Details of Demands for Grants and Appropriations - Vol-IV (Development), part 5
The Details of Demands for Grants and Appropriations - Vol-IV (Development) is part of the federal budget for FY 2026-27. This page reproduces the text of its 515 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.
This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.
NO. 125.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF COMMUNICATION
DEMANDS FOR GRANTS
DIVISION
DEMAND NO. 125
( FC12N10 )
EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF COMMUNICATION DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 for EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF COMMUNICATION DIVISION.
Voted
Rs. 59,255,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF COMMUNICATIONS .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 54,856,200,000 | 49,370,580,000 | 59,250,000,000 |
| 045 | Construction and Transport | 5,000,000 | ||
| Total | 54,856,200,000 | 49,370,580,000 | 59,255,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 2,000,000 | ||
| A08 | Loans and Advances | 54,856,200,000 | 49,370,580,000 | 59,250,000,000 |
| A09 | Physical Assets | 3,000,000 | ||
| Total | 54,856,200,000 | 49,370,580,000 | 59,255,000,000 | |
| (In Foreign Exchange) | (54,856,200,000) | (59,255,000,000) | ||
| (Own Resources) | ||||
| (Foreign Aid) | (54,856,200,000) | (59,255,000,000) | ||
| (In Local Currency) | (49,370,580,000) |
NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF COMMUNICATION DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | ||
|---|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | ||||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0142 | Transfers (Others): | ||||
| 014202 IB3836 | Trasfe CAREC | r To Non-financial institutions : CORRIDOR DEVELOPMENT INVESTMENT PR | OGRAMME TRAN | CHE-I PROJECTS ADB | |
| 014202 | - A08 | Loans and Advances | 1,000,000,000 | 2,500,000,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 1,000,000,000 | 2,500,000,000 | |
| Total- | CAREC CORRIDOR DEVELOPMENT INVESTMENT PROGRAMME TRANCHE-I PROJECTS ADB | 1,000,000,000 | 2,500,000,000 | ||
| (In Foreign Exchange) | (1,000,000,000) | ||||
| (Foreign Aid) | (1,000,000,000) | ||||
| (In Local Currency) | (2,500,000,000) | ||||
| IB3837 CORRI | CONST DOR (A | _ RUCTION OF ADDITIONAL CARRIAGE WAY S DB) | _________________ HIKARPUR-RANJA | ___________________ NPUR SECTION ON N | _____________ -55 CAREC |
| 014202 | - A08 | Loans and Advances | 8,120,000,000 | 9,620,000,000 | 4,000,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 8,120,000,000 | 9,620,000,000 | 4,000,000,000 |
| Total- | CONSTRUCTION OF ADDITIONAL | 8,120,000,000 | 9,620,000,000 | 4,000,000,000 | |
| CARRIAGE WAY | |||||
| SHIKARPUR-RANJANPUR SECTION ON N-55 CAREC CORRIDOR (ADB) | |||||
| (In Foreign Exchange) | (8,120,000,000) | (4,000,000,000) | |||
| (Foreign Aid) | (8,120,000,000) | (4,000,000,000) | |||
| (In Local Currency) | (9,620,000,000) | ||||
| IB3838 | CONST | _ RUCTION OF RAJANPUR-DG KHAN AS A 4-L | _________________ ANE HIGHWAY (AD | ___________________ B) | _____________ |
| 014202 | - A08 | Loans and Advances | 6,000,000,000 | 6,000,000,000 | 4,500,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 6,000,000,000 | 6,000,000,000 | 4,500,000,000 |
| Total- | CONSTRUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (ADB) | 6,000,000,000 | 6,000,000,000 | 4,500,000,000 | |
| (In Foreign Exchange) | (6,000,000,000) | (4,500,000,000) | |||
| (Foreign Aid) | (6,000,000,000) | (4,500,000,000) | |||
| (In Local Currency) _ | _________________ | (6,000,000,000) ___________________ | _____________ |
NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF
DEMANDS FOR GRANTS
COMMUNICATION DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | |
|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| IB3839 D.G KH | ACCOUNTANT GENERAL AN-D.I KHAN (ACW) (N-55)-245 KMS CAREC C | PAKISTAN REVEN ORRIDOR ADB | UES | |
| 014202- A08 | Loans and Advances | 6,730,000,000 | 6,730,000,000 | 4,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 6,730,000,000 | 6,730,000,000 | 4,000,000,000 |
| Total- | D.G KHAN-D.I KHAN (ACW) (N-55)-245 KMS CAREC CORRIDOR ADB | 6,730,000,000 | 6,730,000,000 | 4,000,000,000 |
| (In Foreign Exchange) | (6,730,000,000) | (4,000,000,000) | ||
| (Foreign Aid) | (6,730,000,000) | (4,000,000,000) | ||
| (In Local Currency) | (6,730,000,000) | |||
| IB3840 IMPRO | _ VEMENT AND WIDENING OF N-45 (130.22 KM) | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 649,600,000 | 263,980,000 | 450,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 649,600,000 | 263,980,000 | 450,000,000 |
| Total- | IMPROVEMENT AND WIDENING OF N-45 (130.22 KM) | 649,600,000 | 263,980,000 | 450,000,000 |
| (In Foreign Exchange) | (649,600,000) | (450,000,000) | ||
| (Foreign Aid) | (649,600,000) | (450,000,000) | ||
| (In Local Currency) | (263,980,000) | |||
| IB3841 KHYBE | _ R PASS ECONOMIC CORRIDOR PROJECT RE | _________________ VISED WORLD BA | _________________ NK | _______________ |
| 014202- A08 | Loans and Advances | 4,000,000,000 | 2,000,000,000 | 2,200,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 4,000,000,000 | 2,000,000,000 | 2,200,000,000 |
| Total- | KHYBER PASS ECONOMIC CORRIDOR PROJECT REVISED WORLD BANK | 4,000,000,000 | 2,000,000,000 | 2,200,000,000 |
| (In Foreign Exchange) | (4,000,000,000) | (2,200,000,000) | ||
| (Foreign Aid) | (4,000,000,000) | (2,200,000,000) | ||
| (In Local Currency) | (2,000,000,000) | |||
| IB3842 CONST | _ RUCTION OF CHAKDARA CHITRAL ROAD PR | _________________ OJECT (N-45) SEC | _________________ TION III KALKATAK | _______________ CHITRAL (48KM) |
| 014202- A08 | Loans and Advances | 3,056,600,000 | 156,600,000 | 450,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 3,056,600,000 | 156,600,000 | 450,000,000 |
| Total- | CONSTRUCTION OF CHAKDARA CHITRAL ROAD PROJECT (N-45) SECTION III KALKATAK CHITRAL (48KM) | 3,056,600,000 | 156,600,000 | 450,000,000 |
| (In Foreign Exchange) | (3,056,600,000) | (450,000,000) | ||
| (Foreign Aid) | (3,056,600,000) | (450,000,000) | ||
| (In Local Currency) _ | (156,600,000) __________________ | _______________ |
NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF DEMANDS FOR GRANTS
COMMUNICATION DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
IB3843 RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF DAMS ON RIVER
| 014202- A08 | Loans and Advances | 6,000,000,000 | 300,000,000 | 500,000,000 |
|---|---|---|---|---|
| 014202- A085 | Loans to Non Financial Institutions | 6,000,000,000 | 300,000,000 | 500,000,000 |
| Total- | RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF DAMS ON RIVER | 6,000,000,000 | 300,000,000 | 500,000,000 |
| (In Foreign Exchange) | (6,000,000,000) | (500,000,000) | ||
| (Foreign Aid) | (6,000,000,000) | (500,000,000) | ||
| IB3844 CONST | (In Local Currency) RUCTION OF MUZAFFARABAD - MANSEHR | __________________ A ROAD (26.6 KM AP | (300,000,000) _________________ PROX) | _______________ |
| 014202- A08 | Loans and Advances | 1,800,000,000 | 1,800,000,000 | 900,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,800,000,000 | 1,800,000,000 | 900,000,000 |
| Total- | CONSTRUCTION OF MUZAFFARABAD - MANSEHRA ROAD (26.6 KM APPROX) | 1,800,000,000 | 1,800,000,000 | 900,000,000 |
| (In Foreign Exchange) | (1,800,000,000) | (900,000,000) | ||
| (Foreign Aid) | (1,800,000,000) | (900,000,000) | ||
| (In Local Currency) | (1,800,000,000) | |||
| IB3845 REHABILITATION & RECONSTRUCTION OF N-5 FR DAMAGED BRIDGES | __________________ OM MORO TO RANIP | _________________ UR KM. 318-404 (NB | _______________ C/SBC) & 32 X | |
| 014202- A08 | Loans and Advances | 2,000,000,000 | 4,500,000,000 | 7,250,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 2,000,000,000 | 4,500,000,000 | 7,250,000,000 |
| Total- | REHABILITATION & RECONSTRUCTION OF N-5 FROM MORO TO RANIPUR KM. 318-404 (NBC/SBC) & 32 X DAMAGED BRIDGES | 2,000,000,000 | 4,500,000,000 | 7,250,000,000 |
| (In Foreign Exchange) | (2,000,000,000) | (7,250,000,000) | ||
| (Foreign Aid) | (2,000,000,000) | (7,250,000,000) | ||
| (In Local Currency) | (4,500,000,000) _________________ | _______________ |
| NO. 125.- FC1 | 2N10 EXTERNAL DEVELOPMENT LOANS AN COMMUNICATION DIVISION | D ADVANCES OF | DEMANDS FOR GRANTS | |
|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget | 2025-2026 Revised | 2026-2027 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| HALA-MORO IB3846 CHINA | ACCOUNTANT GENERAL 66 KM AIDED PROJECTS OF PAKISTAN NATIONAL | PAKISTAN REVEN HIGHWAY N-5 SEC | UES TIONAL REHABILIT | ATION |
| 014202- A08 | Loans and Advances | 1,500,000,000 | 1,500,000,000 | 2,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,500,000,000 | 1,500,000,000 | 2,000,000,000 |
| Total- | CHINA AIDED PROJECTS OF PAKISTAN NATIONAL HIGHWAY N-5 SECTIONAL REHABILITATION HALA-MORO 66 KM | 1,500,000,000 | 1,500,000,000 | 2,000,000,000 |
| (In Foreign Exchange) | (1,500,000,000) | (2,000,000,000) | ||
| (Foreign Aid) | (1,500,000,000) | (2,000,000,000) | ||
| (In Local Currency) | (1,500,000,000) | |||
| IB3847 CONS OPERATE TR | _ TRUCTION OF HYDERABAD -SUKKUR (306 K ANSFER (BOT) | ________________ M) 6-LANE DIVIDED | __________________ FENCED MOTORWA | _______________ Y ON BUILD |
| 014202- A08 | Loans and Advances | 14,000,000,000 | 14,000,000,000 | 28,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 14,000,000,000 | 14,000,000,000 | 28,000,000,000 |
| Total- | CONSTRUCTION OF HYDERABAD | 14,000,000,000 | 14,000,000,000 | 28,000,000,000 |
| -SUKKUR (306 KM) 6-LANE DIVIDED FENCED MOTORWAY ON BUILD OPERATE TRANSFER (BOT) | ||||
| (In Foreign Exchange) | (14,000,000,000) | (28,000,000,000) | ||
| (Foreign Aid) | (14,000,000,000) | (28,000,000,000) | ||
| (In Local Currency) | (14,000,000,000) | |||
| IB4903 WIDEN RANIPUR SUK | _ ING AND IMPROVEMENT OF PRIORITY SECT KUR | ________________ IONS ON N5(PHAS | __________________ E I)(210 KM) PHASEI | _______________ -A SECTION 2 |
| 014202- A08 | Loans and Advances | 5,000,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 5,000,000,000 | ||
| Total- | WIDENING AND IMPROVEMENT OF PRIORITY SECTIONS ON N5(PHASE | 5,000,000,000 | ||
| I)(210 KM) PHASEI-A SECTION 2 RANIPUR SUKKUR | ||||
| (In Foreign Exchange) | (5,000,000,000) | |||
| (Foreign Aid) | (5,000,000,000) | |||
| 014202 | _ Total- Trasfer To Non-financial institutions | ________________ 54,856,200,000 | __________________ 49,370,580,000 | _______________ 59,250,000,000 |
| 0142 | Total- Transfers (Others) | 54,856,200,000 | 49,370,580,000 | 59,250,000,000 |
NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF DEMANDS FOR GRANTS COMMUNICATION DIVISION
| No of Po | sts 2025-2026 | 2025-2026 | 2026-2027 | |||
|---|---|---|---|---|---|---|
| 2025-26 202 | 6-27 Budget Estimate | Revised Estimate | Budget Estimate | |||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||||
| 014 | Total- | Transfers | 54,856,200,000 | 49,370,580,000 | 59,250,000,000 | |
| 01 | Total- | General Public Service | 54,856,200,000 | 49,370,580,000 | 59,250,000,000 | |
| 04 | Economic Affairs: | |||||
| 045 | Construction | and Transport: | ||||
| 0452 | Road | Transport: | ||||
| 04520 | 1 Admin | istration : | ||||
| IB490 | 6 AUTO | MATION | OF POST OFFICE | |||
| 04520 | 1- A03 | Operating Expenses | 2,000,000 | |||
| 04520 | 1- A031 | Fees | 500,000 | |||
| 04520 | 1- A037 | Consultancy and Contractual Work | 1,500,000 | |||
| 04520 | 1- A09 | Physical Assets | 3,000,000 | |||
| 04520 | 1- A092 | Computer Equipment | 3,000,000 | |||
| Total- | AUTO | MATION OF POST OFFICE | 5,000,000 | |||
| (In Foreign Exchange) | (5,000,000) | |||||
| (Foreig | n Aid) | (5,000,000) | ||||
| 045201 | Total- | Administration | _________________ | _________________ | _______________ 5,000,000 | |
| 0452 | Total- | Road Transport | 5,000,000 | |||
| 045 | Total- | Construction and Transport | 5,000,000 | |||
| 04 | Total- | Economic Affairs | 5,000,000 | |||
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 54,856,200,000 | 49,370,580,000 | 59,255,000,000 | ||
| (In | Foreign Exchange) | (54,856,200,000) | (59,255,000,000) | |||
| (Own Resources) | ||||||
| (Foreign Aid) | (54,856,200,000) | (59,255,000,000) | ||||
| (In | Local Currency) | (49,370,580,000) | ||||
| TOTAL | - DEMAND | 54,856,200,000 | 49,370,580,000 | 59,255,000,000 | ||
| (In Foreign Exchange) | (54,856,200,000) | (59,255,000,000) | ||||
| (Own Resources) | ||||||
| (Foreign Aid) | (54,856,200,000) | (59,255,000,000) | ||||
| (In Loc | al Currency) | _________________ | (49,370,580,000) _________________ |
SECTION III
MINISTRY OF ENERGY
2026-2027 Budget Estimate (Rupees in Thousand)
Demands presented on behalf of the Ministry of Energy
Development Expenditure on Capital Account.
| 126. Capital Outlay on Petroleum Division | 311,800 | |
|---|---|---|
| 127. External Development Loans and Advances of Power Division | 76,607,502 | |
| Total : | 76,919,302 |
NO. 126.- CAPITAL OUTLAY ON PETROLEUM DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 126 ( FC12C50 )
CAPITAL OUTLAY ON PETROLEUM DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON PETROLEUM DIVISION.
Voted
Rs. 311,800,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF ENERGY .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 041 | General Economic,Commercial & Labour Affairs | 718,580,000 | 368,287,000 | 311,800,000 |
| 043 | Fuel and Energy | 244,426,000 | ||
| Total | 718,580,000 | 612,713,000 | 311,800,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 90,000,000 | 70,167,000 | 37,000,000 |
| A011 | Pay | 65,000,000 | 50,167,000 | 30,000,000 |
| A011-1 | Pay of Officers | (65,000,000) | (50,167,000) | (30,000,000) |
| A012 | Allowances | 25,000,000 | 20,000,000 | 7,000,000 |
| A012-1 | Regular Allowances | (15,000,000) | (15,000,000) | (5,000,000) |
| A012-2 | Other Allowances (Excluding TA) | (10,000,000) | (5,000,000) | (2,000,000) |
| A03 | Operating Expenses | 358,980,000 | 218,346,000 | 123,764,000 |
| A09 | Physical Assets | 266,200,000 | 310,607,000 | 144,700,000 |
| A12 | Civil works | 6,193,000 | ||
| A13 | Repairs and Maintenance | 3,400,000 | 7,400,000 | 6,336,000 |
| Total | 718,580,000 | 612,713,000 | 311,800,000 |
NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget Estimate | 2025-2026 Revised Estimate | 2026-2027 Budget Estimate | |||
|---|---|---|---|---|---|---|
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||||
| 04 | Economic Affairs: | |||||
| 043 | Fuel and Energy: | |||||
| 0432 | Petroleum and Natural Gas: | |||||
| 043202 ID9681 OPERA | PETR EXPAN TIONS | OLEUM . & UP TO | AND NATURAL GAS : GRADATION OF PAKISTAN PETROLEUM | CORE HONE (PETCO | RE) FOR ITS SU | STAINABLE |
| 043202 | - A09 | Physical Assets | 238,233,000 | |||
| 043202 | - A096 | Purchase of Plant and Machinery | 238,233,000 | |||
| 043202 | - A12 | Civil | works | 6,193,000 | ||
| 043202 | - A124 | Building and Structures | 6,193,000 | |||
| Total- | EXPA PETR FOR I TO | N. & UPGRADATION OF PAKISTAN OLEUM CORE HONE (PETCORE) TS SUSTAINABLE OPERATIONS | 244,426,000 | |||
| 0 | 43202 | Total- | PETROLEUM AND NATURAL GAS | 244,426,000 | ||
| 0 | 432 | Total- | Petroleum and Natural Gas | 244,426,000 | ||
| 0 | 43 | Total- | Fuel and Energy | 244,426,000 | ||
| 0 | 4 | Total- | Economic Affairs | 244,426,000 | ||
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 244,426,000 |
NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION
| PETROLEUM DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 04 Economic Affairs: |
|---|
041 General Economic,Commercial & Labour Affairs: 0411 General Economic Affairs: 041103 Geological Survey : QA0702 ACCELERATED GEOLOGICAL MAPPING USING MODERN SATELLITE IMAGING- BASED TECHNOLOGIES FOR UNMAPPED AREAS IN
| 041103- A01 | Employees Related Expenses | 90,000,000 | 70,167,000 | 37,000,000 | |
|---|---|---|---|---|---|
| 041103- A011 | Pay 32 | 32 | 65,000,000 | 50,167,000 | 30,000,000 |
| 041103- A011-1 | Pay of Officers (32) | (32) | (65,000,000) | (50,167,000) | (30,000,000) |
| 041103- A012 | Allowances | 25,000,000 | 20,000,000 | 7,000,000 | |
| 041103- A012-1 | Regular Allowances | (15,000,000) | (15,000,000) | (5,000,000) | |
| 041103- A012-2 | Other Allowances (Excluding TA) | (10,000,000) | (5,000,000) | (2,000,000) | |
| 041103- A03 | Operating Expenses | 358,980,000 | 218,346,000 | 123,764,000 | |
| 041103- A032 | Communications | 1,850,000 | 850,000 | 1,600,000 | |
| 041103- A033 | Utilities | 1,200,000 | 1,300,000 | 1,500,000 | |
| 041103- A034 | Occupancy Costs | 1,620,000 | |||
| 041103- A036 | Motor Vehicles | 2,670,000 | 1,500,000 | ||
| 041103- A038 | Travel & Transportation | 169,600,000 | 65,143,000 | 11,200,000 | |
| 041103- A039 | General | 186,330,000 | 146,763,000 | 107,964,000 | |
| 041103- A09 | Physical Assets | 266,200,000 | 72,374,000 | 144,700,000 | |
| 041103- A092 | Computer Equipment | 110,000,000 | 30,060,000 | 94,500,000 | |
| 041103- A095 | Purchase of Transport | 24,000,000 | 200,000 | ||
| 041103- A096 | Purchase of Plant and Machinery | 132,000,000 | 41,514,000 | 50,000,000 | |
| 041103- A097 | Purchase of Furniture and Fixture | 200,000 | 800,000 | ||
| 041103- A13 | Repairs and Maintenance | 3,400,000 | 7,400,000 | 6,336,000 | |
| 041103- A130 | Transport | 1,000,000 | 5,000,000 | 5,000,000 | |
| 041103- A131 | Machinery and Equipment | 1,000,000 | 1,000,000 | 1,000,000 | |
| 041103- A132 | Furniture and Fixture | 500,000 | 500,000 | ||
| 041103- A137 | Computer Equipment | 900,000 | 900,000 | 336,000 | |
| Total- | ACCELERATED GEOLOGICAL MAP USING MODERN SATELLITE IMAGI BASED TECHNOLOGIES FOR UNMAPPED AREAS IN | PING NG- | 718,580,000 | 368,287,000 | 311,800,000 |
| NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 041103 | Total- Geological Survey | 718,580,000 | 368,287,000 | 311,800,000 |
|---|---|---|---|---|
| 0411 | Total- General Economic Affairs | 718,580,000 | 368,287,000 | 311,800,000 |
| 041 | Total- General Economic,Commercial & Labour Affairs | 718,580,000 | 368,287,000 | 311,800,000 |
| 04 | Total- Economic Affairs | 718,580,000 | 368,287,000 | 311,800,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 718,580,000 | 368,287,000 | 311,800,000 | |
| TOTAL - DEMAND | 718,580,000 | 612,713,000 | 311,800,000 |
NO. 127.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DIVISION DEMANDS FOR GRANTS DEMAND NO. 127 ( FC12P10 )
EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 for EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DIVISION. Voted Rs. 76,607,502,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF ENERGY .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 72,106,914,000 | 63,131,336,000 | 76,607,502,000 |
| Total | 72,106,914,000 | 63,131,336,000 | 76,607,502,000 | |
| OBJECT CLASSIFICATION | ||||
| A08 | Loans and Advances | 72,106,914,000 | 63,131,336,000 | 76,607,502,000 |
| Total | 72,106,914,000 | 63,131,336,000 | 76,607,502,000 | |
| (In Foreign Exchange) | (72,106,914,000) | |||
| (Own Resources) | ||||
| (Foreign Aid) | (72,106,914,000) | |||
| (In Local Currency) | _________________ | (63,131,336,000) __________________ | (76,607,502,000) _______________ |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
III. - DETAILS are as follows :-
| No of Posts 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|
| 2025-26 2026-27 Budget | Revised | Budget |
| Estimate | Estimate | Estimate |
| Rs | Rs | Rs |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
01 General Public Service: 014 Transfers: 0142 Transfers (Others): 014202 Trasfer To Non-financial institutions :
IB3866 INSTALLATION OF ASSETS PERFORMANCE MANAGEMENT SYSTEM ON 100K AND 200KV DISTRIBUTION TRANSFORMERS
| 014202- A08 | Loans and Advances | 1,599,000,000 | 1,599,000,000 | |
|---|---|---|---|---|
| 014202- A085 | Loans to Non Financial Institutions | 1,599,000,000 | 1,599,000,000 | |
| Total- | INSTALLATION OF ASSETS PERFORMANCE MANAGEMENT SYSTEM ON 100K AND 200KV DISTRIBUTION TRANSFORMERS | 1,599,000,000 | 1,599,000,000 | |
| (In Foreign Exchange) | (1,599,000,000) | |||
| (Foreign Aid) | (1,599,000,000) | |||
| (In Local Currency) | (1,599,000,000) | |||
| IB3867 EXTENSION AND AUGMENTATION OF 500KV AND FOR REMOVAL OF NTDC | _________________ 2 KV TRANSFORME | _______________ RS AT THE EXISTIN | ________________ G GRID STATION | |
| 014202- A08 | Loans and Advances | 4,000,000,000 | 4,000,000,000 | 2,438,560,000 |
| 014202- A085 | Loans to Non Financial Institutions | 4,000,000,000 | 4,000,000,000 | 2,438,560,000 |
| Total- | EXTENSION AND AUGMENTATION OF 500KV AND 2 KV TRANSFORMERS AT THE EXISTING GRID STATION FOR REMOVAL OF NTDC | 4,000,000,000 | 4,000,000,000 | 2,438,560,000 |
| (In Foreign Exchange) | (4,000,000,000) | |||
| (Foreign Aid) | (4,000,000,000) | |||
| (In Local Currency) | (4,000,000,000) | (2,438,560,000) | ||
| IB3868 THERM JAMSHORO 014202- A08 | AL FOR INSTALLATION OF NEW COAL FIR Loans and Advances | __________________ ED POWER PLANT H 1,575,000,000 | ________________ AVING CAPACITY | ________________ 2X660 MW AT |
| 014202- A085 | Loans to Non Financial Institutions | 1,575,000,000 | ||
| Total- | THERMAL FOR INSTALLATION OF NEW COAL FIRED POWER PLANT HAVING CAPACITY 2X660 MW AT JAMSHORO | 1,575,000,000 | ||
| (In Foreign Exchange) | (1,575,000,000) |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | |
|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | |
| ACCOUNTANT GENERAL (Foreign Aid) | PAKISTAN REVEN (1,575,000,000) | UES | ||
| IB3869 DI KHA | _ N-ZHOB T/L AND ZHOB S/S | _______________ | ||
| 014202- A08 | Loans and Advances | 418,000,000 | 418,000,000 | 100,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 418,000,000 | 418,000,000 | 100,000,000 |
| Total- | DI KHAN-ZHOB T/L AND ZHOB S/S | 418,000,000 | 418,000,000 | 100,000,000 |
| (In Foreign Exchange) | (418,000,000) | |||
| (Foreign Aid) | (418,000,000) | |||
| (In Local Currency) | (418,000,000) | (100,000,000) | ||
| IB3870 220KV | _ MIRPUR KHAS G/S & T/L | _______________ | ||
| 014202- A08 | Loans and Advances | 3,000,000,000 | 3,000,000,000 | 2,150,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 3,000,000,000 | 3,000,000,000 | 2,150,000,000 |
| Total- | 220KV MIRPUR KHAS G/S & T/L | 3,000,000,000 | 3,000,000,000 | 2,150,000,000 |
| (In Foreign Exchange) | (3,000,000,000) | |||
| (Foreign Aid) | (3,000,000,000) | |||
| (In Local Currency) | (3,000,000,000) | (2,150,000,000) | ||
| IB3872 UPGR | _ ADATION OF NTDC SCADA SYSTEM | _______________ | ||
| 014202- A08 | Loans and Advances | 998,000,000 | 998,000,000 | 3,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 998,000,000 | 998,000,000 | 3,500,000,000 |
| Total- | UPGRADATION OF NTDC SCADA SYSTEM | 998,000,000 | 998,000,000 | 3,500,000,000 |
| (In Foreign Exchange) | (998,000,000) | |||
| (Foreign Aid) | (998,000,000) | |||
| (In Local Currency) | (998,000,000) | (3,500,000,000) | ||
| IB3873 EVACU | _ ATION OF POWER FROM 500 MW WIND POW | ________________ ER PLANTS JHIMP | __________________ IR & GHARO CLUST | _______________ ERS |
