Details of Demands for Grants and Appropriations - Vol-IV (Development), part 7
The Details of Demands for Grants and Appropriations - Vol-IV (Development) is part of the federal budget for FY 2025-26. This page reproduces the text of its 671 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.
This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.
| NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
IB9581 CONSTRUCTION OF SEWERAGE SOLING RE-SOLING DRAIN AND SLUDGE CARRIER IN DIFFERENCT UCS
AND CONTONMENT
| 045702- A03 | Operating Expenses | 29,692,000 |
|---|---|---|
| 045702- A039 | General | 29,692,000 |
| 045702- A12 | Civil works | 456,808,000 |
| 045702- A124 | Building and Structures | 456,808,000 |
| Total- | CONSTRUCTION OF SEWERAGE | 486,500,000 |
| SOLING RE-SOLING DRAIN AND SLUDGE CARRIER IN DIFFERENCT UCS AND CONTONMENT | ||
| IB9582 CONSTRUCTION OF METTALED ROAD 20 FEET WID BAHAWALPUR (10 KM) | E BHATTA CHOWK TO AHMADPUR DISTRICT | |
| 045702- A03 | Operating Expenses | 18,555,000 |
| 045702- A039 | General | 18,555,000 |
| 045702- A12 | Civil works | 285,482,000 |
| 045702- A124 | Building and Structures | 285,482,000 |
| Total- IB9583 CONST | CONSTRUCTION OF METTALED ROAD 20 FEET WIDE BHATTA CHOWK TO AHMADPUR DISTRICT BAHAWALPUR (10 KM) RUCTION / WIDENING OF KACHA PAKKA NO | 304,037,000 OR SHAH ROAD DISTRICT SAHIWAL |
| 045702- A03 | Operating Expenses | 34,776,000 |
| 045702- A039 | General | 34,776,000 |
| 045702- A12 | Civil works | 535,014,000 |
| 045702- A124 | Building and Structures | 535,014,000 |
| Total- | CONSTRUCTION / WIDENING OF | 569,790,000 |
| KACHA PAKKA NOOR SHAH ROAD DISTRICT SAHIWAL | ||
| IB9584 CONST LADHY WALA | / REHB. OF METALLED ROAD OF KHAIRPU & BASTI | R TAMAY WALI ROAD MOUZA JINDO SHAH CHAK |
| 045702- A03 | Operating Expenses | 25,270,000 |
| 045702- A039 | General | 25,270,000 |
| 045702- A12 | Civil works | 388,770,000 |
| 045702- A124 | Building and Structures | 388,770,000 |
| Total- | CONST / REHB. OF METALLED ROAD | 414,040,000 |
| OF KHAIRPUR TAMAY WALI ROAD MOUZA JINDO SHAH CHAK LADHY WALA & BASTI |
| NO. 132.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMANDS 2024-2025 Revised Estimate | FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| IB9585 CONST | ACCOUNTANT GENERAL RUCTION OF IB OFFICES (03) AT GHALLANA | PAKISTAN REVENUES I TD MOHMAND KOHAT | AND D.I KHAN | |
| 045702- A03 | Operating Expenses | 8,789,000 | ||
| 045702- A039 | General | 8,789,000 | ||
| 045702- A12 | Civil works | 135,211,000 | ||
| 045702- A124 | Building and Structures | 135,211,000 | ||
| Total- | CONSTRUCTION OF IB OFFICES (03) AT GHALLANAI TD MOHMAND KOHAT AND D.I KHAN | 144,000,000 | ||
| IB9586 INSTAL | LATION OF PRESSURE PUMPS / TUBEWELL | S IN DISTRICT BANNU | ||
| 045702- A03 | Operating Expenses | 38,451,000 | ||
| 045702- A039 | General | 38,451,000 | ||
| 045702- A12 | Civil works | 591,549,000 | ||
| 045702- A124 | Building and Structures | 591,549,000 | ||
| Total- | INSTALLATION OF PRESSURE PUMPS / TUBEWELLS IN DISTRICT BANNU | 630,000,000 | ||
| 045702 | Total- Buildings and Structures | 23,828,459,000 | 736,353,000 | 386,353,000 |
| 045720 Others IB3526 REHAB | : ILITATION / CONSTRUCTION OF ROADS AT L | ATIFABAD HYDERABAD CITY 6 NOS SCHEMES | ||
| 045720- A03 | Operating Expenses | 3,052,000 | ||
| 045720- A039 | General | 3,052,000 | ||
| 045720- A12 | Civil works | 46,948,000 | ||
| 045720- A124 | Building and Structures | 46,948,000 | ||
| Total- IB3527 REFUR | REHABILITATION / CONSTRUCTION OF ROADS AT LATIFABAD HYDERABAD CITY 6 NOS SCHEMES BISHMENT AND REHABILITATION OF GOVER | 50,000,000 NMENT OWNED BUILD | INGS AT ISLAMA | BAD |
| 045720- A03 | Operating Expenses | 30,516,000 | 15,257,000 | |
| 045720- A039 | General | 30,516,000 | 15,257,000 | |
| 045720- A12 | Civil works | 469,484,000 | 234,743,000 | 90,000,000 |
| 045720- A124 | Building and Structures | 469,484,000 | 234,743,000 | 90,000,000 |
| Total- | REFURBISHMENT AND | 500,000,000 | 250,000,000 | 90,000,000 |
| REHABILITATION OF GOVERNMENT OWNED BUILDINGS AT ISLAMABAD |
| NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES IB3528 REFURBISHMENT OF EXISTING FACILITIES & PROVISION OF ADDITIONAL FACILITIES AT PM STAFF COLONY ISLAMABAD
| 045720- A03 | Operating Expenses | 8,239,000 | 8,239,000 | |
|---|---|---|---|---|
| 045720- A039 | General | 8,239,000 | 8,239,000 | |
| 045720- A12 | Civil works | 126,761,000 | 126,761,000 | 55,000,000 |
| 045720- A124 | Building and Structures | 126,761,000 | 126,761,000 | 55,000,000 |
| Total- | REFURBISHMENT OF EXISTING | 135,000,000 | 135,000,000 | 55,000,000 |
| FACILITIES & PROVISION OF ADDITIONAL FACILITIES AT PM STAFF COLONY ISLAMABAD | ||||
| IB3529 REFUR | BISHMENT OF PM OFFICE ISLAMABAD | |||
| 045720- A03 | Operating Expenses | 9,956,000 | 9,956,000 | |
| 045720- A039 | General | 9,956,000 | 9,956,000 | |
| 045720- A12 | Civil works | 153,174,000 | 153,174,000 | 65,000,000 |
| 045720- A124 | Building and Structures | 153,174,000 | 153,174,000 | 65,000,000 |
| Total- | REFURBISHMENT OF PM OFFICE | 163,130,000 | 163,130,000 | 65,000,000 |
| ISLAMABAD | ||||
| IB3542 PAVEMENT OF STREETS SOLING SYSTEM IN 15 DIFFERENT AREAS OF | GUJRANWALA | |||
| 045720- A03 | Operating Expenses | 9,897,000 | ||
| 045720- A039 | General | 9,897,000 | ||
| 045720- A12 | Civil works | 152,270,000 | ||
| 045720- A124 | Building and Structures | 152,270,000 | ||
| Total- | PAVEMENT OF STREETS SOLING SYSTEM IN 15 DIFFERENT AREAS OF GUJRANWALA | 162,167,000 | ||
| IB3543 CONSTRUCTION OF CARPETED ROAD FROM DHIL GUJRANWALA AND | LAN WAL PHATTAK TO AIMANABAD | TOWN DISTRICT | ||
| 045720- A03 | Operating Expenses | 6,494,000 | ||
| 045720- A039 | General | 6,494,000 | ||
| 045720- A12 | Civil works | 99,906,000 | ||
| 045720- A124 | Building and Structures | 99,906,000 | ||
| Total- | CONSTRUCTION OF CARPETED ROAD FROM DHILLAN WAL PHATTAK TO AIMANABAD TOWN DISTRICT GUJRANWALA AND | 106,400,000 |
| NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3545 PROVIDING WATER SUPPLY SEWERAGE LINES CC OF NAWABSHAH | TOPPING SOLAR LIGHTS IN VARIOUS WARDS / UCS | |
|---|---|---|
| 045720- A03 | Operating Expenses | 3,052,000 |
| 045720- A039 | General | 3,052,000 |
| 045720- A12 | Civil works | 46,948,000 |
| 045720- A124 | Building and Structures | 46,948,000 |
| Total- | PROVIDING WATER SUPPLY | 50,000,000 |
| SEWERAGE LINES CC TOPPING SOLAR LIGHTS IN VARIOUS WARDS / UCS OF NAWABSHAH | ||
| IB3548 IMPROVEMENT/REHABILITATION OF DIFFERENT RO SYSTEM IN VARIOUS UNION | ADS/STREETS INCLUDING WATER & SEWERAGE | |
| 045720- A03 | Operating Expenses | 3,052,000 |
| 045720- A039 | General | 3,052,000 |
| 045720- A12 | Civil works | 46,948,000 |
| 045720- A124 | Building and Structures | 46,948,000 |
| Total- IB3549 IMPRO SYSTEM IN VA | IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION VEMENT/REHABILITATION OF DIFFERENT RO RIOUS UNION | 50,000,000 ADS/STREETS INCLUDING WATER & SEWERAGE |
| 045720- A03 | Operating Expenses | 3,052,000 |
| 045720- A039 | General | 3,052,000 |
| 045720- A12 | Civil works | 46,948,000 |
| 045720- A124 | Building and Structures | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS | 50,000,000 |
| INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION |
| NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3550 IMPROVEMENT/REHABILITATION OF DIFFERENT R SYSTEM IN VARIOUS UNION | OADS/STREETS INCLUDING WATER & SEWERAGE | |
|---|---|---|
| 045720- A03 | Operating Expenses | 3,052,000 |
| 045720- A039 | General | 3,052,000 |
| 045720- A12 | Civil works | 46,948,000 |
| 045720- A124 | Building and Structures | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF | 50,000,000 |
| IB3553 IMPRO SYSTEM AT D | DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION VEMENT/REHABILITATION OF DIFFERENT R ISTRICT | OADS/STREETS INCLUDING WATER & SEWERAGE |
| 045720- A03 | Operating Expenses | 3,052,000 |
| 045720- A039 | General | 3,052,000 |
| 045720- A12 | Civil works | 46,948,000 |
| 045720- A124 | Building and Structures | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM AT DISTRICT | 50,000,000 |
| IB3555 IMPROVEMENT/REHABILITATION OF DIFFERENT R SYSTEM AT VARIOUS MAIN | OADS /STREETS INCLUDING WATER & SEWERAGE | |
| 045720- A03 | Operating Expenses | 3,052,000 |
| 045720- A039 | General | 3,052,000 |
| 045720- A12 | Civil works | 46,948,000 |
| 045720- A124 | Building and Structures | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF | 50,000,000 |
| DIFFERENT ROADS /STREETS INCLUDING WATER & SEWERAGE SYSTEM AT VARIOUS MAIN | ||
| IB3556 DEVEL SHAHEED | OPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- LARKANA SUKKUR AND | |
| 045720- A03 | Operating Expenses | 3,052,000 |
| 045720- A039 | General | 3,052,000 |
| 045720- A12 | Civil works | 46,948,000 |
| 045720- A124 | Building and Structures | 46,948,000 |
| Total- | DEVELOPMENT SCHEMES UNDER | 50,000,000 |
| PRIME MINISTERS PROGRAMME IN SINDH- LARKANA SUKKUR AND SHAHEED |
| NO. 132.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate Rs | DEMANDS 2024-2025 Revised Estimate Rs | FOR GRANTS 2025-2026 Budget Estimate Rs |
|---|---|---|---|---|
| IB3557 DEVEL MIRPURKHAS | ACCOUNTANT GENERAL PA OPMENT SCHEMES UNDER PRIME MINISTERS P DIVISIONS | KISTAN REVENUES ROGRAMME IN SINDH | - HYDERABAD | AND |
| 045720- A03 | Operating Expenses | 3,052,000 | ||
| 045720- A039 | General | 3,052,000 | ||
| 045720- A12 | Civil works | 46,948,000 | ||
| 045720- A124 | Building and Structures | 46,948,000 | ||
| Total- IB3563 CONST | DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- HYDERABAD AND MIRPURKHAS DIVISIONS RUCTION OF BLACK TOP ROAD CHINKINDIK TO | 50,000,000 MASKEECHAH DIST | RICT CHAGHI | |
| 045720- A03 | Operating Expenses | 6,106,000 | ||
| 045720- A039 | General | 6,106,000 | ||
| 045720- A12 | Civil works | 93,933,000 | ||
| 045720- A124 | Building and Structures | 93,933,000 | ||
| Total- | CONSTRUCTION OF BLACK TOP ROAD CHINKINDIK TO MASKEECHAH DISTRICT CHAGHI | 100,039,000 | ||
| IB3567 19 NOS | DEVELOPMENT SCHEMES IN DISTRICT BADIN | |||
| 045720- A03 | Operating Expenses | 610,000 | ||
| 045720- A039 | General | 610,000 | ||
| 045720- A12 | Civil works | 9,390,000 | ||
| 045720- A124 | Building and Structures | 9,390,000 | ||
| Total- | 19 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN | 10,000,000 | ||
| IB3568 11 NOS | DEVELOPMENT SCHEMES IN DISTRICT BADIN | |||
| 045720- A03 | Operating Expenses | 610,000 | ||
| 045720- A039 | General | 610,000 | ||
| 045720- A12 | Civil works | 9,390,000 | ||
| 045720- A124 | Building and Structures | 9,390,000 | ||
| Total- | 11 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN | 10,000,000 |
| NO. 132.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| IB3569 15 NOS | DEVELOPMENT SCHEMES IN DISTRICT BADIN | |||
| 045720- A03 | Operating Expenses | 610,000 | ||
| 045720- A039 | General | 610,000 | ||
| 045720- A12 | Civil works | 9,390,000 | ||
| 045720- A124 | Building and Structures | 9,390,000 | ||
| Total- | 15 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN | 10,000,000 | ||
| IB3570 CONSTRUCTION OF METALED ROADS IN TALUKA LAK | HI DISTRICT SHIKARPUR SINDH (09 | SCHEMES) | ||
| 045720- A03 | Operating Expenses | 610,000 | ||
| 045720- A039 | General | 610,000 | ||
| 045720- A12 | Civil works | 9,390,000 | ||
| 045720- A124 | Building and Structures | 9,390,000 | ||
| Total- | CONSTRUCTION OF METALED ROADS IN TALUKA LAKHI DISTRICT SHIKARPUR SINDH (09 SCHEMES) | 10,000,000 | ||
| IB3571 CONSTRUCTION OF BLACK TOP ROADS PURANA DUKI | AND RABBAT VILLAGES DISTRICT | DUKI | ||
| 045720- A03 | Operating Expenses | 7,385,000 | ||
| 045720- A039 | General | 7,385,000 | ||
| 045720- A12 | Civil works | 113,615,000 | ||
| 045720- A124 | Building and Structures | 113,615,000 | ||
| Total- | CONSTRUCTION OF BLACK TOP | 121,000,000 | ||
| ROADS PURANA DUKI AND RABBAT VILLAGES DISTRICT DUKI | ||||
| IB3591 CONSTRUCTION OF SOLINGS/NALL AND TUFF TILE IN BAHAWALPUR (02 NOS | DIFFERENT UCS OF TEHSIL YAZMAN DISTRICT | |||
| 045720- A03 | Operating Expenses | 335,000 | ||
| 045720- A039 | General | 335,000 | ||
| 045720- A12 | Civil works | 5,159,000 | ||
| 045720- A124 | Building and Structures | 5,159,000 | ||
| Total- | CONSTRUCTION OF SOLINGS/NALL AND TUFF TILE IN DIFFERENT UCS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (02 NOS | 5,494,000 |
| NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3599 CONST DISTRICT | RUCTION OF PCC ROAD AND INFRASTRUCTURE DEVELOPMENT AT DIFFERENT UNION COUNCIL | |
|---|---|---|
| 045720- A03 | Operating Expenses | 9,276,000 |
| 045720- A039 | General | 9,276,000 |
| 045720- A12 | Civil works | 142,702,000 |
| 045720- A124 | Building and Structures | 142,702,000 |
| Total- | CONSTRUCTION OF PCC ROAD AND INFRASTRUCTURE DEVELOPMENT AT DIFFERENT UNION COUNCIL DISTRICT | 151,978,000 |
| IB3603 DEVEL GUJRAT | OPMENT SCHEMES OF INFRASTRUCTURE AND PUBLIC WORKS IN DIFFERENT UCS OF DISTRICT | |
