Performance Based Budget 2021-22 / 2023-24, part 3

FY 2021-22Performance based budgetPages 201 to 224 of 224

The Performance Based Budget 2021-22 / 2023-24 is part of the federal budget for FY 2021-22. This page reproduces the text of its 224 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer, without OCR. Tables are rebuilt from the page layout and can differ from the printed columns, a page that is only a chart or image links to the PDF, and blank pages are left out. Check the official PDF before relying on any figure.

Page 201

Science and Technology Division

Budget by Outputs

Budget by Outputs Rs. '000
Oututs - Office Resonsible Actual Expenditure Budget Foreca sts
p p 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
Total 8,556,706 9,385,663 14,140,338 18,542,000 9,948,000 10,097,000
Budget by Inputs Rs. '000
I Actual Expenditure Budget Forec asts
npu s 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
A01 Employee Related Expenses 4,803,647 4,671,683 5,324,976 6,387,035 5,508,147 5,591,521
A02 Project Pre-Investment Analysis 168,513 201,667 363,678 737,126 161,994 164,388
A03 Operating Expenses 787,011 949,622 2,098,765 2,284,609 875,597 888,537
A04 Employees Retirement Benefits 1,951,414 1,758,298 2,143,787 2,147,207 2,179,415 2,211,623
A05 Grants, Subsidies & Write off Loans 760,308 787,506 1,290,081 1,097,181 1,113,627 1,130,096
A06 Transfers 35,984 82,593 89,988 227,397 40,985 41,591
A09 Physical Assets 18,198 674,228 1,385,481 2,242,794 38,417 38,985
A12 Civil Works 238,159 1,373,188 3,039,685
A13 Repairs & Maintenance 31,631 21,908 70,394 378,966 29,818 30,259
Total 8,556,706 9,385,663 14,140,338 18,542,000 9,948,000 10,097,000

Medium-Term Outcome(s) Outcome 1: Research and knowledge trickle down from developed world Outcome 2: Availability of trained science and technology (S&T) manpower Outcome 3: Efficient, responsive & productive S&T setup Outcome 4: Promising smooth and efficient working of S&T Sector Outcome 5: Availability of Efficient Technical support for Public & Private Sector Outcome 6: Promotion of metrology, standards, testing and quality assurance system Outcome 7: Science & Technology For Economic Development through PPP mode

Performance Indicators and Targets

O Selected Performance Targets Achieved Planned Targets Forecas t Targets
utputs Idi
ncators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
1. Promotion of Standards and No. of Testing and Calibration Laboratories Accredited by PNAC 160 160 170 180 190 190
Quality Assurance. No. of Inspection Bodies Accredited by PNAC 11 11 11 13 14 15
No. of Medical Lab. Accreditation by PNAC 7 7 8 9 10 10
No. of Halal Certification Bodies by PNAC 5 5 6 7 8 9
Certification Bodies (PNAC) 7 7 8 9 10 11
Proficiency Testing (PNAC) 4 4 5 5 6 7
Product Certification (PNAC) 1 1 2 3 4 5
Certification of Persons (PNAC) 1 2 3 4 5
Trainings/Courses (PNAC) 12 12 12 12 12 12
No. of Testing & Calibration 2785 2813 3000 3200 3400 3800

Ministry of Science and Technology

Page 202

Science and Technology Division

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
Services Provided by NPSL
Physical Working Standards Fabricated/Calibrated and Reference Materials Developed (NPSL) 31 35 40 40 40 50
No. of Training/Workshop Organized by NPSL 3 4 8 10 15 18
On-site Calibrations by NPSL 150 165 200 220 300 350
No. of Public/Private Sectors Clients Served (NPSL) 305 336 350 400 450 450
International Traceability of Equipment (NPSL) 4 15 15 10
Traceability of In house Equipment (NPSL) 53 58 70 90 100 150
PT Program Organized by NPSL 6 5 5 5 8 12
Participation In International ILC/PT Programs (NPSL). 2 3 2 2 2 2
Paper Published (International), NPSL 1 5 5 5 5 5
Paper Published (National), NPSL 2 5 5 5 5 5
Technical Reports (NPSL) 5 6 6 6 6 6
Consultancies Provided by NPSL 2 3 5 5 5
MoUs Signed by NPSL 3 3 4 4 5 5
Students Supervised (NPSL) 1 4 5 5 5 10
No. Need based Projects (NPSL). 2 5 8 10 15
2. Promotion of Alternate Energy No. of R&D Projects on emerging water related issues (PCRWR). 4 6 5 5 5
and Water Quality. Operation of Research Farms (1286 acres) and Pilot Sites for innovative research and demonstration activities to end users (Nos.), PCRWR 7 7 7 7 7
Training of Farmers/end users/community on efficient water conservation techniques and rainwater harvesting (persons), PCRWR 400 300 400 400 400
Desertification Control and rainwater harvesting activities Plantation (acres), PCRWR 40 50 50 50 50
Desertification Control and rainwater harvesting activities Rainwater harvesting (No.), PCRWR. 2 2
Capacity Building of Staff of Water Supply Agencies and professionals (Persons). 100 200 300 300 200

