Details of Demands for Grants and Appropriations - Vol-IV (Development), part 3
The Details of Demands for Grants and Appropriations - Vol-IV (Development) is part of the federal budget for FY 2025-26. This page reproduces the text of its 671 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.
This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
RN0094 CONSTRUCTION OF APPROACHES ON BOTH SIDES OF SHIEKH KHALIFA BRIDGE (UAE) OVER RIVER INDUS LENGTH 1521
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | 200,000,000 | 30,000,000 |
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 200,000,000 | 200,000,000 | 30,000,000 |
| Total- | CONSTRUCTION OF APPROACHES ON | 200,000,000 | 200,000,000 | 30,000,000 |
| BOTH SIDES OF SHIEKH KHALIFA BRIDGE (UAE) OVER RIVER INDUS LENGTH 1521 | ||||
| RP8111 CONSTRUCTION OF DEC OFFICE RAJANPUR | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,600,000 | ||
| 014101- A052 | Grants Domestic | 100,600,000 | ||
| Total- | CONSTRUCTION OF DEC OFFICE RAJANPUR | 100,600,000 | ||
| SG0175 CONSTRUCTION OF DUAL CARRIAGE WAY FROM | SALAM TO SARGODHA VIA BHALWAL | AJNALA ROAD | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 30,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 30,000,000 |
| Total- | CONSTRUCTION OF DUAL CARRIAGE WAY FROM SALAM TO SARGODHA VIA BHALWAL AJNALA ROAD | 500,000,000 | 500,000,000 | 30,000,000 |
| SG8111 CONS AND RUKHAN | TRUCTION OF ROAD / PCC/ TUFF PAVER / N DISTRICT | ALLAH / SOLING / DRAIN /CULVERT IN | CHAK 105 SB | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 91,166,000 | ||
| 014101- A052 | Grants Domestic | 91,166,000 | ||
| Total- SG8112 MISCE SARGODHA ( | CONSTRUCTION OF ROAD / PCC/ TUFF PAVER / NALLAH / SOLING / DRAIN /CULVERT IN CHAK 105 SB AND RUKHAN DISTRICT LLANEOUS DEVELOPMENT SCHEMES IN TE REVISED) | HSIL KOT MOMIN & | 91,166,000 TEHSIL SARGODH | A DISTRICT |
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,000,000 | 184,000,000 | |
| 014101- A052 | Grants Domestic | 100,000,000 | 184,000,000 | |
| Total- | MISCELLANEOUS DEVELOPMENT SCHEMES IN TEHSIL KOT MOMIN & TEHSIL SARGODHA DISTRICT SARGODHA (REVISED) | 100,000,000 | 184,000,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| SL8111 CONS | ACCOUNTANT GENERAL PAKISTAN R TRUCTION / WIDENING OF KACHA PAKKA NO | EVENUES SUB-OFFICE, LAHORE OR SHAH ROAD DISTRICT SAHIWAL | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 419,790,000 | 250,000,000 | |
| 014101- A052 | Grants Domestic | 419,790,000 | 250,000,000 | |
| Total- | CONSTRUCTION / WIDENING OF | 419,790,000 | 250,000,000 | |
| KACHA PAKKA NOOR SHAH ROAD DISTRICT SAHIWAL | ||||
| SL8112 CONSTRUCTION OF DEC OFFICE SAHIWAL | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 244,836,000 | 244,836,000 | |
| 014101- A052 | Grants Domestic | 244,836,000 | 244,836,000 | |
| Total- | CONSTRUCTION OF DEC OFFICE | 244,836,000 | 244,836,000 | |
| SAHIWAL | ||||
| ST0121 ROAD | FROM SIALKOT CANNTT TO JASSAR GARRISON. | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 2,000,000,000 | 2,000,000,000 | 750,000,000 |
| 014101- A052 | Grants Domestic | 2,000,000,000 | 2,000,000,000 | 750,000,000 |
| Total- | ROAD FROM SIALKOT CANNTT TO | 2,000,000,000 | 2,000,000,000 | 750,000,000 |
| JASSAR GARRISON. | ||||
| ST5555 DUAK 65.1 KM) DIST | IZATION OF SIALKOT EMINABAD ROAD UP KA RICT SIALKOT | MOKE INCLUDING | LINK TO MOTOR WA | Y (LENGTH |
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | |
| Total- | DUAKIZATION OF SIALKOT EMINABAD ROAD UP KAMOKE INCLUDING LINK TO MOTOR WAY (LENGTH 65.1 KM) DISTRICT SIALKOT | 500,000,000 | 500,000,000 | |
| ST8111 REHABILITATION / IMPROVEMENT OF ROAD FROM DISTRICT SIALKOT | DUGRI TO SATRA | SINDHWAN TEHSIL DASKA | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 77,420,000 | ||
| 014101- A052 | Grants Domestic | 77,420,000 | ||
| Total- | REHABILITATION / IMPROVEMENT OF ROAD FROM DUGRI TO SATRA SINDHWAN TEHSIL DASKA DISTRICT SIALKOT | 77,420,000 | ||
| ST8112 INCLU SIALKOT | SION OF ROAD FROM ADDA GULBAHAR TO C | HAPAR MARAKIWAL AND LINK ROADS | DISTRICT | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 346,190,000 | ||
| 014101- A052 | Grants Domestic | 346,190,000 | ||
| Total- | INCLUSION OF ROAD FROM ADDA | 346,190,000 | ||
| GULBAHAR TO CHAPAR MARAKIWAL | ||||
| AND LINK ROADS DISTRICT SIALKOT |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| ST8113 CONSTRUCTION OF ROAD FROM BHAGWAL AWAN TO DABOLA VIA KOTLI BHUTTA RORAS ROAD WITH |
|---|
| LINK INFRASTRUCTURE |
| 014101- A05 | Grants, Subsidies and Write off Loans | 269,460,000 | ||
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 269,460,000 | ||
| Total- ST8114 CONS WITH LINK INF | CONSTRUCTION OF ROAD FROM BHAGWAL AWAN TO DABOLA VIA KOTLI BHUTTA RORAS ROAD WITH LINK INFRASTRUCTURE TRUCTION OF ROAD FROM JURIYAN KALAN RASTRUCTURE | TO MALKE KALAN | 269,460,000 VIA OLAKH AWAN | & MALO CHAK |
| 014101- A05 | Grants, Subsidies and Write off Loans | 346,823,000 | ||
| 014101- A052 | Grants Domestic | 346,823,000 | ||
| Total- TS8111 CONS | CONSTRUCTION OF ROAD FROM JURIYAN KALAN TO MALKE KALAN VIA OLAKH AWAN & MALO CHAK WITH LINK INFRASTRUCTURE TRUCTION OF RAILWAY UNDER PASS GOJR | A TOBA TEK SING | 346,823,000 H (REVISED) | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 334,485,000 | 150,000,000 | |
| 014101- A052 | Grants Domestic | 334,485,000 | 150,000,000 | |
| Total- | CONSTRUCTION OF RAILWAY UNDER | 334,485,000 | 150,000,000 | |
| TS8112 URBA DISTRICT TOB | PASS GOJRA TOBA TEK SINGH (REVISED) N SEWERAGE / DRAINAGE PCC AND TUFF T A TEK | ILE STREET FOR Z | ONE-D GOJRA CITY | TEHSIL GOJRA |
| 014101- A05 | Grants, Subsidies and Write off Loans | 304,389,000 | 150,000,000 | |
| 014101- A052 | Grants Domestic | 304,389,000 | 150,000,000 | |
| Total- | URBAN SEWERAGE / DRAINAGE PCC | 304,389,000 | 150,000,000 | |
| AND TUFF TILE STREET FOR ZONE-D GOJRA CITY TEHSIL GOJRA DISTRICT TOBA TEK | ||||
| 014101 | Total- To provinces | 7,850,000,000 | 19,073,458,000 | 7,641,836,000 |
| 0141 | Total- Transfers (Inter-Governmental) | 7,850,000,000 | 19,073,458,000 | 7,641,836,000 |
| 014 | Total- Transfers | 7,850,000,000 | 19,073,458,000 | 7,641,836,000 |
| 01 | Total- General Public Service | 7,850,000,000 | 19,073,458,000 | 7,641,836,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | 7,850,000,000 | 19,073,458,000 | 7,641,836,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
| 01 | General Public Service: | |||
|---|---|---|---|---|
| 014 | Transfers: | |||
| 0141 | Transfers (Inter-Governmental): | |||
| 014101 BU811 SUB DI | To pro 1 VARIO VISION | vinces : US DEVELOPMENTAL IE BLACK TOP FLOOD | PROTECTION WALL AND COMMUNITY | CENTER IN |
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 30,000,000 | 274,471,000 |
| 014101 | - A052 | Grants Domestic | 30,000,000 | 274,471,000 |
| Total- | VARIOUS DEVELOPMENTAL IE BLACK | 30,000,000 | 274,471,000 | |
| BU811 | 2 INSTA | TOP FLOOD PROTECTION WALL AND COMMUNITY CENTER IN SUB DIVISION LLATION OF PRESSURE PUMPS / TUBEWELL | S IN DISTRICT BANNU | |
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 230,000,000 | 305,743,000 |
| 014101 | - A052 | Grants Domestic | 230,000,000 | 305,743,000 |
| Total- | INSTALLATION OF PRESSURE PUMPS / | 230,000,000 | 305,743,000 | |
| TUBEWELLS IN DISTRICT BANNU | ||||
| CL0027 | WIDE | NING & CARPETING OF BOONI BUZAND- TOR | KHOW ROAD CHITRAL | |
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 57,616,000 57,616,000 | 7,497,000 |
| 014101 | - A052 | Grants Domestic | 57,616,000 57,616,000 | 7,497,000 |
| Total- | WIDENING & CARPETING OF BOONI | 57,616,000 57,616,000 | 7,497,000 | |
| BUZAND- TORKHOW ROAD CHITRAL | ||||
| DI8111 | CONST | RUCTION OF IB OFFICES (03) AT GHALLANAI | TD MOHMAND KOHAT AND DI KHAN | |
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 144,000,000 | 124,004,000 |
| 014101 | - A052 | Grants Domestic | 144,000,000 | 124,004,000 |
| Total- | CONSTRUCTION OF IB OFFICES (03) AT | 144,000,000 | 124,004,000 | |
| GHALLANAI TD MOHMAND KOHAT AND DI KHAN | ||||
| KD811 | 1 CONSTRUCTION OF OFFICE FOR IB AT DASSU | |||
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 45,000,000 | 54,500,000 |
| 014101 | - A052 | Grants Domestic | 45,000,000 | 54,500,000 |
| Total- | CONSTRUCTION OF OFFICE FOR IB AT | 45,000,000 | 54,500,000 | |
| KM811 | 1 CONS | DASSU TRUCTION OF BRIDGES/CULVERT AT VARIO | US PLACES DISTRICT UPPER AND LOW | ER KURRUM |
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 100,000,000 | |
| 014101 | - A052 | Grants Domestic | 100,000,000 | |
| Total- | CONSTRUCTION OF | 100,000,000 | ||
| BRIDGES/CULVERT AT VARIOUS | ||||
| PLACES DISTRICT UPPER AND LOWER KURRUM |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| KM8112 CONS | ACCOUNTANT GENERAL PAKISTAN RE TRUCTION OF BLACK TOP ROAD AT VARIOU | Rs VENUES SUB-OFF S PLACES OF DIST | Rs ICE, PESHAWAR RICT UPPER AND LO | Rs WER KURRUM |
| 014101- A05 | Grants, Subsidies and Write off Loans | 48,000,000 | 219,600,000 | |
| 014101- A052 | Grants Domestic | 48,000,000 | 219,600,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 48,000,000 | 219,600,000 | |
| AT VARIOUS PLACES OF DISTRICT UPPER AND LOWER KURRUM | ||||
| LK8111 DEVELOPMENT WORK AT VARIOUS PLACES TEHSIL SARAI NAURANG | DISTRICT LAKKI | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,000,000 | 15,000,000 | |
| 014101- A052 | Grants Domestic | 100,000,000 | 15,000,000 | |
| Total- LK8112 CONS | DEVELOPMENT WORK AT VARIOUS PLACES TEHSIL SARAI NAURANG DISTRICT LAKKI TRUCTION OF ROAD AND PCC STREET AT DI | STRUCT LAKKI MA | 100,000,000 RWAT | 15,000,000 |
| 014101- A05 | Grants, Subsidies and Write off Loans | 193,000,000 | 100,000,000 | |
| 014101- A052 | Grants Domestic | 193,000,000 | 100,000,000 | |
| Total- | CONSTRUCTION OF ROAD AND PCC STREET AT DISTRUCT LAKKI MARWAT | 193,000,000 | 100,000,000 | |
| MD0081 ESTABLISHMENT OF CARDIOLOGY UNIT & BURN / AT BATKHELA | TRUAMA UNIT AT | CAT-A DHQ HOSPITAL MALAKAND | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,000,000 | 100,000,000 | 15,000,000 |
| 014101- A052 | Grants Domestic | 100,000,000 | 100,000,000 | 15,000,000 |
| Total- | ESTABLISHMENT OF CARDIOLOGY | 100,000,000 | 100,000,000 | 15,000,000 |
| PR0671 KHYB | UNIT & BURN / TRUAMA UNIT AT CAT-A DHQ HOSPITAL MALAKAND AT BATKHELA ER INSTITUTE OF CHILD HEALTH & CHILD HO | SPITAL | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,500,000,000 | 1,500,000,000 | 400,000,000 |
| 014101- A052 | Grants Domestic | 1,500,000,000 | 1,500,000,000 | 400,000,000 |
| Total- | KHYBER INSTITUTE OF CHILD HEALTH & CHILD HOSPITAL | 1,500,000,000 | 1,500,000,000 | 400,000,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMA 2024-2025 Revised Estimate | NDS FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| PR1194 ESTA | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OF B. OF INSTITUTE OF PETROLEUM TECHNOLOGY KARAK | FICE, PESHAWAR | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | 200,000,000 | 15,000,000 |
| 014101- A052 | Grants Domestic | 200,000,000 | 200,000,000 | 15,000,000 |
| Total- | ESTAB. OF INSTITUTE OF PETROLEUM TECHNOLOGY KARAK | 200,000,000 | 200,000,000 | 15,000,000 |
| PR3102 UPGRADATION & REHAB. OF LAWRENCEPUR-TAR | BELA ROAD | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,000,000 | 100,000,000 | 92,503,000 |
| 014101- A052 | Grants Domestic | 100,000,000 | 100,000,000 | 92,503,000 |
| Total- | UPGRADATION & REHAB. OF | 100,000,000 | 100,000,000 | 92,503,000 |
| LAWRENCEPUR-TARBELA ROAD | ||||
| PR3103 MERGED DISTRICT OF KHYBER PAKHTUNKHWA | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 27,000,000,000 | 27,000,000,000 | 28,000,000,000 |
| 014101- A052 | Grants Domestic | 27,000,000,000 | 27,000,000,000 | 28,000,000,000 |
| Total- | MERGED DISTRICT OF KHYBER PAKHTUNKHWA | 27,000,000,000 | 27,000,000,000 | 28,000,000,000 |
| PR3107 ZYAR | A TO DABORI ROAD ORKAZAI AGENCY | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 684,521,000 | 684,521,000 | 444,329,000 |
| 014101- A052 | Grants Domestic | 684,521,000 | 684,521,000 | 444,329,000 |
| Total- | ZYARA TO DABORI ROAD ORKAZAI | 684,521,000 | 684,521,000 | 444,329,000 |
| AGENCY | ||||
| PR3108 MERGED AREAS OF (ERSTWHILE FATA) 10 YEAR DEVELOPMENT PLAN | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 42,315,479,000 | 42,315,479,000 | 37,000,000,000 |
| 014101- A052 | Grants Domestic | 42,315,479,000 | 42,315,479,000 | 37,000,000,000 |
| Total- | MERGED AREAS OF (ERSTWHILE | 42,315,479,000 | 42,315,479,000 | 37,000,000,000 |
| FATA) 10 YEAR DEVELOPMENT PLAN | ||||
| PR5000 LAND | ACQUISITION SWAT MOTORWAY (PHASE-II) | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,000,000,000 | 1,000,000,000 | 15,000,000 |
| 014101- A052 | Grants Domestic | 1,000,000,000 | 1,000,000,000 | 15,000,000 |
| Total- | LAND ACQUISITION SWAT MOTORWAY | 1,000,000,000 | 1,000,000,000 | 15,000,000 |
| PR8111 CONS PESHAWAR | (PHASE-II) TRUCTION OF AUDITORIUM BACHELOR HOS | TEL AND OFFICER | 'S MESS FOR NAB | (KP) AT |
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,000,000 | 40,000,000 | |
| 014101- A052 | Grants Domestic | 100,000,000 | 40,000,000 | |
| Total- | CONSTRUCTION OF AUDITORIUM | 100,000,000 | 40,000,000 | |
| BACHELOR HOSTEL AND OFFICER 'S MESS FOR NAB (KP) AT PESHAWAR |
NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE
| T EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
| SW0166 CONSTRUCTION OF GRAVITY BASED WATER SUPPLY SCHEME FOR M | ATTA AND SURROUNDING AREAS | |||
|---|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | 200,000,000 | |
| 014101- A052 | Grants Domestic | 200,000,000 | 200,000,000 | |
| Total- SW8111 CONS | CONSTRUCTION OF GRAVITY BASED WATER SUPPLY SCHEME FOR MATTA AND SURROUNDING AREAS TRUCTION OF OPERATION THEATER AT CE | 200,000,000 NTRAL HOSPITAL A | 200,000,000 T MINGORA SWAT (R | EVISED PC-I) |
| 014101- A05 | Grants, Subsidies and Write off Loans | 131,381,000 | 52,552,000 | |
| 014101- A052 | Grants Domestic | 131,381,000 | 52,552,000 | |
| Total- | CONSTRUCTION OF OPERATION THEATER AT CENTRAL HOSPITAL AT MINGORA SWAT (REVISED PC-I) | 131,381,000 | 52,552,000 | |
| TK8111 CONSTRUCTION OF PCC ROADS AND DRAIN AT DISTRICT TANK | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 86,490,000 | 34,596,000 | |
| 014101- A052 | Grants Domestic | 86,490,000 | 34,596,000 | |
| Total- | CONSTRUCTION OF PCC ROADS AND | 86,490,000 | 34,596,000 | |
| DRAIN AT DISTRICT TANK | ||||
| TU8111 SOLA PACKAGE-III I | RISATTION OF HOMES AT VARIOUS VILLAG II IV V | ES OF TRIBAL DISTRICT NORTH WAZIRIS | RAN | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 40,000,000 | ||
| 014101- A052 | Grants Domestic | 40,000,000 | ||
| Total- | SOLARISATTION OF HOMES AT VARIOUS VILLAGES OF TRIBAL DISTRICT NORTH WAZIRISRAN PACKAGE-III III IV V | 40,000,000 | ||
| TU8112 100 NOS WATER BORE FOR TUEB WELL AT DISTRICT SOUTH WAZIRSITAN | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 98,640,000 | ||
| 014101- A052 | Grants Domestic | 98,640,000 | ||
| Total- | 100 NOS WATER BORE FOR TUEB | 98,640,000 | ||
| WELL AT DISTRICT SOUTH WAZIRSITAN | ||||
| TU8113 SOLA AGAINST APP | RISATION OF HOMES AT DISTRICT SOUTH W ROVED COST OF | AZIRISRAN (AT REDUCED COST OF RS | 340915 MN | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 48,960,000 | ||
| 014101- A052 | Grants Domestic | 48,960,000 | ||
| Total- | SOLARISATION OF HOMES AT DISTRICT SOUTH WAZIRISRAN (AT REDUCED COST OF RS 340915 MN AGAINST APPROVED COST OF | 48,960,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
| TU8114 CONSTRUCTION OF BLACK TOP ROAD PCC STR UPPER SOUTH | EET AND JEEPABLE | TRACKS AT TRIBAL | DISTRICT | |
|---|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 471,100,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 471,100,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 50,000,000 | 471,100,000 | |
| TU8115 CONS | PCC STREET AND JEEPABLE TRACKS AT TRIBAL DISTRICT UPPER SOUTH TRUCTION OF CAT-D HOSPITAL AT AZAM | WARSAK TEHSIL BIR | MAL SWTD WANA | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 300,000,000 | 372,315,000 | |
| 014101- A052 | Grants Domestic | 300,000,000 | 372,315,000 | |
| Total- | CONSTRUCTION OF CAT-D HOSPITAL | 300,000,000 | 372,315,000 | |
| AT AZAM WARSAK TEHSIL BIRMAL SWTD WANA | ||||
| 014101 | Total- To provinces | 73,157,616,000 | 74,903,087,000 | 68,053,210,000 |
| 0141 | Total- Transfers (Inter-Governmental) | 73,157,616,000 | 74,903,087,000 | 68,053,210,000 |
| 014 | Total- Transfers | 73,157,616,000 | 74,903,087,000 | 68,053,210,000 |
| 01 | Total- General Public Service | 73,157,616,000 | 74,903,087,000 | 68,053,210,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | 73,157,616,000 | 74,903,087,000 | 68,053,210,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 2024-2025 Budget Estimate | DEMANDS 2024-2025 Revised Estimate | FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | |||
| 01 Gener | al Public Service: | ||
| 014 Transf | ers: | ||
| 0141 Transf | ers (Inter-Governmental): | ||
| 014101 To pro BN8111 11 NO | vinces : S DEVELOPMENT SCHEMES IN DISTRICT BADIN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 10,000,000 | |
| 014101- A052 | Grants Domestic | 10,000,000 | |
| Total- | 11 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN | 10,000,000 | |
| BN8112 15 NO | S DEVELOPMENT SCHEMES IN DISTRICT BADIN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 10,000,000 | |
| 014101- A052 | Grants Domestic | 10,000,000 | |
| Total- | 15 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN | 10,000,000 | |
| BN8113 19 NO | S DEVELOPMENT SCHEMES IN DISTRICT BADIN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 10,000,000 | |
| 014101- A052 | Grants Domestic | 10,000,000 | |
| Total- | 19 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN | 10,000,000 | |
| HD0065 EXP R | AW WATER FILT PLANT & SUPPLY NW FOR SUPP CLEAN WATER TO HYDERABAD | ||
| 014101- A05 | Grants, Subsidies and Write off Loans 10,000,000 | 10,000,000 | |
| 014101- A052 | Grants Domestic 10,000,000 | 10,000,000 | |
| Total- | EXP RAW WATER FILT PLANT & 10,000,000 | 10,000,000 | |
| SUPPLY NW FOR SUPP CLEAN WATER TO HYDERABAD | |||
| HD0069 CONS PACKAGE. | T. OF EASTERN AND EXPANSION OF SOUTHERN SEWAGE TREATMENT PLANTS HYDERABAD | ||
| 014101- A05 | Grants, Subsidies and Write off Loans 10,000,000 | 10,000,000 | |
| 014101- A052 | Grants Domestic 10,000,000 | 10,000,000 | |
| Total- | CONST. OF EASTERN AND EXPANSION 10,000,000 | 10,000,000 | |
| OF SOUTHERN SEWAGE TREATMENT PLANTS HYDERABAD PACKAGE. | |||
| HD0232 HYDERABAD URBAN INFRASTRUCTURE DEVELOPMENT PACKAGE (REVAMPING & REHABILITATION) | |||
| 014101- A05 | Grants, Subsidies and Write off Loans 5,000,000,000 | 5,000,000,000 | |
| 014101- A052 | Grants Domestic 5,000,000,000 | 5,000,000,000 | |
| Total- | HYDERABAD URBAN 5,000,000,000 | 5,000,000,000 | |
| INFRASTRUCTURE DEVELOPMENT PACKAGE (REVAMPING & REHABILITATION) |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1387 PRIME MINISTER'S PROGRAM FOR CONSTRUCTION/RECONSTRUCTION OF EXISTING SCHOOLS IN SINDH AFFECTED
| 014101- A05 | Grants, Subsidies and Write off Loans | 5,000,000,000 | 5,000,000,000 | 3,169,000,000 |
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 5,000,000,000 | 5,000,000,000 | 3,169,000,000 |
| Total- KA1460 PRIM UNDER 4RF | PRIME MINISTER'S PROGRAM FOR CONSTRUCTION/RECONSTRUCTION OF EXISTING SCHOOLS IN SINDH AFFECTED E MINISTER'S PROGRAMME FOR RE-BUILDI | 5,000,000,000 NG OF HOUSES IN F | 5,000,000,000 LOOD AFFECTED A | 3,169,000,000 REAS OF SINDH |
| 014101- A05 | Grants, Subsidies and Write off Loans | 20,000,000,000 | ||
| 014101- A052 | Grants Domestic | 20,000,000,000 | ||
| Total- KA7307 EXTE | PRIME MINISTER'S PROGRAMME FOR RE-BUILDING OF HOUSES IN FLOOD AFFECTED AREAS OF SINDH UNDER 4RF NSION / CONSTRUCTION OF SINDH COAST | AL HIGHWAY (36KMS | ) (50:50) | 20,000,000,000 |
| 014101- A05 | Grants, Subsidies and Write off Loans | 3,000,000,000 | 3,000,000,000 | 8,000,000,000 |
| 014101- A052 | Grants Domestic | 3,000,000,000 | 3,000,000,000 | 8,000,000,000 |
| Total- | EXTENSION / CONSTRUCTION OF | 3,000,000,000 | 3,000,000,000 | 8,000,000,000 |
| KA7308 KARA | SINDH COASTAL HIGHWAY (36KMS) (50:50) CHI URBAN INFRASTRUCTURE DEVELOPM | ENT PACKAGE | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 10,000,000,000 | 10,000,000,000 | |
| 014101- A052 | Grants Domestic | 10,000,000,000 | 10,000,000,000 | |
| Total- | KARACHI URBAN INFRASTRUCTURE | 10,000,000,000 | 10,000,000,000 | |
| KA8111 DEVE BENAZEERAB | DEVELOPMENT PACKAGE LOPMENT SCHEMES UNDER PM'S PROGRA AD DIVISION | MME IN SINDH LARKANA SUKKUR AND | SHAEED | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | ||
| 014101- A052 | Grants Domestic | 50,000,000 | ||
| Total- | DEVELOPMENT SCHEMES UNDER PM'S PROGRAMME IN SINDH LARKANA SUKKUR AND SHAEED BENAZEERABAD DIVISION | 50,000,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| KA9000 FLOOD RESPONSE EMERGENCY HOUSING Project (1st Revised) | ||||
|---|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 30,000,000,000 | ||
| 014101- A052 | Grants Domestic | 30,000,000,000 | ||
| Total- KA9601 REHA | FLOOD RESPONSE EMERGENCY HOUSING Project (1st Revised) BILITATION / CONSTRUCTION OF ROADS IN | SITE INDUSTRIAL A | 30,000,000,000 REA KARACHI | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 3,000,000,000 | 3,000,000,000 | 3,015,611,000 |
| 014101- A052 | Grants Domestic | 3,000,000,000 | 3,000,000,000 | 3,015,611,000 |
| Total- LA0026 DUALI | REHABILITATION / CONSTRUCTION OF ROADS IN SITE INDUSTRIAL AREA KARACHI ZATION OF ROAD FROM LARKANO TO LAK | 3,000,000,000 HI (@N-65) = 45.50 K | 3,000,000,000 MS.(50:50) | 3,015,611,000 |
| 014101- A05 | Grants, Subsidies and Write off Loans | 480,000,000 | 480,000,000 | |
| 014101- A052 | Grants Domestic | 480,000,000 | 480,000,000 | |
| Total- | DUALIZATION OF ROAD FROM | 480,000,000 | 480,000,000 | |
| NH5000 CONT RANIPUR | LARKANO TO LAKHI (@N-65) = 45.50 KMS.(50:50) RACTION OF ADDITION CARRIAGEWAY AL | ONG MEHRAN HIGH | WAY FROM NAWAB | SHAH TO |
| 014101- A05 | Grants, Subsidies and Write off Loans | 6,000,000,000 | 6,000,000,000 | 10,000,000,000 |
| 014101- A052 | Grants Domestic | 6,000,000,000 | 6,000,000,000 | 10,000,000,000 |
| Total- | CONTRACTION OF ADDITION | 6,000,000,000 | 6,000,000,000 | 10,000,000,000 |
| SK0324 IMPR KHAIRPUR MA | CARRIAGEWAY ALONG MEHRAN HIGHWAY FROM NAWABSHAH TO RANIPUR OVEMENT OF ROAD FROM ROHRI TO GUDD HAR MIR PUR MATHELO | O BARRAGE @M-5 INTERCHANGE SADI | QABAD VIA | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 6,000,000,000 | 6,000,000,000 | 4,856,137,000 |
| 014101- A052 | Grants Domestic | 6,000,000,000 | 6,000,000,000 | 4,856,137,000 |
| Total- | IMPROVEMENT OF ROAD FROM ROHRI | 6,000,000,000 | 6,000,000,000 | 4,856,137,000 |
| TO GUDDO BARRAGE @M-5 INTERCHANGE SADIQABAD VIA KHAIRPUR MAHAR MIR PUR MATHELO |
NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE
| T EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
SK5000 IMPROVEMENT OF ROAD FROM SANGHAR TO NATIONAL HIGHWAY N-5 AT POINT ROHRI VIA MUDH JAMRAO AND SALEHPUT
| 014101- A05 | Grants, Subsidies and Write off Loans | 5,000,000,000 | 5,000,000,000 | 11,856,073,000 |
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 5,000,000,000 | 5,000,000,000 | 11,856,073,000 |
| Total- | IMPROVEMENT OF ROAD FROM | 5,000,000,000 | 5,000,000,000 | 11,856,073,000 |
| SK8111 CONS | SANGHAR TO NATIONAL HIGHWAY N-5 AT POINT ROHRI VIA MUDH JAMRAO AND SALEHPUT TRUCTION OF OFFICE OF THE NAB SUKKU | R AT AIRPORT ROAD SUKKUR | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 165,785,000 | 115,000,000 | |