| 045720- A03 | Operating Expenses | 3,052,000 |
| 045720- A039 | General | 3,052,000 |
| 045720- A12 | Civil works | 46,948,000 |
| 045720- A124 | Building and Structures | 46,948,000 |
| Total- | DEVELOPMENT SCHEMES OF INFRASTRUCTURE AND PUBLIC WORKS IN DIFFERENT UCS OF DISTRICT GUJRAT | 50,000,000 |
| IB3604 DEVELOPMENT SCHEMES IN DIFFERENT UCS OF DISTRICT GUJRAT-II (38 NOS DEVELOPMENT SCHEMES) | ||
| 045720- A03 | Operating Expenses | 10,498,000 |
| 045720- A039 | General | 10,498,000 |
| 045720- A12 | Civil works | 161,504,000 |
| 045720- A124 | Building and Structures | 161,504,000 |
| Total- | DEVELOPMENT SCHEMES IN DIFFERENT UCS OF DISTRICT GUJRAT-II (38 NOS DEVELOPMENT SCHEMES) | 172,002,000 |
| IB3606 MISCE SARGODHA | LLANEOUS DEVELOPMENT SCHEMES IN TEHSIL KOT MOMIN & TEHSIL SARGODHA DISTRICT | |
| 045720- A03 | Operating Expenses | 6,103,000 |
| 045720- A039 | General | 6,103,000 |
| 045720- A12 | Civil works | 93,897,000 |
| 045720- A124 | Building and Structures | 93,897,000 |
| Total- | MISCELLANEOUS DEVELOPMENT SCHEMES IN TEHSIL KOT MOMIN & | 100,000,000 |
| TEHSIL SARGODHA DISTRICT SARGODHA |
NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS DEMANDS FOR GRANTS No of Posts 2024-2025 2024-2025 2025-2026 2024-25 2025-26 Budget Revised Budget Estimate Estimate Estimate Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB3607 CONST RUKHAN DIST | RUCTI RICT | ON OF ROAD/PCC/TUFF PAVER/NAL | LAH/SOLING/DRAIN/C | ULVERTS IN CHAK | 105 SB & |
|---|---|---|---|---|---|
| 045720- A03 | Operating Expenses | 5,564,000 | |||
| 045720- A039 | General | 5,564,000 | |||
| 045720- A12 | Civil | works | 85,602,000 | ||
| 045720- A124 | Building and Structures | 85,602,000 | |||
| Total- IB3608 CONST | CONS PAVE RTS IN DISTR RUCTI | TRUCTION OF ROAD/PCC/TUFF R/NALLAH/SOLING/DRAIN/CULVE CHAK 105 SB & RUKHAN ICT ON OF ROAD/PCC/TUFF | 91,166,000 | ||
| 045720- A03 | Operating Expenses | 26,789,000 | |||
| 045720- A039 | General | 26,789,000 | |||
| 045720- A12 | Civil | works | 412,137,000 | ||
| 045720- A124 | Building and Structures | 412,137,000 | |||
| Total- | CONSTRUCTION OF ROAD/PCC/TUFF | 438,926,000 | |||
| 045720 | Total- | Others | 2,787,302,000 | 548,130,000 | 210,000,000 |
| 0457 | Total- | Construction (Works) | 28,188,072,000 | 1,434,483,000 | 596,353,000 |
| 045 | Total- | Construction and Transport | 28,188,072,000 | 1,434,483,000 | 596,353,000 |
| 04 | Total- | Economic Affairs | 28,188,072,000 | 1,434,483,000 | 596,353,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 28,188,072,000 | 1,434,483,000 | 596,353,000 |
| NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI |
| 04 | Economic Affairs: | |||
|---|---|---|---|---|
| 045 | Construction and Transport: | |||
| 0452 | Road | Transport: | ||
| 045202 KA139 | Highways.Roads and Bridges : 0 RECONSTRUCTION OF MANGHOPIR ROAD FROM JAM CHAKRO TO B | ANARAS | ||
| 045202 | - A12 | Civil works | 144,530,000 | |
| 045202 | - A121 | Roads Highways and Bridges | 144,530,000 | |
| KA139 | Total- 2 GREE | RECONSTRUCTION OF MANGHOPIR ROAD FROM JAM CHAKRO TO BANARAS LINE BUS RAPID TRANSPORT SYSTEM (BRTS) KARACHI | 144,530,000 | |
| 045202 | - A12 | Civil works | 850,000,000 | 3,000,000,000 |
| 045202 | - A121 | Roads Highways and Bridges | 850,000,000 | 3,000,000,000 |
| Total- | GREELINE BUS RAPID TRANSPORT | 850,000,000 | 3,000,000,000 | |
| SYSTEM (BRTS) KARACHI | ||||
| KA139 TRANS | 3 OPER PORT | ATIONLIZATION OF GREENLINE BRTS AND INSTALLATION OF SYSTEM | INTEGRATED INTELLIGENT | |
| 045202 | - A05 | Grants, Subsidies and Write off Loans | 185,000,000 | |
| 045202 | - A052 | Grants Domestic | 185,000,000 | |
| 045202 | - A12 | Civil works | 889,570,000 | |
| 045202 | - A121 | Roads Highways and Bridges | 889,570,000 | |
| Total- | OPERATIONLIZATION OF GREENLINE | 889,570,000 | 185,000,000 | |
| KA139 | 4 DEVE | BRTS AND INSTALLATION OF INTEGRATED INTELLIGENT TRANSPORT SYSTEM LOPMENT SCHEMES UNDER PMS PROGRAMS IN SINDH HYDER | ABAD & MIRPURKHAS DIVISIONS | |
| 045202 | - A03 | Operating Expenses | 3,052,000 | 32,575,000 |
| 045202 | - A039 | General | 3,052,000 | 32,575,000 |
| 045202 | - A12 | Civil works | 46,948,000 | 22,425,000 |
| 045202 | - A124 | Building and Structures | 46,948,000 | 22,425,000 |
| Total- | DEVELOPMENT SCHEMES UNDER PMS PROGRAMS IN SINDH HYDERABAD & MIRPURKHAS DIVISIONS | 50,000,000 | 55,000,000 |
| NO. 132.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2024-25 Posts 2025-26 | 2024-2025 Budget | DEMAND 2024-2025 Revised | S FOR GRANTS 2025-2026 Budget |
|---|---|---|---|---|
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| SYSTEM AT KA1395 IMPR | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI OVEMENT /REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER AN | D SEWERAGE | ||
| 045202- A03 | Operating Expenses | 3,052,000 | 32,575,000 | |
| 045202- A039 | General | 3,052,000 | 32,575,000 | |
| 045202- A12 | Civil works | 46,948,000 | 37,425,000 | |
| 045202- A124 | Building and Structures | 46,948,000 | 37,425,000 | |
| Total- | IMPROVEMENT /REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER AND SEWERAGE SYSTEM AT | 50,000,000 | 70,000,000 | |
| KA1396 IMPROVEMENT / REHABILITATION OF DIFFERENT RO SYSTEM IN VARIOUS | ADS / STREET INCLUDING WATER & | SEWERAGE | ||
| 045202- A03 | Operating Expenses | 3,052,000 | 32,575,000 | |
| 045202- A039 | General | 3,052,000 | 32,575,000 | |
| 045202- A12 | Civil works | 46,948,000 | 42,425,000 | |
| 045202- A124 | Building and Structures | 46,948,000 | 42,425,000 | |
| Total- | IMPROVEMENT / REHABILITATION OF | 50,000,000 | 75,000,000 | |
| DIFFERENT ROADS / STREET INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS | ||||
| KA1397 IMPR SYSTEM IN | OVEMENT / REHABILITATION OF DIFFERENT ROADS / STREETS INCLUDING WATER SEWERAGE | |||
| 045202- A03 | Operating Expenses | 3,052,000 | 6,000,000 | |
| 045202- A039 | General | 3,052,000 | 6,000,000 | |
| 045202- A12 | Civil works | 46,948,000 | 69,000,000 | |
| 045202- A124 | Building and Structures | 46,948,000 | 69,000,000 | |
| Total- | IMPROVEMENT / REHABILITATION OF | 50,000,000 | 75,000,000 | |
| DIFFERENT ROADS / STREETS INCLUDING WATER SEWERAGE SYSTEM IN | ||||
| KA1398 IMPROVEMENT/REHABILITATION OF DIFFERENT ROA SYSTEM IN VARIOUS UNION | DS/ STREETS INCLUDING WATER & | SEWERAGE | ||
| 045202- A03 | Operating Expenses | 3,052,000 | 3,000,000 | |
| 045202- A039 | General | 3,052,000 | 3,000,000 | |
| 045202- A12 | Civil works | 46,948,000 | 47,000,000 | |
| 045202- A124 | Building and Structures | 46,948,000 | 47,000,000 | |
| Total- | IMPROVEMENT/REHABILITATION OF | 50,000,000 | 50,000,000 | |
| DIFFERENT ROADS/ STREETS | ||||
| INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION |
NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| KA1399 IMPROVEMENT / REHABILITATION OF ROADS / STREETS INCLUDING WA VARIOUS UNION COUNCIL OF | TER & SEWERAGE | SYSTEM IN | |
|---|---|---|---|
| 045202- A03 | Operating Expenses | 3,052,000 | 4,500,000 |
| 045202- A039 | General | 3,052,000 | 4,500,000 |
| 045202- A12 | Civil works | 46,948,000 | 70,500,000 |
| 045202- A124 | Building and Structures | 46,948,000 | 70,500,000 |
| Total- | IMPROVEMENT / REHABILITATION OF | 50,000,000 | 75,000,000 |
| KA1400 PROV OF NAWABSH | ROADS / STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION COUNCIL OF IDING WATER SUPPLY SEWERAGE LINES CC TOPPING SOLAR LIG AH MIRPURKHAS | HTS IN VARIOUS | WARDS/UCS |
| 045202- A03 | Operating Expenses | 3,052,000 | 2,400,000 |
| 045202- A039 | General | 3,052,000 | 2,400,000 |
| 045202- A12 | Civil works | 46,948,000 | 37,600,000 |
| 045202- A124 | Building and Structures | 46,948,000 | 37,600,000 |
| Total- | PROVIDING WATER SUPPLY | 50,000,000 | 40,000,000 |
| SEWERAGE LINES CC TOPPING SOLAR LIGHTS IN VARIOUS WARDS/UCS OF NAWABSHAH MIRPURKHAS | |||
| KA1401 REHA SCHEME) | BILITATION/CONSTRUCTION OF ROADS AT LATIFABAD AT HYDERABAD CITY(06 NUMBER | ||
| 045202- A03 | Operating Expenses | 3,052,000 | 5,100,000 |
| 045202- A039 | General | 3,052,000 | 5,100,000 |
| 045202- A12 | Civil works | 46,948,000 | 79,900,000 |
| 045202- A124 | Building and Structures | 46,948,000 | 79,900,000 |
| Total- | REHABILITATION/CONSTRUCTION OF | 50,000,000 | 85,000,000 |
| ROADS AT LATIFABAD AT HYDERABAD CITY(06 NUMBER SCHEME) | |||
| KA1402 CONS 045202- A03 | TRUCTION OF CAR BAZAR UC .06 DISTRICT CENTRAL KARACHI Operating Expenses | 4,800,000 |
| NO. 132.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMANDS 2024-2025 Revised Estimate | FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | ||||
| 045202- A039 | General | 4,800,000 | ||
| 045202- A12 | Civil works | 75,200,000 | ||
| 045202- A124 | Building and Structures | 75,200,000 | ||
| Total- | CONSTRUCTION OF CAR BAZAR UC .06 DISTRICT CENTRAL KARACHI | 80,000,000 | ||
| KA1403 CONSTRUCTION OF PAK ASIAN FOOTBALL GROUND | UC 07 DISTRICT CENTRAL KARACHI | |||
| 045202- A03 | Operating Expenses | 5,967,000 | ||
| 045202- A039 | General | 5,967,000 | ||
| 045202- A12 | Civil works | 93,481,000 | ||
| 045202- A124 | Building and Structures | 93,481,000 | ||
| Total- | CONSTRUCTION OF PAK ASIAN | 99,448,000 | ||
| FOOTBALL GROUND UC 07 DISTRICT CENTRAL KARACHI | ||||
| KA1411 CONSTRUCTION OF WATER SUPPLY LINE (24 INCH) D KOHSAR PUMPING STATION | IA FROM HUSSAINABAD FILTER PLANT TO | |||
| 045202- A03 | Operating Expenses | 3,052,000 | 6,200,000 | |
| 045202- A039 | General | 3,052,000 | 6,200,000 | |
| 045202- A12 | Civil works | 46,948,000 | 73,800,000 | |
| 045202- A124 | Building and Structures | 46,948,000 | 73,800,000 | |
| Total- | CONSTRUCTION OF WATER SUPPLY | 50,000,000 | 80,000,000 | |
| LINE (24 INCH) DIA FROM HUSSAINABAD FILTER PLANT TO KOHSAR PUMPING STATION | ||||
| KA1412 REHABILITATION OF INFRASTRUCTURE WORKS (CO PARKS AND PLAYGROUND | NSTRUCTION OF | ROAD WATER LINE SEWERAGE | ||
| 045202- A03 | Operating Expenses | 3,052,000 | 5,000,000 | |
| 045202- A039 | General | 3,052,000 | 5,000,000 | |
| 045202- A12 | Civil works | 46,948,000 | 75,000,000 | |
| 045202- A124 | Building and Structures | 46,948,000 | 75,000,000 | |
| Total- | REHABILITATION OF INFRASTRUCTURE WORKS (CONSTRUCTION OF ROAD WATER LINE SEWERAGE PARKS AND PLAYGROUND | 50,000,000 | 80,000,000 |
NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| KA1413 REHABILITATION OF INFRASTRUCTURE WORKS(CONSTRUC | TION OF ROADS FOOT PATH | S WATER | |
|---|---|---|---|
| SUPPLY SEWERAGE PUBLIC | |||
| 045202- A03 | Operating Expenses | 3,052,000 | 5,200,000 |
| 045202- A039 | General | 3,052,000 | 5,200,000 |
| 045202- A12 | Civil works | 46,948,000 | 74,800,000 |
| 045202- A124 | Building and Structures | 46,948,000 | 74,800,000 |
| Total- | REHABILITATION OF | 50,000,000 | 80,000,000 |
| INFRASTRUCTURE | |||
| WORKS(CONSTRUCTION OF ROADS FOOT PATHS WATER SUPPLY SEWERAGE PUBLIC | |||
| KA1414 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS W PLAYGROUNDS IN | ATER SUPPLY SEWERAGE PARKS AND | ||
| 045202- A03 | Operating Expenses | 3,052,000 | 5,600,000 |
| 045202- A039 | General | 3,052,000 | 5,600,000 |
| 045202- A12 | Civil works | 46,948,000 | 74,400,000 |
| 045202- A124 | Building and Structures | 46,948,000 | 74,400,000 |
| Total- | IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS WATER SUPPLY SEWERAGE PARKS AND PLAYGROUNDS IN | 50,000,000 | 80,000,000 |
| KA1416 SUST HYDERABAD | AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT | LATIFIABAD | |
| 045202- A12 | Civil works | 250,000,000 | |
| 045202- A124 | Building and Structures | 250,000,000 | |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT LATIFIABAD HYDERABAD | 250,000,000 | |
| KA1417 SUST CITY | AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT | HYDERABAD | |
| 045202- A12 | Civil works | 250,000,000 | |
| 045202- A124 | Building and Structures | 250,000,000 | |
| Total- | SUSTAINABLE DEVELOPMENT GOALS | 250,000,000 | |
| ACHIEVEMENT PROGRAMME 2024-2025 | |||
| DISTRICT HYDERABAD CITY |
| NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1418 SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT KORANGI-II KARACHI
| 045202- A12 | Civil works | 250,000,000 |
|---|---|---|
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT KORANGI-II KARACHI | 250,000,000 |
| KA1419 SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT EAST-I KARACHI | ||
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT EAST-I KARACHI | 250,000,000 |
| KA1420 SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGR | AMME 2024-25 DISTRICT EAST-III KARACHI | |
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT EAST-III KARACHI | 250,000,000 |
| KA1421 SUST KARACHI | AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT CENTRAL-IV | |
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT CENTRAL-IV KARACHI | 250,000,000 |
| KA1422 SUST KARACHI | AINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT KORANGI-III | |