| 014202- A08 | Loans and Advances | 800,000,000 | 800,000,000 | 544,533,000 |
| 014202- A085 | Loans to Non Financial Institutions | 800,000,000 | 800,000,000 | 544,533,000 |
| Total- | EVACUATION OF POWER FROM 500 MW | 800,000,000 | 800,000,000 | 544,533,000 |
| WIND POWER PLANTS JHIMPIR & GHARO CLUSTERS | ||||
| (In Foreign Exchange) | (800,000,000) | |||
| (Foreign Aid) | (800,000,000) |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| (In Local Currency) | (800,000,000) | (544,533,000) | ||
|---|---|---|---|---|
| IB3874 ADVANCE METERING PROJECT FOR IESCO | _________________ | _______________ | ||
| 014202- A08 | Loans and Advances | 2,940,000,000 | 466,162,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 2,940,000,000 | 466,162,000 | |
| Total- | ADVANCE METERING PROJECT FOR IESCO | 2,940,000,000 | 466,162,000 | |
| (In Foreign Exchange) (Foreign Aid) | (2,940,000,000) (2,940,000,000) | |||
| (In Local Currency) | (466,162,000) | |||
| IB3875 200 KV | JAUHARABAD G/S | _________________ | _______________ | |
| 014202- A08 | Loans and Advances | 1,500,000,000 | 1,500,000,000 | 1,150,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,500,000,000 | 1,500,000,000 | 1,150,000,000 |
| Total- | 200 KV JAUHARABAD G/S | 1,500,000,000 | 1,500,000,000 | 1,150,000,000 |
| (In Foreign Exchange) | (1,500,000,000) | |||
| (Foreign Aid) | (1,500,000,000) | |||
| (In Local Currency) | (1,500,000,000) _________________ | (1,150,000,000) _______________ | ||
| IB3876 500 KV | LAHORE NORTH | |||
| 014202- A08 | Loans and Advances | 1,000,000,000 | 1,000,000,000 | 700,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,000,000,000 | 1,000,000,000 | 700,000,000 |
| Total- | 500 KV LAHORE NORTH | 1,000,000,000 | 1,000,000,000 | 700,000,000 |
| (In Foreign Exchange) | (1,000,000,000) | |||
| (Foreign Aid) | (1,000,000,000) | |||
| (In Local Currency) | (1,000,000,000) | (700,000,000) | ||
| IB3877 ELECTRICITY TRANS & TRADE PRO CASA | _________________ | _______________ | ||
| 014202- A08 | Loans and Advances | 3,000,000,000 | 3,000,000,000 | 5,113,510,000 |
| 014202- A085 | Loans to Non Financial Institutions | 3,000,000,000 | 3,000,000,000 | 5,113,510,000 |
| Total- | ELECTRICITY TRANS & TRADE PRO CASA | 3,000,000,000 | 3,000,000,000 | 5,113,510,000 |
| (In Foreign Exchange) | (3,000,000,000) | |||
| (Foreign Aid) | (3,000,000,000) | |||
| (In Local Currency) | (3,000,000,000) _________________ | (5,113,510,000) _______________ |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3878 220 KV | TRANSMISSION LINE REINFORCEMENT OF | ISLAMABAD BURHAN TRANSMISSION | LINE | |
|---|---|---|---|---|
| 014202- A08 | Loans and Advances | 1,200,000,000 | 800,000,000 | 959,155,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,200,000,000 | 800,000,000 | 959,155,000 |
| Total- | 220 KV TRANSMISSION LINE REINFORCEMENT OF ISLAMABAD BURHAN TRANSMISSION LINE | 1,200,000,000 | 800,000,000 | 959,155,000 |
| (In Foreign Exchange) | (1,200,000,000) | |||
| (Foreign Aid) | (1,200,000,000) | |||
| (In Local Currency) _ | (800,000,000) __________________ | (959,155,000) _______________ | ||
| IB3879 500 KV | CHAKWAL G/S ALONG WITH ALLIED T/LS | |||
| 014202- A08 | Loans and Advances | 200,000,000 | 100,000,000 | 77,227,000 |
| 014202- A085 | Loans to Non Financial Institutions | 200,000,000 | 100,000,000 | 77,227,000 |
| Total- | 500 KV CHAKWAL G/S ALONG WITH ALLIED T/LS | 200,000,000 | 100,000,000 | 77,227,000 |
| (In Foreign Exchange) | (200,000,000) | |||
| (Foreign Aid) | (200,000,000) | |||
| (In Local Currency) | (100,000,000) | (77,227,000) | ||
| IB3880 EVACU | _ ATION OF POWER FROM TERBELLA 5TH EX | ________________ TENSION | _______________ | |
| 014202- A08 | Loans and Advances | 840,000,000 | 840,000,000 | 442,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 840,000,000 | 840,000,000 | 442,000,000 |
| Total- | EVACUATION OF POWER FROM TERBELLA 5TH EXTENSION | 840,000,000 | 840,000,000 | 442,000,000 |
| (In Foreign Exchange) | (840,000,000) | |||
| (Foreign Aid) | (840,000,000) | |||
| (In Local Currency) | (840,000,000) | (442,000,000) | ||
| IB3881 500 KV | _ ISLAMABAD WEST | _______________ | ||
| 014202- A08 | Loans and Advances | 5,000,000,000 | 5,000,000,000 | 4,382,868,000 |
| 014202- A085 | Loans to Non Financial Institutions | 5,000,000,000 | 5,000,000,000 | 4,382,868,000 |
| Total- | 500 KV ISLAMABAD WEST | 5,000,000,000 | 5,000,000,000 | 4,382,868,000 |
| (In Foreign Exchange) | (5,000,000,000) | |||
| (Foreign Aid) | (5,000,000,000) | |||
| (In Local Currency) _ | (5,000,000,000) __________________ | (4,382,868,000) _______________ |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
IB3882 ENHANCEMENT IN TRANSFORMATION CAPACITY OF NTDC SYSTEM BY EXTENSION & AUGMENTATION OF EXISTING GRID
| 014202- A08 | Loans and Advances | 2,500,000,000 | 2,500,000,000 | |
|---|---|---|---|---|
| 014202- A085 | Loans to Non Financial Institutions | 2,500,000,000 | 2,500,000,000 | |
| Total- | ENHANCEMENT IN TRANSFORMATION CAPACITY OF NTDC SYSTEM BY EXTENSION & AUGMENTATION OF EXISTING GRID | 2,500,000,000 | 2,500,000,000 | |
| (In Foreign Exchange) | (2,500,000,000) | |||
| (Foreign Aid) | (2,500,000,000) | |||
| IB3883 ENTER | (In Local Currency) _ PRISE RESOURCE PLANNING AUTOMATION | (2,500,000,000) __________________ | _______________ | |
| 014202- A08 | Loans and Advances | 1,629,614,000 | 1,341,484,000 | 492,150,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,629,614,000 | 1,341,484,000 | 492,150,000 |
| Total- | ENTERPRISE RESOURCE PLANNING AUTOMATION | 1,629,614,000 | 1,341,484,000 | 492,150,000 |
| (In Foreign Exchange) | (1,629,614,000) | |||
| (Foreign Aid) | (1,629,614,000) | |||
| (In Local Currency) | (1,341,484,000) | (492,150,000) | ||
| IB3884 EVACU | _ ATION OF POWER FROM 2160MW DASU HPP | ________________ STAGE I | _______________ | |
| 014202- A08 | Loans and Advances | 10,970,000,000 | 10,970,000,000 | 5,828,513,000 |
| 014202- A085 | Loans to Non Financial Institutions | 10,970,000,000 | 10,970,000,000 | 5,828,513,000 |
| Total- | EVACUATION OF POWER FROM 2160MW DASU HPP STAGE I | 10,970,000,000 | 10,970,000,000 | 5,828,513,000 |
| (In Foreign Exchange) | (10,970,000,000) | |||
| (Foreign Aid) | (10,970,000,000) | |||
| (In Local Currency) | (10,970,000,000) | (5,828,513,000) | ||
| IB3885 220 KV | _ ARIFWALA SUBSTATION | _______________ | ||
| 014202- A08 | Loans and Advances | 1,200,000,000 | 1,200,000,000 | 984,640,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,200,000,000 | 1,200,000,000 | 984,640,000 |
| Total- | 220 KV ARIFWALA SUBSTATION | 1,200,000,000 | 1,200,000,000 | 984,640,000 |
| (In Foreign Exchange) | (1,200,000,000) |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
| No of Post | s 2025-2026 | 2025-2026 | 2026-2027 | |
|---|---|---|---|---|
| 2025-26 2026- | 27 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENER (Foreign Aid) | AL PAKISTAN REVEN (1,200,000,000) | UES | ||
| (In Local Currency) | (1,200,000,000) | (984,640,000) | ||
| IB3886 500 KV | VEHARI GRID STATION | _________________ | _______________ | |
| 014202- A08 | Loans and Advances | 2,000,000,000 | 2,000,000,000 | 1,392,053,000 |
| 014202- A085 | Loans to Non Financial Institutions | 2,000,000,000 | 2,000,000,000 | 1,392,053,000 |
| Total- | 500 KV VEHARI GRID STATION | 2,000,000,000 | 2,000,000,000 | 1,392,053,000 |
| (In Foreign Exchange) | (2,000,000,000) | |||
| (Foreign Aid) | (2,000,000,000) | |||
| (In Local Currency) | (2,000,000,000) | (1,392,053,000) | ||
| IB3887 INSTALLATION OF PILOT BATTERY ENERGY ST | __________________ ORAGE SYSTEM BESS | _________________ AT 220 KV JHIMPIR | _______________ G/STATION | |
| 014202- A08 | Loans and Advances | 1,700,000,000 | 1,700,000,000 | 500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,700,000,000 | 1,700,000,000 | 500,000,000 |
| Total- | INSTALLATION OF PILOT BATTERY ENERGY STORAGE SYSTEM BESS AT 220 KV JHIMPIR G/STATION | 1,700,000,000 | 1,700,000,000 | 500,000,000 |
| (In Foreign Exchange) | (1,700,000,000) | |||
| (Foreign Aid) | (1,700,000,000) | |||
| (In Local Currency) | (1,700,000,000) | (500,000,000) | ||
| IB3888 EVACU | ATION OF POWER FROM SUKI KINARI KO | __________________ HALA MAHAL HPPS N | _________________ TDC | _______________ |
| 014202- A08 | Loans and Advances | 3,500,000,000 | 3,500,000,000 | 3,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 3,500,000,000 | 3,500,000,000 | 3,000,000,000 |
| Total- | EVACUATION OF POWER FROM SUKI KINARI KOHALA MAHAL HPPS NTDC | 3,500,000,000 | 3,500,000,000 | 3,000,000,000 |
| (In Foreign Exchange) | (3,500,000,000) | |||
| (Foreign Aid) | (3,500,000,000) | |||
| (In Local Currency) | (3,500,000,000) | (3,000,000,000) | ||
| IB3889 500 22 | 0 KV SIALKOT SUB STATION NTDC | _________________ | _______________ | |
| 014202- A08 | Loans and Advances | 2,500,000,000 | 2,500,000,000 | 4,741,547,000 |
| 014202- A085 | Loans to Non Financial Institutions | 2,500,000,000 | 2,500,000,000 | 4,741,547,000 |
| Total- | 500 220 KV SIALKOT SUB STATION NTDC | 2,500,000,000 | 2,500,000,000 | 4,741,547,000 |
| (In Foreign Exchange) | (2,500,000,000) |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | |
|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | |
| ACCOUNTANT GENERAL (Foreign Aid) | PAKISTAN REVEN (2,500,000,000) | UES | ||
| (In Local Currency) | (2,500,000,000) | (4,741,547,000) | ||
| IB3890 220KV | _ DHARKI RAHIM YAR KHAN BHAWALPUR D/C | _________________ T/L NTDC | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 5,000,000,000 | 5,000,000,000 | 1,044,533,000 |
| 014202- A085 | Loans to Non Financial Institutions | 5,000,000,000 | 5,000,000,000 | 1,044,533,000 |
| Total- | 220KV DHARKI RAHIM YAR KHAN BHAWALPUR D/C T/L NTDC | 5,000,000,000 | 5,000,000,000 | 1,044,533,000 |
| (In Foreign Exchange) (Foreign Aid) | (5,000,000,000) (5,000,000,000) | |||
| (In Local Currency) | (5,000,000,000) | (1,044,533,000) | ||
| IB3891 ELECT | _ RICITY DISTRIBUTION EFFICIENCY ELECTRIC | _________________ ITY DISTRIBU IMP | _________________ ROVEMENT PROJE | _______________ CT |
| 014202- A08 | Loans and Advances | 3,150,000,000 | 1,260,000,000 | 965,333,000 |
| 014202- A085 | Loans to Non Financial Institutions | 3,150,000,000 | 1,260,000,000 | 965,333,000 |
| Total- | ELECTRICITY DISTRIBUTION EFFICIENCY ELECTRICITY DISTRIBU IMPROVEMENT PROJECT | 3,150,000,000 | 1,260,000,000 | 965,333,000 |
| (In Foreign Exchange) | (3,150,000,000) | |||
| (Foreign Aid) | (3,150,000,000) | |||
| (In Local Currency) | (1,260,000,000) | (965,333,000) | ||
| IB3893 220-KV | _ JAMRUD G/S ALONGWITH ALLIED T/LS | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 1,500,000,000 | 200,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 1,500,000,000 | 200,000,000 | |
| Total- | 220-KV JAMRUD G/S ALONGWITH ALLIED T/LS | 1,500,000,000 | 200,000,000 | |
| (In Foreign Exchange) | (1,500,000,000) | |||
| (Foreign Aid) | (1,500,000,000) | |||
| (In Local Currency) | (200,000,000) | |||
| IB3894 EVACU | _ ATION OF POWER FROM 816 MW MOHMAND | _________________ DAM | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 2,000,000,000 | 2,000,000,000 | 3,900,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 2,000,000,000 | 2,000,000,000 | 3,900,000,000 |
| Total- | EVACUATION OF POWER FROM 816 MW MOHMAND DAM | 2,000,000,000 | 2,000,000,000 | 3,900,000,000 |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
| No of 2025-26 Posts 2026-27 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| (In For | eign Exchange) (2,000,000,000) | |||
| (Foreig | n Aid) (2,000,000,000) | |||
| (In Local Currency) | (2,000,000,000) | (3,900,000,000) | ||
| 014202 | Total- | __________________ Trasfer To Non-financial institutions 65,719,614,000 | _________________ 57,692,646,000 | _______________ 44,406,622,000 |
| 0142 | Total- | Transfers (Others) 65,719,614,000 | 57,692,646,000 | 44,406,622,000 |
| 014 | Total- | Transfers 65,719,614,000 | 57,692,646,000 | 44,406,622,000 |
| 01 | Total- | General Public Service 65,719,614,000 | 57,692,646,000 | 44,406,622,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES 65,719,614,000 | 57,692,646,000 | 44,406,622,000 | |
| (In (O | Foreign Exchange) (65,719,614,000) wn Resources) | |||
| (Fo | reign Aid) (65,719,614,000) | |||
| (In | Local Currency) | (57,692,646,000) | (44,406,622,000) |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS
DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| 01 Gener | al Public Service: |
|---|---|
| 014 Trans | fers: |
| 0142 Trans | fers (Others): |
| 014202 Trasfe | r To Non-financial institutions : |
| LO1675 POWER DISTRIBUTION STRENTHENING PROJECT (LESCO) | |
| 014202- A08 | Loans and Advances 2,595,330,000 |
| 014202- A085 | Loans to Non Financial Institutions 2,595,330,000 |
| Total- | POWER DISTRIBUTION STRENTHENING PROJECT (LESCO) 2,595,330,000 |
| LO1676 SUPP SYSTENMS (A | LY. INSTALLATION TESTING & COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT PMS) FOR |
| 014202- A08 | Loans and Advances 1,223,270,000 |
| 014202- A085 | Loans to Non Financial Institutions 1,223,270,000 |
| Total- | SUPPLY. INSTALLATION TESTING & 1,223,270,000 |
| LO1677 500KV | COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT SYSTENMS (APMS) FOR DOUBLE CIRCUIT TRANSMISSION LINE FROM GHAZI BROTHA TO FAISALABAD WEST |
| 014202- A08 | Loans and Advances 2,608,061,000 |
| 014202- A085 | Loans to Non Financial Institutions 2,608,061,000 |
| Total- | 500KV DOUBLE CIRCUIT 2,608,061,000 |
| LO1678 INSTA | TRANSMISSION LINE FROM GHAZI BROTHA TO FAISALABAD WEST LLATION OF REACTIVE POWER COMPENSATION DEVICES (STATCOM) IN NGC NETWORK |
| 014202- A08 | Loans and Advances 10,233,119,000 |
| 014202- A085 | Loans to Non Financial Institutions 10,233,119,000 |
| Total- | INSTALLATION OF REACTIVE POWER 10,233,119,000 |
| COMPENSATION DEVICES (STATCOM) IN NGC NETWORK | |
| LO1679 BESS | FOR FREQUENCY REGULATION |
| 014202- A08 | Loans and Advances 3,027,286,000 |
| 014202- A085 | Loans to Non Financial Institutions 3,027,286,000 |
| Total- | BESS FOR FREQUENCY REGULATION 3,027,286,000 |
| LO1680 CAPA THROUGH | CITY BUILDING FOR PREPARATION AND IMPLEMENTATION OF THE BOOSTING ENERGY SECURITY |
| 014202- A08 | Loans and Advances 550,163,000 |
| 014202- A085 | Loans to Non Financial Institutions 550,163,000 |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER
DEMANDS FOR GRANTS
DIVISION
| No of Posts 2025-2026 | 2025-2026 | 2026-2027 | |
|---|---|---|---|
| 2025-26 2026-27 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | |||
| Total- | CAPACITY BUILDING FOR | 550,163,000 | |
| PREPARATION AND IMPLEMENTATION OF THE BOOSTING ENERGY SECURITY THROUGH | |||
| LO1681 SUPP PROJECT-LL ( | LY FOR THREE PHASE AMI METERS UNDER ADB POWER DISTRI LESCO) | BUTION STRENGTHENING | |
| 014202- A08 | Loans and Advances | 599,515,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 599,515,000 | |
| Total- MN0148 ELEC | SUPPLY FOR THREE PHASE AMI METERS UNDER ADB POWER DISTRIBUTION STRENGTHENING PROJECT-LL (LESCO) TRICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT | 599,515,000 | |
| 014202- A08 | Loans and Advances 1,770,000,000 | 1,770,000,000 | 3,189,462,000 |
| 014202- A085 | Loans to Non Financial Institutions 1,770,000,000 | 1,770,000,000 | 3,189,462,000 |
| Total- | ELECTRICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT 1,770,000,000 | 1,770,000,000 | 3,189,462,000 |
| (In Foreign Exchange) (1,770,000,000) | |||
| (Foreign Aid) (1,770,000,000) | |||
| (In Local Currency) | (1,770,000,000) | (3,189,462,000) | |
| MN0377 POW | __________________ ER DISTRIBUTION STRENTHENING PROJECT (MEPCO) | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 1,892,053,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 1,892,053,000 | |
| Total- | POWER DISTRIBUTION STRENTHENING PROJECT (MEPCO) | 1,892,053,000 | |
| 014202 | Total- Trasfer To Non-financial institutions 1,770,000,000 | 1,770,000,000 | 25,918,259,000 |
| 0142 | Total- Transfers (Others) 1,770,000,000 | 1,770,000,000 | 25,918,259,000 |
| 014 | Total- Transfers 1,770,000,000 | 1,770,000,000 | 25,918,259,000 |
| 01 | Total- General Public Service 1,770,000,000 | 1,770,000,000 | 25,918,259,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 1,770,000,000 SUB-OFFICE, LAHORE | 1,770,000,000 | 25,918,259,000 | |
| (In Foreign Exchange) (1,770,000,000) (Own Resources) | |||
| (Foreign Aid) (1,770,000,000) | |||
| (In Local Currency) | (1,770,000,000) | (25,918,259,000) |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS
DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, | PESHAWAR |
| 01 | General Public Service: | ||||
|---|---|---|---|---|---|
| 014 | Transfers: | ||||
| 0142 | Transfers (Others): | ||||
| 014202 AD0122 SYSTE | Trasfe SUPP NMS (A | r To Non-financial institutions : LY. INSTALLATION TESTING & COMMISSIO PMS) FOR | NING OF ASSET PERFORMANCE MANAGENMENT | ||
| 014202 | - A08 | Loans and Advances | 197,998,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 197,998,000 | ||
| Total- | SUPPLY. INSTALLATION TESTING & COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT SYSTENMS (APMS) FOR | 197,998,000 | |||
| PR1183 | ELECTRIC DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT | ||||
| 014202 | - A08 | Loans and Advances | 2,427,300,000 | 2,427,300,000 | 2,244,291,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 2,427,300,000 | 2,427,300,000 | 2,244,291,000 |
| Total- | ELECTRIC DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT | 2,427,300,000 | 2,427,300,000 | 2,244,291,000 | |
| (In Foreign Exchange) | (2,427,300,000) | ||||
| (Foreign Aid) | (2,427,300,000) | ||||
| (In Local Currency) | (2,427,300,000) | (2,244,291,000) | |||
| PR1188 SYSTE | SUPP NMS (A | LY. INSTALLATION TESTING & COMMISSIO PMS) FOR | __________________ NING OF ASSET PER | _________________ FORMANCE MANAG | _______________ ENMENT |
| 014202 | - A08 | Loans and Advances | 306,976,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 306,976,000 | ||
| Total- | SUPPLY. INSTALLATION TESTING & COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT SYSTENMS (APMS) FOR | 306,976,000 | |||
| 0 | 14202 | Total- Trasfer To Non-financial institutions | 2,427,300,000 | 2,427,300,000 | 2,749,265,000 |
| 0 | 142 | Total- Transfers (Others) | 2,427,300,000 | 2,427,300,000 | 2,749,265,000 |
| 0 | 14 | Total- Transfers | 2,427,300,000 | 2,427,300,000 | 2,749,265,000 |
| 0 | 1 | Total- General Public Service | 2,427,300,000 | 2,427,300,000 | 2,749,265,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | 2,427,300,000 | 2,427,300,000 | 2,749,265,000 | ||
| (In Foreign Exchange) | (2,427,300,000) | ||||
| (Own Resources) | |||||
| (Foreign Aid) | (2,427,300,000) | ||||
| (In Local Currency) | (2,427,300,000) | (2,749,265,000) |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS
DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 | General Public Service: | ||||
|---|---|---|---|---|---|
| 014 | Transfers: | ||||
| 0142 | Transfers (Others): | ||||
| 014202 | Trasfe | r To Non-financial institutions : | |||
| HD0238 | ELECTRICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT | ||||
| 014202 | - A08 | Loans and Advances | 1,890,000,000 | 1,241,390,000 | 1,556,203,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 1,890,000,000 | 1,241,390,000 | 1,556,203,000 |
| Total- | ELECTRICITY DISTRIBUTION | 1,890,000,000 | 1,241,390,000 | 1,556,203,000 | |
| EFFICIENCY IMPROVEMENT PROJECT | |||||
| (In Foreign Exchange) | (1,890,000,000) | ||||
| (Foreign Aid) | (1,890,000,000) | ||||
| (In Local Currency) | (1,241,390,000) | (1,556,203,000) | |||
| KA1467 | 500 K | V MATIARI-MORO-RAHIM YAR KHAN T/L | _________________ | _______________ | |
| 014202 | - A08 | Loans and Advances | 300,000,000 | 419,255,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 300,000,000 | 419,255,000 | |
| Total- | 500 KV MATIARI-MORO-RAHIM YAR KHAN T/L | 300,000,000 | 419,255,000 | ||
| (In Foreign Exchange) | (300,000,000) | ||||
| (Foreign Aid) | (300,000,000) | ||||
| (In Local Currency) | (419,255,000) | ||||
| SK0083 | POWER DISTRIBUTION STRENTHENING PROJEC | __________________ T (SEPCO) | _________________ | _______________ | |
| 014202 | - A08 | Loans and Advances | 1,205,165,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 1,205,165,000 | ||
| Total- | POWER DISTRIBUTION STRENTHENING | 1,205,165,000 | |||
| PROJECT (SEPCO) | |||||
| SK0084 SYSTE | SUPP NMS (A | LY. INSTALLATION TESTING & COMMISSIO PMS) FOR | NING OF ASSET PERFORMANCE MANAGENMENT | ||
| 014202 | - A08 | Loans and Advances | 122,211,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 122,211,000 | ||
| Total- | SUPPLY. INSTALLATION TESTING & COMMISSIONING OF ASSET | 122,211,000 | |||
| PERFORMANCE MANAGENMENT | |||||
| SYSTENMS (APMS) FOR |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 014202 | Total- Trasfer To Non-financial institutions | 2,190,000,000 | 1,241,390,000 | 3,302,834,000 |
|---|---|---|---|---|
| 0142 | Total- Transfers (Others) | 2,190,000,000 | 1,241,390,000 | 3,302,834,000 |
| 014 | Total- Transfers | 2,190,000,000 | 1,241,390,000 | 3,302,834,000 |
| 01 | Total- General Public Service | 2,190,000,000 | 1,241,390,000 | 3,302,834,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 2,190,000,000 | 1,241,390,000 | 3,302,834,000 | |
| (In Foreign Exchange) | (2,190,000,000) | |||
| (Own Resources) | ||||
| (Foreign Aid) | (2,190,000,000) | |||
| (In Local Currency) | (1,241,390,000) | (3,302,834,000) |
NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DEMANDS FOR GRANTS
DIVISION
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 01 | General Public Service: | |||||
|---|---|---|---|---|---|---|
| 014 | Transfers: | |||||
| 0142 | Transfers (Others): | |||||
| 014202 | Trasfe | r To No | n-financial institutions : | |||
| QA070 SYSTE | 8 SUPP NMS (A | LY. INSTALLATION TESTING & COMMISSIO PMS) FOR | NING OF ASSET PERFORMANCE MANAGENMENT | |||
| 014202 | - A08 | Loans and Advances | 230,522,000 | |||
| 014202 | - A085 | Loans to Non Financial Institutions | 230,522,000 | |||
| Total- | SUPP COMM PERF SYSTE | LY. INSTALLATION TESTING & ISSIONING OF ASSET ORMANCE MANAGENMENT NMS (APMS) FOR | 230,522,000 | |||
| 0 | 14202 | Total- | Trasfer To Non-financial institutions | 230,522,000 | ||
| 0 | 142 | Total- | Transfers (Others) | 230,522,000 | ||
| 0 | 14 | Total- | Transfers | 230,522,000 | ||
| 0 | 1 | Total- | General Public Service | 230,522,000 | ||
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 230,522,000 | ||||
| TOTAL | - DEMAND | 72,106,914,000 | 63,131,336,000 | 76,607,502,000 | ||
| (In Foreign Exchange) | (72,106,914,000) | |||||
| (Own | Resources) | |||||
| (Foreign Aid) | (72,106,914,000) | |||||
| (In Loc | al Currency) | _________________ | (63,131,336,000) _________________ | (76,607,502,000) ________________ |
SECTION IV
MINISTRY OF FINANCE AND REVENUE
2026-2027 Budget Estimate (Rupees in Thousand) Demands presented on behalf of the Ministry of Finance and Revenue.