| 014101- A052 | Grants Domestic | 165,785,000 | 115,000,000 | |
| Total- | CONSTRUCTION OF OFFICE OF THE | 165,785,000 | 115,000,000 | |
| SP8111 CONS | NAB SUKKUR AT AIRPORT ROAD SUKKUR TRUCTION OF MATTELED ROADS AT TALU | KA LAKHI DISTRICT | SHIKARPUR SINDH | (09 SCHEMES) |
| 014101- A05 | Grants, Subsidies and Write off Loans | 10,000,000 | ||
| 014101- A052 | Grants Domestic | 10,000,000 | ||
| Total- | CONSTRUCTION OF MATTELED ROADS | 10,000,000 | ||
| TD0002 DUAL | AT TALUKA LAKHI DISTRICT SHIKARPUR SINDH (09 SCHEMES) AIZATION OF TANDO ALLAHYAR TO TANDO | ADAM ROAD 31.40 | KMS | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,500,000,000 | 1,500,000,000 | 5,270,237,000 |
| 014101- A052 | Grants Domestic | 1,500,000,000 | 1,500,000,000 | 5,270,237,000 |
| Total- | DUALAIZATION OF TANDO ALLAHYAR TO TANDO ADAM ROAD 31.40 KMS | 1,500,000,000 | 1,500,000,000 | 5,270,237,000 |
| 014101 | Total- To provinces | 45,000,000,000 | 75,255,785,000 | 66,282,058,000 |
| 0141 | Total- Transfers (Inter-Governmental) | 45,000,000,000 | 75,255,785,000 | 66,282,058,000 |
| 014 | Total- Transfers | 45,000,000,000 | 75,255,785,000 | 66,282,058,000 |
| 01 | Total- General Public Service | 45,000,000,000 | 75,255,785,000 | 66,282,058,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 45,000,000,000 | 75,255,785,000 | 66,282,058,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMANDS 2024-2025 Revised Estimate | FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | ||||
| 01 Gener | al Public Service: | |||
| 014 Transf | ers: | |||
| 0141 Transf | ers (Inter-Governmental): | |||
| 014101 To provinces : | ||||
| CG0009 CONS CHAGHI | TRUCTION OF BLACK TOP ROADS FROM KILLI | SARDAR ABDUL | RAHIM KHILJI TAFTAN DISTRICT | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 75,000,000 | ||
| 014101- A052 | Grants Domestic | 75,000,000 | ||
| Total- | CONSTRUCTION OF BLACK TOP ROADS FROM KILLI SARDAR ABDUL RAHIM KHILJI TAFTAN DISTRICT CHAGHI | 75,000,000 | ||
| CG8111 CONSTRUCTION OF BLACK TOP ROAD CHINKINDIK TO MASKEECHAH | DISTRICT CHAGHI | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,039,000 | ||
| 014101- A052 | Grants Domestic | 100,039,000 | ||
| Total- | CONSTRUCTION OF BLACK TOP ROAD CHINKINDIK TO MASKEECHAH DISTRICT CHAGHI | 100,039,000 | ||
| CG8112 CHAGHI DEVELOPMENT PACKAGE( HOME SOLAR KI TUFF TILE STREETS LIGHTS) | TS SOLAR PUMPING STATION WATER | SUPPLY | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 225,000,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 225,000,000 | |
| Total- | CHAGHI DEVELOPMENT PACKAGE( | 50,000,000 | 225,000,000 | |
| HOME SOLAR KITS SOLAR PUMPING STATION WATER SUPPLY TUFF TILE STREETS LIGHTS) | ||||
| CG8113 COMMUNITY HOME SOLAR ENERGY SYSTEM & AGRI VARIOUS KILLIS OF | CULTURE CUM WATER SUPPLY SCHEMES IN | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 54,000,000 | ||
| 014101- A052 | Grants Domestic | 54,000,000 | ||
| Total- | COMMUNITY HOME SOLAR ENERGY SYSTEM & AGRICULTURE CUM WATER SUPPLY SCHEMES IN VARIOUS KILLIS OF | 54,000,000 | ||
| CG8114 COMMUNITY HOME SOLAR ENERGY SYSTEM IN TEH CHAGHI DISTRICT | SIL AMORI TAFTAN DALBANDIN CHILGHAZAI AND | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 130,000,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 130,000,000 | |
| Total- | COMMUNITY HOME SOLAR ENERGY SYSTEM IN TEHSIL AMORI TAFTAN DALBANDIN CHILGHAZAI AND CHAGHI DISTRICT | 50,000,000 | 130,000,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| CN8111 CONS | ACCOUNTANT GENERAL PAKISTAN R TRUCTION OF INTERNAL BLACK TOP ROADS | EVENUES SUB-OFFICE, QUETTA AT TEHSIL & DISTRICT CHAMAN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 80,000,000 | 110,000,000 | |
| 014101- A052 | Grants Domestic | 80,000,000 | 110,000,000 | |
| Total- | CONSTRUCTION OF INTERNAL BLACK TOP ROADS AT TEHSIL & DISTRICT CHAMAN | 80,000,000 | 110,000,000 | |
| CN8112 PUBL ENERGY | IC SECTOR DEVELOPMENT PROGRAM FOR B | ORING OF TUBE WELL AND INSTALLATION OF SOLAR | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 97,200,000 | ||
| 014101- A052 | Grants Domestic | 97,200,000 | ||
| Total- | PUBLIC SECTOR DEVELOPMENT PROGRAM FOR BORING OF TUBE WELL AND INSTALLATION OF SOLAR ENERGY | 97,200,000 | ||
| CN8113 CONSTRUCTION OF OFFICE FOR IB AT DISTRICT CHAMAN | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 25,000,000 | 40,250,000 | |
| 014101- A052 | Grants Domestic | 25,000,000 | 40,250,000 | |
| Total- | CONSTRUCTION OF OFFICE FOR IB AT | 25,000,000 | 40,250,000 | |
| DISTRICT CHAMAN | ||||
| DB0014 CONS | TRUCTION OF BLACKTOP ROADS FROM SUI | TO KASHMORE 53 | KM | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,450,000,000 | 1,450,000,000 | 2,000,000,000 |
| 014101- A052 | Grants Domestic | 1,450,000,000 | 1,450,000,000 | 2,000,000,000 |
| Total- | CONSTRUCTION OF BLACKTOP ROADS | 1,450,000,000 | 1,450,000,000 | 2,000,000,000 |
| FROM SUI TO KASHMORE 53 KM | ||||
| DB0024 CONS | T. OF B/T ROAD FROM LEHRI TO SANGSILA R | OAD PHASE - I DE | RA BUGTI PACKAGE | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 323,260,000 | 517,260,000 | |
| 014101- A052 | Grants Domestic | 323,260,000 | 517,260,000 | |
| Total- | CONST. OF B/T ROAD FROM LEHRI TO SANGSILA ROAD PHASE - I DERA BUGTI PACKAGE | 323,260,000 | 517,260,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| DB0025 CONS 014101- A05 | T. OF BB/T ROAD FROM SUR TO UCH FIELD Grants, Subsidies and Write off Loans | (57 KM) DERA BUGTI 250,757,000 | PACKAGE) | 250,000,000 |
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 250,757,000 | 250,000,000 | |
| Total- | CONST. OF BB/T ROAD FROM SUR TO | 250,757,000 | 250,000,000 | |
| DB0032 CONS | UCH FIELD (57 KM) DERA BUGTI PACKAGE) TRUCTION OF BLACKTOPPING ROAD FROM | PIRKOH TO PEER S | OHRI | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 136,534,000 | 136,534,000 | |
| 014101- A052 | Grants Domestic | 136,534,000 | 136,534,000 | |
| Total- DB0034 CONS | CONSTRUCTION OF BLACKTOPPING ROAD FROM PIRKOH TO PEER SOHRI TRUCTION OF BLACKTOPPING OF ROAD FR | 136,534,000 OM PIRKOH TO PAT | 136,534,000 HAR NALA | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 170,534,000 | 170,534,000 | |
| 014101- A052 | Grants Domestic | 170,534,000 | 170,534,000 | |
| Total- DB0035 CONS | CONSTRUCTION OF BLACKTOPPING OF ROAD FROM PIRKOH TO PATHAR NALA TRUCTION OF ROAD FROM SUI TO BIJO QA | 170,534,000 BRISTAN-ASRELLI DI | 170,534,000 STRICT DERA BUGTI | (25 KM) |
| 014101- A05 | Grants, Subsidies and Write off Loans | 179,428,000 | 179,428,000 | |
| 014101- A052 | Grants Domestic | 179,428,000 | 179,428,000 | |
| Total- | CONSTRUCTION OF ROAD FROM SUI TO BIJO QABRISTAN-ASRELLI DISTRICT DERA BUGTI (25 KM) | 179,428,000 | 179,428,000 | |
| DB0036 CONS | TRICTION OF ROAD FROM BAIKAR TO MARI | TOP (56.00 KM) DISTRICT DERA BUGTI | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 25,000,000 | ||
| 014101- A052 | Grants Domestic | 25,000,000 | ||
| Total- | CONSTRICTION OF ROAD FROM BAIKAR TO MARI TOP (56.00 KM) DISTRICT DERA BUGTI | 25,000,000 | ||
| DB0037 CONSTRUCTION OF GHAND DAM BAKER DERA BUGTI | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 250,000,000 | ||
| 014101- A052 | Grants Domestic | 250,000,000 | ||
| Total- | CONSTRUCTION OF GHAND DAM BAKER DERA BUGTI | 250,000,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| DK8111 CONSTRUCTION OF BLACK TOP ROADS PURANA | DUKI AND RABBAT | VILLAGES DISTRICT DUKI | ||
|---|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 121,000,000 | 60,000,000 | |
| 014101- A052 | Grants Domestic | 121,000,000 | 60,000,000 | |
| Total- | CONSTRUCTION OF BLACK TOP | 121,000,000 | 60,000,000 | |
| ROADS PURANA DUKI AND RABBAT VILLAGES DISTRICT DUKI | ||||
| GR0047 GWADAR DEVELOPMENT AUTHORITY | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,800,000,000 | 1,800,000,000 | 250,000,000 |
| 014101- A052 | Grants Domestic | 1,800,000,000 | 1,800,000,000 | 250,000,000 |
| Total- | GWADAR DEVELOPMENT AUTHORITY | 1,800,000,000 | 1,800,000,000 | 250,000,000 |
| GR0081 GWADAR SAFE CITY PROJECT PHASE-1 | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,000,000,000 | 1,000,000,000 | 1,500,000,000 |
| 014101- A052 | Grants Domestic | 1,000,000,000 | 1,000,000,000 | 1,500,000,000 |
| Total- | GWADAR SAFE CITY PROJECT PHASE-1 | 1,000,000,000 | 1,000,000,000 | 1,500,000,000 |
| GR0116 REHABILITATION OF OLD TOWN GAWADAR | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 230,000,000 | 230,000,000 | 400,000,000 |
| 014101- A052 | Grants Domestic | 230,000,000 | 230,000,000 | 400,000,000 |
| Total- | REHABILITATION OF OLD TOWN | 230,000,000 | 230,000,000 | 400,000,000 |
| GR8111 CONS TURBAT(06-N | GAWADAR TRUCTION OF OFFICES FOR IB ALONG WIT OS TOTAL COST | H CPEC (MANSEHRA | ) GAWADAR KHUZDAR | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 71,349,000 | 170,000,000 | |
| 014101- A052 | Grants Domestic | 71,349,000 | 170,000,000 | |
| Total- | CONSTRUCTION OF OFFICES FOR IB | 71,349,000 | 170,000,000 | |
| ALONG WITH CPEC (MANSEHRA) GAWADAR KHUZDAR TURBAT(06-NOS TOTAL COST | ||||
| GR8112 DEC | GAWADAR & LASBELLA | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 333,061,000 | ||
| 014101- A052 | Grants Domestic | 333,061,000 | ||
| Total- | DEC GAWADAR & LASBELLA | 333,061,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
GR9003 NECESSARY FACILITIES OF FRESH WATER TREATMENT WATER SUPPLY AND DISTRIBUTION GAWADAR(CPEC)
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 470,648,000 |
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 470,648,000 |
| Total- GR9007 GAW | NECESSARY FACILITIES OF FRESH WATER TREATMENT WATER SUPPLY AND DISTRIBUTION GAWADAR(CPEC) ADAR SMART ENVIRONMENTAL AND SANITA | 500,000,000 TION SYSTEM AND | 500,000,000 LANDFILL (CEPEC) | 470,648,000 |
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | 200,000,000 | 200,000,000 |
| 014101- A052 | Grants Domestic | 200,000,000 | 200,000,000 | 200,000,000 |
| Total- | GAWADAR SMART ENVIRONMENTAL AND SANITATION SYSTEM AND LANDFILL (CEPEC) | 200,000,000 | 200,000,000 | 200,000,000 |
| HU8111 DEVELOPMENT SCHEMES IN PIRHYAN ARI PEER | BARAK BEHLOOR DI | STRICT HUB (04 SCH | EMES) | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 103,137,000 | ||
| 014101- A052 | Grants Domestic | 103,137,000 | ||
| Total- | DEVELOPMENT SCHEMES IN PIRHYAN ARI PEER BARAK BEHLOOR DISTRICT HUB (04 SCHEMES) | 103,137,000 | ||
| JF8111 DEC J | AFFARABAD & MASTUNG | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 338,887,000 | ||
| 014101- A052 | Grants Domestic | 338,887,000 | ||
| Total- | DEC JAFFARABAD & MASTUNG | 338,887,000 | ||
| JH8111 DEVELOPMENT SCHEMES IN DISTRICT KACHHI JH | AL MAGSI AND NASEERABAD (10 NOS SCHEMES) | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 129,987,000 | 50,015,000 | |
| 014101- A052 | Grants Domestic | 129,987,000 | 50,015,000 | |
| Total- | DEVELOPMENT SCHEMES IN DISTRICT | 129,987,000 | 50,015,000 | |
| JH8112 CONS JHAL MAGSI | KACHHI JHAL MAGSI AND NASEERABAD (10 NOS SCHEMES) TRUCTION OF BLACK TOP ROAD FROM REH | ABILITATION BAND | MAHMOOD TO BARIJA DISTRICT | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 80,000,000 | 50,624,000 | |
| 014101- A052 | Grants Domestic | 80,000,000 | 50,624,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD FROM REHABILITATION BAND MAHMOOD TO BARIJA DISTRICT JHAL MAGSI |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| KL8111 COMM SYSTEM IN VA | ACCOUNTANT GENERAL PAKISTAN R UNITY BASED DEVELOPMENT SCHEMES FOR RIOUS KILLIS OF | EVENUES SUB-OFF INSTALLATION OF | ICE, QUETTA COMMUNITY HOM | E SOLAR |
| 014101- A05 | Grants, Subsidies and Write off Loans | 39,600,000 | ||
| 014101- A052 | Grants Domestic | 39,600,000 | ||
| Total- | COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR SYSTEM IN VARIOUS KILLIS OF | 39,600,000 | ||
| KL8112 CONSTRUCTION OF BLACK TOP ROAD 24 KM LALA KALAT BALOCHISTAN | LEHAD CROSS VIA | HUMARI ROSH SH | OB DISTRICT | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,000,000 | 300,000,000 | |
| 014101- A052 | Grants Domestic | 100,000,000 | 300,000,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD 24 KM LALA LEHAD CROSS VIA HUMARI ROSH SHOB DISTRICT KALAT BALOCHISTAN | 100,000,000 | 300,000,000 | |
| KL8113 DEVELOPMENT SCHEMES IN KALAT SURAB & MASTUNG DISTRICTS | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 300,000,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 300,000,000 | |
| Total- | DEVELOPMENT SCHEMES IN KALAT SURAB & MASTUNG DISTRICTS | 50,000,000 | 300,000,000 | |
| KN0012 CADET COLLEGE KHARAN | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 302,649,000 | 302,649,000 | |
| 014101- A052 | Grants Domestic | 302,649,000 | 302,649,000 | |
| Total- | CADET COLLEGE KHARAN | 302,649,000 | 302,649,000 | |
| KN8111 KHAR (REVISED) | AN DEVELOPMENT PACKAGE(SOLAR PUMPING HOME SOLAR KITS ROADS WATER | SUPPLY) | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 41,747,000 | 100,074,000 | |
| 014101- A052 | Grants Domestic | 41,747,000 | 100,074,000 | |
| Total- | KHARAN DEVELOPMENT | 41,747,000 | 100,074,000 | |
| PACKAGE(SOLAR PUMPING HOME SOLAR KITS ROADS WATER SUPPLY) (REVISED) |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| KN8112 SOLA 014101- A05 | RISATION OF EXISTING TUBEWELLS/BORES FOR AGR Grants, Subsidies and Write off Loans | ICULTURE PURPOSE IN VARIO 36,000,000 | US KILLIS OF |
|---|---|---|---|
| 014101- A052 | Grants Domestic | 36,000,000 | |
| Total- | SOLARISATION OF EXISTING | 36,000,000 | |
| KR8111 CONS | TUBEWELLS/BORES FOR AGRICULTURE PURPOSE IN VARIOUS KILLIS OF TRUCTION OF BLACK TOP ROAD FROM RCD TO HINA | MI BENT TESHIL WADH DISTRICT KHUZDAR | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | 250,000,000 |
| 014101- A052 | Grants Domestic | 200,000,000 | 250,000,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD FROM RCD TO HINAMI BENT TESHIL WADH DISTRICT KHUZDAR | 200,000,000 | 250,000,000 |
| KR8112 CONSTRUCTION OF BLACK TOP ROAD FROM MARVI TOWA DISTRICT KHUZDAR | RDS MADRESSA TOOK TEHSIL | WADH | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 195,586,000 | |
| 014101- A052 | Grants Domestic | 195,586,000 | |
| Total- KR8113 CONS DISTRICT KHU | CONSTRUCTION OF BLACK TOP ROAD FROM MARVI TOWARDS MADRESSA TOOK TEHSIL WADH DISTRICT KHUZDAR TRUCTION OF BLACK TOP ROAD FROM RCD TOWARD ZDAR | 195,586,000 S KILLI ABDUL HANAN TEHSIL | WADH |
| 014101- A05 | Grants, Subsidies and Write off Loans | 83,024,000 | 150,000,000 |
| 014101- A052 | Grants Domestic | 83,024,000 | 150,000,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 83,024,000 | 150,000,000 |
| FROM RCD TOWARDS KILLI ABDUL HANAN TEHSIL WADH DISTRICT KHUZDAR | |||
| KR8114 CONSTRUCTION OF 11 KM BT- BLACK TOP ROAD FROM ZEE DISTRICT KHUZDAR | DI WEIR TO GHOUR DHAI KHUNJ ZEEDI AT | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 86,000,000 | |
| 014101- A052 | Grants Domestic | 86,000,000 | |
| Total- | CONSTRUCTION OF 11 KM BT- BLACK TOP ROAD FROM ZEEDI WEIR TO GHOUR DHAI KHUNJ ZEEDI AT DISTRICT KHUZDAR | 86,000,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| KR8115 BLAC | ACCOUNTANT GENERAL PAKISTAN RE KTOP ROAD AT VARIOUS PLACES IN KHUZDAR | VENUES SUB-OFFI CITY | CE, QUETTA | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 85,521,000 | ||
| 014101- A052 | Grants Domestic | 85,521,000 | ||
| Total- | BLACKTOP ROAD AT VARIOUS | 85,521,000 | ||
| PLACES IN KHUZDAR CITY | ||||
| KR8116 CUTTI STRUCTURE | NG AND IMPROVEMENT OF KACHA ROAD HIGH WORKS DISTRICT | WAY TO ARANJI VI | A AWAK INCLUDING | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 125,000,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 125,000,000 | |
| Total- | CUTTING AND IMPROVEMENT OF | 50,000,000 | 125,000,000 | |
| KR8117 CONS | KACHA ROAD HIGHWAY TO ARANJI VIA AWAK INCLUDING STRUCTURE WORKS DISTRICT TRUCTION OF B/T ROAD IN MUNICIPLE CORPO | RATION KHUZDAR | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 73,925,000 | 130,000,000 | |
| 014101- A052 | Grants Domestic | 73,925,000 | 130,000,000 | |
| Total- | CONSTRUCTION OF B/T ROAD IN | 73,925,000 | 130,000,000 | |
| MUNICIPLE CORPORATION KHUZDAR | ||||
| KR8118 CONSTRUCTION OF 50 NOS SOLAR WATER SUPPLY | SCHEMES IN DISTRICT KHUZDAR | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 237,987,000 | 115,000,000 | |
| 014101- A052 | Grants Domestic | 237,987,000 | 115,000,000 | |
| Total- | CONSTRUCTION OF 50 NOS SOLAR | 237,987,000 | 115,000,000 | |
| WATER SUPPLY SCHEMES IN DISTRICT KHUZDAR | ||||
| LI0030 CONSTRUCTION OF BLACK TOP NORTHERN BYPASS | ROAD LORALAI (15. | 50 KM) | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 75,000,000 | ||
| 014101- A052 | Grants Domestic | 75,000,000 | ||
| Total- | CONSTRUCTION OF BLACK TOP | 75,000,000 | ||
| LI8111 PUBLIC HOME SOLAR | NORTHERN BYPASS ROAD LORALAI (15.50 KM) SECTOR DEVELOPMENT PROGRAM FOR AGR ENERGY SYSTEM | ICULTURE CUM WATER SUPPLY AND | COMMUNITY | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 20,000,000 | 120,000,000 | |
| 014101- A052 | Grants Domestic | 20,000,000 | 120,000,000 | |
| Total- | PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY HOME SOLAR ENERGY SYSTEM | 20,000,000 | 120,000,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| LI8112 PUBLI HOME SOLAR | C SECTOR DEVELOPMENT PROGRAM FOR AGRICULTU ENERGY SYSTEM | RE CUM WATER SUPPLY AND | COMMUNITY |
|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 90,000,000 | |
| 014101- A052 | Grants Domestic | 90,000,000 | |
| Total- | PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY HOME SOLAR ENERGY SYSTEM | 90,000,000 | |
| LS8111 REHA DISTRICT | BILITATION / UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I | KM 16 TO 50) | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 39,311,000 | |
| 014101- A052 | Grants Domestic | 39,311,000 | |
| Total- | REHABILITATION / UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I KM 16 TO 50) DISTRICT | 39,311,000 | |
| LS8112 REHA DISTRICT | BILITATION / UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I | KM 50 TO 75) | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 34,822,000 | |
| 014101- A052 | Grants Domestic | 34,822,000 | |
| Total- ML8111 PUBL VARIOUS KIL | REHABILITATION / UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I KM 50 TO 75) DISTRICT IC SECTOR DEVELOPMENT PROGRAM FOR COMMUNIT LIS TEHSIL DUKI | 34,822,000 Y HOME SOLAR ENERGY SYS | TEM IN |
| 014101- A05 | Grants, Subsidies and Write off Loans | 93,922,000 | 83,992,000 |
| 014101- A052 | Grants Domestic | 93,922,000 | 83,992,000 |
| Total- | PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS KILLIS TEHSIL DUKI | 93,922,000 | 83,992,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate Rs | DEMANDS 2024-2025 Revised Estimate Rs | FOR GRANTS 2025-2026 Budget Estimate Rs |
|---|---|---|---|---|
| MU8111 CONS | ACCOUNTANT GENERAL PAKISTAN REVE TRUCTION OF OFFICE FOR IB AT MASTUNG | NUES SUB-OFFICE, QUETTA | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 35,000,000 | 44,740,000 | |
| 014101- A052 | Grants Domestic | 35,000,000 | 44,740,000 | |
| Total- | CONSTRUCTION OF OFFICE FOR IB AT MASTUNG | 35,000,000 | 44,740,000 | |
| NI8111 NUSHKI DEVELOPMENT PACKAGE (ROADS) (REVISED) | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 130,000,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 130,000,000 | |
| Total- | NUSHKI DEVELOPMENT PACKAGE (ROADS) (REVISED) | 50,000,000 | 130,000,000 | |
| NI8112 CONST | RUCTION/REHABILITATION OF BLACK TOP ROAD | IN 07 KILLIS OF DISTRICT NUSHKI | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 36,000,000 | ||
| 014101- A052 | Grants Domestic | 36,000,000 | ||
| Total- | CONSTRUCTION/REHABILITATION OF BLACK TOP ROAD IN 07 KILLIS OF DISTRICT NUSHKI | 36,000,000 | ||
| PI8111 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMM VARIOUS KILLIS OF DISTRICT | UNITY HOME SO | LAR ENERGY SYSTEM IN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 150,000,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 150,000,000 | |
| Total- | PUBLIC SECTOR DEVELOPMENT | 50,000,000 | 150,000,000 | |
| PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS KILLIS OF DISTRICT | ||||
| PI8112 PUBLI OF DISTRICT | C SECTOR DEVELOPMENT PROGRAM FOR AGRIC PISHIN | ULTURE CUM WATER SUPPLY IN VARIOUS KILLIS | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 125,002,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 125,002,000 | |
| Total- | PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS OF DISTRICT PISHIN | 50,000,000 | 125,002,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAN 2024-2025 Revised Estimate | DS FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| PI8113 CONST | ACCOUNTANT GENERAL PAKISTAN R RUCTION OF OFFICE FOR IB AT PISHIN | EVENUES SUB-OFFICE, QUETTA | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 25,000,000 | 35,250,000 | |
| 014101- A052 | Grants Domestic | 25,000,000 | 35,250,000 | |
| Total- | CONSTRUCTION OF OFFICE FOR IB AT | 25,000,000 | 35,250,000 | |
| PISHIN | ||||
| PJ0027 CONS 22800KM)(SB) | TRUCTION OF PANJGUR-GICHAK-AWARAN ROAD DISTRICT PANJGUR/AWARAN (LENGTH | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 2,000,000,000 | 2,000,000,000 | 1,900,000,000 |
| 014101- A052 | Grants Domestic | 2,000,000,000 | 2,000,000,000 | 1,900,000,000 |
| Total- | CONSTRUCTION OF | 2,000,000,000 | 2,000,000,000 | 1,900,000,000 |
| PJ0028 CONS | PANJGUR-GICHAK-AWARAN ROAD DISTRICT PANJGUR/AWARAN (LENGTH 22800KM)(SB) TRUCTION OF ROAD FROM PROOM-JALGAI (6 | 5KM) (SB) | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 700,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 700,000,000 |
| Total- | CONSTRUCTION OF ROAD FROM | 500,000,000 | 500,000,000 | 700,000,000 |
| PROOM-JALGAI (65KM) (SB) | ||||
| PJ0029 CONSTRUCTION OF ROAD FROM CHEDGI-PROOM (7 | 0KM)(SB) | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 700,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 700,000,000 |
| Total- | CONSTRUCTION OF ROAD FROM | 500,000,000 | 500,000,000 | 700,000,000 |
| CHEDGI-PROOM (70KM)(SB) | ||||
| PJ0030 CONSTRUCTION OF ROAD FROM NAAG-GICHAK (46 | KM) (SB) | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 700,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 700,000,000 |
| Total- | CONSTRUCTION OF ROAD FROM | 500,000,000 | 500,000,000 | 700,000,000 |
| NAAG-GICHAK (46KM) (SB) | ||||
| PJ0032 CONSTRUCTION OF 110 KM ROAD CHEDAGI IRAN B | ORDER TO PANJGUR | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 75,000,000 | ||
| 014101- A052 | Grants Domestic | 75,000,000 | ||
| Total- | CONSTRUCTION OF 110 KM ROAD | 75,000,000 | ||
| CHEDAGI IRAN BORDER TO PANJGUR |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
QA0643 CONSTRUCTION/UPGRADATION OF DIRGI SHABOZAI (N-70) TO TAUNSA (N-55) ROAD (FEDERAL SHARE
60%)
| 014101- A05 | Grants, Subsidies and Write off Loans | 800,000,000 | 1,712,017,000 | 750,000,000 |
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 800,000,000 | 1,712,017,000 | 750,000,000 |
| Total- | CONSTRUCTION/UPGRADATION OF DIRGI SHABOZAI (N-70) TO TAUNSA (N-55) ROAD (FEDERAL SHARE 60%) | 800,000,000 | 1,712,017,000 | 750,000,000 |
| QA0683 CONSTRUCTION OF PROVINCIAL ASSEMBLY BUILDING QUETTA | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 250,000,000 | ||
| 014101- A052 | Grants Domestic | 250,000,000 | ||
| Total- | CONSTRUCTION OF PROVINCIAL ASSEMBLY BUILDING QUETTA | 250,000,000 | ||
| QA0804 CONS CONGESTION | TRUCTION OF FLYOVERS AT VARIOUS LOC | ATIONS OF QUETTA | CITY TO MITIGATE | TRAFFIC |
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,450,000,000 | 1,450,000,000 | 700,000,000 |
