Skip to content
Qanoon Digest

Details of Demands for Grants and Appropriations Vol-IV (Development), part 7

FY 2022-23Details of demandsPages 601 to 668 of 668

The Details of Demands for Grants and Appropriations Vol-IV (Development) is part of the federal budget for FY 2022-23. This page reproduces the text of its 668 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.

Page 601
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- CONSTRUCTION OF OFFICES FOR 46,948,000 46,948,000 18,779,000
IB2240 DUALI INTELLEGENCE BUREAU ALONG-WITH CPEC ZATION AND IMPROVEMENT OF MANDRA TO C HAKWAL ROAD (6 4 KM)
045702- A12 Civil works 200,000,000 200,000,000 100,000,000
045702- A124 Building and Structures 200,000,000 200,000,000 100,000,000
Total- DUALIZATION AND IMPROVEMENT OF 200,000,000 200,000,000 100,000,000
MANDRA TO CHAKWAL ROAD (64 KM)
IB2241 DUALI ZATION AND IMPROVEMENT OF SOHAWA TO C HAKWAL ROAD (7 0 KM)
045702- A12 Civil works 200,000,000 200,000,000 100,000,000
045702- A124 Building and Structures 200,000,000 200,000,000 100,000,000
Total- DUALIZATION AND IMPROVEMENT OF 200,000,000 200,000,000 100,000,000
SOHAWA TO CHAKWAL ROAD (70 KM)
IB2247 PROVISION OF INSTALLATION OF PRESSURE SAND PRIME MINISTER FILTER PLANT & BLOCK WIRING (VOICE/DATA) AT
045702- A12 Civil works 2,582,000
045702- A124 Building and Structures 2,582,000
Total- IB2251 WIDEN MASHANI MC PROVISION OF INSTALLATION OF PRESSURE SAND FILTER PLANT & BLOCK WIRING (VOICE/DATA) AT PRIME MINISTER ING / REHABILITATION / CONSTRUCTION OF 0 2,582,000 8 NOS ROADS IN U C MANDA KHEL UC QAMAR
045702- A12 Civil works 46,948,000 46,949,000 28,169,000
045702- A124 Building and Structures 46,948,000 46,949,000 28,169,000
Total- WIDENING / REHABILITATION / 46,948,000 46,949,000 28,169,000
IB2252 WIDEN KOT CONSTRUCTION OF 08 NOS ROADS IN UC MANDA KHEL UC QAMAR MASHANI MC ING / REHABILITATION / CONSTRUCTION OF 0 5 ROADS IN UC PAKI SHAH MARDIAN UC NAMAL UC
045702- A12 Civil works 46,948,000 46,949,000 28,169,000
045702- A124 Building and Structures 46,948,000 46,949,000 28,169,000
Total- WIDENING / REHABILITATION / 46,948,000 46,949,000 28,169,000
CONSTRUCTION OF 05 ROADS IN UC
Page 602
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget 2021-2022 Revised 2022-2023 Budget
Estimate Estimate Estimate
Rs Rs Rs
IB2253 WIDEN PAI KHEL ACCOUNTANT GENERAL P PAKI SHAH MARDIAN UC NAMAL UC KOT ING / REHABILITATION / CONSTRUCTION OF 0 AKISTAN REVENU 7 NOS ROADS IN U ES C SHAHBAZ KHEL UC ROKHRI UC
045702- A12 Civil works 46,948,000 46,949,000 28,169,000
045702- A124 Building and Structures 46,948,000 46,949,000 28,169,000
Total- WIDENING / REHABILITATION / 46,948,000 46,949,000 28,169,000
CONSTRUCTION OF 07 NOS ROADS IN UC SHAHBAZ KHEL UC ROKHRI UC PAI KHEL
IB2259 CONST BHIMER NALL RUCTION OF INDUSTRIAL AREA ROAD FROM AH GT ROAD TO GHAZI CHAK INCLUDING BRIDGES ON
045702- A12 Civil works 234,742,000 234,742,000 93,897,000
045702- A124 Building and Structures 234,742,000 234,742,000 93,897,000
Total- CONSTRUCTION OF INDUSTRIAL AREA 234,742,000 234,742,000 93,897,000
IB2264 CONST GUJRAT-II ROAD FROM GT ROAD TO GHAZI CHAK INCLUDING BRIDGES ON BHIMER NALLAH RUCTION OF SERVICE MORE FLYOVER AND I NDUSTRIAL AREA LINK ROAD GUJRAT DISTRICT
045702- A12 Civil works 281,691,000 154,928,000 126,763,000
045702- A124 Building and Structures 281,691,000 154,928,000 126,763,000
Total- CONSTRUCTION OF SERVICE MORE 281,691,000 154,928,000 126,763,000
FYOVER AND INDSTRIA AREA INK
L UL L ROAD GUJRAT DISTRICT GUJRAT-II
IB2265 REHAB JHALL 36 PUL LITION OF ROAD FROM LAHORE ROAD (ADA L 10 MILE) TO FAISLABAD ROAD (46 AD A) VIA 29
045702- A12 Civil works 8,332,000
045702- A124 Building and Structures 8,332,000
Total- REHABLITION OF ROAD FROM LAHORE ROAD (ADA 10 MILE) TO FAISLABAD ROAD (46 ADA) VIA 29 JHALL 36 PULL 8,332,000
IB2266 DEVEL POMENT SCHEME 21 NOS IN DISTRICT CHAKWAL NA-65 (ROAD SCHEMES)
045702- A12 Civil works 187,793,000 187,793,000 187,793,000
045702- A124 Building and Structures 187,793,000 187,793,000 187,793,000
Page 603
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- DEVELPOMENT SCHEME 21 NOS IN 187,793,000 187,793,000 187,793,000
IB2267 CONST DISTRICT CHAKWAL NA-65 (ROAD SCHEMES) RUCTION OF 20 BEDDED HOSPITAL AT VILLA GE LATIFAL DISTRICT CHAKWAL
045702- A12 Civil works 676,204,000 338,103,000 75,117,000
045702- A124 Building and Structures 676,204,000 338,103,000 75,117,000
Total- CONSTRUCTION OF 20 BEDDED 676,204,000 338,103,000 75,117,000
HOSPITAL AT VILLAGE LATIFAL
DISTRICT CHAKWAL
IB2268 WIDEN KHUSHAB ING/REHABILITATION OF ROAD FROM QUAIDABAD TO WARCHHA VIA FATEHPUR DISTRICT
045702- A12 Civil works 281,690,000 169,014,000 28,169,000
045702- A124 Building and Structures 281,690,000 169,014,000 28,169,000
Total- WIDENING/REHABILITATION OF ROAD 281,690,000 169,014,000 28,169,000
FROM QUAIDABAD TO WARCHHA VIA
FATEHPUR DISTRICT KHUSHAB
IB2271 CONSTRUCTION / REHABILITATION OF FLOOD AFFE CTED ROAD DISTRICT MUZAFFARGARH-I
045702- A12 Civil works 189,689,000 189,689,000 56,338,000
045702- A124 Building and Structures 189,689,000 189,689,000 56,338,000
Total- CONSTRUCTION / REHABILITATION OF 189,689,000 189,689,000 56,338,000
FLOOD AFFECTED ROAD DISTRICT
MUZAFFARGARH-I
IB2273 CONSTRUCTION OF 2ND FLOOR OF BOLAN HOSTEL AT CIVIL SERVICE S ACADEMY WALTON LAHORE
045702- A12 Civil works 25,000,000 46,234,000 9,390,000
045702- A124 Building and Structures 25,000,000 46,234,000 9,390,000
Total- CONSTRUCTION OF 2ND FLOOR OF 25,000,000 46,234,000 9,390,000
BOLAN HOSTEL AT CIVIL SERVICES
ACADEMY WALTON LAHORE
IB2278 CONSTRUCTION OF POLICE BARRACKS POLICE STA NAB KPK HAYATABAD TION CIVIL LINES INCLUDING PRISON ER CELL AT
045702- A12 Civil works 34,237,000
045702- A124 Building and Structures 34,237,000
Total- CONSTRUCTION OF POLICE 34,237,000
BARRACKS POLICE STATION CIVIL LINES INCLUDING PRISONER CELL AT
Page 604
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget 2021-2022 Revised 2022-2023 Budget
Estimate Estimate Estimate
Rs Rs Rs
IB2285 CONST PESHAWAR ACCOUNTANT GENERAL P NAB KPK HAYATABAD RUCTION OF AUDITORIUM BACHELOR HOSTE AKISTAN REVENU L AND OFFICERS ES MESS FOR NAB (KP ) AT
045702- A12 Civil works 93,897,000 93,897,000 56,338,000
045702- A124 Building and Structures 93,897,000 93,897,000 56,338,000
Total- CONSTRUCTION OF AUDITORIUM 93,897,000 93,897,000 56,338,000
IB2294 CONST BACHELOR HOSTEL AND OFFICERS MESS FOR NAB (KP) AT PESHAWAR RUCTION OF BLACK TOP ROAD FROM NH-40 KHUCHAKI WADH TO KHARAN ROAD (30KM)
045702- A12 Civil works 144,221,000 115,377,000 28,843,000
045702- A124 Building and Structures 144,221,000 115,377,000 28,843,000
Total- CONSTRUCTION OF BLACK TOP ROAD 144,221,000 115,377,000 28,843,000
FROM NH-40 KHUCHAKI WADH TO
KHARAN ROAD (30KM)
IB2296 CONST RUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA
045702- A12 Civil works 46,948,000 46,949,000 309,859,000
045702- A124 Building and Structures 46,948,000 46,949,000 309,859,000
Total- CONSTRUCTION OF BUILDING FOR 46,948,000 46,949,000 309,859,000
GIRLS COLLEGE AT KACHI BAIG
SARYAB ROAD QUETTA
IB2297 CONSTRUCTION OF LIBRARY SARYAB ROAD QUETTA
045702- A12 Civil works 28,169,000 16,901,000 30,047,000
045702- A124 Building and Structures 28,169,000 16,901,000 30,047,000
Total- CONSTRUCTION OF LIBRARY SARYAB 28,169,000 16,901,000 30,047,000
IB2299 CONST ROAD QUETTA RUCTION OF ROAD FROM HAZRAT JAFT TO E SSAH CHAH DISTRICT NUSHKI
045702- A12 Civil works 109,872,000 87,898,000 21,974,000
045702- A124 Building and Structures 109,872,000 87,898,000 21,974,000
Total- CONSTRUCTION OF ROAD FROM 109,872,000 87,898,000 21,974,000
IB2301 CONST HAZRAT JAFT TO ESSAH CHAH DISTRICT NUSHKI RUCTION OF ROAD FROM UNION COUNCIL D AAK DISTRICT NUSHKI TO CHAGAI
045702- A12 Civil works 126,773,000 101,418,000 25,355,000
045702- A124 Building and Structures 126,773,000 101,418,000 25,355,000
Page 605
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- CONSTRUCTION OF ROAD FROM 126,773,000 101,418,000 25,355,000
IB2303 MUSA UNION COUNCIL DAAK DISTRICT NUSHKI TO CHAGAI KHAIL TANNSA ROAD (35-KM) STRETCH ROAD TO CONSTRUCTED AND LINKS WITH ZHOB
045702- A12 Civil works 254,250,000 203,400,000 50,850,000
045702- A124 Building and Structures 254,250,000 203,400,000 50,850,000
Total- MUSA KHAIL TANNSA ROAD (35-KM) 254,250,000 203,400,000 50,850,000
IB2311 CONST BALOCHISTA STRETCH ROAD TO CONSTRUCTED AND LINKS WITH ZHOB RUCTION OF BRIDGE OVER RIVER KOTIRA AN N D 17 KMS ROAD IN UC LOHI DISTRICT LASBELA
045702- A12 Civil works 233,854,000 116,927,000 116,927,000
045702- A124 Building and Structures 233,854,000 116,927,000 116,927,000
Total- CONSTRUCTION OF BRIDGE OVER 233,854,000 116,927,000 116,927,000
RIVER KOTIRA AND 17 KMS ROAD IN
IB2360 CONST UC LOHI DISTRICT LASBELA BALOCHISTAN RUCTION OF DHUDIAL BY PASS DISTRICT CH AKWAL
045702- A12 Civil works 191,742,000 95,871,000 93,897,000
045702- A124 Building and Structures 191,742,000 95,871,000 93,897,000
Total- CONSTRUCTION OF DHUDIAL BY PASS 191,742,000 95,871,000 93,897,000
ID8076 ESTAB DISTRICT CHAKWAL LISHMENT CHARGES CREDITED TO OTHER G OVERNMENT DEPARTMENTS (PAK. PWD SINDH)
045702- A03 Operating Expenses 445,409,000 191,000,000 159,137,000
045702- A039 General 445,409,000 191,000,000 159,137,000
045702- A12 Civil works 18,918,000
045702- A124 Building and Structures 18,918,000
Total- ESTABLISHMENT CHARGES CREDITED 464,327,000 191,000,000 159,137,000
ID8077 TOOLS TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH) AND PLANTS CHARGES CREDITED TO OTHE R GOVERNMENT DEPARTMENTS (PAK. PWD SINDH)
045702- A03 Operating Expenses 135,401,000 57,316,000 47,742,000
045702- A039 General 135,401,000 57,316,000 47,742,000
Total- TOOLS AND PLANTS CHARGES 135,401,000 57,316,000 47,742,000
CREDITED TO OTHER GOVERNMENT
Page 606
NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