Development Expenditure on Capital Account.
| 128. | Capital Outlay on Federal Investments | 2,359,678 | |
|---|---|---|---|
| 129. | by the Federal Government Development Loans and Advances | 169,210,378 | |
| 130. | External Development Loans and Advances | 609,608,690 | |
| by the Federal Government | |||
| Total : | 781,178,746 |
NO. 128.- CAPITAL OUTLAY ON FEDERAL INVESTMENTS DEMANDS FOR GRANTS
DEMAND NO. 128 ( FC12C39 )
CAPITAL OUTLAY ON FEDERAL INVESTMENTS
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 for CAPITAL OUTLAY ON FEDERAL INVESTMENTS.
Voted
Rs. 2,359,678,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE AND REVENUE .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 |
| Total | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 |
| Total | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | |
| (In Foreign Exchange) | (1,063,520,000) | (1,048,700,000) | ||
| (Own Resources) | (1,063,520,000) | (1,048,700,000) | ||
| (Foreign Aid) | ||||
| (In Local Currency) | (426,400,000) __________________ | (1,489,920,000) _________________ | (1,310,978,000) _______________ |
NO. 128.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of 2025-26 Po 202 | sts 6-27 | 2025-2026 Budget Estimate | 2025-2026 Revised Estimate | 2026-2027 Budget Estimate | ||
|---|---|---|---|---|---|---|
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||||
| 01 | General Public Service: | |||||
| 014 | Transfers: | |||||
| 0143 | Investments: | |||||
| 01430 IB371 | 2 Non-Financial Institutions : 1 REVAMPING OF PTVC | |||||
| 01430 | 2- A03 | Operating Expenses | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | |
| 01430 | 2- A039 | General | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | |
| Total- | REVAMPING OF PTVC | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | ||
| (In Foreign Exchange) | (1,063,520,000) | (1,048,700,000) | ||||
| (Own Resources) | (1,063,520,000) | (1,048,700,000) | ||||
| (In Local Currency) | _ | (426,400,000) _________________ | (1,489,920,000) _________________ | (1,310,978,000) _______________ | ||
| 014302 | Total- Non-Financial Institutions | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | ||
| 0143 | Total- Investments | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | ||
| 014 | Total- Transfers | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | ||
| 01 | Total- General Public Service | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | ||
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | |||
| (In Foreign Exchange) | (1,063,520,000) | (1,048,700,000) | ||||
| (Own Resources) | (1,063,520,000) | (1,048,700,000) | ||||
| (Foreign Aid) | ||||||
| (In Local Currency) | (426,400,000) | (1,489,920,000) | (1,310,978,000) | |||
| TOTAL - DEMAND | 1,489,920,000 | 1,489,920,000 | 2,359,678,000 | |||
| (In Foreign Exchange) | (1,063,520,000) | (1,048,700,000) | ||||
| (Own Resources) | (1,063,520,000) | (1,048,700,000) | ||||
| (Foreign Aid) | ||||||
| (In Local Currency) | _ | (426,400,000) _________________ | (1,489,920,000) _________________ | (1,310,978,000) _______________ |
NO. 129.- DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT DEMANDS FOR GRANTS DEMAND NO. 129 ( FC12D36 )
DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 for DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT. Voted
Rs. 169,210,378,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE AND REVENUE .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 183,758,219,000 | 163,916,654,000 | 169,210,378,000 |
| Total | 183,758,219,000 | 163,916,654,000 | 169,210,378,000 | |
| OBJECT CLASSIFICATION | ||||
| A05 | Grants, Subsidies and Write off Loans | 370,868,000 | ||
| A08 | Loans and Advances | 183,758,219,000 | 163,916,654,000 | 168,839,510,000 |
| Total | 183,758,219,000 | 163,916,654,000 | 169,210,378,000 | |
| (In Foreign Exchange) | (928,326,000) | |||
| (Own Resources) | (928,326,000) | |||
| (Foreign Aid) | ||||
| (In Local Currency) | (182,829,893,000) _________________ | (163,916,654,000) _________________ | (169,210,378,000) ________________ |
NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | ||
|---|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | ||||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0141 | Transfers (Inter-Governmental): | ||||
| 014102 IB0816 | To dis CAREC | trict governments : CORRIDOR DEVELOPMENT INVESTMENT PR | OGRAMME TRANCHE-I PROJECTS ADB | ||
| 014102 | - A08 | Loans and Advances | 323,000,000 | 1,323,000,000 | 830,000,000 |
| 014102 | - A083 | District Government / TMAs | 323,000,000 | 1,323,000,000 | 830,000,000 |
| Total- | CAREC CORRIDOR DEVELOPMENT | 323,000,000 | 1,323,000,000 | 830,000,000 | |
| IB0817 | CONST | INVESTMENT PROGRAMME TRANCHE-I PROJECTS ADB RUCTION OF 02 LANE HIGHWAY FROM BASI | MA TO KHUZDAR ( | LENGTH 106 KM) | |
| 014102 | - A08 | Loans and Advances | 2,500,000,000 | 925,000,000 | 1,000,000,000 |
| 014102 | - A083 | District Government / TMAs | 2,500,000,000 | 925,000,000 | 1,000,000,000 |
| Total- | CONSTRUCTION OF 02 LANE HIGHWAY | 2,500,000,000 | 925,000,000 | 1,000,000,000 | |
| IB0830 | CONST | FROM BASIMA TO KHUZDAR (LENGTH 106 KM) RUCTION OF BRIDGE ON RIVER RAVI AT SYE | D WALA (NANKANA SAHIB) | ||
| 014102 | - A08 | Loans and Advances | 323,602,000 | 45,000,000 | 50,000,000 |
| 014102 | - A083 | District Government / TMAs | 323,602,000 | 45,000,000 | 50,000,000 |
| Total- | CONSTRUCTION OF BRIDGE ON RIVER | 323,602,000 | 45,000,000 | 50,000,000 | |
| RAVI AT SYED WALA (NANKANA | |||||
| IB0835 | CONST | SAHIB) RUCTION OF MOTORWAY FROM BURHAN - H | AKLA ON M-I TO DERA ISMAIL KHAN | ||
| 014102 | - A08 | Loans and Advances | 500,000,000 | 880,000,000 | 1,000,000,000 |
| 014102 | - A083 | District Government / TMAs | 500,000,000 | 880,000,000 | 1,000,000,000 |
| Total- | CONSTRUCTION OF MOTORWAY FROM | 500,000,000 | 880,000,000 | 1,000,000,000 | |
| BURHAN - HAKLA ON M-I TO DERA | |||||
| IB0838 1167+0 | DUALI 00 | ISMAIL KHAN ZATION & IMPROVEMENT OF OLD BANNU RO | AD FROM KM 1040 | +000 - 1050+000 & KM | 1088+000 - |
| 014102 | - A08 | Loans and Advances | 988,150,000 | 988,150,000 | 760,000,000 |
| 014102 | - A083 | District Government / TMAs | 988,150,000 | 988,150,000 | 760,000,000 |
| Total- | DUALIZATION & IMPROVEMENT OF | 988,150,000 | 988,150,000 | 760,000,000 | |
| OLD BANNU ROAD FROM KM 1040+000 - 1050+000 & KM 1088+000 - 1167+000 |
NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
| T LOANS AND ADVANCES T No of Posts | BY THE FEDERAL 2025-2026 | DEMAND 2025-2026 | S FOR GRANTS 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| IB0839 DUALI | ZATION & IMPROVEMENT OF PINDIGHEB- KOHAT ROAD | |||
|---|---|---|---|---|
| 014102- A08 | Loans and Advances | 800,000,000 | 800,000,000 | 500,000,000 |
| 014102- A083 | District Government / TMAs | 800,000,000 | 800,000,000 | 500,000,000 |
| Total- | DUALIZATION & IMPROVEMENT OF | 800,000,000 | 800,000,000 | 500,000,000 |
| IB0840 DUALI | PINDIGHEB- KOHAT ROAD ZATION OF INDUS HIGHWAY (N-55) SARAI G | AMBILA TO KOHAT | SECTION | |
| 014102- A08 | Loans and Advances | 1,500,000,000 | 1,250,000,000 | 2,625,845,000 |
| 014102- A083 | District Government / TMAs | 1,500,000,000 | 1,250,000,000 | 2,625,845,000 |
| Total- | DUALIZATION OF INDUS HIGHWAY | 1,500,000,000 | 1,250,000,000 | 2,625,845,000 |
| IB0842 IMPRO | (N-55) SARAI GAMBILA TO KOHAT SECTION VEMENT UPGRADATION AND WIDENING OF | JAGLOT - SKARDU | ROAD (S-1 167 KM) | REVISED |
| 014102- A08 | Loans and Advances | 1,000,000,000 | 2,260,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 1,000,000,000 | 2,260,000,000 | 1,000,000,000 |
| Total- | IMPROVEMENT UPGRADATION AND | 1,000,000,000 | 2,260,000,000 | 1,000,000,000 |
| IB0843 KARA SUKKUR-SUK | WIDENING OF JAGLOT - SKARDU ROAD (S-1 167 KM) REVISED CHI - LAHORE MOTORWAY (LAND ACQUISITI KUR | ON) (CPEC)-LAHORE ABDUL HAKEEM- | MULTAN | |
| 014102- A08 | Loans and Advances | 500,000,000 | 1,260,000,000 | 800,000,000 |
| 014102- A083 | District Government / TMAs | 500,000,000 | 1,260,000,000 | 800,000,000 |
| Total- | KARACHI - LAHORE MOTORWAY (LAND | 500,000,000 | 1,260,000,000 | 800,000,000 |
| IB0844 LAHOR | ACQUISITION) (CPEC)-LAHORE ABDUL HAKEEM-MULTAN SUKKUR-SUKKUR E-MULTAN MOTORWAY (M-3 SECTION) OF | KARACHI - LAHORE | MOTORWAY | |
| 014102- A08 | Loans and Advances | 1,000,000,000 | 250,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 1,000,000,000 | 250,000,000 | 1,000,000,000 |
| Total- | LAHORE-MULTAN MOTORWAY (M-3 | 1,000,000,000 | 250,000,000 | 1,000,000,000 |
| IB0853 PESHA | SECTION) OF KARACHI - LAHORE MOTORWAY WAR NORTHERN BYPASS (32.2 KM) (REVIS | ED) | ||
| 014102- A08 | Loans and Advances | 500,000,000 | 2,260,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 500,000,000 | 2,260,000,000 | 1,000,000,000 |
| Total- | PESHAWAR NORTHERN BYPASS (32.2 KM) (REVISED) | 500,000,000 | 2,260,000,000 | 1,000,000,000 |
NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2025-2026 2025-2026 | 2026-2027 | |
|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate Revised Estimate | Budget Estimate | |
| Rs Rs | Rs | ||
| IB0856 CONST DEPOSIT WOR | ACCOUNTANT GENERAL RUCTION FOR IMPROVEMENT AND WIDENIN K | PAKISTAN REVENUES G CHITRAL-AYUN-BUMBORATE ROAD | (48 KM) |
| 014102- A08 | Loans and Advances | 750,000,000 39,339,000 | 200,000,000 |
| 014102- A083 | District Government / TMAs | 750,000,000 39,339,000 | 200,000,000 |
| Total- | CONSTRUCTION FOR IMPROVEMENT | 750,000,000 39,339,000 | 200,000,000 |
| AND WIDENING CHITRAL-AYUN-BUMBORATE ROAD (48 KM) DEPOSIT WORK | |||
| IB0857 CONSTRUCTION OF ADDITIONAL CARRIAGE WAY S CORRIDOR (ADB) | HIKARPUR-RAJANPUR SECTION OF N- | 55 CAREC | |
| 014102- A08 | Loans and Advances | 500,000,000 1,840,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 500,000,000 1,840,000,000 | 1,000,000,000 |
| Total- | CONSTRUCTION OF ADDITIONAL | 500,000,000 1,840,000,000 | 1,000,000,000 |
| CARRIAGE WAY SHIKARPUR-RAJANPUR SECTION OF N-55 CAREC CORRIDOR (ADB) | |||
| IB0863 CONSTRUCTION OF HOSHAB-AWARAN SECTION OF | M-8 (146 KM) | ||
| 014102- A08 | Loans and Advances | 3,734,813,000 1,800,000,000 | 3,500,000,000 |
| 014102- A083 | District Government / TMAs | 3,734,813,000 1,800,000,000 | 3,500,000,000 |
| Total- | CONSTRUCTION OF HOSHAB-AWARAN | 3,734,813,000 1,800,000,000 | 3,500,000,000 |
| SECTION OF M-8 (146 KM) | |||
| IB0865 CONSTRUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (ADB) | |||
| 014102- A08 | Loans and Advances | 200,000,000 50,000,000 | 500,000,000 |
| 014102- A083 | District Government / TMAs | 200,000,000 50,000,000 | 500,000,000 |
| Total- | CONSTRUCTION OF RAJANPUR-DG | 200,000,000 50,000,000 | 500,000,000 |
| IB0866 CONST KM) (DEPOSIT | KHAN AS A 4-LANE HIGHWAY (ADB) RUCTION OF ZIARAT MOR - KECH - HARNAI | ROAD (107.2 KM) AND HARNAI - SANJA | VI ROAD (55.1 |
| 014102- A08 | Loans and Advances | 200,000,000 1,110,000 | 1,500,000,000 |
| 014102- A083 | District Government / TMAs | 200,000,000 1,110,000 | 1,500,000,000 |
| Total- | CONSTRUCTION OF ZIARAT MOR - KECH - HARNAI ROAD (107.2 KM) AND HARNAI - SANJAVI ROAD (55.1 KM) (DEPOSIT | 200,000,000 1,110,000 | 1,500,000,000 |
NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | |
|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUE | S | |||
| IB0867 D.G. KHAN # D.I. KHAN (ACW) (N-55) - 245 KMS (CAREC | CORRIDOR ADB) | |||
| 014102- A08 | Loans and Advances | 500,000,000 | 550,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 500,000,000 | 550,000,000 | 1,000,000,000 |
| Total- | D.G. KHAN # D.I. KHAN (ACW) (N-55) - | 500,000,000 | 550,000,000 | 1,000,000,000 |
| 245 KMS (CAREC CORRIDOR ADB) | ||||
| IB0868 DUALI (210 KM) | ZATION & IMPROVEMENT OF EXISTING N-50 FR | OM YARIK - SAGU - | ZHOB INCLUDING ZHOB BYPASS | |
| 014102- A08 | Loans and Advances | 1,000,000,000 | 500,000,000 | 773,273,000 |
| 014102- A083 | District Government / TMAs | 1,000,000,000 | 500,000,000 | 773,273,000 |
| Total- IB0869 IMPRO | DUALIZATION & IMPROVEMENT OF EXISTING N-50 FROM YARIK - SAGU - ZHOB INCLUDING ZHOB BYPASS (210 KM) VEMENT AND WIDENING OF CHITRAL-BOONI-M | 1,000,000,000 ASTUJ-SHANDUR | 500,000,000 (CPEC) | 773,273,000 |
| 014102- A08 | Loans and Advances | 1,500,000,000 | 2,130,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 1,500,000,000 | 2,130,000,000 | 1,000,000,000 |
| Total- | IMPROVEMENT AND WIDENING OF CHITRAL-BOONI-MASTUJ-SHANDUR (CPEC) | 1,500,000,000 | 2,130,000,000 | 1,000,000,000 |
| IB0870 IMPROVEMENT AND WIDENING OF N-45 (130.22 KM) | ||||
| 014102- A08 | Loans and Advances | 100,000,000 | 10,000,000 | 50,000,000 |
| 014102- A083 | District Government / TMAs | 100,000,000 | 10,000,000 | 50,000,000 |
| Total- | IMPROVEMENT AND WIDENING OF N-45 (130.22 KM) | 100,000,000 | 10,000,000 | 50,000,000 |
| IB0871 JHAL J | AHO-BELA SECTION (82 KM) (DEPOSIT WORK) | |||
| 014102- A08 | Loans and Advances | 3,834,261,000 | 3,034,261,000 | 731,250,000 |
| 014102- A083 | District Government / TMAs | 3,834,261,000 | 3,034,261,000 | 731,250,000 |
| Total- | JHAL JAHO-BELA SECTION (82 KM) | 3,834,261,000 | 3,034,261,000 | 731,250,000 |
| IB0872 KHYBE | (DEPOSIT WORK) R PASS ECONOMIC CORRIDOR PROJECT (REV | ISED) (WORLD BANK) | ||
| 014102- A08 | Loans and Advances | 500,000,000 | 20,000,000 | 300,000,000 |
| 014102- A083 | District Government / TMAs | 500,000,000 | 20,000,000 | 300,000,000 |
| Total- | KHYBER PASS ECONOMIC CORRIDOR | 500,000,000 | 20,000,000 | 300,000,000 |
| PROJECT (REVISED) (WORLD BANK) |
| NO. 129.- FC1 | 2D36 DEVELOPMENT LOANS AND ADVANCE GOVERNMENT | S BY THE FEDERA | L DEMAN | DS FOR GRANTS |
|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget | 2025-2026 Revised | 2026-2027 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB0873 NOKU | ACCOUNTANT GENERAL NDI- MASHKHEL ROAD CPEC (DEPOSIT WOR | PAKISTAN REVEN K) | UES | |
| 014102- A08 | Loans and Advances | 700,000,000 | 1,220,000,000 | 484,152,000 |
| 014102- A083 | District Government / TMAs | 700,000,000 | 1,220,000,000 | 484,152,000 |
| Total- | NOKUNDI- MASHKHEL ROAD CPEC | 700,000,000 | 1,220,000,000 | 484,152,000 |
| (DEPOSIT WORK) | ||||
| IB0874 QUETTA WESTERN BYPASS(23 KM) | ||||
| 014102- A08 | Loans and Advances | 900,000,000 | 565,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 900,000,000 | 565,000,000 | 1,000,000,000 |
| Total- | QUETTA WESTERN BYPASS(23 KM) | 900,000,000 | 565,000,000 | 1,000,000,000 |
| IB0878 ZHOB | TO KUCHLAK ROAD CPEC WESTERN CORRIDOR | |||
| 014102- A08 | Loans and Advances | 4,500,000,000 | 375,000,000 | 3,000,000,000 |
| 014102- A083 | District Government / TMAs | 4,500,000,000 | 375,000,000 | 3,000,000,000 |
| Total- | ZHOB TO KUCHLAK ROAD CPEC | 4,500,000,000 | 375,000,000 | 3,000,000,000 |
| WESTERN CORRIDOR | ||||
| IB0882 CONSTRUCTION OF KOT PINDI DAS INTERCHANGE | M-2 | |||
| 014102- A08 | Loans and Advances | 251,291,000 | 301,291,000 | 100,000,000 |
| 014102- A083 | District Government / TMAs | 251,291,000 | 301,291,000 | 100,000,000 |
| Total- | CONSTRUCTION OF KOT PINDI DAS | 251,291,000 | 301,291,000 | 100,000,000 |
| IB0883 DUALI | INTERCHANGE M-2 ZATION OF KHUZDAR - KUCHLAK SECTION O | F NATIONAL HIGH | WAY (N-25) 330KM | |
| 014102- A08 | Loans and Advances | 34,000,000,000 | 31,919,410,000 | 22,000,000,000 |
| 014102- A083 | District Government / TMAs | 34,000,000,000 | 31,919,410,000 | 22,000,000,000 |
| Total- | DUALIZATION OF KHUZDAR - KUCHLAK | 34,000,000,000 | 31,919,410,000 | 22,000,000,000 |
| IB0884 CONST KM) | SECTION OF NATIONAL HIGHWAY (N-25) 330KM RUCTION OF HOSHAB # AWARAN # KHUZDA | R SECTION OF M-8 | SECTION-2 AWARAN # NAAL (168 | |
| 014102- A08 | Loans and Advances | 6,000,000,000 | 6,860,000,000 | 3,000,000,000 |
| 014102- A083 | District Government / TMAs | 6,000,000,000 | 6,860,000,000 | 3,000,000,000 |
| Total- | CONSTRUCTION OF HOSHAB # AWARAN # KHUZDAR SECTION OF M-8 SECTION-2 AWARAN # NAAL (168 KM) | 6,000,000,000 | 6,860,000,000 | 3,000,000,000 |
| NO. 129.- FC12D36 DEVELOPMENT LO GOVERNMENT | ANS AND ADVANCES B No of Posts | Y THE FEDERAL 2025-2026 | DEMAND 2025-2026 | S FOR GRANTS 2026-2027 |
|---|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB0885 REHABILITATION & UPGRADATION OF AWARAN-J | HALIJAO ROAD (548 | KM) | ||
|---|---|---|---|---|
| 014102- A08 | Loans and Advances | 1,047,943,000 | 1,047,943,000 | 500,000,000 |
| 014102- A083 | District Government / TMAs | 1,047,943,000 | 1,047,943,000 | 500,000,000 |
| Total- | REHABILITATION & UPGRADATION OF AWARAN-JHALIJAO ROAD (548 KM) | 1,047,943,000 | 1,047,943,000 | 500,000,000 |
| IB3080 CONST WORK) | RUCTION OF ROAD FROM DALBANTIN TO | ZIARAT BALANOSH ( | 77KM) DISTRICT CHAGHI (DEPOSIT | |
| 014102- A08 | Loans and Advances | 50,000,000 | 100,000,000 | |
| 014102- A083 | District Government / TMAs | 50,000,000 | 100,000,000 | |
| Total- | CONSTRUCTION OF ROAD FROM DALBANTIN TO ZIARAT BALANOSH (77KM) DISTRICT CHAGHI (DEPOSIT WORK) | 50,000,000 | 100,000,000 | |
| IB3083 CONST (48KM) | RUCTION OF CHAKDARA - CHITRAL ROAD | PROJECT (N-45) SECTION III: KALKATAK - CHITRAL | ||
| 014102- A08 | Loans and Advances | 500,000,000 | 50,000,000 | |
| 014102- A083 | District Government / TMAs | 500,000,000 | 50,000,000 | |
| Total- | CONSTRUCTION OF CHAKDARA - | 500,000,000 | 50,000,000 | |
| CHITRAL ROAD PROJECT (N-45) SECTION III: KALKATAK - CHITRAL (48KM) | ||||
| IB3085 RELOCATION OF KARAKORUM HIGHWAY BETWE DAMS ON RIVER | EN THAKOT & RAIKOT DUE TO CONSTRUCTION OF | |||
| 014102- A08 | Loans and Advances | 500,000,000 | 4,500,000,000 | |
| 014102- A083 | District Government / TMAs | 500,000,000 | 4,500,000,000 | |
| Total- | RELOCATION OF KARAKORUM | 500,000,000 | 4,500,000,000 | |
| HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF DAMS ON RIVER | ||||