| 014101- A052 | Grants Domestic | 1,450,000,000 | 1,450,000,000 | 700,000,000 |
| Total- | CONSTRUCTION OF FLYOVERS AT | 1,450,000,000 | 1,450,000,000 | 700,000,000 |
| QA0818 FEASI | VARIOUS LOCATIONS OF QUETTA CITY TO MITIGATE TRAFFIC CONGESTION BILITY STUDY FOR METRO BUS ROUTE IN | QUETTA. | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 50,000,000 | |
| 014101- A052 | Grants Domestic | 50,000,000 | 50,000,000 | |
| Total- | FEASIBILITY STUDY FOR METRO BUS | 50,000,000 | 50,000,000 | |
| ROUTE IN QUETTA. | ||||
| QA3107 CONS | TR. OF ROAD FROM SIBI TALI(20KM & KOHLU-RAKHANI(80 KM) | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 500,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 500,000,000 |
| Total- | CONSTR. OF ROAD FROM SIBI | 500,000,000 | 500,000,000 | 500,000,000 |
| TALI(20KM & KOHLU-RAKHANI(80 KM) | ||||
| QA7044 DEVELOPMENT OF ZIARAT TOWN | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 300,000,000 | 300,000,000 | 300,000,000 |
| 014101- A052 | Grants Domestic | 300,000,000 | 300,000,000 | 300,000,000 |
| Total- | DEVELOPMENT OF ZIARAT TOWN | 300,000,000 | 300,000,000 | 300,000,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| QA7045 WIDE AND ZIARAT S | NING/IMPROVEMENT/RECONSTRUCTION OF INJAVI | 134-KM LONG ROAD KHANI CROSS TO | ZIARAT (70-KM) | |
|---|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,000,000,000 | 1,000,000,000 | 2,500,000,000 |
| 014101- A052 | Grants Domestic | 1,000,000,000 | 1,000,000,000 | 2,500,000,000 |
| Total- | WIDENING/IMPROVEMENT/RECONSTRU | 1,000,000,000 | 1,000,000,000 | 2,500,000,000 |
| QA7046 CONS (55 KM) | CTION OF 134-KM LONG ROAD KHANI CROSS TO ZIARAT (70-KM) AND ZIARAT SINJAVI TRUCTION OF BLACK TOP ROAD FROM DU | KI TO CHAMALANG | (105 KM) WITH WITH LINK ROADS | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,500,000,000 | 1,500,000,000 | 750,000,000 |
| 014101- A052 | Grants Domestic | 1,500,000,000 | 1,500,000,000 | 750,000,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD FROM DUKI TO CHAMALANG (105 KM) WITH WITH LINK ROADS (55 KM) | 1,500,000,000 | 1,500,000,000 | 750,000,000 |
| QA8107 CONSTRUCTION OF ADDITIONAL CLASS ROOMS DIFFERENT SCHOOLS DISTRICT | & EXAMINATION CENTRE/MULTIPURPOSE HALL AT | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 65,000,000 | 1,996,000 | |
| 014101- A052 | Grants Domestic | 65,000,000 | 1,996,000 | |
| Total- | CONSTRUCTION OF ADDITIONAL | 65,000,000 | 1,996,000 | |
| QA8109 CONS DISTRICT | CLASS ROOMS & EXAMINATION CENTRE/MULTIPURPOSE HALL AT DIFFERENT SCHOOLS DISTRICT TRUCTION OF INTERNAL ROADS AT PANJP | AI AGHBARG CHASHMA & SURROUNDING AREAS OF | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 68,588,000 | 60,500,000 | |
| 014101- A052 | Grants Domestic | 68,588,000 | 60,500,000 | |
| Total- | CONSTRUCTION OF INTERNAL ROADS | 68,588,000 | 60,500,000 | |
| QA8110 CONS | AT PANJPAI AGHBARG CHASHMA & SURROUNDING AREAS OF DISTRICT TRUCTION OF INTERNAL ROADS IN KUCHL | AAK AND SURROUN | DING AREAS DISTRICT QUETTA | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 61,412,000 | 98,412,000 | |
| 014101- A052 | Grants Domestic | 61,412,000 | 98,412,000 | |
| Total- | CONSTRUCTION OF INTERNAL ROADS IN KUCHLAAK AND SURROUNDING AREAS DISTRICT QUETTA | 61,412,000 | 98,412,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| QA8111 CONSTRUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA | |||
|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 196,727,000 | 102,487,000 |
| 014101- A052 | Grants Domestic | 196,727,000 | 102,487,000 |
| Total- | CONSTRUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA | 196,727,000 | 102,487,000 |
| QA8112 CONSTRUCTION OF INTERNAL ROADS IN QUETTA | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 93,400,000 | |
| 014101- A052 | Grants Domestic | 93,400,000 | |
| Total- | CONSTRUCTION OF INTERNAL ROADS IN QUETTA | 93,400,000 | |
| QA8113 CONSTRUCTION OF BLACK TOP ROAD AND TUFF TILES IN QUETTA | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 78,000,000 | 100,000,000 |
| 014101- A052 | Grants Domestic | 78,000,000 | 100,000,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 78,000,000 | 100,000,000 |
| AND TUFF TILES IN QUETTA | |||
| QA8114 CONSTRUCTION OF SOLAR TUBEWELLS AND STREET LIGHTS IN QUETTA (REVISED) | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 93,076,000 | |
| 014101- A052 | Grants Domestic | 93,076,000 | |
| Total- | CONSTRUCTION OF SOLAR | 93,076,000 | |
| QA8115 CONS | TUBEWELLS AND STREET LIGHTS IN QUETTA (REVISED) TRUCTION OF GIRLS MIDDLE SCHOOL AT KHALAQ HAJI ABDUL | BASIT QUETTA | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 47,000,000 | |
| 014101- A052 | Grants Domestic | 47,000,000 | |
| Total- | CONSTRUCTION OF GIRLS MIDDLE | 47,000,000 | |
| QA8116 CONS AREAS OF NA | SCHOOL AT KHALAQ HAJI ABDUL BASIT QUETTA TRUCTION OF 24 KM BLACK TOP ROAD IN NAWAN KILLI KILLI KO WAN KILLI | TWAL AND SURROUNDING | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 132,091,000 | |
| 014101- A052 | Grants Domestic | 132,091,000 | |
| Total- | CONSTRUCTION OF 24 KM BLACK TOP ROAD IN NAWAN KILLI KILLI KOTWAL AND SURROUNDING AREAS OF NAWAN KILLI | 132,091,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE No of 2024-25 Posts 2025-26 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|
| Rs | Rs | Rs | |
| QA8117 ESTA | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-O BLISHMENT COMMUNITY HALL AT LOUD KAREZ | FFICE, QUETTA | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 62,000,000 | 47,404,000 |
| 014101- A052 | Grants Domestic | 62,000,000 | 47,404,000 |
| Total- | ESTABLISHMENT COMMUNITY HALL AT | 62,000,000 | 47,404,000 |
| LOUD KAREZ | |||
| QA8118 IMPR | OVEMENT OF SEWAGE SYSTEM TUFF TILES AND BLACK TOP IN | DIFFERENT AREA QUETTA-3 | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 54,000,000 | |
| 014101- A052 | Grants Domestic | 54,000,000 | |
| Total- | IMPROVEMENT OF SEWAGE SYSTEM TUFF TILES AND BLACK TOP IN DIFFERENT AREA QUETTA-3 | 54,000,000 | |
| QA8119 INSTA DASHT MIAN | LLATION OF SOLAR KITS FOR ELECTRIFICATION DIGARI MERGED ZEDCO SIMDIGI | ZARGHOON | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 72,000,000 | |
| 014101- A052 | Grants Domestic | 72,000,000 | |
| Total- | INSTALLATION OF SOLAR KITS FOR | 72,000,000 | |
| ELECTRIFICATION DIGARI MERGED ZEDCO SIMDIGI ZARGHOON DASHT MIAN | |||
| QA9080 IMPROVEMENT WIDENING OF SPERA RAGHA ROAD FROM KHANOZA SAIFULLAH ROAD | I CROSS TO LORALAI KILA | ||
| 014101- A05 | Grants, Subsidies and Write off Loans 1,687,653,000 | 1,687,653,000 | 200,000,000 |
| 014101- A052 | Grants Domestic 1,687,653,000 | 1,687,653,000 | 200,000,000 |
| Total- | IMPROVEMENT WIDENING OF SPERA 1,687,653,000 | 1,687,653,000 | 200,000,000 |
| RAGHA ROAD FROM KHANOZAI CROSS TO LORALAI KILA SAIFULLAH ROAD | |||
| QD8111 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION O SYSTEM IN VARIOUS KILLIS OF | F COMMUNITY HOME SOLAR | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 72,402,000 | |
| 014101- A052 | Grants Domestic | 72,402,000 | |
| Total- | COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR SYSTEM IN VARIOUS KILLIS OF | 72,402,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| WITH BT ROAD FROM QS0017 FEASIBILITY STUDY FOR CONSTRUCTION OF BOA | RDER TERMINAL 8 PA | K AFGHAN BOA | RDER BADINI | |
|---|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 562,000,000 | 2,500,000,000 |
| 014101- A052 | Grants Domestic | 50,000,000 | 562,000,000 | 2,500,000,000 |
| Total- | FEASIBILITY STUDY FOR CONSTRUCTION OF BOARDER TERMINAL 8 PAK AFGHAN BOARDER BADINI WITH BT ROAD FROM | 50,000,000 | 562,000,000 | 2,500,000,000 |
| QS8108 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR VARIOUS KILLIS OF DISTRICT | COMMUNITY HOME SO | LAR ENERGY SYSTEM IN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 30,000,000 | 160,000,000 | |
| 014101- A052 | Grants Domestic | 30,000,000 | 160,000,000 | |
| Total- | PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS KILLIS OF DISTRICT | 30,000,000 | 160,000,000 | |
| QS8111 CONS (PACKAGE-II) | TRUCTION OF 15 KM BLACK TOP ROAD N-5 | 0 TO MURGHA FAQIRZAI DISTRICT KILLA SAIFULLAH | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | 325,000,000 | |
| 014101- A052 | Grants Domestic | 200,000,000 | 325,000,000 | |
| Total- QS8116 CONS (PACKAGE-I) | CONSTRUCTION OF 15 KM BLACK TOP ROAD N-50 TO MURGHA FAQIRZAI DISTRICT KILLA SAIFULLAH (PACKAGE-II) TRUCTION OF 18 KM BLACK TOP ROAD N-5 | 0 TO MURGHA FAQIRZ | 200,000,000 AI DISTRICT KILL | 325,000,000 A SAIFULLAH |
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | 330,000,000 | |
| 014101- A052 | Grants Domestic | 200,000,000 | 330,000,000 | |
| Total- | CONSTRUCTION OF 18 KM BLACK TOP | 200,000,000 | 330,000,000 | |
| SV0002 ESTA | ROAD N-50 TO MURGHA FAQIRZAI DISTRICT KILLA SAIFULLAH (PACKAGE-I) BLISHMENT OF DANISH SCHOOL JIA KHAN S | OHBATPUR (80/20) | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 800,000,000 | 1,350,000,000 | |
| 014101- A052 | Grants Domestic | 800,000,000 | 1,350,000,000 | |
| Total- | ESTABLISHMENT OF DANISH SCHOOL JIA KHAN SOHBATPUR (80/20) | 800,000,000 | 1,350,000,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| TB0073 RECO 014101- A05 | NSTRUCTION OF TURBAT-MAND ROAD M-8 (1 Grants, Subsidies and Write off Loans | 30KM TILL IRANIAN 5,000,000,000 | BORDER REDEEM 5,000,000,000 | ) (SB) 2,000,000,000 |
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 5,000,000,000 | 5,000,000,000 | 2,000,000,000 |
| Total- | RECONSTRUCTION OF TURBAT-MAND | 5,000,000,000 | 5,000,000,000 | 2,000,000,000 |
| TB0074 CONS | ROAD M-8 (130KM TILL IRANIAN BORDER REDEEM) (SB) TRUCTION OF ROAD FROM BULEDA-PROOM | (60KM) (SB) | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 1,500,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 1,500,000,000 |
| Total- | CONSTRUCTION OF ROAD FROM | 500,000,000 | 500,000,000 | 1,500,000,000 |
| BULEDA-PROOM (60KM) (SB) | ||||
| TB0075 COMP | LETION OF NIHENG BRIDGE AT RODBUN DIS | TRICT KECH (SB) | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 227,668,000 | 227,668,000 | 227,668,000 |
| 014101- A052 | Grants Domestic | 227,668,000 | 227,668,000 | 227,668,000 |
| Total- | COMPLETION OF NIHENG BRIDGE AT | 227,668,000 | 227,668,000 | 227,668,000 |
| RODBUN DISTRICT KECH (SB) | ||||
| TB8111 CONSTRUCTION OF TEACHERS HOSTEL IN MAND | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 20,000,000 | ||
| 014101- A052 | Grants Domestic | 20,000,000 | ||
| Total- | CONSTRUCTION OF TEACHERS HOSTEL IN MAND | 20,000,000 | ||
| TB8112 MISSING FACILITIES TOILETS OF VARIOUS SCHOOLS OF MAND | ||||
| 014101- A05 | Grants, Subsidies and Write off Loans | 64,000,000 | ||
| 014101- A052 | Grants Domestic | 64,000,000 | ||
| Total- | MISSING FACILITIES TOILETS OF | 64,000,000 | ||
| VARIOUS SCHOOLS OF MAND | ||||
| WS8111 DEVELOPMENT SCHEME FOR COMMUNITY HOME MASHKEL AND BASIMA | SOLAR ENERGY SYSTEM IN VARIOUS | UCS OF TEHSIL | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 150,000,000 | ||
| 014101- A052 | Grants Domestic | 150,000,000 | ||
| Total- | DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL MASHKEL AND BASIMA | 150,000,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
WS8112 DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL WASHUK DISTRICT WASHUK 014101- A05 Grants, Subsidies and Write off Loans 135,000,000 014101- A052 Grants Domestic 135,000,000 Total- DEVELOPMENT SCHEME FOR 135,000,000 COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL WASHUK DISTRICT WASHUK WS8113 CONSTRUCTION OF BLACK TOP ROAD KAMANROD TO NOKCHAH WASHUK MASHKEL ROAD DISTRICT WASHUK 014101- A05 Grants, Subsidies and Write off Loans 163,983,000 014101- A052 Grants Domestic 163,983,000 Total- CONSTRUCTION OF BLACK TOP ROAD 163,983,000 KAMANROD TO NOKCHAH WASHUK MASHKEL ROAD DISTRICT WASHUK WS8114 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS OF TEHSIL BESIMA 014101- A05 Grants, Subsidies and Write off Loans 20,000,000 115,000,000 014101- A052 Grants Domestic 20,000,000 115,000,000 Total- PUBLIC SECTOR DEVELOPMENT 20,000,000 115,000,000 PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS OF TEHSIL BESIMA
WS8115 DEVELOPMENT SCHEMES IN PLANTAK BASIMA ASFANDABAD DISTRICT WASHUK (4 SCHEMES) (AT
REDUCED COST OF RS 014101- A05 Grants, Subsidies and Write off Loans 103,242,000 014101- A052 Grants Domestic 103,242,000 Total- DEVELOPMENT SCHEMES IN PLANTAK 103,242,000 BASIMA ASFANDABAD DISTRICT WASHUK (4 SCHEMES) (AT REDUCED COST OF RS
NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE
| T EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
ZB0021 CONSTRUCTION OF BLACK TOP ROAD FROM ZHOB TO MEKHTAR VIA MURGHA KIBZAI (N-50 AND N 70) LENGTH 103 KM
| 014101- A05 | Grants, Subsidies and Write off Loans | 75,000,000 | ||
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 75,000,000 | ||
| Total- ZB8111 CONS ZHOB | CONSTRUCTION OF BLACK TOP ROAD FROM ZHOB TO MEKHTAR VIA MURGHA KIBZAI (N-50 AND N 70) LENGTH 103 KM TRUCTION OF 19 KM BLACK TOP ROAD CH | INGEE TO KANKOO | KAKAR KHURASAA | 75,000,000 N DISTRICT |
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | 280,000,000 | |
| 014101- A052 | Grants Domestic | 200,000,000 | 280,000,000 | |
| Total- | CONSTRUCTION OF 19 KM BLACK TOP | 200,000,000 | 280,000,000 | |
| ROAD CHINGEE TO KANKOO KAKAR KHURASAAN DISTRICT ZHOB | ||||
| ZB8112 RESTORATION/ REHABILITATION OF FLOOD DAM OF TEHSIL AND | AGED AGRICULTU | RE TUBE WELLS IN | VARIOUS KILLIS | |
| 014101- A05 | Grants, Subsidies and Write off Loans | 30,000,000 | 145,118,000 | |
| 014101- A052 | Grants Domestic | 30,000,000 | 145,118,000 | |
| Total- ZT0009 CONS DISTRICT ZIA | RESTORATION/ REHABILITATION OF FLOOD DAMAGED AGRICULTURE TUBE WELLS IN VARIOUS KILLIS OF TEHSIL AND TRUCTION OF ROAD FROM MAIN DUK ROA RAT | D TO KHARSHANG V | 30,000,000 IA BAGHAW AND S | 145,118,000 HINLAIZ SINJAWI |
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 751,565,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 751,565,000 |
| Total- | CONSTRUCTION OF ROAD FROM MAIN | 500,000,000 | 500,000,000 | 751,565,000 |
| DUK ROAD TO KHARSHANG VIA BAGHAW AND SHINLAIZ SINJAWI DISTRICT ZIARAT | ||||
| 014101 | Total- To provinces | 24,408,483,000 | 30,257,509,000 | 29,253,005,000 |
| 0141 | Total- Transfers (Inter-Governmental) | 24,408,483,000 | 30,257,509,000 | 29,253,005,000 |
| 014 | Total- Transfers | 24,408,483,000 | 30,257,509,000 | 29,253,005,000 |
| 01 | Total- General Public Service | 24,408,483,000 | 30,257,509,000 | 29,253,005,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 24,408,483,000 | 30,257,509,000 | 29,253,005,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT
| 01 | General Public Service: | ||||
|---|---|---|---|---|---|
| 014 | Transfers: | ||||
| 0141 | Transfers (Inter-Governmental): | ||||
| 014101 | To provinces : | ||||
| GL0386 | 20MW | HYDRO POWER PROJECT HENZAL GILGIT | |||
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 20,000,000 | 20,000,000 | 10,000,000 |
| 014101 | - A052 | Grants Domestic | 20,000,000 | 20,000,000 | 10,000,000 |
| Total- | 20MW HYDRO POWER PROJECT | 20,000,000 | 20,000,000 | 10,000,000 | |
| HENZAL GILGIT | |||||
| GL0387 | 4 MW | HYDEL POWER PROJECT THACK NALLAH ( | CHILAS). (CHILAS). | ||
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 20,000,000 | 20,000,000 | |
| 014101 | - A052 | Grants Domestic | 20,000,000 | 20,000,000 | |
| Total- | 4 MW HYDEL POWER PROJECT THACK | 20,000,000 | 20,000,000 | ||
| NALLAH (CHILAS). (CHILAS). | |||||
| GL0388 | CONS | TRUCTION OF 16 MW HYDEL POWER PROJE | CT NALTAR-III NALTAR-III | ||
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 1,818,173,000 | 1,818,173,000 | 1,000,000,000 |
| 014101 | - A052 | Grants Domestic | 1,818,173,000 | 1,818,173,000 | 1,000,000,000 |
| Total- | CONSTRUCTION OF 16 MW HYDEL | 1,818,173,000 | 1,818,173,000 | 1,000,000,000 | |
| GL0389 | DEVE | POWER PROJECT NALTAR-III NALTAR-III LOPMENT SCHEMES IN GILGIT-BALTISTAN. | GILGIT-BALTISTAN. | ||
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 20,000,000,000 | 20,000,000,000 | 21,500,000,000 |
| 014101 | - A052 | Grants Domestic | 20,000,000,000 | 20,000,000,000 | 21,500,000,000 |
| Total- | DEVELOPMENT SCHEMES IN | 20,000,000,000 | 20,000,000,000 | 21,500,000,000 | |
| GILGIT-BALTISTAN. GILGIT-BALTISTAN. | |||||
| GL0390 | 26 MW | HYDRO POWER PROJECT SHAGRTHANG. | |||
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 1,200,000,000 | 2,000,000,000 | 1,000,000,000 |
| 014101 | - A052 | Grants Domestic | 1,200,000,000 | 2,000,000,000 | 1,000,000,000 |
| Total- | 26 MW HYDRO POWER PROJECT | 1,200,000,000 | 2,000,000,000 | 1,000,000,000 | |
| GL0392 | SEWE | SHAGRTHANG. RAGE & SANITATION SYS. TO GILGIT CITY. | CITY. | ||
| 014101 | - A05 | Grants, Subsidies and Write off Loans | 871,827,000 | 871,827,000 | 1,000,000,000 |
| 014101 | - A052 | Grants Domestic | 871,827,000 | 871,827,000 | 1,000,000,000 |
| Total- | SEWERAGE & SANITATION SYS. TO GILGIT CITY. CITY. | 871,827,000 | 871,827,000 | 1,000,000,000 |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT |
| GL0393 ESTA 014101- A05 | BLISHMENT OF REGIONAL GRID GILGIT GIL Grants, Subsidies and Write off Loans | GIT-BALTISTAN GILG 800,000,000 | IT-BALTISTAN 1,600,000,000 | 1,200,000,000 |
|---|---|---|---|---|
| 014101- A052 | Grants Domestic | 800,000,000 | 1,600,000,000 | 1,200,000,000 |
| Total- | ESTABLISHMENT OF REGIONAL GRID | 800,000,000 | 1,600,000,000 | 1,200,000,000 |
| GL0394 ESTA AT | GILGIT GILGIT-BALTISTAN GILGIT-BALTISTAN BLISHMENT OF 50 BEDDED CARDIAC HOSP | ITAL AT GILGIT- GILGIT BALTISTAN PHASE I HOSPITAL | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 1,000,000,000 | 1,000,000,000 | 300,000,000 |
| 014101- A052 | Grants Domestic | 1,000,000,000 | 1,000,000,000 | 300,000,000 |
| Total- | ESTABLISHMENT OF 50 BEDDED | 1,000,000,000 | 1,000,000,000 | 300,000,000 |
| GL0396 ESTA | CARDIAC HOSPITAL AT GILGIT- GILGIT BALTISTAN PHASE I HOSPITAL AT BLISHMENT OF 250 BEDDED HOSPITAL AT | SKARDU (PHASE-1) SKARDU (PHASE-1) | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 600,000,000 | 600,000,000 | 1,000,000,000 |
| 014101- A052 | Grants Domestic | 600,000,000 | 600,000,000 | 1,000,000,000 |
| Total- | ESTABLISHMENT OF 250 BEDDED | 600,000,000 | 600,000,000 | 1,000,000,000 |
| HOSPITAL AT SKARDU (PHASE-1) SKARDU (PHASE-1) | ||||
| GL0397 PROJECT DIRECTOR CONSTRUCTION OF DAREL KHANBURY AND BUNAR (GBP) | AND TANGIR EXPRESSWAY ALONG WITH | ROADS IN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 1,200,000,000 | 1,000,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 1,200,000,000 | 1,000,000,000 |
| Total- | PROJECT DIRECTOR CONSTRUCTION | 500,000,000 | 1,200,000,000 | 1,000,000,000 |
| OF DAREL AND TANGIR EXPRESSWAY ALONG WITH ROADS IN KHANBURY AND BUNAR (GBP) | ||||
| GL0398 CONS (SHAHRA-ENA | TRUCTION OF ROAD FROM PISSAN TO HOP GAR) 40 KM | E NAGAR (SHAHRA- | ENAGAR) 40 KM HO | PE NAGAR |
| 014101- A05 | Grants, Subsidies and Write off Loans | 700,000,000 | 700,000,000 | 790,000,000 |
| 014101- A052 | Grants Domestic | 700,000,000 | 700,000,000 | 790,000,000 |
| Total- | CONSTRUCTION OF ROAD FROM | 700,000,000 | 700,000,000 | 790,000,000 |
| PISSAN TO HOPE NAGAR (SHAHRA-ENAGAR) 40 KM HOPE NAGAR (SHAHRA-ENAGAR) 40 KM |
| NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT GL0399 INTERPROVINCIAL CONNECTIVITY ECONOMIC CORRIDOR THROUGH GILGIT-BALTISTAN AND AJK
| (THALICCHI G | B-SHOUNTER | |||
|---|---|---|---|---|
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 1,300,000,000 | 1,500,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 1,300,000,000 | 1,500,000,000 |
| Total- | INTERPROVINCIAL CONNECTIVITY | 500,000,000 | 1,300,000,000 | 1,500,000,000 |
| ECONOMIC CORRIDOR THROUGH GILGIT-BALTISTAN AND AJK (THALICCHI GB-SHOUNTER | ||||
| GL0438 PROJ DIVISION | ECT DIRECTOR INTER REGIONAL CONNECTIVITY BETWEEN BALTISTAN DIVISION -A | STORE | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 100,000,000 | 100,000,000 | 300,000,000 |
| 014101- A052 | Grants Domestic | 100,000,000 | 100,000,000 | 300,000,000 |
| Total- | PROJECT DIRECTOR INTER REGIONAL CONNECTIVITY BETWEEN BALTISTAN DIVISION -ASTORE DIVISION | 100,000,000 | 100,000,000 | 300,000,000 |
| GL0439 30 MW | HYDRO POWER PROJECT GHOWARI GHANCHE GHANCHE | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 20,000,000 | 20,000,000 | |
| 014101- A052 | Grants Domestic | 20,000,000 | 20,000,000 | |
| Total- | 30 MW HYDRO POWER PROJECT | 20,000,000 | 20,000,000 | |
| GHOWARI GHANCHE GHANCHE | ||||
| GL0440 UP-GR (GBP) | ADATION OF PROVINCIAL HQ GILGIT BASED ON MASTER PLAN | (GBP) BASED ON MASTER PLAN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans | 500,000,000 | 500,000,000 | 500,000,000 |
| 014101- A052 | Grants Domestic | 500,000,000 | 500,000,000 | 500,000,000 |
| Total- GL0441 ESTA | UP-GRADATION OF PROVINCIAL HQ GILGIT BASED ON MASTER PLAN (GBP) BASED ON MASTER PLAN (GBP) BLISHMENT OF MEDICAL AND NURSING COL | 500,000,000 LEGE AT GILGIT CO | 500,000,000 LLEGE AT GILGIT | 500,000,000 |
| 014101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 50,000,000 | 300,000,000 |
| 014101- A052 | Grants Domestic | 50,000,000 | 50,000,000 | 300,000,000 |
| Total- | ESTABLISHMENT OF MEDICAL AND NURSING COLLEGE AT GILGIT COLLEGE AT GILGIT | 50,000,000 | 50,000,000 | 300,000,000 |
| NO. 109.- FC2 | 2D52 OTHER DEVELOPMENT EXPENDITURE | DEMANDS FOR GRANTS | |
|---|---|---|---|
| No of 2024-25 Posts 2025-26 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| GL0442 GREA | Rs ACCOUNTANT GENERAL PAKISTAN REVENUES SUB- TER HUNZA WATER SUPPLY | Rs OFFICE, GILGIT | Rs |
| 014101- A05 | Grants, Subsidies and Write off Loans 500,000,000 | 900,000,000 | 600,000,000 |
| 014101- A052 | Grants Domestic 500,000,000 | 900,000,000 | 600,000,000 |
| Total- | GREATER HUNZA WATER SUPPLY 500,000,000 | 900,000,000 | 600,000,000 |
| GL0444 PM'S | SPECIAL PACKAGE FOR GILGIT BALITISTAN | ||
| 014101- A05 | Grants, Subsidies and Write off Loans 4,000,000,000 | 300,000,000 | 4,000,000,000 |
| 014101- A052 | Grants Domestic 4,000,000,000 | 300,000,000 | 4,000,000,000 |
| Total- | PM'S SPECIAL PACKAGE FOR GILGIT 4,000,000,000 | 300,000,000 | 4,000,000,000 |
| BALITISTAN | |||
| GL7110 ESTABLISHMENT OF 300 BEDDED ICT HOSPITAL MOTHER AND CHILD HOSPITAL IN CHILAS | |||
| 014101- A05 | Grants, Subsidies and Write off Loans 300,000,000 | 300,000,000 | 300,000,000 |
| 014101- A052 | Grants Domestic 300,000,000 | 300,000,000 | 300,000,000 |
| Total- | ESTABLISHMENT OF 300 BEDDED ICT 300,000,000 | 300,000,000 | 300,000,000 |
| HOSPITAL MOTHER AND CHILD HOSPITAL IN CHILAS | |||
| GL7111 ESTABLISHMENT OF MOUNTAINEERING INSTITUTE SHIGAR GB | |||
| 014101- A05 | Grants, Subsidies and Write off Loans | 200,000,000 | |
| 014101- A052 | Grants Domestic | 200,000,000 | |
| Total- | ESTABLISHMENT OF | 200,000,000 | |
| MOUNTAINEERING INSTITUTE SHIGAR GB | |||
| 014101 | Total- To provinces 33,500,000,000 | 33,300,000,000 | 36,500,000,000 |
| 0141 | Total- Transfers (Inter-Governmental) 33,500,000,000 | 33,300,000,000 | 36,500,000,000 |
| 014 | Total- Transfers 33,500,000,000 | 33,300,000,000 | 36,500,000,000 |
| 01 | Total- General Public Service 33,500,000,000 | 33,300,000,000 | 36,500,000,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT 33,500,000,000 | 33,300,000,000 | 36,500,000,000 | |
| TOTAL - DEMAND 220,456,099,000 | 269,329,839,000 | 251,130,109,000 |
DEMANDS FOR GRANTS
NO. 110.- DEVELOPMENT EXPENDITURE OF REVENUE DIVISION
DEMAND NO. 110 ( FC22D49 )
DEVELOPMENT EXPENDITURE OF REVENUE DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF REVENUE DIVISION.
