAD 14,817,000 139,000 14,817,000
IB2027 SEMICONDUCTOR CHIP DESIGN FACILITATION CENTER NIE ISLAMABAD
016120- A01 Employees Related Expenses 17,242,000 4,007,000 31,845,000
016120- A011 Pay 17,242,000 4,007,000 31,845,000
016120- A011-1 Pay of Officers (16,282,000) (3,707,000) (19,845,000)
016120- A011-2 Pay of Other Staff (960,000) (300,000) (12,000,000)
016120- A03 Operating Expenses 15,813,000 7,537,000 16,559,000
016120- A032 Communications 400,000 77,000 139,000
016120- A033 Utilities 1,805,000 1,461,000 500,000
016120- A039 General 13,608,000 5,999,000 15,920,000
016120- A09 Physical Assets 63,818,000 2,424,000 126,894,000
016120- A092 Computer Equipment 62,318,000 1,500,000 112,318,000
016120- A097 Purchase of Furniture and Fixture 1,500,000 924,000 14,576,000
Total- SEMICONDUCTOR CHIP DESIGN 96,873,000 13,968,000 175,298,000
IB2028 UPGRA FACILITATION CENTER NIE ISLAMABAD DATION OF PRINTED CIRCUIT BOARD (PCB ) FACILITY NIE ISLAMABAD
016120- A01 Employees Related Expenses 5,689,000 2,214,000 7,036,000
016120- A011 Pay 4,044,000 1,745,000 6,636,000
Page 412

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Estimate Rs Revised Estimate Rs Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
016120- A011-1 Pay of Officers (1,104,000) (1,890,000)
016120- A011-2 Pay of Other Staff (2,940,000) (1,745,000) (4,746,000)
016120- A012 Allowances 1,645,000 469,000 400,000
016120- A012-1 Regular Allowances (1,645,000) (469,000) (400,000)
016120- A03 Operating Expenses 4,500,000 1,267,000 3,100,000
016120- A039 General 4,500,000 1,267,000 3,100,000
016120- A09 Physical Assets 24,905,000 4,241,000 89,516,000
016120- A096 Purchase of Plant and Machinery 24,905,000 4,241,000 88,016,000
016120- A097 Purchase of Furniture and Fixture 1,500,000
016120- A13 Repairs and Maintenance 3,794,000 1,641,000 2,300,000
016120- A132 Furniture and Fixture 1,794,000 341,000 300,000
016120- A133 Buildings and Structure 2,000,000 1,300,000 2,000,000
Total- UPGRADATION OF PRINTED CIRCUIT 38,888,000 9,363,000 101,952,000
I BOARD (PCB) FACILITY NIE SLAMABAD
IB3450 STRENGTHENING AND UPGRADATION OF RESEAR ACCREDITATION OF CH AND DEVELOPMENT FACILITIES AND
016120- A13 Repairs and Maintenance 40,000,000 16,402,000 35,358,000
016120- A131 Machinery and Equipment 40,000,000 16,402,000 35,358,000
Total- STRENGTHENING AND UPGRADATION 40,000,000 16,402,000 35,358,000
OF RESEARCH AND DEVELOPMENT FACILITIES AND ACCREDITATION OF
IB3451 ESTABLISHMENT OF ADDITIONAL PRODUCTION LI INDIGENOUS ELECTRO MEDICAL NES FOR RESEARCH AND DEVELOPMENT OF
016120- A01 Employees Related Expenses 46,236,000 17,495,000 18,923,000
016120- A011 Pay 46,236,000 17,495,000 18,923,000
016120- A011-1 Pay of Officers (35,392,000) (13,790,000) (12,912,000)
016120- A011-2 Pay of Other Staff (10,844,000) (3,705,000) (6,011,000)
016120- A03 Operating Expenses 12,100,000 8,123,000 13,768,000
016120- A038 Travel & Transportation 4,100,000 320,000 3,780,000
016120- A039 General 8,000,000 7,803,000 9,988,000
016120- A09 Physical Assets 151,664,000 14,400,000 184,468,000
016120- A092 Computer Equipment 2,300,000 2,967,000
Page 413

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 2022-2023 2023-2024
Budget Estimate Rs Revised Estimate Rs Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
016120- A094 Other Stores and Stocks 11,000,000 10,400,000
016120- A095 Purchase of Transport 6,000,000
016120- A096 Purchase of Plant and Machinery 128,364,000 177,000,000
016120- A097 Purchase of Furniture and Fixture 4,000,000 4,000,000 4,501,000
016120- A12 Civil works 40,000,000 63,011,000 508,000
016120- A124 Building and Structures 40,000,000 63,011,000 508,000
Total- ESTABLISHMENT OF ADDITIONAL PRODUCTION LINES FOR RESEARCH AND DEVELOPMENT OF INDIGENOUS ELECTRO MEDICAL 250,000,000 103,029,000 217,667,000
( In Foreign Exchange) (46,000,000)
( Own Resources) (46,000,000)
( In Local Currency) (204,000,000) ( 103,029,000) (217,667,000)
IB3455 DIGITAL TRANSFORMATION STRENGTHENING AN ______________________ D AUTOMATION OF PCSI ______________ R
016120- A01 Employees Related Expenses 46,500,000 43,230,000 49,500,000
016120- A011 Pay 43,500,000 39,942,000 45,500,000
016120- A011-1 Pay of Officers (30,000,000) (26,562,000) (32,000,000)
016120- A011-2 Pay of Other Staff (13,500,000) (13,380,000) (13,500,000)
016120- A012 Allowances 3,000,000 3,288,000 4,000,000
016120- A012-1 Regular Allowances (3,000,000) (3,288,000) (4,000,000)
016120- A03 Operating Expenses 47,429,000 18,262,000 21,700,000
016120- A032 Communications 10,800,000 90,000 10,000,000
016120- A037 Consultancy and Contractual Work 15,374,000 11,901,000 4,000,000
016120- A038 Travel & Transportation 5,200,000 1,935,000 2,400,000
016120- A039 General 16,055,000 4,336,000 5,300,000
016120- A09 Physical Assets 283,702,000 6,980,000 127,480,000
016120- A092 Computer Equipment 270,401,000 5,495,000 126,930,000
016120- A095 Purchase of Transport 10,800,000 100,000
016120- A097 Purchase of Furniture and Fixture 2,501,000 1,485,000 450,000
016120- A13 Repairs and Maintenance 2,369,000 1,049,000 1,320,000
016120- A130 Transport 400,000 450,000
016120- A131 Machinery and Equipment 100,000 100,000
Page 414

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
016120- A132 ACCOUNTANT GENERA Furniture and Fixture Budget Estimate Rs L PAKISTAN REVENUES 100,000 Revised Estimate Rs Budget Estimate Rs 100,000
016120- A133 Buildings and Structure 1,569,000 995,000 470,000
016120- A137 Computer Equipment 200,000 54,000 200,000
Total- DIGITAL TRANSFORMATION STRENGTHENING AND AUTOMATION OF PCSIR 380,000,000 69,521,000 200,000,000
IB3456 ESTABLISHMENT OF MATERIAL RESOURCE CENT MANUFACTURING AND REVERSE RE AND DEVELOPMENT OF ADDITIVE
016120- A01 Employees Related Expenses 58,938,000 31,961,000 55,223,000
016120- A011 Pay 55,638,000 28,205,000 51,660,000
016120- A011-1 Pay of Officers (39,833,000) (17,310,000) (34,448,000)
016120- A011-2 Pay of Other Staff (15,805,000) (10,895,000) (17,212,000)
016120- A012 Allowances 3,300,000 3,756,000 3,563,000
016120- A012-1 Regular Allowances (3,300,000) (3,756,000) (3,563,000)
016120- A03 Operating Expenses 19,521,000 9,774,000 16,400,000
016120- A032 Communications 200,000
016120- A033 Utilities 1,500,000 1,000,000
016120- A038 Travel & Transportation 9,000,000 2,860,000 9,700,000
016120- A039 General 9,021,000 6,914,000 5,500,000
016120- A09 Physical Assets 196,541,000 94,177,000 194,377,000
016120- A092 Computer Equipment 10,000,000 3,933,000 20,000,000
016120- A094 Other Stores and Stocks 40,000,000
016120- A095 Purchase of Transport 15,541,000 483,000 15,541,000
016120- A096 Purchase of Plant and Machinery 167,000,000 87,261,000 114,836,000
016120- A097 Purchase of Furniture and Fixture 4,000,000 2,500,000 4,000,000
016120- A12 Civil works 50,000,000 50,000,000 14,000,000
016120- A124 Building and Structures 50,000,000 50,000,000 14,000,000
016120- A13 Repairs and Maintenance 25,000,000 20,000,000
016120- A133 Buildings and Structure 25,000,000 20,000,000
Total- ESTABLISHMENT OF MATERIAL RESOURCE CENTRE AND DEVELOPMENT OF ADDITIVE MANUFACTURING AND REVERSE 350,000,000 185,912,000 300,000,000
Page 415

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 2022-2023 2023-2024
( ( ( ACCOUNTANT GENER In Foreign Exchange) Own Resources) In Local Currency) Budget Estimate Rs AL PAKISTAN REVENUES (5,000,000) (5,000,000) (345,000,000) Revised Estimate Rs (185,912,000) Budget Estimate Rs (300,000,000)
IB3459 DATA R EPOSITORY OF SCIENTIFIC INSTRUMENT _____________________ ATION _______________
016120- A01 Employees Related Expenses 4,740,000 9,850,000 10,400,000
016120- A011 Pay 4,740,000 9,850,000 10,400,000
016120- A011-2 Pay of Other Staff (4,740,000) (9,850,000) (10,400,000)
016120- A03 Operating Expenses 35,260,000 15,011,000 19,600,000
016120- A038 Travel & Transportation 1,360,000 132,000 700,000
016120- A039 General 33,900,000 14,879,000 18,900,000
016120- A09 Physical Assets 10,000,000 10,000,000
016120- A092 Computer Equipment 10,000,000 10,000,000
Total- I DATA REPOSITORY OF SCIENTIFIC NSTRUMENTATION 50,000,000 24,861,000 40,000,000
IB5280 ESTABLISHMENT OF NUST CHIP DESIGN CENTRE (PC-II)
016120- A01 Employees Related Expenses 15,000,000
016120- A011 Pay 14,000,000
016120- A011-1 Pay of Officers (7,000,000)
016120- A011-2 Pay of Other Staff (7,000,000)
016120- A012 Allowances 1,000,000
016120- A012-1 Regular Allowances (1,000,000)
016120- A03 Operating Expenses 7,530,000 27,000,000
016120- A032 Communications 1,000,000
016120- A039 General 6,530,000 27,000,000
016120- A09 Physical Assets 37,470,000 27,000,000
016120- A092 Computer Equipment 2,000,000
016120- A094 Other Stores and Stocks 34,000,000
016120- A097 Purchase of Furniture and Fixture 3,470,000 25,000,000
016120- A12 Civil works 130,000,000 70,000,000 71,000,000
016120- A124 Building and Structures 130,000,000 70,000,000 71,000,000
016120- A13 Repairs and Maintenance 25,000,000
016120- A131 Machinery and Equipment 25,000,000
Page 416

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- ESTABLISHMENT OF NUST CHIP DESIGN CENTRE (PC-II) 190,000,000 70,000,000 150,000,000
IB7790 MEDICAL EQUIPMENT & DEVICES INNOVATION CENTER (MEDICINE)
016120- A01 Employees Related Expenses 40,800,000 13,360,000 33,674,000
016120- A011 Pay 39,300,000 12,060,000 32,234,000
016120- A011-1 Pay of Officers (30,300,000) (6,560,000) (19,300,000)
016120- A011-2 Pay of Other Staff (9,000,000) (5,500,000) (12,934,000)
016120- A012 Allowances 1,500,000 1,300,000 1,440,000
016120- A012-1 Regular Allowances (1,500,000) (1,300,000) (1,440,000)
016120- A03 Operating Expenses 57,550,000 39,245,000 253,268,000
016120- A033 Utilities 500,000 2,500,000
016120- A034 Occupancy Costs 2,700,000 1,250,000
016120- A038 Travel & Transportation 700,000 750,000 1,650,000
016120- A039 General 53,650,000 38,495,000 247,868,000
016120- A09 Physical Assets 83,150,000 4,745,000 234,000,000
016120- A092 Computer Equipment 4,500,000 1,745,000 40,000,000
016120- A094 Other Stores and Stocks 31,450,000 10,000,000
016120- A095 Purchase of Transport 1,200,000 4,000,000
016120- A096 Purchase of Plant and Machinery 43,000,000 150,000,000
016120- A097 Purchase of Furniture and Fixture 3,000,000 3,000,000 30,000,000
016120- A12 Civil works 18,000,000 32,250,000 3,000,000
016120- A124 Building and Structures 18,000,000 32,250,000 3,000,000
016120- A13 Repairs and Maintenance 500,000 400,000 250,000
016120- A133 Buildings and Structure 500,000 400,000 250,000
Total- I MEDICAL EQUIPMENT & DEVICES NNOVATION CENTER (MEDICINE) 200,000,000 90,000,000 524,192,000
IB9352 RESEAR INGREDIENTS ( CH DEVELOPMENT AND TECHNOLOGY APIS) TRANSFER OF SELECTED ACTIVE PHARMACEUTICAL
016120- A01 Employees Related Expenses 8,423,000
016120- A011 Pay 7,873,000
016120- A011-1 Pay of Officers (6,865,000)
016120- A011-2 Pay of Other Staff (1,008,000)
Page 417

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
016120- A012 Allowances 550,000
016120- A012-1 Regular Allowances (550,000)
016120- A03 Operating Expenses 303,800,000
016120- A038 Travel & Transportation 3,500,000
016120- A039 General 300,300,000
016120- A09 Physical Assets 62,777,000
016120- A092 Computer Equipment 2,000,000
016120- A095 Purchase of Transport 1,000,000
016120- A096 Purchase of Plant and Machinery 57,777,000
016120- A097 Purchase of Furniture and Fixture 2,000,000
016120- A12 Civil works 25,000,000
016120- A124 Building and Structures 25,000,000
Total- RESEARCH DEVELOPMENT AND 400,000,000
TECHNOLOGY TRANSFER OF
SELECTED ACTIVE PHARMACEUTICAL INGREDIENTS (APIS)
IB9353 ESTABL BIO-PRODUCTS ISHMENT OF MEDICAL CANNABIS GREENHO NATIONAL HEMP USES FOR BIOTECHNOLOGY DERIVED
016120- A01 Employees Related Expenses 14,200,000
016120- A011 Pay 13,000,000
016120- A011-1 Pay of Officers (10,000,000)
016120- A011-2 Pay of Other Staff (3,000,000)
016120- A012 Allowances 1,200,000
016120- A012-1 Regular Allowances (1,200,000)
016120- A03 Operating Expenses 158,000,000
016120- A038 Travel & Transportation 9,000,000
016120- A039 General 149,000,000
016120- A09 Physical Assets 177,800,000
016120- A092 Computer Equipment 5,000,000
016120- A095 Purchase of Transport 10,000,000
016120- A096 Purchase of Plant and Machinery 148,000,000
016120- A097 Purchase of Furniture and Fixture 14,800,000
016120- A12 Civil works 150,000,000
Page 418

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

ACCOUNTANT GENERAL PA 2022-2023 Budget Estimate Rs KISTAN REVENUES 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
016120- A124 Building and Structures 150,000,000
Total- ESTABLISHMENT OF MEDICAL CANNABIS GREENHOUSES FOR BIOTECHNOLOGY DERIVED BIO-PRODUCTS NATIONAL HEMP 500,000,000
ID9233 FIRST NATIONAL INDUSTRIAL INNOVATION SURVEY
016120- A01 Employees Related Expenses 6,880,000 5,947,000
016120- A011 Pay 6,591,000 5,659,000
016120- A011-1 Pay of Officers (5,437,000) (4,505,000)
016120- A011-2 Pay of Other Staff (1,154,000) (1,154,000)
016120- A012 Allowances 289,000 288,000
016120- A012-1 Regular Allowances (1,000)
016120- A012-2 Other Allowances (Excluding TA) (288,000) (288,000)
016120- A02 Project Pre-Investment Analysis 9,588,000 9,588,000
016120- A022 Research Survey & Exploratory Oper 9,588,000 9,588,000
016120- A03 Operating Expenses 753,000
016120- A039 General 753,000
Total- I FIRST NATIONAL INDUSTRIAL NNOVATION SURVEY 17,221,000 15,535,000

ID9238 NEED ASSESSMENT OF S&T HUMAN RESOURCES FOR DERIVING INNOVATION AND ACHIEVING VISION 2050

016120- A01 Employees Related Expenses 2,157,000 1,305,000
016120- A011 Pay 1,725,000 945,000
016120- A011-1 Pay of Officers (1,256,000) (945,000)
016120- A011-2 Pay of Other Staff (469,000)
016120- A012 Allowances 432,000 360,000
016120- A012-2 Other Allowances (Excluding TA) (432,000) (360,000)
016120- A02 Project Pre-Investment Analysis 7,838,000 7,828,000
016120- A022 Research Survey & Exploratory Oper 7,838,000 7,828,000
016120- A03 Operating Expenses 2,005,000 235,000
016120- A038 Travel & Transportation 400,000
016120- A039 General 1,605,000 235,000
016120- A13 Repairs and Maintenance 100,000 100,000
Page 419

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Estimate Rs Revised Estimate Rs Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
016120- A137 Computer Equipment 100,000 100,000
Total- ID9368 ESTAB. NEED ASSESSMENT OF S&T HUMAN RESOURCES FOR DERIVING INNOVATION AND ACHIEVING VISION 2050 OF PAK-KOREA TESTING FACILITY FOR SO 12,100,000 LAR & ALLIED EQUIPM 9,468,000 ENT PCRET
016120- A01 Employees Related Expenses 6,100,000 5,010,000 34,911,000
016120- A011 Pay 5,200,000 4,190,000 27,411,000
016120- A011-1 Pay of Officers (3,600,000) (3,450,000) (15,000,000)
016120- A011-2 Pay of Other Staff (1,600,000) (740,000) (12,411,000)
016120- A012 Allowances 900,000 820,000 7,500,000
016120- A012-1 Regular Allowances (900,000) (820,000) (5,000,000)
016120- A012-2 Other Allowances (Excluding TA) (2,500,000)
016120- A02 Project Pre-Investment Analysis 465,000 1,000,000
016120- A021 Feasibility Studies 465,000 1,000,000
016120- A03 Operating Expenses 3,400,000 1,239,000 16,900,000
016120- A032 Communications 200,000 40,000 300,000
016120- A033 Utilities 1,850,000 10,200,000
016120- A034 Occupancy Costs 500,000 400,000 1,500,000
016120- A039 General 850,000 799,000 4,900,000
016120- A09 Physical Assets 500,000 400,000 100,000
016120- A092 Computer Equipment 100,000
016120- A097 Purchase of Furniture and Fixture 500,000 400,000
Total- ESTAB. OF PAK-KOREA TESTING FACILITY FOR SOLAR & ALLIED EQUIPMENT PCRET 10,000,000 7,114,000 52,911,000
016120 Total- Others 1,649,899,000 615,312,000 2,712,195,000
0161 Total- Basic Research 2,419,899,000 940,958,000 3,812,195,000
016 Total- Basic Research 2,419,899,000 940,958,000 3,812,195,000
01 Total- General Public Service 2,419,899,000 940,958,000 3,812,195,000
04 Econo mic Affairs:
042 Agricul ture,Food,Irrigation,Forestry and Fishing:

0422 Irrigation:

Page 420

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Estimate Rs Revised Estimate Rs Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
042205 IB3449 Equipment machinery workshops : LAUNCHING OF STEM IN PAKISTAN PHASE-I
042205 - A01 Employees Related Expenses 26,825,000 2,998,000 26,661,000
042205 - A011 Pay 24,953,000 2,245,000 24,933,000
042205 - A011-1 Pay of Officers (22,596,000) (1,809,000) (21,321,000)
042205 - A011-2 Pay of Other Staff (2,357,000) (436,000) (3,612,000)
042205 - A012 Allowances 1,872,000 753,000 1,728,000
042205 - A012-1 Regular Allowances (1,872,000) (753,000) (1,728,000)
042205 - A03 Operating Expenses 116,175,000 62,007,000 143,339,000
042205 - A038 Travel & Transportation 18,000,000 25,000,000
042205 - A039 General 98,175,000 62,007,000 118,339,000
042205 - A09 Physical Assets 37,000,000 127,000 20,000,000
042205 - A092 Computer Equipment 17,000,000 127,000 15,000,000
042205 - A097 Purchase of Furniture and Fixture 20,000,000 5,000,000
042205 - A13 Repairs and Maintenance 120,000,000 4,589,000 10,000,000
042205 - A130 Transport 10,000,000
042205 - A131 Machinery and Equipment 120,000,000
042205 - A133 Buildings and Structure 4,589,000
Total- LAUNCHING OF STEM IN PAKISTAN PHASE-I 300,000,000 69,721,000 200,000,000
0 42205 Total- Equipment machinery workshops 300,000,000 69,721,000 200,000,000
0 422 Total- Irrigation 300,000,000 69,721,000 200,000,000
0 42 Total- Agriculture,Food,Irrigation,Forestry and Fishing 300,000,000 69,721,000 200,000,000
0 4 Total- Economic Affairs 300,000,000 69,721,000 200,000,000
09 Education Affairs and Services:
095 Subsidiary Services to Education:
0951 Subsidiary Services to Education:
095101 IB2025 Archives Library and Museums : NATIONAL DIGITAL ARCHIVE OF RESEARCH PUBL ISHED IN PAKISTAN JOURNALS
095101 - A01 Employees Related Expenses 1,015,000 963,000 51,000
095101 - A012 Allowances 1,015,000 963,000 51,000
095101 - A012-1 Regular Allowances (144,000) (144,000) (15,000)
Page 421

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Estimate Rs Revised Estimate Rs Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
095101- A012-2 Other Allowances (Excluding TA) (871,000) (819,000) (36,000)
095101- A03 Operating Expenses 27,755,000 2,242,000 25,230,000
095101- A032 Communications 120,000 30,000 90,000
095101- A038 Travel & Transportation 3,633,000 1,037,000 2,734,000
095101- A039 General 24,002,000 1,175,000 22,406,000
095101- A06 Transfers 100,000 40,000 60,000
095101- A063 Entertainment & Gifts 100,000 40,000 60,000
095101- A09 Physical Assets 13,110,000 1,401,000 10,862,000
095101- A092 Computer Equipment 12,240,000 1,201,000 10,192,000
095101- A096 Purchase of Plant and Machinery 470,000 470,000
095101- A097 Purchase of Furniture and Fixture 400,000 200,000 200,000
095101- A13 Repairs and Maintenance 20,000 5,000 15,000
095101- A133 Buildings and Structure 20,000 5,000 15,000
Total- NATIONAL DIGITAL ARCHIVE OF 42,000,000 4,651,000 36,218,000
RESEARCH PUBLISHED IN PAKISTAN JOURNALS
IB9354 EXTENSION OF DISPLAY EXHIBITS COLLECTION R EPOSITORIES IMPROVEMENT AND RESEARCH
095101- A01 Employees Related Expenses 14,310,000
095101- A011 Pay 12,782,000
095101- A011-1 Pay of Officers (8,750,000)
095101- A011-2 Pay of Other Staff (4,032,000)
095101- A012 Allowances 1,528,000
095101- A012-1 Regular Allowances (528,000)
095101- A012-2 Other Allowances (Excluding TA) (1,000,000)
095101- A03 Operating Expenses 5,000,000
095101- A032 Communications 1,000,000
095101- A038 Travel & Transportation 1,000,000
095101- A039 General 3,000,000
095101- A09 Physical Assets 9,180,000
095101- A092 Computer Equipment 1,700,000
095101- A095 Purchase of Transport 6,000,000
095101- A097 Purchase of Furniture and Fixture 1,480,000
Page 422

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION 2022-2023 Budget Estimate 2022-2023 Revised Estimate 2023-2024 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
095101- A12 Civil works 471,510,000
095101- A124 Building and Structures 471,510,000
Total- I EXTENSION OF DISPLAY EXHIBITS COLLECTION REPOSITORIES MPROVEMENT AND RESEARCH 500,000,000
ID8319 SCIENCE TALENT FARMING SCHEME(STFS) 1800 YOUNG STUDENTS
095101- A01 Employees Related Expenses 16,870,000 9,163,000 30,100,000
095101- A011 Pay 16,870,000 8,863,000 28,100,000
095101- A011-1 Pay of Officers (15,870,000) (8,028,000) (26,500,000)
095101- A011-2 Pay of Other Staff (1,000,000) (835,000) (1,600,000)
095101- A012 Allowances 300,000 2,000,000
095101- A012-1 Regular Allowances (300,000)
095101- A012-2 Other Allowances (Excluding TA) (2,000,000)
095101- A02 Project Pre-Investment Analysis 21,000,000 4,200,000 24,000,000
095101- A022 Research Survey & Exploratory Oper 21,000,000 4,200,000 24,000,000
095101- A03 Operating Expenses 58,460,000 7,874,000 45,900,000
095101- A032 Communications 8,400,000 350,000 500,000
095101- A038 Travel & Transportation 15,600,000 2,300,000 13,600,000
095101- A039 General 34,460,000 5,224,000 31,800,000
095101- A06 Transfers 200,720,000 98,764,000 300,000,000
095101- A061 Scholarship 200,720,000 98,764,000 300,000,000
095101- A09 Physical Assets 2,950,000
095101- A092 Computer Equipment 950,000
095101- A096 Purchase of Plant and Machinery 1,000,000
095101- A097 Purchase of Furniture and Fixture 1,000,000
Total- SCIENCE TALENT FARMING SCHEME(STFS) 1800 YOUNG 300,000,000 120,001,000 400,000,000
STUDENTS ID9234 FINANCIAL SUPPORT TO SCIENTIFIC SOCIETIES IN PAKISTAN(PHASE-II)
095101- A01 Employees Related Expenses 1,200,000 775,000 1,000,000
095101- A012 Allowances 1,200,000 775,000 1,000,000
095101- A012-1 Regular Allowances (1,200,000) (775,000) (1,000,000)
095101- A03 Operating Expenses 41,300,000 23,975,000 25,000,000
Page 423

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 2022-2023 2023-2024
ACCOUNTANT GENERA Budget Estimate Rs L PAKISTAN REVENUES Revised Estimate Rs Budget Estimate Rs
095101- A032 Communications 30,000 23,000 25,000
095101- A038 Travel & Transportation 5,400,000 2,756,000 5,375,000
095101- A039 General 35,870,000 21,196,000 19,600,000
095101- A06 Transfers 1,500,000
095101- A061 Scholarship 1,500,000
095101- A09 Physical Assets 1,000,000 1,000,000
095101- A092 Computer Equipment 1,000,000 1,000,000
Total- FINANCIAL SUPPORT TO SCIENTIFIC SOCIETIES IN PAKISTAN(PHASE-II) 45,000,000 24,750,000 27,000,000
ID9239 COMPETITIVE RESEARCH PROGRAMME
095101- A01 Employees Related Expenses 9,736,000 4,016,000 9,760,000
095101- A011 Pay 7,896,000 1,848,000 7,896,000
095101- A011-1 Pay of Officers (7,560,000) (1,848,000) (7,560,000)
095101- A011-2 Pay of Other Staff (336,000) (336,000)
095101- A012 Allowances 1,840,000 2,168,000 1,864,000
095101- A012-1 Regular Allowances (840,000) (1,168,000) (864,000)
095101- A012-2 Other Allowances (Excluding TA) (1,000,000) (1,000,000) (1,000,000)
095101- A02 Project Pre-Investment Analysis 270,000,000 150,053,000 163,500,000
095101- A022 Research Survey & Exploratory Oper 270,000,000 150,053,000 163,500,000
095101- A03 Operating Expenses 12,964,000 7,767,000 8,440,000
095101- A038 Travel & Transportation 2,200,000 1,548,000 2,300,000
095101- A039 General 10,764,000 6,219,000 6,140,000
095101- A06 Transfers 2,500,000 2,072,000 3,500,000
095101- A062 Technical Assistance 2,500,000 2,072,000 3,500,000
095101- A09 Physical Assets 4,800,000 4,800,000
095101- A092 Computer Equipment 1,300,000 1,300,000
095101- A095 Purchase of Transport 3,000,000 3,000,000
095101- A097 Purchase of Furniture and Fixture 500,000 500,000
Total- COMPETITIVE RESEARCH PROGRAMME 300,000,000 163,908,000 190,000,000
095101 Total- Archives Library and Museums 687,000,000 313,310,000 1,153,218,000
0951 Total- Subsidiary Services to Education 687,000,000 313,310,000 1,153,218,000
Page 424

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
095 Total- Subsidiary Services to Education 687,000,000 313,310,000 1,153,218,000
09 Total- Education Affairs and Services 687,000,000 313,310,000 1,153,218,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 3,406,899,000 1,323,989,000 5,165,413,000
(In Foreign Exchange) (51,000,000)
(Own Resources) (51,000,000)
(Foreign Aid)
(In Local Currency) (3,355,899,000) (1,323,989,000) (5,165,413,000)
Page 425

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
01 General Public Service:
016 Basic Research:
0161 Basic Research:
016101 Administration :
LO901 0 QUALITY SEED PRODUCTION AND SUPPLY TO THE FARMING COMMUNITY FOR
016101 - A01 Employees Related Expenses 15,550,000
016101 - A011 Pay 9,050,000
016101 - A011-1 Pay of Officers (5,550,000)
016101 - A011-2 Pay of Other Staff (3,500,000)
016101 - A012 Allowances 6,500,000
016101 - A012-2 Other Allowances (Excluding TA) (6,500,000)
016101 - A03 Operating Expenses 5,600,000
016101 - A038 Travel & Transportation 2,600,000
016101 - A039 General 3,000,000
016101 - A09 Physical Assets 282,995,000
016101 - A092 Computer Equipment 85,500,000
016101 - A094 Other Stores and Stocks 81,500,000
016101 - A096 Purchase of Plant and Machinery 95,000,000
016101 - A097 Purchase of Furniture and Fixture 20,995,000
016101 - A12 Civil works 295,855,000
016101 - A124 Building and Structures 295,855,000
Total- QUALITY SEED PRODUCTION AND 600,000,000
SUPPLY TO THE FARMING COMMUNITY
FOR
0 16101 Total- Administration 600,000,000
016120 Others :
LO163 PURPO 8 GENE E SE DITING OF BIOLOGICAL AGENTS FOR NUTRITIONAL BIOCHEMICAL AND THERAPEUTIC AL
016120 - A01 Employees Related Expenses 36,800,000 38,192,000 88,863,000
016120 - A011 Pay 33,000,000 34,810,000 58,520,000
016120 - A011-1 Pay of Officers (26,000,000) (28,710,000) (49,476,000)
016120 - A011-2 Pay of Other Staff (7,000,000) (6,100,000) (9,044,000)
Page 426

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
ACCOUNTANT GENERAL PAKISTAN Budget Estimate Rs REVENUES SUB-OF Revised Estimate Rs FICE, LAHORE Budget Estimate Rs
016120- A012 Allowances 3,800,000 3,382,000 30,343,000
016120- A012-1 Regular Allowances (2,800,000) (2,382,000) (29,343,000)
016120- A012-2 Other Allowances (Excluding TA) (1,000,000) (1,000,000) (1,000,000)
016120- A03 Operating Expenses 116,000,000 304,455,000 14,750,000
016120- A038 Travel & Transportation 9,000,000 1,180,000
016120- A039 General 107,000,000 303,275,000 14,750,000
016120- A09 Physical Assets 207,200,000 284,873,000 314,987,000
016120- A092 Computer Equipment 700,000 23,100,000 2,000,000
016120- A094 Other Stores and Stocks 25,000,000 148,873,000 85,000,000
016120- A095 Purchase of Transport 5,000,000
016120- A096 Purchase of Plant and Machinery 180,000,000 111,400,000 219,987,000
016120- A097 Purchase of Furniture and Fixture 1,500,000 1,500,000 3,000,000
016120- A12 Civil works 39,000,000 39,000,000 6,000,000
016120- A124 Building and Structures 39,000,000 39,000,000 6,000,000
016120- A13 Repairs and Maintenance 1,000,000 500,000 5,400,000
016120- A130 Transport 400,000
016120- A131 Machinery and Equipment 3,000,000
016120- A133 Buildings and Structure 1,000,000 500,000 2,000,000
Total- GENE EDITING OF BIOLOGICAL 400,000,000 667,020,000 430,000,000
AGENTS FOR NUTRITIONAL
BIOCHEMICAL AND THERAPEUTIC AL PURPOSE
( In Foreign Exchange) (50,000,000)
( Own Resources) (50,000,000)
( In Local Currency) (350,000,000) (667,020,000) (430,000,000)
LO1639 CULTIV FIELDS AND ATION AND PROCESSING OF MEDICINAL __________________ AND INDUSTRIAL CA __________________ NNABIS ON EXPERI ______________ MENTAL
016120- A01 Employees Related Expenses 52,800,000 64,191,000 61,340,000
016120- A011 Pay 50,000,000 60,730,000 57,840,000
016120- A011-1 Pay of Officers (27,000,000) (30,650,000) (32,940,000)
016120- A011-2 Pay of Other Staff (23,000,000) (30,080,000) (24,900,000)
016120- A012 Allowances 2,800,000 3,461,000 3,500,000
Page 427

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
016120- A012-1 Regular Allowances (2,800,000) (3,461,000) (3,500,000)
016120- A03 Operating Expenses 66,300,000 183,449,000 11,000,000
016120- A032 Communications 100,000
016120- A033 Utilities 5,000,000 1,083,000 2,900,000
016120- A038 Travel & Transportation 2,500,000 2,500,000 3,000,000
016120- A039 General 58,800,000 179,866,000 5,000,000
016120- A09 Physical Assets 175,400,000 397,367,000 187,500,000
016120- A092 Computer Equipment 500,000
016120- A094 Other Stores and Stocks 24,400,000 94,745,000 45,000,000
016120- A096 Purchase of Plant and Machinery 151,000,000 302,622,000 142,000,000
016120- A12 Civil works 55,000,000 47,300,000 40,000,000
016120- A122 Irrigation Works 1,000,000 1,000,000
016120- A124 Building and Structures 54,000,000 46,300,000 40,000,000
016120- A13 Repairs and Maintenance 500,000 250,000 160,000
016120- A130 Transport 500,000 250,000 160,000
Total- CULTIVATION AND PROCESSING OF MEDICINAL AND INDUSTRIAL CANNABIS ON EXPERIMENTAL FIELDS AND 350,000,000 692,557,000 300,000,000

LO1640 DEVELOPMENT OF COMPUTER CONTROLLED FERMENTERS AND PRODUCTION OF BIOCHEMICAL & BIO PRODUCTS

016120- A01 Employees Related Expenses 24,948,000 35,970,000 35,900,000
016120- A011 Pay 24,207,000 34,623,000 34,200,000
016120- A011-1 Pay of Officers (19,425,000) (24,944,000) (30,810,000)
016120- A011-2 Pay of Other Staff (4,782,000) (9,679,000) (3,390,000)
016120- A012 Allowances 741,000 1,347,000 1,700,000
016120- A012-1 Regular Allowances (741,000) (847,000) (700,000)
016120- A012-2 Other Allowances (Excluding TA) (500,000) (1,000,000)
016120- A03 Operating Expenses 18,700,000 75,149,000 307,843,000
016120- A038 Travel & Transportation 3,200,000 519,000 2,000,000
016120- A039 General 15,500,000 74,630,000 305,843,000
016120- A09 Physical Assets 275,352,000 267,954,000 89,000,000
016120- A092 Computer Equipment 3,000,000
Page 428

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
016120- A094 Other Stores and Stocks 11,000,000 10,342,000 5,000,000
016120- A096 Purchase of Plant and Machinery 263,352,000 256,969,000 79,000,000
016120- A097 Purchase of Furniture and Fixture 1,000,000 643,000 2,000,000
016120- A12 Civil works 487,000 3,000,000
016120- A124 Building and Structures 487,000 3,000,000
016120- A13 Repairs and Maintenance 41,000,000 23,817,000 28,000,000
016120- A133 Buildings and Structure 41,000,000 23,817,000 28,000,000
Total- DEVELOPMENT OF COMPUTER CONTROLLED FERMENTERS AND PRODUCTION OF BIOCHEMICAL & BIO PRODUCTS 360,000,000 403,377,000 463,743,000
016120 Total- Others 1,110,000,000 1,762,954,000 1,193,743,000
0161 Total- Basic Research 1,110,000,000 1,762,954,000 1,793,743,000
016 Total- Basic Research 1,110,000,000 1,762,954,000 1,793,743,000
01 Total- General Public Service 1,110,000,000 1,762,954,000 1,793,743,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 1,110,000,000 1,762,954,000 1,793,743,000
SUB-OFFICE, LAHORE
(In Foreign Exchange) (50,000,000)
(Own Resources) (50,000,000)
(Foreign Aid)
(In Local Currency) (1,060,000,000) (1,762,954,000) (1,793,743,000)
Page 429