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT KORANGI-III KARACHI | 250,000,000 |
| KA1423 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT KEMARI-1 | ||
| KARACHI | ||
| 045202- A12 | Civil works | 250,000,000 |
| NO. 132.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate Rs | DEMAND 2024-2025 Revised Estimate Rs | S FOR GRANTS 2025-2026 Budget Estimate Rs |
|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | ||||
| 045202- A124 | Building and Structures | 250,000,000 | ||
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT KEMARI-1 KARACHI | 250,000,000 | ||
| KA1424 SUST KARACHI | AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2 | 024-2025 DISTRICT | WEST-I | |
| 045202- A12 | Civil works | 240,000,000 | ||
| 045202- A124 | Building and Structures | 240,000,000 | ||
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT WEST-I KARACHI | 240,000,000 | ||
| KA1425 SUST KARACHI | AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2 | 024-2025 DISTRICT | CENTRAL -1 | |
| 045202- A12 | Civil works | 250,000,000 | ||
| 045202- A124 | Building and Structures | 250,000,000 | ||
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT CENTRAL -1 KARACHI | 250,000,000 | ||
| KA1426 SUST KARACHI | AINABLE DEVELOPMENT GOAL ACHIEVEMENT | PROGRAMME 20 | 24-25 DISTRICT KORANGI-1 | |
| 045202- A12 | Civil works | 250,000,000 | ||
| 045202- A124 | Building and Structures | 250,000,000 | ||
| Total- | SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT KORANGI-1 KARACHI | 250,000,000 | ||
| KA1427 SUST KARACHI | AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2 | 024-2025 DISTRICT | EAST -IV | |
| 045202- A12 | Civil works | 250,000,000 | ||
| 045202- A124 | Building and Structures | 250,000,000 | ||
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT EAST -IV KARACHI | 250,000,000 | ||
| KA1428 SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT | PROGRAMME 20 | 24-25 DISTRICT WEST-II KARACHI | ||
| 045202- A12 | Civil works | 250,000,000 | ||
| 045202- A124 | Building and Structures | 250,000,000 | ||
| Total- | SUSTAINABLE DEVELOPMENT GOAL | 250,000,000 | ||
| ACHIEVEMENT PROGRAMME 2024-25 DISTRICT WEST-II KARACHI |
NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1429 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT CENTRAL -III
KARACHI
| 045202- A12 | Civil works | 250,000,000 |
|---|---|---|
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT CENTRAL -III KARACHI | 250,000,000 |
| KA1432 SUST KARACHI | AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT SOUTH -II | |
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT SOUTH -II KARACHI | 250,000,000 |
| KA1433 SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT WEST-II KARACHI | ||
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOAL ACHIEVEMENT PROGRAMME 2024-25 DISTRICT WEST-II KARACHI | 250,000,000 |
| KA1434 SUST KARACHI | AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT CENTRAL -II |
| 045202- A12 | Civil works | 250,000,000 |
|---|---|---|
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT CENTRAL -II KARACHI | 250,000,000 |
| KA1435 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT BAJAUR | ||
| 045202- A12 | Civil works | 250,000,000 |
| 045202- A124 | Building and Structures | 250,000,000 |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT BAJAUR | 250,000,000 |
| NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| KA1436 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME | 2024-2025 DISTRICT | SHANGLA | |
|---|---|---|---|
| 045202- A12 | Civil works | 250,000,000 | |
| 045202- A124 | Building and Structures | 250,000,000 | |
| Total- KA1437 SUST | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT SHANGLA AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME | 250,000,000 2024-2025 DISTRICT | KOHISTAN |
| 045202- A12 | Civil works | 200,000,000 | |
| 045202- A124 | Building and Structures | 200,000,000 | |
| Total- KA1438 SUST | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT KOHISTAN AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME | 200,000,000 2024 2025 DISTRICT | MANSEHRA |
| 045202- A12 | Civil works | 250,000,000 | |
| 045202- A124 | Building and Structures | 250,000,000 | |
| Total- KA1439 SUST | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024 2025 DISTRICT MANSEHRA AINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME | 250,000,000 2024-2025 DISTRICT | D.I KHAN |
| 045202- A12 | Civil works | 170,000,000 | |
| 045202- A124 | Building and Structures | 170,000,000 | |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME 2024-2025 DISTRICT D.I KHAN | 170,000,000 | |
| KA9982 KARACHI URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE | |||
| 045202- A12 | Civil works | 7,500,000,000 | |
| 045202- A124 | Building and Structures | 7,500,000,000 | |
| Total- KA9983 HYDE | KARACHI URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE RABAD URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE(R | EVAMPING AND REH | 7,500,000,000 ABILIATION) |
| 045202- A12 | Civil works | 2,500,000,000 | |
| 045202- A124 | Building and Structures | 2,500,000,000 | |
| Total- | HYDERABAD URBAN INFRASTRUCTRE | 2,500,000,000 | |
| DEVELOPMENT PACKAGE(REVAMPING AND REHABILIATION) |
NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA9984 CONSTRUCTION OF RCC PRE STRESSED BRIDGE MARI SAFDAR SHAH AT SIREN RIVER UC BEHKUND TEHSIL AND DISTRICT
| 045202- A12 | Civil works | 100,000,000 | ||
|---|---|---|---|---|
| 045202- A124 | Building and Structures | 100,000,000 | ||
| Total- | CONSTRUCTION OF RCC PRE | 100,000,000 | ||
| STRESSED BRIDGE MARI SAFDAR SHAH AT SIREN RIVER UC BEHKUND TEHSIL AND DISTRICT | ||||
| KA9985 CONSTRUCTION OF RCC PRE STRESSED BRIDG TEHSIL AND DISTRICT | E AT SHAH DA PANJ | A AT SIREN RIVER | UC BEHKUND | |
| 045202- A12 | Civil works | 100,000,000 | ||
| 045202- A124 | Building and Structures | 100,000,000 | ||
| Total- | CONSTRUCTION OF RCC PRE STRESSED BRIDGE AT SHAH DA PANJA AT SIREN RIVER UC BEHKUND TEHSIL AND DISTRICT | 100,000,000 | ||
| 045202 | Total- Highways.Roads and Bridges | 7,844,100,000 | 14,409,448,000 | |
| 0452 | Total- Road Transport | 7,844,100,000 | 14,409,448,000 | |
| 045 | Total- Construction and Transport | 7,844,100,000 | 14,409,448,000 | |
| 04 | Total- Economic Affairs | 7,844,100,000 | 14,409,448,000 | |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 7,844,100,000 | 14,409,448,000 | ||
| SUB-OFFICE, KARACHI | ||||
| TOTAL - DEMAND | 28,188,072,000 | 9,278,583,000 | 15,005,801,000 |
SECTION VI
MINISTRY OF INDUSTRIES AND PRODUCTION
2025-2026 Budget Estimate (Rupees in Thousand)
Demands presented on behalf of the Ministry of Industries and Production
Development Expendiutre on Capital Account.
| 133. | Capital Outlay on Industrial Development | Total : | 1,904,281 1,904,281 |
|---|
DEMANDS FOR GRANTS
NO. 133.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMAND NO. 133 ( FC12C32 )
CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.
Voted Rs. 1,904,281,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF INDUSTRIES AND PRODUCTION .
| 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 044 | Mining and Manufacturing | 4,918,758,000 | 2,128,731,000 | 1,904,281,000 |
| Total | 4,918,758,000 | 2,128,731,000 | 1,904,281,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 222,456,000 | 142,327,000 | 149,759,000 |
| A011 | Pay | 222,456,000 | 142,327,000 | 149,759,000 |
| A011- | 1 Pay of Officers | (148,605,000) | (118,158,000) | (95,048,000) |
| A011- | 2 Pay of Other Staff | (73,851,000) | (24,169,000) | (54,711,000) |
| A03 | Operating Expenses | 545,186,000 | 197,625,000 | 165,389,000 |
| A05 | Grants, Subsidies and Write off Loans | 217,582,000 | 152,076,000 | 235,970,000 |
| A09 | Physical Assets | 1,964,137,000 | 1,119,450,000 | 468,371,000 |
| A12 | Civil works | 1,939,397,000 | 489,253,000 | 884,792,000 |
| A13 | Repairs and Maintenance | 30,000,000 | 28,000,000 | |
| Total | 4,918,758,000 | 2,128,731,000 | 1,904,281,000 |
NO. 133.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT DEMANDS FOR GRANTS
| III. - DETAILS | are as | follows :- No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
|---|---|---|---|---|---|---|
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||||
| 04 | Economic Affairs: | |||||
| 044 | Mining | and Manufacturing: | ||||
| 0441 | Manufacturing: | |||||
| 044101 IB5262 | Support for Industrial Development : SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENG | THENING THE ENGINEERING INDUSTRY | ||||
| 044101 | - A01 | Employees Related Expenses | 80,000,000 | 78,000,000 | 74,000,000 | |
| 044101 | - A011 | Pay | 19 19 | 80,000,000 | 78,000,000 | 74,000,000 |
| 044101 | - A011- | 1 Pay | of Officers (13) (13) | (65,000,000) | (63,000,000) | (56,000,000) |
| 044101 | - A011- | 2 Pay | of Other Staff (6) (6) | (15,000,000) | (15,000,000) | (18,000,000) |
| 044101 | - A03 | Operating Expenses | 102,000,000 | 17,448,000 | 70,500,000 | |
| 044101 | - A032 | Communications | 1,000,000 | 450,000 | 500,000 | |
| 044101 | - A037 | Consultancy and Contractual Work | 28,000,000 | 8,000,000 | 25,500,000 | |
| 044101 | - A038 | Travel & Transportation | 5,000,000 | 2,500,000 | 6,500,000 | |
| 044101 | - A039 | General | 68,000,000 | 6,498,000 | 38,000,000 | |
| 044101 | - A09 | Physical Assets | 18,000,000 | 9,475,000 | 5,500,000 | |
| 044101 | - A092 | Computer Equipment | 14,000,000 | 7,000,000 | 4,500,000 | |
| 044101 | - A096 | Purchase of Plant and Machinery | 2,000,000 | 475,000 | ||
| 044101 | - A097 | Purchase of Furniture and Fixture | 2,000,000 | 2,000,000 | 1,000,000 | |
| Total- | SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENGTHENING THE ENGINEERING INDUSTRY | 200,000,000 | 104,923,000 | 150,000,000 | ||
| 0 | 44101 | Total- | Support for Industrial Development | 200,000,000 | 104,923,000 | 150,000,000 |
| 0 | 441 | Total- | Manufacturing | 200,000,000 | 104,923,000 | 150,000,000 |
| 0 | 44 | Total- | Mining and Manufacturing | 200,000,000 | 104,923,000 | 150,000,000 |
| 0 | 4 | Total- | Economic Affairs | 200,000,000 | 104,923,000 | 150,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 200,000,000 | 104,923,000 | 150,000,000 |
NO. 133.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| INDUSTRIAL DEVEL No of Posts | OPMENT 2024-2025 | DEMAND 2024-2025 | S FOR GRANTS 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
04 Economic Affairs:
| 044 Mining | and Manufacturing: | ||||
|---|---|---|---|---|---|
| 0441 Manufa | cturing: | ||||
| 044101 Support for Industrial Development : | |||||
| LO1180 PRODU | CT DEV. CENTRE FOR COMPOSITES BASED | SPORTS GOOD SIALKOT | |||
| 044101- A01 | Employees Related Expenses | 27,111,000 | 4,000,000 | 29,721,000 | |
| 044101- A011 | Pay | 56 56 | 27,111,000 | 4,000,000 | 29,721,000 |
| 044101- A011-1 | Pay of Officers | (6) (4) | (4,200,000) | (600,000) | (4,755,000) |
| 044101- A011-2 | Pay of Other Staff | (50) (52) | (22,911,000) | (3,400,000) | (24,966,000) |
| 044101- A03 | Operating Expenses | 29,089,000 | 4,000,000 | 25,089,000 | |
| 044101- A039 | General | 29,089,000 | 4,000,000 | 25,089,000 | |
| 044101- A09 | Physical Assets | 46,237,000 | 36,807,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 15,680,000 | 15,680,000 | ||
| 044101- A098 | Purchase of Other Assets | 30,557,000 | 21,127,000 | ||
| Total- | PRODUCT DEV. CENTRE F COMPOSITES BASED SPO SIALKOT | OR RTS GOOD | 102,437,000 | 8,000,000 | 91,617,000 |
| LO1182 BUSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION | |||||
| 044101- A01 | Employees Related Expenses | 6,955,000 | 6,955,000 | ||
| 044101- A011 | Pay | 8 | 6,955,000 | 6,955,000 | |
| 044101- A011-1 | Pay of Officers | (8) | (6,955,000) | (6,955,000) | |
| 044101- A03 | Operating Expenses | 4,241,000 | 4,241,000 | ||
| 044101- A039 | General | 4,241,000 | 4,241,000 | ||
| Total- | BUSINESS SKILL DEV. CE WOMEN AT VARIOUS LOC | NTRE FOR ATION | 11,196,000 | 11,196,000 | |
| LO1280 INDUSTRIAL DESIGN AND AUTO | MATION CENTRE | ||||
| 044101- A01 | Employees Related Expenses | 16,000,000 | 3,508,000 | 14,000,000 | |
| 044101- A011 | Pay | 18 18 | 16,000,000 | 3,508,000 | 14,000,000 |
| 044101- A011-1 | Pay of Officers | (5) (5) | (7,000,000) | (3,032,000) | (9,000,000) |
| 044101- A011-2 | Pay of Other Staff | (13) (13) | (9,000,000) | (476,000) | (5,000,000) |
| 044101- A03 | Operating Expenses | 5,000,000 | 3,400,000 | 8,000,000 | |
| 044101- A039 | General | 5,000,000 | 3,400,000 | 8,000,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 4,000,000 | 5,000,000 |
| NO. 133.- FC12 | C32 CAPITAL OUTLAY ON I | NDUSTRIAL DEVE No of 2024-25 Posts 2025-26 | LOPMENT 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | |||||
| 044101- A052 | Grants Domestic | 4,000,000 | 5,000,000 | ||
| 044101- A09 | Physical Assets | 115,000,000 | 72,574,000 | 108,000,000 | |
| 044101- A091 | Purchase of Building | 2,500,000 | 800,000 | 1,800,000 | |