| IB3086 LAND CONSTRUCTI | ACQUISITION FOR RELOCATION OF KARAK ON OF DAMS | ORUM HIGHWAY BETWEEN THAKOT & | RAIKOT DUE TO | |
| 014102- A08 | Loans and Advances | 633,900,000 | 750,000,000 | |
| 014102- A083 | District Government / TMAs | 633,900,000 | 750,000,000 | |
| Total- | LAND ACQUISITION FOR RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF DAMS | 633,900,000 | 750,000,000 |
| NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES B GOVERNMENT No of Posts | Y THE FEDERAL 2025-2026 | DEMAND 2025-2026 | S FOR GRANTS 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3087 CONSTRUCTION OF MASHKHEL # PANJGOOR ROAD (191.6 KM) | ||||
|---|---|---|---|---|
| 014102- A08 | Loans and Advances | 50,000,000 | 750,000,000 | |
| 014102- A083 | District Government / TMAs | 50,000,000 | 750,000,000 | |
| Total- | CONSTRUCTION OF MASHKHEL # | 50,000,000 | 750,000,000 | |
| IB3088 DUALI | PANJGOOR ROAD (191.6 KM) ZATION/ STRENGTHENING OF N-65 FROM Q | UETTA - DHADAR 11 | 0 KMS (FEASIBILITY STUDY) | |
| 014102- A08 | Loans and Advances | 5,000,000 | ||
| 014102- A083 | District Government / TMAs | 5,000,000 | ||
| Total- IB3386 CONST | DUALIZATION/ STRENGTHENING OF N-65 FROM QUETTA - DHADAR 110 KMS (FEASIBILITY STUDY) RUCTION OF GILGIT # SHANDUR ROAD (216 | 5,000,000 KM)GBP | ||
| 014102- A08 | Loans and Advances | 3,000,000,000 | 7,300,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 3,000,000,000 | 7,300,000,000 | 1,000,000,000 |
| Total- | CONSTRUCTION OF GILGIT # SHANDUR | 3,000,000,000 | 7,300,000,000 | 1,000,000,000 |
| IB3848 DUAKI 65.1 KM) DIST | ROAD (216 KM)GBP ZATION OF SIALKOT EMINABAD ROAD UP K RICT SIALKOT | AMOKE INCLUDING | LINK TO MOTOR WAY | (LENGTH |
| 014102- A08 | Loans and Advances | 500,000,000 | 2,000,000,000 | |
| 014102- A083 | District Government / TMAs | 500,000,000 | 2,000,000,000 | |
| Total- IB3849 WIDEN | DUAKIZATION OF SIALKOT EMINABAD ROAD UP KAMOKE INCLUDING LINK TO MOTOR WAY (LENGTH 65.1 KM) DISTRICT SIALKOT ING AND IMPROVEMENT OF PRIORITY SECT | 500,000,000 IONS ON N-5 (PHAS | E-IA & IB)(210 KM) | 2,000,000,000 |
| 014102- A08 | Loans and Advances | 1,900,000,000 | 150,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 1,900,000,000 | 150,000,000 | 1,000,000,000 |
| Total- | WIDENING AND IMPROVEMENT OF | 1,900,000,000 | 150,000,000 | 1,000,000,000 |
| PRIORITY SECTIONS ON N-5 (PHASE-IA & IB)(210 KM) |
| NO. 129.- FC1 | 2D36 DEVELOPMENT LOANS AND ADVANCES GOVERNMENT | BY THE FEDERAL | DEMANDS FOR GRANTS | |
|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget | 2025-2026 Revised | 2026-2027 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB3852 LALA | ACCOUNTANT GENERAL MUSA BYPASS OF N-5 | PAKISTAN REVENUES | ||
| 014102- A08 | Loans and Advances | 100,000,000 | 100,000,000 | |
| 014102- A083 | District Government / TMAs | 100,000,000 | 100,000,000 | |
| Total- | LALA MUSA BYPASS OF N-5 | 100,000,000 | 100,000,000 | |
| IB5373 GWADAR RATODERO ROAD PROJECT M-8 | ||||
| 014102- A08 | Loans and Advances | 3,000,000,000 | 800,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 3,000,000,000 | 800,000,000 | 1,000,000,000 |
| Total- | GWADAR RATODERO ROAD PROJECT | 3,000,000,000 | 800,000,000 | 1,000,000,000 |
| IB5375 LAND DUALIZATION | M-8 ACQUISITION AFFECTED PROPERTIES COMP OF | ENSATION AND RELOCATION OF UTILITIES FOR | ||
| 014102- A08 | Loans and Advances | 1,348,690,000 | 500,000,000 | 850,000,000 |
| 014102- A083 | District Government / TMAs | 1,348,690,000 | 500,000,000 | 850,000,000 |
| Total- | LAND ACQUISITION AFFECTED | 1,348,690,000 | 500,000,000 | 850,000,000 |
| IB5380 CONST | PROPERTIES COMPENSATION AND RELOCATION OF UTILITIES FOR DUALIZATION OF RUCTION OF 6 LANE OVERHEAD VRIDGE AT | IMAMILA COLONY | RAILWAY CROSSING SHAHDRA | |
| 014102- A08 | Loans and Advances | 200,000,000 | 255,000,000 | 250,000,000 |
| 014102- A083 | District Government / TMAs | 200,000,000 | 255,000,000 | 250,000,000 |
| Total- | CONSTRUCTION OF 6 LANE OVERHEAD | 200,000,000 | 255,000,000 | 250,000,000 |
| VRIDGE AT IMAMILA COLONY RAILWAY | ||||
| IB5384 CONST | CROSSING SHAHDRA RUCTION OF BHONG INTERCHANGE ON MOT | ORWAY M-5 | ||
| 014102- A08 | Loans and Advances | 5,000,000 | 355,000,000 | 100,000,000 |
| 014102- A083 | District Government / TMAs | 5,000,000 | 355,000,000 | 100,000,000 |
| Total- | CONSTRUCTION OF BHONG | 5,000,000 | 355,000,000 | 100,000,000 |
| IB5388 CONST | INTERCHANGE ON MOTORWAY M-5 RUCTION OF FLYOVER AT THE JUNCTION O | F N-5 AND N-65 AT SUKKUR | ||
| 014102- A08 | Loans and Advances | 50,000,000 | 815,000,000 | 1,000,000,000 |
| 014102- A083 | District Government / TMAs | 50,000,000 | 815,000,000 | 1,000,000,000 |
| Total- CON JUN SUK | STRUCTION OF FLYOVER AT THE CTION OF N-5 AND N-65 AT KUR | 50,000,000 | 815,000,000 | 1,000,000,000 |
| NO. 129.- FC12D36 DEVELOPMENT LO GOVERNMENT | ANS AND ADVANCES B No of Posts | Y THE FEDERAL 2025-2026 | DEMAND 2025-2026 | S FOR GRANTS 2026-2027 |
|---|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES IB5389 CONSTRUCTION OF INTERCHANGE AT M- 3 ABDUL HAKEEM MOTORWAY AT ESSAN SHARAQPUR DISTRICT SHEIKHUPURA 20
| 014102- A08 | Loans and Advances | 500,000,000 | 225,000,000 | 650,000,000 |
|---|---|---|---|---|
| 014102- A083 | District Government / TMAs | 500,000,000 | 225,000,000 | 650,000,000 |
| Total- | CONSTRUCTION OF INTERCHANGE AT | 500,000,000 | 225,000,000 | 650,000,000 |
| M- 3 ABDUL HAKEEM MOTORWAY AT ESSAN SHARAQPUR DISTRICT SHEIKHUPURA 20 | ||||
| IB5390 CONSTRUCTION OF INTERCHANGE ON HAZARA M SHERWAN ROAD RIGHT AFTER THE FIRST | OTORWAY TO CONN | ECT ABBOTTABAD | AND | |
| 014102- A08 | Loans and Advances | 800,000,000 | 7,478,000 | 100,000,000 |
| 014102- A083 | District Government / TMAs | 800,000,000 | 7,478,000 | 100,000,000 |
| Total- | CONSTRUCTION OF INTERCHANGE ON HAZARA MOTORWAY TO CONNECT ABBOTTABAD AND SHERWAN ROAD RIGHT AFTER THE FIRST | 800,000,000 | 7,478,000 | 100,000,000 |
| IB5391 CONST IN THE NAME | RUCTION OF INTERCHANGE ON LAHORE - K OF RAI | ARACHI MOTORWAY AT BUCHEKE - NANKANA ROAD | ||
| 014102- A08 | Loans and Advances | 300,000,000 | 2,000,000 | 100,000,000 |
| 014102- A083 | District Government / TMAs | 300,000,000 | 2,000,000 | 100,000,000 |
| Total- | CONSTRUCTION OF INTERCHANGE ON LAHORE - KARACHI MOTORWAY AT BUCHEKE - NANKANA ROAD IN THE NAME OF RAI | 300,000,000 | 2,000,000 | 100,000,000 |
| IB5392 CONSTRUCTION OF KHARAN-BASIMA ROAD (124 K | M) FEASIBILITY STUDY | |||
| 014102- A08 | Loans and Advances | 5,000,000 | 5,188,000 | |
| 014102- A083 | District Government / TMAs | 5,000,000 | 5,188,000 | |
| Total- | CONSTRUCTION OF KHARAN-BASIMA | 5,000,000 | 5,188,000 | |
| ROAD (124 KM) FEASIBILITY STUDY | ||||
| IB5393 CONST NAROWAL (10 | RUCTION OF LAHORE-SIALKOT MOTORWAY 1.41KM) | (LSM) LINK (4-LANE | ) VIA NARANG MA | NDI TO |
| 014102- A08 | Loans and Advances | 3,000,000,000 | 500,000,000 | 2,000,000,000 |
| 014102- A083 | District Government / TMAs | 3,000,000,000 | 500,000,000 | 2,000,000,000 |
| NO. 129.- FC1 | 2D36 DEVELOPMENT LOANS AND ADVANCE GOVERNMENT | S BY THE FEDERAL | DEMAN | DS FOR GRANTS |
|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget Estimate | 2025-2026 Revised Estimate | 2026-2027 Budget Estimate | |
| ACCOUNTANT GENERAL | Rs PAKISTAN REVEN | Rs UES | Rs | |
| Total- | CONSTRUCTION OF LAHORE-SIALKOT | 3,000,000,000 | 500,000,000 | 2,000,000,000 |
| IB5396 CONST LINK WITH | MOTORWAY (LSM) LINK (4-LANE) VIA NARANG MANDI TO NAROWAL (101.41KM) RUCTION OF MIRPUR MATHELO INTERCHAN | GE ON SUKKUR-MULTAN MOTORWAY (M-5) AND ITS | ||
| 014102- A08 | Loans and Advances | 100,000,000 | 16,194,000 | |
| 014102- A083 | District Government / TMAs | 100,000,000 | 16,194,000 | |
| Total- IB5408 DUALI (TOTAL LENG | CONSTRUCTION OF MIRPUR MATHELO INTERCHANGE ON SUKKUR-MULTAN MOTORWAY (M-5) AND ITS LINK WITH ZATION AND REHABILITATION OF KARACHI - TH | 100,000,000 KARARO (232 KMS | 16,194,000 ) & WADH - KHUZD | AR (41 KMS) |
| 014102- A08 | Loans and Advances | 33,000,000,000 | 31,868,972,000 | 30,000,000,000 |
| 014102- A083 | District Government / TMAs | 33,000,000,000 | 31,868,972,000 | 30,000,000,000 |
| Total- | DUALIZATION AND REHABILITATION | 33,000,000,000 | 31,868,972,000 | 30,000,000,000 |
| IB5409 DUALI (TOTAL LENG | OF KARACHI - KARARO (232 KMS) & WADH - KHUZDAR (41 KMS) (TOTAL LENGTH ZATION AND REHABILITATION OF KARARO - TH 187 | WADH (83 KMS) & | KUCHLAK - CHAMAN (104 KMS) | |
| 014102- A08 | Loans and Advances | 33,000,000,000 | 31,724,846,000 | 48,000,000,000 |
| 014102- A083 | District Government / TMAs | 33,000,000,000 | 31,724,846,000 | 48,000,000,000 |
| Total- | DUALIZATION AND REHABILITATION | 33000000000 | 31724846000 | 48000000000 |
| OF KARARO - WADH (83 KMS) & KUCHLAK - CHAMAN (104 KMS) (TOTAL LENGTH 187 | ,,, | ,,, | ,,, | |
| IB5411 DUALI RAILWAY PAS | ZATION OF RAWALPINDI - KAHUTA ROAD (28 S SIHALA | .4 KM) INCLUDING | 4-LANE BRIDGE OVER SIHALA |
| 014102- A08 | Loans and Advances | 800,000,000 | 1,615,000,000 | 1,000,000,000 |
|---|---|---|---|---|
| 014102- A083 | District Government / TMAs | 800,000,000 | 1,615,000,000 | 1,000,000,000 |
| Total- | DUALIZATION OF RAWALPINDI - KAHUTA ROAD (28.4 KM) INCLUDING 4-LANE BRIDGE OVER SIHALA RAILWAY PASS SIHALA | 800,000,000 | 1,615,000,000 | 1,000,000,000 |
| NO. 129.- FC1 | 2D36 DEVELOPMENT LOANS AND ADVANCES GOVERNMENT | BY THE FEDERAL | DEMAN | DS FOR GRANTS |
|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget | 2025-2026 Revised | 2026-2027 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB5414 CONST | ACCOUNTANT GENERAL RUCTION OF MUZAFFARABAD-MANSEHRA R | PAKISTAN REVENUES OAD (26.6 KM APPROX) | ||
| 014102- A08 | Loans and Advances | 200,000,000 | 100,000,000 | |
| 014102- A083 | District Government / TMAs | 200,000,000 | 100,000,000 | |
| Total- | CONSTRUCTION OF | 200,000,000 | 100,000,000 | |
| MUZAFFARABAD-MANSEHRA ROAD (26.6 KM APPROX) | ||||
| IB5421 LAND AS 4- LANE HI | ACQUISITION AFFECTED PROPERTIES AND C GHWAY AND | OMPENSATION FOR RAJANPUR-DG KHAN SECTION | ||
| 014102- A08 | Loans and Advances | 1,000,000,000 | 2,000,000,000 | 1,300,000,000 |
| 014102- A083 | District Government / TMAs | 1,000,000,000 | 2,000,000,000 | 1,300,000,000 |
| Total- | LAND ACQUISITION AFFECTED | 1,000,000,000 | 2,000,000,000 | 1,300,000,000 |
| IB9431 REHAB | PROPERTIES AND COMPENSATION FOR RAJANPUR-DG KHAN SECTION AS 4- LANE HIGHWAY AND ILITATION & UPGRADATION OF PEZU # TANK | ROAD (LENGTH: | 38 KM) | |
| 014102- A08 | Loans and Advances | 500,000,000 | 258,375,000 | 500,000,000 |
| 014102- A083 | District Government / TMAs | 500,000,000 | 258,375,000 | 500,000,000 |
| Total- | REHABILITATION & UPGRADATION OF | 500,000,000 | 258,375,000 | 500,000,000 |
| PEZU # TANK ROAD (LENGTH: 38 KM) | ||||
| IB9442 INTER | CHANGE ON JAMALDIN WALI DISTRICT RAHIM YAR KHAN | |||
| 014102- A08 | Loans and Advances | 100,000,000 | 224,000 | 750,000,000 |
| 014102- A083 | District Government / TMAs | 100,000,000 | 224,000 | 750,000,000 |
| Total- | INTERCHANGE ON JAMALDIN WALI | 100,000,000 | 224,000 | 750,000,000 |
| IB9443 CONST | DISTRICT RAHIM YAR KHAN RUCTION OF LAHORE - SAHIWAL - BAHAWALNAGAR MOTORWAY - PPP MODE | |||
| 014102- A08 | Loans and Advances | 4,000,000,000 | 525,000,000 | 2,000,000,000 |
| 014102- A083 | District Government / TMAs | 4,000,000,000 | 525,000,000 | 2,000,000,000 |
| Total- | CONSTRUCTION OF LAHORE - | 4,000,000,000 | 525,000,000 | 2,000,000,000 |
| IB9445 CONST | SAHIWAL - BAHAWALNAGAR MOTORWAY - PPP MODE RUCTION OF BESHAM KHAWAZAKHELA EXP | RESSWAY PROJECT (64 KM) PPP MO | DE | |
| 014102- A08 | Loans and Advances | 500,000,000 | 1,000,000,000 | |
| 014102- A083 | District Government / TMAs | 500,000,000 | 1,000,000,000 | |
| Total- | CONSTRUCTION OF BESHAM | 500,000,000 | 1,000,000,000 | |
| KHAWAZAKHELA EXPRESSWAY PROJECT (64 KM) PPP MODE |
| NO. 129.- FC12D36 DEVELOPMENT LO GOVERNMENT | ANS AND ADVANCES B No of Posts | Y THE FEDERAL 2025-2026 | DEMAND 2025-2026 | S FOR GRANTS 2026-2027 |
|---|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
IB9447 PC-I FOR LOWARI TUNNEL ELECTRICAL & MECHANICAL WORKS PLUS BRDIGES
| 014102- A08 | Loans and Advances | 1,000,000,000 | 100,000,000 | 2,000,000,000 |
|---|---|---|---|---|
| 014102- A083 | District Government / TMAs | 1,000,000,000 | 100,000,000 | 2,000,000,000 |
| Total- | PC-I FOR LOWARI TUNNEL | 1,000,000,000 | 100,000,000 | 2,000,000,000 |
| IB9448 LINK R | ELECTRICAL & MECHANICAL WORKS PLUS BRDIGES OAD M-I MOTORWAY TO MARGALLA AVEN | UE IN ICT | ||
| 014102- A08 | Loans and Advances | 3,250,000,000 | 1,076,183,000 | 4,517,677,000 |
| 014102- A083 | District Government / TMAs | 3,250,000,000 | 1,076,183,000 | 4,517,677,000 |
| Total- | LINK ROAD M-I MOTORWAY TO | 3,250,000,000 | 1,076,183,000 | 4,517,677,000 |
| MARGALLA AVENUE IN ICT | ||||
| IB9449 DUALI | ZATION OF ROAD FROM FAISALABAD BYPASS TO MOTORWAY | M-3 VIA SATIANA (50:5 | 0 BASIS) | |
| 014102- A08 | Loans and Advances | 500,000,000 | ||
| 014102- A083 | District Government / TMAs | 500,000,000 | ||
| Total- IB9453 NEW M | DUALIZATION OF ROAD FROM FAISALABAD BYPASS TO MOTORWAY M-3 VIA SATIANA (50:50 BASIS) OTORWAY FROM KARACHI TO HYDERABA | 500,000,000 D PPP MODE - COMM | ERCIAL FEASIBILITY | |
| 014102- A08 | Loans and Advances | 50,000,000 | 75,000,000 | |
| 014102- A083 | District Government / TMAs | 50,000,000 | 75,000,000 | |
| Total- | NEW MOTORWAY FROM KARACHI TO | 50,000,000 | 75,000,000 | |
| IB9455 CONST MANSEHRA | HYDERABAD PPP MODE - COMMERCIAL FEASIBILITY RUCTION OF TANAWAL INTERCHANGE ON | HAZARA MOTORWAY AT VILLAGE POTHA | DISTRICT | |
| 014102- A08 | Loans and Advances | 10,000,000 | 121,000 | |
| 014102- A083 | District Government / TMAs | 10,000,000 | 121,000 | |
| Total- | CONSTRUCTION OF TANAWAL | 10,000,000 | 121,000 | |
| INTERCHANGE ON HAZARA MOTORWAY AT VILLAGE POTHA DISTRICT MANSEHRA | ||||
| IB9456 CONSTRUCTION OF TUNNEL JOINING KHAKI WITH | OGHI DISTRICT MANSEHRA (FEASIBILITY | ) | ||
| 014102- A08 | Loans and Advances | 5,000,000 | 17,313,000 | |
| 014102- A083 | District Government / TMAs | 5,000,000 | 17,313,000 | |
| Total- | CONSTRUCTION OF TUNNEL JOINING KHAKI WITH OGHI DISTRICT MANSEHRA (FEASIBILITY) | 5,000,000 | 17,313,000 |
| NO. 129.- FC1 | 2D36 DEVELOPMENT LOANS AND ADVANCE GOVERNMENT | S BY THE FEDERAL | DEMA | NDS FOR GRANTS |
|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget Estimate | 2025-2026 Revised Estimate | 2026-2027 Budget Estimate | |
| Rs | Rs | Rs | ||
| IB9467 REHAB DAMAGED BR | ACCOUNTANT GENERAL ILITATION & RECONSTRUCTION OF N-5 FRO IDGES | PAKISTAN REVENUES M MORO TO RANIPUR KM. 318-404 (N | BC/SBC) & 32 X | |
| 014102- A08 | Loans and Advances | 300,000,000 | 670,000,000 | 1,750,000,000 |
| 014102- A083 | District Government / TMAs | 300,000,000 | 670,000,000 | 1,750,000,000 |
| Total- | REHABILITATION & RECONSTRUCTION OF N-5 FROM MORO TO RANIPUR KM. 318-404 (NBC/SBC) & 32 X DAMAGED BRIDGES | 300,000,000 | 670,000,000 | 1,750,000,000 |
| IB9468 CHINA HALA-MORO 6 | AIDED PROJECTS OF PAKISTAN NATIONAL 6 KM | HIGHWAY N-5 SEC | TIONAL REHABILITATION | |
| 014102- A08 | Loans and Advances | 200,000,000 | 500,000,000 | |
| 014102- A083 | District Government / TMAs | 200,000,000 | 500,000,000 | |
| Total- | CHINA AIDED PROJECTS OF PAKISTAN NATIONAL HIGHWAY N-5 SECTIONAL REHABILITATION HALA-MORO 66 KM | 200,000,000 | 500,000,000 | |
| 014102 | Total- To district governments | 165,115,650,000 | 145,274,085,000 | 161,014,510,000 |
| 014110 Others IB3903 UPGRA | : DATION & REPLACEMENT OF 300 KW-MW T | RANSMITTER AT H | PT KHUZDAR | |
| 014110- A08 | Loans and Advances | 1,390,000,000 | 1,390,000,000 | |
| 014110- A083 | District Government / TMAs | 1,390,000,000 | 1,390,000,000 | |
| Total- | UPGRADATION & REPLACEMENT OF 300 KW-MW TRANSMITTER AT HPT KHUZDAR | 1,390,000,000 | 1,390,000,000 | |
| (In Foreign Exchange) | (869,440,000) | |||
| (Own Resources) | (869,440,000) | |||
| (In Local Currency) | (520560000) | (1390000000) | ||
| IB3904 UPGRA | _ DATION & REPLACEMENT OF 100 KW-MW T | ,, _________________ RANSMITTER AT H | ,,, ________________ PT-1 QUETTA | |
| 014110- A08 | Loans and Advances | 799,141,000 | 799,141,000 | |
| 014110- A083 | District Government / TMAs | 799,141,000 | 799,141,000 | |
| Total- | UPGRADATION & REPLACEMENT OF 100 KW-MW TRANSMITTER AT HPT-1 QUETTA | 799,141,000 | 799,141,000 | |
| (In Foreign Exchange) | (58,886,000) | |||
| (Own Resources) | (58,886,000) | |||
| (In Local Currency) | (740,255,000) _________________ | (799,141,000) _________________ |
NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3905 REHA 50KW MW | BILIATI | ON AND UP GRADATION OF GILGIT | AND SKARDU RADIO | STATIONS(REPLACEMENT OF | |
|---|---|---|---|---|---|
| 014110- A08 | Loans and Advances | 133,000,000 | 133,000,000 | ||
| 014110- A083 | District Government / TMAs | 133,000,000 | 133,000,000 | ||
| Total- IB3906 SAUTU | REHA OF GIL STATI MW L QUR | BILIATION AND UP GRADATION GIT AND SKARDU RADIO ONS(REPLACEMENT OF 50KW AN FM RADIO NETWORK PHASE IV | 133,000,000 (PESHAWAR KARAC | 133,000,000 HI MOTORWAY) | |
| 014110- A08 | Loans and Advances | 598,595,000 | 598,595,000 | ||
| 014110- A083 | District Government / TMAs | 598,595,000 | 598,595,000 | ||
| Total- | SAUT PHAS MOTO | UL QURAN FM RADIO NETWORK E IV(PESHAWAR KARACHI RWAY) | 598,595,000 | 598,595,000 | |
| 014110 | Total- | Others | 2,920,736,000 | 2,920,736,000 | |
| 0141 | Total- | Transfers (Inter-Governmental) | 168,036,386,000 | 148,194,821,000 | 161,014,510,000 |
| 0142 Trans 014202 Trasfe IB3483 220 KV | fers (Ot r To No HARIP | hers): n-Financial Institutions : UR SUBSTATION (NTDC) | |||
| 014202- A08 | Loans and Advances | 774,000,000 | 1,905,398,000 | 1,100,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 774,000,000 | 1,905,398,000 | 1,100,000,000 | |