Ministry of Science and Technology

Page 203

Science and Technology Division

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
Monitoring of Bottled Water throughout the country (no. of Quarters per year), PCRWR. 4 4 4 4 4
Prototype development of renewable energy products (PCRET) 5 6 7 4 4 3
Accreditation of Testing Lab with ISO-17025 standard (PCRET). 1
Monitoring Water Quality Health of Major Rivers (Nos.)., PCRWR. 6 6
Annual Report, Newsletter, Brief Handouts, Research Reports, Paper and Publications for end users, professionals and policy makes (No.), PCRWR. 14 14 14 14 20
Provide Consultancy/technical services to Public/Private sector organizations in the field of renewable energy technologies (PCRET) 5 4 4 6 6 7
Impact factor Journals publications in the field of Advance PV Technologies (PCRET) 1 2 1 2 2 3
Collaboration/signing of MoUs with National/International Universities/Organizations/Comp anies (PCRET) 4 8 4 4 3
PV Panel testing services to Public/Private Sector (PCRET) 12 7 4 5 10 11
MS research projects carried out at PCRET lab 2 1 2 4 4 4
PHD research projects carried out at PCRET lab (PCRET) 3 2 1 1 2 2
Arrangement of renewable energy seminars/conferences (PCRET) 1 1 2 3 3
Training programs to installers/users of renewable energy applications (PCRET) 2 3 1 4 4 4
Number of projects with international financial/technical cooperation / organizations related to renewable energy (PCRET) 1 1 2 3 3 3
Seminars, Workshops and Professional meetings (Nos.), PCRWR. 15 15 15 15 20
PNC-IHP meetings on National Hydrological Programme (Nos.), 1 1 1 1 1

Ministry of Science and Technology

Page 204

Science and Technology Division

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
PCRWR.
Fabrication and distribution of indigenous technologies like microbiological testing kits, testing-meters, etc (Mehfooz Pani Tablets - MPT Nos.) PCRWR. 10000 10000 10000 12000
Patents filed in the field of renewable energy technologies (PCRET) 3 1 1 1
Groundwater Investigation Services (Nos.), PCRWR 25 30 30 30 50
Fabrication and distribution of indigenous technologies like microbiological testing kits, testing-meters, etc (Micro testing kists Nos.) PCRWR. 30000 20000 10000 10000 8000
National Water Quality Monitoring throughout field laborities (No. of Samples): Drinking Water Testing, PCRWR 13000 13000 13000 13000 13000
National Water Quality Monitoring throughout field laborities (No. of Samples): Waste Water Testing, PCRWR 30000 20000 10000 10000 8000
3. Promotion of Paper to be published by NUST 1028 1224 1370 1700 2000 2400
Higher Education in the field of Science and Technology Industrial linkage established by NUST 725 780 805 850 875 925
No. of Patent/Copy rights /trademarks filed by NUST 206 250 300 350 400 450
No. of Research Articles to be presented in conferences by NUST 485 469 122 450 500 600
No. of Patent/Copy rights /trademarks filed by NUST 300
No. of Research Articles to be presented in conferences by NUST 400
4. Formulation / Implementation of No. of S&T Policy Studies/ Technical Reports (PCST) 2 1 5 5 5 5
Policy Frame Work and Provision of Adi S Technology Foresight Studies (No.), PCST 1 1 1 1 1
mn upports. Executive Committee of NCST meetings (PCST) 1 1 1 1
Quarterly Journal "Science Technology" (PCST). 4 4 4 4 4 4
PCST Quarterly Newsletter "STI Voice" (PCST) Books (Directories etc.), PCST. 4 1 4 1 4 1 4 1

Ministry of Science and Technology

Page 205

Science and Technology Division

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
5. Research and Development for Socio Economic Testing of Building Materials (Quality Control and Quality Assurance), CWHR. 17 25 57 60 60 60
Development Non Destructive Testing Contract Research and Consultancy Services, CWHR. 4 5 6 8 10 10
To coordinate and maintain liaison with international organization and institute for arranging training or expert services (No.) (NIO) 3 3 4 5 5 3
To undertake mission oriented multi-disciplinary research in Pakistan maritime zones (NIO). 3 3 20 20 20 20
No. Clients to be served by PCSIR 13316 14584 14,000 14500 15000 15500
No. Processes Developed (PCSIR). 221 210 190 195 200 210
No. Processes Leased Out (PCSIR) 56 72 70 75 80 85
No. of Services Provided by PCSIR. 40478 44318 38000 38500 40000 42500
No. Patent Filed (PCSIR). 42 28 55 55 55 55
No. Patents Obtained (PCSIR). 5 12 30 30 30 30
No. Students Supervised (PCSIR). 1673 2305 950 950 1000 1000
No. Consultancies Provided (PCSIR) 522 525 400 425 450 475
No. Technical / Feasibility Reports (PCSIR). 270 281 170 175 180 185
No. of Paper Published (International) PCSIR. 160 113 190 190 190 190
No. of Paper Published (National) PCSIR. 50 52 80 85 85 90
No. Analytical Equipment Development (PCSIR). 208 213 170 173 175 180
Exhibitions / Conferences / Seminars Organized by PCSIR. 60 54 95 95 95 95
Research & Development of Electronic Products (NIE). 07 06 10 10 10 10
Design & Development of Energy Conservative Products, Energy Management & Audit by NIE. 5000 45000 6000 6000 6000 6000
No. of Testing Calibration of Electronics Equipment (NIE). 95 103 100 100 100 100
No. of fabrication of printed circuits board of different layer jobs (NIE) 1050 1030 1300 1300 1300 1300