| 044101- A092 | Computer Equipment | 13,700,000 | 25,000,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 94,600,000 | 71,774,000 | 77,000,000 | |
| 044101- A097 | Purchase of Furniture and Fixture | 4,200,000 | 4,200,000 | ||
| 044101- A12 | Civil works | 160,000,000 | 34,600,000 | 150,000,000 | |
| 044101- A124 | Building and Structures | 160,000,000 | 34,600,000 | 150,000,000 | |
| Total- INDUSTRIAL DESIGN AND AUTOMATION CENTRE | 300,000,000 | 114,082,000 | 285,000,000 | ||
| LO1299 1000 INDUSTRIAL STITCHING UNITS ALL ACROSS PAKISTAN | |||||
| 044101- A01 | Employees Related Expenses | 15,500,000 | 15,500,000 | 21,270,000 | |
| 044101- A011 | Pay | 14 14 | 15,500,000 | 15,500,000 | 21,270,000 |
| 044101- A011-1 | Pay of Officers | (10) (9) | (13,500,000) | (13,500,000) | (18,645,000) |
| 044101- A011-2 | Pay of Other Staff | (4) (5) | (2,000,000) | (2,000,000) | (2,625,000) |
| 044101- A03 | Operating Expenses | 23,196,000 | 23,196,000 | 32,000,000 | |
| 044101- A039 | General | 23,196,000 | 23,196,000 | 32,000,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 38,458,000 | 38,458,000 | 194,730,000 | |
| 044101- A052 | Grants Domestic | 38,458,000 | 38,458,000 | 194,730,000 | |
| 044101- A09 | Physical Assets | 2,000,000 | |||
| 044101- A092 | Computer Equipment | 2,000,000 | |||
| Total- | 1000 INDUSTRIAL STITCHING UNITS | 77,154,000 | 77,154,000 | 250,000,000 | |
| ALL ACROSS PAKISTAN LO1303 ACQUISITION OF LAND FOR ESTA | BLISHMENT OF SME FACILITATION CENTRES AT VARIOUS LOCATIONS | ||||
| 044101- A01 | Employees Related Expenses | 10,215,000 | 760,000 | ||
| 044101- A011 | Pay | 6 2 | 10,215,000 | 760,000 | |
| 044101- A011-1 | Pay of Officers | (4) (1) | (8,715,000) | (240,000) | |
| 044101- A011-2 | Pay of Other Staff | (2) (1) | (1,500,000) | (520,000) | |
| 044101- A03 | Operating Expenses | 18,500,000 | 18,500,000 | 4,000,000 | |
| 044101- A039 | General | 18,500,000 | 18,500,000 | 4,000,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 43,859,000 | 1,500,000 | 1,240,000 | |
| 044101- A052 | Grants Domestic | 43,859,000 | 1,500,000 | 1,240,000 | |
| 044101- A09 | Physical Assets | 16,900,000 |
| NO. 133.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | ||||
| 044101- A091 | Purchase of Building | 5,150,000 | ||
| 044101- A092 | Computer Equipment | 3,050,000 | ||
| 044101- A095 | Purchase of Transport | 4,500,000 | ||
| 044101- A097 | Purchase of Furniture and Fixture | 3,000,000 | ||
| 044101- A098 | Purchase of Other Assets | 1,200,000 | ||
| 044101- A12 | Civil works | 572,873,000 | 44,000,000 | |
| 044101- A124 | Building and Structures | 572,873,000 | 44,000,000 | |
| Total- | ACQUISITION OF LAND FOR ESTABLISHMENT OF SME FACILITATION CENTRES AT VARIOUS LOCATIONS | 662,347,000 | 20,000,000 | 50,000,000 |
| LO1644 SUPPORT CENTRE FOR DENTAL AND SURGICAL EQUIPMENT'S (SCDS | ) SIALKOT | |||
| 044101- A01 | Employees Related Expenses | 8,000,000 | 6,293,000 | 9,000,000 |
| 044101- A011 | Pay 3 18 | 8,000,000 | 6,293,000 | 9,000,000 |
| 044101- A011-1 | Pay of Officers (2) (5) | (5,000,000) | (4,000,000) | (6,000,000) |
| 044101- A011-2 | Pay of Other Staff (1) (13) | (3,000,000) | (2,293,000) | (3,000,000) |
| 044101- A03 | Operating Expenses | 5,000,000 | 2,200,000 | 6,000,000 |
| 044101- A039 | General | 5,000,000 | 2,200,000 | 6,000,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 5,000,000 | 1,000,000 | 5,000,000 |
| 044101- A052 | Grants Domestic | 5,000,000 | 1,000,000 | 5,000,000 |
| 044101- A09 | Physical Assets | 121,000,000 | 39,019,000 | 128,400,000 |
| 044101- A092 | Computer Equipment | 14,000,000 | 18,000,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 104,000,000 | 39,019,000 | 104,950,000 |
| 044101- A097 | Purchase of Furniture and Fixture | 3,000,000 | 5,450,000 | |
| 044101- A12 | Civil works | 111,000,000 | 36,500,000 | 76,600,000 |
| 044101- A124 | Building and Structures | 111,000,000 | 36,500,000 | 76,600,000 |
| Total- | SUPPORT CENTRE FOR DENTAL AND | 250,000,000 | 85,012,000 | 225,000,000 |
| SURGICAL EQUIPMENT'S (SCDS) SIALKOT LO1645 RESEARCH REGULATORY INSIGHTS & ADVOCACY | ASSISTANCE FOR | SMES | ||
| 044101- A01 | Employees Related Expenses | 16,275,000 | 16,275,000 | |
| 044101- A011 | Pay 10 | 16,275,000 | 16,275,000 | |
| 044101- A011-1 | Pay of Officers (6) | (15,275,000) | (15,275,000) | |
| 044101- A011-2 | Pay of Other Staff (4) | (1,000,000) | (1,000,000) |
| NO. 133.- FC1 | 2C32 CAPITAL OUTLAY ON INDUSTRIAL DEV No of 2024-25 Posts 2025-26 ACCOUNTANT GENERAL PAKISTAN R | ELOPMENT 2024-2025 Budget Estimate Rs EVENUES SUB-OF | DEMAND 2024-2025 Revised Estimate Rs FICE, LAHORE | S FOR GRANTS 2025-2026 Budget Estimate Rs |
|---|---|---|---|---|
| 044101- A03 | Operating Expenses | 7,460,000 | 7,460,000 | |
| 044101- A034 | Occupancy Costs | 3,960,000 | 3,960,000 | |
| 044101- A039 | General | 3,500,000 | 3,500,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 56,265,000 | 78,118,000 | |
| 044101- A052 | Grants Domestic | 56,265,000 | 78,118,000 | |
| Total- | RESEARCH REGULATORY INSIGHTS & ADVOCACY ASSISTANCE FOR SMES | 80,000,000 | 101,853,000 | |
| LO9644 NATIO KNOWLEDGE | NAL STRATEGIC PROGRAM FOR ACQUISITION OF IND TECH-NSPAIT INCLUDING FEASIBILITY- | |||
| 044101- A01 | Employees Related Expenses | 35,000,000 | 11,000,000 | |
| 044101- A011 | Pay 28 | 35,000,000 | 11,000,000 | |
| 044101- A011-1 | Pay of Officers (13) | (20,000,000) | (11,000,000) | |
| 044101- A011-2 | Pay of Other Staff (15) | (15,000,000) | ||
| 044101- A03 | Operating Expenses | 30,000,000 | 13,000,000 | |
| 044101- A039 | General | 30,000,000 | 13,000,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 70,000,000 | 33,000,000 | |
| 044101- A052 | Grants Domestic | 70,000,000 | 33,000,000 | |
| 044101- A09 | Physical Assets | 335,000,000 | 75,782,000 | |
| 044101- A092 | Computer Equipment | 20,000,000 | 15,298,000 | |
| 044101- A095 | Purchase of Transport | 9,000,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 290,000,000 | 55,000,000 | |
| 044101- A097 | Purchase of Furniture and Fixture | 8,000,000 | 3,725,000 | |
| 044101- A098 | Purchase of Other Assets | 8,000,000 | 1,759,000 | |
| 044101- A13 | Repairs and Maintenance | 30,000,000 | 28,000,000 | |
| 044101- A133 | Buildings and Structure | 30,000,000 | 28,000,000 | |
| Total- | NATIONAL STRATEGIC PROGRAM FOR ACQUISITION OF IND TECH-NSPAIT INCLUDING FEASIBILITY- KNOWLEDGE | 500,000,000 | 160,782,000 | |
| 044101 | Total- Support for Industrial Development | 1,983,134,000 | 578,079,000 | 901,617,000 |
| 0441 | Total- Manufacturing | 1,983,134,000 | 578,079,000 | 901,617,000 |
| 044 | Total- Mining and Manufacturing | 1,983,134,000 | 578,079,000 | 901,617,000 |
| 04 | Total- Economic Affairs | 1,983,134,000 | 578,079,000 | 901,617,000 |
| Total- ACCOUNTANT GENERAL | 1,983,134,000 | 578,079,000 | 901,617,000 | |
| PAKISTAN REVENUES | ||||
| SUB-OFFICE, LAHORE |
| NO. 133.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 04 | Economic Affairs: | ||||
|---|---|---|---|---|---|
| 044 | Mining | and Manufacturing: | |||
| 0441 | Manufacturing: | ||||
| 044101 KA137 | Support for Industrial Development : 3 DEVELOPMENT OF KARACHI INDUSTRIAL PARK | (KIP) AT 1500 ACRES | PSM LAND KARACHI | ||
| 044101 | - A03 | Operating Expenses | 209,000,000 | ||
| 044101 | - A037 | Consultancy and Contractual Work | 209,000,000 | ||
| Total- | DEVELOPMENT OF KARACHI INDUSTRIAL PARK (KIP) AT 1500 ACRES PSM LAND KARACHI | 209,000,000 | |||
| KA137 SETUP | 4 ESTA AT KT | BLISHMENT OF HIGH TENSILE SHEET META DMC | L DIES MANUFACTURING AND TITANIUM COATING | ||
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 30,000,000 | ||
| 044101 | - A052 | Grants Domestic | 30,000,000 | ||
| 044101 | - A09 | Physical Assets | 205,000,000 | ||
| 044101 | - A091 | Purchase of Building | 5,000,000 | ||
| 044101 | - A096 | Purchase of Plant and Machinery | 200,000,000 | ||
| 044101 | - A12 | Civil works | 18,130,000 | 753,000 | 40,000,000 |
| 044101 | - A124 | Building and Structures | 18,130,000 | 753,000 | 40,000,000 |
| Total- | ESTABLISHMENT OF HIGH TENSILE | 223,130,000 | 753,000 | 70,000,000 | |
| KA719 | 8 ESTA | SHEET METAL DIES MANUFACTURING AND TITANIUM COATING SETUP AT KTDMC BLISHMENT OF 132 KV GRID STATION AT BI | N QASIM INDUSTRIAL PARK KARACHI | ||
| 044101 | - A03 | Operating Expenses | 11,000,000 | 11,000,000 | |
| 044101 | - A037 | Consultancy and Contractual Work | 11,000,000 | 11,000,000 | |
| 044101 | - A09 | Physical Assets | 1,105,000,000 | 921,600,000 | 182,664,000 |
| 044101 | - A096 | Purchase of Plant and Machinery | 1,105,000,000 | 921,600,000 | 182,664,000 |
| 044101 | - A12 | Civil works | 187,494,000 | 187,400,000 | |
| 044101 | - A125 | Other Works | 187,494,000 | 187,400,000 | |
| Total- | ESTABLISHMENT OF 132 KV GRID STATION AT BIN QASIM INDUSTRIAL PARK KARACHI | 1,303,494,000 | 1,120,000,000 | 182,664,000 |
NO. 133.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| INDUSTRIAL DEVEL No of Posts | OPMENT 2024-2025 | DEMAND 2024-2025 | S FOR GRANTS 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| ON STEEL MIL DEVELOPMEN | L LAND T OF BLOCK A (500 ACRES) OF PHASE I OF | KARACHI INDUSTRIAL PARK (FEDERAL | SEZ) | |
|---|---|---|---|---|
| 044101- A03 | Operating Expenses | 5,000,000 | ||
| 044101- A037 | Consultancy and Contractual Work | 5,000,000 | ||
| 044101- A09 | Physical Assets | 5,000,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 5,000,000 | ||
| 044101- A12 | Civil works | 490,000,000 | ||
| 044101- A125 | Other Works | 490,000,000 | ||
| Total- | DEVELOPMENT OF BLOCK A (500 ACRES) OF PHASE I OF KARACHI INDUSTRIAL PARK (FEDERAL SEZ) ON STEEL MILL LAND | 500,000,000 | ||
| 044101 | Total- Support for Industrial Development | 1,735,624,000 | 1,120,753,000 | 752,664,000 |
| 0441 | Total- Manufacturing | 1,735,624,000 | 1,120,753,000 | 752,664,000 |
| 044 | Total- Mining and Manufacturing | 1,735,624,000 | 1,120,753,000 | 752,664,000 |
| 04 | Total- Economic Affairs | 1,735,624,000 | 1,120,753,000 | 752,664,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 1,735,624,000 | 1,120,753,000 | 752,664,000 |
NO. 133.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| INDUSTRIAL DEVEL No of Posts | OPMENT 2024-2025 | DEMAND 2024-2025 | S FOR GRANTS 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 04 | Economic Affairs: | |||||
|---|---|---|---|---|---|---|
| 044 | Mining | and Manufacturing: | ||||
| 0441 | Manufacturing: | |||||
| 044101 LS0109 | Suppo ESTAB | rt for Industrial Development : LISHMENT OF HUB SPECIAL ECONOMIC ZO | NE LASBELA | |||
| 044101 | - A01 | Employees Related Expenses | 7,400,000 | 796,000 | 1,008,000 | |
| 044101 | - A011 | Pay | 29 29 | 7,400,000 | 796,000 | 1,008,000 |
| 044101 | - A011- | 1 Pay | of Officers (12) (12) | (2,960,000) | (796,000) | (408,000) |
| 044101 | - A011- | 2 Pay | of Other Staff (17) (17) | (4,440,000) | (600,000) | |
| 044101 | - A03 | Operating Expenses | 100,700,000 | 93,180,000 | 14,800,000 | |
| 044101 | - A032 | Communications | 200,000 | |||
| 044101 | - A037 | Consultancy and Contractual Work | 32,000,000 | 26,980,000 | 5,000,000 | |
| 044101 | - A038 | Travel & Transportation | 2,500,000 | 2,500,000 | 1,500,000 | |
| 044101 | - A039 | General | 66,000,000 | 63,700,000 | 8,300,000 | |
| 044101 | - A09 | Physical Assets | 2,000,000 | 1,000,000 | ||
| 044101 | - A097 | Purchase of Furniture and Fixture | 2,000,000 | 1,000,000 | ||
| 044101 | - A12 | Civil | works | 889,900,000 | 230,000,000 | 84,192,000 |
| 044101 | - A121 | Road | s Highways and Bridges | 150,000,000 | 150,000,000 | 50,000,000 |
| 044101 | - A123 | Embankment and Drainage Works | 80,000,000 | 80,000,000 | 34,192,000 | |
| 044101 | - A124 | Building and Structures | 259,900,000 | |||
| 044101 | - A125 | Other Works | 400,000,000 | |||
| Total- | ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA | 1,000,000,000 | 324,976,000 | 100,000,000 | ||
| 0 | 44101 | Total- | Support for Industrial Development | 1,000,000,000 | 324,976,000 | 100,000,000 |
| 0 | 441 | Total- | Manufacturing | 1,000,000,000 | 324,976,000 | 100,000,000 |
| 0 | 44 | Total- | Mining and Manufacturing | 1,000,000,000 | 324,976,000 | 100,000,000 |
| 0 | 4 | Total- | Economic Affairs | 1,000,000,000 | 324,976,000 | 100,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 1,000,000,000 | 324,976,000 | 100,000,000 | ||
| TOTAL | - DEMAND | 4,918,758,000 | 2,128,731,000 | 1,904,281,000 |
SECTION VII
MINISTRY OF MARITIME AFFAIRS
2025-2026 Budget Estimate (Rupees in Thousand)
Demand presented on behalf of the Capital Outlay on Maritime Affairs Division
Development Expenditure on Capital Account.
| 134. | Capital Outlay on Maritime Affairs Division | Total : | 3,465,000 3,465,000 |
|---|
NO. 134.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 134 ( FC12C51 )
CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 for CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION.