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01 General Public Service:
016 Basic Research:
0161 Basic Research:
016120 PR1245 LAB C Others UPGRA OMP. PE : DATION OF MEDICINAL BOTANIC CENTRE SHAWAR AS ANTIONAL CENTRE FOR HERBAL MEDICINE PCSIR
016120 - A01 Employees Related Expenses 19,248,000 4,107,000 16,375,000
016120 - A011 Pay 19,248,000 4,107,000 16,375,000
016120 - A011-1 Pay of Officers (972,000) (922,000) (8,050,000)
016120 - A011-2 Pay of Other Staff (18,276,000) (3,185,000) (8,325,000)
016120 - A03 Operating Expenses 7,632,000 4,038,000 6,160,000
016120 - A038 Travel & Transportation 5,295,000 701,000 5,160,000
016120 - A039 General 2,337,000 3,337,000 1,000,000
016120 - A09 Physical Assets 134,767,000 5,378,000 116,401,000
016120 - A094 Other Stores and Stocks 134,767,000 5,378,000 116,401,000
016120 - A13 Repairs and Maintenance 15,000,000 11,599,000 12,590,000
016120 - A130 Transport 8,000,000 8,000,000
016120 - A133 Buildings and Structure 7,000,000 11,599,000 4,590,000
Total- UPGRADATION OF MEDICINAL 176,647,000 25,122,000 151,526,000
BOTANIC CENTRE AS ANTIONAL CENTRE FOR HERBAL MEDICINE PCSIR LAB COMP. PESHAWAR
PR1399 UPGRADATION OF CALIBRATION CENTRE CAPABILITIES AT PCSIR PESHAWAR
016120 - A01 Employees Related Expenses 280,000 280,000
016120 - A012 Allowances 280,000 280,000
016120 - A012-1 Regular Allowances (280,000) (280,000)
016120 - A03 Operating Expenses 925,000 650,000 274,000
016120 - A038 Travel & Transportation 325,000 50,000 274,000
016120 - A039 General 600,000 600,000
016120 - A09 Physical Assets 18,795,000 1,670,000 16,340,000
016120 - A094 Other Stores and Stocks 18,795,000 1,670,000 16,340,000
Total- UPGRADATION OF CALIBRATION 20,000,000 2,600,000 16,614,000
Page 430

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

CENTRE CAPABILITIES AT PCSIR

PESHAWAR

016120 Total- Others 196,647,000 27,722,000 168,140,000
0161 Total- Basic Research 196,647,000 27,722,000 168,140,000
016 Total- Basic Research 196,647,000 27,722,000 168,140,000
01 Total- General Public Service 196,647,000 27,722,000 168,140,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR 196,647,000 27,722,000 168,140,000
Page 431

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01 General Public Service:
016 0161 016101 KA137 Basic Research: Basic Research: Administration : 2 STRENGTHENING OF OCEANOGRAPHIC RESEA RCH SUB STATION GWADAR PAKISTAN
016101 - A01 Employees Related Expenses 28,540,000 3,447,000 6,413,000
016101 - A011 Pay 27,540,000 3,047,000 5,237,000
016101 - A011-1 Pay of Officers (15,340,000) (1,324,000) (1,339,000)
016101 - A011-2 Pay of Other Staff (12,200,000) (1,723,000) (3,898,000)
016101 - A012 Allowances 1,000,000 400,000 1,176,000
016101 - A012-1 Regular Allowances (576,000)
016101 - A012-2 Other Allowances (Excluding TA) (1,000,000) (400,000) (600,000)
016101 - A03 Operating Expenses 25,064,000 5,126,000 17,888,000
016101 - A032 Communications 1,900,000 311,000 1,289,000
016101 - A034 Occupancy Costs 3,000,000 213,000 2,787,000
016101 - A038 Travel & Transportation 5,950,000 2,498,000 3,452,000
016101 - A039 General 14,214,000 2,104,000 10,360,000
016101 - A09 Physical Assets 177,646,000 31,000 23,108,000
016101 - A092 Computer Equipment 10,000,000 31,000 4,378,000
016101 - A094 Other Stores and Stocks 10,200,000 11,700,000
016101 - A095 Purchase of Transport 12,000,000 10,000
016101 - A096 Purchase of Plant and Machinery 58,446,000 10,000
016101 - A097 Purchase of Furniture and Fixture 7,000,000 7,000,000
016101 - A098 Purchase of Other Assets 80,000,000 10,000
016101 - A13 Repairs and Maintenance 55,163,000 17,872,000 37,591,000
016101 - A132 Furniture and Fixture 2,000,000 2,000,000
016101 - A133 Buildings and Structure 51,163,000 17,747,000 33,716,000
016101 - A137 Computer Equipment 1,000,000 1,000,000
016101 - A138 General 1,000,000 125,000 875,000
Total- STRENGTHENING OF OCEANOGRAPHIC RESEARCH SUB STATION GWADAR PAKISTAN 286,413,000 26,476,000 85,000,000
Page 432

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 2022-2023 2023-2024
KA3148 ESTAB ACCOUNTANT GENERAL PAKISTAN . OF POST GRADUATE CENTRE FOR AI IN A Budget Estimate Rs REVENUES SUB-OFF GRI. & HEALTH SCI.( Revised Estimate Rs ICE, KARACHI KNOWLEDGE ECO Budget Estimate Rs NOMY INITIATE)
016101- A01 Employees Related Expenses 1,620,000 1,620,000 2,135,000
016101- A011 Pay 1,620,000 1,620,000 2,135,000
016101- A011-1 Pay of Officers (1,620,000) (1,620,000) (2,135,000)
016101- A03 Operating Expenses 8,380,000 8,380,000 15,675,000
016101- A038 Travel & Transportation 8,380,000 8,380,000 13,110,000
016101- A039 General 2,565,000
016101- A09 Physical Assets 12,190,000
016101- A092 Computer Equipment 8,190,000
016101- A097 Purchase of Furniture and Fixture 4,000,000
Total- ESTAB. OF POST GRADUATE CENTRE FOR AI IN AGRI. & HEALTH SCI.(KNOWLEDGE ECONOMY INITIATE) 10,000,000 10,000,000 30,000,000
(In Foreign Exchange) (8,380,000)
(Own Resources) (8,380,000)
(In Local Currency) (1,620,000) (10,000,000) (30,000,000)
KA9622 ESTAB EBRAHIM _ LISHMENT OF FACILITIES FOR INDUSTRIAL __________________ PRODUCTION OF N _________________ ANOMATERIALS IN ______________ LATIF
016101- A01 Employees Related Expenses 11,730,000 3,556,000 8,938,000
016101- A011 Pay 11,730,000 3,556,000 8,938,000
016101- A011-1 Pay of Officers (5,000,000) (1,664,000) (4,238,000)
016101- A011-2 Pay of Other Staff (6,730,000) (1,892,000) (4,700,000)
016101- A03 Operating Expenses 68,347,000 9,058,000 58,526,000
016101- A038 Travel & Transportation 40,272,000 453,000 36,026,000
016101- A039 General 28,075,000 8,605,000 22,500,000
016101- A09 Physical Assets 271,133,000 47,714,000 223,420,000
016101- A092 Computer Equipment 1,983,000 283,000 1,700,000
016101- A096 Purchase of Plant and Machinery 248,537,000 47,431,000 201,107,000
016101- A097 Purchase of Furniture and Fixture 20,613,000 20,613,000
Total- ESTABLISHMENT OF FACILITIES FOR INDUSTRIAL PRODUCTION OF NANOMATERIALS IN LATIF EBRAHIM 351,210,000 60,328,000 290,884,000
Page 433

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

ACCOUNTANT GENERAL PAKISTA 2022-2023 Budget Estimate Rs N REVENUES SUB-OF 2022-2023 Revised Estimate Rs FICE, KARACHI 2023-2024 Budget Estimate Rs
In Foreign Exchange) (168,635,000)
(Own Resources) (168,635,000)
(In Local Currency) (182,575,000) (60,328,000) (290,884,000)
016101 Total- Administration ___________________ 647,623,000 _________________ 96,804,000 ______________ 405,884,000
016120 Others KA3066 MONIT CREEK SYSTE : ORING SEA LEVEL RISE SEA WATER INT M WITH RUSION AND LAND SUBSIDENCE IN INDUS DELTAIN
016120- A01 Employees Related Expenses 27,143,000 12,222,000 19,772,000
016120- A011 Pay 25,693,000 11,070,000 18,722,000
016120- A011-1 Pay of Officers (19,924,000) (7,277,000) (14,396,000)
016120- A011-2 Pay of Other Staff (5,769,000) (3,793,000) (4,326,000)
016120- A012 Allowances 1,450,000 1,152,000 1,050,000
016120- A012-1 Regular Allowances (450,000) (432,000) (432,000)
016120- A012-2 Other Allowances (Excluding TA) (1,000,000) (720,000) (618,000)
016120- A03 Operating Expenses 112,950,000 114,843,000 63,395,000
016120- A032 Communications 75,000 150,000
016120- A038 Travel & Transportation 7,300,000 6,912,000 5,895,000
016120- A039 General 105,650,000 107,856,000 57,350,000
016120- A09 Physical Assets 106,507,000 19,500,000 35,383,000
016120- A092 Computer Equipment 2,000,000
016120- A095 Purchase of Transport 7,375,000 13,383,000
016120- A096 Purchase of Plant and Machinery 99,132,000 19,500,000 20,000,000
016120- A12 Civil works 2,500,000 1,000,000
016120- A124 Building and Structures 2,500,000 1,000,000
016120- A13 Repairs and Maintenance 900,000 1,018,000 450,000
016120- A130 Transport 500,000 618,000
016120- A131 Machinery and Equipment 200,000 200,000 250,000
016120- A132 Furniture and Fixture 200,000 200,000 200,000
Total- MONITORING SEA LEVEL RISE SEA WATER INTRUSION AND LAND SUBSIDENCE IN INDUS DELTAIN CREEK SYSTEM WITH 250,000,000 147,583,000 120,000,000
Page 434

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA3069 EXTERNAL DEVELOPMENT OF PSQCA BUILDING GUISTAN-E-JOHAR COMPLEX AT KARACHI

016120- A01 Employees Related Expenses 3,749,000
016120- A011 Pay 1,080,000
016120- A011-1 Pay of Officers (600,000)
016120- A011-2 Pay of Other Staff (480,000)
016120- A012 Allowances 2,669,000
016120- A012-1 Regular Allowances (1,823,000)
016120- A012-2 Other Allowances (Excluding TA) (846,000)
016120- A03 Operating Expenses 1,818,000
016120- A038 Travel & Transportation 546,000
016120- A039 General 1,272,000
016120- A12 Civil works 31,110,000
016120- A124 Building and Structures 31,110,000
Total- EXTERNAL DEVELOPMENT OF PSQCA BUILDING GUISTAN-E-JOHAR 36,677,000

COMPLEX AT KARACHI

KA7086 UPGRADATION OF MACHINERY EQUIPMENT AND RENOVATION OF BUILDING OF IIEEE AND PSTC KARACHI

016120- A01 Employees Related Expenses 1,900,000 1,447,000 508,000
016120- A011 Pay 600,000 316,000 118,000
016120- A011-2 Pay of Other Staff (600,000) (316,000) (118,000)
016120- A012 Allowances 1,300,000 1,131,000 390,000
016120- A012-1 Regular Allowances (1,300,000) (1,131,000) (390,000)
016120- A03 Operating Expenses 3,186,000 1,009,000 3,335,000
016120- A038 Travel & Transportation 1,357,000
016120- A039 General 3,186,000 1,009,000 1,978,000
016120- A09 Physical Assets 49,588,000 6,668,000 41,220,000
016120- A092 Computer Equipment 9,566,000 1,836,000 7,730,000
016120- A095 Purchase of Transport 9,400,000 8,200,000
016120- A096 Purchase of Plant and Machinery 29,858,000 4,068,000 25,290,000
016120- A097 Purchase of Furniture and Fixture 764,000 764,000
016120- A13 Repairs and Maintenance 8,874,000 8,117,000 1,757,000
Page 435

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
016120- A131 Machinery and Equipment 500,000 500,000 1,000,000
016120- A133 Buildings and Structure 8,374,000 7,617,000 757,000
Total- UPGRADATION OF MACHINERY EQUIPMENT AND RENOVATION OF BUILDING OF IIEEE AND PSTC KARACHI 63,548,000 17,241,000 46,820,000
016120 Total- Others 350,225,000 164,824,000 166,820,000
0161 Total- Basic Research 997,848,000 261,628,000 572,704,000
016 Total- Basic Research 997,848,000 261,628,000 572,704,000
01 Total- General Public Service 997,848,000 261,628,000 572,704,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 997,848,000 261,628,000 572,704,000
(In Foreign Exchange) (177,015,000)
(Own Resources) (177,015,000)
(Foreign Aid)
(In Local Currency) (820,833,000) (261,628,000) (572,704,000)
Page 436

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS

DIVISION

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

01 General Public Service:
016 Basic Research:
0161 Basic Research:
016120 Others :
QA070 0 ESTABLISHMENT OF MINERAL RESOURCE CENTER IN DISTRICT DUKKI BALUCHISTAN
016120 - A01 Employees Related Expenses 11,602,000
016120 - A011 Pay 11,602,000
016120 - A011-1 Pay of Officers (9,502,000)
016120 - A011-2 Pay of Other Staff (2,100,000)
016120 - A03 Operating Expenses 20,398,000
016120 - A033 Utilities 5,600,000
016120 - A038 Travel & Transportation 7,000,000
016120 - A039 General 7,798,000
016120 - A09 Physical Assets 118,000,000
016120 - A092 Computer Equipment 5,000,000
016120 - A095 Purchase of Transport 20,000,000
016120 - A096 Purchase of Plant and Machinery 90,000,000
016120 - A097 Purchase of Furniture and Fixture 3,000,000
016120 - A12 Civil works 150,000,000
016120 - A124 Building and Structures 150,000,000
Total- ESTABLISHMENT OF MINERAL RESOURCE CENTER IN DISTRICT DUKKI BALUCHISTAN 300,000,000
QA301 1 CONST PSQCA LABS OFFICES AT QUETTA
016120 - A01 Employees Related Expenses 200,000
016120 - A012 Allowances 200,000
016120 - A012-1 Regular Allowances (200,000)
016120 - A03 Operating Expenses 300,000
016120 - A038 Travel & Transportation 100,000
016120 - A039 General 200,000
016120 - A12 Civil works 4,500,000
016120 - A124 Building and Structures 4,500,000
Total- CONST PSQCA LABS OFFICES AT 5,000,000
QUETTA
Page 437

NO. 121.- FC22D31 DEVELOPMENT EXPENDITURE OF SCIENCE AND TECHNOLOGY DEMANDS FOR GRANTS DIVISION

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

016120 Total- Others 5,000,000 300,000,000
0161 Total- Basic Research 5,000,000 300,000,000
016 Total- Basic Research 5,000,000 300,000,000
01 Total- General Public Service 5,000,000 300,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 5,000,000 300,000,000
TOTAL - DEMAND 5,716,394,000 3,376,293,000 8,000,000,000
(In Foreign Exchange) (278,015,000)
(Own Resources) (278,015,000)
(Foreign Aid)
(In Local Currency) (5,438,379,000) __________________ (3,376,293,000) _________________ (8,000,000,000) _______________
Page 439

SECTION XXIII

MINISTRY OF STATES AND FRONTIER REGIONS

* 2023-2024 Budget Estimate (Rupees in Thousand)

Demand presented on behalf of the Ministry of
States and Frontier Regions.
Development Expenditure on Revenue Account.
122. Development Expenditure of States and Frontier
Regions 964,223
Total : 964,223
Page 441

DEMANDS FOR GRANTS

NO. 122.- DEVELOPMENT EXPENDITURE OF STATES AND FRONTIER REGIONS DEMAND NO. 122 ( FC22D88 )

DEVELOPMENT EXPENDITURE OF STATES AND FRONTIER REGIONS

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF STATES AND FRONTIER REGIONS.

Voted

Rs. 964,223,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF STATES AND FRONTIER REGIONS .

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
107 Administration 964,223,000
Total 964,223,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 130,500,000
A011 Pay 120,000,000
A011-1 Pay of Officers (80,000,000)
A011-2 Pay of Other Staff (40,000,000)
A012 Allowances 10,500,000
A012-1 Regular Allowances (500,000)
A012-2 Other Allowances (Excluding TA) (10,000,000)
A03 Operating Expenses 248,223,000
A06 Transfers 500,000
A09 Physical Assets 544,000,000
A13 Repairs and Maintenance 41,000,000
Total 964,223,000
(In Foreign Exchange) (964,223,000)
(Own Resources)
(Foreign Aid) ___________________ (964,223,000) _______________
Page 442

NO. 122.- FC22D88 DEVELOPMENT EXPENDITURE OF STATES AND FRONTIER REGIONS

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
10 Social Protection:
107 Administration:
1071 Administration:
107103 IB9347 Refugees relief : STRENGTHENING INSTITUTION FOR REFUGEES AD MINISTRATION (SIRA)
107103 - A01 Employees Related Expenses 130,500,000
107103 - A011 Pay 120,000,000
107103 - A011-1 Pay of Officers (80,000,000)
107103 - A011-2 Pay of Other Staff (40,000,000)
107103 - A012 Allowances 10,500,000
107103 - A012-1 Regular Allowances (500,000)
107103 - A012-2 Other Allowances (Excluding TA) (10,000,000)
107103 - A03 Operating Expenses 248,223,000
107103 - A032 Communications 1,500,000
107103 - A033 Utilities 400,000
107103 - A034 Occupancy Costs 10,000,000
107103 - A036 Motor Vehicles 2,000,000
107103 - A038 Travel & Transportation 38,000,000
107103 - A039 General 196,323,000
107103 - A06 Transfers 500,000
107103 - A063 Entertainment & Gifts 500,000
107103 - A09 Physical Assets 544,000,000
107103 - A092 Computer Equipment 421,000,000
107103 - A095 Purchase of Transport 68,000,000
107103 - A096 Purchase of Plant and Machinery 50,000,000
107103 - A097 Purchase of Furniture and Fixture 5,000,000
107103 - A13 Repairs and Maintenance 41,000,000
107103 - A130 Transport 5,000,000
107103 - A131 Machinery and Equipment 5,000,000
107103 - A132 Furniture and Fixture 5,000,000
107103 - A133 Buildings and Structure 20,000,000
107103 - A137 Computer Equipment 6,000,000
Total- STRENGTHENING INSTITUTION FOR 964,223,000
REFUGEES ADMINISTRATION (SIRA)
(In Foreign Exchange) (964,223,000)
(Foreign Aid) _____________ (964,223,000) _______________
Page 443

NO. 122.- FC22D88 DEVELOPMENT EXPENDITURE OF STATES AND FRONTIER DEMANDS FOR GRANTS REGIONS

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
107103 Total- Refugees relief 964,223,000
1071 Total- Administration 964,223,000
107 Total- Administration 964,223,000
10 Total- Social Protection 964,223,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 964,223,000
(In Foreign Exchange) (964,223,000)
(Own Resources)
(Foreign Aid) (964,223,000)
TOTAL - DEMAND 964,223,000
(In Foreign Exchange) (964,223,000)
(Own Resources)
(Foreign Aid) _______________________ (964,223,000) _______________
Page 445

SECTION XXIV

MINISTRY OF WATER RESOURCES

* 2023-2024 Budget Estimate (Rupees in Thousand)

Demand presented on behalf of the Ministry of Water Resources

Development Expenditure on Revenue Account.