Voted
Rs. 7,150,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE AND REVENUE .
| FUNCTIONAL CLASSIFICATION | 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | |
|---|---|---|---|---|
| 011 | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs | 17,696,000,000 | 14,696,000,000 | 7,150,000,000 |
| Total | 17,696,000,000 | 14,696,000,000 | 7,150,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 25,800,000 | 25,800,000 | 34,285,000 |
| A011 | Pay | 25,500,000 | 25,500,000 | 33,785,000 |
| A011-1 | Pay of Officers | (17,500,000) | (17,327,000) | (22,750,000) |
| A011-2 | Pay of Other Staff | (8,000,000) | (8,173,000) | (11,035,000) |
| A012 | Allowances | 300,000 | 300,000 | 500,000 |
| A012-1 | Regular Allowances | |||
| A012-2 | Other Allowances (Excluding TA) | (300,000) | (300,000) | (500,000) |
| A03 | Operating Expenses | 8,532,542,000 | 6,040,611,000 | 2,981,806,000 |
| A09 | Physical Assets | 1,189,339,000 | 1,835,733,000 | 152,600,000 |
| A12 | Civil works | 7,947,119,000 | 6,792,656,000 | 3,980,109,000 |
| A13 | Repairs and Maintenance | 1,200,000 | 1,200,000 | 1,200,000 |
| Total | 17,696,000,000 | 14,696,000,000 | 7,150,000,000 | |
| (In Foreign Exchange) (Own Resources) | (13,363,830,000) | (4,493,191,000) | ||
| (Foreign Aid) | (13,363,830,000) | (4,493,191,000) | ||
| (In Local Currency) | (4,332,170,000) _________________ | (14,696,000,000) __________________ | (2,656,809,000) _______________ |
NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No o | f Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|---|
| 2024-25 | 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||||
| 01 | General Public Service: | |||||
| 011 | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs: | |||||
| 0112 011205 IB2047 | Financial and Fiscal Affairs: Tax Management (Customs, Income Tax, E PAKISTAN RAISES REVENUE PROGRAMM | xcise etc.) E (PRRP) | : | |||
| 011205 | - A03 | Operating Expenses | 7,363,830,000 | 4,363,830,000 | 2,493,191,000 | |
| 011205 | - A039 | General | 7,363,830,000 | 4,363,830,000 | 2,493,191,000 | |
| Total- | PAKISTAN RAISES REVENUE PROGRAMME (PRRP) | 7,363,830,000 | 4,363,830,000 | 2,493,191,000 | ||
| ( | In Foreign Exchange) | (7,363,830,000) | (2,493,191,000) | |||
| ( | Foreign Aid) | (7,363,830,000) | (2,493,191,000) | |||
| ( | In Local Currency) | (4,363,830,000) | ||||
| ID7176 REGIO | DEVELOPMENT OF INTEGRATED TRANSIT NAL IMPROVING BORDER | __ TRADE M | ________________ ANAGEMENT SYS | _________________ TEM (ITTMS) UNDER | _______________ ADB's | |
| 011205 | - A01 | Employees Related Expenses | 25,800,000 | 25,800,000 | 34,285,000 | |
| 011205 | - A011 | Pay 60 | 38 | 25,500,000 | 25,500,000 | 33,785,000 |
| 011205 | - A011-1 | Pay of Officers (26) | (15) | (17,500,000) | (17,327,000) | (22,750,000) |
| 011205 | - A011-2 | Pay of Other Staff (34) | (23) | (8,000,000) | (8,173,000) | (11,035,000) |
| 011205 | - A012 | Allowances | 300,000 | 300,000 | 500,000 | |
| 011205 | - A012-2 | Other Allowances (Excluding TA) | (300,000) | (300,000) | (500,000) | |
| 011205 | - A03 | Operating Expenses | 1,168,712,000 | 1,676,781,000 | 488,615,000 | |
| 011205 | - A032 | Communications | 800,000 | 719,000 | 700,000 | |
| 011205 | - A033 | Utilities | 3,800,000 | 2,261,000 | 3,300,000 | |
| 011205 | - A034 | Occupancy Costs | 839,112,000 | 1,359,674,000 | 212,965,000 | |
| 011205 | - A035 | Operating Leases | 200,000,000 | 195,439,000 | 145,000,000 | |
| 011205 | - A037 | Consultancy and Contractual Work | 100,000,000 | 100,000,000 | 100,000,000 | |
| 011205 | - A038 | Travel & Transportation | 8,800,000 | 6,051,000 | 7,150,000 | |
| 011205 | - A039 | General | 16,200,000 | 12,637,000 | 19,500,000 | |
| 011205 | - A09 | Physical Assets | 503,200,000 | 1,149,594,000 | 2,600,000 | |
| 011205 | - A091 | Purchase of Building | 100,000 | 100,000 | ||
| 011205 | - A092 | Computer Equipment | 501,500,000 | 720,053,000 | 1,800,000 | |
| 011205 | - A096 | Purchase of Plant and Machinery | 1,500,000 | 35,841,000 | 600,000 |
| NO. 110.- FC2 | 2D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||
| 011205- A097 | Purchase of Furniture and Fixture | 100,000 | 393,700,000 | 100,000 |
| 011205- A12 | Civil works | 5,801,088,000 | 6,609,960,000 | 1,973,300,000 |
| 011205- A124 | Building and Structures | 5,801,088,000 | 6,609,960,000 | 1,973,300,000 |
| 011205- A13 | Repairs and Maintenance | 1,200,000 | 1,200,000 | 1,200,000 |
| 011205- A130 | Transport | 500,000 | 500,000 | 500,000 |
| 011205- A131 | Machinery and Equipment | 500,000 | 500,000 | 500,000 |
| 011205- A137 | Computer Equipment | 200,000 | 200,000 | 200,000 |
| Total- | DEVELOPMENT OF INTEGRATED TRANSIT TRADE MANAGEMENT SYSTEM (ITTMS) UNDER ADB's REGIONAL IMPROVING BORDER | 7,500,000,000 | 9,463,335,000 | 2,500,000,000 |
| (In Foreign Exchange) | (6,000,000,000) | (2,000,000,000) | ||
| (Foreign Aid) | (6,000,000,000) | (2,000,000,000) | ||
| (In Local Currency) | (1,500,000,000) | (9,463,335,000) | (500,000,000) | |
| ID9384 CONST CENTR-TRAN | _ RUCTION. OF CUSTOMS COMPLX.AT SOST I SIT ACCOMD. & CUSTOMS | ________________ NVOLVING SEPOY | ___________________ BARKS.- E-FACLTN | |
| 011205- A12 | Civil works | 182,696,000 | 182,696,000 | 539,629,000 |
| 011205- A124 | Building and Structures | 182,696,000 | 182,696,000 | 539,629,000 |
| Total- | CONSTRUCTION. OF CUSTOMS COMPLX.AT SOST INVOLVING SEPOY BARKS.- E-FACLTN CENTR-TRANSIT ACCOMD. & CUSTOMS | 182,696,000 | 182,696,000 | 539,629,000 |
| 011205 | Total- Tax Management (Customs, Income Tax, Excise etc.) | 15,046,526,000 | 14,009,861,000 | 5,532,820,000 |
| 0112 | Total- Financial and Fiscal Affairs | 15,046,526,000 | 14,009,861,000 | 5,532,820,000 |
| 011 | Total- Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs | 15,046,526,000 | 14,009,861,000 | 5,532,820,000 |
| 01 | Total- General Public Service | 15,046,526,000 | 14,009,861,000 | 5,532,820,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 15,046,526,000 | 14,009,861,000 | 5,532,820,000 | |
| (In Foreign Exchange) (Own Resources) | (13,363,830,000) | (4,493,191,000) | ||
| (Foreign Aid) | (13,363,830,000) | (4,493,191,000) | ||
| (In Local Currency) | (1,682,696,000) | (14,009,861,000) | (1,039,629,000) |
| NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE |
| 01 011 | General Public Service: Executive & Legislative Organs,Financial and Fisca | l Affairs, External Affairs: | ||||
|---|---|---|---|---|---|---|
| 0112 011205 SG020 | Financ Tax M 1 CONS | ial and anagem TRUCT | Fiscal Affairs: ent (Customs, Income Tax, Excise etc ION OF REGIONAL TAX OFFICE SAR | .) : GODHA | ||
| 011205 | - A12 | Civil | works | 490,981,000 | 490,981,000 | |
| 011205 | - A124 | Building and Structures | 490,981,000 | 490,981,000 | ||
| SL0059 | Total- CONS | CONSTRUCTION OF REGIONAL TAX OFFICE SARGODHA TRUCTION OF ADDITIONAL OFFICE BLOCK | 490,981,000 FOR RTO SAHIWAL | 490,981,000 | ||
| 011205 | - A12 | Civil | works | 222,483,000 | 222,483,000 | |
| 011205 | - A124 | Building and Structures | 222,483,000 | 222,483,000 | ||
| Total- | CONSTRUCTION OF ADDITIONAL OFFICE BLOCK FOR RTO SAHIWAL | 222,483,000 | 222,483,000 | |||
| ST0122 | PURCHASE OF LAND FOR REGIONAL TAX OFFICE | SIALKOT | ||||
| 011205 | - A09 | Physical Assets | 686,139,000 | 686,139,000 | 150,000,000 | |
| 011205 | - A091 | Purchase of Building | 686,139,000 | 686,139,000 | 150,000,000 | |
| Total- | PURCHASE OF LAND FOR REGIONAL TAX OFFICE SIALKOT | 686,139,000 | 686,139,000 | 150,000,000 | ||
| 0 | 11205 | Total- | Tax Management (Customs, Income Tax, Excise etc.) | 1,399,603,000 | 686,139,000 | 863,464,000 |
| 0 | 112 | Total- | Financial and Fiscal Affairs | 1,399,603,000 | 686,139,000 | 863,464,000 |
| 0 | 11 | Total- | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs | 1,399,603,000 | 686,139,000 | 863,464,000 |
| 0 | 1 | Total- | General Public Service | 1,399,603,000 | 686,139,000 | 863,464,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | 1,399,603,000 | 686,139,000 | 863,464,000 |
| NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
| 01 | General Public Service: | ||
|---|---|---|---|
| 011 | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs: | ||
| 0112 | Financial and | Fiscal Affairs: | |
| 011205 PR960 STATI | Tax M 2 CONS ON | anagem TRUCT | ent (Customs, Income Tax, Excise etc.) : ION OF TRANSIT ACCOMMODATION AT LANDI KOTAL (KPK) FOR TORKHAM CUSTOMS |
| 011205 | - A12 | Civil | works 256,509,000 |
| 011205 | - A124 | Build | ing and Structures 256,509,000 |
| Total- | CONS ACCO (KPK) STATI | TRUCTION OF TRANSIT MMODATION AT LANDI KOTAL FOR TORKHAM CUSTOMS ON 256,509,000 | |
| 0 | 11205 | Total- | Tax Management (Customs, Income Tax, Excise etc.) 256,509,000 |
| 0 | 112 | Total- | Financial and Fiscal Affairs 256,509,000 |
| 0 | 11 | Total- | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs 256,509,000 |
| 0 | 1 | Total- | General Public Service 256,509,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR 256,509,000 |
| NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 | General Public Service: | |||
|---|---|---|---|---|
| 011 | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs: | |||
| 0112 | Financial and | Fiscal Affairs: | ||
| 01120 KA129 | 5 Tax M 8 CONS | anagem T. OF O | ent (Customs, Income Tax, Excise etc.) : FFICE OF INTELLIGENCE & INVESTIGATION (IRS) KARACHI | |
| 01120 | 5- A12 | Civil | works 72,883,000 | 72,883,000 |
| 01120 | 5- A124 | Build | ing and Structures 72,883,000 | 72,883,000 |
| Total- | CONS & INVE | T. OF OFFICE OF INTELLIGENCE STIGATION (IRS) KARACHI 72,883,000 | 72,883,000 | |
| 011205 | Total- | Tax Management (Customs, Income Tax, Excise etc.) 72,883,000 | 72,883,000 | |
| 0112 | Total- | Financial and Fiscal Affairs 72,883,000 | 72,883,000 | |
| 011 | Total- | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs 72,883,000 | 72,883,000 | |
| 01 | Total- | General Public Service 72,883,000 | 72,883,000 | |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 72,883,000 | 72,883,000 |
| NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
01 General Public Service:
| 011 0112 | Executive & L Financial and | egislative Organs,Financial and Fisc Fiscal Affairs: | al Affairs, External Affairs: | |||
|---|---|---|---|---|---|---|
| 011205 QA033 QUETT | Tax M 2 CONS A | anagem TRUCT | ent (Customs, Income Tax, Excise et ION OF MODEL CUSTOM COLLECTT | c.) : ORATE (ENFORCEME | NT & COMPLIANCE) AT BALLELI | |
| 011205 | - A12 | Civil | works | 239,646,000 | ||
| 011205 | - A124 | Building and Structures | 239,646,000 | |||
| QA305 | Total- 6 CONS | CONS COLLE COMP TRUCT | TRUCTION OF MODEL CUSTOM CTTORATE (ENFORCEMENT & LIANCE) AT BALLELI QUETTA ION OF MODEL CUSTOM COLLECT | 239,646,000 ORATE AT GAWADAR | ||
| 011205 | - A12 | Civil | works | 680,833,000 | 680,833,000 | |
| 011205 | - A124 | Building and Structures | 680,833,000 | 680,833,000 | ||
| Total- | CONSTRUCTION OF MODEL CUSTOM COLLECTORATE AT GAWADAR | 680,833,000 | 680,833,000 | |||
| 0 | 11205 | Total- | Tax Management (Customs, Income Tax, Excise etc.) | 920,479,000 | 680,833,000 | |
| 0 | 112 | Total- | Financial and Fiscal Affairs | 920,479,000 | 680,833,000 | |
| 0 | 11 | Total- | Executive & Legislative | 920,479,000 | 680,833,000 | |
| Organs,Financial and Fiscal Affairs, External Affairs | ||||||
| 0 | 1 | Total- | General Public Service | 920,479,000 | 680,833,000 | |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 920,479,000 | 680,833,000 | |||
| TOTAL | - DEMAND | 17,696,000,000 | 14,696,000,000 | 7,150,000,000 | ||
| (In Foreign Exchange) | (13,363,830,000) | (4,493,191,000) | ||||
| (Own Resources) | ||||||
| (Foreign Aid) | (13,363,830,000) | (4,493,191,000) | ||||
| (In Local Currency) | (4,332,170,000) ___________________ | (14,696,000,000) ________________ | (2,656,809,000) _______________ |
SECTION X
MINISTRY OF HUMAN RIGHTS *
2025-2026 Budget Estimate (Rupees in Thousand)
Demands presented on behalf of the Ministry of Human Rights .
Development Expenditure on Revenue Account
| 111. | Development Expenditure of Human Rights Division Total : | 23,000 23,000 |
|---|
NO. 111.- DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 111
( FC22D71 )
DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION.
Voted
Rs. 23,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF HUMAN RIGHTS .
| 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 036 | Administration Of Public Order | 104,000,000 | 104,000,000 | 23,000,000 |
| Total | 104,000,000 | 104,000,000 | 23,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 61,407,000 | 61,407,000 | 18,200,000 |
| A011 | Pay | 61,407,000 | 61,407,000 | 18,200,000 |
| A011- | 1 Pay of Officers | (50,461,000) | (50,461,000) | (15,700,000) |
| A011- | 2 Pay of Other Staff | (10,946,000) | (10,946,000) | (2,500,000) |
| A03 | Operating Expenses | 21,795,000 | 21,645,000 | 4,480,000 |
| A09 | Physical Assets | 8,253,000 | 8,403,000 | 300,000 |
| A12 | Civil works | 11,795,000 | 11,795,000 | |
| A13 | Repairs and Maintenance | 750,000 | 750,000 | 20,000 |
| Total | 104,000,000 | 104,000,000 | 23,000,000 |
NO. 111.- FC22D71 DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 03 Public | Order And Safety Affairs: | |||
| 036 Admini | stration Of Public Order: | |||
| 0361 Admini 036101 SECRE IB0293 ESTABL | stration: TARIAT/ADMINISTRATION : ISHMENT OF PROJECT PLANNING AND MONI | TORING UNIT(PMU) IN | MOHR | |
| 036101- A01 | Employees Related Expenses | 17,180,000 | 17,180,000 | 10,500,000 |
| 036101- A011 | Pay 11 | 17,180,000 | 17,180,000 | 10,500,000 |
| 036101- A011-1 | Pay of Officers (5) | (14,868,000) | (14,868,000) | (8,000,000) |
| 036101- A011-2 | Pay of Other Staff (6) | (2,312,000) | (2,312,000) | (2,500,000) |
| 036101- A03 | Operating Expenses | 1,816,000 | 1,666,000 | 1,200,000 |
| 036101- A032 | Communications | 21,000 | 21,000 | 50,000 |
| 036101- A036 | Motor Vehicles | 50,000 | 50,000 | |
| 036101- A038 | Travel & Transportation | 213,000 | 213,000 | 500,000 |
| 036101- A039 | General | 1,532,000 | 1,382,000 | 650,000 |
| 036101- A09 | Physical Assets | 984,000 | 1,134,000 | 300,000 |
| 036101- A092 | Computer Equipment | 233,000 | 233,000 | |
| 036101- A095 | Purchase of Transport | 350,000 | 500,000 | |
| 036101- A096 | Purchase of Plant and Machinery | 400,000 | 400,000 | 300,000 |
| 036101- A097 | Purchase of Furniture and Fixture | 1,000 | 1,000 | |
| 036101- A13 | Repairs and Maintenance | 20,000 | 20,000 | |
| 036101- A131 | Machinery and Equipment | 10,000 | 10,000 | |
| 036101- A133 | Buildings and Structure | 10,000 | 10,000 | |
| Total- | ESTABLISHMENT OF PROJECT PLANNING AND MONITORING UNIT(PMU) IN MOHR | 20,000,000 | 20,000,000 | 12,000,000 |
| IB0720 HUMAN | RIGHTS AWARENESS PROGRAMME | |||
| 036101- A01 | Employees Related Expenses | 2,400,000 | 2,400,000 | 2,500,000 |
| 036101- A011 | Pay 3 | 2,400,000 | 2,400,000 | 2,500,000 |
| 036101- A011-1 | Pay of Officers (3) | (2,400,000) | (2,400,000) | (2,500,000) |
| 036101- A03 | Operating Expenses | 6,500,000 | 6,500,000 | 1,500,000 |
| 036101- A032 | Communications | 125,000 | 125,000 | 100,000 |
| 036101- A038 | Travel & Transportation | 610,000 | 610,000 | 500,000 |
| 036101- A039 | General | 5,765,000 | 5,765,000 | 900,000 |
| Total- | HUMAN RIGHTS AWARENESS PROGRAMME | 8,900,000 | 8,900,000 | 4,000,000 |
| NO. 111.- FC22D71 DEVELOPMENT EXPENDITURE OF HUMAN No of Posts | RIGHTS DIVISION 2024-2025 | DEMAND 2024-2025 | S FOR GRANTS 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| IB1975 PILOT P 036101- A01 | ROJECT FOR ESTABLISHMENT OF TRANSG Employees Related Expenses | ENDER PROTECTIO 9,018,000 | N CENTRE ISLAMABAD 9,018,000 |
|---|---|---|---|
| 036101- A011 | Pay 10 | 9,018,000 | 9,018,000 |
| 036101- A011-1 | Pay of Officers (3) | (7,009,000) | (7,009,000) |
| 036101- A011-2 | Pay of Other Staff (7) | (2,009,000) | (2,009,000) |
| 036101- A03 | Operating Expenses | 3,573,000 | 3,573,000 |
| 036101- A032 | Communications | 136,000 | 136,000 |
| 036101- A033 | Utilities | 670,000 | 670,000 |
| 036101- A038 | Travel & Transportation | 600,000 | 600,000 |
| 036101- A039 | General | 2,167,000 | 2,167,000 |
| 036101- A09 | Physical Assets | 229,000 | 229,000 |
| 036101- A092 | Computer Equipment | 29,000 | 29,000 |
| 036101- A096 | Purchase of Plant and Machinery | 200,000 | 200,000 |
| 036101- A13 | Repairs and Maintenance | 180,000 | 180,000 |
| 036101- A130 | Transport | 50,000 | 50,000 |
| 036101- A131 | Machinery and Equipment | 50,000 | 50,000 |
| 036101- A132 | Furniture and Fixture | 50,000 | 50,000 |
| 036101- A137 | Computer Equipment | 30,000 | 30,000 |
| Total- | PILOT PROJECT FOR ESTABLISHMENT OF TRANSGENDER PROTECTION | 13,000,000 | 13,000,000 |
CENTRE ISLAMABAD
IB1976 HUMAN RIGHTS COORDINATION AND MONITORING UNIT FOR NATIONAL MECHANISM FOR REPORTING AND
| 036101- A01 | Employees Related Expenses | 7,655,000 | 7,655,000 | 5,200,000 |
|---|---|---|---|---|
| 036101- A011 | Pay 5 | 7,655,000 | 7,655,000 | 5,200,000 |
| 036101- A011-1 | Pay of Officers (5) | (7,655,000) | (7,655,000) | (5,200,000) |
| 036101- A03 | Operating Expenses | 5,866,000 | 5,866,000 | 1,780,000 |
| 036101- A032 | Communications | 30,000 | 30,000 | 30,000 |
| 036101- A038 | Travel & Transportation | 726,000 | 726,000 | 700,000 |
| 036101- A039 | General | 5,110,000 | 5,110,000 | 1,050,000 |
| 036101- A13 | Repairs and Maintenance | 60,000 | 60,000 | 20,000 |
| NO. 111.- FC22 | D71 DEVELOPMENT EXPENDITURE OF HUMA No of 2024-25 Posts 2025-26 | N RIGHTS DIVISION 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 036101- A131 | Machinery and Equipment | 60,000 | 60,000 | 20,000 |
| Total- | HUMAN RIGHTS COORDINATION AND | 13,581,000 | 13,581,000 | 7,000,000 |
| MONITORING UNIT FOR NATIONAL MECHANISM FOR REPORTING AND | ||||
| IB9184 ACQUIS FOR CHILD | ITION OF LAND AND FEASIBILITY STUDY/CONSTRUCTION OF BOUNDARY WALL/GUARD ROOM | |||
| 036101- A12 | Civil works | 11,795,000 | 11,795,000 | |
| 036101- A124 | Building and Structures | 11,795,000 | 11,795,000 | |
| Total- | ACQUISITION OF LAND AND | 11,795,000 | 11,795,000 | |
| ID9201 INSTITU | FEASIBILITY STUDY/CONSTRUCTION OF BOUNDARY WALL/GUARD ROOM FOR CHILD TIONAL STRENGTHENING OF M/O HUMAN RIG | HTS | ||
| 036101- A01 | Employees Related Expenses | 11,282,000 | 11,282,000 | |
| 036101- A011 | Pay 9 | 11,282,000 | 11,282,000 | |
| 036101- A011-1 | Pay of Officers (4) | (9,128,000) | (9,128,000) | |
| 036101- A011-2 | Pay of Other Staff (5) | (2,154,000) | (2,154,000) | |
| 036101- A03 | Operating Expenses | 280,000 | 280,000 | |
| 036101- A032 | Communications | 70,000 | 70,000 | |
| 036101- A039 | General | 210,000 | 210,000 | |
| 036101- A09 | Physical Assets | 2,762,000 | 2,762,000 | |
| 036101- A092 | Computer Equipment | 2,762,000 | 150,000 | |
| 036101- A096 | Purchase of Plant and Machinery | 2,612,000 | ||
| Total- | INSTITUTIONAL STRENGTHENING OF M/O HUMAN RIGHTS | 14,324,000 | 14,324,000 | |
| ID9677 ETAB. OF HUMAN RIGHTS INFORMATION MANAGEMENT SYSTEM (HRIMS) | ||||
| 036101- A01 | Employees Related Expenses | 6,600,000 | 6,600,000 | |
| 036101- A011 | Pay 10 | 6,600,000 | 6,600,000 | |
| 036101- A011-1 | Pay of Officers (6) | (5,300,000) | (5,300,000) | |
| 036101- A011-2 | Pay of Other Staff (4) | (1,300,000) | (1,300,000) | |
| 036101- A03 | Operating Expenses | 1,450,000 | 1,450,000 | |
| 036101- A032 | Communications | 740,000 | 740,000 | |
| 036101- A038 | Travel & Transportation | 610,000 | 610,000 | |
| 036101- A039 | General | 100,000 | 100,000 |
| NO. 111.- FC2 | 2D71 D | EVELOPMENT EXPENDITURE OF HUMA No of 2024-25 Posts 2025-26 ACCOUNTANT GENERAL P | N RIGHTS DIVISION 2024-2025 Budget Estimate Rs AKISTAN REVENUES | DEMAND 2024-2025 Revised Estimate Rs | S FOR GRANTS 2025-2026 Budget Estimate Rs |
|---|---|---|---|---|---|
| 036101- A13 | Repairs and Maintenance | 350,000 | 350,000 | ||
| 036101- A130 | Transport | 250,000 | 250,000 | ||
| 036101- A131 | Machinery and Equipment | 100,000 | 100,000 | ||
| Total- | ETAB. INFOR (HRIM | OF HUMAN RIGHTS MATION MANAGEMENT SYSTEM S) | 8,400,000 | 8,400,000 | |
| 036101 | Total- | SECRETARIAT/ADMINISTRATION | 90,000,000 | 90,000,000 | 23,000,000 |
| 0361 | Total- | Administration | 90,000,000 | 90,000,000 | 23,000,000 |
| 036 | Total- | Administration Of Public Order | 90,000,000 | 90,000,000 | 23,000,000 |
| 03 | Total- | Public Order And Safety Affairs | 90,000,000 | 90,000,000 | 23,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 90,000,000 | 90,000,000 | 23,000,000 |
| NO. 111.- FC22D71 DEVELOPMENT EXPENDITURE OF HUMAN | RIGHTS DIVISION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
03 Public Order And Safety Affairs: 036 Administration Of Public Order: 0361 Administration:
036101 SECRETARIAT/ADMINISTRATION :
PR9622 ESTABLISHMENT OF SUB OFFICE OF HUMAN RIGHTS IN MERGED DISTRICTS OF KP
| 036101- A01 | Employees Related Expenses | 7,272,000 | 7,272,000 | |
|---|---|---|---|---|
| 036101- A011 | Pay 10 | 7,272,000 | 7,272,000 | |
| 036101- A011- | 1 Pay of Officers (3) | (4,101,000) | (4,101,000) | |
| 036101- A011- | 2 Pay of Other Staff (7) | (3,171,000) | (3,171,000) | |
| 036101- A03 | Operating Expenses | 2,310,000 | 2,310,000 | |
| 036101- A032 | Communications | 200,000 | 200,000 | |
| 036101- A033 | Utilities | 20,000 | 20,000 | |
| 036101- A034 | Occupancy Costs | 10,000 | 10,000 | |
| 036101- A036 | Motor Vehicles | 20,000 | 20,000 | |
| 036101- A038 | Travel & Transportation | 350,000 | 350,000 | |
| 036101- A039 | General | 1,710,000 | 1,710,000 | |
| 036101- A09 | Physical Assets | 4,278,000 | 4,278,000 | |
| 036101- A092 | Computer Equipment | 1,150,000 | 1,150,000 | |
| 036101- A095 | Purchase of Transport | 2,827,000 | 2,827,000 | |
| 036101- A096 | Purchase of Plant and Machinery | 300,000 | 300,000 | |
| 036101- A097 | Purchase of Furniture and Fixture | 1,000 | 1,000 | |
| 036101- A13 | Repairs and Maintenance | 140,000 | 140,000 | |
| 036101- A130 | Transport | 10,000 | 10,000 | |
| 036101- A131 | Machinery and Equipment | 40,000 | 40,000 | |
| 036101- A132 | Furniture and Fixture | 47,000 | 47,000 | |
| 036101- A133 | Buildings and Structure | 40,000 | 40,000 | |
| 036101- A137 | Computer Equipment | 3,000 | 3,000 | |
| Total- | ESTABLISHMENT OF SUB OFFICE OF HUMAN RIGHTS IN MERGED DISTRICTS OF KP | 14,000,000 | 14,000,000 | |
| 036101 | Total- SECRETARIAT/ADMINISTRATION | 14,000,000 | 14,000,000 | |
| 0361 | Total- Administration | 14,000,000 | 14,000,000 | |
| 036 | Total- Administration Of Public Order | 14,000,000 | 14,000,000 | |
| 03 | Total- Public Order And Safety Affairs | 14,000,000 | 14,000,000 | |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | 14,000,000 | 14,000,000 | ||
| TOTAL - DEMAND | 104,000,000 | 104,000,000 | 23,000,000 |
SECTION XI
MINISTRY OF INFORMATION AND BROADCASTING
* 2025-2026 Budget Estimate (Rupees in Thousand)
Demand presented on behalf of the Ministry of Information and Broadcasting
Development Expenditure on Revenue Account.
| 112. | Development Expenditure of Information and Broadcasting Division | 1,616,321 | |
|---|---|---|---|
| Total : | 1,616,321 |
NO. 112.- DEVELOPMENT EXPENDITURE OF INFORMATION AND BROADCASTING DEMANDS FOR GRANTS DIVISION
DEMAND NO. 112 ( FC22D22 )
DEVELOPMENT EXPENDITURE OF INFORMATION AND BROADCASTING DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF INFORMATION AND BROADCASTING DIVISION.