Voted
Rs. 3,465,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF MARITIME AFFAIRS .
| 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 045 | Construction and Transport | 5,300,000,000 | 678,000,000 | 2,224,000,000 |
| 046 | Communications | 1,050,000,000 | 1,241,000,000 | |
| Total | 5,300,000,000 | 1,728,000,000 | 3,465,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A02 | Project Pre-Investment Analysis | 93,794,000 | 143,794,000 | 15,000,000 |
| A03 | Operating Expenses | 50,000,000 | ||
| A09 | Physical Assets | 1,000,000,000 | 1,115,565,000 | |
| A12 | Civil works | 5,156,206,000 | 584,206,000 | 2,334,435,000 |
| Total | 5,300,000,000 | 1,728,000,000 | 3,465,000,000 |
NO. 134.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |||
|---|---|---|---|---|---|---|
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||||
| 04 | Economic Affairs: | |||||
| 045 | Construction | and Transport: | ||||
| 0453 | Water | Transport: | ||||
| 04530 IB997 | 1 PORT 5 GAWA | AND SHIPPPING : DAR BLUE ECONOMY CENTER PHASE-I | ||||
| 04530 | 1- A02 | Project Pre-Investment Analysis | 50,000,000 | 15,000,000 | ||
| 04530 | 1- A021 | Feasibility Studies | 50,000,000 | 15,000,000 | ||
| Total- | GAWADAR BLUE ECONOMY CENTER PHASE-I | 50,000,000 | 15,000,000 | |||
| 045301 | Total- | PORT AND SHIPPPING | 50,000,000 | 15,000,000 | ||
| 0453 | Total- | Water Transport | 50,000,000 | 15,000,000 | ||
| 045 | Total- | Construction and Transport | 50,000,000 | 15,000,000 | ||
| 04 | Total- | Economic Affairs | 50,000,000 | 15,000,000 | ||
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 50,000,000 | 15,000,000 |
| NO. 134.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS | DIVISION | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI |
| 04 | Economic Affairs: | ||||
|---|---|---|---|---|---|
| 045 | Construction | and Transport: | |||
| 0453 | Water | Transport: | |||
| 045301 KA138 HARB | PORT 5 ESTA OUR AU | AND S BLISH TORIT | HIPPPING : MENT OF EXPORT ORIENTED FISHERI Y | ES & INFRASTRUCTURE AT KORANGI FISHERIES | |
| 045301 | - A12 | Civil | works | 734,206,000 | 534,206,000 |
| 045301 | - A124 | Building and Structures | 734,206,000 | 534,206,000 | |
| Total- | ESTABLISHMENT OF EXPORT | 734,206,000 | 534,206,000 | ||
| KA138 | 9 ANCIL | ORIENTED FISHERIES & INFRASTRUCTURE AT KORANGI FISHERIES HARBOUR AUTORITY IARY FACILIES AT GPA HOUSING COMPLEX | GAWADAR | ||
| 045301 | - A03 | Operating Expenses | 50,000,000 | ||
| 045301 | - A039 | General | 50,000,000 | ||
| Total- | ANCIL COMP | IARY FACILIES AT GPA HOUSING LEX GAWADAR | 50,000,000 | ||
| 0 | 45301 | Total- | PORT AND SHIPPPING | 784,206,000 | 534,206,000 |
| 0 | 453 | Total- | Water Transport | 784,206,000 | 534,206,000 |
| 0 | 45 | Total- | Construction and Transport | 784,206,000 | 534,206,000 |
| 0 | 4 | Total- | Economic Affairs | 784,206,000 | 534,206,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 784,206,000 | 534,206,000 | ||
| SUB-OFFICE, KARACHI |
| NO. 134.- FC1 | 2C51 CAPITAL OUTLAY ON MARITIME AFFAIR No of 2024-25 Posts 2025-26 | S DIVISION 2024-2025 Budget Estimate | DEMAN 2024-2025 Revised Estimate | DS FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | ||||
| 04 Econo | mic Affairs: | |||
| 045 Const | ruction and Transport: | |||
| 0453 Water | Transport: | |||
| 045301 PORT | AND SHIPPPING : | |||
| GR0093 CONSTRUCTION OF EASTBAY EXPRESSWAY PHASE-II (GRANT-IN-AID) | ||||
| 045301- A12 | Civil works | 200,000,000 | ||
| 045301- A124 | Building and Structures | 200,000,000 | ||
| Total- | CONSTRUCTION OF EASTBAY EXPRESSWAY PHASE-II | 200,000,000 | ||
| (GRANT-IN-AID) | ||||
| GR0094 INFRASTRUCTURE WORKS OF OFF-DOCK TERMINAL AT GWADAR | ||||
| 045301- A12 | Civil works | 100,000,000 | ||
| 045301- A124 | Building and Structures | 100,000,000 | ||
| Total- | INFRASTRUCTURE WORKS OF | 100,000,000 | ||
| OFF-DOCK TERMINAL AT GWADAR | ||||
| GR0134 SURV GAWADAR | EY AND FEASIBILITY STUDY FOR CONSTRUCTION OF EASTBAY EXPRESSWAYS P | HASE-II OF | ||
| 045301- A02 | Project Pre-Investment Analysis | 93,794,000 | 93,794,000 | |
| 045301- A021 | Feasibility Studies | 93,794,000 | 93,794,000 | |
| Total- | SURVEY AND FEASIBILITY STUDY FOR CONSTRUCTION OF EASTBAY EXPRESSWAYS PHASE-II OF GAWADAR | 93,794,000 | 93,794,000 | |
| GR0135 MODERNIZATION AND UPGRADATION OF GADDAN (MUGSBRI) AND | I SHIP BREAKING AND RECYCLING INDUSTRY | |||
| 045301- A12 | Civil works | 4,172,000,000 | 1,909,000,000 | |
| 045301- A125 | Other Works | 4,172,000,000 | 1,909,000,000 | |
| Total- | MODERNIZATION AND UPGRADATION | 4,172,000,000 | 1,909,000,000 | |
| OF GADDANI SHIP BREAKING AND | ||||
| RECYCLING INDUSTRY (MUGSBRI) AND | ||||
| GR0136 BLUE | ECONOMY CENTRE | |||
| 045301- A12 | Civil works | 250,000,000 | ||
| 045301- A125 | Other Works | 250,000,000 | ||
| Total- | BLUE ECONOMY CENTRE | 250,000,000 |
| NO. 134.- FC1 | 2C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION | DEMANDS FOR GRANTS | |||
|---|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | ||
| ACCOUNTANT GENERAL PAKISTAN R | Rs EVENUES SUB-O | Rs FFICE, QUETTA | Rs | ||
| 045301 | Total- | PORT AND SHIPPPING | 4,515,794,000 | 93,794,000 | 2,209,000,000 |
| 0453 | Total- | Water Transport | 4,515,794,000 | 93,794,000 | 2,209,000,000 |
| 045 | Total- | Construction and Transport | 4,515,794,000 | 93,794,000 | 2,209,000,000 |
| 046 Comm | unications: | ||||
| 0461 Comm 046101 ADMI GR0091 ANCI | unicati NISTRA LLARY | ons: TION : FACILITIES IN GPA HOUSING COMPLE | X GAWADAR | ||
| 046101- A12 | Civil | works | 50,000,000 | 125,435,000 | |
| 046101- A124 | Building and Structures | 50,000,000 | 125,435,000 | ||
| Total- | ANCILLARY FACILITIES IN GPA HOUSING COMPLEX GAWADAR | 50,000,000 | 125,435,000 | ||
| GR0092 LAND | ACQUISITION AS PER GWADAR PLAN 750 AC | RES AT GADANI JUNUBI | |||
| 046101- A09 | Physical Assets | 1,000,000,000 | 1,115,565,000 | ||
| 046101- A091 | Purchase of Building | 1,000,000,000 | 1,115,565,000 | ||
| Total- | LAND PLAN | ACQUISITION AS PER GWADAR 750 ACRES AT GADANI JUNUBI | 1,000,000,000 | 1,115,565,000 | |
| 046101 | Total- | ADMINISTRATION | 1,050,000,000 | 1,241,000,000 | |
| 0461 | Total- | Communications | 1,050,000,000 | 1,241,000,000 | |
| 046 | Total- | Communications | 1,050,000,000 | 1,241,000,000 | |
| 04 | Total- | Economic Affairs | 4,515,794,000 | 1,143,794,000 | 3,450,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 4,515,794,000 | 1,143,794,000 | 3,450,000,000 | |
| TOTAL | - DEMAND | 5,300,000,000 | 1,728,000,000 | 3,465,000,000 |
SECTION VIII
MINISTRY OF RAILWAYS
2025-2026 Budget Estimate (Rupees in Thousand)
Demand presented on behalf of the Ministry of Railways
Development Expenditure on Capital Account.
| 135. | Capital Outlay on Railways Division | Total : | 22,415,000 22,415,000 |
|---|
NO. 135.- CAPITAL OUTLAY ON RAILWAYS DIVISION
DEMANDS FOR GRANTS
DEMAND NO. 135
( FC12C33 )
CAPITAL OUTLAY ON RAILWAYS DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 for CAPITAL OUTLAY ON RAILWAYS DIVISION.
Voted
Rs. 22,415,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF RAILWAYS .
| 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 44,649,000,000 | 34,084,000,000 | 22,365,000,000 |
| 045 | Construction and Transport | 351,000,000 | 715,000,000 | 50,000,000 |
| Total | 45,000,000,000 | 34,799,000,000 | 22,415,000,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 101,000,000 | 100,000,000 | |
| A11 | Investments | 44,899,000,000 | 34,799,000,000 | 22,315,000,000 |
| Total | 45,000,000,000 | 34,799,000,000 | 22,415,000,000 | |
| (In Foreign Exchange) | (25,877,000,000) | (10,438,000,000) | ||
| (Own Resources) | (25,676,000,000) | (10,338,000,000) | ||
| (Foreign Aid) | (201,000,000) | (100,000,000) | ||
| (In Local Currency) | (19,123,000,000) _________________ | (34,799,000,000) __________________ | (11,977,000,000) _______________ |
NO. 135.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0143 | Investments: | ||||
| 014302 | Non-Financial Institutions : | ||||
| IB3639 DIREC | STRENGTHENING OF PLANNING DEVELOPMENT MON TORATE MINISTRY OF | ITORING AND EVALUATION (PDANDME) | |||
| 014302 | - A11 | Investments | 50,000,000 | ||
| 014302 | - A111 | Investment Local | 50,000,000 | ||
| Total- | STRENGTHENING OF PLANNING | 50,000,000 | |||
| DEVELOPMENT MONITORING AND EVALUATION (PDANDME) DIRECTORATE MINISTRY OF | |||||
| IB3640 MODE | COLLA L) | BORATION OF PAKISTAN RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE | HELIX | ||
| 014302 | - A11 | Investments | 50,000,000 | ||
| 014302 | - A111 | Investment Local | 50,000,000 | ||
| Total- | COLLABORATION OF PAKISTAN | 50,000,000 | |||
| RAILWAYS WITH DIFFERENT | |||||
| ACADEMIC INSTITUTES (TRIPLE HELIX MODEL) | |||||
| 0 | 14302 | Total- Non-Financial Institutions | 100,000,000 | ||
| 0 | 143 | Total- Investments | 100,000,000 | ||
| 0 | 14 | Total- Transfers | 100,000,000 | ||
| 0 | 1 | Total- General Public Service | 100,000,000 | ||
| 04 | Economic Affairs: | ||||
| 045 | Construction and Transport: | ||||
| 0454 | Railway Trasport: | ||||
| 045401 | Railway Trasport : | ||||
| IB3652 ROOM | RENOVATION AND CONSTRUCTION OF OFFICES WOM S AT OFFICE OF THE | ENS BARRACKS AND | MULTI PURPOSE | TRAINING | |
| 045401 | - A03 | Operating Expenses | 101,000,000 | ||
| 045401 | - A039 | General | 101,000,000 | ||
| 045401 | - A11 | Investments | 50,000,000 | ||
| 045401 | - A111 | Investment Local | 50,000,000 |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | |
| ACCOUNTANT GENERAL P | AKISTAN REVENUES | |||
| Total- | RENOVATION AND CONSTRUCTION OF OFFICES WOMENS BARRACKS AND MULTI PURPOSE TRAINING ROOMS AT OFFICE OF THE | 101,000,000 | 50,000,000 | |
| (In Foreign Exchange) | (101,000,000) | |||
| (Foreign Aid) | (101,000,000) | |||
| (In Local Currency) | (50,000,000) | |||
| 045401 | __ Total- Railway Trasport | ____________________ 101,000,000 | ______________ 50,000,000 | |
| 0454 | Total- Railway Trasport | 101,000,000 | 50,000,000 | |
| 045 | Total- Construction and Transport | 101,000,000 | 50,000,000 | |
| 04 | Total- Economic Affairs | 101,000,000 | 50,000,000 | |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 101,000,000 | 150,000,000 | ||
| (In Foreign Exchange) (Own Resources) | (101,000,000) | |||
| (Foreign Aid) | (101,000,000) | |||
| (In Local Currency) | (150,000,000) |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMANDS 2024-2025 Revised Estimate | FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | ||||
| 01 Gener | al Public Service: | |||
| 014 Transf | ers: | |||
| 0143 Invest | ments: | |||
| 014302 Non-Financial Institutions : | ||||
| LO1306 ESTABLISHMENT OF BUSINESS DEVELOPMENT AND | HR SUPPORT UNIT AT PAKISTAN RAILWAYS | |||
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | ESTABLISHMENT OF BUSINESS | 50,000,000 | ||
| DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS | ||||
| LO1307 IMPROVEMENT OF TERMINAL FACILITIES AND ENHA YARD PIPRI KARACHI | NCING SECURITY | ARRANGEMENTS IN | MARSHLING | |
| 014302- A11 | Investments | 100,000,000 | ||
| 014302- A111 | Investment Local | 100,000,000 | ||
| Total- | IMPROVEMENT OF TERMINAL FACILITIES AND ENHANCING SECURITY ARRANGEMENTS IN MARSHLING YARD PIPRI KARACHI | 100,000,000 | ||
| LO1308 INSTALLATION AND COMMISSIONING OF SOLAR SYSTEM AT 155 NOS RAILWAY STATIONS | ||||
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | INSTALLATION AND COMMISSIONING | 50,000,000 | ||
| OF SOLAR SYSTEM AT 155 NOS RAILWAY STATIONS | ||||
| LO1311 REHA SECTION | BILITATION OF TRACK BETWEEN SAMA SATTA | - BAHAWALNAGAR ON SAMA SATTA- | AMRUKA | |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | REHABILITATION OF TRACK BETWEEN SAMA SATTA- BAHAWALNAGAR ON SAMA SATTA- AMRUKA SECTION | 50,000,000 | ||
| LO1312 REPLACEMENT OF ROOF MOUNTED AC PLANTS IN PASSENGER COACHES FOR BETTER SERVICE | ||||
| DELIVERY | ||||
| 014302- A11 | Investments | 400,000,000 |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAN 2024-2025 Revised Estimate | DS FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | ||||
| 014302- A111 | Investment Local | 400,000,000 | ||
| Total- | REPLACEMENT OF ROOF MOUNTED AC PLANTS IN PASSENGER COACHES FOR BETTER SERVICE DELIVERY | 400,000,000 | ||
| (In Foreign Exchange) | (380,000,000) | |||
| (Own Resources) | (380,000,000) | |||
| (In Local Currency) | (20,000,000) | |||
| LO1313 REHA TRACK BETW | ____ BILITATION AND IMPROVEMENT OF KOTRI JAM EEN | _______________ SHORO RAIL LINK | ________________ / PC-1 OF REHAB | _______________ ILITATION OF |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | REHABILITATION AND IMPROVEMENT OF KOTRI JAMSHORO RAIL LINK / PC-1 OF REHABILITATION OF TRACK BETWEEN | 50,000,000 | ||
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) | |||
| (In Local Currency) | (10,000,000) | |||
| LO1314 IMME | ____ DIATE TRACK SAFETY WORK ON TDM-ROH SEC | _______________ TION | _______________ | |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | IMMEDIATE TRACK SAFETY WORK ON TDM-ROH SECTION | 50,000,000 | ||
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) | |||
| (In Local Currency) | (10,000,000) | |||
| LO1315 IMME | ____ DIATE TRACK SAFETY WORK ON ROH-KPR SEC | _______________ TION | _______________ | |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | IMMEDIATE TRACK SAFETY WORK ON ROH-KPR SECTION | 50,000,000 | ||
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAND 2024-2025 Revised Estimate | S FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN RE (In Local Currency) ___ | VENUES SUB-OFF _______________ | ICE, LAHORE _________________ | (10,000,000) ______________ | |
| LO1316 IMPROVE SAFETY THROUGH BETTER COMMUNICATION SYSTEM | ||||
| 014302- A11 | Investments | 20,000,000 | ||
| 014302- A111 | Investment Local | 20,000,000 | ||
| Total- | IMPROVE SAFETY THROUGH BETTER COMMUNICATION SYSTEM | 20,000,000 | ||
| LO1318 UP-G SARHAD JUM | RADATION OF THE SIGNALLING SYSTEM BY PR MA GOTHBADAL | OVIDING COMPUTER BASED INTER LOCKING AT | ||
| 014302- A11 | Investments | 10,000,000 | ||
| 014302- A111 | Investment Local | 10,000,000 | ||
| Total- | UP-GRADATION OF THE SIGNALLING | 10,000,000 | ||
| SYSTEM BY PROVIDING COMPUTER BASED INTER LOCKING AT SARHAD JUMMA GOTHBADAL | ||||