| Total- | 220 KV | HARIPUR SUBSTATION (NTDC) | 774,000,000 | 1,905,398,000 | 1,100,000,000 |
| IB3484 220 KV | SWABI SUBSTATION (NTDC) | ||||
| 014202- A08 | Loans and Advances | 1,439,000,000 | 2,117,664,000 | 1,450,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 1,439,000,000 | 2,117,664,000 | 1,450,000,000 | |
| Total- | 220 KV | SWABI SUBSTATION (NTDC) | 1,439,000,000 | 2,117,664,000 | 1,450,000,000 |
| 014202 | Total- | Trasfer To Non-Financial Institutions | 2,213,000,000 | 4,023,062,000 | 2,550,000,000 |
| 0142 | Total- | Transfers (Others) | 2,213,000,000 | 4,023,062,000 | 2,550,000,000 |
| 014 | Total- | Transfers | 170,249,386,000 | 152,217,883,000 | 163,564,510,000 |
| 01 | Total- | General Public Service | 170,249,386,000 | 152,217,883,000 | 163,564,510,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 170,249,386,000 | 152,217,883,000 | 163,564,510,000 | |
| (In | Foreign Exchange) | (928,326,000) | |||
| (Own Resources) | (928,326,000) | ||||
| (Foreign Aid) | |||||
| (In | Local Currency) | (169,321,060,000) | (152,217,883,000) | (163,564,510,000) |
| NO. 129.- FC12D36 DEVELOPMENT LO GOVERNMENT | ANS AND ADVANCES B No of Posts | Y THE FEDERAL 2025-2026 | DEMAND 2025-2026 | S FOR GRANTS 2026-2027 |
|---|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| 01 | General Public Service: | |||||
|---|---|---|---|---|---|---|
| 014 | Transfers: | |||||
| 0142 | Transfers (Others): | |||||
| 014202 | Trasfe | r To No | n-Financial Institutions : | |||
| LO533 ELECT | 9 200 K RICITY | V QUAI TO | D-E-AZAM APPAREL AND BUSINESS | PARK (QABP) GRID | STATION FOR PROVISION OF | |
| 014202 | - A08 | Loans and Advances | 1,118,000,000 | 1,907,938,000 | 1,400,000,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 1,118,000,000 | 1,907,938,000 | 1,400,000,000 | |
| Total- | 200 K | V QUAID-E-AZAM APPAREL AND | 1118000000 | 1907938000 | 1400000000 | |
| BUSINESS PARK (QABP) GRID STATION FOR PROVISION OF ELECTRICITY TO | ,,, | ,,, | ,,, | |||
| LO534 THE FI | 0 500 K EDMC A | V ALLA REA | MA IQBAL INDUSTRIAL CITY FOR 600 | MW DEMAND OF THE SPECIAL ECONOMIC ZONE IN | ||
| 014202 | - A08 | Loans and Advances | 4,440,658,000 | 4,440,658,000 | 1,243,000,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 4,440,658,000 | 4,440,658,000 | 1,243,000,000 | |
| Total- | 500 K CITY F SPECI FIEDM | V ALLAMA IQBAL INDUSTRIAL OR 600 MW DEMAND OF THE AL ECONOMIC ZONE IN THE C AREA | 4,440,658,000 | 4,440,658,000 | 1,243,000,000 | |
| 0 | 14202 | Total- | Trasfer To Non-Financial Institutions | 5,558,658,000 | 6,348,596,000 | 2,643,000,000 |
| 0 | 142 | Total- | Transfers (Others) | 5,558,658,000 | 6,348,596,000 | 2,643,000,000 |
| 0 | 14 | Total- | Transfers | 5,558,658,000 | 6,348,596,000 | 2,643,000,000 |
| 0 | 1 | Total- | General Public Service | 5,558,658,000 | 6,348,596,000 | 2,643,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 5,558,658,000 | 6,348,596,000 | 2,643,000,000 | ||
| SUB-OFFICE, LAHORE |
NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL
| S AND ADVANCES B | Y THE FEDERAL | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
GOVERNMENT
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
| 01 | General Public Service: | ||||
|---|---|---|---|---|---|
| 014 | Transfers: | ||||
| 0142 | Transfers (Others): | ||||
| 014202 PR701 | Trasfe 8 SUPP | r To No LY OF | n-Financial Institutions : POWER TO RASHAKAI ECONOMIC Z | ONE KPK | |
| 014202 | - A08 | Loans and Advances | 314,560,000 | 314,560,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 314,560,000 | 314,560,000 | |
| Total- | SUPPLY OF POWER TO RASHAKAI | 314,560,000 | 314,560,000 | ||
| PR701 | 9 SUPP | ECON LY OF | OMIC ZONE KPK POWER TO HATTAR SPECIAL ECON | OMIC ZONE KPK | |
| 014202 | - A08 | Loans and Advances | 174,615,000 | 174,615,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 174,615,000 | 174,615,000 | |
| Total- | SUPPLY OF POWER TO HATTAR SPECIAL ECONOMIC ZONE KPK | 174,615,000 | 174,615,000 | ||
| 0 | 14202 | Total- | Trasfer To Non-Financial | 489,175,000 | 489,175,000 |
| Institutions | |||||
| 0 | 142 | Total- | Transfers (Others) | 489,175,000 | 489,175,000 |
| 0 | 14 | Total- | Transfers | 489,175,000 | 489,175,000 |
| 0 | 1 | Total- | General Public Service | 489,175,000 | 489,175,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | 489,175,000 | 489,175,000 |
NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL
DEMANDS FOR GRANTS
GOVERNMENT
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 | General Public Service: | |||||
|---|---|---|---|---|---|---|
| 014 | Transfers: | |||||
| 0142 | Transfers (Others): | |||||
| 014202 HD020 | Trasfe 1 INSTA | r To No LLATI | n-Financial Institutions : ON OF 2X600 MW (NET) COAL FIRED | POWER PROJECT JAMSHORO (GENCO-I) | ||
| 014202 | - A08 | Loans and Advances | 2,675,000,000 | 75,000,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 2,675,000,000 | 75,000,000 | ||
| Total- | INSTA COAL JAMS | LLATION OF 2X600 MW (NET) FIRED POWER PROJECT HORO (GENCO-I) | 2,675,000,000 | 75,000,000 | ||
| KA138 | 6 500 K | V MATIARI-MORO-R.Y.KHAN T/L | ||||
| 014202 | - A05 | Grants, Subsidies and Write off Loans | 370,868,000 | |||
| 014202 | - A052 | Grants Domestic | 370,868,000 | |||
| 014202 | - A08 | Loans and Advances | 700,000,000 | 700,000,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 700,000,000 | 700,000,000 | ||
| Total- | 500 KV | MATIARI-MORO-R.Y.KHAN T/L | 700,000,000 | 700,000,000 | 370,868,000 | |
| 0 | 14202 | Total- | Trasfer To Non-Financial Institutions | 3,375,000,000 | 775,000,000 | 370,868,000 |
| 0 | 142 | Total- | Transfers (Others) | 3,375,000,000 | 775,000,000 | 370,868,000 |
| 0 | 14 | Total- | Transfers | 3,375,000,000 | 775,000,000 | 370,868,000 |
| 0 | 1 | Total- | General Public Service | 3,375,000,000 | 775,000,000 | 370,868,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 3,375,000,000 | 775,000,000 | 370,868,000 |
| NO. 12 | 9.- FC1 | 2D36 D G | EVELOPMENT LOANS AND ADVANCES BY THE FEDERA OVERNMENT | L DEMA | NDS FOR GRANTS |
|---|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 2025-2026 Budget | 2025-2026 Revised | 2026-2027 Budget | |||
| Estimate | Estimate | Estimate | |||
| 01 | General Publi | Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB- c Service: | Rs OFFICE, QUETTA | Rs | |
| 014 | Transfers: | ||||
| 0142 | Transfers (Others): | ||||
| 014202 QA410 | Trasfe 1 CONS | r To No TRUCT | n-Financial Institutions : ION OF 132 KV GRID STATION ATKHAN MEHTERZAI WIT | H ALLIED T/LINE | |
| 014202 | - A08 | Loan | s and Advances 86,000,000 | 86,000,000 | |
| 014202 | - A085 | Loan | s to Non Financial Institutions 86,000,000 | 86,000,000 | |
| Total- | CONS STATI ALLIE | TRUCTION OF 132 KV GRID ON ATKHAN MEHTERZAI WITH D T/LINE 86,000,000 | 86,000,000 | ||
| QA410 PANJG | 4 INTER OOR G | CONNECTION OF ISOLATED MAKRAN NETWORK AT BASIMA /STATION | VIA NAG G/STATION | FROM | |
| 014202 | - A08 | Loan | s and Advances 4,000,000,000 | 4,000,000,000 | 2,632,000,000 |
| 014202 | - A085 | Loan | s to Non Financial Institutions 4,000,000,000 | 4,000,000,000 | 2,632,000,000 |
| Total- | INTER MAKR NAG G G/STA | CONNECTION OF ISOLATED AN NETWORK AT BASIMA VIA /STATION FROM PANJGOOR TION 4,000,000,000 | 4,000,000,000 | 2,632,000,000 | |
| 0 | 14202 | Total- | Trasfer To Non-Financial Institutions 4,086,000,000 | 4,086,000,000 | 2,632,000,000 |
| 0 | 142 | Total- | Transfers (Others) 4,086,000,000 | 4,086,000,000 | 2,632,000,000 |
| 0 | 14 | Total- | Transfers 4,086,000,000 | 4,086,000,000 | 2,632,000,000 |
| 0 | 1 | Total- | General Public Service 4,086,000,000 | 4,086,000,000 | 2,632,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 4,086,000,000 | 4,086,000,000 | 2,632,000,000 | ||
| TOTAL | - DEMAND 183,758,219,000 | 163,916,654,000 | 169,210,378,000 | ||
| (In For | eign Exchange) (928,326,000) | ||||
| (Own R | esources) (928,326,000) | ||||
| (Foreign Aid) | |||||
| (In Loc | al Currency) (182,829,893,000) _________________ | (163,916,654,000) _________________ | (169,210,378,000) ________________ |
DEMANDS FOR GRANTS
NO. 130.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL
GOVERNMENT
DEMAND NO. 130 ( FC12E14 / FC15E14 )
EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 for EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT. Total Rs. 609,608,690,000 (Charged) Rs. 607,308,690,000 (Voted) Rs. 2,300,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE AND REVENUE .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 |
| Total | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 | |
| (Charged) | 774,953,280,000 | 774,953,280,000 | 607,308,690,000 | |
| (Voted) | 2,100,000,000 _________________ | 2,100,000,000 _________________ | 2,300,000,000 _______________ | |
| OBJECT CLASSIFICATION | ||||
| A08 | Loans and Advances | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 |
| (Charged) | 774,953,280,000 | 774,953,280,000 | 607,308,690,000 | |
| (Voted) | 2,100,000,000 | 2,100,000,000 | 2,300,000,000 | |
| Total | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 | |
| (Charged) | 774,953,280,000 | 774,953,280,000 | 607,308,690,000 | |
| (Voted) | 2,100,000,000 | 2,100,000,000 | 2,300,000,000 | |
| (In Foreign Exchange) | _________________ (777,053,280,000) | _________________ (777,053,280,000) | ________________ (609,608,690,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (777,053,280,000) _________________ | (777,053,280,000) _________________ | (609,608,690,000) ________________ |
NO. 130.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | ||
|---|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | ||||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0141 | Transfers (Inter-Governmental): | ||||
| 014101 | TO PROVINCES : | ||||
| IB3907 | AJK BLOCK ALLOCATION (FOREIGN) | ||||
| 014101 | - A08 | Loans and Advances | 1,000,000,000 | 1,000,000,000 | 1,000,000,000 |
| 014101 | - A085 | Loans to Non Financial Institutions | 1,000,000,000 | 1,000,000,000 | 1,000,000,000 |
| Total- | AJK BLOCK ALLOCATION (FOREIGN) | 1,000,000,000 | 1,000,000,000 | 1,000,000,000 | |
| (In Foreign Exchange) | (1,000,000,000) | (1,000,000,000) | (1,000,000,000) | ||
| (Foreign Aid) | (1,000,000,000) | (1,000,000,000) | (1,000,000,000) | ||
| IB3908 | GB BL | _ OCK ALLOCATION (FOREIGN) | _________________ | ||
| 014101 | - A08 | Loans and Advances | 500,000,000 | 500,000,000 | 300,000,000 |
| 014101 | - A085 | Loans to Non Financial Institutions | 500,000,000 | 500,000,000 | 300,000,000 |
| Total- | GB BLOCK ALLOCATION (FOREIGN) | 500,000,000 | 500,000,000 | 300,000,000 | |
| (In Foreign Exchange) | (500,000,000) | (500,000,000) | (300,000,000) | ||
| (Foreign Aid) | (500,000,000) | (500,000,000) | (300,000,000) | ||
| ID8871 | PUNJA | _ B PROGRAMME LOAN | _________________ | ||
| 014101 | - A08 | Loans and Advances | 53,209,200,000 | 53,209,200,000 | 49,665,980,000 |
| (Charged) | 53,209,200,000 | 53,209,200,000 | 49,665,980,000 | ||
| 014101 | - A082 | Provinces | 53,209,200,000 | 53,209,200,000 | 49,665,980,000 |
| (Charged) | 53,209,200,000 | 53,209,200,000 | 49,665,980,000 | ||
| Total- | PUNJAB PROGRAMME LOAN | 53,209,200,000 | 53,209,200,000 | 49,665,980,000 | |
| (In Foreign Exchange) | (53,209,200,000) | (53,209,200,000) | (49,665,980,000) | ||
| (Foreign Aid) | (53,209,200,000) | (53,209,200,000) | (49,665,980,000) | ||
| ID8872 | SINDH | _ PROGRAMME LOAN | _________________ | ||
| 014101 | - A08 | Loans and Advances | 5,800,000,000 | ||
| (Charged) | 5,800,000,000 | ||||
| 014101 | - A082 | Provinces | 5,800,000,000 | ||
| (Charged) | 5,800,000,000 | ||||
| Total- | SINDH PROGRAMME LOAN | 5,800,000,000 | |||
| (In Foreign Exchange) | (5,800,000,000) | ||||
| (Foreign Aid) | (5,800,000,000) | ||||
| ID8873 | KPK PROGRAMME LOAN | ||||
| 014101 | - A08 | Loans and Advances | 35,223,400,000 | 35,223,400,000 | 27,245,500,000 |
| (Charged) | 35,223,400,000 | 35,223,400,000 | 27,245,500,000 | ||
| 014101 | - A082 | Provinces | 35,223,400,000 | 35,223,400,000 | 27,245,500,000 |
NO. 130.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE
DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| (Charged) | 35,223,400,000 | 35,223,400,000 | 27,245,500,000 | |
|---|---|---|---|---|
| Total- | KPK PROGRAMME LOAN | 35,223,400,000 | 35,223,400,000 | 27,245,500,000 |
| (In Foreign Exchange) | (35,223,400,000) | (35,223,400,000) | (27,245,500,000) | |
| (Foreign Aid) | (35,223,400,000) | (35,223,400,000) | (27,245,500,000) | |
| ID8986 SINDH | ||||
| 014101- A08 | Loans and Advances | 359,616,730,000 | 359,616,730,000 | 252,005,910,000 |
| (Charged) | 359,616,730,000 | 359,616,730,000 | 252,005,910,000 | |
| 014101- A082 | Provinces | 359,616,730,000 | 359,616,730,000 | 252,005,910,000 |
| (Charged) | 359,616,730,000 | 359,616,730,000 | 252,005,910,000 | |
| Total- | SINDH | 359,616,730,000 | 359,616,730,000 | 252,005,910,000 |
| (In Foreign Exchange) | (359,616,730,000) | (359,616,730,000) | (252,005,910,000) | |
| (Foreign Aid) | (359,616,730,000) | (359,616,730,000) | (252,005,910,000) | |
| ID8987 PUNJAB | ||||
| 014101- A08 | Loans and Advances | 123,824,490,000 | 123,824,490,000 | 139,733,600,000 |
| (Charged) | 123,824,490,000 | 123,824,490,000 | 139,733,600,000 | |
| 014101- A082 | Provinces | 123,824,490,000 | 123,824,490,000 | 139,733,600,000 |
| (Charged) | 123,824,490,000 | 123,824,490,000 | 139,733,600,000 | |
| Total- | PUNJAB | 123,824,490,000 | 123,824,490,000 | 139,733,600,000 |
| (In Foreign Exchange) | (123,824,490,000) | (123,824,490,000) | (139,733,600,000) | |
| (Foreign Aid) | (123,824,490,000) | (123,824,490,000) | (139,733,600,000) | |
| ID8988 KHYBER PAKHTUNKHWA | ||||
| 014101- A08 | Loans and Advances | 170,802,460,000 | 170,802,460,000 | 104,324,600,000 |
| (Charged) | 170,802,460,000 | 170,802,460,000 | 104,324,600,000 | |
| 014101- A082 | Provinces | 170,802,460,000 | 170,802,460,000 | 104,324,600,000 |
| (Charged) | 170,802,460,000 | 170,802,460,000 | 104,324,600,000 | |
| Total- | KHYBER PAKHTUNKHWA | 170,802,460,000 | 170,802,460,000 | 104,324,600,000 |
| (In Foreign Exchange) | (170,802,460,000) | (170,802,460,000) | (104,324,600,000) | |
| (Foreign Aid) | (170,802,460,000) | (170,802,460,000) | (104,324,600,000) | |
| ID8989 BALOCHISTAN | ||||
| 014101- A08 | Loans and Advances | 32,277,000,000 | 32,277,000,000 | 28,533,100,000 |
| (Charged) | 32,277,000,000 | 32,277,000,000 | 28,533,100,000 | |
| 014101- A082 | Provinces | 32,277,000,000 | 32,277,000,000 | 28,533,100,000 |
| (Charged) | 32,277,000,000 | 32,277,000,000 | 28,533,100,000 | |
| Total- | BALOCHISTAN | 32,277,000,000 | 32,277,000,000 | 28,533,100,000 |
| NO. 130.- FC1 | 2E14 EXTERNAL DEVELOPMENT LOANS AN FEDERAL GOVERNMENT | D ADVANCES BY T | HE DEMA | NDS FOR GRANTS |
|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget | 2025-2026 Revised | 2026-2027 Budget | |
| Estimate | Estimate | Estimate | ||
| ACCOUNTANT GENERAL | Rs PAKISTAN REVE | Rs NUES | Rs | |
| (In Foreign Exchange) | (32,277,000,000) | (32,277,000,000) | (28,533,100,000) | |
| (Foreign Aid) | (32,277,000,000) | (32,277,000,000) | (28,533,100,000) | |
| 014101 | Total- TO PROVINCES | ________________ 776,453,280,000 | __________________ 776,453,280,000 | ________________ 608,608,690,000 |
| 014110 OTHERS : | ||||
| IB0688 40 MW | DOWARIAN | |||
| 014110- A08 | Loans and Advances | 10,753,000 | 10,753,000 | 199,743,000 |
| 014110- A086 | Loans to Others | 10,753,000 | 10,753,000 | 199,743,000 |
| Total- | 40 MW DOWARIAN | 10,753,000 | 10,753,000 | 199,743,000 |
| (In Foreign Exchange) | (10,753,000) | (10,753,000) | (199,743,000) | |
| (Foreign Aid) | (10,753,000) | (10,753,000) | (199,743,000) | |
| ID8222 48 MW | JAGRAN HYDRO POWER PROJECT AJK | |||
| 014110- A08 | Loans and Advances | 589,247,000 | 589,247,000 | 800,257,000 |
| 014110- A086 | Loans to Others | 589,247,000 | 589,247,000 | 800,257,000 |
| Total- | 48 MW JAGRAN HYDRO POWER PROJECT AJK | 589,247,000 | 589,247,000 | 800,257,000 |
| (In Foreign Exchange) | (589,247,000) | (589,247,000) | (800,257,000) | |
| (Foreign Aid) | (589,247,000) | (589,247,000) | (800,257,000) | |
| 014110 | Total- OTHERS | ________________ 600,000,000 | _________________ 600,000,000 | ________________ 1,000,000,000 |
| 0141 | Total- Transfers (Inter-Governmental) | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 |
| 014 | Total- Transfers | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 |
| 01 | Total- General Public Service | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 | |
| (Charged) | 774,953,280,000 | 774,953,280,000 | 607,308,690,000 | |
| (Voted) | 2,100,000,000 | 2,100,000,000 | 2,300,000,000 | |
| (In Foreign Exchange) (Own Resources) | (777,053,280,000) | (777,053,280,000) | (609,608,690,000) | |
| (Foreign Aid) | (777,053,280,000) | (777,053,280,000) | (609,608,690,000) | |
| TOTAL - DEMAND | 777,053,280,000 | 777,053,280,000 | 609,608,690,000 | |
| (Charged) | 774,953,280,000 | 774,953,280,000 | 607,308,690,000 | |
| (Voted) | 2,100,000,000 | 2,100,000,000 | 2,300,000,000 | |
| (In Foreign Exchange) | ________________ (777,053,280,000) | __________________ (777,053,280,000) | ________________ (609,608,690,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (777,053,280,000) ________________ | (777,053,280,000) __________________ | (609,608,690,000) ________________ |
SECTION V
MINISTRY OF HOUSING AND WORKS
2026-2027 Budget Estimate (Rupees in Thousand) Demand presented on behalf of the Ministry of Housing and Works Development Expenditure on Capital Account 131. Capital Outlay on Civil Works 16,394,700 Total : 16,394,700
NO. 131.- CAPITAL OUTLAY ON CIVIL WORKS
DEMANDS FOR GRANTS
DEMAND NO. 131 ( FC12C28 )
CAPITAL OUTLAY ON CIVIL WORKS
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 for CAPITAL OUTLAY ON CIVIL
WORKS.