123. Development Expenditure of Water Resources Division 107,500,000
Total : 107,500,000
Page 447

NO. 123.- DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVISION

DEMANDS FOR GRANTS

DEMAND NO. 123

( FC22D84 )

DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 for DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVISION.

Voted

Rs. 107,500,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF WATER RESOURCES .

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
042 Agriculture,Food,Irrigation,Forestry and Fishing 90,571,992,000 88,226,840,000 89,637,537,000
043 Fuel and Energy 556,473,000 299,000,000 360,000,000
107 Administration 750,000,000 1,224,536,000 17,502,463,000
Total 91,878,465,000 89,750,376,000 107,500,000,000
OBJECT CLASSIFICATION
A03 Operating Expenses 300,000,000 6,502,463,000
A05 Grants, Subsidies and Write off Loans 91,578,465,000 89,750,376,000 100,997,537,000
Total 91,878,465,000 89,750,376,000 107,500,000,000
(In Foreign Exchange) (10,000,000) (510,000,000) (11,130,000,000)
(Own Resources)
(Foreign Aid) (10,000,000) (510,000,000) (11,130,000,000)
(In Local Currency) (91,868,465,000) _________________ (89,240,376,000) _________________ (96,370,000,000) ________________
Page 448

NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVISION DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042203 IB3447 HPP Canal PC-II F irrigation : OR ENVIRONMENTAL STUDY AND DETERMIN ATION OF ENVIRONMENTAL FLOW NEELUM JHELUM
042203 - A05 Grants, Subsidies and Write off Loans 150,000,000 50,000,000
042203 - A052 Grants Domestic 150,000,000 50,000,000
Total- PC-II FOR ENVIRONMENTAL STUDY AND DETERMINATION OF ENVIRONMENTAL FLOW NEELUM JHELUM HPP 150,000,000 50,000,000
0 42203 Total- Canal irrigation 150,000,000 50,000,000
0 422 Total- Irrigation 150,000,000 50,000,000
0 42 Total- Agriculture,Food,Irrigation,Forestry 150,000,000 50,000,000
and Fishing
043 Fuel and Energy:
0438 Other s:
043820 IB3445 Other PROJE s : CT PLA NNING & DEVELOPMENT UNIT (PPDU ) MOWR
043820 - A05 Grants, Subsidies and Write off Loans 150,000,000 123,000,000 200,000,000
043820 - A052 Grants Domestic 150,000,000 123,000,000 200,000,000
Total- PROJECT PLANNING & DEVELOPMENT 150,000,000 123,000,000 200,000,000
UNIT ( PPDU) MOWR
IB3446 CAPACITY BUILDING OF OFFICE OF PCIW
043820 - A05 Grants, Subsidies and Write off Loans 150,000,000 30,000,000 50,000,000
043820 - A052 Grants Domestic 150,000,000 30,000,000 50,000,000
Total- CAPA PCIW CITY BUILDING OF OFFICE OF 150,000,000 30,000,000 50,000,000
0 43820 Total- Others 300,000,000 153,000,000 250,000,000
0 438 Total- Others 300,000,000 153,000,000 250,000,000
0 43 Total- Fuel and Energy 300,000,000 153,000,000 250,000,000
0 4 Total- Economic Affairs 450,000,000 153,000,000 300,000,000
10 Social Protection:
Page 449
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WAT ER RESOURCES DIVISIO 2022-2023 Budget Estimate N DEMAN 2022-2023 Revised Estimate DS FOR GRANTS 2023-2024 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
107 Admin istration:
1071 Admin istration:
107105 Flood IB5328 PROVI Control : SION FOR DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVISION
107105- A03 Operating Expenses 6,502,463,000
107105- A039 General 6,502,463,000
Total- PROVISION FOR DEVELOPMENT 6,502,463,000
EXPENDITURE OF WATER RESOURCES DIVISION
IB9366 UMBR ELLA PC-I OF THE FLOOD PROTECTION SECTOR PROJECT (FPSP-III)
107105- A05 Grants, Subsidies and Write off Loans 10,000,000,000
107105- A052 Grants Domestic 10,000,000,000
Total- UMBRELLA PC-I OF THE FLOOD PROTECTION SECTOR PROJECT 10,000,000,000
(FPSP-III)
(In Foreign Exchange) (9,000,000,000)
(Foreign Aid) (9,000,000,000)
(In Local Currency) (1,000,000,000)
ID9181 NORM _ AL EMERGENT FLOOD PROGRAM AZAD JAM ______________________ MU & KASHMIR SECTOR _______________
107105- A05 Grants, Subsidies and Write off Loans 7,500,000 10,000,000
107105- A052 Grants Domestic 7,500,000 10,000,000
Total- NORMAL EMERGENT FLOOD 7,500,000 10,000,000
PROGRAM AZAD JAMMU & KASHMIR SECTOR
107105 Total- Flood Control 7,500,000 16,512,463,000
1071 Total- Administration 7,500,000 16,512,463,000
107 Total- Administration 7,500,000 16,512,463,000
10 Total- Social Protection 7,500,000 16,512,463,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 457,500,000 153,000,000 16,812,463,000
(In Foreign Exchange) (9,000,000,000)
(Own Resources)
(Foreign Aid) (9,000,000,000)
(In Local Currency) (457,500,000) ( 153,000,000) (7,812,463,000)
Page 450
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042202 JM0031 Irrigation dams : RAISING OF MANGLA DAM MIRPUR AJK
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000 10,000,000 50,000,000
042202 - A052 Grants Domestic 100,000,000 10,000,000 50,000,000
Total- RAISING OF MANGLA DAM MIRPUR 100,000,000 10,000,000 50,000,000
AJK
LO1213 LININ G OF IRRIGATION CHANNELS IN PUNJAB
042202 - A05 Grants, Subsidies and Write off Loans 10,000,000
042202 - A052 Grants Domestic 10,000,000
Total- LINING OF IRRIGATION CHANNELS IN PUNJAB 10,000,000
LO1217 GHAB IR DAM CHAKWAL PUNJAB
042202 - A05 Grants, Subsidies and Write off Loans 80,000,000
042202 - A052 Grants Domestic 80,000,000
Total- GHABIR DAM CHAKWAL PUNJAB 80,000,000
LO1218 PAPIN DAM RAWALPINDI
042202 - A05 Grants, Subsidies and Write off Loans 50,000,000
042202 - A052 Grants Domestic 50,000,000
Total- PAPIN DAM RAWALPINDI 50,000,000
LO1635 DETAILED ENGINEERING DESIGN PREPARATION OF TENDER DOCUMENTS & PC-I OF HIN GOL DAM
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000 100,000,000 100,000,000
042202 - A052 Grants Domestic 100,000,000 100,000,000 100,000,000
Total- DETAILED ENGINEERING DESIGN 100,000,000 100,000,000 100,000,000
LO1636 DETAI PREPARATION OF TENDER DOCUMENTS & PC-I OF HINGOL DAM LED ENGINEERING DESIGN PREPARATION O F TENDER DOCUMENTS & PC-I OF CHINIOT DAM
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000 100,000,000 100,000,000
042202 - A052 Grants Domestic 100,000,000 100,000,000 100,000,000
Total- DETAILED ENGINEERING DESIGN PREPARATION OF TENDER 100,000,000 100,000,000 100,000,000

DOCUMENTS & PC-I OF CHINIOT DAM

Page 451
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO3128 FEASIBILITY STUDY OF MURUNJ DAM AT NILA KU RAJANPUR PUNJAB (SP) ND ON KAHAL HILL TORRENT PROJECT (PUNJAB)
042202- A05 Grants, Subsidies and Write off Loans 127,117,000 127,117,000
042202- A052 Grants Domestic 127,117,000 127,117,000
Total- FEASIBILITY STUDY OF MURUNJ DAM AT NILA KUND ON KAHAL HILL TORRENT PROJECT (PUNJAB) RAJANPUR PUNJAB (SP) 127,117,000 127,117,000
042202 Total- Irrigation dams 437,117,000 337,117,000 380,000,000
042203 Canal AK8000 FEAS irrigation : IBILITY STUDY OF SHATUNG NULLAH DIVER SION PROJECT
042203- A05 Grants, Subsidies and Write off Loans 100,000,000 67,000,000 123,568,000
042203- A052 Grants Domestic 100,000,000 67,000,000 123,568,000
Total- FEASIBILITY STUDY OF SHATUNG 100,000,000 67,000,000 123,568,000
NULLAH DIVERSION PROJECT
DG0031 KACH HI CANAL PROJECT RESTORATION OF FLOOD DAMAGES 2022 ( RD 0+000 TO RD 1005+000)
042203- A05 Grants, Subsidies and Write off Loans 1,000,000,000
042203- A052 Grants Domestic 1,000,000,000
Total- KACHHI CANAL PROJECT 1,000,000,000
RESTORATION OF FLOOD DAMAGES 2022 (RD 0+000 TO RD 1005+000)
(In Foreign Exchange) (1,000,000,000)
(Foreign Aid) (1,000,000,000)
DG0081 REME ADDU DISTT _ DIAL MEASURES TO CONTROL WATER LOG __________________ GING DUE TO MUZA _______________ FFARGARH &TP ________________ LINK CANAL KOT
042203- A05 Grants, Subsidies and Write off Loans 50,000,000 100,000,000
042203- A052 Grants Domestic 50,000,000 100,000,000
Total- REMEDIAL MEASURES TO CONTROL 50000000 100000000
WATER LOGGING DUE TO MUZAFFARGARH &TP LINK CANAL KOT ADDU DISTT ,, ,,
DG0161 KACH HI CANAL PROJECT PHASE-I DERA BUGHTI JHAL MAGSI
042203- A05 Grants, Subsidies and Write off Loans 2,500,000,000 1,836,911,000 500,000,000
Page 452
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WA TER RESOURCES DI 2022-2023 Budget Estimate VISION DEMAN 2022-2023 Revised Estimate DS FOR GRANTS 2023-2024 Budget Estimate
ACCOUNTANT GENERAL PAKISTAN Rs REVENUES SUB-O Rs FFICE, LAHORE Rs
042203- A052 Grants Domestic 2,500,000,000 1,836,911,000 500,000,000
Total- KACHHI CANAL PROJECT PHASE-I 2,500,000,000 1,836,911,000 500,000,000
DG0169 KACH DERA BUGHTI JHAL MAGSI HI CANAL PROJECT (REMAINING WORKS) PHASE-I DISTRICT DERA BUGTI
042203- A05 Grants, Subsidies and Write off Loans 5,000,000,000 7,150,000,000 500,000,000
042203- A052 Grants Domestic 5,000,000,000 7,150,000,000 500,000,000
Total- KACHHI CANAL PROJECT (REMAINING WORKS) PHASE-I DISTRICT DERA BUGTI 5,000,000,000 7,150,000,000 500,000,000
LO1391 FEASIBILITY STUDY OF SINDH BARRAGE
042203- A05 Grants, Subsidies and Write off Loans 51,264,000 7,956,000 93,308,000
042203- A052 Grants Domestic 51,264,000 7,956,000 93,308,000
Total- FEASIBILITY STUDY OF SINDH 51,264,000 7,956,000 93,308,000
LO2122 REVIE CANAL(LIFT-C BARRAGE W OF FEASIBILITY STUDY ENGINEERING D UM-GRAVITY) ESIGN TENDER DOC . & PC-1 CHASHMA RIGHT BANK
042203- A05 Grants, Subsidies and Write off Loans 213,926,000 213,926,000
042203- A052 Grants Domestic 213,926,000 213,926,000
Total- REVIEW OF FEASIBILITY STUDY ENGINEERING DESIGN TENDER DOC. & PC-1 CHASHMA RIGHT BANK CANAL(LIFT-CUM-GRAVITY) 213,926,000 213,926,000
042203 Total- Canal irrigation 7,915,190,000 9,275,793,000 2,316,876,000
0422 Total- Irrigation 8,352,307,000 9,612,910,000 2,696,876,000
042 Total- Agriculture,Food,Irrigation,Forestry 8,352,307,000 9,612,910,000 2,696,876,000
and Fishing
043 Fuel a nd Energy:
0438 Other :
043820 Others LO1219 LAND : AND WATER MONITORING/ EVALUATION O F INDUS PLAINS (SM O)
043820- A05 Grants, Subsidies and Write off Loans 56,473,000 126,000,000
043820- A052 Grants Domestic 56,473,000 126,000,000
Total- LAND AND WATER MONITORING/ 56,473,000 126,000,000
EVALUATION OF INDUS PLAINS (SMO)
Page 453
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO9601 INDUS BASIN IRRIGATION SYSTEM (IBIS) AUTOMATION OF 07 KEY SITES FOR DISCHARGE MONITORING
043820- A05 Gran ts, Subsidies and Write off Loans 200,000,000 20,000,000 110,000,000
043820- A052 Gran ts Domestic 200,000,000 20,000,000 110,000,000
Total- INDUS BASIN IRRIGATION SYSTEM 200,000,000 20,000,000 110,000,000
(IBIS) FOR D AUTOMATION OF 07 KEY SITES ISCHARGE MONITORING
(In Foreign Exchange) (10,000,000)
(Foreign Aid) (10,000,000)
(In Loc al Currency) (200,000,000) __________________ (20,000,000) _________________ (100,000,000) _______________
043820 Total- Others 256,473,000 146,000,000 110,000,000
0438 Total- Others 256,473,000 146,000,000 110,000,000
043 Total- Fuel and Energy 256,473,000 146,000,000 110,000,000
04 Total- Economic Affairs 8,608,780,000 9,758,910,000 2,806,876,000
10 Social Protection:
107 Admin istration:
1071 Admin 107105 Flood istration: Control :
LO1216 NORM AL /EM ERGENT FLOOD PROGRAMME PUNJAB
107105- A05 Gran ts, Subsidies and Write off Loans 337,500,000 337,500,000 450,000,000
107105- A052 Gran ts Domestic 337,500,000 337,500,000 450,000,000
Total- NORM PROG AL /EMERGENT FLOOD RAMME PUNJAB 337,500,000 337,500,000 450,000,000
107105 Total- Flood Control 337,500,000 337,500,000 450,000,000
1071 Total- Administration 337,500,000 337,500,000 450,000,000
107 Total- Administration 337,500,000 337,500,000 450,000,000
10 Total- Social Protection 337,500,000 337,500,000 450,000,000
Total- ACCOUNTANT GENERAL 8,946,280,000 10,096,410,000 3,256,876,000
PAKISTAN REVENUES SUB-OFFICE, LAHORE
(In Foreign Exchange) (1,010,000,000)
(Own Resources)
(Foreign Aid) (1,010,000,000)
(In Local Currency) (8,946,280,000) (10,096,410,000) (2,246,876,000)
Page 454
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042202 Irrigation dams :
BU0220 KURRAM TANGI (KAITU WEIR) NORTH WAZIRISTAN AGENCY
042202 - A05 Grants, Subsidies and Write off Loans 1,000,000,000 500,000,000 1,000,000,000
042202 - A052 Grants Domestic 1,000,000,000 500,000,000 1,000,000,000
Total- KURRAM TANGI (KAITU WEIR) NORTH WAZIRISTAN AGENCY 1,000,000,000 500,000,000 1,000,000,000
(In Foreign Exchange) (500,000,000) (500,000,000)
(Foreign Aid) (500,000,000) (500,000,000)
(In Local Currency) (1,000,000,000) (500,000,000)
BU0238 DESIG KURR N AM TANGI DAM PROJECT STAGE-II UPDATI ____________________ NG OF FEASIBILITY ST _______________ UDY & DETAILED _______________ ENGINEERING
042202 - A05 Grants, Subsidies and Write off Loans 50,000,000 250,000,000
042202 - A052 Grants Domestic 50,000,000 250,000,000
Total- KURRAM TANGI DAM PROJECT 50,000,000 250,000,000
STAGE-II UPDATING OF FEASIBILITY STUDY & DETAILED ENGINEERING DESIGN
(In Foreign Exchange) (50,000,000)
(Foreign Aid) (50,000,000)
(In Local Currency) (50,000,000) (200,000,000)
KT0157 CONSTRUCTION OF 20 SMALL DAMS IN KHYBER ____________________ PAKHTUNKHWA _______________ _______________
042202 - A05 Grants, Subsidies and Write off Loans 241,334,000
042202 - A052 Grants Domestic 241,334,000
Total- CONSTRUCTION OF 20 SMALL DAMS IN KHYBER PAKHTUNKHWA 241,334,000
KT0163 CONSTRUCTION OF SUMARI PAYAN DAM PROJECT DISTRICT KOHAT
042202 - A05 Grants, Subsidies and Write off Loans 1,000,000,000
042202 - A052 Grants Domestic 1,000,000,000
Total- CONSTRUCTION OF SUMARI PAYAN 1,000,000,000
DAM PROJECT DISTRICT KOHAT
Page 455
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVI 2022-2023 Budget Estimate SION DEMAN 2022-2023 Revised Estimate DS FOR GRANTS 2023-2024 Budget Estimate
Rs Rs Rs
PR1175 CONS ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR TRUCTION OF SANAM/PALAI & KUNDAL DAM KHYBER PAKHTUNKHWA
042202- A05 Grants, Subsidies and Write off Loans 120,000,000 500,000,000
042202- A052 Grants Domestic 120,000,000 500,000,000
Total- CONSTRUCTION OF SANAM/PALAI & 120,000,000 500,000,000
PR1209 RAISI KUNDAL DAM KHYBER PAKHTUNKHWA NG OF BARAN DAM BANNU
042202- A05 Grants, Subsidies and Write off Loans 777,248,000 777,248,000
042202- A052 Grants Domestic 777,248,000 777,248,000
Total- RAISING OF BARAN DAM BANNU 777,248,000 777,248,000
PR3133 CONS CHANNELS R T & IMPROVEMENT OF IRRIGATION INFRASTRU OAD CTURE INCLUDING FLOOD PROTECTION WORK
042202- A05 Grants, Subsidies and Write off Loans 260,897,000 172,179,000 80,000,000
042202- A052 Grants Domestic 260,897,000 172,179,000 80,000,000
Total- CONST & IMPROVEMENT OF 260,897,000 172,179,000 80,000,000
IRRIGATION INFRASTRUCTURE INCLUDING FLOOD PROTECTION WORK CHANNELS ROAD
PR3134 INCREASING STORAGE CAPACITY AND IMPROVEMENT IN COMMAND AREA OF TANDA DAM
042202- A05 Grants, Subsidies and Write off Loans 200,000,000 270,266,000 1,000,000,000
042202- A052 Grants Domestic 200,000,000 270,266,000 1,000,000,000
Total- INCREASING STORAGE CAPACITY AND 200,000,000 270,266,000 1,000,000,000
PR3135 CONS IMPROVEMENT IN COMMAND AREA OF TANDA DAM TRUCTION OF CHASHMA AKHOR KEHL DAM DI STRICT KARAK
042202- A05 Grants, Subsidies and Write off Loans 50,000,000 50,000,000 500,000,000
042202- A052 Grants Domestic 50,000,000 50,000,000 500,000,000
Total- CONSTRUCTION OF CHASHMA AKHOR 50,000,000 50,000,000 500,000,000
KEHL DAM DISTRICT KARAK
PR3136 CONSTRUCTION OF SAROZI DAM DISTRICT HANGU
042202- A05 Grants, Subsidies and Write off Loans 100,000,000 100,000,000 100,000,000
042202- A052 Grants Domestic 100,000,000 100,000,000 100,000,000
Total- CONSTRUCTION OF SAROZI DAM DISTRICT HANGU 100,000,000 100,000,000 100,000,000
Page 456
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WA TER RESOURCES DI 2022-2023 Budget Estimate VISION DEMA 2022-2023 Revised Estimate NDS FOR GRANTS 2023-2024 Budget Estimate
Rs Rs Rs
PR3137 CONS ACCOUNTANT GENERAL PAKISTAN TRUCTION OF MAKH BANDA DAM DISTRIC REVENUES SUB-OFF T KARAK ICE, PESHAWAR
042202- A05 Grants, Subsidies and Write off Loans 200,000,000 200,000,000 283,338,000
042202- A052 Grants Domestic 200,000,000 200,000,000 283,338,000
Total- CONSTRUCTION OF MAKH BANDA DAM 200,000,000 200,000,000 283,338,000
DISTRICT KARAK
PR3138 CONS TRUCTION OF KHATTAK BANDA DAM SHA KAR DARA DISTRICT KOHAT
042202- A05 Grants, Subsidies and Write off Loans 348,352,000 348,352,000
042202- A052 Grants Domestic 348,352,000 348,352,000
Total- CONSTRUCTION OF KHATTAK BANDA DAM SHAKAR DARA DISTRICT KOHAT 348,352,000 348,352,000
PR3139 CONSTRUCTION OF PEZU DAM PROJECT DISTRICT LAKKI MARWAT
042202- A05 Grants, Subsidies and Write off Loans 302,192,000 302,192,000
042202- A052 Grants Domestic 302,192,000 302,192,000
Total- CONSTRUCTION OF PEZU DAM PROJECT DISTRICT LAKKI MARWAT 302,192,000 302,192,000
PR6190 MOHMAND DAM HYDROPOWER PROJECT FUNDING GRNT FOR DAM
042202- A05 Grants, Subsidies and Write off Loans 12,060,310,000 12,061,310,000 10,500,000,000
042202- A052 Grants Domestic 12,060,310,000 12,061,310,000 10,500,000,000
Total- MOHMAND DAM HYDROPOWER PROJECT FUNDING GRNT FOR DAM 12,060,310,000 12,061,310,000 10,500,000,000
(In Foreign Exchange) (1,000,000) (500,000,000)
(Foreign Aid) (1,000,000) (500,000,000)
(In Local Currency) (12,060,310,000) (12,060,310,000) (10,000,000,000)
042202 Total- Irrigation dams __________________ 15,590,333,000 ________________ 14,901,547,000 ________________ 15,213,338,000
042203 Canal irrigation :
DI0111 CHASHMA RIGHT BANK CANAL (CRBC) LEFT CUM GRAVITY PROJECT
042203- A05 Grants, Subsidies and Write off Loans 500,000,000 100,000,000
042203- A052 Grants Domestic 500,000,000 100,000,000
Total- CHASHMA RIGHT BANK CANAL (CRBC) LEFT CUM GRAVITY PROJECT 500,000,000 100,000,000
(In Foreign Exchange) (10,000,000)
(Foreign Aid) (10,000,000)
(In Local Currency) (500,000,000) __________________ (90,000,000) ________________
Page 457
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