Ministry of Science and Technology

Page 206

Science and Technology Division

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
To Impart Advance Training in IT & Electronics (NIE) 400 410 600 600 600 600
Provide Internship to University Students by NIE 200 250 300 300 300 300
Design & Development of Energy Conservative Products, Energy Management & Audit (NIE) 6000
Trainings/Workshops Organized by PCSIR 88 74 150 155 155 155
No. MoUs Signed by PCSIR 17 25 50 50 50 50
Procurement of Specialized instruments and equipments, transfer of marine technology, and development of cooperative research program by NIO. 3 3 4 6 8 8
Civil Engineering Conference, Exhibitions, Symposia etc. (CWHR). 1 1 3 3 3 3
Other Activities Related to joint Collaboration (CWHR). 1 2 3 6 6 6
Interaction with Industries (visits), PCSIR. 1930 1929 1200 1200 1300 1400
Skill Development and Training to Organizations (CWHR). 2 1 3 3 3 3
Dissemination of R&D Products (CWHR). 2 1 5 5 7 7
6. Popularization of Science. No.of research and development organizations to be provided with support (PSF) 90 95 60 60 65 70
Financial Support to Societies/ Journals/ Schools by PSF 10 10 10 10 10 10
No. of Research Initiatives to by undertaken by PSF 30 42 35 35 37 38
Financial Support to Conferences/ Workshops/ Symposium by PSF 35 40 50 55 60 70
Financial Support to Organize Project Formulation Workshops by PSF 4 4 4 4 4 4
Financial Support to Scientific Societies of Pakistan by PSF 14 15 13 18 20 23
Literature Search & Supply of S&T Documents (PASTIC) 90500 91000 93000 95000 98000 100000
No. of Users served by PASTIC for Documents Supply Services. 7320 7500 7700 7900 8100 8300
No. of Events (Seminars, Symposia, Exhibitions) organized by PASTIC. 8 8 10 13 15 20
Technology Roundup No. of 6 6 6 6 6 6

Ministry of Science and Technology

Page 207

Science and Technology Division

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
issues brought out electronically (PASTIC).
Pakistan Journal of Computer & Information Systems (PASTIC) 1 2 2 2 2 2
No. of Library and Information Professionals / Researchers trained in the area of ICT / Research Tools by PASTIC 1600 1700 2000 2500 3000 3500
No. of specimens Identified Curated, Catalogued and Preserved in PMNH Laboratory. 35112 22000 28000 29500 40000 47000
No. of Collaboration /MoUS signed with National and International Organizations by PMNH. 8 12 6 11 12 13
No. of visit in the different area of the Country for the collection of Natural History specimens by PMNH. 19 12 17 20 19 21
No. of Research Articles/ Books/ Monographs/ Paten is published in National and International Journals by PMNH. 37 24 23 18 20 21
Workshop / symposia training on taxidermy medical plants / gemstone / are mineral identifications by PMNH 7 10 12 13 13 13
Development / maintenance of dioramas / display for public education by PMNH. 31 20 27 31 34 34
No. of Schools / Colleges / Universities and General Public Visited in PMNH. 16678 139678 215000 150000 175000 175000
No. of Organizations served regarding printing services by PASTIC 12 13 15 17 20 25
Technology databases, PASTIC. 14 14 14 16 18 20
No. of Printing Jobs complected by PASTC. 177 182 187 192 197 200
Impart of Education through lectures, public display (PMNH). 35 22 30 35 38 38
Abstracting Service (Pakistan Science Abstracts, PSA in 10 main subjects) PASTIC. 6000 8000 12000 16000 20000 25000
No. of clients served by Library (PASTIC). 12655 12700 14500 15000 15500 16000

Ministry of Science and Technology

Page 208

States and Frontier Regions Division

Principal Accounting Officer

Secretary, States and Frontier Regions Division

Executive Authority

Minister for State and Frontier Regions

Goal

a. To protect and regulate States & Frontier Regions and manage a supporting service for this purpose.

  • b. Rehabilitation and Repatriation of Afghan Refugees in Pakistan

c. To manage temporary stay of Afghan Refugees in Pakistan.

Budget Details:
Budget by Demands Rs. '000
Demand for Grants Demand No Total
2021-22
States and Frontier Regions Division (Voted) 1 83 2,621,000
Total 2,621,000
Budget by Outputs
Budget by Outputs Rs. '000
Outputs - Office Responsible Actual Expenditure Budget Foreca sts
2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
1 Administrative and policy formulation services - Main Secretariat 122,681 112,719 138,318 156,000 158,321 160,702
2 Maintenance of Afghan refugees' camps - Chief Commissionerate for Afghan Refugees 762,042 496,025 572,087 595,000 603,853 612,936
3 Allowance for ex- rulers of merged / acceded states - Main Secretariat 21,853 8,400 20,469 20,460 20,764 21,077
4 Management of levies & khassadars 12,812,764 2,097,842 1,861,422 1,849,540 1,877,061 1,905,285
- Home & Tribal Affairs Department Baluchistan
Total 13,719,340 2,714,986 2,592,296 2,621,000 2,660,000 2,700,000
Budget by Inputs