| (In Foreign Exchange) | (8,000,000) | |||
| (Own Resources) | (8,000,000) | |||
| (In Local Currency) | (2,000,000) | |||
| LO1319 ESSE | ___ NTIAL TRACK SAFETY WORK ON SHERSHAH # | ________________ KUNDIAN SECTION | _________________ IN MULTAN DIVIS | ______________ ION |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | ESSENTIAL TRACK SAFETY WORK ON SHERSHAH # KUNDIAN SECTION IN MULTAN DIVISION | 50,000,000 | ||
| LO1320 ESSENTIAL TRACK SAFETY WORK ON ROHRI # SIBI SECTION IN SUKKUR DIVISION | ||||
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | ESSENTIAL TRACK SAFETY WORK ON ROHRI # SIBI SECTION IN SUKKUR DIVISION | 50,000,000 | ||
| LO1328 REPLACEMENT OF OLD AND OBSOLETE SIGNAL GE SHAHDARA BAGH MAINLINE | AR FROM LODHRAN- MULTAN #KHANEWAL- | |||
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM | 50,000,000 | ||
| LODHRAN- MULTAN #KHANEWAL- SHAHDARA BAGH MAINLINE |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAN 2024-2025 Revised Estimate | DS FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN RE | Rs VENUES SUB-OFF | Rs ICE, LAHORE | Rs | |
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) | |||
| (In Local Currency) | (10,000,000) | |||
| LO1329 ESSE SHAHDARA S | ____ NTIAL TRACK SAFETY WORK ON KHANEWAL-S ECTION IN | _______________ HORKOT- FAISALA | ________________ BAD- QILA SHEI | _______________ KHUPURA- |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | ESSENTIAL TRACK SAFETY WORK ON KHANEWAL-SHORKOT- FAISALABAD- QILA SHEIKHUPURA- SHAHDARA SECTION IN | 50,000,000 | ||
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) | |||
| (In Local Currency) | (10,000,000) | |||
| LO1332 ESTA | ____ BLISHMENT OF PROJECT MANAGEMENT UNIT ( | _______________ PMU) IN MINISTRY | ________________ OF RAILWAYS (3 | _______________ RD REVISED) |
| 014302- A11 | Investments | 10,000,000 | ||
| 014302- A111 | Investment Local | 10,000,000 | ||
| Total- | ESTABLISHMENT OF PROJECT | 10,000,000 | ||
| MANAGEMENT UNIT (PMU) IN MINISTRY | ||||
| OF RAILWAYS (3RD REVISED) | ||||
| LO1333 PROC PASSENGER | UREMENT / MANUFACTURING OF 820 HIGH CAP COACHES | ACITY BOGIE FREIGHT WAGONS AND 230 | ||
| 014302- A11 | Investments | 7,000,000,000 | ||
| 014302- A111 | Investment Local | 7,000,000,000 | ||
| Total- | PROCUREMENT / MANUFACTURING OF | 7,000,000,000 | ||
| 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER COACHES | ||||
| (In Foreign Exchange) | (6,890,000,000) | |||
| (Own Resources) | (6,890,000,000) | |||
| (In Local Currency) | (110,000,000) |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | DEMAN 2024-2025 Revised Estimate | DS FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | ||||
| LO1334 REHABILITATION AND OVERHAULING OF TRACK MAINTENANCE MACHINES /CRANES | ||||
| 014302- A11 | Investments | 2,725,000,000 | ||
| 014302- A111 | Investment Local | 2,725,000,000 | ||
| Total- | REHABILITATION AND OVERHAULING | 2,725,000,000 | ||
| OF TRACK MAINTENANCE MACHINES /CRANES | ||||
| (In Foreign Exchange) | (1,660,000,000) | |||
| (Own Resources) | (1,660,000,000) | |||
| (In Local Currency) | (1,065,000,000) | |||
| LO1336 REHA | ___ BILITATION AND STRENGTHENING OF WEAK B | _________________ RIDGES ON PAKIS | _______________ TAN RAILWAYS | _______________ SYSTEM |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | REHABILITATION AND | 50,000,000 | ||
| STRENGTHENING OF WEAK BRIDGES ON PAKISTAN RAILWAYS SYSTEM | ||||
| LO1337 CHINA | PAKISTAN ECONOMIC CORRIDOR (CPEC) SUP | PORT PROJECT A | T MOR (1ST REVISED) | |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | CHINA PAKISTAN ECONOMIC CORRIDOR (CPEC) SUPPORT PROJECT AT MOR (1ST REVISED) | 50,000,000 | ||
| LO1341 UP-GR HAVELIAN | ADATION OF PAKISTAN RAILWAYS EXISTING ( | ML-I) AND ESTABLISHMENT OF DR | Y PORT NEAR | |
| 014302- A03 | Operating Expenses | 100,000,000 | ||
| 014302- A039 | General | 100,000,000 | ||
| 014302- A11 | Investments | 2,900,000,000 | ||
| 014302- A111 | Investment Local | 2,900,000,000 | ||
| Total- | UP-GRADATION OF PAKISTAN RAILWAYS EXISTING (ML-I) AND | 3,000,000,000 | ||
| ESTABLISHMENT OF DRY PORT NEAR HAVELIAN | ||||
| (In Foreign Exchange) | (100,000,000) | |||
| (Foreign Aid) | (100,000,000) | |||
| (In Local Currency) | (2,900,000,000) |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2024-25 Posts 2025-26 | DEMAN 2024-2025 Budget Estimate 2024-2025 Revised Estimate | DS FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | |||
| LO1342 CONS (INCLUDING) | TRUCTION OF NEW TRACK UP-GRADATION/REHABILITATION OF TRACK FROM CHA | MAN YARD | |
| 014302- A11 | Investments | 50,000,000 | |
| 014302- A111 | Investment Local | 50,000,000 | |
| Total- | CONSTRUCTION OF NEW TRACK UP-GRADATION/REHABILITATION OF TRACK FROM CHAMAN YARD (INCLUDING) | 50,000,000 | |
| LO1343 UMBR | ELLA PC-II FOR FEASIBILITY STUDIES AND TRANSACTION ADVISORY SERVICES | ||
| 014302- A11 | Investments | 10,000,000 | |
| 014302- A111 | Investment Local | 10,000,000 | |
| Total- | UMBRELLA PC-II FOR FEASIBILITY STUDIES AND TRANSACTION ADVISORY SERVICES | 10,000,000 | |
| LO1344 ACQU KHARLACHI | ISITION OF LAND FOR RAIL CONNECTIVITY WITH AFGHANISTAN FROM KOHAT (ZERO POINT) TO | ||
| 014302- A11 | Investments | 10,000,000 | |
| 014302- A111 | Investment Local | 10,000,000 | |
| Total- | ACQUISITION OF LAND FOR RAIL CONNECTIVITY WITH AFGHANISTAN FROM KOHAT (ZERO POINT) TO | 10,000,000 | |
| KHARLACHI | |||
| LO1345 RE-COMMISSIONING OF 05 NOS OF ACCIDENTAL LOCOMOTIVES | |||
| 014302- A11 | Investments | 220,000,000 | |
| 014302- A111 | Investment Local | 220,000,000 | |
| Total- | RE-COMMISSIONING OF 05 NOS OF ACCIDENTAL LOCOMOTIVES | 220,000,000 | |
| (In Foreign Exchange) | (210,000,000) | ||
| (Own Resources) | (210,000,000) | ||
| (In Local Currency) | (10,000,000) | ||
| LO1346 SPECI | ___ AL REPAIR OF 100 DE LOCOS FOR IMPROVING | _________________________________ THE RELIABILITY / AVAILABILITY O | ______________ F RUNNING |
| LOCOS | |||
| 014302- A11 | Investments | 1,000,000,000 | |
| 014302- A111 | Investment Local | 1,000,000,000 |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| ACCOUNTANT GENERAL PAKISTAN RE | Rs VENUES SUB-OFF | Rs ICE, LAHORE | Rs | |
| Total- | SPECIAL REPAIR OF 100 DE LOCOS FOR IMPROVING THE RELIABILITY / AVAILABILITY OF RUNNING LOCOS | 1,000,000,000 | ||
| (In Foreign Exchange) | (950,000,000) | |||
| (Own Resources) | (950,000,000) | |||
| (In Local Currency) | (50,000,000) | |||
| LO1348 ESSE | ____ NTIAL TRACK SAFETY WORKS ON KIAMARI- HY | ________________ DERABAD SECTIO | _______________ N IN KARACHI D | _______________ IVISION |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | ESSENTIAL TRACK SAFETY WORKS ON KIAMARI- HYDERABAD SECTION IN KARACHI DIVISION | 50,000,000 | ||
| (In Foreign Exchange) | (40,000,000) | |||
| (Own Resources) | (40,000,000) | |||
| (In Local Currency) | (10,000,000) | |||
| LO1667 FEASI MAZAR-E-SHA | ____ BILITY STUDY FOR TRANS AFGHAN RAIL CONN RIF | ________________ ECTIVITY FROM K | _______________ ARACHI (PAKIST | _______________ AN TO |
| 014302- A11 | Investments | 50,000,000 | ||
| 014302- A111 | Investment Local | 50,000,000 | ||
| Total- | FEASIBILITY STUDY FOR TRANS | 50,000,000 | ||
| AFGHAN RAIL CONNECTIVITY FROM KARACHI (PAKISTAN TO MAZAR-E-SHARIF | ||||
| 014302 | Total- Non-Financial Institutions | 15,255,000,000 | ||
| 0143 | Total- Investments | 15,255,000,000 | ||
| 014 | Total- Transfers | 15,255,000,000 | ||
| 01 | Total- General Public Service | 15,255,000,000 | ||
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 15,255,000,000 | |||
| SUB-OFFICE, LAHORE | ||||
| (In Foreign Exchange) | (10,438,000,000) | |||
| (Own Resources) | (10,338,000,000) | |||
| (Foreign Aid) | (100,000,000) | |||
| (In Local Currency) | (4,817,000,000) |
| NO. 135.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 014 | General Public Service: Transfers: | |||
|---|---|---|---|---|
| 0143 | Investments: | |||
| 014302 KA085 | Non-Financial Institutions : 3 ESSENTIAL TRACK SAFETY WORKS ON KIAMARI- | HYDERABAD SECTION IN KARACHI DIVISION | ||
| 014302 | - A11 | Investments | 500,000,000 | 50,000,000 |
| 014302 | - A111 | Investment Local | 500,000,000 | 50,000,000 |
| Total- | ESSENTIAL TRACK SAFETY WORKS ON KIAMARI-HYDERABAD SECTION IN KARACHI DIVISION | 500,000,000 | 50,000,000 | |
| (In Foreign Exchange) | (400,000,000) | |||
| (Own Resources) | (400,000,000) | |||
| (In Local Currency) | (100,000,000) | (50,000,000) | ||
| KA085 OF TR | 4 RECO AINS ON | _ NSTRUCTION OF RAILWAY BRIDGE NO.4 (5X | __________________ 23') TO ENHANCE B | _______________________________ RIDGE SAFETY AND PUNCTUALITY |
| 014302 | - A11 | Investments | 294,000,000 | 254,000,000 |
| 014302 | - A111 | Investment Local | 294,000,000 | 254,000,000 |
| Total- | RECONSTRUCTION OF RAILWAY BRIDGE NO.4 (5X23') TO ENHANCE BRIDGE SAFETY AND PUNCTUALITY OF TRAINS ON | 294,000,000 | 254,000,000 | |
| KA085 SARHA | 5 UP-GR D JUM | ADATION OF THE SIGNALLING SYSTEM BY MA GOTH BADAL | PROVIDING COMPUTER BASED INTER LOCKING AT | |
| 014302 | - A11 | Investments | 200,000,000 | 16,083,000 |
| 014302 | - A111 | Investment Local | 200,000,000 | 16,083,000 |
| Total- | UP-GRADATION OF THE SIGNALLING SYSTEM BY PROVIDING COMPUTER BASED INTER LOCKING AT SARHAD JUMMA GOTH BADAL | 200,000,000 | 16,083,000 | |
| (In Foreign Exchange) | (190,000,000) | |||
| (Own Resources) | (190,000,000) | |||
| (In Local Currency) _ | (10,000,000) __________________ | (16,083,000) _______________________________ |
NO. 135.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION
| RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| KA0856 ESSE SECTION IN | NTIAL TRACK SAFETY WORKS ON SHAHDARA - SHIEKHUPURA - | FAISALABAD - KHANEWAL | |
|---|---|---|---|
| 014302- A11 | Investments | 200,000,000 | 200,000,000 |
| 014302- A111 | Investment Local | 200,000,000 | 200,000,000 |
| Total- | ESSENTIAL TRACK SAFETY WORKS ON SHAHDARA - SHIEKHUPURA - FAISALABAD - KHANEWAL SECTION IN | 200,000,000 | 200,000,000 |
| (In Foreign Exchange) (Own Resources) | (150,000,000) (150,000,000) | ||
| (In Local Currency) | (50,000,000) | (200,000,000) | |
| KA0857 REHA | _ BILITATION & STRENGHTENING OF WEAK B | _________________ RIDGES ON PAKIST | ________________________________ AN RAILWAYS SYSTEM |
| 014302- A11 | Investments | 200,000,000 | 304,000,000 |
| 014302- A111 | Investment Local | 200,000,000 | 304,000,000 |
| Total- | REHABILITATION & STRENGHTENING | 200,000,000 | 304,000,000 |
| KA0858 ESSE | OF WEAK BRIDGES ON PAKISTAN RAILWAYS SYSTEM NTIAL TRACK SAFETY WORKS ON SHERSHA | H - KUNDIAN SECTION IN MULTAN DIVISION | |
| 014302- A11 | Investments | 200,000,000 | 195,000,000 |
| 014302- A111 | Investment Local | 200,000,000 | 195,000,000 |
| Total- | ESSENTIAL TRACK SAFETY WORKS ON SHERSHAH - KUNDIAN SECTION IN MULTAN DIVISION | 200,000,000 | 195,000,000 |
| (In Foreign Exchange) | (150,000,000) | ||
| (Own Resources) | (150,000,000) | ||
| (In Local Currency) | (50,000,000) | (195,000,000) | |
| KA0859 ESSE | _ NTIAL TRACK SAFETY WORKS ON ROHRI - S | _________________ IBI SECTION IN SUK | ________________________________ KUR DIVISION |
| 014302- A11 | Investments | 200,000,000 | 60,000,000 |
| 014302- A111 | Investment Local | 200,000,000 | 60,000,000 |
| Total- | ESSENTIAL TRACK SAFETY WORKS ON | 200,000,000 | 60,000,000 |
| ROHRI - SIBI SECTION IN SUKKUR DIVISION | |||
| (In Foreign Exchange) | (150,000,000) | ||
| (Own Resources) | (150,000,000) | ||
| (In Local Currency) _ | (50,000,000) _________________ | (60,000,000) ________________________________ |
| NO. 135.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1263 ACQUISITION OF LAND FOR RAIL CONNECTIVITY FROM GAWADAR TO MASTUNG VIA BESIMA AND BESIMA
| 014302- A11 | Investments | 2,210,000,000 | 1,266,953,000 | 10,000,000 |
|---|---|---|---|---|
| 014302- A111 | Investment Local | 2,210,000,000 | 1,266,953,000 | 10,000,000 |
| Total- | ACQUISITION OF LAND FOR RAIL CONNECTIVITY FROM GAWADAR TO MASTUNG VIA BESIMA AND BESIMA | 2,210,000,000 | 1,266,953,000 | 10,000,000 |
| KA1273 ACQU KHARLACHI | ISITION OF LAND FOR RAIL CONNECTIVITY | WITH AFGHANISTAN FROM KOHAT (ZERO | POINT) TO | |
| 014302- A11 | Investments | 200,000,000 | 195,000,000 | |
| 014302- A111 | Investment Local | 200,000,000 | 195,000,000 | |
| Total- | ACQUISITION OF LAND FOR RAIL CONNECTIVITY WITH AFGHANISTAN FROM KOHAT (ZERO POINT) TO KHARLACHI | 200,000,000 | 195,000,000 | |
| KA1326 REPL DELIVERY | ACEMENT OF ROOF MOUNTED A.C PLANTS | IN PASSENGER COACHES FOR BETTER SERVICE | ||
| 014302- A11 | Investments | 100,000,000 | 450,000,000 | |
| 014302- A111 | Investment Local | 100,000,000 | 450,000,000 | |
| Total- | REPLACEMENT OF ROOF MOUNTED A.C PLANTS IN PASSENGER COACHES FOR BETTER SERVICE DELIVERY | 100,000,000 | 450,000,000 | |
| (In Foreign Exchange) | (75,000,000) | |||
| (Own Resources) | (75,000,000) | |||
| (In Local Currency) | (25,000,000) | (450,000,000) | ||
| KA1363 INSTALLATION AND COMMISSIONING OF SOLAR | __________________ SYSTEM AT 155 NOS | _____________________ RAILWAY STATIONS | ___________ | |
| 014302- A11 | Investments | 50,000,000 | 71,000,000 | |
| 014302- A111 | Investment Local | 50,000,000 | 71,000,000 | |
| Total- | INSTALLATION AND COMMISSIONING | 50,000,000 | 71,000,000 | |
| OF SOLAR SYSTEM AT 155 NOS RAILWAY STATIONS | ||||
| KA1367 CONS (INCLUDING) | TRUCTION OF NEW TRACK & UP-GRADATION / REHABILITATION OF TRACK FROM CHAMAN YARD | |||
| 014302- A11 | Investments | 975,000,000 | 110,559,000 | |
| 014302- A111 | Investment Local | 975,000,000 | 110,559,000 |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| ACCOUNTANT GENERAL PAKISTAN | Rs REVENUES SUB-OF | Rs FICE, KARACHI | Rs | |
| Total- | CONSTRUCTION OF NEW TRACK & UP-GRADATION / REHABILITATION OF TRACK FROM CHAMAN YARD (INCLUDING) | 975,000,000 | 110,559,000 | |
| (In Foreign Exchange) | (500,000,000) | |||
| (Own Resources) | (500,000,000) | |||
| (In Local Currency) | (475,000,000) | (110,559,000) | ||
| KA7109 CHINA | -PAKISTAN ECONOMIC CORRIDOR SUPPOR | __________________ T PROJECT (CPEC | _____________________ SP) AT MINISTRY OF RA | ___________ ILWAYS |
| 014302- A11 | Investments | 50,000,000 | 57,000,000 | |
| 014302- A111 | Investment Local | 50,000,000 | 57,000,000 | |