Voted Rs. 1,616,321,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF INFORMATION AND BROADCASTING .
| 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 083 | Broadcasting and Publishing | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 |
| Total | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 133,059,000 | 104,950,000 | 154,937,000 |
| A011 | Pay | 133,059,000 | 104,826,000 | 154,649,000 |
| A011-1 | Pay of Officers | (116,155,000) | (90,598,000) | (130,000,000) |
| A011-2 | Pay of Other Staff | (16,904,000) | (14,228,000) | (24,649,000) |
| A012 | Allowances | 124,000 | 288,000 | |
| A012-1 | Regular Allowances | |||
| A012-2 | Other Allowances (Excluding TA) | (124,000) | (288,000) | |
| A03 | Operating Expenses | 85,091,000 | 91,890,000 | 250,761,000 |
| A09 | Physical Assets | 856,850,000 | 1,177,823,000 | 1,210,623,000 |
| Total | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 |
NO. 112.- FC22D22 DEVELOPMENT EXPENDITURE OF INFORMATION AND BROADCASTING DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No o | f Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|---|
| 2024-25 | 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | ||||
| ACCOUNTANT G | ENERAL PAKISTAN REVENUES | |||||
| 08 | Recreation, Culture and Religion: | |||||
| 083 | Broadcasting and Publishing: | |||||
| 0831 | Broadcasting and Publishing: | |||||
| 083120 IB3242 | Others ESTAB | : LISHMENT OF NATIONAL COMMUN | ICATION AND STRATEGY UNIT (THINK TANK) | |||
| 083120 | - A01 | Employees Related Expenses | 21,500,000 | 21,500,000 | 21,500,000 | |
| 083120 | - A011 | Pay 22 | 22 | 21,500,000 | 21,500,000 | 21,500,000 |
| 083120 | - A011-1 | Pay of Officers (14) | (14) | (20,000,000) | (20,000,000) | (20,000,000) |
| 083120 | - A011-2 | Pay of Other Staff (8) | (8) | (1,500,000) | (1,500,000) | (1,500,000) |
| 083120 | - A03 | Operating Expenses | 19,500,000 | 20,722,000 | 33,900,000 | |
| 083120 | - A032 | Communications | 1,000,000 | 1,000,000 | 1,000,000 | |
| 083120 | - A038 | Travel & Transportation | 1,000,000 | 3,000,000 | 3,000,000 | |
| 083120 | - A039 | General | 17,500,000 | 16,722,000 | 29,900,000 | |
| 083120 | - A09 | Physical Assets | 29,000,000 | 57,778,000 | 52,005,000 | |
| 083120 | - A092 | Computer Equipment | 20,000,000 | 30,524,000 | 25,005,000 | |
| 083120 | - A096 | Purchase of Plant and Machinery | 3,000,000 | 10,878,000 | 11,000,000 | |
| 083120 | - A097 | Purchase of Furniture and Fixture | 6,000,000 | 16,376,000 | 16,000,000 | |
| Total- | ESTABLISHMENT OF NATIONAL | 70,000,000 | 100,000,000 | 107,405,000 | ||
| COMMUNICATION AND STRATEGY (THINK TANK) | UNIT | |||||
| IB3243 | CITIZEN | COLLABORATION FACILITATION | CENTER (C | CFC) | ||
| 083120 | - A01 | Employees Related Expenses | 33,000,000 | 33,000,000 | ||
| 083120 | - A011 | Pay 22 | 22 | 33,000,000 | 33,000,000 | |
| 083120 | - A011-1 | Pay of Officers (14) | (14) | (31,000,000) | (31,000,000) | |
| 083120 | - A011-2 | Pay of Other Staff (8) | (8) | (2,000,000) | (2,000,000) | |
| 083120 | - A03 | Operating Expenses | 39,018,000 | 148,018,000 | ||
| 083120 | - A032 | Communications | 1,000,000 | 1,000,000 | ||
| 083120 | - A037 | Consultancy and Contractual Work | 30,000,000 | 124,000,000 | ||
| 083120 | - A038 | Travel & Transportation | 518,000 | 518,000 | ||
| 083120 | - A039 | General | 7,500,000 | 22,500,000 | ||
| 083120 | - A09 | Physical Assets | 27,982,000 | 68,982,000 | ||
| 083120 | - A092 | Computer Equipment | 19,800,000 | 41,982,000 | ||
| 083120 | - A096 | Purchase of Plant and Machinery | 2,584,000 | 15,000,000 | ||
| 083120 | - A097 | Purchase of Furniture and Fixture | 5,598,000 | 12,000,000 | ||
| Total- | CITIZEN COLLABORATION FACILITATION CENTER (CCFC) | 100,000,000 | 250,000,000 |
NO. 112.- FC22D22 DEVELOPMENT EXPENDITURE OF INFORMATION AND BROADCASTING DIVISION
DEMANDS FOR GRANTS
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3709 ESTABLISHMENT OF DEDICATED PID MEDIA CELL TO COUNTER VIOLENT EXTREMISM (CVE) PHASE-I | |||
|---|---|---|---|
| 083120- A01 | Employees Related Expenses | 21,366,000 | 42,413,000 |
| 083120- A011 | Pay 32 | 21,366,000 | 42,413,000 |
| 083120- A011-1 | Pay of Officers (12) | (15,256,000) | (30,000,000) |
| 083120- A011-2 | Pay of Other Staff (20) | (6,110,000) | (12,413,000) |
| 083120- A03 | Operating Expenses | 32,350,000 | 25,000,000 |
| 083120- A032 | Communications | 1,000,000 | 2,000,000 |
| 083120- A038 | Travel & Transportation | 7,180,000 | 7,000,000 |
| 083120- A039 | General | 24,170,000 | 16,000,000 |
| 083120- A09 | Physical Assets | 46,284,000 | 24,210,000 |
| 083120- A092 | Computer Equipment | 45,208,000 | 23,787,000 |
| 083120- A097 | Purchase of Furniture and Fixture | 1,076,000 | 423,000 |
| Total- IB3710 DEVEL | ESTABLISHMENT OF DEDICATED PID MEDIA CELL TO COUNTER VIOLENT EXTREMISM (CVE) PHASE-I OPMENT AND STRENGTHENING OF THE OFFICE OF TH | 100,000,000 E PRESS REGISTRAR | 91,623,000 |
| 083120- A01 | Employees Related Expenses | 210,000 | |
| 083120- A011 | Pay | 210,000 | |
| 083120- A011-2 | Pay of Other Staff | (210,000) | |
| 083120- A03 | Operating Expenses | 3,835,000 | |
| 083120- A038 | Travel & Transportation | 500,000 | |
| 083120- A039 | General | 3,335,000 | |
| 083120- A09 | Physical Assets | 8,877,000 | |
| 083120- A092 | Computer Equipment | 6,682,000 | |
| 083120- A095 | Purchase of Transport | 300,000 | |
| 083120- A096 | Purchase of Plant and Machinery | 1,130,000 | |
| 083120- A097 | Purchase of Furniture and Fixture | 765,000 | |
| Total- | DEVELOPMENT AND STRENGTHENING OF THE OFFICE OF THE PRESS REGISTRAR | 12,922,000 |
| NO. 112.- FC22 | D22 DEVELOPMENT EXPENDITURE OF INFO BROADCASTING DIVISION | RMATION AND | DEMANDS FOR GRANTS | |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| IB5300 NATION | ACCOUNTANT GENERAL AL INFORMATION AND MEDIA ARCHIVAL RE | Rs PAKISTAN REVENUES POSITORY (NIMAR) | Rs | Rs |
| 083120- A01 | Employees Related Expenses | 24,559,000 | 24,683,000 | 23,024,000 |
| 083120- A011 | Pay 19 29 | 24,559,000 | 24,559,000 | 22,736,000 |
| 083120- A011-1 | Pay of Officers (13) (10) | (22,155,000) | (22,155,000) | (20,000,000) |
| 083120- A011-2 | Pay of Other Staff (6) (19) | (2,404,000) | (2,404,000) | (2,736,000) |
| 083120- A012 | Allowances | 124,000 | 288,000 | |
| 083120- A012-2 | Other Allowances (Excluding TA) | (124,000) | (288,000) | |
| 083120- A03 | Operating Expenses | 11,373,000 | 13,873,000 | 27,550,000 |
| 083120- A032 | Communications | 900,000 | 900,000 | 500,000 |
| 083120- A033 | Utilities | 9,000,000 | ||
| 083120- A034 | Occupancy Costs | 2,873,000 | 2,873,000 | 10,000,000 |
| 083120- A038 | Travel & Transportation | 2,000,000 | 3,000,000 | 2,000,000 |
| 083120- A039 | General | 5,600,000 | 7,100,000 | 6,050,000 |
| 083120- A09 | Physical Assets | 464,068,000 | 861,568,000 | 749,426,000 |
| 083120- A092 | Computer Equipment | 463,568,000 | 861,068,000 | 743,926,000 |
| 083120- A095 | Purchase of Transport | 5,000,000 | ||
| 083120- A097 | Purchase of Furniture and Fixture | 500,000 | 500,000 | 500,000 |
| Total- | NATIONAL INFORMATION AND MEDIA ARCHIVAL REPOSITORY (NIMAR) | 500,000,000 | 900,124,000 | 800,000,000 |
| IB5302 CENTRAL MONITORING UNIT | ||||
| 083120- A01 | Employees Related Expenses | 54,000,000 | 37,191,000 | 35,000,000 |
| 083120- A011 | Pay 39 26 | 54,000,000 | 37,191,000 | 35,000,000 |
| 083120- A011-1 | Pay of Officers (24) (17) | (43,000,000) | (33,187,000) | (29,000,000) |
| 083120- A011-2 | Pay of Other Staff (15) (9) | (11,000,000) | (4,004,000) | (6,000,000) |
| 083120- A03 | Operating Expenses | 15,200,000 | 21,110,000 | 16,293,000 |
| 083120- A033 | Utilities | 500,000 | 1,000,000 | 200,000 |
| 083120- A034 | Occupancy Costs | 5,200,000 | 5,110,000 | 5,000,000 |
| 083120- A038 | Travel & Transportation | 5,500,000 | 1,000,000 | 200,000 |
| 083120- A039 | General | 4,000,000 | 14,000,000 | 10,893,000 |
| 083120- A09 | Physical Assets | 335,800,000 | 203,316,000 | 316,000,000 |
| 083120- A092 | Computer Equipment | 335,800,000 | 203,316,000 | 316,000,000 |
| Total- | CENTRAL MONITORING UNIT | 405,000,000 | 261,617,000 | 367,293,000 |
| 083120 | Total- Others | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 |
| 0831 | Total- Broadcasting and Publishing | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 |
| 083 | Total- Broadcasting and Publishing | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 |
| 08 | Total- Recreation, Culture and Religion | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 |
| Total- ACCOUNTANT GENERAL | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 | |
| PAKISTAN REVENUES | ||||
| TOTAL - DEMAND | 1,075,000,000 | 1,374,663,000 | 1,616,321,000 |
SECTION XII
MINISTRY OF INFORMATION TECHNOLOGY AND TELECOMMUNICATION *
2025-2026 Budget Estimate
| nt Expenditure on Revenue Account. n Technology and Telecommunication esented on behalf of the Ministry of | (Rupees in Thousand) |
|---|---|
| 113. Development Expenditure of Information Technology | 16,227,493 |
| and Telecommunication Division | |
| Total : 16,227,493 |
Demand presented on behalf of the Ministry of Information Technology and Telecommunication Development Expenditure on Revenue Account.
NO. 113.- DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY AND DEMANDS FOR GRANTS TELECOMMUNICATION DIVISION
DEMAND NO. 113 ( FC22D48 )
DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY AND TELECOMMUNICATION DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY AND TELECOMMUNICATION DIVISION.
Voted Rs. 16,227,493,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF INFORMATION TECHNOLOGY AND TELECOMMUNICATION .
| 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | ||
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| FUNCTIONAL CLASSIFICATION | ||||
| 016 | Basic Research | 28,007,861,000 | 9,914,258,000 | 15,477,493,000 |
| 046 | Communications | 921,139,000 | 1,232,247,000 | 750,000,000 |
| Total | 28,929,000,000 | 11,146,505,000 | 16,227,493,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 799,773,000 | 318,912,000 | 653,987,000 |
| A011 | Pay | 787,773,000 | 314,940,000 | 650,957,000 |
| A011-1 | Pay of Officers | (694,417,000) | (278,944,000) | (600,960,000) |
| A011-2 | Pay of Other Staff | (93,356,000) | (35,996,000) | (49,997,000) |
| A012 | Allowances | 12,000,000 | 3,972,000 | 3,030,000 |
| A012-1 | Regular Allowances | (11,000,000) | (3,972,000) | (1,530,000) |
| A012-2 | Other Allowances (Excluding TA) | (1,000,000) | (1,500,000) | |
| A02 | Project Pre-Investment Analysis | 184,875,000 | ||
| A03 | Operating Expenses | 23,680,624,000 | 8,591,175,000 | 13,911,924,000 |
| A05 | Grants, Subsidies and Write off Loans | 2,080,000,000 | 103,439,000 | 198,000,000 |
| A09 | Physical Assets | 1,073,802,000 | 295,937,000 | 697,412,000 |
| A12 | Civil works | 1,270,184,000 | 1,649,206,000 | 752,000,000 |
| A13 | Repairs and Maintenance | 24,617,000 | 2,961,000 | 14,170,000 |
| Total | 28,929,000,000 | 11,146,505,000 | 16,227,493,000 | |
| (In Foreign Exchange) | (21,318,649,000) | (11,880,000,000) | ||
| (Own Resources) | ||||
| (Foreign Aid) | (21,318,649,000) | (11,880,000,000) | ||
| (In Local Currency) | (7,610,351,000) _________________ | (11,146,505,000) __________________ | (4,347,493,000) _______________ |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS AND TELECOMMUNICATION DIVISION
III. - DETAILS are as follows :-
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | ||
| ACCOUNTANT GENERAL P | AKISTAN REVENUES | ||||
| 01 | General Public Service: | ||||
| 016 | Basic | Research: | |||
| 0161 | Basic | Research: | |||
| 016101 IB0278 | Administration : ESTABLISHMENT OF 25 STPS IN PAKISTAN WITH RE | NTAL SUBSIDY | |||
| 016101 | - A01 | Employees Related Expenses | 48,000,000 | 32,456,000 | |
| 016101 | - A011 | Pay 70 | 48,000,000 | 32,456,000 | |
| 016101 | - A011-1 | Pay of Officers (9) | (28,000,000) | (17,281,000) | |
| 016101 | - A011-2 | Pay of Other Staff (61) | (20,000,000) | (15,175,000) | |
| 016101 | - A03 | Operating Expenses | 97,000,000 | 50,962,000 | |
| 016101 | - A032 | Communications | 6,000,000 | 9,744,000 | |
| 016101 | - A033 | Utilities | 2,500,000 | ||
| 016101 | - A034 | Occupancy Costs | 67,500,000 | 32,366,000 | |
| 016101 | - A038 | Travel & Transportation | 1,400,000 | 619,000 | |
| 016101 | - A039 | General | 19,600,000 | 8,233,000 | |
| 016101 | - A09 | Physical Assets | 29,000,000 | 14,966,000 | |
| 016101 | - A092 | Computer Equipment | 25,000,000 | 12,904,000 | |
| 016101 | - A096 | Purchase of Plant and Machinery | 2,500,000 | 2,062,000 | |
| 016101 | - A097 | Purchase of Furniture and Fixture | 1,000,000 | ||
| 016101 | - A098 | Purchase of Other Assets | 500,000 | ||
| 016101 | - A12 | Civil works | 500,000 | ||
| 016101 | - A124 | Building and Structures | 500,000 | ||
| 016101 | - A13 | Repairs and Maintenance | 500,000 | 81,000 | |
| 016101 | - A131 | Machinery and Equipment | 500,000 | 81,000 | |
| Total- | ESTABLISHMENT OF 25 STPS IN | 175,000,000 | 98,465,000 | ||
| IB0285 (AWAN | STREN E SAD | PAKISTAN WITH RENTAL SUBSIDY GTHENING OF ICT INFRASTRUCTURE AND OF DAR) | FICE AUTOMATION OF | PRESIDENT | SECRETARIAT |
| 016101 | - A09 | Physical Assets | 13,370,000 | ||
| 016101 | - A092 | Computer Equipment | 13,370,000 | ||
| Total- | STRENGTHENING OF ICT | 13,370,000 | |||
| INFRASTRUCTURE AND OFFICE | |||||
| AUTOMATION OF PRESIDENT | |||||
| SECRETARIAT (AWAN E SADDAR) |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS
AND TELECOMMUNICATION DIVISION
| No o | f Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|---|
| 2024-25 | 2025-26 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| IB0629 CERTIFICATION OF IT PROFESSIONALS | |||||
| 016101- A01 | Employees Related Expenses | 14,050,000 | 14,050,000 | ||
| 016101- A011 | Pay 9 | 14,050,000 | 14,050,000 | ||
| 016101- A011-1 | Pay of Officers (5) | (12,010,000) | (12,010,000) | ||
| 016101- A011-2 | Pay of Other Staff (4) | (2,040,000) | (2,040,000) | ||
| 016101- A03 | Operating Expenses | 85,950,000 | 232,080,000 | ||
| 016101- A032 | Communications | 200,000 | 200,000 | ||
| 016101- A037 | Consultancy and Contractual Work | 85,000,000 | 231,130,000 | ||
| 016101- A038 | Travel & Transportation | 590,000 | 590,000 | ||
| 016101- A039 | General | 160,000 | 160,000 | ||
| Total- | CERTIFICATION OF IT PROFESSION | ALS | 100,000,000 | 246,130,000 | |
| IB0659 HIGH IMPACT SKILLS BOOT MAP | |||||
| 016101- A01 | Employees Related Expenses | 5,381,000 | 2,463,000 | ||
| 016101- A011 | Pay 4 | 5,381,000 | 2,463,000 | ||
| 016101- A011-1 | Pay of Officers (2) | (4,226,000) | (2,021,000) | ||
| 016101- A011-2 | Pay of Other Staff (2) | (1,155,000) | (442,000) | ||
| 016101- A03 | Operating Expenses | 73,719,000 | 7,256,000 | ||
| 016101- A032 | Communications | 300,000 | 94,000 | ||
| 016101- A038 | Travel & Transportation | 2,000,000 | 500,000 | ||
| 016101- A039 | General | 71,419,000 | 6,662,000 | ||
| 016101- A09 | Physical Assets | 600,000 | |||
| 016101- A092 | Computer Equipment | 600,000 | |||
| 016101- A13 | Repairs and Maintenance | 300,000 | |||
| 016101- A137 | Computer Equipment | 300,000 | |||
| Total- | HIGH IMPACT SKILLS BOOT MAP | 80,000,000 | 9,719,000 | ||
| IB0660 PROJECT MONITORING & DIGITAL TRANS | FORMATION CELL (KNOWLEDGE | ECONOMY INITIATIVE) | |||
| 016101- A01 | Employees Related Expenses | 81,500,000 | 58,416,000 | 81,500,000 | |
| 016101- A011 | Pay 33 | 33 | 81,500,000 | 58,416,000 | 81,500,000 |
| 016101- A011-1 | Pay of Officers (23) | (23) | (75,000,000) | (54,188,000) | (75,000,000) |
| 016101- A011-2 | Pay of Other Staff (10) | (10) | (6,500,000) | (4,228,000) | (6,500,000) |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS AND TELECOMMUNICATION DIVISION
| No o | f Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|---|
| ACCOU | 2024-25 NTANT G | 2025-26 ENERAL P | Budget Estimate Rs AKISTAN REVENUES | Revised Estimate Rs | Budget Estimate Rs | |
| 016101- A03 | Operating Expenses | 12,100,000 | 2,394,000 | 11,100,000 | ||
| 016101- A032 | Communications | 1,000,000 | 750,000 | 1,000,000 | ||
| 016101- A038 | Travel & Transportation | 6,100,000 | 1,245,000 | 6,100,000 | ||
| 016101- A039 | General | 5,000,000 | 399,000 | 4,000,000 | ||
| 016101- A09 | Physical Assets | 5,400,000 | 200,000 | 6,400,000 | ||
| 016101- A092 | Computer Equipment | 4,400,000 | 5,400,000 | |||
| 016101- A097 | Purchase of Furniture and | Fixture | 1,000,000 | 200,000 | 1,000,000 | |
| 016101- A13 | Repairs and Maintenance | 1,000,000 | 1,000,000 | |||
| 016101- A137 | Computer Equipment | 1,000,000 | 1,000,000 | |||
| Total- ( | PROJECT MONITORING & TRANSFORMATION CELL KNOWLEDGE ECONOMY | DIGITAL INITIATIV | E) | 100,000,000 | 61,010,000 | 100,000,000 |
| IB2001 ONE PATIENT ONE ID | ||||||
| 016101- A01 | Employees Related Expenses | 29,044,000 | 16,681,000 | 21,854,000 | ||
| 016101- A011 | Pay | 12 | 12 | 29,044,000 | 16,681,000 | 21,854,000 |
| 016101- A011-1 | Pay of Officers | (4) | (4) | (20,644,000) | (16,681,000) | (11,774,000) |
| 016101- A011-2 | Pay of Other Staff | (8) | (8) | (8,400,000) | (10,080,000) | |
| 016101- A03 | Operating Expenses | 3,454,000 | 6,462,000 | 56,039,000 | ||
| 016101- A038 | Travel & Transportation | 1,100,000 | 100,000 | 6,839,000 | ||
| 016101- A039 | General | 2,354,000 | 6,362,000 | 49,200,000 | ||
| 016101- A09 | Physical Assets | 2,502,000 | 4,962,000 | 19,600,000 | ||
| 016101- A092 | Computer Equipment | 2,502,000 | 4,962,000 | 19,600,000 | ||
| Total- | ONE PATIENT ONE ID | 35,000,000 | 28,105,000 | 97,493,000 | ||
| IB2002 SMART | OFFICE ALL FEDERAL GOVERNMENT ORGANIZATION DEPARTMENT | |||||
| 016101- A01 | Employees Related Expenses | 28,200,000 | 26,720,000 | 26,623,000 | ||
| 016101- A011 | Pay | 21 | 21 | 28,200,000 | 26,720,000 | 26,623,000 |
| 016101- A011-1 | Pay of Officers | (15) | (15) | (26,300,000) | (24,820,000) | (24,687,000) |
| 016101- A011-2 | Pay of Other Staff | (6) | (6) | (1,900,000) | (1,900,000) | (1,936,000) |
| 016101- A03 | Operating Expenses | 2,800,000 | 615,000 | 15,807,000 | ||
| 016101- A038 | Travel & Transportation | 400,000 | 395,000 | 400,000 | ||
| 016101- A039 | General | 2,400,000 | 220,000 | 15,407,000 | ||
| 016101- A09 | Physical Assets | 269,000,000 | 105,330,000 | 157,570,000 |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS
AND TELECOMMUNICATION DIVISION
| No o | f Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|---|
| 2024-25 | 2025-26 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | ||
| 016101- A092 | ACCOU Computer Equipment | NTANT GENERAL P | AKISTAN REVENUES 269,000,000 | 105,330,000 | 157,570,000 | |
| Total- | SMART OFFICE ALL FEDE GOVERNMENT ORGANIZA DEPARTMENT | RAL TION | 300,000,000 | 132,665,000 | 200,000,000 | |
| IB2979 REVAMPING IT INDUSTRY LANDS | CAPE | |||||
| 016101- A01 | Employees Related Expenses | 140,175,000 | 57,663,000 | |||
| 016101- A011 | Pay | 62 | 33 | 140,175,000 | 57,663,000 | |
| 016101- A011-1 | Pay of Officers | (40) | (20) | (114,975,000) | (46,638,000) | |
| 016101- A011-2 | Pay of Other Staff | (22) | (13) | (25,200,000) | (11,025,000) | |
| 016101- A03 | Operating Expenses | 558,325,000 | 421,037,000 | |||
| 016101- A031 | Fees | 50,000,000 | ||||
| 016101- A032 | Communications | 7,517,000 | 1,500,000 | |||
| 016101- A033 | Utilities | 9,600,000 | ||||
| 016101- A034 | Occupancy Costs | 6,000,000 | ||||
| 016101- A037 | Consultancy and Contractual Work | 483,808,000 | 318,204,000 | |||
| 016101- A038 | Travel & Transportation | 14,733,000 | 2,000,000 | |||
| 016101- A039 | General | 42,667,000 | 43,333,000 | |||
| 016101- A09 | Physical Assets | 67,700,000 | 21,300,000 | |||
| 016101- A092 | Computer Equipment | 42,700,000 | 19,300,000 | |||
| 016101- A095 | Purchase of Transport | 15,000,000 | ||||
| 016101- A097 | Purchase of Furniture and | Fixture | 10,000,000 | 2,000,000 | ||
| 016101- A12 | Civil works | 33,333,000 | ||||
| 016101- A124 | Building and Structures | 33,333,000 | ||||