Rs. '000

Actual Expenditure Budget Forecas ts
Input 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
A01 Employee Related Expenses 12,929,116 2,535,326 2,273,906 2,324,357 2,358,943 2,394,415
A03 Operating Expenses 467,386 109,972 127,151 130,713 132,658 134,653
A04 Employees Retirement Benefits 21,049 27,052 33,588 25,790 26,174 26,567
A05 Grants, Subsidies & Write off Loans 16,139 14,702 37,897 30,710 31,167 31,636
A06 Transfers 251,897 5,000 95,000 85,250 86,519 87,820
A09 Physical Assets 7,212 3,519 3,838 4,293 4,357 4,422
A13 Repairs & Maintenance 26,541 19,415 20,916 19,887 20,183 20,486
Total 13,719,340 2,714,986 2,592,296 2,621,000 2,660,000 2,700,000

Ministry of State and Frontier Regions

Page 209

States and Frontier Regions Division

Medium-Term Outcome(s) Outcome 3: Maintenance of Afghan Refugees by providing health and education facilities in their camps Outcome 2: To manage temporary stay of registered Afghan refugees living in Pakistan and their repatriation on voluntary basis Outcome 1: Improved security services of Baluchistan

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
2. Maintenance of Afghan refugees' Provision of basic health facilities (No. of patients per month) 18400 18400 18400 18400 18400 18400
camps Provision of basic education facilities (No. of students enrolled) 57126 97000 98712 98712 98712 98712
Provision of water and sanitation facilities (No. of hand pumps) 1440 1440 1440 1440 1440 1440
Provision of water and sanitation facilities (No. of tube wells) 66 66 66 66 66 66
Total population of registered Afghans refugees in Pakistan (in numbers) 1401992 1421946 1401992 1435445 1435445 1435445
No. of Afghan refugees to be repatriated 6388 1125 45000 45000 45000 45000
Total Number of Afghan refugees (in million) Estimated 3 2.7 3 3 3 3
Number of registered afghan refugees (in million) 1 1 1 1 1 1
Number of un-registered afghan refugees (in million) Estimated 1 1 1 1 1 1
No. of Basic Health units for Afghan refugees Commissionerate of Afghan refugees (CAR) 44 44 44 44 44 44
No. of teachers 2351 2351 2351 2351 2351 2351
No. of schools 273 273 273 273 273 273
No. of beneficiaries 877042 877042 877042 877042 877042 877042
No. of NGO,s 32 32 32 32
3. Allowance for ex- rulers of merged / acceded states Numbers of person benefitting from this allowance 6 6 6 6 6 6
4. Management of levies & khassadars Strength of Khassadars & Levies for maintenance of law & order - (In Numbers) 49384 6559 6559 6559 6559 6559
Number of beneficiaries to be compensated (deceased/injured Federal Levies Personnel) 20 25 35 40 45 50
Amount to be distributed for compensation (deceased/injured Federal Levies Personnel) 30210000 6080360 95000000 850000000 95000000 9500000

Ministry of State and Frontier Regions

Page 210

Water Resources Division

Principal Accounting Officer

Secretary, Water Resources Division

Executive Authority

Minister for Water Resources

Goal

Development of country's water and hydropower resources to meet current and future challenges of water shortage and provision of affordable, environmental friendly renewable energy, act as catalyst in the implementation of the National Water Policy by taking all stakeholders on board, through creativity, initiative, innovation and technology.

Policy Documents

1 National Water Policy

Budget Details:
Budget by Demands
Demand for Grants Demand No Part of Demand of: Total Demand 2021-22 Related Demand 2021-22
1 Water Resources Division 84 Water Resources Division 523,000 523,000
2 Development Expenditure of Water Resource 117 Water Resources Division 92,472,692 92,472,692
Division
3 External Development Loans and Advances (Voted) 123 Economic Affairs Division 75,865,528 11,000,000
Total 168,861,220 103,995,692
Budget by Outputs

Rs. '000

Actual Expenditure Budget Forec asts
Outputs - Office Responsible
2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
1 Admin support / Policy development and approval / technical support - M/o Water Resources 157,389 184,271 289,637 320,000 324,000 330,900
2 Climate resilient Water infrastructure development - WAPDA and Provincial Irrigation departments for federally funded projects 11,213,988 17,274,437 21,114,108 43,313,108 46,000,000 48,320,000
3 Sustainable water resource management, monitoring & flood mitigation services - IRSA and WAPDA for the purposes of water management and CEA/CFFC for coordination of flood irrigation services 64,782,354 95,736,214 59,765,267 59,908,635 62,164,715 63,164,800
4 Research & development / capacity building - WAPDA,CEA/CFFC,IRSA 180,106 620,233 398,000 453,949 42,285 42,300
Total 76,333,836 113,815,156 81,567,012 103,995,692 108,531,000 111,858,000

Ministry of Water Resources

Page 211

Water Resources Division

Budget by Inputs

udget by Inputs Rs. '000
Actual Expenditure Budget Forec asts
Input 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
A01 Employee Related Expenses 208,781 228,015 318,087 360,545 365,380 372,280
A03 Operating Expenses 58,993 51,672 170,064 92,422 94,270 94,300
A04 Employees Retirement Benefits 7,770 2,773 6,000 5,400 5,508 5,520
A05 Grants, Subsidies & Write off Loans 45,899,858 99,757,729 67,018,187 92,481,192 95,538,585 98,328,590
A06 Transfers 664 500 510 550
A08 Loans and Advances 30,153,554 13,760,986 14,041,324 11,000,000 12,470,000 13,000,000
A09 Physical Assets 1,327 9,029 5,310 44,013 44,895 44,900
A13 Repairs & Maintenance 2,890 4,952 8,040 11,620 11,852 11,860
Total 76,333,836 113,815,156 81,567,012 103,995,692 108,531,000 111,858,000