ID8082 ESTAB DEPARTMENTS (PAK. PWD SINDH) LISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB)
045702- A03 Operating Expenses 372,435,000 191,000,000 231,431,000
045702- A039 General 372,435,000 191,000,000 231,431,000
045702- A12 Civil works 4,223,000
045702- A124 Building and Structures 4,223,000
Total- ID8083 TOOLS ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB) AND PLANTS CHARGES CREDITED TO OTH 376,658,000 ER GOVERNMENT D 191,000,000 EPARTMENTS (PAK. 231,431,000 PWD PUNJAB)
045702- A03 Operating Expenses 131,306,000 57,316,000 69,431,000
045702- A039 General 131,306,000 57,316,000 69,431,000
Total- TOOLS AND PLANTS CHARGES 131,306,000 57,316,000 69,431,000
CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB)
ID8085 ESTABLISHMENT CHARGES CREDITED TO OTHER PAKHTUNKHWA). GOVERNMENT DEPARTMENTS (PAK. PWD KHYBER
045702- A03 Operating Expenses 6,407,000 32,612,000 3,756,000
045702- A039 General 6,407,000 32,612,000 3,756,000
Total- ESTABLISHMENT CHARGES CREDITED 6,407,000 32,612,000 3,756,000
TO OTHER GOVERNMENT
ID8086 TOOLS KHYBER PAK DEPARTMENTS (PAK. PWD KHYBER PAKHTUNKHWA). AND PLANTS CHARGES CREDITED TO OTH HTUNKHWA). ER GOVERNMENT DEPARTMENTS (PAK. P.W.D.,
045702- A03 Operating Expenses 1,921,000 9,735,000 1,127,000
045702- A039 General 1,921,000 9,735,000 1,127,000
Total- TOOLS AND PLANTS CHARGES 1,921,000 9,735,000 1,127,000
CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. P.W.D., KHYBER PAKHTUNKHWA).
ID8088 ESTABLISHMENT CHARGES CREDITED TO OTHER BALOCHISTAN) GOVERNMENT DEPARTMENTS (PAK. PWD
045702- A03 Operating Expenses 247,504,000 191,000,000 208,839,000
045702- A039 General 247,504,000 191,000,000 208,839,000
Page 607
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD BALOCHISTAN) 247,504,000 191,000,000 208,839,000
ID8089 TOOLS BALOCHISTA AND PLANTS CHARGES CREDITED TO OTHE N) R GOVERNMENT DEPARTMENTS (PAK . PWD
045702- A03 Operating Expenses 74,245,000 57,316,000 62,651,000
045702- A039 General 74,245,000 57,316,000 62,651,000
Total- TOOLS AND PLANTS CHARGES 74,245,000 57,316,000 62,651,000
CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD BALOCHISTAN)
045702 Total- Buildings and Structures 5,619,539,000 3,776,613,000 2,512,136,000
045720 Others IB3525 REHAB : ILITATION / CONSTRUCTION OF ROADS AT H YDERABAD CITY 2 0 NOS SCHEMES
045720- A12 Civil works 409,469,000 204,734,000 491,238,000
045720- A124 Building and Structures 409,469,000 204,734,000 491,238,000
Total- REHABILITATION / CONSTRUCTION OF 409,469,000 204,734,000 491,238,000
IB3526 REHAB ROADS AT HYDERABAD CITY 20 NOS SCHEMES ILITATION / CONSTRUCTION OF ROADS AT LA TIFABAD HYDERABAD CITY 6 NOS SCHEMES
045720- A12 Civil works 599,469,000 299,734,000 281,690,000
045720- A124 Building and Structures 599,469,000 299,734,000 281,690,000
Total- REHABILITATION / CONSTRUCTION OF 599,469,000 299,734,000 281,690,000
IB3527 REFUR ROADS AT LATIFABAD HYDERABAD CITY 6 NOS SCHEMES BISHMENT AND REHABILITATION OF GOVERN MENT OWNED BUILDINGS AT ISLAMABAD
045720- A12 Civil works 46,948,000 46,949,000 28,169,000
045720- A124 Building and Structures 46,948,000 46,949,000 28,169,000
Total- REFURBISHMENT AND 46,948,000 46,949,000 28,169,000
REHABILITATION OF GOVERNMENT OWNED BUILDINGS AT ISLAMABAD
IB3528 REFUR COLONY ISLA BUSHMENT OF EXISTING FACILITIES & PROVI MABAD SION OF ADDITION AL FACILITIES AT PM STAFF
045720- A12 Civil works 46,949,000 23,474,000 46,949,000
Page 608
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
045720- A124 Building and Structures 46,949,000 23,474,000 46,949,000
Total- REFURBUSHMENT OF EXISTING 46,949,000 23,474,000 46,949,000
FACILITIES & PROVISION OF ADDITIONAL FACILITIES AT PM STAFF COLONY ISLAMABAD
IB3529 REFUR BISHMENT OF PM OFFICE ISLAMABAD
045720- A12 Civil works 46,949,000 28,169,000 46,949,000
045720- A124 Building and Structures 46,949,000 28,169,000 46,949,000
Total- REFURBISHMENT OF PM OFFICE 46,949,000 28,169,000 46,949,000
IB3530 REPLA OFFICE G-5 IS ISLAMABAD CEMENT OF EXISTING OUTLIVED AND ONSOL LAMABAD ETE PASSENGER LIFTS AT PRIME MINISTERS
045720- A12 Civil works 161,521,000 80,760,000 80,762,000
045720- A124 Building and Structures 161,521,000 80,760,000 80,762,000
Total- REPLACEMENT OF EXISTING 161,521,000 80,760,000 80,762,000
IB3531 UPGRA OUTLIVED AND ONSOLETE PASSENGER LIFTS AT PRIME MINISTERS OFFICE G-5 ISLAMABAD DATION AND REFURBISHMENT OF 48 FAMILY SUITS
045720- A12 Civil works 28,169,000 28,169,000 37,465,000
045720- A124 Building and Structures 28,169,000 28,169,000 37,465,000
Total- UPGRADATION AND REFURBISHMENT 28,169,000 28,169,000 37,465,000
IB3532 REPLA PASSENGER OF 48 FAMILY SUITS CEMENT OF UNSERVICEABLE ELEVATORS AT LIFTS) 48 FAMILY SUITS SECTOR G-5/1 ISLAMABAD (4 NOS
045720- A12 Civil works 54,215,000 27,108,000 27,108,000
045720- A124 Building and Structures 54,215,000 27,108,000 27,108,000
Total- REPLACEMENT OF UNSERVICEABLE 54,215,000 27,108,000 27,108,000
ELEVATORS AT 48 FAMILY SUITS SECTOR G-5/1 ISLAMABAD (4 NOS PASSENGER LIFTS)
IB3533 CONST RUCTION OF ADDITIONAL BLOCK AT ELECTIO N HOUSE G-5/2 ISLAMABAD
045720- A12 Civil works 21,908,000
045720- A124 Building and Structures 21,908,000
Total- CONSTRUCTION OF ADDITIONAL 21,908,000
Page 609
NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES BLOCK AT ELECTION HOUSE G-5/2 ISLAMABAD IB3534 20 NOS SCHEMES OF METALLED ROADS TUFF PAVERS CC ROADS & OPEN DRAINS IN TALUKA TALHAR TANDO BAGO MATLI ETC 045720- A12 Civil works 94,834,000 045720- A124 Building and Structures 94,834,000 Total- 20 NOS SCHEMES OF METALLED 94,834,000 ROADS TUFF PAVERS CC ROADS & OPEN DRAINS IN TALUKA TALHAR TANDO BAGO MATLI ETC IB3535 8 NOS SCHEMES OF METALLED ROADS IN UC-AHMED RAJO UC-FATEHABAD UC-HALEPOTA UC HAJI PARIAL BULEDI 045720- A12 Civil works 129,784,000 045720- A124 Building and Structures 129,784,000 Total- 8 NOS SCHEMES OF METALLED ROADS 129,784,000 IN UC-AHMED RAJO UC-FATEHABAD UC-HALEPOTA UC HAJI PARIAL BULEDI IB3536 4 NOS SCHEMES OF METALLED ROADS IN UC-NIDO UC-SAMAN SARKAR VILLAGE ABDUL HAMEED JUNEJO AND VILLAGE 045720- A12 Civil works 88,492,000 045720- A124 Building and Structures 88,492,000 Total- 4 NOS SCHEMES OF METALLED ROADS 88,492,000 IN UC-NIDO UC-SAMAN SARKAR VILLAGE ABDUL HAMEED JUNEJO AND VILLAGE IB3537 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF TUBE WELL AND COMMUNITY SOLAR ENERGY SYSTEM FOR 045720- A12 Civil works 86,689,000 045720- A124 Building and Structures 86,689,000 Total- COMMUNITY BASED DEVELOPMENT 86,689,000 SCHEMES FOR INSTALLATION OF TUBE WELL AND COMMUNITY SOLAR ENERGY SYSTEM FOR IB3538 CONSTRUCTION OF BLACK TOP ROAD KILLI THAL KILLI KOCHI KILLI TADDARI AND KILLI SHAMBAY DISTRICT DUKI

Page 610
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMA 2021-2022 Revised Estimate NDS FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
045720- A12 Civil works 140,845,000 112,676,000 148,122,000
045720- A124 Building and Structures 140,845,000 112,676,000 148,122,000
Total- CONSTRUCTION OF BLACK TOP ROAD 140,845,000 112,676,000 148,122,000
IB3539 DEVEL KILLI THAL KILLI KOCHI KILLI TADDARI AND KILLI SHAMBAY DISTRICT DUKI OPMENT WORKS IN VARIOUS KILLIS OF DISTR ICT WASHUK AND AWARAN (3 NOS SCHEMES)
045720- A12 Civil works 145,540,000 116,432,000 29,108,000
045720- A124 Building and Structures 145,540,000 116,432,000 29,108,000
Total- IB3540 DEVEL DEVELOPMENT WORKS IN VARIOUS KILLIS OF DISTRICT WASHUK AND AWARAN (3 NOS SCHEMES) OPMENT WORKS IN VARIOUS KILLIS OF DISTR 145,540,000 ICT WASHUK 116,432,000 29,108,000
045720- A12 Civil works 225,352,000
045720- A124 Building and Structures 225,352,000
Total- DEVELOPMENT WORKS IN VARIOUS KILLIS OF DISTRICT WASHUK 225,352,000
IB3541 DEVEL OPMENT SCHEMES IN DISTRICT KACHHI JHAL MAGSI AND NASEERABAD(17 NOS SCHEMES)
045720- A12 Civil works 93,897,000 93,897,000 288,732,000
045720- A124 Building and Structures 93,897,000 93,897,000 288,732,000
Total- DEVELOPMENT SCHEMES IN DISTRICT 93,897,000 93,897,000 288,732,000
KACHHI JHAL MAGSI AND NASEERABAD(17 NOS SCHEMES)
IB3542 PAVEM ENT OF STREETS SOLING SYSTEM IN 15 DIFF ERENT AREAS OF GUJRANWALA
045720- A12 Civil works 93,897,000 93,897,000 281,690,000
045720- A124 Building and Structures 93,897,000 93,897,000 281,690,000
Total- PAVEMENT OF STREETS SOLING 93,897,000 93,897,000 281,690,000
SYSTEM IN 15 DIFFERENT AREAS OF GUJRANWALA
IB3543 CONSTRUCTION OF CARPETED ROAD FROM DHILLA GUJRANWALA AND N WAL PHATTAK TO AIMANABAD T OWN DISTRICT
045720- A12 Civil works 38,498,000 38,498,000 28,169,000
045720- A124 Building and Structures 38,498,000 38,498,000 28,169,000
Total- CONSTRUCTION OF CARPETED ROAD FROM DHILLAN WAL PHATTAK TO AIMANABAD TOWN DISTRICT 38,498,000 38,498,000 28,169,000
Page 611
NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

GUJRANWALA AND

IB3544 WIDENING/RE-CARPETING OF ROAD FROM NOORA NI CROSS TO SHRINE HAZRAT SHAH BILAWAL
NOORANI DISTRICT
045720- A12 Civil works 319,831,000
045720- A124 Building and Structures 319,831,000
Total- IB3545 PROVI OF NAWABSH WIDENING/RE-CARPETING OF ROAD FROM NOORANI CROSS TO SHRINE HAZRAT SHAH BILAWAL NOORANI DISTRICT DING WATER SUPPLY SEWERAGE LINES CC AH 319,831,000 TOPPING SOLAR LI GHTS IN VARIOUS W ARDS / UCS
045720- A12 Civil works 89,606,000 127,932,000 28,169,000
045720- A124 Building and Structures 89,606,000 127,932,000 28,169,000
Total- PROVIDING WATER SUPPLY 89,606,000 127,932,000 28,169,000
IB3546 IMPRO DISTRICT SOU SEWERAGE LINES CC TOPPING SOLAR LIGHTS IN VARIOUS WARDS / UCS OF NAWABSHAH VEMENT/REHABILITATION OF DIFFERENT R TH KARACHI OADS/STREETS CC FLOORING & SEWERAGE IN
045720- A12 Civil works 146,441,000 17,921,000 71,685,000
045720- A124 Building and Structures 146,441,000 17,921,000 71,685,000
Total- IMPROVEMENT/REHABILITATION OF 146,441,000 17,921,000 71,685,000
IB3547 IMPRO SYSTEM IN VA DIFFERENT ROADS/STREETS CC FLOORING & SEWERAGE IN DISTRICT SOUTH KARACHI VEMENT/REHABILITATION OF DIFFERENT R RIOUS UNION OADS/STREETS INCLUDING WATER & SEWERAGE
045720- A12 Civil works 926,441,000 58,577,000 87,864,000
045720- A124 Building and Structures 926,441,000 58,577,000 87,864,000
Total- IMPROVEMENT/REHABILITATION OF 926,441,000 58,577,000 87,864,000
DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION
IB3548 IMPROVEMENT/REHABILITATION OF DIFFERENT R SYSTEM IN VARIOUS UNION OADS/STREETS INCLUDING WATER & SEWERAGE
Page 612
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
045720- A12 Civil works 1,362,770,000 522,054,000 281,690,000
045720- A124 Building and Structures 1,362,770,000 522,054,000 281,690,000
Total- IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION 1,362,770,000 522,054,000 281,690,000
IB3549 IMPROVEMENT/REHABILITATION OF DIFFERENT RO SYSTEM IN VARIOUS UNION ADS/STREETS INCLUDING WATER & SEWERAGE
045720- A12 Civil works 569,380,000 113,876,000 281,690,000
045720- A124 Building and Structures 569,380,000 113,876,000 281,690,000
Total- IMPROVEMENT/REHABILITATION OF 569,380,000 113,876,000 281,690,000
IB3550 IMPRO SYSTEM IN VA DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION VEMENT/REHABILITATION OF DIFFERENT RO RIOUS UNION ADS/STREETS INCLUDING WATER & SEWERAGE
045720- A12 Civil works 1,238,770,000 474,930,000 281,690,000
045720- A124 Building and Structures 1,238,770,000 474,930,000 281,690,000
Total- IMPROVEMENT/REHABILITATION OF 1,238,770,000 474,930,000 281,690,000
IB3551 IMPRO SYSTEM IN VA DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION VEMENT/REHABILITATION OF DIFFERENT RO RIOUS UNION ADS/STREETS INCLUDING WATER & SEWERAGE
045720- A12 Civil works 117,136,000 46,854,000 70,285,000
045720- A124 Building and Structures 117,136,000 46,854,000 70,285,000
Total- IMPROVEMENT/REHABILITATION OF 117136000 46854000 70285000
DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION ,, ,, ,,
IB3552 IMPROVEMENT/REHABILITATION OF DIFFERENT RO SYSTEM IN VARIOUS UNION ADS/STREETS INCLUDING WATER & SEWERAGE
045720- A12 Civil works 58,516,000 43,407,000 35,111,000
045720- A124 Building and Structures 58,516,000 43,407,000 35,111,000
Total- IMPROVEMENT/REHABILITATION OF 58,516,000 43,407,000 35,111,000
Page 613
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 DEMAN 2021-2022 Budget 2021-2022 Revised DS FOR GRANTS 2022-2023 Budget
Estimate Estimate Estimate
Rs Rs Rs
IB3553 IMPRO SYSTEM AT D ACCOUNTANT GENERAL P DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION VEMENT/REHABILITATION OF DIFFERENT RO ISTRICT AKISTAN REVENUES ADS/STREETS INCLUDING WATER & SEWERAGE
045720- A12 Civil works 375,233,000 370,576,000 281,690,000
045720- A124 Building and Structures 375,233,000 370,576,000 281,690,000
Total- IMPROVEMENT/REHABILITATION OF 375,233,000 370,576,000 281,690,000
DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM AT DISTRICT
IB3554 IMPROVEMENT/REHABILITATION OF DIFFERENT RO SYSTEM AT DISTRICT EAST ADS/STREETS INCLUDING WATER & SEWERAGE
045720- A12 Civil works 204,610,000 40,922,000 163,681,000
045720- A124 Building and Structures 204,610,000 40,922,000 163,681,000
Total- IMPROVEMENT/REHABILITATION OF 204,610,000 40,922,000 163,681,000
IB3555 IMPRO SYSTEM AT V DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM AT DISTRICT EAST VEMENT/REHABILITATION OF DIFFERENT RO ARIOUS MAIN ADS /STREETS INCLUDING WATER & SEWERAGE
045720- A12 Civil works 418,446,000 167,378,000 281,690,000
045720- A124 Building and Structures 418,446,000 167,378,000 281,690,000
Total- IMPROVEMENT/REHABILITATION OF 418,446,000 167,378,000 281,690,000
DIFFERENT ROADS /STREETS INCLUDING WATER & SEWERAGE SYSTEM AT VARIOUS MAIN
IB3556 DEVEL SHAHEED OPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- LARKANA SUKKUR AND
045720- A12 Civil works 781,842,000 312,736,000 28,169,000
045720- A124 Building and Structures 781,842,000 312,736,000 28,169,000
Total- DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- LARKANA SUKKUR AND SHAHEED 781,842,000 312,736,000 28,169,000