| 016101- A13 | Repairs and Maintenance | 467,000 | ||||
| 016101- A130 | Transport | 467,000 | ||||
| Total- | REVAMPING IT INDUSTRY | LANDSCAPE | 800,000,000 | 500,000,000 | ||
| IB3051 NATIONAL SEMICONDUCTOR HR | DEVELOPMENT PROGRAM (NSHRDP) PHASE-I | |||||
| 016101- A01 | Employees Related Expenses | 61,000,000 | 47,863,000 | |||
| 016101- A011 | Pay | 46 | 33 | 61,000,000 | 47,863,000 | |
| 016101- A011-1 | Pay of Officers | (45) | (32) | (60,000,000) | (47,338,000) | |
| 016101- A011-2 | Pay of Other Staff | (1) | (1) | (1,000,000) | (525,000) |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS
AND TELECOMMUNICATION DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 016101- A03 | Operating Expenses | 614,000,000 | 277,547,000 | |
| 016101- A032 | Communications | 1,000,000 | 499,000 | |
| 016101- A037 | Consultancy and Contractual Work | 273,048,000 | ||
| 016101- A038 | Travel & Transportation | 5,000,000 | 1,000,000 | |
| 016101- A039 | General | 608,000,000 | 3,000,000 | |
| 016101- A09 | Physical Assets | 125,000,000 | 174,590,000 | |
| 016101- A092 | Computer Equipment | 115,000,000 | 169,590,000 | |
| 016101- A097 | Purchase of Furniture and Fixture | 10,000,000 | 5,000,000 | |
| Total- | NATIONAL SEMICONDUCTOR HR DEVELOPMENT PROGRAM (NSHRDP) PHASE-I | 800,000,000 | 500,000,000 | |
| IB3494 TECHNOLOGY MARKETING EXPORT PROGRAM | ||||
| 016101- A02 | Project Pre-Investment Analysis | 184,875,000 | ||
| 016101- A021 | Feasibility Studies | 184,875,000 | ||
| Total- | TECHNOLOGY MARKETING EXPORT PROGRAM | 184,875,000 | ||
| IB3497 ESTABLISHMENT OF IT PARK KARACHI | ||||
| 016101- A01 | Employees Related Expenses | 50,000,000 | 16,875,000 | 50,000,000 |
| 016101- A011 | Pay 17 17 | 50,000,000 | 16,875,000 | 50,000,000 |
| 016101- A011-1 | Pay of Officers (9) (9) | (46,296,000) | (14,704,000) | (45,727,000) |
| 016101- A011-2 | Pay of Other Staff (8) (8) | (3,704,000) | (2,171,000) | (4,273,000) |
| 016101- A03 | Operating Expenses | 8,013,364,000 | 534,533,000 | 5,918,052,000 |
| 016101- A032 | Communications | 3,000,000 | 3,000,000 | |
| 016101- A033 | Utilities | 4,000,000 | 70,000 | 6,000,000 |
| 016101- A034 | Occupancy Costs | 153,000,000 | 52,348,000 | 362,734,000 |
| 016101- A037 | Consultancy and Contractual Work | 7,840,864,000 | 481,043,000 | 5,531,318,000 |
| 016101- A038 | Travel & Transportation | 4,000,000 | 494,000 | 3,000,000 |
| 016101- A039 | General | 8,500,000 | 578,000 | 12,000,000 |
| 016101- A09 | Physical Assets | 24,500,000 | 6,800,000 | 31,948,000 |
| 016101- A092 | Computer Equipment | 7,000,000 | 5,300,000 | 2,000,000 |
| 016101- A095 | Purchase of Transport | 9,500,000 | 17,948,000 | |
| 016101- A096 | Purchase of Plant and Machinery | 6,000,000 | 1,500,000 | 7,000,000 |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS AND TELECOMMUNICATION DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 ACCOUNTANT GENERAL | Budget Estimate Rs PAKISTAN REVENUES | Revised Estimate Rs | Budget Estimate Rs | |
| 016101- A097 | Purchase of Furniture and Fixture | 2,000,000 | 5,000,000 | |
| Total- | ESTABLISHMENT OF IT PARK KARACHI | 8,087,864,000 5 | 58,208,000 | 6,000,000,000 |
| (In Foreign Exchange) | (7,787,864,000) | (5,500,000,000) | ||
| (Foreign Aid) | (7,787,864,000) | (5,500,000,000) | ||
| (In Local Currency) | (300,000,000) (5 | 58,208,000) | (500,000,000) | |
| IB3859 GDPR- | _ DRIVEN ISO COMPLIANCE & IT EXPORTS EN | ______________________ HANCEMENT PROGRAM | _______________ | |
| 016101- A01 | Employees Related Expenses | 10,500,000 | ||
| 016101- A011 | Pay 4 | 10,500,000 | ||
| 016101- A011-1 | Pay of Officers (4) | (10,500,000) | ||
| 016101- A03 | Operating Expenses | 83,600,000 | ||
| 016101- A032 | Communications | 3,200,000 | ||
| 016101- A037 | Consultancy and Contractual Work | 69,100,000 | ||
| 016101- A038 | Travel & Transportation | 3,700,000 | ||
| 016101- A039 | General | 7,600,000 | ||
| 016101- A09 | Physical Assets | 5,900,000 | ||
| 016101- A092 | Computer Equipment | 3,400,000 | ||
| 016101- A097 | Purchase of Furniture and Fixture | 2,500,000 | ||
| Total- | GDPR- DRIVEN ISO COMPLIANCE & IT EXPORTS ENHANCEMENT PROGRAM | 100,000,000 | ||
| IB3860 NATIONAL ARTITICAL INTELLIGENCE (AI) ADVANCE | MENT INITIATIVE (NAAI) | |||
| 016101- A01 | Employees Related Expenses | 33,000,000 | ||
| 016101- A011 | Pay 21 | 33,000,000 | ||
| 016101- A011-1 | Pay of Officers (15) | (30,000,000) | ||
| 016101- A011-2 | Pay of Other Staff (6) | (3,000,000) | ||
| 016101- A03 | Operating Expenses | 45,500,000 | ||
| 016101- A032 | Communications | 500,000 | ||
| 016101- A037 | Consultancy and Contractual Work | 19,000,000 | ||
| 016101- A038 | Travel & Transportation | 5,700,000 | ||
| 016101- A039 | General | 20,300,000 | ||
| 016101- A05 | Grants, Subsidies and Write off Loans | 15,000,000 | ||
| 016101- A052 | Grants Domestic | 15,000,000 |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS
AND TELECOMMUNICATION DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 016101- A09 | Physical Assets | 6,500,000 | ||
| 016101- A092 | Computer Equipment | 5,500,000 | ||
| 016101- A097 | Purchase of Furniture and Fixture | 1,000,000 | ||
| Total- ( | NATIONAL ARTITICAL INTELLIGENCE AI) ADVANCEMENT INITIATIVE (NAAI) | 100,000,000 | ||
| IB3861 SMART | ISLAMABAD INITATIVE | |||
| 016101- A01 | Employees Related Expenses | 20,400,000 | ||
| 016101- A011 | Pay 37 | 20,400,000 | ||
| 016101- A011-1 | Pay of Officers (36) | (20,000,000) | ||
| 016101- A011-2 | Pay of Other Staff (1) | (400,000) | ||
| 016101- A03 | Operating Expenses | 64,507,000 | ||
| 016101- A032 | Communications | 33,800,000 | ||
| 016101- A033 | Utilities | 5,000,000 | ||
| 016101- A038 | Travel & Transportation | 4,000,000 | ||
| 016101- A039 | General | 21,707,000 | ||
| 016101- A09 | Physical Assets | 165,093,000 | ||
| 016101- A092 | Computer Equipment | 165,093,000 | ||
| Total- | SMART ISLAMABAD INITATIVE | 250,000,000 | ||
| IB9597 PRIME | MINISTER'S INITIATIVES SUPPORT FOR I.T STARTUPS AND VENTURE | CAPITAL | ||
| 016101- A01 | Employees Related Expenses | 55,305,000 | 105,817,000 | |
| 016101- A011 | Pay 37 | 55,233,000 | 104,287,000 | |
| 016101- A011-1 | Pay of Officers (29) | ( | 52,724,000) | (101,229,000) |
| 016101- A011-2 | Pay of Other Staff (8) | (2,509,000) | (3,058,000) | |
| 016101- A012 | Allowances | 72,000 | 1,530,000 | |
| 016101- A012-1 | Regular Allowances | (72,000) | (30,000) | |
| 016101- A012-2 | Other Allowances (Excluding TA) | (1,500,000) | ||
| 016101- A03 | Operating Expenses | 19,683,000 | 210,802,000 | |
| 016101- A032 | Communications | 20,000 | 24,000 | |
| 016101- A033 | Utilities | 2,700,000 | ||
| 016101- A034 | Occupancy Costs | 2,500,000 | 5,748,000 | |
| 016101- A037 | Consultancy and Contractual Work | 107,939,000 | ||
| 016101- A038 | Travel & Transportation | 3,877,000 | 13,250,000 |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS
AND TELECOMMUNICATION DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | |
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||
| 016101- A039 | General | 13,286,000 | 81,141,000 | |
| 016101- A05 | Grants, Subsidies and Write off Loans | 2,000,000,000 | 23,439,000 | 183,000,000 |
| 016101- A052 | Grants Domestic | 2,000,000,000 | 23,439,000 | 183,000,000 |
| 016101- A09 | Physical Assets | 705,000 | 311,000 | |
| 016101- A092 | Computer Equipment | 705,000 | 311,000 | |
| 016101- A13 | Repairs and Maintenance | 70,000 | ||
| 016101- A131 | Machinery and Equipment | 20,000 | ||
| 016101- A137 | Computer Equipment | 50,000 | ||
| Total- | PRIME MINISTER'S INITIATIVES SUPPORT FOR I.T STARTUPS AND VENTURE CAPITAL | 2,000,000,000 | 99,132,000 | 500,000,000 |
| ID8130 TECHNOLOGY PARKS DEVELOPMENT PROJECTS A | T ISLAMABAD PHASE-I | |||
| 016101- A01 | Employees Related Expenses | 29,423,000 | 23,135,000 | 30,267,000 |
| 016101- A011 | Pay 10 10 | 29,423,000 | 23,135,000 | 30,267,000 |
| 016101- A011-1 | Pay of Officers (6) | (27,466,000) | (21,178,000) | (28,067,000) |
| 016101- A011-2 | Pay of Other Staff (4) | (1,957,000) | (1,957,000) | (2,200,000) |
| 016101- A03 | Operating Expenses | 10,595,162,000 | 7,671,510,000 | 4,872,933,000 |
| 016101- A032 | Communications | 425,000 | 399,000 | 430,000 |
| 016101- A033 | Utilities | 3,350,000 | 7,401,000 | 50,842,000 |
| 016101- A034 | Occupancy Costs | 548,502,000 | 949,642,000 | 277,328,000 |
| 016101- A037 | Consultancy and Contractual Work | 10,040,785,000 | 6,712,516,000 | 4,541,333,000 |
| 016101- A038 | Travel & Transportation | 600,000 | 600,000 | 1,500,000 |
| 016101- A039 | General | 1,500,000 | 952,000 | 1,500,000 |
| 016101- A09 | Physical Assets | 4,600,000 | 3,200,000 | |
| 016101- A092 | Computer Equipment | 4,000,000 | 2,000,000 | |
| 016101- A095 | Purchase of Transport | 200,000 | 1,000,000 | |
| 016101- A096 | Purchase of Plant and Machinery | 200,000 | 100,000 | |
| 016101- A097 | Purchase of Furniture and Fixture | 200,000 | 100,000 | |
| 016101- A13 | Repairs and Maintenance | 1,600,000 | 546,000 | 1,600,000 |
| 016101- A130 | Transport | 200,000 | 200,000 | 200,000 |
| 016101- A131 | Machinery and Equipment | 500,000 | 500,000 | |
| 016101- A132 | Furniture and Fixture | 200,000 | 52,000 | 200,000 |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS AND TELECOMMUNICATION DIVISION
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||
| 016101- A133 | Buildings and Structure | 200,000 | 200,000 | |
| 016101- A137 | Computer Equipment | 500,000 | 294,000 | 500,000 |
| Total- | TECHNOLOGY PARKS DEVELOPMENT PROJECTS AT ISLAMABAD PHASE-I | 10,630,785,000 | 7,695,191,000 | 4,908,000,000 |
| (In Foreign Exchange) | (10,030,785,000) | (4,408,000,000) | ||
| (Foreign Aid) | (10,030,785,000) | (4,408,000,000) | ||
| (In Local Currency) | (600,000,000) | (7,695,191,000) | (500,000,000) | |
| 016101 | _ Total- Administration | _________________ 23,108,649,000 | _________________ 9,126,870,000 | _______________ 13,255,493,000 |
| 016120 OTHER IB0283 CYBER | S : SECURITY DIGITAL PAKISTAN PHASE-I N-12 | |||
| 016120- A01 | Employees Related Expenses | 168,000,000 | 59,900,000 | 93,500,000 |
| 016120- A011 | Pay 57 57 | 157,000,000 | 56,000,000 | 92,000,000 |
| 016120- A011-1 | Pay of Officers (49) (49) | (150,000,000) | (54,000,000) | (85,000,000) |
| 016120- A011-2 | Pay of Other Staff (8) (8) | (7,000,000) | (2,000,000) | (7,000,000) |
| 016120- A012 | Allowances | 11,000,000 | 3,900,000 | 1,500,000 |
| 016120- A012-1 | Regular Allowances | (11,000,000) | (3,900,000) | (1,500,000) |
| 016120- A03 | Operating Expenses | 241,000,000 | 61,300,000 | 59,000,000 |
| 016120- A031 | Fees | 5,000,000 | 2,000,000 | 1,500,000 |
| 016120- A032 | Communications | 15,000,000 | 3,500,000 | 3,000,000 |
| 016120- A033 | Utilities | 32,000,000 | 13,000,000 | 5,000,000 |
| 016120- A038 | Travel & Transportation | 45,000,000 | 8,000,000 | 8,000,000 |
| 016120- A039 | General | 144,000,000 | 34,800,000 | 41,500,000 |
| 016120- A09 | Physical Assets | 425,000,000 | 149,604,000 | 85,000,000 |
| 016120- A092 | Computer Equipment | 425,000,000 | 149,604,000 | 83,000,000 |
| 016120- A096 | Purchase of Plant and Machinery | 1,000,000 | ||
| 016120- A097 | Purchase of Furniture and Fixture | 1,000,000 | ||
| 016120- A12 | Civil works | 146,000,000 | 253,000,000 | 2,000,000 |
| 016120- A124 | Building and Structures | 146,000,000 | 253,000,000 | 2,000,000 |
| 016120- A13 | Repairs and Maintenance | 20,000,000 | 2,334,000 | 10,500,000 |
| 016120- A130 | Transport | 3,000,000 | 500,000 | 500,000 |
| 016120- A131 | Machinery and Equipment | 7,000,000 | 1,834,000 | 4,000,000 |
| 016120- A132 | Furniture and Fixture | 1,000,000 | ||
| 016120- A133 | Buildings and Structure | 10,000,000 | 2,000,000 | |
| 016120- A137 | Computer Equipment | 3,000,000 | ||
| Total- | CYBER SECURITY DIGITAL PAKISTAN PHASE-I N-12 | 1,000,000,000 | 526,138,000 | 250,000,000 |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS
AND TELECOMMUNICATION DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| IB5471 EXPAN | 2024-25 2025-26 ACCOUNTANT GENERAL SION OF GPON FTTH SERVICE IN NEW AND | Budget Estimate Rs PAKISTAN REVENUES EXISTING CITIES (SCO) | Revised Estimate Rs | Budget Estimate Rs |
| 016120- A12 | Civil works | 169,212,000 | 163,959,000 | |
| 016120- A126 | Telecommunication Works | 169,212,000 | 163,959,000 | |
| Total- | EXPANSION OF GPON FTTH SERVICE IN NEW AND EXISTING CITIES (SCO) | 169,212,000 | 163,959,000 | |
| IB5474 DIGITAL ECONOMY ENHANCEMENT PROJECT (WB | FUNDED) | |||
| 016120- A01 | Employees Related Expenses | 115,000,000 | 5,000,000 | 75,000,000 |
| 016120- A011 | Pay 42 13 | 115,000,000 | 5,000,000 | 75,000,000 |
| 016120- A011-1 | Pay of Officers (39) (13) | (113,000,000) | (5,000,000) | (75,000,000) |
| 016120- A011-2 | Pay of Other Staff (3) | (2,000,000) | ||
| 016120- A03 | Operating Expenses | 3,354,500,000 | 4,000,000 | 1,876,000,000 |
| 016120- A032 | Communications | 2,000,000 | 2,000,000 | |
| 016120- A036 | Motor Vehicles | 1,000,000 | ||
| 016120- A037 | Consultancy and Contractual Work | 3,327,000,000 | 4,000,000 | 1,780,000,000 |
| 016120- A038 | Travel & Transportation | 8,000,000 | 13,000,000 | |
| 016120- A039 | General | 16,500,000 | 81,000,000 | |
| 016120- A09 | Physical Assets | 30,000,000 | 20,000,000 | |
| 016120- A092 | Computer Equipment | 13,000,000 | 13,000,000 | |
| 016120- A095 | Purchase of Transport | 10,000,000 | ||
| 016120- A097 | Purchase of Furniture and Fixture | 7,000,000 | 7,000,000 | |
| 016120- A13 | Repairs and Maintenance | 500,000 | 1,000,000 | |
| 016120- A130 | Transport | 100,000 | ||
| 016120- A137 | Computer Equipment | 400,000 | 1,000,000 | |
| Total- | DIGITAL ECONOMY ENHANCEMENT PROJECT (WB FUNDED) | 3,500,000,000 | 9,000,000 | 1,972,000,000 |
| (In Foreign Exchange) | (3,500,000,000) | (1,972,000,000) | ||
| (Foreign Aid) | (3,500,000,000) | (1,972,000,000) | ||
| (In Local Currency) | (9,000,000) | |||
| 016120 | _ Total- OTHERS | _____________________ 4,669,212,000 | _____________ 699,097,000 | _______________ 2,222,000,000 |
| 0161 | Total- Basic Research | 27,777,861,000 9 | ,825,967,000 | 15,477,493,000 |
| 016 | Total- Basic Research | 27,777,861,000 9 | ,825,967,000 | 15,477,493,000 |
| 01 | Total- General Public Service | 27,777,861,000 9 | ,825,967,000 | 15,477,493,000 |
04 Economic Affairs: 046 Communications: 0461 Communications: 046103 Telegraph and Telephone : IB0274 HYBRID POWER SOLUTION (SOLARIZATION) FOR REMOTE SITES OF SCO IN AJK 046103- A12 Civil works 221,042,000 218,402,000
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS
AND TELECOMMUNICATION DIVISION
| No of Posts 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|
| 2024-25 2025-26 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVEN | UES | ||
| 046103- A126 | Telecommunication Works 221,042,000 | 218,402,000 | |
| Total- | HYBRID POWER SOLUTION 221,042,000 | 218,402,000 | |
| IB0275 HYBRI | (SOLARIZATION) FOR REMOTE SITES OF SCO IN AJK D POWER SOLUTION (SOLARIZATION) FOR REMOTE SITES OF S | CO IN GB | |
| 046103- A12 | Civil works 206,097,000 | 200,667,000 | |
| 046103- A126 | Telecommunication Works 206,097,000 | 200,667,000 | |
| Total- IB2977 EXPAN | HYBRID POWER SOLUTION (SOLARIZATION) FOR REMOTE SITES OF SCO IN GB 206,097,000 SION OF CELLULAR SERVICES IN AJ&K AND GB PHASE-IV | 200,667,000 | |
| 046103- A12 | Civil works 194,000,000 | 198,125,000 | 500,000,000 |
| 046103- A126 | Telecommunication Works 194,000,000 | 198,125,000 | 500,000,000 |
| Total- | EXPANSION OF CELLULAR SERVICES IN AJ&K AND GB PHASE-IV 194,000,000 | 198,125,000 | 500,000,000 |
| IB2978 NGMS | CORE UP-GRADATION | ||
| 046103- A12 | Civil works 100,000,000 | 212,636,000 | 250,000,000 |
| 046103- A126 | Telecommunication Works 100,000,000 | 212,636,000 | 250,000,000 |
| Total- | NGMS CORE UP-GRADATION 100,000,000 | 212,636,000 | 250,000,000 |
| IB9337 EXPAN | SION OF GPON FTTH SERVICES IN ELEVEN NEW & EXISTING CITIES PHASE-IV | ||
| 046103- A12 | Civil works 200,000,000 | 402,417,000 | |
| 046103- A126 | Telecommunication Works 200,000,000 | 402,417,000 | |
| Total- | EXPANSION OF GPON FTTH SERVICES IN ELEVEN NEW & EXISTING CITIES PHASE-IV 200,000,000 | 402,417,000 | |
| 046103 | Total- Telegraph and Telephone 921,139,000 | 1,232,247,000 | 750,000,000 |
| 0461 | Total- Communications 921,139,000 | 1,232,247,000 | 750,000,000 |
| 046 | 921,139,000 Total- Communications | 1,232,247,000 | 750,000,000 |
| 04 | 921,139,000 Total- Economic Affairs | 1,232,247,000 | 750,000,000 |
| Total- ACCOUNTANT GENERAL 28,699,000,000 PAKISTAN REVENUES | 11,058,214,000 | 16,227,493,000 | |
| (21,318,649,000) (In Foreign Exchange) | (11,880,000,000) | ||
| (Own Resources) | |||
| (21,318,649,000) (Foreign Aid) | (11,880,000,000) | ||
| (In Local Currency) (7,380,351,000) | (11,058,214,000) | (4,347,493,000) |
NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY DEMANDS FOR GRANTS
AND TELECOMMUNICATION DIVISION
| No of 2024-25 Posts 2025-26 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
|---|---|---|---|
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | |||
| 01 Gener | al Public Service: | ||
| 016 Basic | Research: | ||
| 0161 Basic 016101 ADMIN | Research: ISTRATION : | ||
| LO1404 CRIME | ANALYTICS AND SMART POLICING IN PAKISTAN | ||
| 016101- A05 | Grants, Subsidies and Write off Loans 80,000,000 | 80,000,000 | |
| 016101- A052 | Grants Domestic 80,000,000 | 80,000,000 | |
| Total- | CRIME ANALYTICS AND SMART POLICING IN PAKISTAN 80,000,000 | 80,000,000 | |
| LO3116 BLENDED VIRTUAL EDUCATION PROJECT FOR KNOWLEDGE ECONOMY | |||
| 016101- A01 | Employees Related Expenses 30,000,000 | 7,911,000 | |
| 016101- A011 | Pay 1168 29,000,000 | 7,911,000 | |
| 016101- A011- | 1 Pay of Officers (66) (16,500,000) | (4,337,000) | |
| 016101- A011- | 2 Pay of Other Staff (1102) (12,500,000) | (3,574,000) | |
| 016101- A012 | Allowances 1,000,000 | ||
| 016101- A012- | 2 Other Allowances (Excluding TA) (1,000,000) | ||
| 016101- A03 | Operating Expenses 29,250,000 | 380,000 | |
| 016101- A036 | Motor Vehicles 550,000 | 350,000 | |
| 016101- A038 | Travel & Transportation 1,500,000 | 30,000 | |
| 016101- A039 | General 27,200,000 | ||
| 016101- A09 | Physical Assets 90,500,000 | ||
| 016101- A092 | Computer Equipment 90,500,000 | ||
| 016101- A13 | Repairs and Maintenance 250,000 | ||
| 016101- A132 | Furniture and Fixture 100,000 | ||
| 016101- A137 | Computer Equipment 150,000 | ||
| Total- | BLENDED VIRTUAL EDUCATION PROJECT FOR KNOWLEDGE ECONOMY 150,000,000 | 8,291,000 | |
| 016101 | Total- Administration 230,000,000 | 88,291,000 | |
| 0161 | Total- Basic Research 230,000,000 | 88,291,000 | |
| 016 | Total- Basic Research 230,000,000 | 88,291,000 | |
| 01 | Total- General Public Service 230,000,000 | 88,291,000 | |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 230,000,000 SUB-OFFICE, LAHORE | 88,291,000 | ||
| 28,929,000,000 TOTAL - DEMAND | 11,146,505,000 | 16,227,493,000 | |
| (21,318,649,000) (In Foreign Exchange) | (11,880,000,000) | ||
| (Own Resources) | |||
| (Foreign Aid) (21,318,649,000) | (11,880,000,000) | ||
| (In Local Currency) (7,610,351,000) _________________ | (11,146,505,000) _________________ | (4,347,493,000) ________________ |
SECTION XIII
MINISTRY OF INTERIOR AND NARCOTICS CONTROL
* 2025-2026 Budget Estimate (Rupees in Thousand)
| Demand presented on behalf of the Ministry of Interior and | ||
|---|---|---|
| Narcotics Control | ||
| Development Expenditure on Revenue Account. | ||
| 114. Development Expenditure of Interior | 12,908,444 | |
| and Narcotics Control Division | ||
| Total : | 12,908,444 |
NO. 114.- DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS CONTROL DEMANDS FOR GRANTS DIVISION
DEMAND NO. 114 ( FC22D23 )
DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS CONTROL DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other Expenses of the DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS CONTROL DIVISION.