Voted Rs. 16,394,700,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF HOUSING AND WORKS .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 045 | Construction and Transport | 15,005,801,000 | 20,471,720,000 | 16,394,700,000 |
| Total | 15,005,801,000 | 20,471,720,000 | 16,394,700,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 151,492,000 | 132,472,000 | |
| A05 | Grants, Subsidies and Write off Loans | 185,000,000 | 185,000,000 | |
| A12 | Civil works | 14,669,309,000 | 20,154,248,000 | 16,394,700,000 |
| Total | 15,005,801,000 | 20,471,720,000 | 16,394,700,000 |
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | ||
|---|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 04 | Economic Affairs: | ||||
| 045 | Construction and Transport: | ||||
| 0457 | Construction (Works): | ||||
| 045702 IB2244 SHAHE | Buildi REPLA ED-E-M | ngs and Structures : CEMENT OF OLD AND UNSERVICEABLE ELEV ILLAT SECRETARIAT | ATORS WITH NEW | ELEVATORS AT | |
| 045702 | - A12 | Civil works | 53,631,000 | 53,631,000 | 101,000 |
| 045702 | - A124 | Building and Structures | 53,631,000 | 53,631,000 | 101,000 |
| Total- | REPLACEMENT OF OLD AND | 53,631,000 | 53,631,000 | 101,000 | |
| IB3250 | CONST | UNSERVICEABLE ELEVATORS WITH NEW ELEVATORS AT SHAHEED-E-MILLAT SECRETARIAT RUCTION OF OFFICE BUILDING OF IB IN DIPL | OMATIC ENCLAVE | ISLAMABAD | |
| 045702 | - A12 | Civil works | 100,000,000 | 100,000,000 | 100,000,000 |
| 045702 | - A124 | Building and Structures | 100,000,000 | 100,000,000 | 100,000,000 |
| Total- | CONSTRUCTION OF OFFICE BUILDING | 100,000,000 | 100,000,000 | 100,000,000 | |
| IB3274 | CONST | OF IB IN DIPLOMATIC ENCLAVE ISLAMABAD RUCTION OF 12 NOS. APARTMENTS IN MINIST | ER'S ENCLAVE ISLAMABAD | ||
| 045702 | - A12 | Civil works | 132,722,000 | 132,722,000 | 53,080,000 |
| 045702 | - A124 | Building and Structures | 132,722,000 | 132,722,000 | 53,080,000 |
| Total- | CONSTRUCTION OF 12 NOS. | 132,722,000 | 132,722,000 | 53,080,000 | |
| IB3621 PAKIS | CONST TAN | APARTMENTS IN MINISTER'S ENCLAVE ISLAMABAD RUCTION OF ELECTION ACADEMY AND OTHE | R OFFICES OF ELECTION COMMISSION OF | ||
| 045702 | - A12 | Civil works | 100,000,000 | 100,000,000 | 100,000,000 |
| 045702 | - A124 | Building and Structures | 100,000,000 | 100,000,000 | 100,000,000 |
| Total- | CONSTRUCTION OF ELECTION | 100,000,000 | 100,000,000 | 100,000,000 | |
| ACADEMY AND OTHER OFFICES OF ELECTION COMMISSION OF PAKISTAN | |||||
| 0 | 45702 | Total- Buildings and Structures | 386,353,000 | 386,353,000 | 253,181,000 |
| 045720 | Others | : |
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3527 REFUR | BISHMENT AND REHABILITATION OF GOVERNMENT OWNED BUILDINGS AT ISLAMA | BAD | ||
|---|---|---|---|---|
| 045720- A12 | Civil works | 90,000,000 | 90,000,000 | 100,000,000 |
| 045720- A124 | Building and Structures | 90,000,000 | 90,000,000 | 100,000,000 |
| Total- | REFURBISHMENT AND | 90,000,000 | 90,000,000 | 100,000,000 |
| IB3528 REFUR COLONY ISLA | REHABILITATION OF GOVERNMENT OWNED BUILDINGS AT ISLAMABAD BISHMENT OF EXISTING FACILITIES & PRO MABAD | VISION OF ADDITION | AL FACILITIES AT P | M STAFF |
| 045720- A12 | Civil works | 55,000,000 | 55,000,000 | 80,000,000 |
| 045720- A124 | Building and Structures | 55,000,000 | 55,000,000 | 80,000,000 |
| Total- | REFURBISHMENT OF EXISTING | 55,000,000 | 55,000,000 | 80,000,000 |
| FACILITIES & PROVISION OF ADDITIONAL FACILITIES AT PM STAFF COLONY ISLAMABAD | ||||
| IB3529 REFUR | BISHMENT OF PM OFFICE ISLAMABAD | |||
| 045720- A12 | Civil works | 65,000,000 | 65,000,000 | 153,380,000 |
| 045720- A124 | Building and Structures | 65,000,000 | 65,000,000 | 153,380,000 |
| Total- | REFURBISHMENT OF PM OFFICE ISLAMABAD | 65,000,000 | 65,000,000 | 153,380,000 |
| 045720 | Total- Others | 210,000,000 | 210,000,000 | 333,380,000 |
| 0457 | Total- Construction (Works) | 596,353,000 | 596,353,000 | 586,561,000 |
| 045 | Total- Construction and Transport | 596,353,000 | 596,353,000 | 586,561,000 |
| 04 | Total- Economic Affairs | 596,353,000 | 596,353,000 | 586,561,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 596,353,000 | 596,353,000 | 586,561,000 |
| NO. 13 | 1.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|---|
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget Estimate | 2025-2026 Revised Estimate | 2026-2027 Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN RE | VENUES SUB-OFFICE, KARACHI | ||||
| 04 | Economic Affairs: | ||||
| 045 | Construction and Transport: | ||||
| 0452 | Road | Transport: | |||
| 045202 | Highways.Roads and Bridges : | ||||
| KA139 | 2 GREE | LINE BUS RAPID TRANSPORT SYSTEM (BRTS) | KARACHI | ||
| 045202 | - A12 | Civil works | 3,000,000,000 | 2,760,560,000 | 1,984,049,000 |
| 045202 | - A121 | Roads Highways and Bridges | 3,000,000,000 | 2,760,560,000 | |
| 045202 | - A124 | Building and Structures | 1,984,049,000 | ||
| Total- | GREELINE BUS RAPID TRANSPORT | 3,000,000,000 | 2,760,560,000 | 1,984,049,000 | |
| KA139 TRANS | 3 OPER PORT | SYSTEM (BRTS) KARACHI ATIONLIZATION OF GREENLINE BRTS AND IN SYSTEM | STALLATION OF INTEGRATED INTELLIGENT | ||
| 045202 | - A05 | Grants, Subsidies and Write off Loans | 185,000,000 | 185,000,000 | |
| 045202 | - A052 | Grants Domestic | 185,000,000 | 185,000,000 | |
| KA139 | Total- 4 DEVE | OPERATIONLIZATION OF GREENLINE BRTS AND INSTALLATION OF INTEGRATED INTELLIGENT TRANSPORT SYSTEM LOPMENT SCHEMES UNDER PMS PROGRAMS | 185,000,000 IN SINDH HYDER | 185,000,000 ABAD & MIRPURKHA | S DIVISIONS |
| 045202 | - A03 | Operating Expenses | 32,575,000 | 32,575,000 | |
| 045202 | - A039 | General | 32,575,000 | 32,575,000 | |
| 045202 | - A12 | Civil works | 22,425,000 | 22,425,000 | 200,000,000 |
| 045202 | - A124 | Building and Structures | 22,425,000 | 22,425,000 | 200,000,000 |
| Total- | DEVELOPMENT SCHEMES UNDER PMS | 55,000,000 | 55,000,000 | 200,000,000 | |
| PROGRAMS IN SINDH HYDERABAD & MIRPURKHAS DIVISIONS | |||||
| KA139 SYSTE | 5 IMPR M AT | OVEMENT /REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER AND SEWERAGE | |||
| 045202 | - A03 | Operating Expenses | 32,575,000 | 32,575,000 | |
| 045202 | - A039 | General | 32,575,000 | 32,575,000 | |
| 045202 | - A12 | Civil works | 37,425,000 | 37,425,000 | 345,260,000 |
| 045202 | - A124 | Building and Structures | 37,425,000 | 37,425,000 | 345,260,000 |
| Total- | IMPROVEMENT /REHABILITATION OF | 70,000,000 | 70,000,000 | 345,260,000 | |
| DIFFERENT ROADS/STREETS | |||||
| INCLUDING WATER AND SEWERAGE SYSTEM AT |
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI KA1396 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS / STREET INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS
| 045202- A03 | Operating Expenses | 32,575,000 | 27,114,000 | |
|---|---|---|---|---|
| 045202- A039 | General | 32,575,000 | 27,114,000 | |
| 045202- A12 | Civil works | 42,425,000 | 17,885,000 | 45,000,000 |
| 045202- A124 | Building and Structures | 42,425,000 | 17,885,000 | 45,000,000 |
| Total- | IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS / STREET INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS | 75,000,000 | 44,999,000 | 45,000,000 |
KA1397 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS / STREETS INCLUDING WATER SEWERAGE SYSTEM IN
| 045202- A03 | Operating Expenses | 6,000,000 | 900,000 |
|---|---|---|---|
| 045202- A039 | General | 6,000,000 | 900,000 |
| 045202- A12 | Civil works | 69,000,000 | 3,476,000 |
| 045202- A124 | Building and Structures | 69,000,000 | 3,476,000 |
| Total- | IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS / STREETS INCLUDING WATER SEWERAGE SYSTEM IN | 75,000,000 | 4,376,000 |
| KA1398 IMPROVEMENT/REHABILITATION OF DIFFERENT | ROADS/ STREETS INCLUDING WATER & SEWERAGE | ||
| SYSTEM IN VARIOUS UNION |
| 045202- A03 | Operating Expenses | 3,000,000 | 2,085,000 | |
|---|---|---|---|---|
| 045202- A039 | General | 3,000,000 | 2,085,000 | |
| 045202- A12 | Civil works | 47,000,000 | 32,915,000 | 50,000,000 |
| 045202- A124 | Building and Structures | 47,000,000 | 32,915,000 | 50,000,000 |
| Total- | IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/ STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION | 50,000,000 | 35,000,000 | 50,000,000 |
| KA1399 IMPROVEMENT / REHABILITATION OF ROADS / ST VARIOUS UNION COUNCIL OF | REETS INCLUDING WATER & SEWERAGE | SYSTEM IN | ||
| 045202- A03 | Operating Expenses | 4,500,000 |
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 045202- A039 | General | 4,500,000 | |
|---|---|---|---|
| 045202- A12 | Civil works | 70,500,000 | |
| 045202- A124 | Building and Structures | 70,500,000 | |
| Total- KA1400 PROV OF NAWABSH | IMPROVEMENT / REHABILITATION OF ROADS / STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION COUNCIL OF IDING WATER SUPPLY SEWERAGE LINES CC AH MIRPURKHAS | 75,000,000 TOPPING SOLAR LIG | HTS IN VARIOUS WARDS/UCS |
| 045202- A03 | Operating Expenses | 2,400,000 | 2,400,000 |
| 045202- A039 | General | 2,400,000 | 2,400,000 |
| 045202- A12 | Civil works | 37,600,000 | 37,600,000 35,688,000 |
| 045202- A124 | Building and Structures | 37,600,000 | 37,600,000 35,688,000 |
| Total- | PROVIDING WATER SUPPLY | 40,000,000 | 40,000,000 35,688,000 |
| SEWERAGE LINES CC TOPPING SOLAR LIGHTS IN VARIOUS WARDS/UCS OF NAWABSHAH MIRPURKHAS | |||
| KA1401 REHA SCHEME) | BILITATION/CONSTRUCTION OF ROADS AT LATIFABAD AT HYDERABAD CITY(06 NUMBER | ||
| 045202- A03 | Operating Expenses | 5,100,000 | 10,294,000 |
| 045202- A039 | General | 5,100,000 | 10,294,000 |
| 045202- A12 | Civil works | 79,900,000 | 159,806,000 200,000,000 |
| 045202- A124 | Building and Structures | 79,900,000 | 159,806,000 200,000,000 |
| Total- | REHABILITATION/CONSTRUCTION OF | 85,000,000 | 170,100,000 200,000,000 |
| ROADS AT LATIFABAD AT HYDERABAD CITY(06 NUMBER SCHEME) | |||
| KA1402 CONSTRUCTION OF CAR BAZAR UC .06 DISTRICT CENTRAL KARACHI | |||
| 045202- A03 | Operating Expenses | 4,800,000 | |
| 045202- A039 | General | 4,800,000 | |
| 045202- A12 | Civil works | 75,200,000 | |
| 045202- A124 | Building and Structures | 75,200,000 | |
| Total- | CONSTRUCTION OF CAR BAZAR UC .06 | 80,000,000 | |
| DISTRICT CENTRAL KARACHI |
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1403 CONSTRUCTION OF PAK ASIAN FOOTBALL GROUND UC 07 DISTRICT CENTRAL KARACHI
| 045202- A03 | Operating Expenses | 5,967,000 | ||
|---|---|---|---|---|
| 045202- A039 | General | 5,967,000 | ||
| 045202- A12 | Civil works | 93,481,000 | ||
| 045202- A124 | Building and Structures | 93,481,000 | ||
| Total- KA1411 CONS KOHSAR PUM | CONSTRUCTION OF PAK ASIAN FOOTBALL GROUND UC 07 DISTRICT CENTRAL KARACHI TRUCTION OF WATER SUPPLY LINE (24 INC PING STATION | 99,448,000 H) DIA FROM HUSSA | INABAD FILTER PLANT TO | |
| 045202- A03 | Operating Expenses | 6,200,000 | 11,386,000 | |
| 045202- A039 | General | 6,200,000 | 11,386,000 | |
| 045202- A12 | Civil works | 73,800,000 | 153,586,000 | 250,000,000 |
| 045202- A124 | Building and Structures | 73,800,000 | 153,586,000 | 250,000,000 |
| Total- | CONSTRUCTION OF WATER SUPPLY LINE (24 INCH) DIA FROM HUSSAINABAD FILTER PLANT TO KOHSAR PUMPING STATION | 80,000,000 | 164,972,000 | 250,000,000 |
KA1412 REHABILITATION OF INFRASTRUCTURE WORKS (CONSTRUCTION OF ROAD WATER LINE SEWERAGE PARKS AND PLAYGROUND
| 045202- A03 | Operating Expenses | 5,000,000 | 2,343,000 | |
|---|---|---|---|---|
| 045202- A039 | General | 5,000,000 | 2,343,000 | |
| 045202- A12 | Civil works | 75,000,000 | 34,117,000 | 245,457,000 |
| 045202- A124 | Building and Structures | 75,000,000 | 34,117,000 | 245,457,000 |
| Total- | REHABILITATION OF | 80,000,000 | 36,460,000 | 245,457,000 |
| KA1413 REHA SUPPLY SEW | INFRASTRUCTURE WORKS (CONSTRUCTION OF ROAD WATER LINE SEWERAGE PARKS AND PLAYGROUND BILITATION OF INFRASTRUCTURE WORKS( ERAGE PUBLIC | CONSTRUCTION OF ROADS FOOT PATH | S WATER | |
| 045202- A03 | Operating Expenses | 5,200,000 | 5,200,000 | |
| 045202- A039 | General | 5,200,000 | 5,200,000 | |
| 045202- A12 | Civil works | 74,800,000 | 74,800,000 | |
| 045202- A124 | Building and Structures | 74,800,000 | 74,800,000 | |
| Total- | REHABILITATION OF | 80,000,000 | 80,000,000 | |
| INFRASTRUCTURE WORKS(CONSTRUCTION OF ROADS FOOT PATHS WATER SUPPLY SEWERAGE PUBLIC |
| NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1414 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS WATER SUPPLY SEWERAGE PARKS AND PLAYGROUNDS IN
| 045202- A03 | Operating Expenses | 5,600,000 | 5,600,000 | |
|---|---|---|---|---|
| 045202- A039 | General | 5,600,000 | 5,600,000 | |
| 045202- A12 | Civil works | 74,400,000 | 74,400,000 | 200,000,000 |
| 045202- A124 | Building and Structures | 74,400,000 | 74,400,000 | 200,000,000 |
| Total- | IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS WATER SUPPLY SEWERAGE PARKS AND PLAYGROUNDS IN | 80,000,000 | 80,000,000 | 200,000,000 |
| KA1473 06 NO PROGRAMME | S. DEVELOPMENT SCHEMES UNDER SUSTA SAP | INABLE DEVELOPMENT GOALS ACHIEVEMENT |
| 045202- A12 | Civil works 250,000,000 |
|---|---|
| 045202- A124 | Building and Structures 250,000,000 |
| Total- KA1474 06 NO PROGRAMME | 06 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP 250,000,000 S. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT SAP |
| 045202- A12 | Civil works 250,000,000 |
| 045202- A124 | Building and Structures 250,000,000 |
| Total- KA1475 10 NO PROGRAMME | 06 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP 250,000,000 S. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT SAP FOR |
| 045202- A12 | Civil works 250,000,000 |
| 045202- A124 | Building and Structures 250,000,000 |
| Total- | 10 NOS. DEVELOPMENT SCHEMES 250,000,000 UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR |
| NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1476 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR
| 045202- A12 | Civil works | 250,000,000 |
|---|---|---|
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR | 250,000,000 |
| KA1477 DEVE SAP FOR | LOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME | |
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR | 250,000,000 |
| KA1478 07 NO PROGRAMME | S DEVELOPMENT SCHEMES UNDER SUSTAINABLE DE SAP FOR | VELOPMENT GOALS ACHIEVEMENT |
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | 07 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR | 250,000,000 |
| KA1479 10 NO PROGRAMME | S DEVELOPMENT SCHEMES UNDER SUSTAINABLE DE SAP FOR | VELOPMENT GOALS ACHIEVEMENT |
| 045202- A12 | Civil works | 250,000,000 |
|---|---|---|
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | 10 NOS DEVELOPMENT SCHEMES | 250,000,000 |
| UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME | ||
| SAP FOR |
| NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1480 09 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- 09 NOS DEVELOPMENT SCHEMES 250,000,000 UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR KA1481 10 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- 10 NOS DEVELOPMENT SCHEMES 250,000,000 UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR KA1482 09 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- 09 NOS DEVELOPMENT SCHEMES 250,000,000 UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR KA1483 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- DEVELOPMENT SCHEMES UNDER 250,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR KA1484 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- DEVELOPMENT SCHEMES UNDER 250,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR
| NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI KA1485 07 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
| 045202- A12 | Civil works 250,000,000 |
|---|---|
| 045202- A124 | Building and Structures 250,000,000 |
| Total- | 07 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR 250,000,000 |
| KA1486 08 NO PROGRAMME | S. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT SAP FOR |
| 045202- A12 | Civil works 250,000,000 |
| 045202- A124 | Building and Structures 250,000,000 |
| Total- KA1487 08 NO PROGRAMME | 08 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR 250,000,000 S. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT SAP FOR |
| 045202- A12 | Civil works 250,000,000 |
| 045202- A124 | Building and Structures 250,000,000 |
| Total- | 08 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR 250,000,000 |
| KA1488 10 NO PROGRAMME | S. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT SAP FOR |
| 045202- A12 | Civil works | 250,000,000 |
|---|---|---|
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | 10 NOS. DEVELOPMENT SCHEMES | 250,000,000 |
| UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME | ||
| SAP FOR |
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1489 09 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- 09 NOS. DEVELOPMENT SCHEMES 250,000,000 UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR KA1490 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR BAJAUR FOR THE 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- DEVELOPMENT SCHEMES UNDER 250,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR BAJAUR FOR THE KA1491 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR SHANGLA FOR THE 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- DEVELOPMENT SCHEMES UNDER 250,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR SHANGLA FOR THE
KA1492 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR KOHISTAN UPPER 045202- A12 Civil works 250,000,000 045202- A124 Building and Structures 250,000,000 Total- DEVELOPMENT SCHEMES UNDER 250,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR KOHISTAN UPPER KA1493 06 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR D I 045202- A12 Civil works 190,000,000 045202- A124 Building and Structures 190,000,000 Total- 06 NOS. DEVELOPMENT SCHEMES 190,000,000 UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME SAP FOR D I
| NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1505 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT 045202- A12 Civil works 500,000,000 045202- A124 Building and Structures 500,000,000 Total- DEVELOPMENT SCHEMES UNDER 500,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT KA1506 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT 045202- A12 Civil works 1,000,000,000 045202- A124 Building and Structures 1,000,000,000 Total- DEVELOPMENT SCHEMES UNDER 1,000,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT KA1507 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT 045202- A12 Civil works 50,000,000 045202- A124 Building and Structures 50,000,000 Total- DEVELOPMENT SCHEMES UNDER 50,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT KA1508 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT 045202- A12 Civil works 200,000,000 045202- A124 Building and Structures 200,000,000 Total- DEVELOPMENT SCHEMES UNDER 200,000,000 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1509 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
YEAR 2025-26 DISTRICT
| 045202- A12 | Civil works | 150,000,000 | |
|---|---|---|---|
| 045202- A124 | Building and Structures | 150,000,000 | |
| Total- | DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME YEAR 2025-26 DISTRICT | 150,000,000 | |
| KA1511 KARACHI URBAN INFRASTRUCTURE DEVELOPMENT PACKAGE - II | |||
| 045202- A12 | Civil works | 7,500,000,000 | |
| 045202- A124 | Building and Structures | 7,500,000,000 | |
| Total- | KARACHI URBAN INFRASTRUCTURE DEVELOPMENT PACKAGE - II | 7,500,000,000 | |
| KA1512 HYDERABAD URBAN INFRASTRUCTURE DEVELOPMENT PACKAGE - II | |||
| 045202- A12 | Civil works | 2,500,000,000 | |
| 045202- A124 | Building and Structures | 2,500,000,000 | |
| Total- | HYDERABAD URBAN | 2,500,000,000 | |
| INFRASTRUCTURE DEVELOPMENT PACKAGE - II | |||
| KA1513 NATIONAL IQBAL LIBARARY AND MONUMENT | |||
| 045202- A12 | Civil works | 1,200,000,000 | |
| 045202- A124 | Building and Structures | 1,200,000,000 | |
| Total- | NATIONAL IQBAL LIBARARY AND | 1,200,000,000 | |
| MONUMENT | |||
| KA1514 CONSTRUCTION OF IB OFFICE MITHI RS.50.0 M | |||
| 045202- A12 | Civil works | 50,000,000 | |
| 045202- A124 | Building and Structures | 50,000,000 | |
| Total- | CONSTRUCTION OF IB OFFICE MITHI RS.50.0 M | 50,000,000 | |
| KA1515 CONSTRUCTION OF I B OFFICE SWAT | |||
| 045202- A12 | Civil works | 50,000,000 | |
| 045202- A124 | Building and Structures | 50,000,000 | |
| Total- | CONSTRUCTION OF I B OFFICE SWAT | 50,000,000 |
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI KA1516 REHABILITATION OF MAIN EXISTING NALA FROM STTAR SHAH PARK TO ODIAN PLAZA VIA NISHAT COWK HYDERABAD
| 045202- A12 | Civil works 150,000,000 |
|---|---|
| 045202- A124 | Building and Structures 150,000,000 |
| Total- | REHABILITATION OF MAIN EXISTING 150,000,000 |
| NALA FROM STTAR SHAH PARK TO | |
| ODIAN PLAZA VIA NISHAT COWK | |
| HYDERABAD | |
| KA1517 CONSTRUCTION OF GOVERNMENT GIRLS DEGREE COLLEGE BUILDING & LIBRARY WITH FURNITURE AT | |
| GOVERNMENT BOYS |
| 045202- A12 | Civil works | 100,000,000 |
|---|---|---|
| 045202- A124 | Building and Structures | 100,000,000 |
| Total- | CONSTRUCTION OF GOVERNMENT GIRLS DEGREE COLLEGE BUILDING & LIBRARY WITH FURNITURE AT GOVERNMENT BOYS | 100,000,000 |
| KA1520 REHA SUPPLY-SWE | BILITATION OF INFRASTRUCTURE WORKS (CONST. OF ROAD-FOOTPATH-WATER ARAGE-PUBLIC PARK-PLAY | |
| 045202- A12 | Civil works | 220,000,000 |
| 045202- A124 | Building and Structures | 220,000,000 |
| Total- | REHABILITATION OF | 220,000,000 |
| INFRASTRUCTURE WORKS (CONST. OF | ||
| ROAD-FOOTPATH-WATER | ||
| SUPPLY-SWEARAGE-PUBLIC | ||
| PARK-PLAY |
KA9982 KARACHI URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE
| 045202- A12 | Civil works | 7,500,000,000 | 6,560,690,000 |
|---|---|---|---|
| 045202- A124 | Building and Structures | 7,500,000,000 | 6,560,690,000 |
| Total- | KARACHI URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE | 7,500,000,000 | 6,560,690,000 |
| KA9983 HYDERABAD URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE(REVAMPING AND REHABILIATION) | |||
| 045202- A12 | Civil works | 2,500,000,000 | 2,198,210,000 |
| 045202- A124 | Building and Structures | 2,500,000,000 | 2,198,210,000 |
| Total- | HYDERABAD URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE(REVAMPING AND REHABILIATION) | 2,500,000,000 | 2,198,210,000 |
NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA9984 CONSTRUCTION OF RCC PRE STRESSED BRIDGE MARI SAFDAR SHAH AT SIREN RIVER UC BEHKUND TEHSIL AND DISTRICT
| 045202- A12 | Civil works | 100,000,000 | 150,000,000 | 250,375,000 |
|---|---|---|---|---|
| 045202- A124 | Building and Structures | 100,000,000 | 150,000,000 | 250,375,000 |
| Total- | CONSTRUCTION OF RCC PRE | 100,000,000 | 150,000,000 | 250,375,000 |
| KA9985 CONS TEHSIL AND D | STRESSED BRIDGE MARI SAFDAR SHAH AT SIREN RIVER UC BEHKUND TEHSIL AND DISTRICT TRUCTION OF RCC PRE STRESSED BRIDG ISTRICT | E AT SHAH DA PANJ | A AT SIREN RIVER | UC BEHKUND |
| 045202- A12 | Civil works | 100,000,000 | 150,000,000 | 232,310,000 |
| 045202- A124 | Building and Structures | 100,000,000 | 150,000,000 | 232,310,000 |
| Total- | CONSTRUCTION OF RCC PRE STRESSED BRIDGE AT SHAH DA PANJA AT SIREN RIVER UC BEHKUND TEHSIL AND DISTRICT | 100,000,000 | 150,000,000 | 232,310,000 |
| 045202 | Total- Highways.Roads and Bridges | 14,409,448,000 | 19,875,367,000 | 15,808,139,000 |
| 0452 | Total- Road Transport | 14,409,448,000 | 19,875,367,000 | 15,808,139,000 |
| 045 | Total- Construction and Transport | 14,409,448,000 | 19,875,367,000 | 15,808,139,000 |
| 04 | Total- Economic Affairs | 14,409,448,000 | 19,875,367,000 | 15,808,139,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 14,409,448,000 | 19,875,367,000 | 15,808,139,000 | |
| TOTAL - DEMAND | 15,005,801,000 | 20,471,720,000 | 16,394,700,000 |
SECTION VI
MINISTRY OF INDUSTRIES AND PRODUCTION
2026-2027 Budget Estimate (Rupees in Thousand)
Demands presented on behalf of the Ministry of Industries and Production Development Expendiutre on Capital Account.