Medium-Term Outcome(s) Outcome 1: Ensuring a consistent supply of water for agriculture, residential, commercial and industrial use, and the prevention of climate risk including floods

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
1. Admin support / Policy development and approval / technical support Finalization/Approval of National Water Policy Approved
2. Climate resilient Water infrastructure development Number of Medium Dams to be started 1 Naulong Dam (0.20 MAF)
Number of Large Dams to be Started 1 Mohmand Dam (0.676 MAF) 1 Diamer Basha Dam (6.40 MAF)
Total water storage capacity(MAF) 15.89 MAF 15.89 MAF 15.89 MAF 15.89 MAF 15.89 MAF 16.05 MAF
Number of Feasibility Studies (FS) to be completed including formulation of Detailed Engineering Design (DED) and PC-I for Large Dams 1 Mohmand Dam (DED) (0.676 MAF)
Number of Feasibility Studies (FS) to be completed including formulation of Detailed Engineering Design (DED) and PC-I for Medium Dams 3 - Shyok Multipurpose Dam (FS) (5.5 MAF) - Murunj Dam 2 - Hingol Dam (DED) (0.816 MAF) - Chiniot Dam (DED) (0.85 3 - Bhimber Dam (FS & DED) (0.029 MAF) - Bara Dam
(FS & DED) (0.60 MAF) MAF) (DED) (0.062 MAF)

Ministry of Water Resources

Page 212

Water Resources Division

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecast Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
Number of Feasibility Studies (FS) to be started including formulation of Detailed Engineering Design (DED) and PC-I for Medium Dams - Sindh Barrage (FS) (1.80 MAF) 4 - Kurram Tangi Dam - Stage II (FS & DED) (0.90 MAF) - Hingol Dam (DED) (0.816 MAF) 2 - Tank Zam (DED) (0.162 MAF) - Bara Multipurpose Dam (DED) (0.062 MAF) - Tank Zam Dam (DED) (0.162 MAF)
- Bhimber Dam (FS & DED) (0.029 MAF)
Finalization/Approval of National Water Policy Number of Medium Dams to be completed Approved Chiniot Dam (DED) (0.85 MAF) 1 Nai Gaj Dam (0.16 MAF)
3. Sustainable water resource management, Hydrology & Research: Hydro meteorological Station (HYCOS) under O&M 5 O&M carried out O&M continued O&M continued O&M continued O&M continued
monitoring & flood mitigation services Flood Telemetry Stations under O&M 44 05 34 O&M continued O&M continued O&M continued
Weather Observations under O&M 12 O&M carrired out 12 O&M continued O&M continued O&M continued
Expansion of Flood Forecasting Stations under Flood Management Component of 2nd Rehabilitation of Warsak Project 9 Letter of Credit established 9 O&M continued O&M continued
Installation of automatic stream gauging stations to be completed by Neelum Jehlum Hydro-Power Project funded 4 (carried out) 4 (completed) O&M continued O&M continued O&M continued
Expansion of Flood Telemetric Station under TIKA 18 concept paper for Stations has been submitted. PC-I will be processed and approved. Installation of 18 Stations will be carried out. O&M of the Project to be continued.
Automation of 20 No. Existing Manual Gauging Stations under 0 world bank has shifted Proposal has been
WCAP WCAP funds to Covid-19 considered to be included in

Ministry of Water Resources

Page 213

Water Resources Division

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecast Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
Installation of new Automatic Hydromet and Gauges Stations in Balochistan funded by Foreign donors/PID Flood Protection Sector Project- III. Proposal to be included in Flood Protection Sector Project- III
Development of Telemetry Network in Upper Indus Basin Funder by WB under Dasu HP Up gradation of Existing FFT and Manual Climate Stations funded by World Bank under WCAP Project. 46 O&M carried out PC-I will be processed and approved. O&M continued PC-I has been prepared. 34 Stations and 12 weather stations installation of Stations will be carried out. O&M continued O&M of the Project to be continued. O&M continued
4. Research & development / capacity building Number of research studies initiated/carried out (along with work completed in %age) 5 (20%) 5 (20%) 5 (20%) 5 (20%)
Installation of new Weather Stations under Pakistan Glacier Monitoring Network Project (KfW funded) Pre- qualification of contractors completed Bidding/Tende r/Evaluation was done Tendering Process is in final stage Installation of AWS & ARL's. Installation of AWS and ARL's to be continued.
Mass balance study/survey (Passu, Yashkuk, Barpu, Hispar Glaciers) (Number) 2 2 1 3 3
Snout Survey (Kuki Jerab, Dook Pal, Hunza, Astore and Gilgit Glaciers) (Number) 1 4 1 1 1