Voted Rs. 12,908,444,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF INTERIOR AND NARCOTICS CONTROL .
| FUNCTIONAL CLASSIFICATION | 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | |
|---|---|---|---|---|
| 011 | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs | 50,000,000 | ||
| 015 | General Services | 84,999,000 | 2,589,700,000 | |
| 019 | General Public Service Not Elsewhere Defined | 250,000,000 | 279,370,000 | 377,204,000 |
| 032 | Police | 780,592,000 | 1,606,342,000 | 794,671,000 |
| 042 | Agriculture,Food,Irrigation,Forestry and Fishing | 50,000,000 | 50,000,000 | 40,296,000 |
| 045 | Construction and Transport | 1,154,234,000 | 3,168,358,000 | 1,380,951,000 |
| 062 | Community Development | 6,835,174,000 | 4,830,141,000 | 7,675,622,000 |
| Total | 9,070,000,000 | 10,019,210,000 | 12,908,444,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 246,622,000 | 170,105,000 | 138,091,000 |
| A011 | Pay | 234,348,000 | 168,205,000 | 129,694,000 |
| A011-1 | Pay of Officers | (88,932,000) | (55,719,000) | (70,090,000) |
| A011-2 | Pay of Other Staff | (145,416,000) | (112,486,000) | (59,604,000) |
| A012 | Allowances | 12,274,000 | 1,900,000 | 8,397,000 |
| A012-1 | Regular Allowances | (12,050,000) | (1,900,000) | (6,700,000) |
| A012-2 | Other Allowances (Excluding TA) | (224,000) | (1,697,000) | |
| A03 | Operating Expenses | 211,983,000 | 276,581,000 | 1,117,834,000 |
| A06 | Transfers | 400,000 | 500,000 | 2,000,000 |
| A09 | Physical Assets | 522,842,000 | 1,436,483,000 | 5,296,982,000 |
| A12 | Civil works | 6,496,810,000 | 7,114,240,000 | 5,903,737,000 |
| A13 | Repairs and Maintenance | 1,591,343,000 | 1,021,301,000 | 449,800,000 |
| Total | 9,070,000,000 | 10,019,210,000 | 12,908,444,000 | |
| (In Foreign Exchange) | (19,716,000) | (2,589,700,000) | ||
| (Own Resources) | (19,716,000) | |||
| (Foreign Aid) | (2,589,700,000) | |||
| (In Local Currency) | (9,050,284,000) _________________ | (10,019,210,000) __________________ | (10,318,744,000) _______________ |
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS CONTROL DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |||
|---|---|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | |||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||||
| 01 | General Public Service: | |||||
| 011 | Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs: | |||||
| 0111 | Executive and Legislative Organs: | |||||
| 011105 | District Administration : | |||||
| IB3902 | LAND | REVENUE RECORD MANAGEMENT SYSTEM IN ICT | ||||
| 011105 | - A09 | Physical Assets | 50,000,000 | |||
| 011105 | - A092 | Computer Equipment | 50,000,000 | |||
| Total- | LAND MANA | REVENUE RECORD GEMENT SYSTEM IN ICT | 50,000,000 | |||
| 0 | 11105 | Total- | District Administration | 50,000,000 | ||
| 0 | 111 | Total- | Executive and Legislative Organs | 50,000,000 | ||
| 0 | 11 | Total- | Executive & Legislative | 50,000,000 | ||
| Organs,Financial and Fiscal Affairs, External Affairs | ||||||
| 015 | General Services: | |||||
| 0154 | Other | General Services: | ||||
| 015420 | OTHERS : | |||||
| IB9983 | DIGITAL ECONOMY ENHANCEMENT PROJECT (DEEP) | |||||
| 015420 | - A03 | Operating Expenses | 84,999,000 | 563,174,000 | ||
| 015420 | - A039 | General | 84,999,000 | 563,174,000 | ||
| 015420 | - A09 | Physical Assets | 2,026,526,000 | |||
| 015420 | - A092 | Computer Equipment | 2,011,526,000 | |||
| 015420 | - A098 | Purchase of Other Assets | 15,000,000 | |||
| Total- | DIGITAL ECONOMY ENHANCEMENT PROJECT (DEEP) | 84,999,000 | 2,589,700,000 | |||
| (In Foreign Exchange) | (2,589,700,000) | |||||
| (Foreign Aid) | (2,589,700,000) | |||||
| (In Local Currency) | (84,999,000) | |||||
| 0 | 15420 | Total- | ______ OTHERS | _____________ 84,999,000 | _______________ 2,589,700,000 | |
| 0 | 154 | Total- | Other General Services | 84,999,000 | 2,589,700,000 | |
| 0 | 15 | Total- | General Services | 84,999,000 | 2,589,700,000 |
019 General Public Service Not Elsewhere Defined: 0191 Gen Public Service Not Elsewhere Defined: 019102 Administrative Research :
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS
CONTROL DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| IB2043 REVAMPING | ACCOUNTANT GENERAL P OF CYBER CRIMES WING FIA | AKISTAN REVENUES | |||
| 019102- A09 | Physical Assets | 100,000,000 | |||
| 019102- A092 | Computer Equipment | 100,000,000 | |||
| Total- | REVA FIA | MPING OF CYBER CRIMES WING | 100,000,000 | ||
| IB2044 INTEGRATED | BORDER MANAGEMENT SYSTEM-II | ||||
| 019102- A01 | Employees Related Expenses | 35,750,000 | 15,120,000 | ||
| 019102- A011 | Pay | 62 | 35,750,000 | 15,120,000 | |
| 019102- A011-1 | Pay | of Officers (30) | (25,150,000) | (14,620,000) | |
| 019102- A011-2 | Pay | of Other Staff (32) | (10,600,000) | (500,000) | |
| 019102- A03 | Operating Expenses | 9,050,000 | 9,912,000 | ||
| 019102- A038 | Travel & Transportation | 8,600,000 | 7,450,000 | ||
| 019102- A039 | General | 450,000 | 2,462,000 | ||
| 019102- A06 | Transfers | 300,000 | 500,000 | ||
| 019102- A061 | Scholarship | 300,000 | 500,000 | ||
| 019102- A09 | Physical Assets | 104,500,000 | 253,438,000 | 377,204,000 | |
| 019102- A092 | Computer Equipment | 98,000,000 | 187,988,000 | 377,204,000 | |
| 019102- A095 | Purchase of Transport | 100,000 | |||
| 019102- A096 | Purchase of Plant and Machinery | 6,400,000 | 65,450,000 | ||
| 019102- A13 | Repairs and Maintenance | 400,000 | 400,000 | ||
| 019102- A130 | Transport | 200,000 | 200,000 | ||
| 019102- A131 | Machinery and Equipment | 200,000 | 200,000 | ||
| Total- | INTEGRATED BORDER MANAGEMENT SYSTEM-II | 150,000,000 | 279,370,000 | 377,204,000 | |
| 019102 | Total- | Administrative Research | 250,000,000 | 279,370,000 | 377,204,000 |
| 0191 | Total- | Gen Public Service Not Elsewhere Defined | 250,000,000 | 279,370,000 | 377,204,000 |
| 019 | Total- | General Public Service Not Elsewhere Defined | 250,000,000 | 279,370,000 | 377,204,000 |
| 01 | Total- | General Public Service | 250,000,000 | 364,369,000 | 3,016,904,000 |
03 Public Order And Safety Affairs: 032 Police: 0321 Police:
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS
CONTROL DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| 032109 Immigr IB0777 CONSTR | ACCOUNTANT GENERAL PA ation and Passport : UCTION OF 13 REGIONAL PASSPORT OFFICE | KISTAN REVENUES S IN SINDH PROVINCE | ||
| 032109- A12 | Civil works | 108,652,000 | 368,671,000 | |
| 032109- A124 | Building and Structures | 108,652,000 | 368,671,000 | |
| Total- | CONSTRUCTION OF 13 REGIONAL PASSPORT OFFICES IN SINDH PROVINCE | 108,652,000 | 368,671,000 | |
| IB3435 NATIONAL FORENSICS AND CYBERCRIME AGENCY | ||||
| 032109- A01 | Employees Related Expenses | 10,500,000 | 4,680,000 | |
| 032109- A011 | Pay | 10,500,000 | 4,680,000 | |
| 032109- A011-1 | Pay of Officers | (5,500,000) | (4,680,000) | |
| 032109- A011-2 | Pay of Other Staff | (5,000,000) | ||
| 032109- A03 | Operating Expenses | 90,500,000 | 81,750,000 | |
| 032109- A032 | Communications | 10,500,000 | 2,200,000 | |
| 032109- A033 | Utilities | 30,000,000 | 6,000,000 | |
| 032109- A034 | Occupancy Costs | 10,000,000 | 150,000 | |
| 032109- A037 | Consultancy and Contractual Work | 40,000,000 | ||
| 032109- A038 | Travel & Transportation | 10,000,000 | 2,200,000 | |
| 032109- A039 | General | 30,000,000 | 31,200,000 | |
| 032109- A09 | Physical Assets | 44,000,000 | 991,943,000 | |
| 032109- A092 | Computer Equipment | 10,000,000 | 484,298,000 | |
| 032109- A094 | Other Stores and Stocks | 30,000,000 | 304,760,000 | |
| 032109- A095 | Purchase of Transport | 1,000,000 | 53,800,000 | |
| 032109- A097 | Purchase of Furniture and Fixture | 2,000,000 | 17,360,000 | |
| 032109- A098 | Purchase of Other Assets | 1,000,000 | 131,725,000 | |
| 032109- A12 | Civil works | 50,000,000 | 146,600,000 | |
| 032109- A124 | Building and Structures | 50,000,000 | 146,600,000 | |
| 032109- A13 | Repairs and Maintenance | 5,000,000 | 15,427,000 | |
| 032109- A130 | Transport | 1,000,000 | 2,000,000 | |
| 032109- A131 | Machinery and Equipment | 500,000 | 11,500,000 | |
| 032109- A132 | Furniture and Fixture | 2,000,000 | ||
| 032109- A133 | Buildings and Structure | 1,927,000 |
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS
CONTROL DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| 032109- A137 | Computer Equipment | 1,500,000 | ||
|---|---|---|---|---|
| Total- | NATIONAL FORENSICS AND CYBERCRIME AGENCY | 200,000,000 | 1,240,400,000 | |
| IB3613 UPGRADATION OF BIOMETRIC IDENTIFICATION | SYSTEM FOR PASSPORT APPLICATION | |||
| 032109- A01 | Employees Related Expenses | 15,782,000 | 2,923,000 | 22,067,000 |
| 032109- A011 | Pay 10 | 15,782,000 | 2,923,000 | 20,370,000 |
| 032109- A011-1 | Pay of Officers (10) | (15,782,000) | (2,923,000) | (20,370,000) |
| 032109- A012 | Allowances | 1,697,000 | ||
| 032109- A012-2 | Other Allowances (Excluding TA) | (1,697,000) | ||
| 032109- A03 | Operating Expenses | 2,699,000 | 450,000 | 2,600,000 |
| 032109- A038 | Travel & Transportation | 1,100,000 | 1,100,000 | |
| 032109- A039 | General | 1,599,000 | 450,000 | 1,500,000 |
| 032109- A09 | Physical Assets | 126,519,000 | 56,628,000 | 165,333,000 |
| 032109- A092 | Computer Equipment | 126,519,000 | 56,628,000 | 165,333,000 |
| 032109- A12 | Civil works | 5,000,000 | 10,000,000 | |
| 032109- A124 | Building and Structures | 5,000,000 | 10,000,000 | |
| Total- | UPGRADATION OF BIOMETRIC IDENTIFICATION SYSTEM FOR PASSPORT APPLICATION | 150,000,000 | 60,001,000 | 200,000,000 |
IB3616 UPGRADATION OF 163 REGIONAL PASSPORT OFFICES AND MRP FACILITY AT 49 PAKISTAN MISSION ABROAD
| 032109- A01 | Employees Related Expenses | 2,240,000 | |
|---|---|---|---|
| 032109- A011 | Pay 8 | 2,016,000 | |
| 032109- A011-2 | Pay of Other Staff (8) | (2,016,000) | |
| 032109- A012 | Allowances | 224,000 | |
| 032109- A012-2 | Other Allowances (Excluding TA) | (224,000) | |
| 032109- A03 | Operating Expenses | 7,100,000 | 5,000,000 |
| 032109- A036 | Motor Vehicles | 5,100,000 | 5,000,000 |
| 032109- A038 | Travel & Transportation | 500,000 | |
| 032109- A039 | General | 1,500,000 | |
| 032109- A09 | Physical Assets | 33,483,000 | 34,353,000 |
| 032109- A092 | Computer Equipment | 28,125,000 | 28,671,000 |
| 032109- A096 | Purchase of Plant and Machinery | 2,358,000 | 2,358,000 |
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS
CONTROL DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 032109- A097 | Purchase of Furniture and Fixture | 3,000,000 | 3,324,000 | |
| 032109- A12 | Civil works | 71,000,000 | 73,631,000 | |
| 032109- A124 | Building and Structures | 71,000,000 | 73,631,000 | |
| 032109- A13 | Repairs and Maintenance | 900,000 | 1,740,000 | |
| 032109- A130 | Transport | 900,000 | 1,740,000 | |
| Total- | UPGRADATION OF 163 REGIONAL PASSPORT OFFICES AND MRP FACILITY AT 49 PAKISTAN MISSION ABROAD | 114,723,000 | 114,724,000 | |
| (In Foreign Exchange) | (19,716,000) | |||
| (Own Resources) | (19,716,000) | |||
| (In Local Currency) | (95,007,000) ( | 114,724,000) | ||
| IB3897 INTER | ___ NATIONAL STANDARD PURPOSE BUILD CONV | ___________________ ENTIONAL FORENSIC | ______________ S FACILITIES FO | ______________ R NFA |
| 032109- A01 | Employees Related Expenses | 10,000,000 | ||
| 032109- A011 | Pay | 10,000,000 | ||
| 032109- A011- | 1 Pay of Officers | (10,000,000) | ||
| 032109- A03 | Operating Expenses | 90,000,000 | ||
| 032109- A039 | General | 90,000,000 | ||
| Total- | INTERNATIONAL STANDARD PURPOSE BUILD CONVENTIONAL FORENSICS FACILITIES FOR NFA | 100,000,000 | ||
| 032109 | Total- Immigration and Passport | 573,375,000 1 | ,415,125,000 | 668,671,000 |
| 032110 Narcotics Control Administration : IB3896 CONSTRUCTION ADDICTION TREATMENT AND REHA | BILITATION CENTRE I | SLAMABAD | ||
| 032110- A12 | Civil works | 110,000,000 | ||
| 032110- A124 | Building and Structures | 110,000,000 | ||
| Total- | CONSTRUCTION ADDICTION TREATMENT AND REHABILITATION CENTRE ISLAMABAD | 110,000,000 | ||
| 032110 | Total- Narcotics Control Administration | 110,000,000 |
| NO. 114.- FC2 | 2D23 DEVELOPMENT EXPENDITURE OF INTER CONTROL DIVISION | IOR AND NARCOT | ICS DEMAND | S FOR GRANTS |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget | 2024-2025 Revised | 2025-2026 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB9383 ACQUI MAUVE AREA 032114 ANTI | ACCOUNTANT GENERAL P SITION OF LAND FOR CONSTRUCTION OF NAT G-11 TERRORISM : | AKISTAN REVENU IONAL COUNTER | ES TERRORISM AUTHO | RITY HQS |
| 032114- A12 | Civil works | 142,217,000 | 142,217,000 | |
| 032114- A124 | Building and Structures | 142,217,000 | 142,217,000 | |
| Total- | ACQUISITION OF LAND FOR CONSTRUCTION OF NATIONAL COUNTER TERRORISM AUTHORITY HQS MAUVE AREA G-11 | 142,217,000 | 142,217,000 | |
| 032114 | Total- ANTI TERRORISM | 142,217,000 | 142,217,000 | |
| 0321 | Total- Police | 715,592,000 | 1,557,342,000 | 778,671,000 |
| 032 | Total- Police | 715,592,000 | 1,557,342,000 | 778,671,000 |
| 03 | Total- Public Order And Safety Affairs | 715,592,000 | 1,557,342,000 | 778,671,000 |
| 04 Econo | mic Affairs: | |||
| 042 Agricu | lture,Food,Irrigation,Forestry and Fishing: | |||
| 0421 Agricu 042101 Admin IB9409 RAIN W | lture: istration/land commission : ATER HARVESTING IN RURAL AREA OF ICT I | SLAMABAD | ||
| 042101- A01 | Employees Related Expenses | 600,000 | 600,000 | 700,000 |
| 042101- A012 | Allowances | 600,000 | 600,000 | 700,000 |
| 042101- A012- | 1 Regular Allowances | (600,000) | (600,000) | (700,000) |
| 042101- A03 | Operating Expenses | 5,600,000 | 5,600,000 | 4,100,000 |
| 042101- A038 | Travel & Transportation | 800,000 | 800,000 | |
| 042101- A039 | General | 4,800,000 | 4,800,000 | 4,100,000 |
| 042101- A12 | Civil works | 43,800,000 | 43,800,000 | 35,496,000 |
| 042101- A124 | Building and Structures | 43,800,000 | 43,800,000 | 35,496,000 |
| Total- | RAIN WATER HARVESTING IN RURAL AREA OF ICT ISLAMABAD | 50,000,000 | 50,000,000 | 40,296,000 |
| 042101 | Total- Administration/land commission | 50,000,000 | 50,000,000 | 40,296,000 |
| 0421 | Total- Agriculture | 50,000,000 | 50,000,000 | 40,296,000 |
| 042 | Total- Agriculture,Food,Irrigation,Forestry and Fishing | 50,000,000 | 50,000,000 | 40,296,000 |
| 045 Const | ruction and Transport: | |||
| 0457 Const | ruction (Works): | |||
| 045702 Buildings and Structures : |
IB5002 ESTABLISHMENT OF LAND REVENUE RECORDS MANAGEMENT INFORMATION SYSTEM IN ICT 045702- A01 Employees Related Expenses 12,750,000
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS CONTROL DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A011 | Pay | 6,300,000 | ||
| 045702- A011-1 | Pay of Officers | (4,500,000) | ||
| 045702- A011-2 | Pay of Other Staff | (1,800,000) | ||
| 045702- A012 | Allowances | 6,450,000 | ||
| 045702- A012-1 | Regular Allowances | (6,450,000) | ||
| 045702- A03 | Operating Expenses | 12,750,000 | ||
| 045702- A032 | Communications | 2,400,000 | ||
| 045702- A033 | Utilities | 1,200,000 | ||
| 045702- A036 | Motor Vehicles | 450,000 | ||
| 045702- A038 | Travel & Transportation | 1,500,000 | ||
| 045702- A039 | General | 7,200,000 | ||
| 045702- A09 | Physical Assets | 4,200,000 | ||
| 045702- A092 | Computer Equipment | 3,000,000 | ||
| 045702- A095 | Purchase of Transport | 300,000 | ||
| 045702- A096 | Purchase of Plant and Machinery | 300,000 | ||
| 045702- A097 | Purchase of Furniture and Fixture | 600,000 | ||
| 045702- A13 | Repairs and Maintenance | 300,000 | ||
| 045702- A137 | Computer Equipment | 300,000 | ||
| Total- ESTABLISHMENT OF LAND REVENUE RECORDS MANAGEMENT | 30,000,000 | |||
| INFORMATION SYSTEM IN ICT | ||||
| IB5490 FOREIGN NATIONALS SECURITY CELL DASHBOARD | & ALLIED FACILITIES | |||
| 045702- A01 | Employees Related Expenses | 49,500,000 | 41,992,000 | 46,500,000 |
| 045702- A011 | Pay 41 | 49,000,000 | 41,992,000 | 46,500,000 |
| 045702- A011-1 | Pay of Officers (22) | (37,000,000) | (32,696,000) | (36,000,000) |
| 045702- A011-2 | Pay of Other Staff (19) | (12,000,000) | (9,296,000) | (10,500,000) |
| 045702- A012 | Allowances | 500,000 | ||
| 045702- A012-1 | Regular Allowances | (500,000) | ||
| 045702- A03 | Operating Expenses | 13,284,000 | 14,020,000 | 111,700,000 |
| 045702- A032 | Communications | 1,020,000 | 100,000 | |
| 045702- A038 | Travel & Transportation | 8,164,000 | 8,064,000 | 2,336,000 |
| 045702- A039 | General | 4,100,000 | 5,956,000 | 109,264,000 |
| NO. 11 | 4.- FC2 | 2D23 DEVELOPMENT EXPENDITURE OF INTER CONTROL DIVISION | IOR AND NARCOT | ICS DEMAN | DS FOR GRANTS |
|---|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 045702 | - A06 | Transfers | 100,000 | 2,000,000 | |
| 045702 | - A061 | Scholarship | 100,000 | 2,000,000 | |
| 045702 | - A09 | Physical Assets | 45,140,000 | 45,977,000 | 38,000,000 |
| 045702 | - A092 | Computer Equipment | 33,690,000 | 45,977,000 | 37,000,000 |
| 045702 | - A095 | Purchase of Transport | 10,950,000 | 500,000 | |
| 045702 | - A097 | Purchase of Furniture and Fixture | 500,000 | 500,000 | |
| 045702 | - A13 | Repairs and Maintenance | 1,650,000 | 177,000 | 1,800,000 |
| 045702 | - A130 | Transport | 100,000 | 200,000 | |
| 045702 | - A131 | Machinery and Equipment | 450,000 | 46,000 | 400,000 |
| 045702 | - A132 | Furniture and Fixture | 450,000 | 41,000 | 400,000 |
| 045702 | - A137 | Computer Equipment | 650,000 | 90,000 | 800,000 |
| Total- | FOREIGN NATIONALS SECURITY CELL DASHBOARD & ALLIED FACILITIES | 109,674,000 | 102,166,000 | 200,000,000 | |
| ID3671 | CONSTRUCTION OF MODEL PRISION IN SECTOR H-1 | 6 ISLAMABAD | |||
| 045702 | - A12 | Civil works | 500,000,000 | 1,324,218,000 | 1,180,951,000 |
| 045702 | - A122 | Irrigation Works | 1,180,951,000 | ||
| 045702 | - A124 | Building and Structures | 500,000,000 | 1,324,218,000 | |
| Total- | CONSTRUCTION OF MODEL PRISION IN SECTOR H-16 ISLAMABAD | 500,000,000 | 1,324,218,000 | 1,180,951,000 | |
| 0 | 45702 | Total- Buildings and Structures | 639,674,000 | 1,426,384,000 | 1,380,951,000 |
| 0 | 457 | Total- Construction (Works) | 639,674,000 | 1,426,384,000 | 1,380,951,000 |
| 0 | 45 | Total- Construction and Transport | 639,674,000 | 1,426,384,000 | 1,380,951,000 |
| 0 | 4 | Total- Economic Affairs | 689,674,000 | 1,476,384,000 | 1,421,247,000 |
| 06 | Housing And Community Amenities: | ||||
| 062 | Community Development: | ||||
| 0621 | Urban | Development: | |||
| 062120 IB0651 | Others KORA | : NG RIVER & RAWAL LAKE WATER TREATMEN | T PLANT SIB | ||
| 062120 | - A12 | Civil works | 50,000,000 | 100,000,000 | |
| 062120 | - A124 | Building and Structures | 50,000,000 | 100,000,000 | |
| Total- | KORANG RIVER & RAWAL LAKE | 50,000,000 | 100,000,000 | ||
| WATER TREATMENT PLANT SIB |
| NO. 114.- FC2 | 2D23 DEVELOPMENT EXPENDITURE OF INTER CONTROL DIVISION | IOR AND NARCOTI | CS DEMANDS | FOR GRANTS |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget | 2024-2025 Revised | 2025-2026 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| ISLAMABAD I IB0773 BALAN | ACCOUNTANT GENERAL P NTERNATIONAL AIRPORT CE WORK FOR OPERATIONALIZATION OF ME | AKISTAN REVENUES TRO BUS FROM PESHAWAR MOR TO NE | W | |
| 062120- A12 | Civil works | 100,000,000 | 300,000,000 | 424,079,000 |
| 062120- A124 | Building and Structures | 100,000,000 | 300,000,000 | 424,079,000 |
| Total- | BALANCE WORK FOR | 100,000,000 | 300,000,000 | 424,079,000 |
| OPERATIONALIZATION OF METRO BUS FROM PESHAWAR MOR TO NEW ISLAMABAD INTERNATIONAL AIRPORT | ||||
| IB0775 ESTABLISHMENT OF CHANGE MANAGEMENT UNIT | WITHIN ICT POLICE | ISLAMABAD | ||
| 062120- A01 | Employees Related Expenses | 111,000,000 | 103,490,000 | 30,824,000 |
| 062120- A011 | Pay | 111,000,000 | 103,490,000 | 30,824,000 |
| 062120- A011- | 1 Pay of Officers | (1,000,000) | (800,000) | (720,000) |
| 062120- A011- | 2 Pay of Other Staff | (110,000,000) | (102,690,000) | (30,104,000) |
| 062120- A03 | Operating Expenses | 10,000,000 | 8,312,000 | |
| 062120- A034 | Occupancy Costs | 2,000,000 | ||
| 062120- A039 | General | 8,000,000 | 8,312,000 | |
| 062120- A09 | Physical Assets | 65,000,000 | 54,144,000 | 6,719,000 |
| 062120- A092 | Computer Equipment | 25,000,000 | 16,456,000 | 2,000 |
| 062120- A095 | Purchase of Transport | 15,542,000 | ||
| 062120- A096 | Purchase of Plant and Machinery | 20,000,000 | 20,000,000 | 1,717,000 |
| 062120- A097 | Purchase of Furniture and Fixture | 20,000,000 | 2,146,000 | 5,000,000 |
| 062120- A12 | Civil works | 97,174,000 | 97,174,000 | 14,000,000 |
| 062120- A124 | Building and Structures | 97,174,000 | 97,174,000 | 14,000,000 |
| 062120- A13 | Repairs and Maintenance | 2,000,000 | 635,000 | |
| 062120- A131 | Machinery and Equipment | 2,000,000 | 635,000 | |
| Total- | ESTABLISHMENT OF CHANGE | 285,174,000 | 263,755,000 | 51,543,000 |
| IB2206 CONST | MANAGEMENT UNIT WITHIN ICT POLICE ISLAMABAD RUCTION OF FLYOVER AND APPROACHES A | T RAILWAY LINE SI | HALA ISLAMABAD | |
| 062120- A12 | Civil works | 50,000,000 | ||
| 062120- A124 | Building and Structures | 50,000,000 | ||
| Total- | CONSTRUCTION OF FLYOVER AND APPROACHES AT RAILWAY LINE SIHALA ISLAMABAD | 50,000,000 |
| NO. 114.- FC2 | 2D23 DEVELOPMENT EXPENDITURE OF INTER CONTROL DIVISION | IOR AND NARCOTICS DEMAN | DS FOR GRANTS |
|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget 2024-2025 Revised | 2025-2026 Budget | |
| Estimate Estimate | Estimate | ||
| Rs Rs | Rs | ||
| IB2212 CONST | ACCOUNTANT GENERAL P RUCTION OF 10TH AVENUE ISLAMABAD | AKISTAN REVENUES | |
| 062120- A12 | Civil works | 400,000,000 627,088,000 | |
| 062120- A124 | Building and Structures | 400,000,000 627,088,000 | |
| Total- | CONSTRUCTION OF 10TH AVENUE ISLAMABAD | 400,000,000 627,088,000 | |
| IB5491 NATIONAL POLICE HOSPITAL ISLAMABAD | |||
| 062120- A12 | Civil works | 600,000,000 600,000,000 | 100,000,000 |
| 062120- A124 | Building and Structures | 600,000,000 600,000,000 | 100,000,000 |
| Total- | NATIONAL POLICE HOSPITAL ISLAMABAD | 600,000,000 600,000,000 | 100,000,000 |
| IB8796 EXPAN | SION OF SAFE CITY ISLAMABAD | ||
| 062120- A01 | Employees Related Expenses | 18,000,000 | |
| 062120- A011 | Pay | 18,000,000 | |
| 062120- A011- | 1 Pay of Officers | (3,000,000) | |
| 062120- A011- | 2 Pay of Other Staff | (15,000,000) | |
| 062120- A03 | Operating Expenses | 268,800,000 | |
| 062120- A032 | Communications | 500,000 | |
| 062120- A033 | Utilities | 15,000,000 | |
| 062120- A039 | General | 253,300,000 | |
| 062120- A09 | Physical Assets | 2,633,200,000 | |
| 062120- A092 | Computer Equipment | 2,609,200,000 | |
| 062120- A096 | Purchase of Plant and Machinery | 12,000,000 | |
| 062120- A097 | Purchase of Furniture and Fixture | 12,000,000 | |
| 062120- A13 | Repairs and Maintenance | 80,000,000 | |
| 062120- A131 | Machinery and Equipment | 10,000,000 | |
| 062120- A133 | Buildings and Structure | 70,000,000 | |
| Total- | EXPANSION OF SAFE CITY ISLAMABAD | 3,000,000,000 | |
| ID9450 CONST SERVANTS | RUCTION OF ADDITIONAL FAMILY SUITS FOR | THE MEMBERS OF PARLIAMENT INCLUDING 500 | |
| 062120- A12 | Civil works | 350,000,000 | |
| 062120- A124 | Building and Structures | 350,000,000 | |
| Total- | CONSTRUCTION OF ADDITIONAL | 350,000,000 | |
| FAMILY SUITS FOR THE MEMBERS OF PARLIAMENT INCLUDING 500 SERVANTS |
| NO. 114.- FC2 | 2D23 DEVELOPMENT EXPENDITURE OF INTE CONTROL DIVISION | RIOR AND NARCOTICS DEMAN | DS FOR GRANTS |
|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | ||
| 062120 | Total- Others | 1,835,174,000 1,790,843,000 | 3,675,622,000 |
| 0621 | Total- Urban Development | 1,835,174,000 1,790,843,000 | 3,675,622,000 |