KT0156 CONSTRUCTION OF SANAM/PALAI & KUNDAL DAM KHYBER PAKHTUNKHWA
042203- A05 Grants, Subsidies and Write off Loans 150,000,000
042203- A052 Grants Domestic 150,000,000
Total- PR1211 REMO CONSTRUCTION OF SANAM/PALAI & KUNDAL DAM KHYBER PAKHTUNKHWA DELING OF WARSAK CANAL SYSTEM 150,000,000
042203- A05 Grants, Subsidies and Write off Loans 1,000,000,000 1,000,000,000 500,000,000
042203- A052 Grants Domestic 1,000,000,000 1,000,000,000 500,000,000
Total- REMODELING OF WARSAK CANAL 1,000,000,000 1,000,000,000 500,000,000
SYSTEM
SU0049 UPDA GHAZI TING OF SUPPLEMENTARY ENVIRONMENT AL & SOCIAL STUDY OF INDUS RIVER R EACH B/W
042203- A05 Grants, Subsidies and Write off Loans 42,000,000 42,000,000
042203- A052 Grants Domestic 42,000,000 42,000,000
Total- UPDATING OF SUPPLEMENTARY ENVIRONMENTAL & SOCIAL STUDY OF INDUS RIVER REACH B/W GHAZI 42,000,000 42,000,000
042203 Total- Canal irrigation 1,692,000,000 1,042,000,000 600,000,000
0422 Total- Irrigation 17,282,333,000 15,943,547,000 15,813,338,000
042 Total- Agriculture,Food,Irrigation,Forestry and Fishing 17,282,333,000 15,943,547,000 15,813,338,000
04 Total- Economic Affairs 17,282,333,000 15,943,547,000 15,813,338,000
10 Social Protection:
107 Admin istration:
1071 Admin istration:
107105 Flood PR1201 NORM Control : AL EMERGENT FLOOD PROGRAMME KHYB ER PAKHTUNKHWA
107105- A05 Grants, Subsidies and Write off Loans 105,000,000 140,000,000
107105- A052 Grants Domestic 105,000,000 140,000,000
Total- NORMAL EMERGENT FLOOD 105000000 140000000
PROGRAMME KHYBER PAKHTUNKHWA ,, ,,
107105 Total- Flood Control 105,000,000 140,000,000
1071 Total- Administration 105,000,000 140,000,000
Page 458
NO. 123.- F C22D84 DEVELOPMENT EXPENDITURE OF ACCOUNTANT GENERAL PAKISTA WATER RESOURCES D 2022-2023 Budget Estimate Rs N REVENUES SUB-OF IVISION DEMAN 2022-2023 Revised Estimate Rs FICE, PESHAWAR DS FOR GRANTS 2023-2024 Budget Estimate Rs
107 Total- Administration 105,000,000 140,000,000
10 Total- Social Protection 105,000,000 140,000,000
Total- ACCOUNTANT GENERAL 17,387,333,000 15,943,547,000 15,953,338,000
PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
(In Foreign Exchange) (501,000,000) (1,060,000,000)
(Own Resources)
(Foreign Aid) (501,000,000) (1,060,000,000)
(In Local Currency) (17,387,333,000) (15,442,547,000) (14,893,338,000)
Page 459
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042202 Irrigation dams :
HD010 5 DARW AT DAM JAMSHORO THATTA
042202 - A05 Grants, Subsidies and Write off Loans 678,173,000 678,137,000
042202 - A052 Grants Domestic 678,173,000 678,137,000
Total- DARWAT DAM JAMSHORO THATTA 678,173,000 678,137,000
JS0011 GARW CONSTRUCTION OF 05 SMALL DAMS NAMELY SAL ARI DAM & AAMRI ARI-2 DAM RAI JO D AT DAM SHALMANI DAM
042202 - A05 Grants, Subsidies and Write off Loans 300,000,000 600,000,000 700,000,000
042202 - A052 Grants Domestic 300,000,000 600,000,000 700,000,000
Total- CONSTRUCTION OF 05 SMALL DAMS 300,000,000 600,000,000 700,000,000
JS0012 BANTA CONS RIMOO NAMELY SALARI-2 DAM RAI JO DAT DAM SHALMANI DAM GARWARI DAM & AAMRI TRUCTION OF 06 SMALL DAMS NAMELY DE R NADI JO WANDIO DAMS IN NSI KOONDAL KAMB OWAH KHIROPORA
042202 - A05 Grants, Subsidies and Write off Loans 300,000,000 800,000,000 1,000,000,000
042202 - A052 Grants Domestic 300,000,000 800,000,000 1,000,000,000
Total- CONSTRUCTION OF 06 SMALL DAMS 300,000,000 800,000,000 1,000,000,000
JS0013 IN LOW CONS ER NAMELY DENSI KOONDAL KAMBOWAH KHIROPORA BANTARIMOOR NADI JO WANDIO DAMS IN TRUCTION OF 06 SMALL DAMS NAMELY KA TRAH KUOHAR SARI -II SARONI WADEJO & KHAR DAMS
042202 - A05 Grants, Subsidies and Write off Loans 300,000,000 900,000,000 900,000,000
042202 - A052 Grants Domestic 300,000,000 900,000,000 900,000,000
Total- CONSTRUCTION OF 06 SMALL DAMS NAMELY KATRAH KUOHAR SARI-II SARONI WADEJO & KHAR DAMS IN LOWER 300,000,000 900,000,000 900,000,000
0 42202 Total- Irrigation dams 1,578,173,000 2,978,137,000 2,600,000,000
042203 Canal irrigation :
DU003 2 NAI G AJ DAM DADU SINDH
Page 460
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WAT ACCOUNTANT GENERAL PAKISTAN ER RESOURCES D 2022-2023 Budget Estimate Rs REVENUES SUB-O IVISION DEMA 2022-2023 Revised Estimate Rs FFICE, KARACHI NDS FOR GRANTS 2023-2024 Budget Estimate Rs
042203- A05 Grants, Subsidies and Write off Loans 5,000,000,000 3,000,000,000 500,000,000
042203- A052 Grants Domestic 5,000,000,000 3,000,000,000 500,000,000
Total- NAI GAJ DAM DADU SINDH 5,000,000,000 3,000,000,000 500,000,000
KA1371 K-IV GREATER WATER SUPPLY SCHEME
042203- A05 Grants, Subsidies and Write off Loans 20,000,000,000 20,000,000,000 17,500,000,000
042203- A052 Grants Domestic 20,000,000,000 20,000,000,000 17,500,000,000
Total- K-IV GREATER WATER SUPPLY 20,000,000,000 20,000,000,000 17,500,000,000
SCHEME
KA3104 CONS BARRIERS IN TRUCTION OF SMALL STORAGE DAMS DEL SINDH AY ACTION DAMS R ETENTION WEIRS AND ISSO
042203- A05 Grants, Subsidies and Write off Loans 479,535,000 479,535,000
042203- A052 Grants Domestic 479,535,000 479,535,000
Total- KA3105 MAKH CONSTRUCTION OF SMALL STORAGE DAMS DELAY ACTION DAMS RETENTION WEIRS AND ISSO BARRIERS IN SINDH I FARASH LINK CANAL PROJECT (PH-II) FOR 479,535,000 WATER SUPPLY T 479,535,000 O THAR COAL
042203- A05 Grants, Subsidies and Write off Loans 10,000,000 100,000,000
042203- A052 Grants Domestic 10,000,000 100,000,000
Total- MAKHI FARASH LINK CANAL PROJECT (PH-II) FOR WATER SUPPLY TO THAR COAL 10,000,000 100,000,000
KA3108 LININ G OF DISTRIBUTARIES & MINORS IN SINDH
042203- A05 Grants, Subsidies and Write off Loans 100,000,000
042203- A052 Grants Domestic 100,000,000
Total- LINING OF DISTRIBUTARIES & MINORS IN SINDH 100,000,000
SK0066 FEASIBILITY STUDY OF THAR CANAL PROJECT
042203- A05 Grants, Subsidies and Write off Loans 100,000,000 100,000,000 50,000,000
042203- A052 Grants Domestic 100,000,000 100,000,000 50,000,000
Total- FEASIBILITY STUDY OF THAR CANAL PROJECT 100,000,000 100,000,000 50,000,000
Page 461

NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIVISION

SOURCES DIVI 2022-2023 SION DEMANDS 2022-2023 FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

SK0067 FEASIBILITY STUDY CONSTRUCTION OF DRAINAGE NETWORK TALUKA UBAURO DAHARKI KHANGAR MIRPUR MATHELO

042203- A05 Gran ts, Subsidies and Write off Loans 100,000,000 100,000,000 100,000,000
042203- A052 Gran ts Domestic 100,000,000 100,000,000 100,000,000
Total- FEASI BILITY STUDY CONSTRUCTION 100,000,000 100,000,000 100,000,000
SK0068 FEAS DRAINAGE PR OF DR UBAU MATH IBILITY OJECT AINAGE NETWORK TALUKA RO DAHARKI KHANGAR MIRPUR ELO STUDY DETAILED ENGINEERING DESIGN PC-I OF JACO BABAD SHIKARPUR & KASHMORE
042203- A05 Gran ts, Subsidies and Write off Loans 100,000,000 100,000,000 451,232,000
042203- A052 Gran ts Domestic 100,000,000 100,000,000 451,232,000
Total- FEASI ENGIN JACO KASH BILITY STUDY DETAILED EERING DESIGN PC-I OF BABAD SHIKARPUR & MORE DRAINAGE PROJECT 100,000,000 100,000,000 451,232,000
042203 Total- Canal irrigation 25,889,535,000 23,779,535,000 18,701,232,000
0422 Total- Irrigation 27,467,708,000 26,757,672,000 21,301,232,000
042 Total- Agriculture,Food,Irrigation,Forestry and Fishing 27,467,708,000 26,757,672,000 21,301,232,000
04 Total- Economic Affairs 27,467,708,000 26,757,672,000 21,301,232,000
10 Social 107 Admin 1071 Admin 107105 Flood KA3100 NORM Protection: istration: istration: Control : AL EMERGENT FLOOD PROGRAMMED SINDH
107105- A05 Gran ts, Subsidies and Write off Loans 232,500,000 628,813,000 310,000,000
107105- A052 Gran ts Domestic 232,500,000 628,813,000 310,000,000
Total- NORM PROG AL EMERGENT FLOOD RAMMED SINDH 232,500,000 628,813,000 310,000,000
107105 Total- Flood Control 232,500,000 628,813,000 310,000,000
1071 Total- Administration 232,500,000 628,813,000 310,000,000
107 Total- Administration 232,500,000 628,813,000 310,000,000
10 Total- Social Protection 232,500,000 628,813,000 310,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 27,700,208,000 27,386,485,000 21,611,232,000
Page 462
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042202 AW000 Irrigation dams : 6 CONSTRUCTION OF AWARAN DAM AWARAN
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000 3,000,000,000
042202 - A052 Grants Domestic 100,000,000 3,000,000,000
Total- CONSTRUCTION OF AWARAN DAM AWARAN 100,000,000 3,000,000,000
GR008 6 CONSTRUCTION OF SHEHZANIK DAM GWADAR
042202 - A05 Grants, Subsidies and Write off Loans 300,000,000 300,000,000 500,000,000
042202 - A052 Grants Domestic 300,000,000 300,000,000 500,000,000
Total- CONSTRUCTION OF SHEHZANIK DAM 300,000,000 300,000,000 500,000,000
GWADAR
JH0010 NAUL ONG STORAGE DAM JHAL MAGSI BALOCHISTAN
042202 - A05 Grants, Subsidies and Write off Loans 500,000,000 110,000,000
042202 - A052 Grants Domestic 500,000,000 110,000,000
Total- NAULONG STORAGE DAM JHAL MAGSI BALOCHISTAN 500,000,000 110,000,000
(In Foreign Exchange) (10,000,000)
(Foreign Aid) (10,000,000)
(In Local Currency) (500,000,000) (100,000,000)
KL5555 CONS __ TRUCTION OF DAM AT ROSHANABAD KALAT _________________ _______________
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000 250,000,000
042202 - A052 Grants Domestic 100,000,000 250,000,000
Total- CONSTRUCTION OF DAM AT 100000000 250000000
KN0200 CONS ROSHANABAD KALAT TRUCTION OF SARI KALANG DELAY ACTION D AMS DISTRICT KH ,, ARAN ,,
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000 100,000,000 243,000,000
042202 - A052 Grants Domestic 100,000,000 100,000,000 243,000,000
Total- CONSTRUCTION OF SARI KALANG DELAY ACTION DAMS DISTRICT KHARAN 100,000,000 100,000,000 243,000,000
Page 463
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WAT ER RESOURCES DI 2022-2023 Budget Estimate VISION DEMAN 2022-2023 Revised Estimate DS FOR GRANTS 2023-2024 Budget Estimate
Rs Rs Rs
KR0213 CONS ACCOUNTANT GENERAL PAKISTAN TRUCTION OF SUNNI GAR DAM KHUZDAR REVENUES SUB-OFFICE, QUETTA
042202- A05 Grants, Subsidies and Write off Loans 400,000,000 500,000,000
042202- A052 Grants Domestic 400,000,000 500,000,000
Total- CONSTRUCTION OF SUNNI GAR DAM KHUZDAR 400,000,000 500,000,000
LI0026 CONSTRUCTION OF 05 NOS. OF DAMS IN DISTRICT LORALAI
042202- A05 Grants, Subsidies and Write off Loans 200,000,000 100,000,000 299,591,000
042202- A052 Grants Domestic 200,000,000 100,000,000 299,591,000
Total- CONSTRUCTION OF 05 NOS. OF DAMS 200,000,000 100,000,000 299,591,000
IN DISTRICT LORALAI
LS0017 WINDE R DAM LASBELA BALOCHISTAN
042202- A05 Grants, Subsidies and Write off Loans 1,000,000,000 1,950,000,000 2,000,000,000
042202- A052 Grants Domestic 1,000,000,000 1,950,000,000 2,000,000,000
Total- WINDER DAM LASBELA BALOCHISTAN 1,000,000,000 1,950,000,000 2,000,000,000
NI5555 CONSTRUCTION OF DEENARI STORAGE (DELAY AC TION DAM)
042202- A05 Grants, Subsidies and Write off Loans 50,000,000 287,925,000
042202- A052 Grants Domestic 50,000,000 287,925,000
Total- CONSTRUCTION OF DEENARI 50,000,000 287,925,000
STORAGE (DELAY ACTION DAM)
PJ0026 CONSTRUCTION OF PANJGOOR STORAGE DAM PANJGOOR
042202- A05 Grants, Subsidies and Write off Loans 100,000,000 2,500,000,000
042202- A052 Grants Domestic 100,000,000 2,500,000,000
Total- CONSTRUCTION OF PANJGOOR 100,000,000 2,500,000,000
STORAGE DAM PANJGOOR
QA0703 REHABILITATION AND CONSERVATION OF KAREZ MANAGEMENT AND LIVELIHOOD ES FOR SUSTAINABLE GROUND WATER
042202- A05 Grants, Subsidies and Write off Loans 27,000,000
042202- A052 Grants Domestic 27,000,000
Total- REHABILITATION AND CONSERVATION OF KAREZES FOR SUSTAINABLE 27,000,000
GROUND WATER MANAGEMENT AND LIVELIHOOD
Page 464
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