Ministry of Water Resources

Page 214

National Assembly

Principal Accounting Officer

Secretary, National Assembly

Executive Authority

Prime Minister

Goal

Smooth functioning of legislation

Budget Details:
Budget by Demands Rs. '000
Demand for Grants Demand No Total
2021-22
National Assembly (Voted) 1 71 3,195,288
National Assembly (Charged) 2 71 2,385,712
Total 5,581,000
Budget by Outputs Rs. '000
Actual Expenditure Budget Foreca sts
Outputs - Office Responsible 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
Overall effectiveness of the National Assembly 1 1,664,324 1,840,900 2,468,917 2,600,307 2,639,312 2,678,901
- Main secretariat
Committee effectiveness / Public Accounts Committees / Research etc. 2 1,838,349 1,991,576 2,940,083 2,980,693 3,025,403 3,070,784
- Main Secretariat
Total 3,502,673 3,832,476 5,409,000 5,581,000 5,664,715 5,749,686
Budget by Inputs Rs. '000
Actual Expenditure Budget Forecas ts
Input s 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
A01 Employee Related Expenses 2,054,934 2,144,573 2,842,060 2,902,892 2,946,435 2,990,632
A02 Project Pre-Investment Analysis 15,500 5,600 5,684 5,769
A03 Operating Expenses 1,224,769 1,444,422 2,192,932 2,273,557 2,307,660 2,342,275
A04 Employees Retirement Benefits 15,587 16,527 24,840 27,672 28,087 28,508
A05 Grants, Subsidies & Write off Loans 163,099 181,121 228,055 249,045 252,781 256,572
A06 Transfers 1,305
A09 Physical Assets 23,876 27,565 58,830 69,030 70,065 71,116
A12 Civil Works 10,000 300 305 309
A13 Repairs & Maintenance 19,103 18,268 36,783 52,904 53,698 54,503
Total 3,502,673 3,832,476 5,409,000 5,581,000 5,664,715 5,749,686
Medium-Term Outcome(s) Outcome 1: Effective promulgation of constitutional framework

National Assembly and The Senate

Page 215

National Assembly

Performance Indicators and Targets

Outputs Selected Performance Targets Achieved Planned Targets Forecas t Targets
Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
1. Overall effectiveness of the Meeting of National Assembly (In days) 130 130 130 130 130 100
National Assembly Facilitation to MNAs (No.of MNAs) 287 285 285 285 285 300
Bills passed (Numbers) 49 37 22 29 35 10
Resolutions (Numbers) 26 19 12 14 19 10
Notices (Numbers) 254 395 338 246 350 200
Questions received in Sectt (Numbers) 5499 3979 8013 5033 6500 3000
Motions (Numbers) 812 507 687 349 500 200
2. Committee effectiveness / Meeting of Public Accounts Committees (Numbers) 45 9 11 38 45 20
Public Accounts Committees / Research etc. Monitoring and Implementation committee (Numbers) 8 4 1 20 22 10
Sub committees of PAC (numbers) 4 7 12 12 12 12
Sub committees' meetings of PAC (Numbers) 42 18 80 72 80 40
Standing Committee / sub Committees meetings (Numbers) 266 300 300 300* 300 150
Amounts recovered through PAC directives (in billion) As per PAC directives As per PAC directives 354,629.20 Millions As per PAC directives As per PAC directives
Research and information for parliamentarians in Pakistan Institute for Parliamentary Services(PIPS) on different issues (Numbers) 79 80 101 94 110 120
National workshops / Seminars to achieve millennium goals (Numbers) 29 24 33 22 30 35

Note : *Standing Committee / sub Committees meetings (Numbers) 2021-22 due to pandemic Covid-19, some meetings of standing committees / sub Committees were held virtually

National Assembly and The Senate

Page 216

The Senate

Principal Accounting Officer

Secretary, The Senate

Executive Authority

Prime Minister

Goal

Effective promulgation of constitutional framework

Policy Documents
  • 1 Rules of Procedure and conduct of Business in the Senate 2012 (As amended upto 27th January, 2020), http://www.senate.gov.pk/uploads/documents/RPCB2012-12-3-2020%20updated.pdf
Budget Details:
Budget by Demands

Rs. '000

Demand for Grants Demand No Total 2021-22
The Senate (Voted) 1 72 1,548,373
The Senate (Charged) 2 72 2,199,318
Total 3,747,691
Budget by Outputs
Rs. '000
Ott Offi Ribl Actual Expenditure Budget Forecas ts
upus - ce esponse 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
Administrative services to legislation 1 1,658,330 1,653,707 2,129,954 2,199,318 2,203,717 2,229,784
(Senate)
- Senate Secretariat
Overall effectiveness of the Senate 2 1,170,259 1,123,298 1,490,025 1,548,373 1,552,610 1,582,265
- Senate Secretariat
Total 2,828,589 2,777,005 3,619,979 3,747,691 3,756,327 3,812,049
Budget by Inputs
Rs. '000
Actual Expenditure Budget Forecas ts
Input 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
A01 Employee Related Expenses 1,710,408 1,706,620 1,975,444 2,130,051 2,132,181 2,149,238
A03 Operating Expenses 898,778 745,250 1,133,774 1,142,355 1,145,211 1,168,115
A04 Employees Retirement Benefits 10,823 13,235 13,460 16,837 16,871 17,714
A05 Grants, Subsidies & Write off Loans 88,111 98,418 174,028 168,348 169,526 178,003
A06 Transfers 11,513 2,061 19,550 19,550 19,687 20,671
A09 Physical Assets 87,690 192,912 256,773 135,650 137,007 139,747
A13 Repairs & Maintenance 21,266 18,509 46,950 134,900 135,844 138,561
Total 2,828,589 2,777,005 3,619,979 3,747,691 3,756,327 3,812,049
Medium-Term Outcome(s) Outcome 1: Promotion of National Cohesion and Harmony

National Assembly and The Senate

Page 217

The Senate

Performance Indicators and Targets

Ott Selected Performance Targets Achieved Planned Targets Forecas t Targets
upus Indicators 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
2. Overall Number of days, the Senate shall 110 110 110 118 118 118
effectiveness of the meet during a year
Senate Number of Senator to be 104 104 104 100 100 100
facilitated
Number Chairmen Standing 38 38 40 40 40 40
Committees to be facilitated