| Total- | CHINA-PAKISTAN ECONOMIC | 50,000,000 | 57,000,000 | |
| CORRIDOR SUPPORT PROJECT (CPECSP) AT MINISTRY OF RAILWAYS | ||||
| KA7111 PRELIMINARY DESIGN / DRAWINGS FOR UPGRAD ESTABLISHMENT OF | ATION/REHABILITATION OF MAIN LINE (ML | -1) AND | ||
| 014302- A11 | Investments | 20,000,000 | 295,000,000 | |
| 014302- A111 | Investment Local | 20,000,000 | 295,000,000 | |
| Total- | PRELIMINARY DESIGN / DRAWINGS FOR UPGRADATION/REHABILITATION OF MAIN LINE (ML-1) AND ESTABLISHMENT OF | 20,000,000 | 295,000,000 | |
| KA7114 PROC PASSENGER | UREMENT/MANUFACTURE OF 820 HIGH CA COACHES | PACITY BOGIE FREIGHT WAGONS AND 230 | ||
| 014302- A11 | Investments | 11,157,000,000 | 8,105,189,000 | |
| 014302- A111 | Investment Local | 11,157,000,000 | 8,105,189,000 | |
| Total- | PROCUREMENT/MANUFACTURE OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER | 11,157,000,000 | 8,105,189,000 | |
| COACHES | ||||
| (In Foreign Exchange) | (10,500,000,000) | |||
| (Own Resources) | (10,500,000,000) | |||
| (In Local Currency) | (657,000,000) | (8,105,189,000) | ||
| KA7115 PROJECT MANAGEMENT UNIT (PMU) IN MINISTRY | __________________ OF RAILWAYS (2ND | _____________________ REVISED) | ___________ | |
| 014302- A11 | Investments | 300,000,000 | 300,000,000 |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2024-25 Posts 2025-26 | N 2024-2025 Budget Estimate | DEMANDS 2024-2025 Revised Estimate | FOR GRANTS 2025-2026 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | ||||
| 014302- A111 | Investment Local | 300,000,000 | 300,000,000 | |
| Total- KA7120 REPL | PROJECT MANAGEMENT UNIT (PMU) IN MINISTRY OF RAILWAYS (2ND REVISED) ACEMENT OF OLD AND OBSOLETE SIGNAL G | 300,000,000 EAR FROM LODHR | 300,000,000 AN -MULTAN-KHANEW | AL #NAME? |
| 014302- A11 | Investments | 600,000,000 | 600,000,000 | |
| 014302- A111 | Investment Local | 600,000,000 | 600,000,000 | |
| Total- | REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL #NAME? | 600,000,000 | 600,000,000 | |
| (In Foreign Exchange) | (550,000,000) | |||
| (Own Resources) | (550,000,000) | |||
| (In Local Currency) | (50,000,000) | (600,000,000) | ||
| KA7121 STRE DIRECTORAT | __ NGTHENING OF PLANNING DEVELOPMENT MO E MINISTRY OF MINISTRY | ________________ NITORING AND E | ____________________ VALUATION (PD&ME) | |
| 014302- A11 | Investments | 50,000,000 | 50,000,000 | |
| 014302- A111 | Investment Local | 50,000,000 | 50,000,000 | |
| Total- | STRENGTHENING OF PLANNING | 50,000,000 | 50,000,000 | |
| KA7129 SPEC RUNNING | DEVELOPMENT MONITORING AND EVALUATION (PD&ME) DIRECTORATE MINISTRY OF MINISTRY IAL REPAIR OF 100 NOS DE LOCOMOTIVES FO | R IMPROVING THE REHABILITEE/AVAILABILITY OF | ||
| 014302- A11 | Investments | 600,000,000 | 2,200,000,000 | |
| 014302- A111 | Investment Local | 600,000,000 | 2,200,000,000 | |
| Total- | SPECIAL REPAIR OF 100 NOS DE LOCOMOTIVES FOR IMPROVING THE REHABILITEE/AVAILABILITY OF RUNNING | 600,000,000 | 2,200,000,000 | |
| (In Foreign Exchange) | (550,000,000) | |||
| (Own Resources) | (550,000,000) | |||
| (In Local Currency) __ | (50,000,000) ________________ | (2,200,000,000) ____________________ |
| NO. 135.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA7133 UP-GRADATION OF PAKISTAN RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF DRY
PORT NEAR
| 014302- A11 | Investments | 1,000,000,000 | |
|---|---|---|---|
| 014302- A111 | Investment Local | 1,000,000,000 | |
| Total- | UP-GRADATION OF PAKISTAN RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF DRY PORT NEAR | 1,000,000,000 | |
| (In Foreign Exchange) | (100,000,000) | ||
| (Foreign Aid) | (100,000,000) | ||
| KA7136 UMBR | (In Local Currency) _ ELLA PCII FOR FEASIBITY STUDIES AND TR | (900,000,000) __________________ ANSACTION ADVISO | _______________________________ RY SERVICES |
| 014302- A11 | Investments | 210,000,000 | 210,000,000 |
| 014302- A111 | Investment Local | 210,000,000 | 210,000,000 |
| Total- KA7137 ESTA | UMBRELLA PCII FOR FEASIBITY STUDIES AND TRANSACTION ADVISORY SERVICES BLISHMENT OF BUSINESS DEVELOPMENT A | 210,000,000 ND HR SUPPORT UN | 210,000,000 IT AT PAKISTAN RAILWAYS |
| 014302- A11 | Investments | 30,000,000 | 13,000,000 |
| 014302- A111 | Investment Local | 30,000,000 | 13,000,000 |
| Total- | ESTABLISHMENT OF BUSINESS DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS | 30,000,000 | 13,000,000 |
| KA7138 COLL MODEL) | ABORATION OF PAKISTAN RAILWAYS WITH | DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX | |
| 014302- A11 | Investments | 25,000,000 | 35,000,000 |
| 014302- A111 | Investment Local | 25,000,000 | 35,000,000 |
| Total- | COLLABORATION OF PAKISTAN | 25,000,000 | 35,000,000 |
| RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX MODEL) | |||
| KA7142 REHABILITATION OF TRACK BETWEEN REHMANI SECTION (SUKKUR DIVISION PH-4) | NAGAR - BAKRANI ROAD ON DADU-HABIB KOT | ||
| 014302- A11 | Investments | 10,000,000 | 6,000,000 |
| 014302- A111 | Investment Local | 10,000,000 | 6,000,000 |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | ||||
| Total- | REHABILITATION OF TRACK BETWEEN REHMANI NAGAR - BAKRANI ROAD ON DADU-HABIB KOT SECTION (SUKKUR DIVISION PH-4) | 10,000,000 | 6,000,000 | |
| KA7143 REHA (PESHAWAR | BILITATION OF TRACK BETWEEN BARULI-SO | HAN BRIDGE ON KUNDIAN - ATTOCK C | ITY SECTION | |
| 014302- A11 | Investments | 10,000,000 | ||
| 014302- A111 | Investment Local | 10,000,000 | ||
| Total- | REHABILITATION OF TRACK BETWEEN BARULI-SOHAN BRIDGE ON KUNDIAN - ATTOCK CITY SECTION (PESHAWAR | 10,000,000 | ||
| KA7145 RECO | MMISSIONING OF 5 ACCIDENTAL LOCOMOTIV | ES | ||
| 014302- A11 | Investments | 150,000,000 | 443,000,000 | |
| 014302- A111 | Investment Local | 150,000,000 | 443,000,000 | |
| Total- | RECOMMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES | 150,000,000 | 443,000,000 | |
| (In Foreign Exchange) | (120,000,000) | |||
| (Own Resources) | (120,000,000) | |||
| (In Local Currency) | (30,000,000) | (443,000,000) | ||
| KA7148 REHA SECTION | __ BILITATION OF TRACK BETWEEN SAMA SATT | ________________ A AND BAHAWAL | __________________ NAGAR ON SAMA S | ______________ ATTA AMRUKA |
| 014302- A11 | Investments | 115,000,000 | 18,000,000 | |
| 014302- A111 | Investment Local | 115,000,000 | 18,000,000 | |
| Total- | REHABILITATION OF TRACK BETWEEN SAMA SATTA AND BAHAWALNAGAR ON SAMA SATTA AMRUKA SECTION | 115,000,000 | 18,000,000 | |
| (In Foreign Exchange) | (100,000,000) | |||
| (Own Resources) | (100,000,000) | |||
| (In Local Currency) | (15,000,000) | (18,000,000) | ||
| KA7310 REHA | __ BILITATION AND OVERHAULING OF TRACK M | ________________ AINTENANCE MAC | __________________ HINES / CRANES | |
| 014302- A11 | Investments | 1,500,000,000 | 2,205,000,000 | |
| 014302- A111 | Investment Local | 1,500,000,000 | 2,205,000,000 | |
| Total- | REHABILITATION AND OVERHAULING OF TRACK MAINTENANCE MACHINES / CRANES | 1,500,000,000 | 2,205,000,000 |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|
| No of 2024-25 Posts 2025-26 | 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN R (In Foreign Exchange) | EVENUES SUB-OF (1,400,000,000) | FICE, KARACHI | ||
| (Own Resources) | (1,400,000,000) | |||
| (In Local Currency) | (100,000,000) | (2,205,000,000) | ||
| KA7311 IMPR | _ OVE SAFETY THROUGH BETTER COMMUNICA | _________________ TION SYSTEM | _____________________ | ___________ |
| 014302- A11 | Investments | 839,000,000 | 10,750,000 | |
| 014302- A111 | Investment Local | 839,000,000 | 10,750,000 | |
| Total- | IMPROVE SAFETY THROUGH BETTER | 839,000,000 | 10,750,000 | |
| COMMUNICATION SYSTEM | ||||
| KA7312 CONSTRUCTION OF LEFT GUIDE BUND OF SHERS (MULTAN DIVISION) | HAH RAILWAY BRIDGE NO.1 ON SHERSHAH-KUNDIAN | |||
| 014302- A11 | Investments | 197,000,000 | 71,000,000 | |
| 014302- A111 | Investment Local | 197,000,000 | 71,000,000 | |
| Total- | CONSTRUCTION OF LEFT GUIDE BUND | 197,000,000 | 71,000,000 | |
| KA7313 IMME | OF SHERSHAH RAILWAY BRIDGE NO.1 ON SHERSHAH-KUNDIAN (MULTAN DIVISION) DIATE TRACK SAFETY WORKS ON TANDO AD | AM-ROHRI SECTION IN SUKKUR DIVISION | ||
| 014302- A11 | Investments | 2,660,000,000 | 1,450,000,000 | |
| 014302- A111 | Investment Local | 2,660,000,000 | 1,450,000,000 | |
| Total- | IMMEDIATE TRACK SAFETY WORKS ON TANDO ADAM-ROHRI SECTION IN SUKKUR DIVISION | 2,660,000,000 | 1,450,000,000 | |
| (In Foreign Exchange) | (660,000,000) | |||
| (Own Resources) | (660,000,000) | |||
| (In Local Currency) | (2,000,000,000) | (1,450,000,000) | ||
| KA7314 IMME | _ DIATE TRACK SAFETY WORKS ON ROHRI-KH | _________________ ANPUR SECTION I | _____________________ N SUKKUR DIVISION | ___________ |
| 014302- A11 | Investments | 3,000,000,000 | 2,217,897,000 | |
| 014302- A111 | Investment Local | 3,000,000,000 | 2,217,897,000 | |
| Total- | IMMEDIATE TRACK SAFETY WORKS ON ROHRI-KHANPUR SECTION IN SUKKUR DIVISION | 3,000,000,000 | 2,217,897,000 | |
| (In Foreign Exchange) | (2,000,000,000) | |||
| (Own Resources) | (2,000,000,000) |
| NO. 135.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| KA9603 CONS | (In Local Currency) TRUCTION OF LINK ROAD FROM NAROWA | (1,000,000,000) __________________ L RAILWAY STATION | (2,217,897,000) __________________ TO SIALKOT PHATT | ______________ AK |
|---|---|---|---|---|
| 014302- A11 | Investments | 200,000,000 | 230,000,000 | |
| 014302- A111 | Investment Local | 200,000,000 | 230,000,000 | |
| Total- KA9608 REHA TRACK BETW | CONSTRUCTION OF LINK ROAD FROM NAROWAL RAILWAY STATION TO SIALKOT PHATTAK BILITATION AND IMPROVEMENT OF KOTRI EEN | 200,000,000 JAMSHORO RAIL LI | 230,000,000 NK / PC-I OF REHABI | LITATION OF |
| 014302- A11 | Investments | 846,000,000 | 1,067,000,000 | |
| 014302- A111 | Investment Local | 846,000,000 | 1,067,000,000 | |
| Total- | REHABILITATION AND IMPROVEMENT OF KOTRI JAMSHORO RAIL LINK / PC-I OF REHABILITATION OF TRACK BETWEEN | 846,000,000 | 1,067,000,000 | |
| (In Foreign Exchange) (Own Resources) | (561,000,000) (561,000,000) | |||
| (In Local Currency) | (285,000,000) | (1,067,000,000) | ||
| KA9609 CONV | ERSION OF BREAKING SYSTEM OF 328 NO | __________________ S OF MBFRS FROM V | __________________ ACCUM BRAKE TO | ______________ AIR BRAKE |
| 014302- A11 | Investments | 641,000,000 | 717,706,000 | |
| 014302- A111 | Investment Local | 641,000,000 | 717,706,000 | |
| Total- | CONVERSION OF BREAKING SYSTEM OF 328 NOS OF MBFRS FROM VACCUM BRAKE TO AIR BRAKE | 641,000,000 | 717,706,000 | |
| (In Foreign Exchange) | (510,000,000) | |||
| (Own Resources) | (510,000,000) | |||
| (In Local Currency) | (131,000,000) | (717,706,000) | ||
| KA9997 THAR CONNECTIVIT | COAL RAIL CONNECTIVITY WITH EXISTING Y WITH PORT | __________________ RAILWAY NETWOR | __________________ K INCLUDING LAST | ______________ MILE |
| 014302- A11 | Investments | 15,110,000,000 | 10,609,863,000 | 7,000,000,000 |
| 014302- A111 | Investment Local | 15,110,000,000 | 10,609,863,000 | 7,000,000,000 |
| Total- | THAR COAL RAIL CONNECTIVITY WITH EXISTING RAILWAY NETWORK INCLUDING LAST MILE CONNECTIVITY WITH PORT | 15,110,000,000 | 10,609,863,000 | 7,000,000,000 |
| NO. 135.- FC1 | 2C33 CAPITAL OUTLAY ON RAILWAYS | DIVISION | DEMANDS FOR GRANTS | ||
|---|---|---|---|---|---|
| No of 2024-25 Po 202 | sts 5-26 2024-2025 Budget Estimate | 2024-2025 Revised Estimate | 2025-2026 Budget Estimate | ||
| Rs | Rs | Rs | |||
| (In For | ACCOUNTANT GENERAL PAKIS eign Exchange) | TAN REVENUES SUB-O (7,110,000,000) | FFICE, KARACHI | ||
| (Own | Resources) | (7,110,000,000) | |||
| (In Local Currency) | (8,000,000,000) | (10,609,863,000) | (7,000,000,000) | ||
| 014302 | Total- | Non-Financial Institutions | _________________ 44,649,000,000 | _________________ 34,084,000,000 | ________________ 7,010,000,000 |
| 0143 | Total- | Investments | 44,649,000,000 | 34,084,000,000 | 7,010,000,000 |
| 014 | Total- | Transfers | 44,649,000,000 | 34,084,000,000 | 7,010,000,000 |
| 01 | Total- | General Public Service | 44,649,000,000 | 34,084,000,000 | 7,010,000,000 |
| 04 Econo | mic Affairs: | ||||
| 045 Const | ruction | and Transport: | |||
| 0454 Railw | ay Trasport: | ||||
| 045401 Railw KA1377 IMPR YAD PIPRI KA | ay Tras OVEME RACHI | port : NT OF TERMINAL FACILITIES AN | D ENHANCING SECURITY ARRANGEMENT IN MARSHILING | ||
| 045401- A11 | Investments | 250,000,000 | 715,000,000 | ||
| 045401- A111 | Investment Local | 250,000,000 | 715,000,000 | ||
| Total- | IMPROVEMENT OF TERMINAL FACILITIES AND ENHANCING SECURITY ARRANGEMENT IN MARSHILING YAD PIPRI KARACHI | 250,000,000 | 715,000,000 | ||
| 045401 | Total- | Railway Trasport | 250,000,000 | 715,000,000 | |
| 0454 | Total- | Railway Trasport | 250,000,000 | 715,000,000 | |
| 045 | Total- | Construction and Transport | 250,000,000 | 715,000,000 | |
| 04 | Total- | Economic Affairs | 250,000,000 | 715,000,000 | |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 44,899,000,000 | 34,799,000,000 | 7,010,000,000 | |
| (In | Foreign Exchange) | (25,776,000,000) | |||
| (Own Resources) | (25,676,000,000) | ||||
| (Foreign Aid) | (100,000,000) | ||||
| (In | Local Currency) | (19,123,000,000) | (34,799,000,000) | (7,010,000,000) | |
| TOTAL | - DEMAND | 45,000,000,000 | 34,799,000,000 | 22,415,000,000 | |
| (In Foreign Exchange) | (25,877,000,000) | (10,438,000,000) | |||
| (Own Resources) | (25,676,000,000) | (10,338,000,000) | |||
| (Foreign Aid) | (201,000,000) | (100,000,000) | |||
| (In Local Currency) | (19,123,000,000) _________________ | (34,799,000,000) _________________ | (11,977,000,000) ________________ |
SECTION IX
MINISTRY OF WATER RESOURCES
2025-2026 Budget Estimate (Rupees in Thousand)
Demand presented on behalf of the Ministry of Water Resources
Development Expenditure on Capital Account. 136. External Development Loans and Advances 50,645,000 of Water Resources Division Total : 50,645,000
NO. 136.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER RESOURCES DIVISION DEMANDS FOR GRANTS
DEMAND NO. 136 ( FC12W01 )
EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER RESOURCES DIVISION
I. ESTIMATES of the Amount required in the year ending 30 June , 2026 for EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER RESOURCES DIVISION. Voted Rs. 50,645,000,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF WATER RESOURCES .