QA0802 UMBR ELLA PC-II FOR FEASIBILITY STUDY AND DETAILED DESIGN OF EIGHT DAM IN BALOCHISTAN
042202- A05 Grants, Subsidies and Write off Loans 200,000,000 100,000,000 150,000,000
042202- A052 Grants Domestic 200,000,000 100,000,000 150,000,000
Total- UMBRELLA PC-II FOR FEASIBILITY 200,000,000 100,000,000 150,000,000
QA0803 PC-II STUDY AND DETAILED DESIGN OF EIGHT DAM IN BALOCHISTAN OF MAPPING ON ALL WATER RESOURCES I N BALOCHISTAN
042202- A05 Grants, Subsidies and Write off Loans 100,000,000 100,000,000 50,000,000
042202- A052 Grants Domestic 100,000,000 100,000,000 50,000,000
Total- PC-II OF MAPPING ON ALL WATER 100,000,000 100,000,000 50,000,000
QA3118 CONS RESOURCES IN BALOCHISTAN TRUCTION OF 100 DAMS IN DIFFERENT ARE AS/DISTRICTS OF BALOCHISTAN (PACKAGE-IV)
042202- A05 Grants, Subsidies and Write off Loans 200,000,000 40,000,000 1,000,000,000
042202- A052 Grants Domestic 200,000,000 40,000,000 1,000,000,000
Total- CONSTRUCTION OF 100 DAMS IN 200,000,000 40,000,000 1,000,000,000
QA7042 CONS DIFFERENT AREAS/DISTRICTS OF BALOCHISTAN (PACKAGE-IV) TRUCTION OF DELAY ACTION DAM AT ZAR KHUNE DISTRICT QUETTA
042202- A05 Grants, Subsidies and Write off Loans 14,000,000 14,000,000
042202- A052 Grants Domestic 14,000,000 14,000,000
Total- CONSTRUCTION OF DELAY ACTION 14,000,000 14,000,000
QA9021 CONS DAM AT ZARKHUNE DISTRICT QUETTA TRUCTION OF 100 DAMS IN BALOCHISTAN PACKAGE III 20 SMALL DAMS
042202- A05 Grants, Subsidies and Write off Loans 800,000,000 340,000,000 1,000,000,000
042202- A052 Grants Domestic 800,000,000 340,000,000 1,000,000,000
Total- CONSTRUCTION OF 100 DAMS IN 800,000,000 340,000,000 1,000,000,000
QA9023 CONS BALOCHISTAN PACKAGE III 20 SMALL DAMS TRUCTION OF MANGI DAM QUETTA (FEDER AL SHARE 50:50)
042202- A05 Grants, Subsidies and Write off Loans 400,000,000 130,000,000 770,000,000
042202- A052 Grants Domestic 400,000,000 130,000,000 770,000,000
Total- CONSTRUCTION OF MANGI DAM 400,000,000 130,000,000 770,000,000
QUETTA (FEDERAL SHARE 50:50)
QA9027 CONSTRUCTION OF BASOOL DAM TEHSIL OMARA DISTRICT GAWADAR
042202- A05 Grants, Subsidies and Write off Loans 800,000,000 1,775,000,000 3,273,834,000
Page 465
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WATER ACCOUNTANT GENERAL PAKISTAN RE RESOURCES DI 2022-2023 Budget Estimate Rs VENUES SUB-O VISION DEMAN 2022-2023 Revised Estimate Rs FFICE, QUETTA DS FOR GRANTS 2023-2024 Budget Estimate Rs
042202- A052 Grants Domestic 800,000,000 1,775,000,000 3,273,834,000
Total- CONSTRUCTION OF BASOOL DAM 800,000,000 1,775,000,000 3,273,834,000
TEHSIL OMARA DISTRICT GAWADAR
QA9044 CONSTRUCTION OF 200 DAMS IN KILLA ABDULLAH GULISTAN & DEO BANDI TEHSILS
042202- A05 Grants, Subsidies and Write off Loans 500,000,000 100,000,000
042202- A052 Grants Domestic 500,000,000 100,000,000
Total- CONSTRUCTION OF 200 DAMS IN KILLA ABDULLAH GULISTAN & DEOBANDI TEHSILS 500,000,000 100,000,000
QA9046 CONSTRUCTION OF TUK STORAGE DAM TEHSIL WADH DISTRICT KHUZDAR
042202- A05 Grants, Subsidies and Write off Loans 130,144,000 130,144,000
042202- A052 Grants Domestic 130,144,000 130,144,000
Total- CONSTRUCTION OF TUK STORAGE DAM TEHSIL WADH DISTRICT KHUZDAR 130,144,000 130,144,000
QA9049 MARA TANGI DAM LORALAI
042202- A05 Grants, Subsidies and Write off Loans 300,000,000 300,000,000 500,000,000
042202- A052 Grants Domestic 300,000,000 300,000,000 500,000,000
Total- MARA TANGI DAM LORALAI 300,000,000 300,000,000 500,000,000
QA9056 GRUK STORAGE DAM DISTRICT KHARAN
042202- A05 Grants, Subsidies and Write off Loans 1,000,000,000 1,245,467,000 2,500,000,000
042202- A052 Grants Domestic 1,000,000,000 1,245,467,000 2,500,000,000
Total- GRUK STORAGE DAM DISTRICT KHARAN 1,000,000,000 1,245,467,000 2,500,000,000
QD0018 CONSTRUCTION OF DINAR DAM KILLA ABDULLAH
042202- A05 Grants, Subsidies and Write off Loans 100,000,000 20,000,000 400,000,000
042202- A052 Grants Domestic 100,000,000 20,000,000 400,000,000
Total- CONSTRUCTION OF DINAR DAM KILLA ABDULLAH 100,000,000 20,000,000 400,000,000
TB0069 CONSTRUCTION OF HEKANOG DELAY ACTION DAM
042202- A05 Grants, Subsidies and Write off Loans 235,000,000 77,000,000 10,000,000
042202- A052 Grants Domestic 235,000,000 77,000,000 10,000,000
Total- CONSTRUCTION OF HEKANOG DELAY ACTION DAM 235,000,000 77,000,000 10,000,000
Page 466
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DI 2022-2023 Budget Estimate VISION DEMAN 2022-2023 Revised Estimate DS FOR GRANTS 2023-2024 Budget Estimate
Rs Rs Rs
TB0070 CONS ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-O TRUCTION OF MASERAG DELAY ACTION DAM FFICE, QUETTA
042202- A05 Grants, Subsidies and Write off Loans 340,500,000 98,100,000 10,000,000
042202- A052 Grants Domestic 340,500,000 98,100,000 10,000,000
Total- CONSTRUCTION OF MASERAG DELAY ACTION DAM 340,500,000 98,100,000 10,000,000
TB0071 CONSTRUCTION OF TOPAK STORAGE DAM KECH
042202- A05 Grants, Subsidies and Write off Loans 350,000,000 350,000,000 200,000,000
042202- A052 Grants Domestic 350,000,000 350,000,000 200,000,000
Total- CONSTRUCTION OF TOPAK STORAGE DAM KECH 350,000,000 350,000,000 200,000,000
TB0072 CONSTRUCTION OF GISH KAUR DAM KECH
042202- A05 Grants, Subsidies and Write off Loans 1,000,000,000 1,000,000,000 1,500,000,000
042202- A052 Grants Domestic 1,000,000,000 1,000,000,000 1,500,000,000
Total- CONSTRUCTION OF GISH KAUR DAM KECH 1,000,000,000 1,000,000,000 1,500,000,000
ZB0019 CONSTRUCTION FO 06 NOS. DAMS IN DISTRICT ZHOB & SHERANI
042202- A05 Grants, Subsidies and Write off Loans 300,000,000 100,000,000 1,244,741,000
042202- A052 Grants Domestic 300,000,000 100,000,000 1,244,741,000
Total- CONSTRUCTION FO 06 NOS. DAMS IN 300,000,000 100,000,000 1,244,741,000
DISTRICT ZHOB & SHERANI
ZT0011 CONSTRUCTION OF SMALL DAMS IN DISTRICT ZIARAT
042202- A05 Grants, Subsidies and Write off Loans 300,000,000 300,000,000 200,000,000
042202- A052 Grants Domestic 300,000,000 300,000,000 200,000,000
Total- CONSTRUCTION OF SMALL DAMS IN DISTRICT ZIARAT 300,000,000 300,000,000 200,000,000
042202 Total- Irrigation dams 9,769,644,000 8,719,711,000 22,626,091,000
042203 Canal DJ0001 REMO irrigation : DELING OF PAT FEEDER CANAL SYSTEM IN BALOCHISTAN
042203- A03 Operating Expenses 300,000,000
042203- A039 General 300,000,000
042203- A05 Grants, Subsidies and Write off Loans 1,000,000,000
042203- A052 Grants Domestic 1,000,000,000
Total- REMODELING OF PAT FEEDER CANAL 300,000,000 1,000,000,000
SYSTEM IN BALOCHISTAN
Page 467
NO. 123.- FC2 2D84 DEVELOPMENT EXPENDITURE OF W ATER RESOURCES DI 2022-2023 Budget Estimate VISION DEMAN 2022-2023 Revised Estimate DS FOR GRANTS 2023-2024 Budget Estimate
ACCOUNTANT GENERAL PAKISTA Rs N REVENUES SUB-O Rs FFICE, QUETTA Rs
042203 Total- Canal irrigation 300,000,000 1,000,000,000
0422 Total- Irrigation 10,069,644,000 8,719,711,000 23,626,091,000
042 Total- Agriculture,Food,Irrigation,Forestry and Fishing 10,069,644,000 8,719,711,000 23,626,091,000
04 Total- Economic Affairs 10,069,644,000 8,719,711,000 23,626,091,000
10 Social Protection:
107 Admi nistratio n:
1071 Admi 107105 Flood QA9042 NOR nistratio Contro MAL EM n: l : ERGENT FLOOD PROGRAMME BAL OCHISTAN
107105- A05 Grants, Subsidies and Write off Loans 60,000,000 258,223,000 80,000,000
107105- A052 Grants Domestic 60,000,000 258,223,000 80,000,000
Total- NORM PROG AL EMERGENT FLOOD RAMME BALOCHISTAN 60,000,000 258,223,000 80,000,000
107105 Total- Flood Control 60,000,000 258,223,000 80,000,000
1071 Total- Administration 60,000,000 258,223,000 80,000,000
107 Total- Administration 60,000,000 258,223,000 80,000,000
10 Total- Social Protection 60,000,000 258,223,000 80,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 10,129,644,000 8,977,934,000 23,706,091,000
(In (O Foreign Exchange) wn Resources) (10,000,000)
(Foreign Aid) (10,000,000)
(In Local Currency) (10,129,644,000) (8,977,934,000) (23,696,091,000)
Page 468
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

04 Economic Affairs:
042 Agriculture,Food,Irrigation,Forestry and Fishing:
0422 Irrigation:
042202 GL1172 Irrigat DIAME ion dams : R BASHA DAM (LAND ACQUISITION AND RE SETTLEMENT) CHILAS
042202 - A05 Grants, Subsidies and Write off Loans 7,000,000,000 7,000,000,000 5,000,000,000
042202 - A052 Grants Domestic 7,000,000,000 7,000,000,000 5,000,000,000
Total- DIAMER BASHA DAM (LAND 7,000,000,000 7,000,000,000 5,000,000,000
ACQUISITION AND RESETTLEMENT) CHILAS
GL7090 DIAMER BASHA DAM PROJECT (DAM PART)
042202 - A05 Grants, Subsidies and Write off Loans 20,000,000,000 20,000,000,000 20,000,000,000
042202 - A052 Grants Domestic 20,000,000,000 20,000,000,000 20,000,000,000
Total- DIAMER BASHA DAM PROJECT (DAM 20,000,000,000 20,000,000,000 20,000,000,000
GL7107 ATTA PART) BAD LAKE HYDROPOWER PROJECT HUNZA
042202 - A05 Grants, Subsidies and Write off Loans 100,000,000 100,000,000 1,000,000,000
042202 - A052 Grants Domestic 100,000,000 100,000,000 1,000,000,000
Total- ATTABAD LAKE HYDROPOWER PROJECT HUNZA 100,000,000 100,000,000 1,000,000,000
SD010 8 HARP O HPP SKARDU
042202 - A05 Grants, Subsidies and Write off Loans 150,000,000 93,000,000 150,000,000
042202 - A052 Grants Domestic 150,000,000 93,000,000 150,000,000
Total- HARPO HPP SKARDU 150,000,000 93,000,000 150,000,000
(In Foreign Exchange) (10,000,000) (9,000,000) (50,000,000)
(Foreign Aid) (10,000,000) (9,000,000) (50,000,000)
(In Local Currency) (140,000,000) (84,000,000) (100,000,000)
0 42202 _ Total- Irrigation dams ________________ 27,250,000,000 __________________ 27,193,000,000 _______________ 26,150,000,000
0 422 Total- Irrigation 27,250,000,000 27,193,000,000 26,150,000,000
0 42 Total- Agriculture,Food,Irrigation,Forestry and Fishing 27,250,000,000 27,193,000,000 26,150,000,000
0 4 Total- Economic Affairs 27,250,000,000 27,193,000,000 26,150,000,000
10 Social Protection:
Page 469
NO. 123.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURCES DIV 2022-2023 ISION DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

107 Administration:
1071 Administration:
10710 GL705 5 Flood 5 NORM Control : AL EMERGENT FLOOD PROGRAMME GILG IT BALTISTAN
10710 5- A05 Grants, Subsidies and Write off Loans 7,500,000 10,000,000
10710 5- A052 Grants Domestic 7,500,000 10,000,000
Total- NORMAL EMERGENT FLOOD PROGRAMME GILGIT BALTISTAN 7,500,000 10,000,000
107105 Total- Flood Control 7,500,000 10,000,000
1071 Total- Administration 7,500,000 10,000,000
107 Total- Administration 7,500,000 10,000,000
10 Total- Social Protection 7,500,000 10,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT 27,257,500,000 27,193,000,000 26,160,000,000
(In Foreign Exchange) (10,000,000) (9,000,000) (50,000,000)
(Own Resources)
(Foreign Aid) (10,000,000) (9,000,000) (50,000,000)
(In Local Currency) (27,247,500,000) (27,184,000,000) (26,110,000,000)
TOTAL - DEMAND 91,878,465,000 89,750,376,000 107,500,000,000
(In Foreign Exchange) (10,000,000) (510,000,000) (11,130,000,000)
(Own Resources)
(Foreign Aid) (10,000,000) (510,000,000) (11,130,000,000)
(In Local Currency) (91,868,465,000) _________________ (89,240,376,000) __________________ (96,370,000,000) _______________
Page 471

(B) DEVELOPMENT EXPENDITURE

ON CAPITAL ACCOUNT

Page 473

SECTION I

CABINET SECRETARIAT

2023-2024 Budget Estimate (Rupees in Thousand)

Demand presented on behalf of the Cabinet Secretariat Development Expenditure on Capital Account

124. Capital Outlay on Development of Atomic Energy 26,100,000
125. Capital Outlay on Development of
Pakistan Nuclear Regulatory Authority 150,000
Total : 26,250,000
Page 475

NO. 124.- CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY

DEMANDS FOR GRANTS DEMAND NO. 124 ( FC12C17 )

CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 for CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY.

Voted Rs. 26,100,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the

CABINET SECRETARIAT .

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
017 Research and Development General Public 25,990,602,000 25,990,602,000 26,100,000,000
Services
Total 25,990,602,000 25,990,602,000 26,100,000,000
OBJECT CLASSIFICATION
A03 Operating Expenses 25,990,602,000 25,990,602,000 26,100,000,000
Total 25,990,602,000 25,990,602,000 26,100,000,000
(In Foreign Exchange) (10,000,000,000) (8,000,000,000) (7,000,000,000)
(Own Resources) (10,000,000,000) (8,000,000,000) (7,000,000,000)
(Foreign Aid)
(In Local Currency) (15,990,602,000) _________________ (17,990,602,000) __________________ (19,100,000,000) _______________
Page 476

NO. 124.- FC12C17 CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
01 Gener al Public Service:
017 Resea rch and Development General Public Services :
0171 Resea rch & Dev. General Public Services:
017101 Atomic Energy :
IB5493 LEU BASED MO-99 PRODUCTION FACILITY (MPF)
017101- A03 Operating Expenses 300,000,000
017101- A039 General 300,000,000
Total- LEU BASED MO-99 PRODUCTION FACILITY (MPF) 300,000,000
ID0021 PAKISTAN ATOMIC ENERGY COMMISSION
017101- A03 Operating Expenses 25,690,602,000 25,990,602,000 26,100,000,000
017101- A039 General 25,690,602,000 25,990,602,000 26,100,000,000
Total- PAKISTAN ATOMIC ENERGY COMMISSION 25,690,602,000 25,990,602,000 26,100,000,000
(In Foreign Exchange) (10,000,000,000) (8,000,000,000) (7,000,000,000)
(Own Resources) (10,000,000,000) (8,000,000,000) (7,000,000,000)
(In Local Currency) _ (15,690,602,000) ________________ (17,990,602,000) _________________ (19,100,000,000) ________________
017101 Total- Atomic Energy 25,990,602,000 25,990,602,000 26,100,000,000
0171 Total- Research & Dev. General Public Services 25,990,602,000 25,990,602,000 26,100,000,000
017 Total- Research and Development General Public Services 25,990,602,000 25,990,602,000 26,100,000,000
01 Total- General Public Service 25,990,602,000 25,990,602,000 26,100,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 25,990,602,000 25,990,602,000 26,100,000,000
(In Foreign Exchange) (10,000,000,000) (8,000,000,000) (7,000,000,000)
(Own Resources) (10,000,000,000) (8,000,000,000) (7,000,000,000)
(Foreign Aid)
(In Local Currency) (15,990,602,000) (17,990,602,000) (19,100,000,000)
TOTAL - DEMAND 25,990,602,000 25,990,602,000 26,100,000,000
(In Foreign Exchange) (10,000,000,000) (8,000,000,000) (7,000,000,000)
(Own Resources) (10,000,000,000) (8,000,000,000) (7,000,000,000)
(Foreign Aid)
(In Local Currency) _ (15,990,602,000) ________________ (17,990,602,000) _________________ (19,100,000,000) ________________
Page 477

NO. 125.- CAPITAL OUTLAY ON DEVELOPMENT OF PAKISTAN NUCLEAR REGULATORY AUTHORITY DEMANDS FOR GRANTS DEMAND NO. 125 ( FC12P01 )

CAPITAL OUTLAY ON DEVELOPMENT OF PAKISTAN NUCLEAR REGULATORY AUTHORITY

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 for CAPITAL OUTLAY ON DEVELOPMENT OF PAKISTAN NUCLEAR REGULATORY AUTHORITY.