National Assembly and The Senate

Page 218

SUMMARY BY DEMANDS AND PRINCIPAL ACCOUNTING OFFICERS

Demand No Demand Name Principal Accounting Officer Rs. '000 Amount 2021-22
1 Cabinet Secretary, Cabinet Division 277,000
2 Cabinet Division Secretary, Cabinet Division 2,048,000
3 Emergency Relief and Repatriation Secretary, Cabinet Division 387,000
4 Intelligence Bureau Secretary, Cabinet Division 8,034,000
5 Atomic Energy Chairman, Pakistan Atomic Energy Commission 10,818,000
6 Pakistan Nuclear Regulatory Authority Chairman, Pakistan Nuclear Regulatory Authority 1,148,000
7 Naya Pakistan Housing Development Chairman, Naya Pakistan Housing Development Authority 30,720,000
8 Prime Minister's office (Internal) Military Secretary to the Prime Minister's Office (Internal) 401,000
9 Prime Minister's office (Public) Secretary to the Prime Minister 520,000
10 National Disaster Management Authority Chairman, National Disaster Management Authority 367,000
Chairman, Earthquake Reconstruction and Rehabilitation Authority* 276,000
11 Board of Investment Secretary, Board of Investment 367,000
12 Prime Minister's Inspection Commission Chairman, Prime Minister's Inspection Commission 60,000
13 Aviation Division Secretary, Aviation Division 1,483,000
14 Airports Security Force Secretary, Aviation Division 8,078,000
15 Establishment Division Secretary, Establishment Division 5,500,000
16 Federal Public Service Commission Secretary, Federal Public Service Commission 884,000
17 National School of Public Policy Rector, National School of Public Policy 1,168,000
18 Civil Services Academy Director General, Civil Services Academy 635,000
19 National Security Division Secretary, National Security Division 144,000
20 Poverty Alleviation and Social Safety Division Secretary, Poverty Alleviation & Social Safety Division 2,155,000
21 Benazir Income Support Programme Secretary, Benazir Income Support Programme 250,000,000
22 Pakistan Bait-Ul-Mal Managing Director, Pakistan Bait-ul-Mal 6,505,000
23 Climate Change Division Secretary, Climate Change Division 468,000
24 Commerce Division Secretary, Commerce Division 26,786,000
25 Communications Division Secretary, Communications Division 204,000
26 Other Expenditure of Communications Division Secretary, Communications Division 20,096,000
27 Pakistan Post office Department (Voted) Secretary, Communications Division 14,980,000
27 Pakistan Post office Department (Charged) Secretary, Communications Division 20,000
28 Defence Division Secretary, Defence Division 3,683,000
Page 219

Rs. '000

Demand No Demand Name Principal Accounting Officer Amount 2021-22
29 Federal Government Educational Institutions in Cantonments and Garrisons Secretary, Defence Division 6,981,000
30 Defence Services Secretary, Defence Division 1,370,000,000
31 Defence Production Division Secretary, Defence Production Division 949,000
32 Economic Affairs Division Secretary, Economic Affairs Division 697,000
33 Miscellaneous Expenditure of Economic Affairs Secretary, Economic Affairs Division 13,187,000
34 Power Division Secretary, Power Division 330,460,000
35 Petroleum Division Secretary, Petroleum Division 20,639,000
36 Geological Survey of Pakistan Secretary, Petroleum Division 601,000
37 Federal Education and Professional Training Division Secretary, Federal Education and Professional Training Division 19,005,000
38 Higher Education Commission (HEC) Executive Director, Higher Education Commission 66,250,000
39 National Vocational & Technical Training (NAVTTC) Executive Director, National Vocational and Technical Training Commission 399,000
40 National Heritage & Culture Division Secretary, National Heritage and Culture Division 1,738,000
41 Finance Division Secretary, Finance Division 1,980,000
42 Other Expenditure of Finance Division Secretary, Finance Division 4,834,000
43 Controller General of Accounts Controller General of Accounts 7,720,000
44 Superannuation Allowances and Pensions (Voted) Secretary, Finance Division 476,520,000
44 Superannuation Allowances and Pensions (Charged) Secretary, Finance Division 3,480,000
45 Grants Subsidies & Miscellaneous Expenditure Secretary, Finance Division 1,064,393,100
Secretary, Kashmir Affairs and Gilgit-Baltistan Division 114,500,000
46 Revenue Division Secretary, Revenue Division / Chairman, Federal Board of Revenue 76,706
47 Federal Board of Revenue Secretary, Revenue Division / Chairman, Federal Board of Revenue 28,800,294
48 Foreign Affairs Division Secretary, Foreign Affairs Division 1,970,498
49 Foreign Missions Secretary, Foreign Affairs Division 21,166,502
50 Housing and Works Division Secretary, Housing and Works Division 5,051,000
51 Human Rights Division Secretary, Human Rights Division 1,185,000
52 Industries and Production Division Secretary, Industries and Production Division 13,631,000
53 Financial Action Task Force (FATF) Director General, Financial Action Task Force National FATF Secretariat 85,000
54 Information and Broadcasting Division Secretary, Information and Broadcasting Division 2,755,000
Page 220