| 132. | Capital Outlay on Industrial Development | Total : | 6,657,650 6,657,650 |
|---|
NO. 132.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS DEMAND NO. 132 ( FC12C32 )
CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.
Voted
Rs. 6,657,650,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF INDUSTRIES AND PRODUCTION .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 044 | Mining and Manufacturing | 1,904,281,000 | 1,713,853,000 | 6,657,650,000 |
| Total | 1,904,281,000 | 1,713,853,000 | 6,657,650,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 149,759,000 | 149,759,000 | 244,820,000 |
| A011 | Pay | 149,759,000 | 149,759,000 | 244,820,000 |
| A011- | 1 Pay of Officers | (95,048,000) | (95,048,000) | (164,360,000) |
| A011- | 2 Pay of Other Staff | (54,711,000) | (54,711,000) | (80,460,000) |
| A03 | Operating Expenses | 165,389,000 | 119,087,000 | 350,691,000 |
| A05 | Grants, Subsidies and Write off Loans | 235,970,000 | 233,520,000 | |
| A09 | Physical Assets | 468,371,000 | 387,171,000 | 2,413,808,000 |
| A12 | Civil works | 884,792,000 | 824,316,000 | 3,647,331,000 |
| A13 | Repairs and Maintenance | 1,000,000 | ||
| Total | 1,904,281,000 | 1,713,853,000 | 6,657,650,000 |
NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget Estimate | 2025-2026 Revised Estimate | 2026-2027 Budget Estimate | |||
|---|---|---|---|---|---|---|
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL P | AKISTAN REVENUES | |||||
| 04 | Economic Affairs: | |||||
| 044 | Mining | and Manufacturing: | ||||
| 0441 | Manufacturing: | |||||
| 044101 IB5262 | Support for Industrial Development : SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENG | THENING THE ENGINEERING INDUSTRY | ||||
| 044101 | - A01 | Employees Related Expenses | 74,000,000 | 74,000,000 | 108,000,000 | |
| 044101 | - A011 | Pay | 19 | 74,000,000 | 74,000,000 | 108,000,000 |
| 044101 | - A011- | 1 Pay | of Officers (13) | (56,000,000) | (56,000,000) | (96,000,000) |
| 044101 | - A011- | 2 Pay | of Other Staff (6) | (18,000,000) | (18,000,000) | (12,000,000) |
| 044101 | - A03 | Operating Expenses | 70,500,000 | 33,000,000 | 149,237,000 | |
| 044101 | - A032 | Communications | 500,000 | 240,000 | 500,000 | |
| 044101 | - A037 | Consultancy and Contractual Work | 25,500,000 | 9,375,000 | 68,368,000 | |
| 044101 | - A038 | Travel & Transportation | 6,500,000 | 5,125,000 | 6,000,000 | |
| 044101 | - A039 | General | 38,000,000 | 18,260,000 | 74,369,000 | |
| 044101 | - A09 | Physical Assets | 5,500,000 | 500,000 | ||
| 044101 | - A092 | Computer Equipment | 4,500,000 | 500,000 | ||
| 044101 | - A097 | Purchase of Furniture and Fixture | 1,000,000 | |||
| Total- | SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENGTHENING THE ENGINEERING INDUSTRY | 150,000,000 | 107,500,000 | 257,237,000 | ||
| 0 | 44101 | Total- | Support for Industrial Development | 150,000,000 | 107,500,000 | 257,237,000 |
| 0 | 441 | Total- | Manufacturing | 150,000,000 | 107,500,000 | 257,237,000 |
| 0 | 44 | Total- | Mining and Manufacturing | 150,000,000 | 107,500,000 | 257,237,000 |
| 0 | 4 | Total- | Economic Affairs | 150,000,000 | 107,500,000 | 257,237,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 150,000,000 | 107,500,000 | 257,237,000 |
| NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
04 Economic Affairs: 044 Mining and Manufacturing: 0441 Manufacturing:
| 044101 Suppor LO1180 PRODU | t for Industrial Development : CT DEV. CENTRE FOR COMPOSITES BASED | SPORTS GOOD SIALKOT | ||
|---|---|---|---|---|
| 044101- A01 | Employees Related Expenses | 29,721,000 | 29,721,000 | 33,426,000 |
| 044101- A011 | Pay 56 | 29,721,000 | 29,721,000 | 33,426,000 |
| 044101- A011-1 | Pay of Officers (4) | (4,755,000) | (4,755,000) | (5,634,000) |
| 044101- A011-2 | Pay of Other Staff (52) | (24,966,000) | (24,966,000) | (27,792,000) |
| 044101- A03 | Operating Expenses | 25,089,000 | 25,089,000 | 26,943,000 |
| 044101- A039 | General | 25,089,000 | 25,089,000 | 26,943,000 |
| 044101- A09 | Physical Assets | 36,807,000 | 36,807,000 | 17,608,000 |
| 044101- A096 | Purchase of Plant and Machinery | 15,680,000 | 15,680,000 | 13,608,000 |
| 044101- A098 | Purchase of Other Assets | 21,127,000 | 21,127,000 | 4,000,000 |
| Total- LO1280 INDUS | PRODUCT DEV. CENTRE FOR COMPOSITES BASED SPORTS GOOD SIALKOT TRIAL DESIGN AND AUTOMATION CENTRE | 91,617,000 | 91,617,000 | 77,977,000 |
| 044101- A01 | Employees Related Expenses | 14,000,000 | 14,000,000 | 21,000,000 |
| 044101- A011 | Pay 18 | 14,000,000 | 14,000,000 | 21,000,000 |
| 044101- A011-1 | Pay of Officers (5) | (9,000,000) | (9,000,000) | (9,000,000) |
| 044101- A011-2 | Pay of Other Staff (13) | (5,000,000) | (5,000,000) | (12,000,000) |
| 044101- A03 | Operating Expenses | 8,000,000 | 3,500,000 | 20,200,000 |
| 044101- A039 | General | 8,000,000 | 3,500,000 | 20,200,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 5,000,000 | 2,550,000 | |
| 044101- A052 | Grants Domestic | 5,000,000 | 2,550,000 | |
| 044101- A09 | Physical Assets | 108,000,000 | 31,800,000 | 102,900,000 |
| 044101- A091 | Purchase of Building | 1,800,000 | 1,800,000 | 550,000 |
| 044101- A092 | Computer Equipment | 25,000,000 | 27,500,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 77,000,000 | 30,000,000 | 72,350,000 |
| 044101- A097 | Purchase of Furniture and Fixture | 4,200,000 | 2,500,000 | |
| 044101- A12 | Civil works | 150,000,000 | 100,000,000 | 55,900,000 |
| 044101- A124 | Building and Structures | 150,000,000 | 100,000,000 | 55,900,000 |
| Total- INDUSTRIAL DESIGN AND AUTOMATION CENTRE | 285,000,000 | 151,850,000 | 200,000,000 |
| NO. 132.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVE No of 2025-26 Posts 2026-27 | LOPMENT 2025-2026 Budget Estimate | DEMAND 2025-2026 Revised Estimate | S FOR GRANTS 2026-2027 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| LO1299 1000 IN | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OF DUSTRIAL STITCHING UNITS ALL ACROSS PAKISTAN | FICE, LAHORE | ||
| 044101- A01 | Employees Related Expenses | 21,270,000 | 21,270,000 | 31,047,000 |
| 044101- A011 | Pay 14 | 21,270,000 | 21,270,000 | 31,047,000 |
| 044101- A011-1 | Pay of Officers (9) | (18,645,000) | (18,645,000) | (27,397,000) |
| 044101- A011-2 | Pay of Other Staff (5) | (2,625,000) | (2,625,000) | (3,650,000) |
| 044101- A03 | Operating Expenses | 32,000,000 | 32,000,000 | 15,000,000 |
| 044101- A039 | General | 32,000,000 | 32,000,000 | 15,000,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 194,730,000 | 194,730,000 | |
| 044101- A052 | Grants Domestic | 194,730,000 | 194,730,000 | |
| 044101- A09 | Physical Assets | 2,000,000 | 2,000,000 | 253,953,000 |
| 044101- A092 | Computer Equipment | 2,000,000 | 2,000,000 | 2,000,000 |
| 044101- A096 | Purchase of Plant and Machinery | 251,953,000 | ||
| Total- | 1000 INDUSTRIAL STITCHING UNITS | 250,000,000 | 250,000,000 | 300,000,000 |
| ALL ACROSS PAKISTAN LO1303 ACQUISITION OF LAND FOR ESTABLISHMENT OF SM | E FACILITATION CENTRES AT VARIOUS LOCATIONS | |||
| 044101- A01 | Employees Related Expenses | 760,000 | 760,000 | 10,339,000 |
| 044101- A011 | Pay 2 | 760,000 | 760,000 | 10,339,000 |
| 044101- A011-1 | Pay of Officers (1) | (240,000) | (240,000) | (8,921,000) |
| 044101- A011-2 | Pay of Other Staff (1) | (520,000) | (520,000) | (1,418,000) |
| 044101- A03 | Operating Expenses | 4,000,000 | 4,000,000 | 16,000,000 |
| 044101- A039 | General | 4,000,000 | 4,000,000 | 16,000,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 1,240,000 | 1,240,000 | |
| 044101- A052 | Grants Domestic | 1,240,000 | 1,240,000 | |
| 044101- A12 | Civil works | 44,000,000 | 44,000,000 | 273,661,000 |
| 044101- A124 | Building and Structures | 44,000,000 | 44,000,000 | 273,661,000 |
| Total- | ACQUISITION OF LAND FOR ESTABLISHMENT OF SME FACILITATION CENTRES AT VARIOUS LOCATIONS | 50,000,000 | 50,000,000 | 300,000,000 |
| LO1644 SUPPORT CENTRE FOR DENTAL AND SURGICAL EQUIPMENT'S (SCDS | ) SIALKOT | |||
| 044101- A01 | Employees Related Expenses | 9,000,000 | 9,000,000 | 12,000,000 |
| 044101- A011 | Pay 18 | 9,000,000 | 9,000,000 | 12,000,000 |
| NO. 132.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVE No of 2025-26 Posts 2026-27 | LOPMENT 2025-2026 Budget Estimate | DEMAN 2025-2026 Revised Estimate | DS FOR GRANTS 2026-2027 Budget Estimate |
|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN R | Rs EVENUES SUB-OF | Rs FICE, LAHORE | Rs | |
| 044101- A011-1 | Pay of Officers (5) | (6,000,000) | (6,000,000) | (7,000,000) |
| 044101- A011-2 | Pay of Other Staff (13) | (3,000,000) | (3,000,000) | (5,000,000) |
| 044101- A03 | Operating Expenses | 6,000,000 | 6,000,000 | 12,257,000 |
| 044101- A039 | General | 6,000,000 | 6,000,000 | 12,257,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 5,000,000 | 5,000,000 | |
| 044101- A052 | Grants Domestic | 5,000,000 | 5,000,000 | |
| 044101- A09 | Physical Assets | 128,400,000 | 128,400,000 | 37,600,000 |
| 044101- A092 | Computer Equipment | 18,000,000 | 18,000,000 | 2,450,000 |
| 044101- A096 | Purchase of Plant and Machinery | 104,950,000 | 104,950,000 | 35,150,000 |
| 044101- A097 | Purchase of Furniture and Fixture | 5,450,000 | 5,450,000 | |
| 044101- A12 | Civil works | 76,600,000 | 76,600,000 | 200,000 |
| 044101- A124 | Building and Structures | 76,600,000 | 76,600,000 | 200,000 |
| Total- | SUPPORT CENTRE FOR DENTAL AND | 225,000,000 | 225,000,000 | 62,057,000 |
| SURGICAL EQUIPMENT'S (SCDS) SIALKOT | ||||
| LO9644 NATIO KNOWLEDGE | NAL STRATEGIC PROGRAM FOR ACQUISITION OF IND TECH-NSPAIT INCLUDING FEASIBILITY- | |||
| 044101- A01 | Employees Related Expenses | 28,000,000 | ||
| 044101- A011 | Pay | 28,000,000 | ||
| 044101- A011-1 | Pay of Officers | (10,000,000) | ||
| 044101- A011-2 | Pay of Other Staff | (18,000,000) | ||
| 044101- A03 | Operating Expenses | 37,000,000 | ||
| 044101- A039 | General | 37,000,000 | ||
| 044101- A09 | Physical Assets | 228,311,000 | ||
| 044101- A092 | Computer Equipment | 3,400,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 223,411,000 | ||
| 044101- A098 | Purchase of Other Assets | 1,500,000 | ||
| 044101- A13 | Repairs and Maintenance | 1,000,000 | ||
| 044101- A133 | Buildings and Structure | 1,000,000 | ||
| Total- | NATIONAL STRATEGIC PROGRAM FOR ACQUISITION OF IND TECH-NSPAIT INCLUDING FEASIBILITY- KNOWLEDGE | 294,311,000 | ||
| 044101 | Total- Support for Industrial Development | 901,617,000 | 768,467,000 | 1,234,345,000 |
| 0441 | Total- Manufacturing | 901,617,000 | 768,467,000 | 1,234,345,000 |
| 044 | Total- Mining and Manufacturing | 901,617,000 | 768,467,000 | 1,234,345,000 |
| 04 | Total- Economic Affairs | 901,617,000 | 768,467,000 | 1,234,345,000 |
| T | otal- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | 901,617,000 | 768,467,000 | 1,234,345,000 |
NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| INDUSTRIAL DEVEL No of Posts | OPMENT 2025-2026 | DEMAND 2025-2026 | S FOR GRANTS 2026-2027 |
|---|---|---|---|
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
04 Economic Affairs: 044 Mining and Manufacturing: 0441 Manufacturing:
044101 Support for Industrial Development :
KA1374 ESTABLISHMENT OF HIGH TENSILE SHEET METAL DIES MANUFACTURING AND TITANIUM COATING SETUP AT KTDMC
| 044101- A03 | Operating Expenses | 8,052,000 | ||
|---|---|---|---|---|
| 044101- A037 | Consultancy and Contractual Work | 3,750,000 | ||
| 044101- A039 | General | 4,302,000 | ||
| 044101- A05 | Grants, Subsidies and Write off Loans | 30,000,000 | 30,000,000 | |
| 044101- A052 | Grants Domestic | 30,000,000 | 30,000,000 | |
| 044101- A09 | Physical Assets | 184,866,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 183,350,000 | ||
| 044101- A097 | Purchase of Furniture and Fixture | 1,516,000 | ||
| 044101- A12 | Civil works | 40,000,000 | 40,000,000 | 42,000,000 |
| 044101- A124 | Building and Structures | 40,000,000 | 40,000,000 | 42,000,000 |
| Total- KA7198 ESTA | ESTABLISHMENT OF HIGH TENSILE SHEET METAL DIES MANUFACTURING AND TITANIUM COATING SETUP AT KTDMC BLISHMENT OF 132 KV GRID STATION AT BIN | 70,000,000 QASIM INDUSTRIAL | 70,000,000 PARK KARACHI | 234,918,000 |
| 044101- A09 | Physical Assets | 182,664,000 | 182,664,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 182,664,000 | 182,664,000 | |
| Total- | ESTABLISHMENT OF 132 KV GRID STATION AT BIN QASIM INDUSTRIAL PARK KARACHI | 182,664,000 | 182,664,000 | |
| KA9988 DEVE ON STEEL MIL | LOPMENT OF BLOCK A (500 ACRES) OF PHA L LAND | SE I OF KARACHI INDUSTRIAL PARK (FEDERAL SEZ) | ||
| 044101- A03 | Operating Expenses | 5,000,000 | 5,000,000 | 52,010,000 |
| 044101- A037 | Consultancy and Contractual Work | 5,000,000 | 5,000,000 | 52,010,000 |
| 044101- A09 | Physical Assets | 5,000,000 | 5,000,000 | 1,588,570,000 |
| 044101- A096 | Purchase of Plant and Machinery | 5,000,000 | 5,000,000 | 1,588,570,000 |
| 044101- A12 | Civil works | 490,000,000 | 490,000,000 | 3,240,570,000 |
| 044101- A125 | Other Works | 490,000,000 | 490,000,000 | 3,240,570,000 |
| NO. 132.- FC1 | 2C32 CAPITAL OUTLAY ON INDUSTRIAL DEVE No of 2025-26 Posts 2026-27 ACCOUNTANT GENERAL PAKISTAN RE | LOPMENT 2025-2026 Budget Estimate Rs VENUES SUB-OF | DEMAN 2025-2026 Revised Estimate Rs FICE, KARACHI | DS FOR GRANTS 2026-2027 Budget Estimate Rs |
|---|---|---|---|---|
| Total- | DEVELOPMENT OF BLOCK A (500 ACRES) OF PHASE I OF KARACHI INDUSTRIAL PARK (FEDERAL SEZ) ON STEEL MILL LAND | 500,000,000 | 500,000,000 | 4,881,150,000 |
| 044101 | Total- Support for Industrial Development | 752,664,000 | 752,664,000 | 5,116,068,000 |
| 0441 | Total- Manufacturing | 752,664,000 | 752,664,000 | 5,116,068,000 |
| 044 | Total- Mining and Manufacturing | 752,664,000 | 752,664,000 | 5,116,068,000 |
| 04 | Total- Economic Affairs | 752,664,000 | 752,664,000 | 5,116,068,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 752,664,000 | 752,664,000 | 5,116,068,000 |
| NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA |
| 04 | Economic Affairs: | |||||
|---|---|---|---|---|---|---|
| 044 | Mining | and Manufacturing: | ||||
| 0441 | Manufacturing: | |||||
| 044101 LS0109 | Suppo ESTA | rt for Industrial Development : BLISHMENT OF HUB SPECIAL ECONOMIC Z | ONE LASBELA | |||
| 044101 | - A01 | Employees Related Expenses | 1,008,000 | 1,008,000 | 1,008,000 | |
| 044101 | - A011 | Pay | 29 | 1,008,000 | 1,008,000 | 1,008,000 |
| 044101 | - A011- | 1 Pay | of Officers (12) | (408,000) | (408,000) | (408,000) |
| 044101 | - A011- | 2 Pay | of Other Staff (17) | (600,000) | (600,000) | (600,000) |
| 044101 | - A03 | Operating Expenses | 14,800,000 | 10,498,000 | 13,992,000 | |
| 044101 | - A037 | Consultancy and Contractual Work | 5,000,000 | 4,850,000 | 8,490,000 | |
| 044101 | - A038 | Travel & Transportation | 1,500,000 | 1,000,000 | 1,500,000 | |
| 044101 | - A039 | General | 8,300,000 | 4,648,000 | 4,002,000 | |
| 044101 | - A12 | Civil | works | 84,192,000 | 73,716,000 | 35,000,000 |
| 044101 | - A121 | Road | s Highways and Bridges | 50,000,000 | 39,524,000 | 25,000,000 |
| 044101 | - A123 | Embankment and Drainage Works | 34,192,000 | 34,192,000 | 10,000,000 | |
| Total- | ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA | 100,000,000 | 85,222,000 | 50,000,000 | ||
| 0 | 44101 | Total- | Support for Industrial Development | 100,000,000 | 85,222,000 | 50,000,000 |
| 0 | 441 | Total- | Manufacturing | 100,000,000 | 85,222,000 | 50,000,000 |
| 0 | 44 | Total- | Mining and Manufacturing | 100,000,000 | 85,222,000 | 50,000,000 |
| 0 | 4 | Total- | Economic Affairs | 100,000,000 | 85,222,000 | 50,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 100,000,000 | 85,222,000 | 50,000,000 | ||
| TOTAL | - DEMAND | 1,904,281,000 | 1,713,853,000 | 6,657,650,000 |
SECTION VII
MINISTRY OF MARITIME AFFAIRS
2026-2027 Budget Estimate (Rupees in Thousand)
Demand presented on behalf of the Ministry of Maritime Affairs Development Expenditure on Capital Account. 133. Capital Outlay on Maritime Affairs Division 1,780,000 Total : 1,780,000
NO. 133.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION DEMANDS FOR GRANTS
DEMAND NO. 133
( FC12C51 )
CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 for CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION.