IB3557 DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- HYDERABAD AND

Page 614
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
MIRPURKHAS DIVISIONS
045720- A12 Civil works 569,292,000 227,717,000 328,638,000
045720- A124 Building and Structures 569,292,000 227,717,000 328,638,000
Total- DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- HYDERABAD AND MIRPURKHAS DIVISIONS 569,292,000 227,717,000 328,638,000
IB3558 PROVI NOS)(SB) SION OF SOLAR SYSTEM FOR DOMESTIC USE OF PEOPLE OF DISTRICT CHAGHI(SO LAR KITS 2630
045720- A12 Civil works 93,897,000
045720- A124 Building and Structures 93,897,000
Total- IB3559 WATER DEVELOPMEN PROVISION OF SOLAR SYSTEM FOR DOMESTIC USE OF PEOPLE OF DISTRICT CHAGHI(SOLAR KITS 2630 NOS)(SB) SUPPLY SCHEME FOR NOKHUNDI DISTRICT T OF BORE 93,897,000 CHAGHI FROM PA THAN GAZ (DRILLING AND
045720- A12 Civil works 93,897,000 93,897,000 75,474,000
045720- A124 Building and Structures 93,897,000 93,897,000 75,474,000
Total- WATER SUPPLY SCHEME FOR 93,897,000 93,897,000 75,474,000
NOKHUNDI DISTRICT CHAGHI FROM PATHAN GAZ (DRILLING AND DEVELOPMENT OF BORE
IB3560 REHAB JAFFARABAD ILITATION / RECONSTRUCTION OF TAJ PUR BRIDGE DAMAGED IN FLOODS OF 2010 DISTRICT
045720- A12 Civil works 22,406,000 11,202,000 11,204,000
045720- A124 Building and Structures 22,406,000 11,202,000 11,204,000
Total- REHABILITATION / RECONSTRUCTION 22,406,000 11,202,000 11,204,000
OF TAJ PUR BRIDGE DAMAGED IN FLOODS OF 2010 DISTRICT JAFFARABAD
IB3561 CONST VILLAGE GHA RUCTION OF BLACK TOP ROAD FROM NEW R IBI KHAN OJHAN JAMALI VI A OLD ROJHAN JAM ALI TO
045720- A12 Civil works 187,676,000 112,608,000 75,069,000
045720- A124 Building and Structures 187,676,000 112,608,000 75,069,000
Page 615
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- IB3562 REHAB JAFFARABAD CONSTRUCTION OF BLACK TOP ROAD FROM NEW ROJHAN JAMALI VIA OLD ROJHAN JAMALI TO VILLAGE GHAIBI KHAN ILITATION/RECONSTRUCTION OF LAL MANDI 187,676,000 R BRIDGE DAMAGE 112,608,000 D IN FLOODS OF 20 75,069,000 10 DISTRICT
045720- A12 Civil works 24,901,000 12,450,000 12,451,000
045720- A124 Building and Structures 24,901,000 12,450,000 12,451,000
Total- REHABILITATION/RECONSTRUCTION 24,901,000 12,450,000 12,451,000
IB3563 CONST OF LAL MANDIR BRIDGE DAMAGED IN FLOODS OF 2010 DISTRICT JAFFARABAD RUCTION OF BLACK TOP ROAD CHINKINDIK T O MASKEECHAH DISTRICT CHAGHI
045720- A12 Civil works 140,845,000 84,507,000 93,897,000
045720- A124 Building and Structures 140,845,000 84,507,000 93,897,000
Total- CONSTRUCTION OF BLACK TOP ROAD 140,845,000 84,507,000 93,897,000
IB3564 CONST CHINKINDIK TO MASKEECHAH DISTRICT CHAGHI RUCTION OF BLACK TOP ROAD CHAGHI TO L ASHKARAP DISTRICT CHAGHI
045720- A12 Civil works 140,845,000 84,507,000 152,423,000
045720- A124 Building and Structures 140,845,000 84,507,000 152,423,000
Total- CONSTRUCTION OF BLACK TOP ROAD 140,845,000 84,507,000 152,423,000
CHAGHI TO LASHKARAP DISTRICT
IB3565 CONST CHAGHI RUCTION OF BLACK TOP ROAD LASHKARAP TO NALOOP DISTRICT CHAGHI
045720- A12 Civil works 140,845,000 84,507,000 150,235,000
045720- A124 Building and Structures 140,845,000 84,507,000 150,235,000
Total- CONSTRUCTION OF BLACK TOP ROAD 140,845,000 84,507,000 150,235,000
LASHKARAP TO NALOOP DISTRICT CHAGHI
IB3566 CONST LINK TO TALA RUCTION OF 38 KMS ROAD CONNECTING DU NGA DAM IN REJI TOWN OF LASBELA TO UC TAUNG WITH 8 KMS
045720- A12 Civil works 469,342,000 281,606,000 332,928,000
045720- A124 Building and Structures 469,342,000 281,606,000 332,928,000
Total- CONSTRUCTION OF 38 KMS ROAD 469,342,000 281,606,000 332,928,000
Page 616
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENU CONNECTING DUREJI TOWN OF LASBELA TO UC TAUNG WITH 8 KMS LINK TO TALANGA DAM IN ES
IB3567 19 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A12 Civil works 140,845,000 70,423,000 28,169,000
045720- A124 Building and Structures 140,845,000 70,423,000 28,169,000
Total- 19 NOS DEVELOPMENT SCHEMES IN 140,845,000 70,423,000 28,169,000
DISTRICT BADIN
IB3568 11 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A12 Civil works 187,793,000 93,897,000 28,169,000
045720- A124 Building and Structures 187,793,000 93,897,000 28,169,000
Total- 11 NOS DEVELOPMENT SCHEMES IN 187,793,000 93,897,000 28,169,000
DISTRICT BADIN
IB3569 15 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A12 Civil works 140,845,000 70,423,000 28,169,000
045720- A124 Building and Structures 140,845,000 70,423,000 28,169,000
Total- 15 NOS DEVELOPMENT SCHEMES IN 140,845,000 70,423,000 28,169,000
IB3570 CONST DISTRICT BADIN RUCTION OF METALLED ROADS IN TALULKA LAKHI DISTRICT S HIKARPUR SINDH (09 SCHEMES)
045720- A12 Civil works 444,131,000 222,066,000 28,169,000
045720- A124 Building and Structures 444,131,000 222,066,000 28,169,000
Total- CONSTRUCTION OF METALLED ROADS 444,131,000 222,066,000 28,169,000
IN TALULKA LAKHI DISTRICT
SHIKARPUR SINDH (09 SCHEMES)
IB3571 CONST RUCTION OF BLACK TOP ROADS PURANA DUKI AND RABBAT V ILLAGES DISTRICT DUKI
045720- A12 Civil works 194,366,000 97,183,000 381,419,000
045720- A124 Building and Structures 194,366,000 97,183,000 381,419,000
Total- CONSTRUCTION OF BLACK TOP 194,366,000 97,183,000 381,419,000
IB3572 CONST ROADS PURANA DUKI AND RABBAT VILLAGES DISTRICT DUKI RUCTION OF BLACK TOP ROAD AT DISTRICT HARNAI ZIARAT A ND LORALAI (30 KM)
045720- A12 Civil works 187,793,000 93,897,000 281,690,000
045720- A124 Building and Structures 187,793,000 93,897,000 281,690,000
Total- CONSTRUCTION OF BLACK TOP ROAD 187,793,000 93,897,000 281,690,000
Page 617
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget 2021-2022 Revised 2022-2023 Budget
Estimate Estimate Estimate
Rs Rs Rs
IB3573 CONST ACCOUNTANT GENERAL P AT DISTRICT HARNAI ZIARAT AND LORALAI (30 KM) RUCTION OF BLACK TOP ROAD FROM KILLA AKISTAN REVENU SHAIR TO YARO S ES HAIR THAL DISTRI CT DUKI
045720- A12 Civil works 87,324,000 43,662,000 43,662,000
045720- A124 Building and Structures 87,324,000 43,662,000 43,662,000
Total- CONSTRUCTION OF BLACK TOP ROAD 87,324,000 43,662,000 43,662,000
IB3574 DEVEL SCHEMES) FROM KILLA SHAIR TO YARO SHAIR THAL DISTRICT DUKI OPMENT SCHEMES IN GHAS KARH HATHYARI JHAL MAGSI CITY DISTRICT JHAL MAGSI (3
045720- A12 Civil works 122,066,000 69,577,000 178,675,000
045720- A124 Building and Structures 122,066,000 69,577,000 178,675,000
Total- DEVELOPMENT SCHEMES IN GHAS 122,066,000 69,577,000 178,675,000
KARH HATHYARI JHAL MAGSI CITY
DISTRICT JHAL MAGSI (3 SCHEMES)
IB3575 COMMUNITY BASED DEVELOPMENT SCHEMES FOR DISTRICT JHAL MAGSI (2 NOS WATER SUPPLY IN VARIOUS UCS TEHSIL AND
045720- A12 Civil works 131,455,000 131,455,000 135,753,000
045720- A124 Building and Structures 131,455,000 131,455,000 135,753,000
Total- COMMUNITY BASED DEVELOPMENT 131,455,000 131,455,000 135,753,000
SCHEMES FOR WATER SUPPLY IN VARIOUS UCS TEHSIL AND DISTRICT JHAL MAGSI (2 NOS
IB3576 DEVEL SCHEMES) OPMENT SCHEMES IN THAMBO & DMJAMALI DISTRICT NASEERABAD (2 NOS DEVELOPMENT
045720- A12 Civil works 215,962,000 123,099,000 271,621,000
045720- A124 Building and Structures 215,962,000 123,099,000 271,621,000
Total- DEVELOPMENT SCHEMES IN THAMBO 215,962,000 123,099,000 271,621,000
& DMJAMALI DISTRICT NASEERABAD (2 NOS DEVELOPMENT SCHEMES)
IB3577 COMM SYSTEM IN VA UNITY BASED DEVELOPMENT SCHEMES FOR RIOUS UCS OF INSTALLATION OF COMMUNITY HOME SOLAR
045720- A12 Civil works 46,948,000 46,949,000 187,793,000
045720- A124 Building and Structures 46,948,000 46,949,000 187,793,000
Total- COMMUNITY BASED DEVELOPMENT 46,948,000 46,949,000 187,793,000
Page 618
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMANDS 2021-2022 Revised Estimate FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
IB3578 CONST ACCOUNTANT GENERAL P SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR SYSTEM IN VARIOUS UCS OF RUCTION OF BLACK TOP ROAD FROM PATK T AKISTAN REVENUES O SHIREZA DISTRICT WASHUK
045720- A12 Civil works 46,948,000 28,169,000 18,779,000
045720- A124 Building and Structures 46,948,000 28,169,000 18,779,000
Total- CONSTRUCTION OF BLACK TOP ROAD 46,948,000 28,169,000 18,779,000
FROM PATK TO SHIREZA DISTRICT
WASHUK
IB3579 CUTTI BARRONT NG LEVELING DRESSING AND CONVERTING IT INTO JEEPABLE SUR FACE FROM GARH ARI TO
045720- A12 Civil works 46,946,000 23,473,000 23,472,000
045720- A124 Building and Structures 46,946,000 23,473,000 23,472,000
Total- CUTTING LEVELING DRESSING AND 46,946,000 23,473,000 23,472,000
IB3580 CONST CONVERTING IT INTO JEEPABLE SURFACE FROM GARHARI TO BARRONT RUCTION OF BLACK TOP ROAD FROM LUNDO TOWARDS NAAG DISTRICT WASHUK
045720- A12 Civil works 46,946,000 18,168,000 18,777,000
045720- A124 Building and Structures 46,946,000 18,168,000 18,777,000
Total- CONSTRUCTION OF BLACK TOP ROAD 46,946,000 18,168,000 18,777,000
FROM LUNDO TOWARDS NAAG
DISTRICT WASHUK
IB3581 CONST RUCTION OF BLACL TOP ROAD FROM JORI T O SONERI DISTRICT AWARAN
045720- A12 Civil works 46,948,000 23,474,000 46,949,000
045720- A124 Building and Structures 46,948,000 23,474,000 46,949,000
Total- CONSTRUCTION OF BLACL TOP ROAD 46,948,000 23,474,000 46,949,000
IB3582 COMM STREET LIGH FROM JORI TO SONERI DISTRICT AWARAN UNITY BASED DEVELOPMENT SCHEMES FOR I TS IN VARIOUS NSTALLATION OF COMMUNITY HOME SOLAR
045720- A12 Civil works 46,948,000 23,474,000 70,423,000
045720- A124 Building and Structures 46,948,000 23,474,000 70,423,000
Total- COMMUNITY BASED DEVELOPMENT 46,948,000 23,474,000 70,423,000
SCHEMES FOR INSTALLATION OF
Page 619
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget 2021-2022 Revised 2022-2023 Budget
Estimate Estimate Estimate
Rs Rs Rs
IB3583 CONST ACCOUNTANT GENERAL P COMMUNITY HOME SOLAR STREET LIGHTS IN VARIOUS RUCTION OF BLACKTOP ROAD FROM DELI KA AKISTAN REVENUES LAAGAN TO PURPAT DISTRICT WASHUK
045720- A12 Civil works 46,945,000 28,167,000 18,777,000
045720- A124 Building and Structures 46,945,000 28,167,000 18,777,000
Total- CONSTRUCTION OF BLACKTOP ROAD 46,945,000 28,167,000 18,777,000
FROM DELI KALAAGAN TO PURPAT
DISTRICT WASHUK
IB3584 CONSTRUCTION OF BLACKTOP ROAD FROM CPEC K DISTRICT WASHUK HARAN YAK MACH ROAD TO GUL KHARAMGAI
045720- A12 Civil works 46,948,000 28,169,000 18,779,000
045720- A124 Building and Structures 46,948,000 28,169,000 18,779,000
Total- CONSTRUCTION OF BLACKTOP ROAD 46,948,000 28,169,000 18,779,000
IB3585 COMM IN U/C SOTHG FROM CPEC KHARAN YAK MACH ROAD TO GUL KHARAMGAI DISTRICT WASHUK UNITY BASED DEVELOPMET SCHEMES FOR IN AN AND STALLATION OF COMMUNITY HOME SOLAR SYSTEM
045720- A12 Civil works 46,948,000 46,949,000 187,793,000
045720- A124 Building and Structures 46,948,000 46,949,000 187,793,000
Total- COMMUNITY BASED DEVELOPMET 46,948,000 46,949,000 187,793,000
SCHEMES FOR INSTALLATION OF
COMMUNITY HOME SOLAR SYSTEM IN U/C SOTHGAN AND
IB3586 CONSTRUCTION BLACKTOP ROAD FROM CADET CO DISTRICT AWARAN LLEGE JAHOO TO SISTAGAN TEHSIL JAHOO
045720- A12 Civil works 46,948,000 23,474,000 46,945,000
045720- A124 Building and Structures 46,948,000 23,474,000 46,945,000
Total- CONSTRUCTION BLACKTOP ROAD 46,948,000 23,474,000 46,945,000
IB3587 CONST FROM CADET COLLEGE JAHOO TO SISTAGAN TEHSIL JAHOO DISTRICT AWARAN RUCTION OF ADDITIONAL ROOMS FOR GOVT GIRLS/BOYS PRIMARY/MIDDLE/HIGH SCHOOL AT
045720- A12 Civil works 145,331,000 72,666,000 72,665,000
045720- A124 Building and Structures 145,331,000 72,666,000 72,665,000
Page 620
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- IB3588 CONST CONSTRUCTION OF ADDITIONAL ROOMS FOR GOVT GIRLS/BOYS PRIMARY/MIDDLE/HIGH SCHOOL AT RUCTION OF ROAD FROM ROBDBUN TO GOM 145,331,000 AZI 23 KM DISTRIC 72,666,000 T KECH 72,665,000
045720- A12 Civil works 257,182,000 128,591,000 142,767,000
045720- A124 Building and Structures 257,182,000 128,591,000 142,767,000
Total- CONSTRUCTION OF ROAD FROM ROBDBUN TO GOMAZI 23 KM DISTRICT KECH 257,182,000 128,591,000 142,767,000
IB3589 ESTABLISHMENT OF BIBI BAZAR AT MAND DISTRICT KECH
045720- A12 Civil works 66,971,000 33,485,000 33,487,000
045720- A124 Building and Structures 66,971,000 33,485,000 33,487,000
Total- ESTABLISHMENT OF BIBI BAZAR AT 66,971,000 33,485,000 33,487,000
IB3590 CONST TEHSIL YAZM MAND DISTRICT KECH RUCTION OF SHED AND BWALL OF JANAZGA AN H/GRAVEYARD/SCHOOLS IN DIFFERENT UCS OF
045720- A12 Civil works 51,408,000 33,416,000 17,992,000
045720- A124 Building and Structures 51,408,000 33,416,000 17,992,000
Total- CONSTRUCTION OF SHED AND BWALL 51,408,000 33,416,000 17,992,000
OF JANAZGAH/GRAVEYARD/SCHOOLS IN DIFFERENT UCS OF TEHSIL YAZMAN
IB3591 CONSTRUCTION OF SOLINGS/NALL AND TUFF TILE I BAHAWALPUR (02 NOS N DIFFERENT UCS OF TEHSIL YAZMAN DISTRICT
045720- A12 Civil works 138,122,000 89,779,000 95,291,000
045720- A124 Building and Structures 138,122,000 89,779,000 95,291,000
Total- CONSTRUCTION OF SOLINGS/NALL 138,122,000 89,779,000 95,291,000
AND TUFF TILE IN DIFFERENT UCS OF
IB3592 PROVI DEVELOPMEN TEHSIL YAZMAN DISTRICT BAHAWALPUR (02 NOS SION OF SEWERAGE IN DIFFERENT UCS OF TE T HSIL YAZMAN DISTICT BAHAWALPUR (8 NOS
045720- A12 Civil works 78,488,000 51,018,000 74,419,000
045720- A124 Building and Structures 78,488,000 51,018,000 74,419,000
Total- PROVISION OF SEWERAGE IN 78,488,000 51,018,000 74,419,000
DIFFERENT UCS OF TEHSIL YAZMAN
Page 621
NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES

DISTICT BAHAWALPUR (8 NOS DEVELOPMENT

IB3593 INSTALLATION OF FILTERATION PLANT IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (3 NOS DEVELOPMENT

045720- A12 Civil works 63,850,000
045720- A124 Building and Structures 63,850,000
Total- INSTALLATION OF FILTERATION PLANT 63,850,000
IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (3 NOS DEVELOPMENT

IB3594 CONSTRUCTION OF METALLED ROAD IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (24 NOS DEVELOPMENT

045720- A12 Civil works 235,168,000 188,134,000 456,487,000
045720- A124 Building and Structures 235,168,000 188,134,000 456,487,000
Total- CONSTRUCTION OF METALLED ROAD IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (24 NOS DEVELOPMENT 235,168,000 188,134,000 456,487,000

IB3595 CONSTRUCTION OF METTALED ROADS AND BRIDGES IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (12 NOS

045720- A12 Civil works 148,321,000 96,409,000 51,912,000
045720- A124 Building and Structures 148,321,000 96,409,000 51,912,000
Total- CONSTRUCTION OF METTALED ROADS AND BRIDGES IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (12 NOS 148,321,000 96,409,000 51,912,000

IB3596 CONSTRUCTION OF SOLING IN DIFFERENT AREAS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (20 NOS SCHEMES)

045720- A12 Civil works 281,690,000 183,099,000 238,444,000
045720- A124 Building and Structures 281,690,000 183,099,000 238,444,000
Total- CONSTRUCTION OF SOLING IN DIFFERENT AREAS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (20 NOS SCHEMES) 281,690,000 183,099,000 238,444,000

IB3597 CONSTRUCTION OF SOLING IN UC-KARAMPUR AND UC ANAITI TEHSIL KHAIRPUR TAMAYWALI DISTRICT BAHAWALPUR

045720- A12 Civil works 54,596,000 35,488,000 19,109,000
045720- A124 Building and Structures 54,596,000 35,488,000 19,109,000
Page 622
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- IB3598 DEVEL CONSTRUCTION OF SOLING IN UC-KARAMPUR AND UC ANAITI TEHSIL KHAIRPUR TAMAYWALI DISTRICT BAHAWALPUR OPMENT SCHEMES IN DIFFERENT UCS OF DIS 54,596,000 TRICT GUJRAT-I (6 35,488,000 0 NOS DEVELOPME 19,109,000 NT SCHEMES)
045720- A12 Civil works 938,967,000 938,967,000 28,169,000
045720- A124 Building and Structures 938,967,000 938,967,000 28,169,000
Total- DEVELOPMENT SCHEMES IN 938,967,000 938,967,000 28,169,000
IB3599 CONST DISTRICT DIFFERENT UCS OF DISTRICT GUJRAT-I (60 NOS DEVELOPMENT SCHEMES) RUCTION OF PCC ROAD AND INFRASTRUCTU RE DEVELOPMENT AT DIFFERENT UNION COUNCIL
045720- A12 Civil works 187,794,000 93,897,000 93,897,000
045720- A124 Building and Structures 187,794,000 93,897,000 93,897,000
Total- CONSTRUCTION OF PCC ROAD AND 187,794,000 93,897,000 93,897,000
INFRASTRUCTURE DEVELOPMENT AT DIFFERENT UNION COUNCIL DISTRICT
IB3600 IMPRO VEMENT OF ROAD INFRASTRUCTURE AT DIST RIDCT CHAKWAL (10 NOS SCHEMES)
045720- A12 Civil works 211,329,000 105,665,000 105,664,000
045720- A124 Building and Structures 211,329,000 105,665,000 105,664,000
Total- IMPROVEMENT OF ROAD 211,329,000 105,665,000 105,664,000
INFRASTRUCTURE AT DISTRIDCT
CHAKWAL (10 NOS SCHEMES)
IB3601 CONSTRUCTION AND IMPROVEMENT OF ROAD INFR DISTRICT CHAKWAL (11 NOS ASTRUCTURE AT TEHSIL TALAGANG & LAWA
045720- A12 Civil works 249,296,000 124,648,000 124,648,000
045720- A124 Building and Structures 249,296,000 124,648,000 124,648,000
Total- CONSTRUCTION AND IMPROVEMENT 249,296,000 124,648,000 124,648,000
OF ROAD INFRASTRUCTURE AT TEHSIL TALAGANG & LAWA DISTRICT CHAKWAL (11 NOS
IB3602 REHABILITATION & IMPROVEMENT OF ROAD IN DISTRICT CHAKWAL (1 2 NOS SCHEMES)
045720- A12 Civil works 290,549,000 159,360,000 93,897,000
045720- A124 Building and Structures 290,549,000 159,360,000 93,897,000
Page 623
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMANDS 2021-2022 Revised Estimate FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
Total- REHABILITATION & IMPROVEMENT OF 290,549,000 159,360,000 93,897,000
IB3603 DEVEL GUJRAT ROAD IN DISTRICT CHAKWAL (12 NOS SCHEMES) OPMENT SCHEMES OF INFRASTRUCTURE AN D PUBLIC WORKS IN DIFFERENT UCS OF DISTRICT
045720- A12 Civil works 281,690,000 160,563,000 28,169,000
045720- A124 Building and Structures 281,690,000 160,563,000 28,169,000
Total- IB3604 DEVEL DEVELOPMENT SCHEMES OF INFRASTRUCTURE AND PUBLIC WORKS IN DIFFERENT UCS OF DISTRICT GUJRAT OPMENT SCHEMES IN DIFFERENT UCS OF DIS 281,690,000 TRICT GUJRAT-II ( 160,563,000 38 NOS DEVELOPME 28,169,000 NT SCHEMES)
045720- A12 Civil works 779,343,000 467,606,000 28,169,000
045720- A124 Building and Structures 779,343,000 467,606,000 28,169,000
Total- DEVELOPMENT SCHEMES IN DIFFERENT UCS OF DISTRICT GUJRAT-II (38 NOS DEVELOPMENT SCHEMES) 779,343,000 467,606,000 28,169,000
IB3605 REHABILITATION & CONSTRUCTION OF ROADS IN T DEVELOPMENT EHSIL DASKA & PASROR DISTRICT SIALKOT (13 NOS
045720- A12 Civil works 234,742,000 140,845,000 93,897,000
045720- A124 Building and Structures 234,742,000 140,845,000 93,897,000
Total- REHABILITATION & CONSTRUCTION OF 234,742,000 140,845,000 93,897,000
IB3606 MISCE SARGODHA ROADS IN TEHSIL DASKA & PASROR DISTRICT SIALKOT (13 NOS DEVELOPMENT LLANEOUS DEVELOPMENT SCHEMES IN TEHS IL KOT MOMIN & TEHSIL SARGODHA DISTRICT
045720- A12 Civil works 9,390,000 9,390,000 28,169,000
045720- A124 Building and Structures 9,390,000 9,390,000 28,169,000
Total- MISCELLANEOUS DEVELOPMENT 9,390,000 9,390,000 28,169,000
SCHEMES IN TEHSIL KOT MOMIN & TEHSIL SARGODHA DISTRICT SARGODHA
IB3607 CONSTRUCTION OF ROAD/PCC/TUFF PAVER/NALLA RUKHAN DISTRICT H/SOLING/DRAIN/CULVERTS IN CHAK 1 05 SB &
Page 624
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMAN 2021-2022 Revised Estimate DS FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
045720- A12 Civil works 9,390,000 9,390,000 28,169,000
045720- A124 Building and Structures 9,390,000 9,390,000 28,169,000
Total- CONSTRUCTION OF ROAD/PCC/TUFF 9,390,000 9,390,000 28,169,000
IB3608 CONST PAVER/NALLAH/SOLING/DRAIN/CULVE RTS IN CHAK 105 SB & RUKHAN DISTRICT RUCTION OF ROAD/PCC/TUFF
045720- A12 Civil works 375,587,000 225,352,000 281,690,000
045720- A124 Building and Structures 375,587,000 225,352,000 281,690,000
Total- CONSTRUCTION OF ROAD/PCC/TUFF 375,587,000 225,352,000 281,690,000
IB3609 DEVELOPMENT SCHEMES IN DISTRICT RAWALPINDI
045720- A03 Operating Expenses 18,779,000
045720- A039 General 18,779,000
Total- IB3610 CONST DEVELOPMENT SCHEMES IN DISTRICT RAWALPINDI 18,779,000 RUCTION OF ROADS/PCC/SOLING/INFRASTRUCTURE AT SHEI KHUPURA (10 NOS SCHEMES)
045720- A12 Civil works 56,338,000 33,803,000 22,535,000
045720- A124 Building and Structures 56,338,000 33,803,000 22,535,000
Total- CONSTRUCTION OF 56,338,000 33,803,000 22,535,000
IB3611 DUALI STUDY ROADS/PCC/SOLING/INFRASTRUCTUR E AT SHEIKHUPURA (10 NOS SCHEMES) ZATION AND IMPROVEMENT OF KALLAR KAHAR TO CHOA SAID AN SHAH (28 KM) FEASIBILITY
045720- A12 Civil works 37,258,000 18,629,000 18,629,000
045720- A124 Building and Structures 37,258,000 18,629,000 18,629,000
Total- DUALIZATION AND IMPROVEMENT OF KALLAR KAHAR TO CHOA SAIDAN SHAH (28 KM) FEASIBILITY STUDY 37,258,000 18,629,000 18,629,000
045720 Total- Others 18,570,025,000 9,191,009,000 9,164,142,000
0457 Total- Construction (Works) 25,115,568,000 13,625,473,000 15,060,204,000
045 Total- Construction and Transport 25,115,568,000 13,625,473,000 15,060,204,000
04 Total- Economic Affairs 25,115,568,000 13,625,473,000 15,060,204,000
Total- ACCOUNTANT GENERAL 25,115,568,000 13,625,473,000 15,060,204,000
PAKISTAN REVENUES
Page 625
NO. 128.- FC1 2C28 CAPITAL OUTLAY ON CIVIL WORKS DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL (In Foreign Exchange) PAKISTAN REVENUES (1,000,000,000)
(Own Resources)
(Foreign Aid) (1,000,000,000)
(In Local Currency) (25,115,568,000) (13,625,473,000) (14,060,204,000)
04 Econo mic Affairs:
045 Const ruction and Transport:
0457 Const ruction (Works):
045701 Administration :
IB3443 PC-II OF THE PROJECTED TITLED CONSTRUCTION OF HAJJ COMPLEX LAHORE
045701- A02 Project Pre-Investment Analysis 15,365,000
045701- A021 Feasibility Studies 15,365,000
045701- A12 Civil works 7,682,000
045701- A124 Building and Structures 7,682,000
Total- PC-II OF THE PROJECTED TITLED CONSTRUCTION OF HAJJ COMPLEX LAHORE 15,365,000 7,682,000
IB3444 CONSTRUCTION OF BOUNDARY WALL ALONG WIT COMLEX QUETTA H RAISING OF EXISTING BOUNDARY WALL AT HAJJ
045701- A12 Civil works 25,574,000 25,574,000
045701- A124 Building and Structures 25,574,000 25,574,000
Total- CONSTRUCTION OF BOUNDARY WALL ALONG WITH RAISING OF EXISTING BOUNDARY WALL AT HAJJ COMLEX QUETTA 25,574,000 25,574,000
045701 Total- Administration 40,939,000 33,256,000
0457 Total- Construction (Works) 40,939,000 33,256,000
045 Total- Construction and Transport 40,939,000 33,256,000
04 Total- Economic Affairs 40,939,000 33,256,000
Total- 40,939,000 33,256,000
TOTAL - DEMAND 25,156,507,000 13,658,729,000 15,060,204,000
(In Foreign Exchange) (Own Resources) (1,000,000,000)
(Foreign Aid) (1,000,000,000)
(In Local Currency) _ (25,156,507,000) _________________ (13,658,729,000) ________________ (14,060,204,000) ________________
Page 627

SECTION V

MINISTRY OF INDUSTRIES AND PRODUCTION

2022-2023 Budget Estimate (Rupees in Thousand)

Demands presented on behalf of the Ministry of Industries and Production

Development Expendiutre on Capital Account. 129. Capital Outlay on Industrial Development 2,850,000 Total : 2,850,000

Page 629

DEMANDS FOR GRANTS

NO. 129.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

DEMAND NO. 129 ( FC12C32 )

CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

I. ESTIMATES of the Amount required in the year ending 30 June , 2023 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.

Voted Rs. 2,850,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the

MINISTRY OF INDUSTRIES AND PRODUCTION .

2021-2022 Budget Estimate Rs 2021-2022 Revised Estimate Rs 2022-2023 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
044 Mining and Manufacturing 2,916,082,000 1,700,838,000 2,850,000,000
Total 2,916,082,000 1,700,838,000 2,850,000,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 135,472,000 87,330,000 206,743,000
A011 Pay 135,472,000 87,330,000 206,743,000
A011- 1 Pay of Officers (106,660,000) (74,333,000) (160,816,000)
A011- 2 Pay of Other Staff (28,812,000) (12,997,000) (45,927,000)
A02 Project Pre-Investment Analysis 200,000,000 100,000,000 145,000,000
A03 Operating Expenses 233,227,000 155,987,000 239,033,000
A05 Grants, Subsidies and Write off Loans 613,087,000 291,277,000 560,359,000
A09 Physical Assets 1,096,661,000 684,251,000 979,891,000
A12 Civil works 625,635,000 363,528,000 692,974,000
A13 Repairs and Maintenance 12,000,000 18,465,000 26,000,000
Total 2,916,082,000 1,700,838,000 2,850,000,000
Page 630

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL P AKISTAN REVENUES
04 Econo mic Affairs:
044 Mining and Manufacturing:
0441 Manuf acturing:
044101 Support for Industrial Development : IB3485 IMPROVING COMPETITIVENESS THROUGH SUSTAINA BLE NATION PRODUCTIVITY (SNP)
044101- A01 Employees Related Expenses 4,300,000 4,300,000 7,742,000
044101- A011 Pay 3 3 4,300,000 4,300,000 7,742,000
044101- A011- 1 Pay of Officers (3) (3) (4,300,000) (4,300,000) (7,742,000)
044101- A03 Operating Expenses 16,340,000 13,033,000 48,318,000
044101- A039 General 16,340,000 13,033,000 48,318,000
044101- A09 Physical Assets 4,360,000 4,360,000
044101- A092 Computer Equipment 3,600,000 3,600,000
044101- A097 Purchase of Furniture and Fixture 760,000 760,000
Total- IMPROVING COMPETITIVENESS THROUGH SUSTAINABLE NATION PRODUCTIVITY (SNP) 25,000,000 21,693,000 56,060,000
IB5262 SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENTHENING THE ENGINEERING INDUSTRY
044101- A01 Employees Related Expenses 36,000,000
044101- A011 Pay 5 36,000,000
044101- A011- 1 Pay of Officers (5) (36,000,000)
044101- A03 Operating Expenses 9,000,000
044101- A037 Consultancy and Contractual Work 2,000,000
044101- A039 General 7,000,000
044101- A09 Physical Assets 5,000,000
044101- A092 Computer Equipment 4,000,000
044101- A097 Purchase of Furniture and Fixture 1,000,000
Total- SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENTHENING THE ENGINEERING INDUSTRY 50,000,000
044101 Total- Support for Industrial Development 25,000,000 21,693,000 106,060,000
0441 Total- Manufacturing 25,000,000 21,693,000 106,060,000
044 Total- Mining and Manufacturing 25,000,000 21,693,000 106,060,000
04 Total- Economic Affairs 25,000,000 21,693,000 106,060,000
Total- ACCOUNTANT GENERAL 25,000,000 21,693,000 106,060,000
PAKISTAN REVENUES
Page 631

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04 Economic Affairs:

044 Mining and Manufacturing:
0441 Manufa cturing:
044101 Support for Industrial Development :
LO0774 PESHAWAR LIGHT ENGINEERING SUPPORT CENTRE (PESC) (ADB FUN DED) KHYBER PAKHTUNKHWA
044101- A09 Physical Assets 49,866,000
044101- A096 Purchase of Plant and Machinery 49,866,000
Total- PESHAWAR LIGHT ENGIN SUPPORT CENTRE (PESC FUNDED) KHYBER PAKHT EERING ) (ADB UNKHWA 49,866,000
LO1175 NATIONAL BUSSINESS DEVELOPMENT PROGRAM M FOR SME'S
044101- A01 Employees Related Expenses 46,639,000 39,034,000 52,080,000
044101- A011 Pay 45 36 46,639,000 39,034,000 52,080,000
044101- A011-1 Pay of Officers (32) (8) (44,066,000) (37,558,000) (50,380,000)
044101- A011-2 Pay of Other Staff (13) (28) (2,573,000) (1,476,000) (1,700,000)
044101- A03 Operating Expenses 12,414,000 10,958,000 13,700,000
044101- A037 Consultancy and Contractual Work 3,408,000 3,408,000 3,700,000
044101- A039 General 9,006,000 7,550,000 10,000,000
044101- A05 Grants, Subsidies and Write off Loans 340,947,000 189,526,000 216,234,000
044101- A052 Grants Domestic 340,947,000 189,526,000 216,234,000
Total- NATIONAL BUSSINESS DE PROGRAMM FOR SME'S VELOPMENT 400,000,000 239,518,000 282,014,000
LO1180 PRODU CT DEV.CENTRE FOR COMPOSITS BASED SPORTS GOOD SIALKOT
044101- A01 Employees Related Expenses 4,800,000 4,800,000 17,992,000
044101- A011 Pay 15 51 4,800,000 4,800,000 17,992,000
044101- A011-1 Pay of Officers (4) (2) (1,800,000) (1,800,000) (4,290,000)
044101- A011-2 Pay of Other Staff (11) (49) (3,000,000) (3,000,000) (13,702,000)
044101- A03 Operating Expenses 810,000 810,000 5,508,000
044101- A037 Consultancy and Contractual Work 810,000
044101- A039 General 810,000 5,508,000
044101- A05 Grants, Subsidies and Write off Loans 111,121,000 1,800,000 37,000,000
044101- A052 Grants Domestic 111,121,000 1,800,000 37,000,000
044101- A09 Physical Assets 31,890,000 30,090,000 9,500,000
Page 632
NO. 129.- FC12 C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT DEMAND S FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
044101- A095 Purchase of Transport 1,800,000
044101- A096 Purchase of Plant and Machinery 16,300,000 16,300,000 5,500,000
044101- A097 Purchase of Furniture and Fixture 3,720,000 3,720,000
044101- A098 Purchase of Other Assets 10,070,000 10,070,000 4,000,000
044101- A12 Civil works 12,500,000 12,500,000
044101- A124 Building and Structures 12,500,000 12,500,000
Total- PRODUCT DEV.CENTRE FOR COMPOSITS BASED SPORTS GOOD SIALKOT 161,121,000 50,000,000 70,000,000
LO1182 BUSSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION
044101- A01 Employees Related Expenses 4,230,000 2,818,000 8,444,000
044101- A011 Pay 8 8 4,230,000 2,818,000 8,444,000
044101- A011-1 Pay of Officers (4) (4) (2,970,000) (1,968,000) (7,100,000)
044101- A011-2 Pay of Other Staff (4) (4) (1,260,000) (850,000) (1,344,000)
044101- A03 Operating Expenses 2,445,000 2,370,000 3,758,000
044101- A032 Communications 125,000 50,000 150,000
044101- A033 Utilities 180,000 180,000 280,000
044101- A034 Occupancy Costs 990,000 990,000 808,000
044101- A037 Consultancy and Contractual Work 100,000 100,000 100,000
044101- A038 Travel & Transportation 150,000 150,000 500,000
044101- A039 General 900,000 900,000 1,920,000
044101- A09 Physical Assets 2,325,000 2,325,000 1,180,000
044101- A092 Computer Equipment 550,000 550,000 330,000
044101- A097 Purchase of Furniture and Fixture 400,000 400,000 700,000
044101- A098 Purchase of Other Assets 1,375,000 1,375,000 150,000
044101- A12 Civil works 9,000,000 7,687,000 3,618,000
044101- A124 Building and Structures 9,000,000 7,687,000 3,618,000
Total- BUSSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION 18,000,000 15,200,000 17,000,000
LO1280 INDUSTRIAL DESIGN AND AUTOMATION CENRE
044101- A01 Employees Related Expenses 13,380,000 6,250,000 15,563,000
044101- A011 Pay 7 18 13,380,000 6,250,000 15,563,000
044101- A011-1 Pay of Officers (3) (5) (7,140,000) (4,250,000) (5,000,000)
Page 633
NO. 129.- FC12 C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT DEMAND S FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
044101- A011-2 Pay of Other Staff (4) (13) (6,240,000) (2,000,000) (10,563,000)
044101- A03 Operating Expenses 3,500,000 2,000,000 5,500,000
044101- A039 General 3,500,000 2,000,000 5,500,000
044101- A05 Grants, Subsidies and Write off Loans 8,594,000 8,594,000 5,970,000
044101- A052 Grants Domestic 8,594,000 8,594,000 5,970,000
044101- A09 Physical Assets 155,014,000 127,956,000 132,967,000
044101- A091 Purchase of Building 33,923,000 127,806,000 2,800,000
044101- A092 Computer Equipment 11,415,000 9,415,000
044101- A096 Purchase of Plant and Machinery 107,040,000 115,840,000
044101- A097 Purchase of Furniture and Fixture 2,636,000 150,000 4,912,000
044101- A12 Civil works 119,512,000 42,000,000 127,000,000
044101- A124 Building and Structures 119,512,000 42,000,000 127,000,000
Total- INDUSTRIAL DESIGN AND AUTOMATION CENRE 300,000,000 186,800,000 287,000,000
LO1299 1000 INDUSTRIAL STITCHING UNITS ALL ACROSS PAKISTAN
044101- A01 Employees Related Expenses 12,478,000 7,220,000 15,000,000
044101- A011 Pay 14 14 12,478,000 7,220,000 15,000,000
044101- A011-1 Pay of Officers (9) (9) (11,178,000) (5,920,000) (12,500,000)
044101- A011-2 Pay of Other Staff (5) (5) (1,300,000) (1,300,000) (2,500,000)
044101- A03 Operating Expenses 6,422,000 4,720,000 4,500,000
044101- A032 Communications 450,000 200,000 200,000
044101- A033 Utilities 300,000
044101- A038 Travel & Transportation 3,000,000 2,800,000 2,500,000
044101- A039 General 2,672,000 1,720,000 1,800,000
044101- A05 Grants, Subsidies and Write off Loans 6,100,000 1,000,000 500,000
044101- A052 Grants Domestic 6,100,000 1,000,000 500,000
044101- A09 Physical Assets 75,000,000 54,690,000 60,000,000
044101- A096 Purchase of Plant and Machinery 75,000,000 54,690,000 60,000,000
Total- 1000 INDUSTRIAL STITCHING UNITS 100,000,000 67,630,000 80,000,000
ALL ACROSS PAKISTAN LO1644 SUPPORT CENTRE FOR DENTAL AND SURGICAL EQUIPMENTS (SCDS) SIALKOT
044101- A01 Employees Related Expenses 6,600,000 3,362,000 5,600,000
044101- A011 Pay 3 3 6,600,000 3,362,000 5,600,000
Page 634
NO. 129.- FC12 C32 CAPITAL OUTLAY ON INDUSTRIAL DEVE No of 2021-22 Posts 2022-23 ACCOUNTANT GENERAL PAKISTAN R LOPMENT 2021-2022 Budget Estimate Rs EVENUES SUB-OF DEMAND 2021-2022 Revised Estimate Rs FICE, LAHORE S FOR GRANTS 2022-2023 Budget Estimate Rs
044101- A011-1 Pay of Officers (3) (3) (6,600,000) (3,362,000) (5,600,000)
044101- A03 Operating Expenses 2,100,000 1,100,000 3,500,000
044101- A039 General 2,100,000 1,100,000 3,500,000
044101- A05 Grants, Subsidies and Write off Loans 26,000,000 26,125,000 9,180,000
044101- A052 Grants Domestic 26,000,000 26,125,000 9,180,000
044101- A09 Physical Assets 113,800,000 135,000,000 30,520,000
044101- A091 Purchase of Building 113,800,000 135,000,000
044101- A092 Computer Equipment 14,190,000
044101- A095 Purchase of Transport 5,600,000
044101- A096 Purchase of Plant and Machinery 7,550,000
044101- A097 Purchase of Furniture and Fixture 3,180,000
044101- A12 Civil works 1,500,000 51,200,000
044101- A124 Building and Structures 1,500,000 51,200,000
Total- SUPPORT CENTRE FOR DENTAL AND SURGICAL EQUIPMENTS (SCDS) SIALKOT LO1645 RESEARCH REGULATORY INSIGHTS & ADVOCACY 150,000,000 ASSISTANCE FOR 165,587,000 SMES 100,000,000
044101- A01 Employees Related Expenses 5,895,000 3,455,000 9,006,000
044101- A011 Pay 7 7 5,895,000 3,455,000 9,006,000
044101- A011-1 Pay of Officers (6) (4) (5,670,000) (3,280,000) (8,646,000)
044101- A011-2 Pay of Other Staff (1) (3) (225,000) (175,000) (360,000)
044101- A03 Operating Expenses 8,025,000 5,499,000 11,494,000
044101- A033 Utilities 900,000 300,000
044101- A034 Occupancy Costs 4,500,000 2,924,000 3,217,000
044101- A038 Travel & Transportation 500,000
044101- A039 General 2,125,000 2,275,000 8,277,000
044101- A05 Grants, Subsidies and Write off Loans 4,424,000 5,145,000 50,000,000
044101- A052 Grants Domestic 4,424,000 5,145,000 50,000,000
044101- A09 Physical Assets 4,906,000 5,721,000
044101- A091 Purchase of Building 1,810,000
044101- A092 Computer Equipment 1,810,000
044101- A097 Purchase of Furniture and Fixture 2,200,000 2,610,000
044101- A098 Purchase of Other Assets 896,000 1,301,000
Page 635
NO. 129.- FC12 C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELO No of 2021-22 Posts 2022-23 ACCOUNTANT GENERAL PAKISTAN REV PMENT 2021-2022 Budget Estimate Rs ENUES SUB-OFF DEMAND 2021-2022 Revised Estimate Rs ICE, LAHORE S FOR GRANTS 2022-2023 Budget Estimate Rs
044101- A12 Civil works 6,750,000 7,640,000
044101- A124 Building and Structures 6,750,000 7,640,000
Total- RESEARCH REGULATORY INSIGHTS & ADVOCACY ASSISTANCE FOR SMES 30,000,000 27,460,000 70,500,000
LO1646 AGRO FOOD PROCESSING FACILITIES MIRPURKHAS
044101- A01 Employees Related Expenses 3,840,000 1,154,000 3,690,000
044101- A011 Pay 6 4 3,840,000 1,154,000 3,690,000
044101- A011-1 Pay of Officers (5) (3) (3,540,000) (1,154,000) (3,540,000)
044101- A011-2 Pay of Other Staff (1) (1) (300,000) (150,000)
044101- A03 Operating Expenses 4,110,000
044101- A039 General 4,110,000
044101- A05 Grants, Subsidies and Write off Loans 10,003,000 1,368,000 3,074,000
044101- A052 Grants Domestic 10,003,000 1,368,000 3,074,000
044101- A09 Physical Assets 41,157,000 478,000 2,970,000
044101- A091 Purchase of Building 40,000,000 478,000
044101- A092 Computer Equipment 1,157,000 120,000
044101- A095 Purchase of Transport 2,850,000
044101- A12 Civil works 5,000,000 136,156,000
044101- A124 Building and Structures 5,000,000 136,156,000
Total- AGRO FOOD PROCESSING FACILITIES MIRPURKHAS 60,000,000 3,000,000 150,000,000
LO3121 SME BUSSINESS FACILITATION CENTRE (SMEBFC) MULTAN
044101- A01 Employees Related Expenses 6,204,000 6,112,000 6,162,000
044101- A011 Pay 9 9 6,204,000 6,112,000 6,162,000
044101- A011-1 Pay of Officers (8) (8) (6,204,000) (6,112,000) (5,962,000)
044101- A011-2 Pay of Other Staff (1) (1) (200,000)
044101- A03 Operating Expenses 6,296,000 5,078,000 6,419,000
044101- A039 General 6,296,000 5,078,000 6,419,000
044101- A05 Grants, Subsidies and Write off Loans 500,000 310,000 400,000
044101- A052 Grants Domestic 500,000 310,000 400,000
044101- A09 Physical Assets 2,019,000
044101- A095 Purchase of Transport 2,019,000
Total- SME BUSSINESS FACILITATION CENTRE (SMEBFC) MULTAN 13,000,000 11,500,000 15,000,000
Page 636
NO. 129.- FC12 C32 CAPITAL OUTLAY ON INDUSTRIAL DEVEL OPMENT DEMAND S FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
LO6587 ESTABLISHMENT OF NAPTHA CRACKER COMPLEX ( NCC) FEASIBILITY STUDY
044101- A01 Employees Related Expenses 5,000,000
044101- A011 Pay 6 5,000,000
044101- A011-1 Pay of Officers (3) (2,000,000)
044101- A011-2 Pay of Other Staff (3) (3,000,000)
044101- A03 Operating Expenses 83,870,000
044101- A039 General 83,870,000
044101- A05 Grants, Subsidies and Write off Loans 10,000,000
044101- A052 Grants Domestic 10,000,000
044101- A09 Physical Assets 1,130,000
044101- A092 Computer Equipment 1,130,000
Total- ESTABLISHMENT OF NAPTHA CRACKER COMPLEX (NCC) FEASIBILITY STUDY 100,000,000
LO6588 CENTRE FOR ACQUISITION OF SEMI CONDUCTOR TECHNOLOGY (CAST) FEASIBILITY STUDY
044101- A01 Employees Related Expenses 3,000,000
044101- A011 Pay 6 3,000,000
044101- A011-1 Pay of Officers (3) (1,500,000)
044101- A011-2 Pay of Other Staff (3) (1,500,000)
044101- A03 Operating Expenses 2,870,000
044101- A039 General 2,870,000
044101- A05 Grants, Subsidies and Write off Loans 3,000,000
044101- A052 Grants Domestic 3,000,000
044101- A09 Physical Assets 1,130,000
044101- A092 Computer Equipment 1,130,000
Total- CENTRE FOR ACQUISITION OF SEMI CONDUCTOR TECHNOLOGY (CAST) FEASIBILITY STUDY 10,000,000
LO9644 NATIO KNOWLEDGE NAL STRATEGIC PROGRAM FOR ACQUISTION OF IND TECH-NSPAIT INCLUDING FEASIBILITY-
044101- A01 Employees Related Expenses 13,000,000 4,829,000 11,000,000
044101- A011 Pay 24 46 13,000,000 4,829,000 11,000,000
044101- A011-1 Pay of Officers (10) (20) (7,000,000) (3,129,000) (5,500,000)
Page 637
NO. 129.- FC1 2C32 CAPITAL OUTLAY ON INDUSTRIAL DEV No of 2021-22 Posts 2022-23 ELOPMENT 2021-2022 Budget Estimate DEMAN 2021-2022 Revised Estimate DS FOR GRANTS 2022-2023 Budget Estimate
ACCOUNTANT GENERAL PAKISTAN R Rs EVENUES SUB-OF Rs FICE, LAHORE Rs
044101- A011- 2 Pay of Other Staff (14) (26) (6,000,000) (1,700,000) (5,500,000)
044101- A03 Operating Expenses 9,000,000 2,115,000 14,000,000
044101- A039 General 9,000,000 2,115,000 14,000,000
044101- A05 Grants, Subsidies and Write off Loans 50,000,000 27,000,000 75,000,000
044101- A052 Grants Domestic 50,000,000 27,000,000 75,000,000
044101- A09 Physical Assets 216,000,000 46,531,000 174,000,000
044101- A092 Computer Equipment 4,000,000 2,921,000 5,000,000
044101- A095 Purchase of Transport 2,900,000
044101- A096 Purchase of Plant and Machinery 203,600,000 38,251,000 164,200,000
044101- A097 Purchase of Furniture and Fixture 2,500,000 3,385,000 3,800,000
044101- A098 Purchase of Other Assets 3,000,000 1,974,000 1,000,000
044101- A13 Repairs and Maintenance 12,000,000 18,465,000 26,000,000
044101- A133 Buildings and Structure 12,000,000 18,465,000 26,000,000
Total- NATIONAL STRATEGIC PROGRAM FOR ACQUISTION OF IND TECH-NSPAIT INCLUDING FEASIBILITY- KNOWLEDGE 300,000,000 98,940,000 300,000,000
LO9645 FOOTWEAR CLUSTER DEV THROUGH CAD CAM AND CNC MACHINING LAHORE
044101- A01 Employees Related Expenses 4,434,000 3,480,000 5,628,000
044101- A011 Pay 8 8 4,434,000 3,480,000 5,628,000
044101- A011- 1 Pay of Officers (1) (2) (1,080,000) (1,080,000) (2,500,000)
044101- A011- 2 Pay of Other Staff (7) (6) (3,354,000) (2,400,000) (3,128,000)
044101- A03 Operating Expenses 11,682,000 4,800,000 4,957,000
044101- A039 General 11,682,000 4,800,000 4,957,000
044101- A05 Grants, Subsidies and Write off Loans 420,000 420,000 1,000
044101- A052 Grants Domestic 420,000 420,000 1,000
044101- A09 Physical Assets 15,574,000 13,600,000 1,974,000
044101- A096 Purchase of Plant and Machinery 15,574,000 13,600,000 1,974,000
Total- FOOTWEAR CLUSTER DEV THROUGH CAD CAM AND CNC MACHINING LAHORE 32,110,000 22,300,000 12,560,000
044101 Total- Support for Industrial Development 1,564,231,000 887,935,000 1,543,940,000
0441 Total- Manufacturing 1,564,231,000 887,935,000 1,543,940,000
044 Total- Mining and Manufacturing 1,564,231,000 887,935,000 1,543,940,000
04 Total- Economic Affairs 1,564,231,000 887,935,000 1,543,940,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE 1,564,231,000 887,935,000 1,543,940,000
Page 638
NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04 Economic Affairs:
044 Mining and Manufacturing:
0441 Manufacturing:
044101 KA137 Support for Industrial Development : 3 DEVELOPMENT OF KARACHI INDUSTRIAL PARK ( KIP) AT 1500 ACRES PSM LAND KARACHI
044101 - A02 Project Pre-Investment Analysis 200,000,000 100,000,000 145,000,000
044101 - A021 Feasibility Studies 200,000,000 100,000,000 145,000,000
044101 - A12 Civil works 5,000,000
044101 - A125 Other Works 4,000,000
044101 - A126 Telecommunication Works 1,000,000
Total- DEVELOPMENT OF KARACHI INDUSTRIAL PARK (KIP) AT 1500 ACRES PSM LAND KARACHI 200,000,000 100,000,000 150,000,000
KA137 SETUP 4 ESTA AT KT BLISHMENT OF HIGH TENSILE SHEET META DMC L DIES MANUFACTURING AND TITANIUM COATING
044101 - A05 Grants, Subsidies and Write off Loans 5,000,000 5,000,000
044101 - A052 Grants Domestic 5,000,000 5,000,000
044101 - A09 Physical Assets 95,000,000 95,000,000 300,000,000
044101 - A096 Purchase of Plant and Machinery 95,000,000 95,000,000 300,000,000
Total- ESTABLISHMENT OF HIGH TENSILE 100,000,000 100,000,000 300,000,000
KA719 8 ESTA SHEET METAL DIES MANUFACTURING AND TITANIUM COATING SETUP AT KTDMC BLISHMENT OF 132 KV GRID STATION AT BI N QASIM INDUSTRIAL PARK KARACHI
044101 - A03 Operating Expenses 25,000,000 13,040,000
044101 - A037 Consultancy and Contractual Work 25,000,000 13,040,000
044101 - A05 Grants, Subsidies and Write off Loans 49,978,000 24,989,000 150,000,000
044101 - A052 Grants Domestic 49,978,000 24,989,000 150,000,000
044101 - A09 Physical Assets 334,000,000 167,000,000 200,000,000
044101 - A096 Purchase of Plant and Machinery 334,000,000 167,000,000 200,000,000
044101 - A12 Civil works 211,373,000 105,681,000 50,000,000
044101 - A125 Other Works 211,373,000 105,681,000 50,000,000
Total- ESTABLISHMENT OF 132 KV GRID STATION AT BIN QASIM INDUSTRIAL PARK KARACHI 620,351,000 310,710,000 400,000,000
Page 639
NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA9649 DEVE 044101- A12 LOPME Civil NT OF DATES STORAGE PROCESSIN works G AND PACKAGING PLANT IN TURBAT 100,000,000
044101- A124 Building and Structures 100,000,000
Total- DEVELOPMENT OF DATES STORAGE PROCESSING AND PACKAGING PLANT IN TURBAT 100,000,000
044101 Total- Support for Industrial Development 920,351,000 510,710,000 950,000,000
0441 Total- Manufacturing 920,351,000 510,710,000 950,000,000
044 Total- Mining and Manufacturing 920,351,000 510,710,000 950,000,000
04 Total- Economic Affairs 920,351,000 510,710,000 950,000,000
Total- ACCOUNTANT GENERAL 920,351,000 510,710,000 950,000,000
PAKISTAN REVENUES SUB-OFFICE, KARACHI
Page 640
NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04 Economic Affairs:
044 Mining and Manufacturing:
0441 Manufacturing:
044101 LS0109 Support for Industrial Development : ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZO NE LASBELA
044101 - A01 Employees Related Expenses 9,672,000 516,000 4,836,000
044101 - A011 Pay 29 29 9,672,000 516,000 4,836,000
044101 - A011- 1 Pay of Officers (12) (12) (5,112,000) (420,000) (2,556,000)
044101 - A011- 2 Pay of Other Staff (17) (17) (4,560,000) (96,000) (2,280,000)
044101 - A03 Operating Expenses 22,693,000 9,964,000 17,529,000
044101 - A032 Communications 100,000 100,000
044101 - A037 Consultancy and Contractual Work 16,091,000 5,364,000 11,454,000
044101 - A038 Travel & Transportation 1,800,000 1,800,000 1,800,000
044101 - A039 General 4,702,000 2,800,000 4,175,000
044101 - A09 Physical Assets 7,635,000 1,500,000 7,635,000
044101 - A095 Purchase of Transport 5,135,000 5,135,000
044101 - A097 Purchase of Furniture and Fixture 2,500,000 1,500,000 2,500,000
044101 - A12 Civil works 260,000,000 188,020,000 220,000,000
044101 - A121 Roads Highways and Bridges 150,000,000 124,495,000 90,000,000
044101 - A123 Embankment and Drainage Works 50,000,000 63,525,000 90,000,000
044101 - A124 Building and Structures 10,000,000 20,000,000
044101 - A125 Other Works 50,000,000 20,000,000
Total- ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA 300,000,000 200,000,000 250,000,000
QA917 5 FEASIBILITY FOR ESTABLISHMENT OF METAL PARK IN CHAGAI
044101 - A03 Operating Expenses 106,500,000 80,500,000
044101 - A037 Consultancy and Contractual Work 77,000,000 69,500,000
044101 - A038 Travel & Transportation 9,000,000 2,000,000
044101 - A039 General 20,500,000 9,000,000
Total- FEASIBILITY FOR ESTABLISHMENT OF METAL PARK IN CHAGAI 106,500,000 80,500,000
0 44101 Total- Support for Industrial Development 406,500,000 280,500,000 250,000,000
Page 641
NO. 129.- F C12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-O DEMAN 2021-2022 Revised Estimate Rs FFICE, QUETTA DS FOR GRANTS 2022-2023 Budget Estimate Rs
0441 Total- Manufacturing 406,500,000 280,500,000 250,000,000
044 Total- Mining and Manufacturing 406,500,000 280,500,000 250,000,000
04 Total- Economic Affairs 406,500,000 280,500,000 250,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 406,500,000 280,500,000 250,000,000
TOTAL - DEMAND 2,916,082,000 1,700,838,000 2,850,000,000
Page 643