| 2024-2025 Budget Estimate Rs | 2024-2025 Revised Estimate Rs | 2025-2026 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 50,645,000,000 | ||
| Total | 50,645,000,000 | |||
| OBJECT CLASSIFICATION | ||||
| A05 | Grants, Subsidies and Write off Loans | 4,063,000,000 | ||
| A08 | Loans and Advances | 46,582,000,000 | ||
| Total | 50,645,000,000 | |||
| (In Foreign Exchange) | (50,645,000,000) | |||
| (Own Resources) | ||||
| (Foreign Aid) | ___________________ | _______________ | (50,645,000,000) ________________ |
NO. 136.- FC12W01EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER DEMANDS FOR GRANTS RESOURCES DIVISION
III. - DETAILS are as follows :-
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PA | KISTAN REVENUES | ||||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0142 | Transfers (Others): | ||||
| 014202 IB3856 | Trasfe REFUR | r To Non-financial institutions : BISHMENT AND UPGRADATION OF GENERATIO | N UNITS OF MANGLA | POWER STATION | |
| 014202 | - A08 | Loans and Advances | 1,000,000,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 1,000,000,000 | ||
| Total- | REFURBISHMENT AND UPGRADATION | 1,000,000,000 | |||
| OF GENERATION UNITS OF MANGLA POWER STATION | |||||
| (In Foreign Exchange) | (1,000,000,000) | ||||
| (Foreign Aid) | (1,000,000,000) | ||||
| IB3857 | REFUR | ____ BISHMENT & UP-GRADATION OF GENERATION | __________________ UNITS OF MANGLA P | _______________ OWER STATION | _____________ |
| 014202 | - A05 | Grants, Subsidies and Write off Loans | 4,000,000,000 | ||
| 014202 | - A052 | Grants Domestic | 4,000,000,000 | ||
| Total- | REFURBISHMENT & UP-GRADATION OF GENERATION UNITS OF MANGLA POWER STATION | 4,000,000,000 | |||
| (In Foreign Exchange) | (4,000,000,000) | ||||
| (Foreign Aid) | (4,000,000,000) | ||||
| IB3858 | TARBE | ____ LA 5TH EXTENTION HYDRPOWER PROJECT | _______________ | _____________ | |
| 014202 | - A08 | Loans and Advances | 3,400,000,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 3,400,000,000 | ||
| Total- | TARBELA 5TH EXTENTION HYDRPOWER PROJECT | 3,400,000,000 | |||
| (In Foreign Exchange) | (3,400,000,000) | ||||
| (Foreign Aid) | (3,400,000,000) | ||||
| 0 | 14202 | ____ Total- Trasfer To Non-financial institutions | _______________ | _____________ 8,400,000,000 | |
| 0 | 142 | Total- Transfers (Others) | 8,400,000,000 | ||
| 0 | 14 | Total- Transfers | 8,400,000,000 | ||
| 0 | 1 | Total- General Public Service | 8,400,000,000 | ||
| Total- ACCOUNTANT GENERAL | 8,400,000,000 | ||||
| PAKISTAN REVENUES | |||||
| (In Foreign Exchange) | (8,400,000,000) | ||||
| (Own Resources) | |||||
| (Foreign Aid) | (8,400,000,000) |
NO. 136.- FC12W01EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER DEMANDS FOR GRANTS
RESOURCES DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| 01 | General Public Service: | ||
|---|---|---|---|
| 014 | Transfers: | ||
| 0142 | Transfers (Others): | ||
| 01420 | 2 Trasfe | r To Non-financial institutions : | |
| LO166 | 8 DASU | HYDROPOWER PROJECT | |
| 01420 | 2- A08 | Loans and Advances | 20,000,000,000 |
| 01420 | 2- A085 | Loans to Non Financial Institutions | 20,000,000,000 |
| Total- | DASU HYDROPOWER PROJECT | 20,000,000,000 | |
| (In Foreign Exchange) | (20,000,000,000) | ||
| (Foreign Aid) | (20,000,000,000) | ||
| 014202 | _________________ Total- Trasfer To Non-financial institutions | _________________________________ 20,000,000,000 | |
| 0142 | Total- Transfers (Others) | 20,000,000,000 | |
| 014 | Total- Transfers | 20,000,000,000 | |
| 01 | Total- General Public Service | 20,000,000,000 | |
| Total- ACCOUNTANT GENERAL | 20,000,000,000 | ||
| PAKISTAN REVENUES | |||
| SUB-OFFICE, LAHORE | |||
| (In Foreign Exchange) | (20,000,000,000) | ||
| (Own Resources) | |||
| (Foreign Aid) | (20,000,000,000) |
NO. 136.- FC12W01EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER DEMANDS FOR GRANTS
RESOURCES DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, | PESHAWAR |
| 01 | General Public Service: | |
|---|---|---|
| 014 | Transfers: | |
| 0142 | Transfers (Others): | |
| 014202 MR006 | Trasfe 5 DARG | r To Non-financial institutions : AI HYDROELECTRIC POWER STATION REHABILITATION AND CAPACITY ENHANCEMENT |
| 014202 | - A05 | Grants, Subsidies and Write off Loans 28,000,000 |
| 014202 | - A052 | Grants Domestic 28,000,000 |
| Total- | DARGAI HYDROELECTRIC POWER STATION REHABILITATION AND CAPACITY ENHANCEMENT 28,000,000 | |
| (In Foreign Exchange) (28,000,000) | ||
| (Foreign Aid) (28,000,000) | ||
| MR006 | 6 DARG | __________________________________________________ I HYDROELECTRIC POWER STATION REHABILITATION AND CAPACITY ENHANCEMENT |
| 014202 | - A08 | Loans and Advances 472,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions 472,000,000 |
| Total- | DARGI HYDROELECTRIC POWER STATION REHABILITATION AND CAPACITY ENHANCEMENT 472,000,000 | |
| (In Foreign Exchange) (472,000,000) | ||
| (Foreign Aid) (472,000,000) | ||
| MR006 | 7 CHITR | __________________________________________________ AL HYDEL POWER STATION CAPACITY ENHANCEMENT |
| 014202 | - A05 | Grants, Subsidies and Write off Loans 7,000,000 |
| 014202 | - A052 | Grants Domestic 7,000,000 |
| Total- | CHITRAL HYDEL POWER STATION CAPACITY ENHANCEMENT 7,000,000 | |
| (In Foreign Exchange) (7,000,000) | ||
| (Foreign Aid) (7,000,000) | ||
| MR006 | 8 CHITR | __________________________________________________ AL HYDEL POWER STATION CAPACITY ENHANCEMENT |
| 014202 | - A08 | Loans and Advances 193,000,000 |
| 014202 | - A085 | Loans to Non Financial Institutions 193,000,000 |
| Total- | CHITRAL HYDEL POWER STATION 193,000,000 | |
| CAPACITY ENHANCEMENT |
NO. 136.- FC12W01EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER DEMANDS FOR GRANTS
RESOURCES DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 | |
|---|---|---|---|---|
| 2024-25 2025-26 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | ||||
| (In Foreign Exchange) | (193,000,000) | |||
| (Foreign Aid) | (193,000,000) | |||
| PR1179 WARS | ___ AK HYDROLECTRIC POWER STATION 2ND REH | _________________ ABLILITATION | ||
| 014202- A05 | Grants, Subsidies and Write off Loans | 28,000,000 | ||
| 014202- A052 | Grants Domestic | 28,000,000 | ||
| Total- | WARSAK HYDROLECTRIC POWER STATION 2ND REHABLILITATION | 28,000,000 | ||
| (In Foreign Exchange) | (28,000,000) | |||
| (Foreign Aid) | (28,000,000) | |||
| PR1181 MOHM | ___ AND DAM HYDROPWER PROJECT | _________________ | ||
| 014202- A08 | Loans and Advances | 20,000,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 20,000,000,000 | ||
| Total- | MOHMAND DAM HYDROPWER PROJECT | 20,000,000,000 | ||
| (In Foreign Exchange) | (20,000,000,000) | |||
| (Foreign Aid) | (20,000,000,000) | |||
| PR1182 WARS | ___ AK HYDROELECTRIC POWER STATION 2ND RE | _________________ HABALITATION | ||
| 014202- A08 | Loans and Advances | 817,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 817,000,000 | ||
| Total- | WARSAK HYDROELECTRIC POWER STATION 2ND REHABALITATION | 817,000,000 | ||
| (In Foreign Exchange) | (817,000,000) | |||
| (Foreign Aid) | (817,000,000) | |||
| 014202 | ___ Total- Trasfer To Non-financial institutions | _________________ | ________________ 21,545,000,000 | |
| 0142 | Total- Transfers (Others) | 21,545,000,000 | ||
| 014 | Total- Transfers | 21,545,000,000 | ||
| 01 | Total- General Public Service | 21,545,000,000 | ||
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | 21,545,000,000 | |||
| (In Foreign Exchange) | (21,545,000,000) | |||
| (Own Resources) | ||||
| (Foreign Aid) | (21,545,000,000) |
NO. 136.- FC12W01EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER DEMANDS FOR GRANTS
RESOURCES DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 01 | General Public Service: | ||
|---|---|---|---|
| 014 | Transfers: | ||
| 0142 | Transfers (Others): | ||
| 01420 | 2 Trasfe | r To Non-financial institutions : | |
| QA06 | 85 NAUL | ONG STORAGE DAM JHAL MAGSI BALOCHISTAN | |
| 01420 | 2- A08 | Loans and Advances | 200,000,000 |
| 01420 | 2- A085 | Loans to Non Financial Institutions | 200,000,000 |
| Total- | NAULONG STORAGE DAM JHAL MAGSI | 200,000,000 | |
| BALOCHISTAN | |||
| (In Foreign Exchange) | (200,000,000) | ||
| (Foreign Aid) | (200,000,000) | ||
| 014202 | ______________________ Total- Trasfer To Non-financial institutions | ____________________________ 200,000,000 | |
| 0142 | Total- Transfers (Others) | 200,000,000 | |
| 014 | Total- Transfers | 200,000,000 | |
| 01 | Total- General Public Service | 200,000,000 | |
| Total- ACCOUNTANT GENERAL | 200,000,000 | ||
| PAKISTAN REVENUES SUB-OFFICE, QUETTA | |||
| (In Foreign Exchange) | (200,000,000) | ||
| (Own Resources) | |||
| (Foreign Aid) | (200,000,000) |
NO. 136.- FC12W01EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF WATER DEMANDS FOR GRANTS
RESOURCES DIVISION
| No of Posts | 2024-2025 | 2024-2025 | 2025-2026 |
|---|---|---|---|
| 2024-25 2025-26 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT |
| 01 | General Public Service: | ||
|---|---|---|---|
| 014 | Transfers: | ||
| 0142 | Transfers (Others): | ||
| 01420 SD010 | 2 Trasfe 7 HARP | r To Non-financial institutions : O HPP SKARDU | |
| 01420 | 2- A08 | Loans and Advances | 500,000,000 |
| 01420 | 2- A085 | Loans to Non Financial Institutions | 500,000,000 |
| Total- | HARPO HPP SKARDU | 500,000,000 | |
| (In Foreign Exchange) | (500,000,000) | ||
| (Foreign Aid) ________________ | (500,000,000) _________________________________ | ||
| 014202 | Total- Trasfer To Non-financial institutions | 500,000,000 | |
| 0142 | Total- Transfers (Others) | 500,000,000 | |
| 014 | Total- Transfers | 500,000,000 | |
| 01 | Total- General Public Service | 500,000,000 | |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT | 500,000,000 | ||
| (In Foreign Exchange) | (500,000,000) | ||
| (Own Resources) | |||
| (Foreign Aid) | (500,000,000) | ||
| TOTAL - DEMAND | 50,645,000,000 | ||
| (In Foreign Exchange) | (50,645,000,000) | ||
| (Own Resources) | |||
| (Foreign Aid) _________________ | (50,645,000,000) _________________________________ |