Voted

Rs. 150,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the CABINET SECRETARIAT .

FUNCTIONAL CLASSIFICATION 2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
017 Research and Development General Public 289,890,000 250,890,000 150,000,000
Services
Total 289,890,000 250,890,000 150,000,000
OBJECT CLASSIFICATION
A03 Operating Expenses 289,890,000 250,890,000 150,000,000
Total 289,890,000 250,890,000 150,000,000
(In Foreign Exchange) (70,000,000) (60,128,000) (26,000,000)
(Own Resources) (70,000,000) (60,128,000) (26,000,000)
(Foreign Aid)
(In Local Currency) (219,890,000) __________________ (190,762,000) __________________ (124,000,000) ______________
Page 478

NO. 125.- FC12P01 CAPITAL OUTLAY ON DEVELOPMENT OF PAKISTAN NUCLEAR DEMANDS FOR GRANTS REGULATORY AUTHORITY

III. - DETAILS are as follows :-

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
01 Gener al Public Service:
017 Resea rch and Development General Public Services:
0171 Resea rch & Dev. General Public Services:
017101 Atomic Energy : IB0281 ESTABLISHMENT OF REGIONAL NUCLEAR SAFETY INSPECTORATE AT LAHORE
017101- A03 Operating Expenses 100,000,000 100,000,000 137,900,000
017101- A039 General 100,000,000 100,000,000 137,900,000
Total- ESTABLISHMENT OF REGIONAL 100,000,000 100,000,000 137,900,000
NUCLEAR SAFETY INSPECTORATE AT LAHORE
(In Foreign Exchange) (30,000,000) (25,000,000) (26,000,000)
(Own Resources) (30,000,000) (25,000,000) (26,000,000)
(In Local Currency) (70,000,000) (75,000,000) (111,900,000)
IB1983 RE-EN DIGITIZE ___________________ FORCEMENT OF PNRAS CAPACITY AND REGULATORY OVERSIG _________________ HT AGAINST VULN ______________ ERABILITIES OF
017101- A03 Operating Expenses 189,890,000 150,890,000
017101- A039 General 189,890,000 150,890,000
Total- RE-ENFORCEMENT OF PNRAS CAPACITY AND REGULATORY OVERSIGHT AGAINST VULNERABILITIES OF DIGITIZE 189,890,000 150,890,000
(In Foreign Exchange) (40,000,000) (35,128,000)
(Own Resources) (40,000,000) (35,128,000)
(In Local Currency) (149,890,000) (115,762,000)
IB9360 INSTA ___________________ LLATION OF ON-GRID SOLAR SYSTEM AT PNRA BUILDINGS _________________
017101- A03 Operating Expenses 12,100,000
017101- A039 General 12,100,000
Total- INSTALLATION OF ON-GRID SOLAR SYSTEM AT PNRA BUILDINGS 12,100,000
017101 Total- Atomic Energy 289,890,000 250,890,000 150,000,000
0171 Total- Research & Dev. General Public 289,890,000 250,890,000 150,000,000
Services
017 Total- Research and Development 289,890,000 250,890,000 150,000,000
Page 479

NO. 125.- FC12P01 CAPITAL OUTLAY ON DEVELOPMENT OF PAKISTAN NUCLEAR DEMANDS FOR GRANTS REGULATORY AUTHORITY

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
ACCOUNTANT GENE General Public Services RAL PAKISTAN REVENUES
01 Total- General Public Service 289,890,000 250,890,000 150,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 289,890,000 250,890,000 150,000,000
(In Foreign Exchange) (70,000,000) (60,128,000) (26,000,000)
(Own Resources) (70,000,000) (60,128,000) (26,000,000)
(Foreign Aid)
(In Local Currency) (219,890,000) (190,762,000) (124,000,000)
TOTAL - DEMAND 289,890,000 250,890,000 150,000,000
(In Foreign Exchange) (70,000,000) (60,128,000) (26,000,000)
(Own Resources) (70,000,000) (60,128,000) (26,000,000)
(Foreign Aid)
(In Local Currency) (219,890,000) __________________ (190,762,000) __________________ (124,000,000) ______________
Page 481

SECTION II

MINISTRY OF ENERGY

2023-2024 Budget Estimate (Rupees in Thousand)

Demands presented on behalf of the Ministry of Energy

Development Expenditure on Capital Account.

126. Capital Outlay on Petroleum Division Total : 1,500,000 1,500,000
Page 483

NO. 126.- CAPITAL OUTLAY ON PETROLEUM DIVISION

DEMANDS FOR GRANTS

DEMAND NO. 126 ( FC12C50 )

CAPITAL OUTLAY ON PETROLEUM DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON PETROLEUM DIVISION.

Voted

Rs. 1,500,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF ENERGY .

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
041 General Economic,Commercial & Labour Affairs 300,000,000 124,630,000 597,735,000
043 Fuel and Energy 1,180,509,000 461,180,000 902,265,000
Total 1,480,509,000 585,810,000 1,500,000,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 83,468,000 44,121,000 87,820,000
A011 Pay 63,107,000 34,207,000 56,056,000
A011-1 Pay of Officers (51,020,000) (25,333,000) (45,116,000)
A011-2 Pay of Other Staff (12,087,000) (8,874,000) (10,940,000)
A012 Allowances 20,361,000 9,914,000 31,764,000
A012-1 Regular Allowances (11,504,000) (7,217,000) (16,444,000)
A012-2 Other Allowances (Excluding TA) (8,857,000) (2,697,000) (15,320,000)
A03 Operating Expenses 749,385,000 456,118,000 658,170,000
A05 Grants, Subsidies and Write off Loans 150,000,000
A09 Physical Assets 375,166,000 77,142,000 99,143,000
A12 Civil works 264,790,000 1,978,000 342,467,000
A13 Repairs and Maintenance 7,700,000 6,451,000 162,400,000
Total 1,480,509,000 585,810,000 1,500,000,000
Page 484

NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
04 Economic Affairs:
043 Fuel and Energy:
0432 Petroleum and Natural Gas:
043202 PETROLEUM AND NATURAL GAS :
IB0809 LEGAL CONSULTANCY SERVICES FOR DRAFTING OF MODEL MINERAL AGREEMENT AND UPDATING OF
REGULATORY FRAMEWORK
043202- A01 Employees Related Expenses 910,000 132,000 500,000
043202- A012 Allowances 910,000 132,000 500,000
043202- A012-1 Regular Allowances (700,000) (132,000) (500,000)
043202- A012-2 Other Allowances (Excluding TA) (210,000)
043202- A03 Operating Expenses 64,290,000 466,000 2,500,000
043202- A038 Travel & Transportation 1,110,000 150,000
043202- A039 General 63,180,000 466,000 2,350,000
043202- A09 Physical Assets 4,800,000 439,000 2,000,000
043202- A092 Computer Equipment 3,000,000 439,000 1,000,000
043202- A096 Purchase of Plant and Machinery 1,800,000 1,000,000
Total- LEGAL CONSULTANCY SERVICES FOR DRAFTING OF MODEL MINERAL AGREEMENT AND UPDATING OF REGULATORY FRAMEWORK 70,000,000 1,037,000 5,000,000

IB2220 STRENGTHENING UPGRADATION AND ISO CERTIFICATION OF KARACHI LABORITES COMPLEX (KLC) AT HDIP

043202- A01 Employees Related Expenses 18,274,000 15,041,000 16,500,000
043202- A011 Pay 17,047,000 14,897,000 15,856,000
043202- A011-1 Pay of Officers (13,960,000) (11,817,000) (12,616,000)
043202- A011-2 Pay of Other Staff (3,087,000) (3,080,000) (3,240,000)
043202- A012 Allowances 1,227,000 144,000 644,000
043202- A012-1 Regular Allowances (627,000) (144,000) (144,000)
043202- A012-2 Other Allowances (Excluding TA) (600,000) (500,000)
043202- A03 Operating Expenses 2,100,000 1,706,000 500,000
043202- A031 Fees 500,000 464,000
043202- A038 Travel & Transportation 300,000 212,000
043202- A039 General 1,300,000 1,030,000 500,000
Page 485
NO. 126.- FC12 C50 CAPITAL OUTLAY ON PETROLEUM DIV ISION 2022-2023 Budget Estimate DEMAND 2022-2023 Revised Estimate S FOR GRANTS 2023-2024 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
043202- A09 Physical Assets 204,435,000 10,000,000
043202- A096 Purchase of Plant and Machinery 204,435,000 10,000,000
043202- A13 Repairs and Maintenance 73,000,000
043202- A131 Machinery and Equipment 73,000,000
Total- STRENGTHENING UPGRADATION AND ISO CERTIFICATION OF KARACHI 224,809,000 16,747,000 100,000,000
LABORITES COMPLEX (KLC) AT HDIP
IB2221 ESTABLISHMENT OF NATIONAL MINERALS DATA CENTRE
043202- A01 Employees Related Expenses 14,100,000 450,000 13,920,000
043202- A011 Pay 13,000,000 13,000,000
043202- A011-1 Pay of Officers (13,000,000) (13,000,000)
043202- A012 Allowances 1,100,000 450,000 920,000
043202- A012-1 Regular Allowances (750,000) (450,000) (500,000)
043202- A012-2 Other Allowances (Excluding TA) (350,000) (420,000)
043202- A03 Operating Expenses 81,660,000 26,752,000 87,880,000
043202- A032 Communications 65,000 205,000
043202- A036 Motor Vehicles 75,000 57,000 55,000
043202- A038 Travel & Transportation 5,670,000 605,000 6,220,000
043202- A039 General 75,850,000 26,090,000 81,400,000
043202- A09 Physical Assets 53,600,000 600,000 20,700,000
043202- A092 Computer Equipment 52,600,000 200,000 20,000,000
043202- A096 Purchase of Plant and Machinery 500,000 500,000
043202- A097 Purchase of Furniture and Fixture 500,000 400,000 200,000
043202- A12 Civil works 600,000 36,000 200,000
043202- A124 Building and Structures 500,000 36,000 200,000
043202- A126 Telecommunication Works 100,000
043202- A13 Repairs and Maintenance 600,000 162,000 300,000
043202- A130 Transport 100,000 24,000 50,000
043202- A131 Machinery and Equipment 100,000 50,000
043202- A132 Furniture and Fixture 50,000 46,000 50,000
043202- A133 Buildings and Structure 200,000 92,000 100,000
043202- A137 Computer Equipment 140,000 50,000
043202- A139 Telecommunication Works 10,000
Total- ESTABLISHMENT OF NATIONAL MINERALS DATA CENTRE 150,560,000 28,000,000 123,000,000
Page 486
NO. 126.- FC1 2C50 CAPITAL OUTLAY ON PETROLEUM DIVI SION 2022-2023 Budget Estimate DEMAND 2022-2023 Revised Estimate S FOR GRANTS 2023-2024 Budget Estimate
IB3516 START ACCOUNTANT GENERAL EGIC UNDERGROUND GAS STORAGE (SUGS Rs PAKISTAN REVENUES ) PROJECT Rs Rs
043202- A05 Grants, Subsidies and Write off Loans 150,000,000
043202- A052 Grants Domestic 150,000,000
Total- STARTEGIC UNDERGROUND GAS STORAGE (SUGS) PROJECT 150,000,000
ID9681 EXPAN OPERATIONS . & UPGRADATION OF PAKISTAN PETROLEU TO M CORE HONE (PETCORE) FOR ITS SUSTAINABLE
043202- A01 Employees Related Expenses 34,860,000 19,574,000 34,700,000
043202- A011 Pay 33,060,000 19,310,000 27,200,000
043202- A011- 1 Pay of Officers (24,060,000) (13,516,000) (19,500,000)
043202- A011- 2 Pay of Other Staff (9,000,000) (5,794,000) (7,700,000)
043202- A012 Allowances 1,800,000 264,000 7,500,000
043202- A012- 1 Regular Allowances (1,800,000) (264,000) (300,000)
043202- A012- 2 Other Allowances (Excluding TA) (7,200,000)
043202- A03 Operating Expenses 2,650,000 1,440,000 2,850,000
043202- A032 Communications 100,000 50,000 100,000
043202- A038 Travel & Transportation 800,000 495,000 900,000
043202- A039 General 1,750,000 895,000 1,850,000
043202- A09 Physical Assets 2,000,000 43,748,000
043202- A092 Computer Equipment 1,000,000 2,000,000
043202- A096 Purchase of Plant and Machinery 31,748,000
043202- A097 Purchase of Furniture and Fixture 1,000,000 10,000,000
043202- A12 Civil works 264,190,000 1,942,000 342,267,000
043202- A124 Building and Structures 264,190,000 1,942,000 342,267,000
043202- A13 Repairs and Maintenance 700,000
043202- A132 Furniture and Fixture 200,000
043202- A137 Computer Equipment 500,000
Total- EXPAN. & UPGRADATION OF PAKISTAN PETROLEUM CORE HONE (PETCORE) FOR ITS SUSTAINABLE OPERATIONS TO 303,700,000 22,956,000 424,265,000
043202 Total- PETROLEUM AND NATURAL GAS 749,069,000 68,740,000 802,265,000
0432 Total- Petroleum and Natural Gas 749,069,000 68,740,000 802,265,000
043 Total- Fuel and Energy 749,069,000 68,740,000 802,265,000
04 Total- Economic Affairs 749,069,000 68,740,000 802,265,000
Total- ACCOUNTANT GENERAL 749,069,000 68,740,000 802,265,000
PAKISTAN REVENUES
Page 487
NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION 2022-2023 DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04 Economic Affairs:
043 Fuel and Energy:
0432 Petroleum and Natural Gas:
043202 LO9001 PETROLEUM SUPPLY OF AND NATURAL GAS : GAS/LNG TO ALLAMA IQBAL INDSR. CITY SPL. ECONOMIC ZONE FSB. PUNJAB PROV.
043202 - A03 Operating Expenses 256,735,000 256,735,000
043202 - A039 General 256,735,000 256,735,000
Total- SUPP IQBAL ZONE LY OF GAS/LNG TO ALLAMA INDSR. CITY SPL. ECONOMIC FSB. PUNJAB PROV. 256,735,000 256,735,000
LO9009 SUPPLY OF GAS TO LOCALITIES / VILLAGES IN 5 KM RADIUS OF GAS PRODUCING FIELDS - SNGPL
043202 - A03 Operating Expenses 100,000,000
043202 - A039 General 100,000,000
Total- SUPPLY OF GAS TO LOCALITIES / VILLAGES IN 5KM RADIUS OF GAS PRODUCING FIELDS - SNGPL 100,000,000
0 43202 Total- PETROLEUM AND NATURAL GAS 256,735,000 256,735,000 100,000,000
0 432 Total- Petroleum and Natural Gas 256,735,000 256,735,000 100,000,000
0 43 Total- Fuel and Energy 256,735,000 256,735,000 100,000,000
0 4 Total- Economic Affairs 256,735,000 256,735,000 100,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 256,735,000 256,735,000 100,000,000
SUB-OFFICE, LAHORE
Page 488
NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION 2022-2023 DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04 Economic Affairs:
043 Fuel and Energy:
0432 Petroleum and Natural Gas:
043202 KA136 PETROLEUM 8 SUPPLY OF AND NATURAL GAS : GAS TO SEZ BOSTAN BALCHISTAN (SSG C)
043202 - A03 Operating Expenses 100,000,000 70,000,000
043202 - A039 General 100,000,000 70,000,000
Total- SUPPLY OF GAS TO SEZ BOSTAN 100,000,000 70,000,000
BALC HISTAN (SSGC)
KA136 9 SUPPLY OF GAS TO BIN QASIM INDUSTRIAL PARK
043202 - A03 Operating Expenses 74,705,000 65,705,000
043202 - A039 General 74,705,000 65,705,000
Total- SUPPLY OF GAS TO BIN QASIM INDUSTRIAL PARK 74,705,000 65,705,000
0 43202 Total- PETROLEUM AND NATURAL GAS 174,705,000 135,705,000
0 432 Total- Petroleum and Natural Gas 174,705,000 135,705,000
0 43 Total- Fuel and Energy 174,705,000 135,705,000
0 4 Total- Economic Affairs 174,705,000 135,705,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 174,705,000 135,705,000
Page 489
NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION 2022-2023 DEMAND 2022-2023 S FOR GRANTS 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04 Economic Affairs:
041 General Economic,Commercial & Labour Affairs:
0411 General Economic Affairs:
041103 Geological Survey :
QA070 ISLAM 1 INSTRUMENTAL UP-GRADATION OF GEOSCIENCE ADVANCE RESE ABAD TO BE USED IN ARCH LABORATORIES (GARL) GSP
041103 - A01 Employees Related Expenses 3,000,000
041103 - A012 Allowances 3,000,000
041103 - A012- 1 Regular Allowances (1,000,000)
041103 - A012- 2 Other Allowances (Excluding TA) (2,000,000)
041103 - A03 Operating Expenses 16,900,000
041103 - A032 Communications 800,000
041103 - A033 Utilities 2,700,000
041103 - A034 Occupancy Costs 1,000,000
041103 - A038 Travel & Transportation 6,700,000
041103 - A039 General 5,700,000
041103 - A13 Repairs and Maintenance 80,100,000
041103 - A130 Transport 1,000,000
041103 - A131 Machinery and Equipment 75,000,000
041103 - A132 Furniture and Fixture 1,000,000
041103 - A133 Buildings and Structure 1,000,000
041103 - A137 Computer Equipment 1,600,000
041103 - A138 General 500,000
Total- INSTRUMENTAL UP-GRADATION OF 100,000,000
GEOSCIENCE ADVANCE RESEARCH LABORATORIES (GARL) GSP ISLAMABAD TO BE USED IN
QA070 FOR U 2 ACCE NMAPP LERATED GEOLOGICAL MAPPING USING MODERN SATELLITE ED AREAS IN IMAGING- BASED TECHNOLOGIES
041103 - A03 Operating Expenses 300,000,000
041103 - A039 General 300,000,000
Total- ACCELERATED GEOLOGICAL MAPPING USING MODERN SATELLITE IMAGING- 300,000,000
BASED TECHNOLOGIES FOR
UNMAPPED AREAS IN
Page 490
NO. 126.- FC12 C50 CAPITAL OUTLAY ON PETROLEUM DIV ISION 2022-2023 Budget Estimate DEMAND 2022-2023 Revised Estimate S FOR GRANTS 2023-2024 Budget Estimate
QA0797 PAK N ACCOUNTANT GENERAL PAKISTAN ATIONAL RESEARCH PROGRAM ON GEOHA Rs REVENUES SUB-OF ZARDS (GPS ISLAMA Rs FICE, QUETTA BAD)IS Rs
041103- A01 Employees Related Expenses 4,324,000 5,424,000 8,200,000
041103- A012 Allowances 4,324,000 5,424,000 8,200,000
041103- A012-1 Regular Allowances (2,627,000) (3,727,000) (6,000,000)
041103- A012-2 Other Allowances (Excluding TA) (1,697,000) (1,697,000) (2,200,000)
041103- A03 Operating Expenses 138,845,000 16,575,000 111,840,000
041103- A032 Communications 75,000 60,000 35,000
041103- A033 Utilities 330,000 330,000
041103- A034 Occupancy Costs 20,010,000 10,000 50,000,000
041103- A036 Motor Vehicles 850,000 1,150,000
041103- A038 Travel & Transportation 92,600,000 8,945,000 33,955,000
041103- A039 General 24,980,000 6,080,000 27,850,000
041103- A09 Physical Assets 53,731,000 74,531,000
041103- A092 Computer Equipment 120,000 180,000
041103- A095 Purchase of Transport 41,701,000 7,140,000
041103- A096 Purchase of Plant and Machinery 10,910,000 67,064,000
041103- A097 Purchase of Furniture and Fixture 1,000,000 147,000
041103- A13 Repairs and Maintenance 3,100,000 3,100,000 3,100,000
041103- A130 Transport 1,500,000 1,500,000 1,500,000
041103- A131 Machinery and Equipment 1,000,000 1,000,000 1,000,000
041103- A132 Furniture and Fixture 600,000 500,000 600,000
041103- A137 Computer Equipment 100,000
Total- PAK NATIONAL RESEARCH PROGRAM ON GEOHAZARDS (GPS ISLAMABAD) 200,000,000 99,630,000 123,140,000
QA7043 TOPOS HEETS OF OUTCROP AREA OF BALOCHISTAN PROVINCE
041103- A01 Employees Related Expenses 11,000,000 3,500,000 11,000,000
041103- A012 Allowances 11,000,000 3,500,000 11,000,000
041103- A012-1 Regular Allowances (5,000,000) (2,500,000) (8,000,000)
041103- A012-2 Other Allowances (Excluding TA) (6,000,000) (1,000,000) (3,000,000)
041103- A03 Operating Expenses 28,400,000 16,739,000 35,700,000
041103- A032 Communications 500,000 46,000 200,000
041103- A038 Travel & Transportation 14,800,000 5,705,000 14,500,000
Page 491
NO. 126.- FC1 041103- A039 2C50 C Gene APITAL OUTLAY ON PETROLEUM DI ACCOUNTANT GENERAL PAKISTA ral VISION 2022-2023 Budget Estimate Rs N REVENUES SUB-OF 13,100,000 DEMAN 2022-2023 Revised Estimate Rs FICE, QUETTA 10,988,000 DS FOR GRANTS 2023-2024 Budget Estimate Rs 21,000,000
041103- A09 Physical Assets 56,600,000 1,572,000 22,695,000
041103- A092 Computer Equipment 2,170,000 738,000 7,000,000
041103- A095 Purchase of Transport 17,000,000 12,695,000
041103- A096 Purchase of Plant and Machinery 36,430,000
041103- A097 Purchase of Furniture and Fixture 1,000,000 834,000 3,000,000
041103- A13 Repairs and Maintenance 4,000,000 3,189,000 5,200,000
041103- A130 Transport 2,000,000 3,130,000 4,000,000
041103- A131 Machinery and Equipment 1,000,000 23,000 500,000
041103- A132 Furniture and Fixture 500,000 200,000
041103- A137 Computer Equipment 500,000 36,000 500,000
Total- TOPOSHEETS OF OUTCROP AREA OF BALOCHISTAN PROVINCE 100,000,000 25,000,000 74,595,000
041103 Total- Geological Survey 300,000,000 124,630,000 597,735,000
0411 Total- General Economic Affairs 300,000,000 124,630,000 597,735,000
041 Total- General Economic,Commercial & Labour Affairs 300,000,000 124,630,000 597,735,000
04 Total- Economic Affairs 300,000,000 124,630,000 597,735,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 300,000,000 124,630,000 597,735,000
TOTAL - DEMAND 1,480,509,000 585,810,000 1,500,000,000
Page 493