SECTION VI

CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

2022-2023 Budget Estimate (Rupees in Thousand) Demand presented on behalf of the Capital Outlay on Maritime Affairs Division Development Expenditure on Capital Account. 130. Capital Outlay on Maritime Affairs Division 3,465,378 Total : 3,465,378

Page 645

DEMANDS FOR GRANTS

NO. 130.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

DEMAND NO. 130 ( FC12C51 )

CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2023 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION.

Voted Rs. 3,465,378,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF MARITIME AFFAIRS .

2021-2022 Budget Estimate Rs 2021-2022 Revised Estimate Rs 2022-2023 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
045 Construction and Transport 2,025,638,000 900,646,000 938,933,000
046 Communications 2,436,273,000 1,211,164,000 2,526,445,000
Total 4,461,911,000 2,111,810,000 3,465,378,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 2,000,000 2,000,000 3,032,000
A011 Pay 2,000,000 2,000,000 3,032,000
A011- 1 Pay of Officers (400,000) (400,000) (432,000)
A011- 2 Pay of Other Staff (1,600,000) (1,600,000) (2,600,000)
A02 Project Pre-Investment Analysis 443,000,000 296,124,000 304,240,000
A03 Operating Expenses 7,000,000 4,586,000 1,507,000,000
A09 Physical Assets 447,271,000 81,000 571,290,000
A12 Civil works 3,509,476,000 1,808,420,000 1,079,316,000
A13 Repairs and Maintenance 53,164,000 599,000 500,000
Total 4,461,911,000 2,111,810,000 3,465,378,000
(In Foreign Exchange) (1,856,544,000) (293,532,000)
(Own Resources)
(Foreign Aid) (1,856,544,000) (293,532,000)
(In Local Currency) (2,605,367,000) (2,111,810,000) (3,171,846,000)
Page 646

NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

DEMANDS FOR GRANTS

III. - DETAILS are as follows:-

No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
04 Economic Affairs:
045 Construction and Transport:
0453 Water Transport:
045301 KA708 PORT 3 MODI AND SHIPPPING : FICATION OF AUCTION HALL KORANGI FISHE RIES HARBOUR KARACHI
045301 - A12 Civil works 94,500,000 5,743,000
045301 - A124 Building and Structures 94,500,000 5,743,000
Total- MODIFICATION OF AUCTION HALL 94,500,000 5,743,000
KORANGI FISHERIES HARBOUR KARACHI
(In Foreign Exchange) (5,743,000)
(Foreign Aid) (5,743,000)
(In Local Currency) (94,500,000)
KA708 KARAC 4 ESTA HI __ BLISHMENT OF COLD STORAGE AND FREEZIN __________________ G TUNNELS AT KO _______________ RANGI FISHERIES _______________ HARBOUR
045301 - A12 Civil works 170,100,000 41,928,000
045301 - A124 Building and Structures 170,100,000 41,928,000
Total- ESTABLISHMENT OF COLD STORAGE AND FREEZING TUNNELS AT KORANGI FISHERIES HARBOUR KARACHI 170,100,000 41,928,000
(In Foreign Exchange) (41,928,000)
(Foreign Aid) (41,928,000)
(In Local Currency) (170,100,000)
KA708 5 ESTA __ BLISHMENT OF BUSINESS PARK AT KORANGI __________________ FISHERIES HARBO _______________ UR KARACHI _______________
045301 - A12 Civil works 281,050,000 245,861,000
045301 - A124 Building and Structures 281,050,000 245,861,000
Total- ESTABLISHMENT OF BUSINESS PARK AT KORANGI FISHERIES HARBOUR KARACHI 281,050,000 245,861,000
(In Foreign Exchange) (245,861,000)
(Foreign Aid) (245,861,000)
(In Local Currency) (281,050,000)
0 45301 __ Total- PORT AND SHIPPPING __________________ 545,650,000 _______________ _______________ 293,532,000
Page 647
NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

0453 Total- Water Transport 545,650,000 293,532,000
045 Total- Construction and Transport 545,650,000 293,532,000
04 Total- Economic Affairs 545,650,000 293,532,000
Total- ACCOUNTANT GENERAL 545,650,000 293,532,000
PAKISTAN REVENUES
SUB-OFFICE, KARACHI
(In Foreign Exchange) (293,532,000)
(Own Resources)
(Foreign Aid) (293,532,000)
(In Local Currency) (545,650,000)
Page 648
NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04 Econo mic Affairs:
045 Const ruction and Transport:
0453 Water Transport:
045301 PORT AND SHIPPPING :
GR0118 ESTABLISHMENT OF PORT CONTROL TOWER GWADAR
045301- A02 Project Pre-Investment Analysis 148,000,000 157,240,000
045301- A021 Feasibility Studies 148,000,000 157,240,000
045301- A12 Civil works 192,168,000 119,144,000 34,554,000
045301- A124 Building and Structures 192,168,000 119,144,000 34,554,000
Total- ESTABLISHMENT OF PORT CONTROL 192,168,000 267,144,000 191,794,000
TOWER GWADAR
GR0119 REHABILITATION OF LEADING LIGHT TOWERS GWADAR
045301- A13 Repairs and Maintenance 20,590,000
045301- A133 Buildings and Structure 20,590,000
Total- GR0120 STUD REHABILITATION OF LEADING LIGHT TOWERS GWADAR IES ON MAKING THE GWADAR PORT MORE 20,590,000 COMPETIVE GWADAR
045301- A02 Project Pre-Investment Analysis 295,000,000 148,124,000 147,000,000
045301- A021 Feasibility Studies 295,000,000 148,124,000 147,000,000
Total- STUDIES ON MAKING THE GWADAR 295,000,000 148,124,000 147,000,000
PORT MORE COMPETIVE GWADAR
GR9010 FEAS TERMINALS IBILITY STUDY OF CAPITAL DREDGING OF BERTHING AREAS & CHANNEL FOR ADDITIONAL
045301- A02 Project Pre-Investment Analysis 148,000,000
045301- A021 Feasibility Studies 148,000,000
Total- FEASIBILITY STUDY OF CAPITAL DREDGING OF BERTHING AREAS & CHANNEL FOR ADDITIONAL TERMINALS 148,000,000
GR9014 UPGRADATION OF BERTHING FACILITIES FOR BOATS AT GWADAR MINI PORT
045301- A13 Repairs and Maintenance 31,975,000
045301- A133 Buildings and Structure 31,975,000
Total- UPGRADATION OF BERTHING FACILITIES FOR BOATS AT GWADAR MINI PORT 31,975,000
Page 649
NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