Voted
Rs. 1,780,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF MARITIME AFFAIRS .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 045 | Construction and Transport | 2,224,000,000 | 837,110,000 | 1,280,000,000 |
| 046 | Communications | 1,241,000,000 | 632,460,000 | 500,000,000 |
| Total | 3,465,000,000 | 1,469,570,000 | 1,780,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A02 | Project Pre-Investment Analysis | 15,000,000 | 15,000,000 | |
| A09 | Physical Assets | 1,115,565,000 | 507,025,000 | 500,000,000 |
| A12 | Civil works | 2,334,435,000 | 947,545,000 | 1,280,000,000 |
| Total | 3,465,000,000 | 1,469,570,000 | 1,780,000,000 |
NO. 133.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of 2025-26 Posts 2026-27 | 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 04 Econo | mic Affairs: | ||||
| 045 Const | ruction | and Transport: | |||
| 0453 Water | Transport: | ||||
| 045301 PORT IB9975 GAWA | AND SHIPPPING : DAR BLUE ECONOMY CENTER PHASE-I | ||||
| 045301- A02 | Project Pre-Investment Analysis | 15,000,000 | 15,000,000 | ||
| 045301- A021 | Feasibility Studies | 15,000,000 | 15,000,000 | ||
| Total- | GAWADAR BLUE ECONOMY CENTER PHASE-I | 15,000,000 | 15,000,000 | ||
| 045301 | Total- | PORT AND SHIPPPING | 15,000,000 | 15,000,000 | |
| 0453 | Total- | Water Transport | 15,000,000 | 15,000,000 | |
| 045 | Total- | Construction and Transport | 15,000,000 | 15,000,000 | |
| 04 | Total- | Economic Affairs | 15,000,000 | 15,000,000 | |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 15,000,000 | 15,000,000 |
| NO. 133.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS | DIVISION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 04 | Economic Affairs: | ||||
|---|---|---|---|---|---|
| 045 | Construction and Transport: | ||||
| 0453 | Water | Transport: | |||
| 045301 GR009 | PORT 3 CONS | AND SHIPPPING : TRUCTION OF EASTBAY EXPRESSWAY PHA | SE-II (GRANT-IN-AID) | ||
| 045301 | - A12 | Civil works | 200,000,000 | 22,507,000 | 250,000,000 |
| 045301 | - A124 | Building and Structures | 200,000,000 | 22,507,000 | 250,000,000 |
| Total- | CONSTRUCTION OF EASTBAY | 200,000,000 | 22,507,000 | 250,000,000 | |
| GR009 | 4 INFRA | EXPRESSWAY PHASE-II (GRANT-IN-AID) STRUCTURE WORKS OF OFF-DOCK TERMI | NAL AT GWADAR | ||
| 045301 | - A12 | Civil works | 100,000,000 | 100,000,000 | 250,000,000 |
| 045301 | - A124 | Building and Structures | 100,000,000 | 100,000,000 | 250,000,000 |
| Total- | INFRASTRUCTURE WORKS OF | 100,000,000 | 100,000,000 | 250,000,000 | |
| OFF-DOCK TERMINAL AT GWADAR | |||||
| GR013 (MUGS | 5 MODERNIZATION AND UPGRADATION OF GADDA BRI) AND | NI SHIP BREAKING AND RECYCLING INDUSTRY | |||
| 045301 | - A12 | Civil works | 1,909,000,000 | 699,603,000 | 780,000,000 |
| 045301 | - A125 | Other Works | 1,909,000,000 | 699,603,000 | 780,000,000 |
| Total- | MODERNIZATION AND UPGRADATION | 1,909,000,000 | 699,603,000 | 780,000,000 | |
| OF GADDANI SHIP BREAKING AND RECYCLING INDUSTRY (MUGSBRI) AND | |||||
| 0 | 45301 | Total- PORT AND SHIPPPING | 2,209,000,000 | 822,110,000 | 1,280,000,000 |
| 0 | 453 | Total- Water Transport | 2,209,000,000 | 822,110,000 | 1,280,000,000 |
| 0 | 45 | Total- Construction and Transport | 2,209,000,000 | 822,110,000 | 1,280,000,000 |
| 046 | Communications: | ||||
| 0461 | Communications: | ||||
| 046101 GR009 | ADMINISTRATION : 1 ANCILLARY FACILITIES IN GPA HOUSING COMPL | EX GAWADAR | |||
| 046101 | - A12 | Civil works | 125,435,000 | 125,435,000 | |
| 046101 | - A124 | Building and Structures | 125,435,000 | 125,435,000 | |
| Total- | ANCILLARY FACILITIES IN GPA | 125,435,000 | 125,435,000 | ||
| HOUSING COMPLEX GAWADAR |
| NO. 133.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS | DIVISION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
GR0092 LAND ACQUISITION AS PER GWADAR PLAN 750 ACRES AT GADANI JUNUBI
| 046101- A09 | Physical Assets | 1,115,565,000 | 507,025,000 | 500,000,000 |
|---|---|---|---|---|
| 046101- A091 | Purchase of Building | 1,115,565,000 | 507,025,000 | 500,000,000 |
| Total- | LAND ACQUISITION AS PER GWADAR PLAN 750 ACRES AT GADANI JUNUBI | 1,115,565,000 | 507,025,000 | 500,000,000 |
| 046101 | Total- ADMINISTRATION | 1,241,000,000 | 632,460,000 | 500,000,000 |
| 0461 | Total- Communications | 1,241,000,000 | 632,460,000 | 500,000,000 |
| 046 | Total- Communications | 1,241,000,000 | 632,460,000 | 500,000,000 |
| 04 | Total- Economic Affairs | 3,450,000,000 | 1,454,570,000 | 1,780,000,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 3,450,000,000 | 1,454,570,000 | 1,780,000,000 | |
| TOTAL - DEMAND | 3,465,000,000 | 1,469,570,000 | 1,780,000,000 |
SECTION VIII
MINISTRY OF RAILWAYS
2026-2027 Budget Estimate (Rupees in Thousand)
Demand presented on behalf of the Ministry of Railways
Development Expenditure on Capital Account.
| 134. Capital Outlay on Railways Division | Total : | 40,657,870 40,657,870 |
|---|
NO. 134.- CAPITAL OUTLAY ON RAILWAYS DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 134
( FC12C33 )
CAPITAL OUTLAY ON RAILWAYS DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2027 for CAPITAL OUTLAY ON RAILWAYS DIVISION.
Voted
Rs. 40,657,870,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF RAILWAYS .
| 2025-2026 Budget Estimate Rs | 2025-2026 Revised Estimate Rs | 2026-2027 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 22,365,000,000 | 25,168,733,000 | 40,516,870,000 |
| 045 | Construction and Transport | 50,000,000 | 141,000,000 | |
| Total | 22,415,000,000 | 25,168,733,000 | 40,657,870,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 100,000,000 | ||
| A11 | Investments | 22,315,000,000 | 25,168,733,000 | 40,657,870,000 |
| Total | 22,415,000,000 | 25,168,733,000 | 40,657,870,000 | |
| (In Foreign Exchange) | (10,438,000,000) | (31,867,000,000) | ||
| (Own Resources) | (10,338,000,000) | (5,767,000,000) | ||
| (Foreign Aid) | (100,000,000) | (26,100,000,000) | ||
| (In Local Currency) | (11,977,000,000) _________________ | (25,168,733,000) __________________ | (8,790,870,000) _______________ |
NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 | ||
|---|---|---|---|---|---|
| 2025-26 2026-27 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0143 | Investments: | ||||
| 014302 | Non-Financial Institutions : | ||||
| IB3639 DIREC | STRENGTHENING OF PLANNING DEVELOPMENT MO TORATE MINISTRY OF | NITORING AND EVALUATION (PDANDME) | |||
| 014302 | - A11 | Investments | 50,000,000 | 50,000,000 | 50,000,000 |
| 014302 | - A111 | Investment Local | 50,000,000 | 50,000,000 | 50,000,000 |
| Total- | STRENGTHENING OF PLANNING | 50,000,000 | 50,000,000 | 50,000,000 | |
| DEVELOPMENT MONITORING AND EVALUATION (PDANDME) DIRECTORATE MINISTRY OF | |||||
| IB3640 MODE | COLLA L) | BORATION OF PAKISTAN RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE | HELIX | ||
| 014302 | - A11 | Investments | 50,000,000 | 28,000,000 | 30,000,000 |
| 014302 | - A111 | Investment Local | 50,000,000 | 28,000,000 | 30,000,000 |
| Total- | COLLABORATION OF PAKISTAN | 50,000,000 | 28,000,000 | 30,000,000 | |
| RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX MODEL) | |||||
| 0 | 14302 | Total- Non-Financial Institutions | 100,000,000 | 78,000,000 | 80,000,000 |
| 0 | 143 | Total- Investments | 100,000,000 | 78,000,000 | 80,000,000 |
| 0 | 14 | Total- Transfers | 100,000,000 | 78,000,000 | 80,000,000 |
| 0 | 1 | Total- General Public Service | 100,000,000 | 78,000,000 | 80,000,000 |
| 04 | Economic Affairs: | ||||
| 045 | Construction and Transport: | ||||
| 0454 | Railway Trasport: | ||||
| 045401 IB3652 | Railway Trasport : RENOVATION AND CONSTRUCTION OF OFFICES WO | MENS BARRACKS AND | MULTI PURPOSE | TRAINING | |
| ROOM | S AT OFFICE OF THE | ||||
| 045401 | - A11 | Investments | 50,000,000 | 141,000,000 |
| NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| 045401- A111 | Investment Local | 50,000,000 | 141,000,000 | |
|---|---|---|---|---|
| Total- | OFFICE OF THE RENOVATION AND CONSTRUCTION OF OFFICES WOMENS BARRACKS AND MULTI PURPOSE TRAINING ROOMS AT | 50,000,000 | 141,000,000 | |
| 045401 | Total- Railway Trasport | 50,000,000 | 141,000,000 | |
| 0454 | Total- Railway Trasport | 50,000,000 | 141,000,000 | |
| 045 | Total- Construction and Transport | 50,000,000 | 141,000,000 | |
| 04 | Total- Economic Affairs | 50,000,000 | 141,000,000 | |
| Total- ACCOUNTANT GENERAL | 150,000,000 | 78,000,000 | 221,000,000 | |
| PAKISTAN REVENUES |
| NO. 134.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2025-26 Posts 2026-27 | N 2025-2026 Budget Estimate | DEMANDS 2025-2026 Revised Estimate | FOR GRANTS 2026-2027 Budget Estimate |
|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN R | Rs EVENUES SUB-OF | Rs FICE, LAHORE | Rs | |
| 01 Gener | al Public Service: | |||
| 014 Transf | ers: | |||
| 0143 Invest | ments: | |||
| 014302 Non-Financial Institutions : LO1306 ESTABLISHMENT OF BUSINESS DEVELOPMENT AN | D HR SUPPORT UNIT AT PAKISTAN RAILWAYS | |||
| 014302- A11 | Investments | 50,000,000 | 11,000,000 | 50,000,000 |
| 014302- A111 | Investment Local | 50,000,000 | 11,000,000 | 50,000,000 |
| Total- | ESTABLISHMENT OF BUSINESS | 50,000,000 | 11,000,000 | 50,000,000 |
| DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS | ||||
| LO1307 IMPROVEMENT OF TERMINAL FACILITIES AND ENHA YARD PIPRI KARACHI | NCING SECURITY | ARRANGEMENTS IN | MARSHLING | |
| 014302- A11 | Investments | 100,000,000 | 143,000,000 | 150,000,000 |
| 014302- A111 | Investment Local | 100,000,000 | 143,000,000 | 150,000,000 |
| Total- | IMPROVEMENT OF TERMINAL | 100,000,000 | 143,000,000 | 150,000,000 |
| FACILITIES AND ENHANCING | ||||
| LO1308 INSTA | SECURITY ARRANGEMENTS IN MARSHLING YARD PIPRI KARACHI LLATION AND COMMISSIONING OF SOLAR SY | STEM AT 155 NOS | RAILWAY STATIONS | |
| 014302- A11 | Investments | 50,000,000 | 294,000,000 | |
| 014302- A111 | Investment Local | 50,000,000 | 294,000,000 | |
| Total- | INSTALLATION AND COMMISSIONING | 50,000,000 | 294,000,000 | |
| OF SOLAR SYSTEM AT 155 NOS | ||||
| RAILWAY STATIONS | ||||
| LO1311 REHA SECTION | BILITATION OF TRACK BETWEEN SAMA SATTA- BAHAWALNAGAR ON SAMA SATTA- | AMRUKA | ||
| 014302- A11 | Investments | 50,000,000 | 10,000,000 | |
| 014302- A111 | Investment Local | 50,000,000 | 10,000,000 | |
| Total- | REHABILITATION OF TRACK BETWEEN | 50,000,000 | 10,000,000 | |
| SAMA SATTA- BAHAWALNAGAR ON SAMA SATTA- AMRUKA SECTION | ||||
| LO1312 REPLACEMENT OF ROOF MOUNTED AC PLANTS IN | PASSENGER COACHES FOR BETTER SERVICE | |||
| DELIVERY | ||||
| 014302- A11 | Investments | 400,000,000 | 870,000,000 | 508,860,000 |
| NO. 134.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2025-26 Posts 2026-27 | N 2025-2026 Budget Estimate | DEMAN 2025-2026 Revised Estimate | DS FOR GRANTS 2026-2027 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | ||||
| 014302- A111 | Investment Local | 400,000,000 | 870,000,000 | 508,860,000 |
| Total- | REPLACEMENT OF ROOF MOUNTED AC PLANTS IN PASSENGER COACHES FOR BETTER SERVICE DELIVERY | 400,000,000 | 870,000,000 | 508,860,000 |
| (In Foreign Exchange) | (380,000,000) | (455,000,000) | ||
| (Own Resources) | (380,000,000) | (455,000,000) | ||
| (In Local Currency) | (20,000,000) | (870,000,000) | (53,860,000) | |
| LO1313 REHA TRACK BETW | __ BILITATION AND IMPROVEMENT OF KOTRI JA EEN | ________________ MSHORO RAIL LI | __________________ NK / PC-1 OF REHAB | ______________ ILITATION OF |
| 014302- A11 | Investments | 50,000,000 | 104,000,000 | 477,942,000 |
| 014302- A111 | Investment Local | 50,000,000 | 104,000,000 | 477,942,000 |
| Total- | REHABILITATION AND IMPROVEMENT OF KOTRI JAMSHORO RAIL LINK / PC-1 OF REHABILITATION OF TRACK BETWEEN | 50,000,000 | 104,000,000 | 477,942,000 |
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) | |||
| (In Local Currency) | (10,000,000) | (104,000,000) | (477,942,000) | |
| LO1314 IMME | __ DIATE TRACK SAFETY WORK ON TDM-ROH SE | ________________ CTION | ||
| 014302- A11 | Investments | 50,000,000 | 1,155,000,000 | |
| 014302- A111 | Investment Local | 50,000,000 | 1,155,000,000 | |
| Total- | IMMEDIATE TRACK SAFETY WORK ON TDM-ROH SECTION | 50,000,000 | 1,155,000,000 | |
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) | |||
| (In Local Currency) | (10,000,000) | (1,155,000,000) | ||
| LO1315 IMME | __ DIATE TRACK SAFETY WORK ON ROH-KPR SE | ________________ CTION | ||
| 014302- A11 | Investments | 50,000,000 | 844,000,000 | 500,000,000 |
| 014302- A111 | Investment Local | 50,000,000 | 844,000,000 | 500,000,000 |
| Total- | IMMEDIATE TRACK SAFETY WORK ON ROH-KPR SECTION | 50,000,000 | 844,000,000 | 500,000,000 |
| (In Foreign Exchange) | (40,000,000) | (250,000,000) | ||
| (Own Resources) | (40,000,000) | (250,000,000) |
| NO. 134.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2025-26 Posts 2026-27 | N 2025-2026 Budget Estimate | DEMAND 2025-2026 Revised Estimate | S FOR GRANTS 2026-2027 Budget Estimate |
|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN RE | Rs VENUES SUB-OF | Rs FICE, LAHORE | Rs | |
| (In Local Currency) | (10,000,000) | (844,000,000) | (250,000,000) | |
| LO1316 IMPR | ___ OVE SAFETY THROUGH BETTER COMMUNICAT | _______________ ION SYSTEM | ||
| 014302- A11 | Investments | 20,000,000 | 20,000,000 | 809,017,000 |
| 014302- A111 | Investment Local | 20,000,000 | 20,000,000 | 809,017,000 |
| Total- | IMPROVE SAFETY THROUGH BETTER COMMUNICATION SYSTEM | 20,000,000 | 20,000,000 | 809,017,000 |
| LO1318 UP-GR SARHAD JUM | ADATION OF THE SIGNALLING SYSTEM BY PR MA GOTHBADAL | OVIDING COMPUTER BASED INTER LOCKING AT | ||
| 014302- A11 | Investments | 10,000,000 | 10,000,000 | 50,000,000 |
| 014302- A111 | Investment Local | 10,000,000 | 10,000,000 | 50,000,000 |
| Total- | UP-GRADATION OF THE SIGNALLING | 10,000,000 | 10,000,000 | 50,000,000 |
| SYSTEM BY PROVIDING COMPUTER BASED INTER LOCKING AT SARHAD JUMMA GOTHBADAL | ||||
| (In Foreign Exchange) | (8,000,000) | |||
| (Own Resources) | (8,000,000) | |||
| (In Local Currency) | (2,000,000) | (10,000,000) | (50,000,000) | |
| LO1319 ESSE | ___ NTIAL TRACK SAFETY WORK ON SHERSHAH # | _______________ KUNDIAN SECTIO | __________________ N IN MULTAN DIVIS | ______________ ION |
| 014302- A11 | Investments | 50,000,000 | 25,000,000 | 200,000,000 |
| 014302- A111 | Investment Local | 50,000,000 | 25,000,000 | 200,000,000 |
| Total- | ESSENTIAL TRACK SAFETY WORK ON | 50,000,000 | 25,000,000 | 200,000,000 |
| LO1320 ESSE | SHERSHAH # KUNDIAN SECTION IN MULTAN DIVISION NTIAL TRACK SAFETY WORK ON ROHRI # SIBI | SECTION IN SUKKUR DIVISION | ||
| 014302- A11 | Investments | 50,000,000 | 150,000,000 | 400,000,000 |
| 014302- A111 | Investment Local | 50,000,000 | 150,000,000 | 400,000,000 |
| Total- | ESSENTIAL TRACK SAFETY WORK ON | 50,000,000 | 150,000,000 | 400,000,000 |
| ROHRI # SIBI SECTION IN SUKKUR DIVISION | ||||
| (In Foreign Exchange) | (200,000,000) | |||
| (Own Resources) | (200,000,000) | |||
| (In Local Currency) ___ | (50,000,000) _______________ | (150,000,000) __________________ | (200,000,000) ______________ |
NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION
| RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2025-2026 | 2025-2026 | 2026-2027 |
| 2025-26 2026-27 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
LO1328 REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN- MULTAN #KHANEWALSHAHDARA BAGH MAINLINE
| 014302- A11 | Investments | 50,000,000 | 200,000,000 | 454,088,000 |
|---|---|---|---|---|
| 014302- A111 | Investment Local | 50,000,000 | 200,000,000 | 454,088,000 |
| Total- | REPLACEMENT OF OLD AND | 50,000,000 | 200,000,000 | 454,088,000 |
| OBSOLETE SIGNAL GEAR FROM LODHRAN- MULTAN #KHANEWAL- SHAHDARA BAGH MAINLINE | ||||
| (In Foreign Exchange) | (40,000,000) | (200,000,000) | ||
| (Own Resources) | (40,000,000) | (200,000,000) | ||
| (In Local Currency) | (10,000,000) | (200,000,000) | (254,088,000) | |
| LO1329 ESSENTIAL TRACK SAFETY WORK ON KHANEWA SHAHDARA SECTION IN | __________________ L-SHORKOT- FAISA | _______________ LABAD- QILA SH | _________________ EIKHUPURA- | |
| 014302- A11 | Investments | 50,000,000 | 335,000,000 | 200,000,000 |
| 014302- A111 | Investment Local | 50,000,000 | 335,000,000 | 200,000,000 |
| Total- | ESSENTIAL TRACK SAFETY WORK ON | 50,000,000 | 335,000,000 | 200,000,000 |
| KHANEWAL-SHORKOT- FAISALABAD- QILA SHEIKHUPURA- SHAHDARA SECTION IN | ||||
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) | |||
| (In Local Currency) | (10,000,000) | (335,000,000) | (200,000,000) | |
| LO1332 ESTABLISHMENT OF PROJECT MANAGEMENT UN | __________________ IT (PMU) IN MINISTR | _______________ Y OF RAILWAYS | _________________ (3RD REVISED) | |
| 014302- A11 | Investments | 10,000,000 | 90,000,000 | 200,000,000 |
| 014302- A111 | Investment Local | 10,000,000 | 90,000,000 | 200,000,000 |
| Total- | ESTABLISHMENT OF PROJECT | 10,000,000 | 90,000,000 | 200,000,000 |
| MANAGEMENT UNIT (PMU) IN MINISTRY OF RAILWAYS (3RD REVISED) | ||||
| LO1333 PROC PASSENGER | UREMENT / MANUFACTURING OF 820 HIGH COACHES | CAPACITY BOGIE FR | EIGHT WAGONS | AND 230 |
| 014302- A11 | Investments | 7,000,000,000 | 6,033,733,000 | 1,500,000,000 |
| 014302- A111 | Investment Local | 7,000,000,000 | 6,033,733,000 | 1,500,000,000 |
| Total- | PROCUREMENT / MANUFACTURING OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER COACHES | 7,000,000,000 | 6,033,733,000 | 1,500,000,000 |
| NO. 134.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2025-26 Posts 2026-27 2025-2026 Budget | DEMA 2025-2026 Revised | NDS FOR GRANTS 2026-2027 Budget |
|---|---|---|---|
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | |||
| (In Foreign Exchange) (6,890,000,000) | (1,400,000,000) | ||
| (Own Resources) (6,890,000,000) | (1,400,000,000) | ||
| (In Local Currency) (110,000,000) | (6,033,733,000) | (100,000,000) | |
| LO1334 REHA | __________________ BILITATION AND OVERHAULING OF TRACK MAINTENANCE MAC | ________________ HINES /CRANES | |
| 014302- A11 | Investments 2,725,000,000 | 508,000,000 | 1,840,000,000 |
| 014302- A111 | Investment Local 2,725,000,000 | 508,000,000 | 1,840,000,000 |
| Total- | REHABILITATION AND OVERHAULING 2,725,000,000 | 508,000,000 | 1,840,000,000 |
| OF TRACK MAINTENANCE MACHINES /CRANES | |||
| (In Foreign Exchange) (1,660,000,000) | (1,740,000,000) | ||
| (Own Resources) (1,660,000,000) | (1,740,000,000) | ||
| (In Local Currency) (1,065,000,000) | (508,000,000) | (100,000,000) | |
| LO1336 REHA | __________________ BILITATION AND STRENGTHENING OF WEAK BRIDGES ON PAKI | ________________ STAN RAILWAYS | ________________ SYSTEM |
| 014302- A11 | Investments 50,000,000 | 200,000,000 | 408,963,000 |
| 014302- A111 | Investment Local 50,000,000 | 200,000,000 | 408,963,000 |
| Total- | REHABILITATION AND 50,000,000 | 200,000,000 | 408,963,000 |
| STRENGTHENING OF WEAK BRIDGES ON PAKISTAN RAILWAYS SYSTEM | |||
| LO1337 CHINA | PAKISTAN ECONOMIC CORRIDOR (CPEC) SUPPORT PROJECT | AT MOR (1ST REVISED) | |
| 014302- A11 | Investments 50,000,000 | 50,000,000 | 50,000,000 |
| 014302- A111 | Investment Local 50,000,000 | 50,000,000 | 50,000,000 |
| Total- | CHINA PAKISTAN ECONOMIC 50,000,000 | 50,000,000 | 50,000,000 |
| CORRIDOR (CPEC) SUPPORT PROJECT AT MOR (1ST REVISED) | |||
| LO1338 PRELIMINARY DESIGN AND DRAWING FOR UP GRADATION /REHABIL ESTABLISHMENT OF | ITATION OF MAIN | LINE (ML-1)AND | |
| 014302- A11 | Investments | 20,000,000 | 1,056,000,000 |
| 014302- A111 | Investment Local | 20,000,000 | 1,056,000,000 |
| Total- | PRELIMINARY DESIGN AND DRAWING FOR UP GRADATION /REHABILITATION OF MAIN LINE (ML-1)AND ESTABLISHMENT OF | 20,000,000 | 1,056,000,000 |