SECTION III

MINISTRY OF FINANCE, REVENUE

2023-2024 Budget Estimate (Rupees in Thousand)

Demands presented on behalf of the Ministry of Finance, Revenue.

Development Expenditure on Capital Account.

127. Capital Outlay on Federal Investments 254,650
128. Development Loans and Advances
by the Federal Government 157,313,555
129. External Development Loans and Advances
by the Federal Government 700,522,753
Total : 858,090,958
Page 495

NO. 127.- CAPITAL OUTLAY ON FEDERAL INVESTMENTS

DEMANDS FOR GRANTS

DEMAND NO. 127 ( FC12C39 )

CAPITAL OUTLAY ON FEDERAL INVESTMENTS

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 for CAPITAL OUTLAY ON FEDERAL INVESTMENTS.

Voted

Rs. 254,650,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE AND REVENUE .

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
014 Transfers 204,650,000 146,986,000 254,650,000
Total 204,650,000 146,986,000 254,650,000
OBJECT CLASSIFICATION
A03 Operating Expenses 100,000,000 42,336,000 200,000,000
A11 Investments 104,650,000 104,650,000 54,650,000
Total 204,650,000 146,986,000 254,650,000
(In Foreign Exchange) (150,000,000) (104,650,000) (154,650,000)
(Own Resources) (50,000,000) (4,650,000) (104,650,000)
(Foreign Aid) (100,000,000) (100,000,000) (50,000,000)
(In Local Currency) (54,650,000) (42,336,000) (100,000,000)
Page 496

NO. 127.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENER AL PAKISTAN REVENUES
01 General Public Service:
014 Transfers:
0143 Investments:
014302 Non-Financial Institutions :
IB5492 FILM INSTITUTE AT PTV ACADEMY
014302 - A03 Operating Expenses 100,000,000 42,336,000 200,000,000
014302 - A039 General 100,000,000 42,336,000 200,000,000
Total- FILM INSTITUTE AT PTV ACADEMY 100,000,000 42,336,000 200,000,000
(In Foreign Exchange) (50,000,000) (100,000,000)
(Own Resources) (50,000,000) (100,000,000)
(In Local Currency) (50,000,000) (42,336,000) (100,000,000)
ID9347 PTV T _____________________ ERRESTRIAL DIGITALIZATION DTMB DEMONSTRATION PROJECT T ______________ HROUGH GRANT _______________ -IN-AID
014302 - A11 Investments 104,650,000 104,650,000 54,650,000
014302 - A111 Investment Local 104,650,000 104,650,000 54,650,000
Total- PTV TERRESTRIAL DIGITALIZATION DTMB DEMONSTRATION PROJECT THROUGH GRANT-IN-AID 104,650,000 104,650,000 54,650,000
(In Foreign Exchange) (100,000,000) (104,650,000) (54,650,000)
(Own Resources) (4,650,000) (4,650,000)
(Foreign Aid) (100,000,000) (100,000,000) (50,000,000)
(In Local Currency) (4,650,000) _____________________
0 14302 Total- Non-Financial Institutions 204,650,000 146,986,000 254,650,000
0 143 Total- Investments 204,650,000 146,986,000 254,650,000
0 14 Total- Transfers 204,650,000 146,986,000 254,650,000
0 1 Total- General Public Service 204,650,000 146,986,000 254,650,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 204,650,000 146,986,000 254,650,000
(In Foreign Exchange) (150,000,000) (104,650,000) (154,650,000)
(Own Resources) (50,000,000) (4,650,000) (104,650,000)
(Foreign Aid) (100,000,000) (100,000,000) (50,000,000)
(In Local Currency) (54,650,000) (42,336,000) (100,000,000)
TOTAL - DEMAND 204,650,000 146,986,000 254,650,000
(In Foreign Exchange) (150,000,000) (104,650,000) (154,650,000)
(Own Resources) (50,000,000) (4,650,000) (104,650,000)
(Foreign Aid) (100,000,000) (100,000,000) (50,000,000)
(In Local Currency) (54,650,000) _____________________ (42,336,000) _______________ (100,000,000) ______________
Page 497

NO. 128.- DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT DEMANDS FOR GRANTS

DEMAND NO. 128 ( FC12D36 )

DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

I. ESTIMATES of the Amount required in the year ending 30 June , 2024 for DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT.

Voted

Rs. 157,313,555,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE AND REVENUE .

2022-2023 Budget Estimate Rs 2022-2023 Revised Estimate Rs 2023-2024 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
014 Transfers 104,103,024,000 95,551,024,000 157,313,555,000
Total 104,103,024,000 95,551,024,000 157,313,555,000
OBJECT CLASSIFICATION
A05 Grants, Subsidies and Write off Loans 550,000,000
A08 Loans and Advances 104,103,024,000 95,001,024,000 157,313,555,000
Total 104,103,024,000 95,551,024,000 157,313,555,000
(In Foreign Exchange) (300,000,000)
(Own Resources) (300,000,000)
(Foreign Aid)
(In Local Currency) (103,803,024,000) _________________ (95,551,024,000) _________________ (157,313,555,000) ________________
Page 498

NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

2022-2023 2022-2023 2023-2024
Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
01 General Public Service:
014 Transfers:
0141 Transfers (Inter-Governmental):
014102 IB0816 To dis CAREC trict governments : CORRIDOR DEVELOPMENT INVESTMENT P ROGRAMME TRANCHE-I PROJECTS ADB
014102 - A08 Loans and Advances 500,000,000 160,000,000 500,000,000
014102 - A083 District Government / TMAs 500,000,000 160,000,000 500,000,000
Total- CAREC CORRIDOR DEVELOPMENT 500,000,000 160,000,000 500,000,000
IB0817 CONST INVESTMENT PROGRAMME TRANCHE-I PROJECTS ADB RUCTION OF 02 LANE HIGHWAY FROM BAS IMA TO KHUZDAR (LENGTH 106 KM)
014102 - A08 Loans and Advances 1,000,000,000 1,750,000,000 800,000,000
014102 - A083 District Government / TMAs 1,000,000,000 1,750,000,000 800,000,000
Total- CONSTRUCTION OF 02 LANE HIGHWAY 1,000,000,000 1,750,000,000 800,000,000
FROM BASIMA TO KHUZDAR (LENGTH 106 KM)
IB0818 2-LANE CONSTRUCTION OF 4-LANE BRIDGE ACROSS RIVE APPROACH R INDUS LINKING LAYYAH WITH TAUNSA INCLUDING
014102 - A08 Loans and Advances 600,000,000 1,000,000,000 2,200,000,000
014102 - A083 District Government / TMAs 600,000,000 1,000,000,000 2,200,000,000
Total- CONSTRUCTION OF 4-LANE BRIDGE 600,000,000 1,000,000,000 2,200,000,000
ACROSS RIVER INDUS LINKING LAYYAH WITH TAUNSA INCLUDING 2-LANE APPROACH
IB0819 CONNE CONST CTING RUCTION OF 4-LANE BRIDGE AND 2-LANE KALLURKOT WITH APPROACH ROADS ACROSS RIVER INDUS
014102 - A08 Loans and Advances 400,000,000 4,000,000 50,000,000
014102 - A083 District Government / TMAs 400,000,000 4,000,000 50,000,000
Total- CONSTRUCTION OF 4-LANE BRIDGE AND 2-LANE APPROACH ROADS ACROSS RIVER INDUS CONNECTING KALLURKOT WITH 400,000,000 4,000,000 50,000,000
Page 499

NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

DEMANDS FOR GRANTS

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0828 CONSTRUCTION OF 6-LANE HIGHWAY FROM KALA INCLUDING OVER RIVER SHAH KAKU TO LAHORE RING ROAD ( 18.3 KM)
014102- A08 Loans and Advances 50,000,000
014102- A083 District Government / TMAs 50,000,000
Total- CONSTRUCTION OF 6-LANE HIGHWAY 50,000,000
IB0829 CONST FROM KALA SHAH KAKU TO LAHORE RING ROAD (18.3 KM) INCLUDING OVER RIVER RUCTION OF BLACK TOP ROAD YAKMACH- KHARAN VIA DOSTA IN WADH KHURMA GAI
014102- A08 Loans and Advances 650,000,000 212,000,000 100,000,000
014102- A083 District Government / TMAs 650,000,000 212,000,000 100,000,000
Total- CONSTRUCTION OF BLACK TOP ROAD 650,000,000 212,000,000 100,000,000
IB0830 CONST YAKMACH-KHARAN VIA DOSTAIN WADH KHURMAGAI RUCTION OF BRIDGE ON RIVER RAVI AT SY ED WALA (NANKANA SAHIB)
014102- A08 Loans and Advances 300,000,000 150,000,000 94,495,000
014102- A083 District Government / TMAs 300,000,000 150,000,000 94,495,000
Total- CONSTRUCTION OF BRIDGE ON RIVER 300,000,000 150,000,000 94,495,000
IB0831 CONST RAVI AT SYED WALA (NANKANA SAHIB) RUCTION OF BURHAN-HAVELIAN EXPRESS WAY (E-35) 29.1 KM (REVISED)
014102- A08 Loans and Advances 500,000,000 450,000,000 50,000,000
014102- A083 District Government / TMAs 500,000,000 450,000,000 50,000,000
Total- CONSTRUCTION OF 500,000,000 450,000,000 50,000,000
IB0832 CONST BURHAN-HAVELIAN EXPRESSWAY (E-35) 29.1 KM (REVISED) RUCTION OF FAISALABAD-KHANEWAL (M-4 ) 184 KM
014102- A08 Loans and Advances 500,000,000 350,000,000 200,000,000
014102- A083 District Government / TMAs 500,000,000 350,000,000 200,000,000
Total- CONSTRUCTION OF 500,000,000 350,000,000 200,000,000
IB0833 CONST MOR - NEW FAISALABAD-KHANEWAL (M-4) 184 KM RUCTION OF INFRASTRUCTURE AND ALLIE D WORKS FOR METRO BUS SERVICES PESHAWAR
014102- A08 Loans and Advances 300,000,000 300,000,000 100,000,000
014102- A083 District Government / TMAs 300,000,000 300,000,000 100,000,000
Total- CONSTRUCTION OF INFRASTRUCTURE 300,000,000 300,000,000 100,000,000
AND ALLIED WORKS FOR METRO BUS SERVICES PESHAWAR MOR - NEW
Page 500

NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

DEMANDS FOR GRANTS

2022-2023 2022-2023 2023-2024
Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0834 CONSTRUCTION OF KKH PHASE-II HAVELIAN-THAKOT (118.057 KM) PART OF CHINA PAKISTAN ECONOMIC

014102- A08 Loans and Advances 397,588,000 397,588,000 100,000,000
014102- A083 District Government / TMAs 397,588,000 397,588,000 100,000,000
Total- CONSTRUCTION OF KKH PHASE-II 397,588,000 397,588,000 100,000,000
IB0835 CONST HAVELIAN-THAKOT (118.057 KM) PART OF CHINA PAKISTAN ECONOMIC RUCTION OF MOTORWAY FROM BURHAN - HAKLA ON M-I TO DERA ISMAIL KHAN
014102- A08 Loans and Advances 1,000,000,000 4,500,000,000 1,000,000,000
014102- A083 District Government / TMAs 1,000,000,000 4,500,000,000 1,000,000,000
Total- CONSTRUCTION OF MOTORWAY FROM 1,000,000,000 4,500,000,000 1,000,000,000
BURHAN - HAKLA ON M-I TO DERA ISMAIL KHAN
IB0837 DESIGN AND FEASIBILITIES STUDIES
014102- A08 Loans and Advances 600,000,000 450,000,000 800,000,000
014102- A083 District Government / TMAs 600,000,000 450,000,000 800,000,000
Total- DESIGN AND FEASIBILITIES STUDIES 600,000,000 450,000,000 800,000,000
IB0838 DUALI 1167+000 ZATION & IMPROVEMENT OF OLD BANNU ROAD FROM KM 1040+ 000 - 1050+000 & K M 1088+000 -
014102- A08 Loans and Advances 2,000,000,000 2,000,000,000 5,317,442,000
014102- A083 District Government / TMAs 2,000,000,000 2,000,000,000 5,317,442,000
Total- DUALIZATION & IMPROVEMENT OF 2,000,000,000 2,000,000,000 5,317,442,000
IB0839 DUALI OLD BANNU ROAD FROM KM 1040+000 - 1050+000 & KM 1088+000 - 1167+000 ZATION & IMPROVEMENT OF PINDIGHEB- K OHAT ROAD
014102- A08 Loans and Advances 1,500,000,000 1,287,000,000 2,000,000,000
014102- A083 District Government / TMAs 1,500,000,000 1,287,000,000 2,000,000,000
Total- DUALIZATION & IMPROVEMENT OF 1,500,000,000 1,287,000,000 2,000,000,000
PINDIGHEB- KOHAT ROAD
IB0840 DUALI ZATION OF INDUS HIGHWAY (N-55) SARAI GAMBILA TO KOHAT SECTION
014102- A08 Loans and Advances 2,000,000,000 5,000,000,000 1,000,000,000
014102- A083 District Government / TMAs 2,000,000,000 5,000,000,000 1,000,000,000
Total- DUALIZATION OF INDUS HIGHWAY (N-55) SARAI GAMBILA TO KOHAT SECTION 2,000,000,000 5,000,000,000 1,000,000,000