GR9015 ACQUISITION OF MARINE SERVICES VESSEL FOR GWADAR PORT
045301- A09 Physical Assets 159,650,000
045301- A096 Purchase of Plant and Machinery 159,650,000
Total- GR9018 CONS GWADAR ACQUISITION OF MARINE SERVICES VESSEL FOR GWADAR PORT TRUCTION OF GROYNE WALL/BREAK WAT 159,650,000 ER & ALLIED WORKS AT EAST BAY (DEM I ZER)
045301- A12 Civil works 632,605,000 485,378,000 306,607,000
045301- A125 Other Works 632,605,000 485,378,000 306,607,000
Total- CONSTRUCTION OF GROYNE 632,605,000 485,378,000 306,607,000
WALL/BREAK WATER & ALLIED WORKS AT EAST BAY (DEMI ZER) GWADAR
045301 Total- PORT AND SHIPPPING 1,479,988,000 900,646,000 645,401,000
0453 Total- Water Transport 1,479,988,000 900,646,000 645,401,000
045 Total- Construction and Transport 1,479,988,000 900,646,000 645,401,000
046 Comm unications:
0461 Comm 046101 ADMIN GR0117 ESTA unications: ISTRATION : BLISHMENT OF OFF DOCK TERMINAL (GPA ) GWADAR
046101- A09 Physical Assets 287,540,000
046101- A091 Purchase of Building 287,540,000
Total- ESTABLISHMENT OF OFF DOCK TERMINAL (GPA) GWADAR 287,540,000
GR0210 SEWE RAGE TREATMENT PLANT FOR GPA HOUS ING COMPLEX GWADAR
046101- A12 Civil works 51,895,000
046101- A127 Drought Emergency Relief Assistance 51,895,000
Total- SEWERAGE TREATMENT PLANT FOR GPA HOUSING COMPLEX GWADAR 51,895,000
GR0211 PERIM ETRIC SECURITY SYSTEM FOR GWADAR PORT
046101- A09 Physical Assets 252,350,000
046101- A096 Purchase of Plant and Machinery 252,350,000
Total- PERIMETRIC SECURITY SYSTEM FOR GWADAR PORT 252,350,000
Page 650
NO. 130.- FC1 2C51 CAPITAL OUTLAY ON MARITIME AFFAIR S DIVISION DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
GR0212 MAIN ACCOUNTANT GENERAL PAKISTAN TENANCE DREDGING OF GWADAR PORT REVENUES SUB-OFFICE, QUETTA
046101- A03 Operating Expenses 1,000,000,000
046101- A039 General 1,000,000,000
Total- MAINTENANCE DREDGING OF GWADAR PORT 1,000,000,000
GR0213 PROVISION OF 2000 ENGINES TO POOR FISHERMA N GWADAR
046101- A03 Operating Expenses 500,000,000
046101- A039 General 500,000,000
Total- PROVISION OF 2000 ENGINES TO POOR FISHERMAN GWADAR 500,000,000
GR0214 INSTALLATION OF FLOATING JETTY AT GWADAR FISH HARBOUR
046101- A09 Physical Assets 265,740,000
046101- A091 Purchase of Building 265,740,000
Total- INSTALLATION OF FLOATING JETTY AT GWADAR FISH HARBOUR 265,740,000
GR2015 CONSTRUCTION OF EAST BAY EXPRESSWAY TO L NETWORK GWADAR. INK GWADAR PORT WITH NATIONAL ROAD
046101- A12 Civil works 2,100,544,000 1,159,390,000 278,000,000
046101- A121 Roads Highways and Bridges 2,100,544,000 1,159,390,000 278,000,000
Total- CONSTRUCTION OF EAST BAY 2,100,544,000 1,159,390,000 278,000,000
EXPRESSWAY TO LINK GWADAR PORT WITH NATIONAL ROAD NETWORK GWADAR.
(In Foreign Exchange) (1,856,544,000)
(Foreign Aid) (1,856,544,000)
(In Local Currency) (244,000,000) (1,159,390,000) (278,000,000)
GR2020 PAK- _ CHINA TECHNICAL & VOCATIONAL INSTITUTE ________________ AT GWADAR _________________
046101- A09 Physical Assets 41,000,000
046101- A095 Purchase of Transport 41,000,000
046101- A12 Civil works 38,509,000 38,508,000 30,728,000
046101- A124 Building and Structures 38,509,000 38,508,000 30,728,000
Total- PAK-CHINA TECHNICAL & 38,509,000 38,508,000 71,728,000
VOCATIONAL INSTITUTE AT GWADAR
Page 651
NO. 130.- FC1 2C51 CAPITAL OUTLAY ON MARITIME AFFAIR No of 2021-22 Posts 2022-23 S DIVISION 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
GR2021 ESTA ACCOUNTANT GENERAL PAKISTAN BLISHMENT OF CPEC SUPPORT UNIT(CSU) F REVENUES SUB-OFFICE, QUETTA OR PROJECTS AND ACTIVITES IN GPA
046101- A01 Employees Related Expenses 2,000,000 2,000,000 3,032,000
046101- A011 Pay 10 10 2,000,000 2,000,000 3,032,000
046101- A011- 1 Pay of Officers (3) (400,000) (400,000) (432,000)
046101- A011- 2 Pay of Other Staff (10) (7) (1,600,000) (1,600,000) (2,600,000)
046101- A03 Operating Expenses 7,000,000 4,586,000 7,000,000
046101- A036 Motor Vehicles 2,200,000 2,200,000 2,500,000
046101- A038 Travel & Transportation 1,800,000 1,086,000 2,500,000
046101- A039 General 3,000,000 1,300,000 2,000,000
046101- A09 Physical Assets 81,000 81,000 12,200,000
046101- A092 Computer Equipment 80,000 80,000 200,000
046101- A095 Purchase of Transport 1,000 1,000 12,000,000
046101- A13 Repairs and Maintenance 599,000 599,000 500,000
046101- A130 Transport 599,000 599,000 500,000
Total- ESTABLISHMENT OF CPEC SUPPORT UNIT(CSU) FOR PROJECTS AND ACTIVITES IN GPA 9,680,000 7,266,000 22,732,000
GR3000 1.2 M GD REVERSE OSMOSIS DESALINATION PLANT GAWADAR
046101- A12 Civil works 6,000,000 84,000,000
046101- A127 Drought Emergency Relief Assistance 6,000,000 84,000,000
Total- 1.2 MGD REVERSE OSMOSIS DESALINATION PLANT GAWADAR 6,000,000 84,000,000
046101 Total- ADMINISTRATION 2,436,273,000 1,211,164,000 2,526,445,000
0461 Total- Communications 2,436,273,000 1,211,164,000 2,526,445,000
046 Total- Communications 2,436,273,000 1,211,164,000 2,526,445,000
04 Total- Economic Affairs 3,916,261,000 2,111,810,000 3,171,846,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 3,916,261,000 2,111,810,000 3,171,846,000
(In Foreign Exchange) (1,856,544,000)
(Own Resources)
(Foreign Aid) (1,856,544,000)
(In Local Currency) (2,059,717,000) (2,111,810,000) (3,171,846,000)
TOTAL - DEMAND 4,461,911,000 2,111,810,000 3,465,378,000
(In Foreign Exchange) (Own Resources) (1,856,544,000) (293,532,000)
(Foreign Aid) (1,856,544,000) (293,532,000)
(In Local Currency) _ (2,605,367,000) ________________ (2,111,810,000) ___________________ (3,171,846,000) ______________

GR2021 ESTABLISHMENT OF CPEC SUPPORT UNIT(CSU) FOR PROJECTS AND ACTIVITES IN GPA

Page 653

SECTION VII

MINISTRY OF RAILWAYS

2022-2023 Budget Estimate (Rupees in Thousand)

Demand presented on behalf of the Ministry of Railways

Development Expenditure on Capital Account. 131. Capital Outlay on Pakistan Railways 32,648,036 Total : 32,648,036

Page 655

NO. 131.- CAPITAL OUTLAY ON RAILWAYS DIVISION

DEMANDS FOR GRANTS

DEMAND NO. 131

( FC12C33 )

CAPITAL OUTLAY ON RAILWAYS DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2023 for CAPITAL OUTLAY ON RAILWAYS DIVISION.

Voted Rs. 32,648,036,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF RAILWAYS .

2021-2022 Budget Estimate Rs 2021-2022 Revised Estimate Rs 2022-2023 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
014 Transfers 26,908,506,000 13,961,440,000 31,684,056,000
045 Construction and Transport 3,117,084,000 525,000,000 963,980,000
Total 30,025,590,000 14,486,440,000 32,648,036,000
OBJECT CLASSIFICATION
A03 Operating Expenses 3,117,084,000 30,000,000 507,500,000
A11 Investments 26,908,506,000 14,456,440,000 32,140,536,000
Total 30,025,590,000 14,486,440,000 32,648,036,000
(In Foreign Exchange) (15,707,084,000) (6,456,266,000) (20,187,500,000)
(Own Resources) (12,590,000,000) (6,426,266,000) (19,980,000,000)
(Foreign Aid) (3,117,084,000) (30,000,000) (207,500,000)
(In Local Currency) (14,318,506,000) _________________ (8,030,174,000) __________________ (12,460,536,000) _______________
Page 656

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL P AKISTAN REVENUES
01 General Public Service:
014 Transfers:
0143 Investments:
014302 Non-Financial Institutions :
IB3615 RECONSTRUCTION/REHABILITATION OF ASSETS DAMAGED DURING THE FLOOD 2010
014302 - A11 Investments 100,000,000
014302 - A111 Investment Local 100,000,000
Total- RECONSTRUCTION/REHABILITATION 100,000,000
OF ASSETS DAMAGED DURING THE FLOOD 2010
IB3619 YAD PI IMPROVEMENT OF TERMINAL FACILITIES AND ENHA PRI KARACHI NCING SECURITY ARRANGEMENT IN MARSHILING
014302 - A11 Investments 200,000,000
014302 - A111 Investment Local 200,000,000
Total- IMPROVEMENT OF TERMINAL 200,000,000
FACILITIES AND ENHANCING SECURITY ARRANGEMENT IN MARSHILING YAD PIPRI KARACHI
IB3620 EASTA BLISHMENT OF COAL TERMINALS ON PAKISTAN RAILWAYS PHASE
014302 - A11 Investments 200,000,000
014302 - A111 Investment Local 200,000,000
Total- EASTABLISHMENT OF COAL TERMINALS ON PAKISTAN RAILWAYS PHASE 200,000,000
0 14302 Total- Non-Financial Institutions 500,000,000
0 143 Total- Investments 500,000,000
0 14 Total- Transfers 500,000,000
0 1 Total- General Public Service 500,000,000
04 Economic Affairs:
045 Construction and Transport:
0454 Railway Trasport:
045401 Railway Trasport :

IB3652 RENOVATION AND CONSTRUCTION OF OFFICES WOMENS BARRACKS AND MULTI PURPOSE TRAINING ROOMS AT OFFICE OF THE

Page 657
NO. 131.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
045401- A03 ACCOUNTANT GENERAL P Operating Expenses AKISTAN REVENUES 127,610,000 30,000,000 107,500,000
045401- A039 General 127,610,000 30,000,000 107,500,000
Total- RENOVATION AND CONSTRUCTION OF OFFICES WOMENS BARRACKS AND MULTI PURPOSE TRAINING ROOMS AT OFFICE OF THE 127,610,000 30,000,000 107,500,000
(In Foreign Exchange) (127,610,000) (30,000,000) (107,500,000)
(Foreign Aid) (127,610,000) (30,000,000) (107,500,000)
045401 __ Total- Railway Trasport ____________________ 127,610,000 _____________ 30,000,000 _______________ 107,500,000
0454 Total- Railway Trasport 127,610,000 30,000,000 107,500,000
045 Total- Construction and Transport 127,610,000 30,000,000 107,500,000
04 Total- Economic Affairs 127,610,000 30,000,000 107,500,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 627,610,000 30,000,000 107,500,000
(In Foreign Exchange) (Own Resources) (127,610,000) (30,000,000) (107,500,000)
(Foreign Aid) (127,610,000) (30,000,000) (107,500,000)
(In Local Currency) (500,000,000)
Page 658
NO. 13 1.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
ACCOUNTANT GENERAL PAKISTAN RE Rs VENUES SUB-OFFICE Rs , KARACHI Rs
01 General Public Service:
014 Transfers:
0143 Investments:
014302 KA136 Non-Financial Institutions : 3 INSTALLATION AND COMMISSIONING OF SOLAR SY STEM AT 155 NOS RAILWAY STATIONS
014302 - A11 Investments 210,296,000 10,000,000 300,000,000
014302 - A111 Investment Local 210,296,000 10,000,000 300,000,000
Total- INSTALLATION AND COMMISSIONING 210,296,000 10,000,000 300,000,000
KA136 4 INDIG OF SOLAR SYSTEM AT 155 NOS RAILWAY STATIONS ENOUS DEVELOPMENT OF WIRELESS BASED BLOCK INSTRUMENT INTERLOCKING SYSTEM AND
014302 - A11 Investments 100,000,000 10,000,000 100,000,000
014302 - A111 Investment Local 100,000,000 10,000,000 100,000,000
Total- INDIGENOUS DEVELOPMENT OF 100,000,000 10,000,000 100,000,000
WIRELESS BASED BLOCK INSTRUMENT INTERLOCKING SYSTEM AND
KA136 5 PROCUREMENT OF 600 FLAT CONTAINER BOGIE WAGONS (ZBFC)
014302 - A11 Investments 100,000,000
014302 - A111 Investment Local 100,000,000
Total- PROCUREMENT OF 600 FLAT CONTAINER BOGIE WAGONS (ZBFC) 100,000,000
KA136 6 REHABILITATION OF 300 KVA DG SETS
014302 - A11 Investments 100,000,000 50,000,000 268,000,000
014302 - A111 Investment Local 100,000,000 50,000,000 268,000,000
Total- REHABILITATION OF 300 KVA DG SETS 100,000,000 50,000,000 268,000,000
KA136 (INCLU 7 CONS DING) TRUCTION OF NEW TRACK & UP-GRADATION / REHABILITATION OF TRACK FROM CHAMAN YARD
014302 - A11 Investments 367,610,000 10,000,000 200,000,000
014302 - A111 Investment Local 367,610,000 10,000,000 200,000,000
Total- CONSTRUCTION OF NEW TRACK & 367,610,000 10,000,000 200,000,000
UP-GRADATION / REHABILITATION OF TRACK FROM CHAMAN YARD (INCLUDING)
Page 659
NO. 131.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2021-22 Posts 2022-23 N 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
KA3500 IMPLE MANAGENT IN ACCOUNTANT GENERAL PAKISTAN RE MENTATION OF PAKISTAN RAILAWAYS PLAN FORMATION VENUES SUB-OFF NING PORTAL (PR ICE, KARACHI PP) & HUMAN RESO URCE
014302- A11 Investments 25,950,000 12,500,000 12,500,000
014302- A111 Investment Local 25,950,000 12,500,000 12,500,000
Total- IMPLEMENTATION OF PAKISTAN 25,950,000 12,500,000 12,500,000
RAILAWAYS PLANNING PORTAL (PRPP) & HUMAN RESOURCE MANAGENT INFORMATION
KA7109 CHINA -PAKISTAN ECONOMIC CORRIDOR SUPPORT PROJECT (CPECS P) AT MINISTRY OF RAILWAYS
014302- A11 Investments 200,000,000 40,000,000 50,000,000
014302- A111 Investment Local 200,000,000 40,000,000 50,000,000
Total- CHINA-PAKISTAN ECONOMIC CORRIDOR SUPPORT PROJECT 200,000,000 40,000,000 50,000,000
(CPECSP) AT MINISTRY OF RAILWAYS
(In Foreign Exchange) (40,000,000)
(Own Resources) (40,000,000)
(In Local Currency) (160,000,000) (40,000,000) (50,000,000)
KA7110 CONS __ TRUCTION OF STAFF QUARTERS (REVISED) _________________ _________________
014302- A11 Investments 80,000,000 18,000,000 50,000,000
014302- A111 Investment Local 80,000,000 18,000,000 50,000,000
Total- CONSTRUCTION OF STAFF QUARTERS 80,000,000 18,000,000 50,000,000
KA7111 PRELI ESTABLISHM (REVISED) MINARY DESIGN / DRAWINGS FOR UPGRADA ENT OF TION/REHABILITATION OF MAIN LINE ( ML-1) AND
014302- A11 Investments 500,000,000 500,000,000 500,000,000
014302- A111 Investment Local 500,000,000 500,000,000 500,000,000
Total- PRELIMINARY DESIGN / DRAWINGS 500000000 500000000 500000000
FOR UPGRADATION/REHABILITATION OF MAIN LINE (ML-1) AND ESTABLISHMENT OF ,, ,, ,,
KA7112 PROCUREMENT OF 75 NOS(55 NOS 4000-4500HP & 2 LOCOMOTIVES (DELS) 0 NOS 2000-2500 H P) DIESEL ELECTRIC
014302- A11 Investments 200,000,000
Page 660
NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

014302- A111 Investment Local 200,000,000
Total- PROCUREMENT OF 75 NOS(55 NOS 4000-4500HP & 20 NOS 2000-2500 HP) DIESEL ELECTRIC LOCOMOTIVES (DELS) 200,000,000
(In Foreign Exchange) (100,000,000)
(Own Resources) (100,000,000)
KA7113 PROC (In Local Currency) UREMENT OF EQUIPMENT FOR IMPROVED (100,000,000) __________________ SECURITY AND ANT ________________ I-TERRORSIM MEA ________________ SURES
014302- A11 Investments 141,168,000 1,000,000 139,168,000
014302- A111 Investment Local 141,168,000 1,000,000 139,168,000
Total- PROCUREMENT OF EQUIPMENT FOR 141,168,000 1,000,000 139,168,000
IMPROVED SECURITY AND ANTI-TERRORSIM MEASURES
KA7114 PROC COACHES URMENT/MANUFACTURE OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER
014302- A11 Investments 8,500,000,000 5,110,580,000 15,974,500,000
014302- A111 Investment Local 8,500,000,000 5,110,580,000 15,974,500,000
Total- PROCURMENT/MANUFACTURE OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER COACHES 8,500,000,000 5,110,580,000 15,974,500,000
(In Foreign Exchange) (7,000,000,000) (4,798,354,000) (15,500,000,000)
(Own Resources) (7,000,000,000) (4,798,354,000) (15,500,000,000)
(In Local Currency) (1,500,000,000) (312,226,000) (474,500,000)
KA7115 PROJ ECT MANAGEMENT UNIT (PMU) IN MINISTR __________________ Y OF RAILWAYS (2N ________________ D REVISED)
014302- A11 Investments 281,814,000 15,000,000 250,000,000
014302- A111 Investment Local 281,814,000 15,000,000 250,000,000
Total- PROJECT MANAGEMENT UNIT (PMU) IN MINISTRY OF RAILWAYS (2ND REVISED) 281,814,000 15,000,000 250,000,000

KA7118 REHABILITATION OF RAILWAY ASSETS DAMAGED AT SINDH DURING RIOTS OF 27-28 DECEMBER 2007 FOLLOWED BY 014302- A11 Investments 100,000,000