| 0622 Rural | Development: | ||
| 062203 Integrated rural development programme : IB3276 PRODUCTIVITY ENHANCEMENT THROUGH THE INST IRRIGATION SYSTEMS ICT | ALLATION OF SOLAR POWERED HIGH EFFICIENCY | ||
| 062203- A01 | Employees Related Expenses | 1,300,000 | 1,500,000 |
| 062203- A012 | Allowances | 1,300,000 | 1,500,000 |
| 062203- A012- | 1 Regular Allowances | (1,300,000) | (1,500,000) |
| 062203- A03 | Operating Expenses | 5,538,000 | 15,460,000 |
| 062203- A032 | Communications | 100,000 | |
| 062203- A037 | Consultancy and Contractual Work | 700,000 | 9,800,000 |
| 062203- A038 | Travel & Transportation | 210,000 | 800,000 |
| 062203- A039 | General | 4,628,000 | 4,760,000 |
| 062203- A12 | Civil works | 150,000,000 45,662,000 | 133,040,000 |
| 062203- A122 | Irrigation Works | 45,662,000 | 133,040,000 |
| 062203- A125 | Other Works | 150,000,000 | |
| Total- | PRODUCTIVITY ENHANCEMENT | 150,000,000 52,500,000 | 150,000,000 |
| THROUGH THE INSTALLATION OF SOLAR POWERED HIGH EFFICIENCY IRRIGATION SYSTEMS ICT | |||
| IB3277 PC-1 F AREA ISLAMA | OR THE CONSTRUCTION OF POLICE STATION BAD | AND STAF APARTMENTS AT SUMBAL G-14 MAUVE | |
| 062203- A12 | Civil works | 200,000,000 | |
| 062203- A125 | Other Works | 200,000,000 | |
| Total- | PC-1 FOR THE CONSTRUCTION OF POLICE STATION AND STAF APARTMENTS AT SUMBAL G-14 MAUVE AREA ISLAMABAD | 200,000,000 | |
| IB3895 ISLAMABAD INFRASTRUCTURE DEVELOPMENT | |||
| 062203- A12 | Civil works | 2,000,000,000 |
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS
CONTROL DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 062203- A124 | Building and Structures | 2,000,000,000 | ||
| Total- | ISLAMABAD INFRASTRUCTURE DEVELOPMENT | 2,000,000,000 | ||
| IB9408 PROVISION AND INSTALLATION OF LIFT AT ICT AGRICULTURE COMPLEX | G-11/4 ISLAMABAD | |||
| 062203- A03 | Operating Expenses | 980,000 | ||
| 062203- A039 | General | 980,000 | ||
| 062203- A12 | Civil works | 16,000,000 | 12,000,000 | |
| 062203- A124 | Building and Structures | 16,000,000 | 12,000,000 | |
| Total- | PROVISION AND INSTALLATION OF | 16,000,000 | 12,980,000 | |
| LIFT AT ICT AGRICULTURE COMPLEX G-11/4 ISLAMABAD | ||||
| IB9411 WATE KALINGER U. | R SUPPLY SCHEMES MOHALLAH USMANIA & M C GOLRA | OHALLAH BILAL U.C | SARE-I- KHARBOZA AND | |
| 062203- A03 | Operating Expenses | 4,000,000 | 4,000,000 | 1,928,000 |
| 062203- A039 | General | 4,000,000 | 4,000,000 | 1,928,000 |
| 062203- A12 | Civil works | 88,000,000 | 37,593,000 | 49,000,000 |
| 062203- A125 | Other Works | 88,000,000 | 37,593,000 | 49,000,000 |
| Total- | WATER SUPPLY SCHEMES MOHALLAH USMANIA & MOHALLAH BILAL U.C SARE-I- KHARBOZA AND KALINGER U.C GOLRA | 92,000,000 | 41,593,000 | 50,928,000 |
| IB9412 REHABILITATION OF 5 RURAL ROADS FALLS IN ICT I | SLAMABAD | |||
| 062203- A03 | Operating Expenses | 6,000,000 | 6,000,000 | 4,823,000 |
| 062203- A039 | General | 6,000,000 | 6,000,000 | 4,823,000 |
| 062203- A12 | Civil works | 374,696,000 | 342,577,000 | 155,000,000 |
| 062203- A125 | Other Works | 374,696,000 | 342,577,000 | 155,000,000 |
| Total- | REHABILITATION OF 5 RURAL ROADS | 380,696,000 | 348,577,000 | 159,823,000 |
| IB9413 CONST | FALLS IN ICT ISLAMABAD RUCTION OF REVENUE CENTERS AT TARNOL | & SIHALA ICT ISLAMABAD | ||
| 062203- A03 | Operating Expenses | 6,000,000 | 6,000,000 | 8,472,000 |
| 062203- A039 | General | 6,000,000 | 6,000,000 | 8,472,000 |
| 062203- A12 | Civil works | 41,920,000 | 26,961,000 | 261,000,000 |
| 062203- A124 | Building and Structures | 41,920,000 | 26,961,000 | 261,000,000 |
| Total- | CONSTRUCTION OF REVENUE | 47,920,000 | 32,961,000 | 269,472,000 |
| CENTERS AT TARNOL & SIHALA ICT ISLAMABAD |
| NO. 114.- FC22 | D23 DEVELOPMENT EXPENDITURE OF INTER CONTROL DIVISION | IOR AND NARCOTICS | DEMAND | S FOR GRANTS |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget | 2024-2025 Revised | 2025-2026 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB9414 PROVIS | ACCOUNTANT GENERAL P ION OF DRINKING WATER FACILITIES IN 16 U | AKISTAN REVENUES .CS OF RURAL AREA | OF ICT ISLAMAB | AD |
| 062203- A01 | Employees Related Expenses | 8,500,000 | 8,500,000 | |
| 062203- A011 | Pay 26 | 4,000,000 | 4,000,000 | |
| 062203- A011-2 | Pay of Other Staff (26) | (4,000,000) | (4,000,000) | |
| 062203- A012 | Allowances | 4,500,000 | 4,500,000 | |
| 062203- A012-1 | Regular Allowances | (4,500,000) | (4,500,000) | |
| 062203- A03 | Operating Expenses | 5,000,000 | 5,000,000 | 5,000,000 |
| 062203- A039 | General | 5,000,000 | 5,000,000 | 5,000,000 |
| 062203- A12 | Civil works | 286,500,000 | 146,587,000 | 136,500,000 |
| 062203- A125 | Other Works | 286,500,000 | 146,587,000 | 136,500,000 |
| Total- | PROVISION OF DRINKING WATER | 300,000,000 | 151,587,000 | 150,000,000 |
| FACILITIES IN 16 U.CS OF RURAL AREA OF ICT ISLAMABAD | ||||
| IB9415 DESIGN | - CUM- CONSTRUCTION OF RETAINING WAL | LS AT TALHAR | ||
| 062203- A03 | Operating Expenses | 3,000,000 | 3,000,000 | |
| 062203- A039 | General | 3,000,000 | 3,000,000 | |
| 062203- A12 | Civil works | 62,226,000 | 62,226,000 | |
| 062203- A125 | Other Works | 62,226,000 | 62,226,000 | |
| Total- | DESIGN - CUM- CONSTRUCTION OF RETAINING WALLS AT TALHAR | 65,226,000 | 65,226,000 | |
| IB9416 CONSTRUCTION OF NULLAH/ R.C.C LINE AT SHAH P | UR U.C PHULGRAN | |||
| 062203- A12 | Civil works | 75,921,000 | 75,921,000 | |
| 062203- A125 | Other Works | 75,921,000 | 75,921,000 | |
| Total- | CONSTRUCTION OF NULLAH/ R.C.C LINE AT SHAH PUR U.C PHULGRAN | 75,921,000 | 75,921,000 | |
| IB9417 SEWERAGE SYSTEM AT BANI GALA | ||||
| 062203- A03 | Operating Expenses | 9,000,000 | ||
| 062203- A039 | General | 9,000,000 | ||
| 062203- A12 | Civil works | 400,000,000 | 246,460,000 | 291,000,000 |
| 062203- A125 | Other Works | 400,000,000 | 246,460,000 | 291,000,000 |
| Total- | SEWERAGE SYSTEM AT BANI GALA | 400,000,000 | 246,460,000 | 300,000,000 |
| NO. 114.- FC2 | 2D23 DEVELOPMENT EXPENDITURE OF INTERI CONTROL DIVISION | OR AND NARCOTI | CS DEMAND | S FOR GRANTS |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget | 2024-2025 Revised | 2025-2026 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB9418 CONST | ACCOUNTANT GENERAL PA RUCION OF NULLAH IN VILLAGE SHAH ALLAH | KISTAN REVENU DITTA | ES | |
| 062203- A12 | Civil works | 54,000,000 | 54,000,000 | |
| 062203- A125 | Other Works | 54,000,000 | 54,000,000 | |
| Total- | CONSTRUCION OF NULLAH IN VILLAGE | 54,000,000 | 54,000,000 | |
| IB9419 STREE | SHAH ALLAH DITTA T PAVEMENT AND NULLAH JABBA TOWN NEA | R KHANNA DAK ISLAMABAD | ||
| 062203- A12 | Civil works | 9,645,000 | 9,645,000 | |
| 062203- A125 | Other Works | 9,645,000 | 9,645,000 | |
| Total- | STREET PAVEMENT AND NULLAH | 9,645,000 | 9,645,000 | |
| JABBA TOWN NEAR KHANNA DAK ISLAMABAD | ||||
| IB9420 REHAB | ILITATION / UP-GRADATION OF INTERNAL ROA | DS IN 16 U.CS OF | RURAL AREA IN IC | T ISLAMABAD |
| 062203- A03 | Operating Expenses | 6,000,000 | 6,000,000 | 6,000,000 |
| 062203- A039 | General | 6,000,000 | 6,000,000 | 6,000,000 |
| 062203- A12 | Civil works | 694,000,000 | 408,135,000 | 194,000,000 |
| 062203- A125 | Other Works | 694,000,000 | 408,135,000 | 194,000,000 |
| Total- | REHABILITATION / UP-GRADATION OF | 700,000,000 | 414,135,000 | 200,000,000 |
| INTERNAL ROADS IN 16 U.CS OF RURAL AREA IN ICT ISLAMABAD | ||||
| IB9421 REHABILITATION OF GOLRA MORE TO LINK HAJI CAMP ROAD | ||||
| 062203- A03 | Operating Expenses | 4,000,000 | 4,000,000 | |
| 062203- A039 | General | 4,000,000 | 4,000,000 | |
| 062203- A12 | Civil works | 61,829,000 | 61,829,000 | |
| 062203- A125 | Other Works | 61,829,000 | 61,829,000 | |
| Total- | REHABILITATION OF GOLRA MORE TO LINK HAJI CAMP ROAD | 65,829,000 | 65,829,000 | |
| IB9422 REHABILITATION / UP-GRADATION OF KORANG ROAD BANI GALA | ||||
| 062203- A03 | Operating Expenses | 4,000,000 | 4,000,000 | 3,868,000 |
| 062203- A039 | General | 4,000,000 | 4,000,000 | 3,868,000 |
| 062203- A12 | Civil works | 97,000,000 | ||
| 062203- A125 | Other Works | 97,000,000 | ||
| 062203- A13 | Repairs and Maintenance | 199,820,000 | 98,951,000 |
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS
CONTROL DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| 062203- A136 | Roads, Highways and Bridges | 199,820,000 | 98,951,000 | |
|---|---|---|---|---|
| Total- | REHABILITATION / UP-GRADATION OF KORANG ROAD BANI GALA | 203,820,000 | 102,951,000 | 100,868,000 |
| IB9423 CONSTRUCTION OF RETAINING WALL AT PRINCE | ROAD | |||
| 062203- A03 | Operating Expenses | 5,000,000 | 5,000,000 | 1,987,000 |
| 062203- A039 | General | 5,000,000 | 5,000,000 | 1,987,000 |
| 062203- A12 | Civil works | 278,019,000 | 256,793,000 | 22,000,000 |
| 062203- A125 | Other Works | 278,019,000 | 256,793,000 | 22,000,000 |
| Total- | CONSTRUCTION OF RETAINING WALL | 283,019,000 | 261,793,000 | 23,987,000 |
| AT PRINCE ROAD | ||||
| IB9424 REHAB KHARBOOZA | ILITATION / UP-GRADATION OF LINK ROAD GOLRA | S TO VILLAGE JOHD | DHOK RAMAZANIA | SARA -I |
| 062203- A03 | Operating Expenses | 6,000,000 | 6,000,000 | 8,942,000 |
| 062203- A039 | General | 6,000,000 | 6,000,000 | 8,942,000 |
| 062203- A13 | Repairs and Maintenance | 813,242,000 | 531,300,000 | 273,000,000 |
| 062203- A136 | Roads, Highways and Bridges | 813,242,000 | 531,300,000 | 273,000,000 |
| Total- | REHABILITATION / UP-GRADATION OF LINK ROADS TO VILLAGE JOHD DHOK RAMAZANIA SARA -I KHARBOOZA GOLRA | 819,242,000 | 537,300,000 | 281,942,000 |
| IB9425 STRUC WHOLE SALE | TRAL REHABILITATION AND UP-GRADATION OF INFRASTRUCTURE OF FRUIT Y VEGETABLE | |||
| 062203- A03 | Operating Expenses | 6,000,000 | 6,000,000 | 6,000,000 |
| 062203- A039 | General | 6,000,000 | 6,000,000 | 6,000,000 |
| 062203- A12 | Civil works | 556,651,000 | 194,149,000 | 194,000,000 |
| 062203- A125 | Other Works | 556,651,000 | 194,149,000 | 194,000,000 |
| Total- | STRUCTRAL REHABILITATION AND | 562,651,000 | 200,149,000 | 200,000,000 |
| IB9426 REHAB | UP-GRADATION OF INFRASTRUCTURE OF FRUIT Y VEGETABLE WHOLE SALE ILITATION OF RURAL ROADS IN U.C GOLRA | SHARIF SHAH ALLAH DITTA & SARE -I- | KHARBOOZA | |
| 062203- A03 | Operating Expenses | 6,000,000 | 6,000,000 | 5,000,000 |
| 062203- A039 | General | 6,000,000 | 6,000,000 | 5,000,000 |
| 062203- A13 | Repairs and Maintenance | 568,031,000 | 372,671,000 | 95,000,000 |
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS
CONTROL DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| 062203- A136 | Roads, Highways and Bridges | 568,031,000 | 372,671,000 | 95,000,000 |
|---|---|---|---|---|
| Total- | REHABILITATION OF RURAL ROADS IN U.C GOLRA SHARIF SHAH ALLAH DITTA & SARE -I- KHARBOOZA | 574,031,000 | 378,671,000 | 100,000,000 |
| 062203 | Total- Integrated rural development programme | 5,000,000,000 | 3,039,298,000 | 4,000,000,000 |
| 0622 | Total- Rural Development | 5,000,000,000 | 3,039,298,000 | 4,000,000,000 |
| 062 | Total- Community Development | 6,835,174,000 | 4,830,141,000 | 7,675,622,000 |
| 06 | Total- Housing And Community Amenities | 6,835,174,000 | 4,830,141,000 | 7,675,622,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 8,490,440,000 | 8,228,236,000 | 12,892,444,000 | |
| (In Foreign Exchange) | (19,716,000) | (2,589,700,000) | ||
| (Own Resources) | (19,716,000) | |||
| (Foreign Aid) | (2,589,700,000) | |||
| (In Local Currency) | (8,470,724,000) | (8,228,236,000) | (10,302,744,000) |
NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS DEMANDS FOR GRANTS
CONTROL DIVISION
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | ||
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | |||||
| 03 | Public | Order And Safety Affairs: | |||
| 032 0321 | Police Police | : : | |||
| 032106 PR138 | Frontier Watch and Ward : 9 CONSTRUCTION OF OFFICERS AND TROOPS ACCO | MMODATION BOQ | WITH QUARTER GU | ARD | |
| 032106 | - A12 | Civil works | 65,000,000 | 49,000,000 | 16,000,000 |
| 032106 | - A122 | Irrigation Works | 16,000,000 | ||
| 032106 | - A124 | Building and Structures | 65,000,000 | 49,000,000 | |
| Total- | CONSTRUCTION OF OFFICERS AND TROOPS ACCOMMODATION BOQ WITH QUARTER GUARD | 65,000,000 | 49,000,000 | 16,000,000 | |
| 0 | 32106 | Total- Frontier Watch and Ward | 65,000,000 | 49,000,000 | 16,000,000 |
| 0 | 321 | Total- Police | 65,000,000 | 49,000,000 | 16,000,000 |
| 0 | 32 | Total- Police | 65,000,000 | 49,000,000 | 16,000,000 |
| 0 | 3 | Total- Public Order And Safety Affairs | 65,000,000 | 49,000,000 | 16,000,000 |
| 04 | Economic Affairs: | ||||
| 045 0457 045702 PR094 | Construction and Transport: Construction (Works): Building and Structures : 0 CONSTRUCTION OF 1 X WING HEADQUARTER AT A | HMEDWAM (SOUTH | WAZIRISTAN DISTRICT | ||
| 045702 | - A12 | Civil works | 277,280,000 | 277,280,000 | |
| 045702 | - A124 | Building and Structures | 277,280,000 | 277,280,000 | |
| Total- | CONSTRUCTION OF 1 X WING HEADQUARTER AT AHMEDWAM | 277,280,000 | 277,280,000 | ||
| PR094 | 2 CONS | (SOUTH WAZIRISTAN DISTRICT TRUCTION OF 1 X WING HEADQUARTER AT G | OMALZAM (SOUTH | WAZIRISTAN DISTRICT) | |
| 045702 | - A12 | Civil works | 237,280,000 | 237,280,000 | |
| 045702 | - A124 | Building and Structures | 237,280,000 | 237,280,000 | |
| Total- | CONSTRUCTION OF 1 X WING | 237,280,000 | 237,280,000 | ||
| HEADQUARTER AT GOMALZAM (SOUTH WAZIRISTAN DISTRICT) | |||||
| PR094 AND 2 | 9 REHA X | BILITATION OF EXISTING SOURCE TO DEVELO | P 0.5 MW THROUGH MINI HYDROPOWER PTOJECT | ||
| 045702 | - A12 | Civil works | 50,000,000 | ||
| 045702 | - A124 | Building and Structures | 50,000,000 | ||
| Total- | REHABILITATION OF EXISTING | 50,000,000 | |||
| SOURCE TO DEVELOP 0.5 MW THROUGH MINI HYDROPOWER PTOJECT AND 2 X |
| NO. 114.- FC2 | 2D23 DEVELOPMENT EXPENDITURE OF INTE CONTROL DIVISION | RIOR AND NARCO | TICS DEMAN | DS FOR GRANTS |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| Rs | Rs | Rs | ||
| PR0950 CONS | ACCOUNTANT GENERAL PAKISTAN RE TRUCTION OF 60 X WATER SUPPLY SCHEME | VENUES SUB-OFFICE, PESHAWAR IN TRIBAL DISTRICTS | ||
| 045702- A12 | Civil works | 226,250,000 | ||
| 045702- A124 | Building and Structures | 226,250,000 | ||
| Total- | CONSTRUCTION OF 60 X WATER SUPPLY SCHEME IN TRIBAL DISTRICTS | 226,250,000 | ||
| PR0952 CONS BAJAUR AND | TRUCTION OF 3 X 128 SINGLE MEN BARRACKS FOR SPECIAL | OPERATION COMPANIES IN KHYBER | ||
| 045702- A12 | Civil works | 149,868,000 | ||
| 045702- A124 | Building and Structures | 149,868,000 | ||
| Total- PR0953 CONS | CONSTRUCTION OF 3 X 128 SINGLE MEN BARRACKS FOR SPECIAL OPERATION COMPANIES IN KHYBER BAJAUR AND TRUCTION OF 5 MALE/FEMALE CHECK POST | S IN KHYBER/BAJ | 149,868,000 AUR TRIBLE DISTRI | CT |
| 045702- A12 | Civil works | 344,696,000 | ||
| 045702- A124 | Building and Structures | 344,696,000 | ||
| Total- | CONSTRUCTION OF 5 MALE/FEMALE CHECK POSTS IN KHYBER/BAJAUR TRIBLE DISTRICT | 344,696,000 | ||
| PR9997 CONSTRUCTION OF EIGHT(8) WOMEN FACILITIES IN TRIBAL DISTRIC | TS | |||
| 045702- A12 | Civil works | 456,600,000 | ||
| 045702- A124 | Building and Structures | 456,600,000 | ||
| Total- | CONSTRUCTION OF EIGHT(8) WOMEN FACILITIES IN TRIBAL DISTRICTS | 456,600,000 | ||
| 045702 | Total- Buildings and Structures | 514,560,000 | 1,741,974,000 | |
| 0457 | Total- Construction (Works) | 514,560,000 | 1,741,974,000 | |
| 045 | Total- Construction and Transport | 514,560,000 | 1,741,974,000 | |
| 04 | Total- Economic Affairs | 514,560,000 | 1,741,974,000 | |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | 579,560,000 | 1,790,974,000 | 16,000,000 | |
| TOTAL - DEMAND | 9,070,000,000 | 10,019,210,000 | 12,908,444,000 | |
| (In Foreign Exchange) | (19,716,000) | (2,589,700,000) | ||
| (Own Resources) | (19,716,000) | |||
| (Foreign Aid) | (2,589,700,000) | |||
| (In Local Currency) _ | (9,050,284,000) ________________ | (10,019,210,000) __________________ | (10,318,744,000) _______________ |
SECTION XIV
MINISTRY OF INTER-PROVINCIAL COORDINATION * Demand presented on behalf of the Ministry of Inter-Provincial Coordination Development Expenditure on Revenue Account. 2025-2026 Budget Estimate
| nted on behalf of the Ministry of l Coordination Expenditure on Revenue Account. | (Rupees in Thousand) | |
|---|---|---|
| 115. Development Expenditure of Inter-Provincial | 1,179,840 | |
| Coordination Division | ||
| Total : | 1,179,840 |
NO. 115.- DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL COORDINATION DEMANDS FOR GRANTS
DIVISION
DEMAND NO. 115 ( FC22D67 )
DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL COORDINATION DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 for DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL COORDINATION DIVISION.
Voted
Rs. 1,179,840,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF INTER-PROVINCIAL COORDINATION .
| 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 081 | Recreation and Sporting Services | 3,650,000,000 | 1,539,500,000 | 1,179,840,000 |
| Total | 3,650,000,000 | 1,539,500,000 | 1,179,840,000 | |
| OBJECT CLASSIFICATION | ||||
| A02 | Project Pre-Investment Analysis | 500,000,000 | ||
| A03 | Operating Expenses | 385,000,000 | ||
| A12 | Civil works | 3,150,000,000 | 1,154,500,000 | 1,179,840,000 |
| Total | 3,650,000,000 | 1,539,500,000 | 1,179,840,000 |
NO. 115.- FC22D67 DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL COORDINATION DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget | ||
| Estimate | Estimate | Estimate | |||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 08 | Recreation, Culture and Religion: | ||||
| 081 | Recreation and Sporting Services: | ||||
| 0811 | Recre | ational and Sporting Services: | |||
| 081101 | STADIUM AND SPORTS COMPLEXES : | ||||
| IB0295 MEGA | HIRING EVENT | OF FOREIGN COACHES FOR TRAINING OF NA S | TIONAL ATHLETE | S FOR PARTICIPATION IN THE | |
| 081101 | - A03 | Operating Expenses | 160,000,000 | ||
| 081101 | - A039 | General | 160,000,000 | ||
| 081101 | - A12 | Civil works | 160,000,000 | ||
| 081101 | - A124 | Building and Structures | 160,000,000 | ||
| Total- | HIRING OF FOREIGN COACHES FOR TRAINING OF NATIONAL ATHLETES FOR PARTICIPATION IN THE MEGA EVENTS | 160,000,000 | 160,000,000 | ||
| IB0296 AND L | CONST ANDSC | RUCTION REHABILITATION / REVAMPING OF APING | ROADS FOOTPATH | S MAIN GATE SECURITY SYSTEMS | |
| 081101 | - A12 | Civil works | 60,000,000 | 60,000,000 | |
| 081101 | - A124 | Building and Structures | 60,000,000 | 60,000,000 | |
| IB0297 | Total- REHAB | CONSTRUCTION REHABILITATION / REVAMPING OF ROADS FOOTPATHS MAIN GATE SECURITY SYSTEMS AND LANDSCAPING ILITATION /UP-GRADATION OF EXISTING FACI | 60,000,000 LITIES AT PSB CO | 60,000,000 ACHING CENTRE A | T KARACHI |
| 081101 | - A12 | Civil works | 180,000,000 | 87,000,000 | 70,000,000 |
| 081101 | - A124 | Building and Structures | 180,000,000 | 87,000,000 | 70,000,000 |
| Total- | REHABILITATION /UP-GRADATION OF | 180,000,000 | 87,000,000 | 70,000,000 | |
| EXISTING FACILITIES AT PSB COACHING CENTRE AT KARACHI | |||||
| IB0298 LIGHT | LAYING OF SYNTHETIC ATHLETIC TRACK / FOOTBAL S AT PSB COACHING | L GROUND SPRINKLING SYSTEM AND FLOOD | |||
| 081101 | - A12 | Civil works | 104,893,000 | 23,000,000 | 108,000,000 |
| 081101 | - A124 | Building and Structures | 104,893,000 | 23,000,000 | 108,000,000 |
| Total- | LAYING OF SYNTHETIC ATHLETIC TRACK / FOOTBALL GROUND | 104,893,000 | 23,000,000 | 108,000,000 | |
| SPRINKLING SYSTEM AND FLOOD LIGHTS AT PSB COACHING |
| NO. 115.- FC2 | 2D67 DEVELOPMENT EXPENDITURE OF INTER COORDINATION DIVISION | PROVINCIAL | DEMANDS | FOR GRANTS |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| Rs | Rs | Rs | ||
| IB2316 REHAB PREPARATIO | ACCOUNTANT GENERAL P ILITATION & UPGRADATION OF EXISTING FAC N /HOLDING | AKISTAN REVENUES ILITIES AT PSC ISLAMABAD FOR | ||
| 081101- A12 | Civil works | 312,083,000 | 280,000,000 | 53,105,000 |
| 081101- A124 | Building and Structures | 312,083,000 | 280,000,000 | 53,105,000 |
| Total- | REHABILITATION & UPGRADATION OF | 312,083,000 | 280,000,000 | 53,105,000 |
| IB3036 AIRCO | EXISTING FACILITIES AT PSC ISLAMABAD FOR PREPARATION /HOLDING NDITIONING OF LIAQUAT GYMNASIUM AT PAK | ISTAN SPORTS COMPLEX ISLAMABAD | ||
| 081101- A12 | Civil works | 250,000,000 | 250,000,000 | 108,000,000 |
| 081101- A124 | Building and Structures | 250,000,000 | 250,000,000 | 108,000,000 |
| Total- | AIRCONDITIONING OF LIAQUAT | 250,000,000 | 250,000,000 | 108,000,000 |
| GYMNASIUM AT PAKISTAN SPORTS COMPLEX ISLAMABAD | ||||
| IB3739 CONSTRUCTION OF PSB COACHING CENTRE AT SKARDU | ||||
| 081101- A12 | Civil works | 120,000,000 | 50,000,000 | |
| 081101- A124 | Building and Structures | 120,000,000 | 50,000,000 | |
| Total- | CONSTRUCTION OF PSB COACHING | 120,000,000 | 50,000,000 | |
| CENTRE AT SKARDU | ||||
| IB5285 REHAB | ILITATION / UPGRADATION OF EXISTING FACI | LITIES AT PSB COACHING CENTRE QUETTA | ||
| 081101- A12 | Civil works | 150,000,000 | ||
| 081101- A124 | Building and Structures | 150,000,000 | ||
| Total- | REHABILITATION / UPGRADATION OF | 150,000,000 | ||
| EXISTING FACILITIES AT PSB COACHING CENTRE QUETTA | ||||
| IB5286 CONSTRUCTION OF SWIMMING POOL AT PSB COACHING CENTRE AT KARACHI | ||||
| 081101- A12 | Civil works | 200,000,000 | ||
| 081101- A124 | Building and Structures | 200,000,000 | ||
| Total- | CONSTRUCTION OF SWIMMING POOL AT PSB COACHING CENTRE AT KARACHI | 200,000,000 |
NO. 115.- FC22D67 DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL DEMANDS FOR GRANTS
COORDINATION DIVISION
| No of Posts | 2024-2025 2024-2025 | 2025-2026 | |
|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate Revised Estimate | Budget Estimate | |
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| FACILITIES OF IB5290 PROVIDING AND INSTALLATION OF ELECTRONIC DIS | PLAYS AND SCORING SYSTEM AT DIFFERENT | ||
| 081101- A12 | Civil works | 735,394,000 6,000,000 | 150,000,000 |
| 081101- A124 | Building and Structures | 735,394,000 6,000,000 | 150,000,000 |
| Total- | PROVIDING AND INSTALLATION OF ELECTRONIC DISPLAYS AND SCORING SYSTEM AT DIFFERENT FACILITIES OF | 735,394,000 6,000,000 | 150,000,000 |
| IB5291 PROVI RESIDENTIAL | SION OF MISSING FACILITIES FOR SOUTH ASIAN GAMES VIZ WARM-UP TRACK HEAT | EXCHANGER | |
| 081101- A12 | Civil works | 388,429,000 225,000,000 | 200,000,000 |
| 081101- A124 | Building and Structures | 388,429,000 225,000,000 | 200,000,000 |
| Total- | PROVISION OF MISSING FACILITIES FOR SOUTH ASIAN GAMES VIZ WARM-UP TRACK HEAT EXCHANGER RESIDENTIAL | 388,429,000 225,000,000 | 200,000,000 |
| IB8788 CONST FAISALABAD | RUCTION OF MULTIPURPOSE SPORTS COMPLEX/COURTS AND TWO PEDAL COURTS | AT | |
| 081101- A12 | Civil works | 100,000,000 | |
| 081101- A124 | Building and Structures | 100,000,000 | |
| Total- | CONSTRUCTION OF MULTIPURPOSE | 100,000,000 | |
| IB8789 ESTAB | SPORTS COMPLEX/COURTS AND TWO PEDAL COURTS AT FAISALABAD LISHMENT OF ARSHAD NADEEM/SHEHBAZ SH | ARIF HIGH PERFORMANCE SPORTS AC | ADEMY |
| 081101- A12 | Civil works | 300,000,000 | |
| 081101- A124 | Building and Structures | 300,000,000 | |
| Total- | ESTABLISHMENT OF ARSHAD NADEEM/SHEHBAZ SHARIF HIGH PERFORMANCE SPORTS ACADEMY | 300,000,000 | |
| IB9339 CONSTRUCTION OF 250 MINI SPORTS COMPLEXES ( | 50:50) (PC-II) | ||
| 081101- A02 | Project Pre-Investment Analysis | 500,000,000 | |
| 081101- A021 | Feasibility Studies | 500,000,000 | |
| Total- | CONSTRUCTION OF 250 MINI SPORTS COMPLEXES (50:50) (PC-II) | 500,000,000 | |
| ID6852 ESTABLISHMENT OF BIO MECHANICAL LAB AT PAKISTAN SPORTS COMPLEX ISLAMABAD | |||
| 081101- A12 | Civil works | 120,735,000 63,500,000 | 40,735,000 |