Page 661
NO. 131.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2021-22 Posts 2022-23 N 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
014302- A111 Investment Local 100,000,000
Total- REHABILITATION OF RAILWAY ASSETS DAMAGED AT SINDH DURING RIOTS OF 27-28 DECEMBER 2007 FOLLOWED BY 100,000,000
(In Foreign Exchange) (90,000,000)
(Own Resources) (90,000,000)
(In Local Currency) (10,000,000)
KA7120 REPL -SHAHDARA B __ ACEMENT OF OLD AND OBSOLETE SIGNAL G AGH MAINLINE SECTION OF __________________ EAR FROM LODHRA _________________ N -MULTAN-KHANE _____________ WAL
014302- A11 Investments 900,000,000 771,360,000 1,000,000,000
014302- A111 Investment Local 900,000,000 771,360,000 1,000,000,000
Total- REPLACEMENT OF OLD AND 900,000,000 771,360,000 1,000,000,000
OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL -SHAHDARA BAGH MAINLINE SECTION OF
(In Foreign Exchange) (800,000,000) (800,000,000)
(Own Resources) (800,000,000) (800,000,000)
(In Local Currency) (100,000,000) (771,360,000) (200,000,000)
KA7121 STRE DIRECTORAT __ NGTHENING OF PLANNING DEVELOPMENT MO E MINISTRY OF MINISTRY __________________ NITORING AND EVA _________________ LUATION (PD&ME) _____________
014302- A11 Investments 100,000,000
014302- A111 Investment Local 100,000,000
Total- STRENGTHENING OF PLANNING DEVELOPMENT MONITORING AND 100,000,000
EVALUATION (PD&ME) DIRECTORATE MINISTRY OF MINISTRY
KA7124 UP-GRADATION OF TERMINAL FACILITIES AND DRY PORTS (REVISED)
014302- A11 Investments 2,024,000
014302- A111 Investment Local 2,024,000
Total- UP-GRADATION OF TERMINAL 2,024,000
FACILITIES AND DRYPORTS (REVISED)
Page 662

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION

RAILWAYS DIVISION DEMAND S FOR GRANTS
No of Posts 2021-2022 2021-2022 2022-2023
2021-22 2022-23 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7129 SPECIAL REPAIR OF 100 NOS DE LOCOMOTIVES FOR IMPROVING THE REABILITY/AVAILABILITY OF RUNNING

014302- A11 Investments 2,000,000,000 1,510,000,000 2,300,000,000
014302- A111 Investment Local 2,000,000,000 1,510,000,000 2,300,000,000
Total- SPECIAL REPAIR OF 100 NOS DE 2,000,000,000 1,510,000,000 2,300,000,000
LOCOMOTIVES FOR IMPROVING THE REABILITY/AVAILABILITY OF RUNNING
(In Foreign Exchange) (1,500,000,000) (1,433,937,000) (1,800,000,000)
(Own Resources) (1,500,000,000) (1,433,937,000) (1,800,000,000)
(In Local Currency) (500,000,000) (76,063,000) (500,000,000)
_________________ _______________
KA7130 SPECIAL REPAIR OF 600 PASSENGER COACHES AND 1200 BOGIE WAGONS
014302- A11 Investments 1,000,000,000 1,245,000,000 980,000,000
014302- A111 Investment Local 1,000,000,000 1,245,000,000 980,000,000
Total- SPECIAL REPAIR OF 600 PASSENGER COACHES AND 1200 BOGIE WAGONS 1,000,000,000 1,245,000,000 980,000,000
(In Foreign Exchange) (700,000,000) (155,588,000) (880,000,000)
(Own Resources) (700,000,000) (155,588,000) (880,000,000)
(In Local Currency) (300,000,000) (1,089,412,000) (100,000,000)
KA7132 PC-II PROJECT FOR COMMERCIAL AND FINANCIAL FEASIB __________________ ILITY STUDY FOR TH _________________ E SUB-PROJECT U _______________ NDER ML-I
014302- A11 Investments 16,000,000 5,000,000
014302- A111 Investment Local 16,000,000 5,000,000
Total- PC-II FOR COMMERCIAL AND 16,000,000 5,000,000
FINANCIAL FEASIBILITY STUDY FOR THE SUB-PROJECT UNDER ML-I PROJECT

KA7133 UP-GRADATION OF PAKISTAN RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF DRYPORT NEAR

014302- A11 Investments 3,010,526,000 5,000,000,000
014302- A111 Investment Local 3,010,526,000 5,000,000,000
Total- UP-GRADATION OF PAKISTAN 3,010,526,000 5,000,000,000
RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF DRYPORT NEAR
(In Foreign Exchange) (1,500,000,000) (100,000,000)
(Own Resources) (1,500,000,000)
(Foreign Aid) (100,000,000)
(In Local Currency) (1,510,526,000) __________________________ (4,900,000,000) ________________________
Page 663
NO. 131.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA7134 OPERATIONALIZATION OF TRAIN ON EXISTING KCR ALLIGNMENT
014302- A11 Investments 350,000,000 57,000,000 350,000,000
014302- A111 Investment Local 350,000,000 57,000,000 350,000,000
Total- OPERATIONALIZATION OF TRAIN ON EXISTING KCR ALLIGNMENT 350,000,000 57,000,000 350,000,000
(In Foreign Exchange) (250,000,000)
(Own Resources) (250,000,000)
(In Local Currency) (350,000,000) (57,000,000) (100,000,000)
KA7135 PROV DEVELOPMEN __ ISION OF TRAIN APPROACHING WARNING SY T OF LED BASED _________________ STEM FOR LEVEL C ______________ ROSSING AND _________________ INHOUSE
014302- A11 Investments 66,976,000 41,000,000 24,888,000
014302- A111 Investment Local 66,976,000 41,000,000 24,888,000
Total- PROVISION OF TRAIN APPROACHING 66,976,000 41,000,000 24,888,000
KA7136 UMBR WARNING SYSTEM FOR LEVEL CROSSING AND INHOUSE DEVELOPMENT OF LED BASED ELLA PCII FOR FEASIBITY STUDIES AND TRA NSACTION ADVISORY SERVICES
014302- A11 Investments 500,000,000 128,000,000 100,000,000
014302- A111 Investment Local 500,000,000 128,000,000 100,000,000
Total- UMBRELLA PCII FOR FEASIBITY 500,000,000 128,000,000 100,000,000
STUDIES AND TRANSACTION
KA7137 ESTA ADVISORY SERVICES BLISHMENT OF BUSINESS DEVELOPMENT AN D HR SUPPORT UNIT AT PAKISTAN RAILWAYS
014302- A11 Investments 237,000,000 10,000,000 50,000,000
014302- A111 Investment Local 237,000,000 10,000,000 50,000,000
Total- ESTABLISHMENT OF BUSINESS 237,000,000 10,000,000 50,000,000
DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS
KA7138 COLL MODEL) ABORATION OF PAKISTAN RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX
014302- A11 Investments 100,000,000 48,000,000 50,000,000
014302- A111 Investment Local 100,000,000 48,000,000 50,000,000
Page 664
NO. 131.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISI No of 2021-22 Posts 2022-23 ON 2021-2022 Budget Estimate DEMAND 2021-2022 Revised Estimate S FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
Total- COLLABORATION OF PAKISTAN 100,000,000 48,000,000 50,000,000
KA7139 PROC RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX MODEL) UREMENT AND INSTALLATION OF MACHINER Y AT SIGNAL WORKSHOP
014302- A11 Investments 308,142,000 29,000,000 280,000,000
014302- A111 Investment Local 308,142,000 29,000,000 280,000,000
Total- PROCUREMENT AND INSTALLATION 308,142,000 29,000,000 280,000,000
OF MACHINERY AT SIGNAL WORKSHOP
KA7141 REHABILITATION OF KPT AND RAIL CONNECTIVITY (PHASE-1)
014302- A11 Investments 500,000,000 378,000,000 500,000,000
014302- A111 Investment Local 500,000,000 378,000,000 500,000,000
Total- REHABILITATION OF KPT AND RAIL 500,000,000 378,000,000 500,000,000
CONNECTIVITY (PHASE-1)
KA7142 REHABILITATION OF TRACK BETWEEN REHMANI N SECTION (SUKKUR DIVISION PH-4) AGAR - BAKRANI ROAD ON DADU-HAB IB KOT
014302- A11 Investments 1,250,000,000 10,000,000 300,000,000
014302- A111 Investment Local 1,250,000,000 10,000,000 300,000,000
Total- KA7143 REHA (PESHAWAR REHABILITATION OF TRACK BETWEEN REHMANI NAGAR - BAKRANI ROAD ON DADU-HABIB KOT SECTION (SUKKUR DIVISION PH-4) BILITATION OF TRACK BETWEEN BARULI-SO 1,250,000,000 HAN BRIDGE ON K 10,000,000 UNDIAN - ATTOCK C 300,000,000 ITY SECTION
014302- A11 Investments 1,100,000,000 15,000,000 300,000,000
014302- A111 Investment Local 1,100,000,000 15,000,000 300,000,000
Total- REHABILITATION OF TRACK BETWEEN BARULI-SOHAN BRIDGE ON KUNDIAN - ATTOCK CITY SECTION (PESHAWAR 1,100,000,000 15,000,000 300,000,000
KA7144 REVIVAL OF KARACHI CIRCULAR RAILWAYS (KCR ) - PHASE2
014302- A11 Investments 1,000,000,000
014302- A111 Investment Local 1,000,000,000
Total- REVIVAL OF KARACHI CIRCULAR 1,000,000,000
RAILWAYS (KCR) - PHASE2
Page 665
NO. 131.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
KA7145 RECO ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OF MMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES FICE, KARACHI
014302- A11 Investments 961,000,000 42,000,000 250,000,000
014302- A111 Investment Local 961,000,000 42,000,000 250,000,000
Total- RECOMMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES 961,000,000 42,000,000 250,000,000
(In Foreign Exchange) (860,000,000) (200,000,000)
(Own Resources) (860,000,000) (200,000,000)
(In Local Currency) (101,000,000) (42,000,000) (50,000,000)
KA7146 IMPR RAILWAYS __ OVEMENT OF TERMINAL FACILITIES (MUGHA ________________ LPURA AND QILA S __________________ ATTAR SHAH) ON P ______________ AKISTAN
014302- A11 Investments 100,000,000
014302- A111 Investment Local 100,000,000
Total- KA7148 REHA SECTION IMPROVEMENT OF TERMINAL FACILITIES (MUGHALPURA AND QILA SATTAR SHAH) ON PAKISTAN RAILWAYS BILITATION OF TRACK BETWEEN SAMA SAT 100,000,000 TA AND BAHAWAL NAGAR ON SAMA S ATTA AMRUKA
014302- A11 Investments 2,000,000,000 130,000,000 500,000,000
014302- A111 Investment Local 2,000,000,000 130,000,000 500,000,000
Total- REHABILITATION OF TRACK BETWEEN 2,000,000,000 130,000,000 500,000,000
SAMA SATTA AND BAHAWALNAGAR
ON SAMA SATTA AMRUKA SECTION
KA8500 CONSTRUCTION OF INFRASTRUCTURE (FLY OVER LEVEL CROSS ING FROM / UNDERPASS STRUCTURES)FOR ELI MATION OF
014302- A11 Investments 3,370,000,000 50,000,000
014302- A111 Investment Local 3,370,000,000 50,000,000
Total- CONSTRUCTION OF INFRASTRUCTURE 3,370,000,000 50,000,000
(FLY OVER / UNDERPASS
STRUCTURES)FOR ELIMATION OF LEVEL CROSS ING FROM
KA9608 REHABILITATION AND IMPROVEMENT OF KOTRI JA TRACK BETWEEN MSHORO RAIL LINK / PC-I OF REHABILITATION OF
014302- A03 Operating Expenses 200,000,000
014302- A039 General 200,000,000
Page 666
NO. 13 1.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate DEMAN 2021-2022 Revised Estimate DS FOR GRANTS 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
Total- REHABILITATION AND IMPROVEMENT OF KOTRI JAMSHORO RAIL LINK / PC-I OF REHABILITATION OF TRACK BETWEEN 200,000,000
KA960 9 CONVERSION OF BREAKING SYSTEM OF 328 NOS OF MBFRS FROM VACCUM BRAKE TO AIR BRAKE
014302 - A03 Operating Expenses 200,000,000
014302 - A039 General 200,000,000
Total- CONVERSION OF BREAKING SYSTEM OF 328 NOS OF MBFRS FROM VACCUM BRAKE TO AIR BRAKE 200,000,000
KA969 7 IMMEDIATE TRACK SAFETY WORK IN KARACHI AND SUKKUR
014302 - A11 Investments 400,000,000 800,000,000
014302 - A111 Investment Local 400,000,000 800,000,000
Total- IMMEDIATE TRACK SAFETY WORK IN KARACHI AND SUKKUR 400,000,000 800,000,000
KA990 6 REPA LCEMENT OF TRACK MACHINE
014302 - A11 Investments 600,000,000
014302 - A111 Investment Local 600,000,000
Total- REPALCEMENT OF TRACK MACHINE 600,000,000
(In Foreign Exchange) (550,000,000)
(Own Resources) (550,000,000)
(In Local Currency) (50,000,000)
0 14302 _________________ Total- Non-Financial Institutions 26,408,506,000 __________________ 13,961,440,000 _______________ 31,684,056,000
0 143 Total- Investments 26,408,506,000 13,961,440,000 31,684,056,000
0 14 Total- Transfers 26,408,506,000 13,961,440,000 31,684,056,000
0 1 Total- General Public Service 26,408,506,000 13,961,440,000 31,684,056,000
04 Economic Affairs:
045 Construction and Transport:
0454 Railway Trasport:
045401 Railway Trasport :
KA137 6 RECONSTRUCTION/REHABILITATION OF ASSETS DAMAGED DURING THE FLOOD 2010
045401 - A11 Investments 465,000,000 56,480,000
045401 - A111 Investment Local 465,000,000 56,480,000
Total- RECONSTRUCTION/REHABILITATION 465,000,000 56,480,000
Page 667
NO. 131.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMANDS FOR GRANTS
No of 2021-22 Pos 2022 ts -23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKIST OF ASSETS DAMAGED DURING THE FLOOD 2010 AN REVENUES SUB-OFFICE, KARACHI
(In Foreign Exchange) (38,387,000)
(Own Resources) (38,387,000)
(In Local Currency) (426,613,000) (56,480,000)
KA1377 IMPR YAD PIPRI KA OVEMENT OF TERMINAL FACILITIES AND RACHI __________________ ENHANCING SECURIT _________________ Y ARRANGEMENT IN _______________ MARSHILING
045401- A11 Investments 30,000,000 800,000,000
045401- A111 Investment Local 30,000,000 800,000,000
Total- IMPROVEMENT OF TERMINAL FACILITIES AND ENHANCING SECURITY ARRANGEMENT IN MARSHILING YAD PIPRI KARACHI 30,000,000 800,000,000
045401 Total- Railway Trasport 495,000,000 856,480,000
0454 Total- Railway Trasport 495,000,000 856,480,000
045 Total- Construction and Transport 495,000,000 856,480,000
04 Total- Economic Affairs 495,000,000 856,480,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 26,408,506,000 14,456,440,000 32,540,536,000
(In Foreign Exchange) (12,590,000,000) (6,426,266,000) (20,080,000,000)
(Own Resources) (12,590,000,000) (6,426,266,000) (19,980,000,000)
(Foreign Aid) (100,000,000)
(In Local Currency) COMMERCIA (13,818,506,000) L DEPARTMENTS (8,030,174,000) (12,460,536,000)
Page 668
NO. 1 31.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMANDS FOR GRANTS
No of 2021-22 Posts 2022-23 2021-2022 Budget Estimate 2021-2022 Revised Estimate 2022-2023 Budget Estimate
COMMERCIAL D Rs EPARTMENTS Rs Rs
04 Economic Affairs:
045 Construction and Transport:
0454 Railway Trasport:
04540 1 Railway Trasport :
HQ17 63 PAKISTAN RAILWAYS -(FOREIGN AID PORTION)
04540 1- A03 Operating Expenses 2,989,474,000
04540 1- A039 General 2,989,474,000
Total- PAKISTAN RAILWAYS -(FOREIGN AID PORTION) 2,989,474,000
(In Foreign Exchange) (2,989,474,000)
(Foreign Aid) (2,989,474,000)
045401 Total- Railway Trasport ________________ 2,989,474,000 _______________
0454 Total- Railway Trasport 2,989,474,000
045 Total- Construction and Transport 2,989,474,000
04 Total- Economic Affairs 2,989,474,000
Total- COMMERCIAL DEPARTMENTS 2,989,474,000
(In Foreign Exchange) (2,989,474,000)
(Own Resources)
(Foreign Aid) (2,989,474,000)
TOTAL - DEMAND 30,025,590,000 14,486,440,000 32,648,036,000
(In Foreign Exchange) (15,707,084,000) (6,456,266,000) (20,187,500,000)
(Own Resources) (12,590,000,000) (6,426,266,000) (19,980,000,000)
(Foreign Aid) (3,117,084,000) (30,000,000) (207,500,000)
(In Local Currency) _ (14,318,506,000) ________________ (8,030,174,000) _________________ (12,460,536,000) ________________