Rs. '000

Demand No Demand Name Principal Accounting Officer Amount 2021-22
55 Miscellaneous Expenditure of Information & Broadcasting Division Secretary, Information and Broadcasting Division 6,417,000
56 Information Technology and Telecommunication Division Secretary, Information Technology and Telecommunication Division 5,872,000
57 Interior Division Secretary, Interior Division 8,642,000
58 Other Expenditure of Interior Division Secretary, Interior Division 6,147,000
59 Islamabad Capital Territory (ICT) Secretary, Interior Division 11,430,000
60 Combined Civil Armed Forces Secretary, Interior Division 136,827,000
61 Inter-Provincial Coordination Division Secretary, Inter Provincial Coordination Division 1,661,000
62 Kashmir Affairs and Gilgit Baltistan Secretary, Kashmir Affairs and Gilgit-Baltistan Division 891,000
63 Law and Justice Division (Voted) Secretary, Law and Justice Division 5,225,000
63 Law and Justice Division (Charged) Secretary, Law and Justice Division 297,000
64 Federal Judical Academy Director General, Federal Judicial Academy 210,000
65 Federal Shariat Court Registrar, Federal Shariat Court 494,000
66 Council of Islamic Ideology Chairman, Council of Islamic Ideology 140,000
67 National Accountability Bureau Chairman, National Accountability Bureau 5,137,000
68 District Judiciary, Islamabad Capital Territory Registrar, Islamabad High Court 645,000
69 Maritime Affairs Division Secretary, Maritime Affairs Division 1,190,000
70 Narcotics Control Division Secretary, Narcotics Control Division 3,534,000
71 National Assembly (Voted) Secretary, National Assembly 3,195,288
71 National Assembly (Charged) Secretary, National Assembly 2,385,712
72 The Senate (Voted) Secretary, The Senate 1,548,373
72 The Senate (Charged) Secretary, The Senate 2,199,318
73 National Food Security and Research Division Secretary, National Food Security and Research Division 13,118,000
74 National Health Services, Regulations and Coordination Division Secretary, National Health Services, Regulations and Coordination Division 28,074,000
75 Overseas Pakistanis and Human Resource Development Division Secretary, Overseas Pakistanis and Human Resource Development Division 1,626,000
76 Parliamentary Affairs Division Secretary, Parliamentary Affairs Division 482,000
77 Planning, Development and Special Initiatives Division Secretary, Planning, Development and Special Initiatives Division 5,620,000
78 CPEC Authority CEO, China Pakistan Economic Corridor Authority 313,000
79 Privatisation Division Secretary, Privatization Division 215,000
80 Railways Division (Voted) Secretary, Railways Division 42,300,000
81 Religious Affairs and Inter-Faith Harmony Division Secretary, Religious Affairs and Inter-Faith Harmony Division 1,231,000
Page 221

Rs. '000

Demand No Demand Name Principal Accounting Officer Amount 2021-22
82 Science and Technology Division Secretary, Science and Technology Division 10,201,000
83 States and Frontier Regions Division (Voted) Secretary, States and Frontier Regions Division 2,621,000
84 Water Resources Division Secretary, Water Resources Division 523,000
85 Federal Miscellaneous Investments & Other Loans Secretary, Finance Division 84,154,000
and Advances Secretary, Kashmir Affairs and Gilgit-Baltistan Division 15,060,000
86 Development Expenditure of Cabinet Division Secretary, Board of Investment 80,000
Secretary, Cabinet Division 46,155,000
87 Development Expenditure of Aviation Division Secretary, Aviation Division 3,558,201
88 Development Expenditure of Establishment Division Rector, National School of Public Policy 328,854
Secretary, Federal Public Service Commission 20,000
89 Development Expenditure of Poverty Alleviation and Social Safety Division Secretary, Poverty Alleviation & Social Safety Division 598,910
90 Development Expenditure of SUPARCO Chairman, Pakistan Space and Upper Atmosphere Research Commission 7,368,864
91 Development Expenditure of Climate Change Division Secretary, Climate Change Division 14,327,000
92 Development Expenditure of Commerce Division Secretary, Commerce Division 1,613,500
93 Development Expenditure of Communications Division Secretary, Communications Division 451,322
94 Development Expenditure of Defence Division Secretary, Defence Division 1,977,635
95 Development Expenditure of Survey of Pakistan Surveyor General, Survey of Pakistan 1,501,969
96 Development Expenditure of Defence Production Division Secretary, Defence Production Division 1,745,000
97 Development Expediture of Power Division Secretary, Power Division 19,361,999
98 Development Expenditure of Federal Education & Professional Training Division Secretary, Federal Education and Professional Training Division 4,485,000
99 Development Expenditure of Higher Education Commission (HEC) Executive Director, Higher Education Commission 42,450,000
100 Development Expenditure of National Vocational & Technical Training Commission (NAVTTC) Executive Director, National Vocational and Technical Training Commission 5,215,000
101 Development Expenditure of National Heritage & Culture Division Secretary, National Heritage and Culture Division 125,926
102 Development Expenditure of Finance Division Secretary, Finance Division 835,844
103 Other Development Expenditure Secretary, Finance Division 122,295,160
104 Development Expenditure of Revenue Division Secretary, Revenue Division / Chairman, Federal Board of Revenue 4,025,067
105 Development Expenditure of Human Rights Division Secretary, Human Rights Division 279,200
Page 222
Rs. '000
Amount
Demand No Demand Name Principal Accounting Officer 2021-22
106 Development Expenditure of Information and Broadcasting Division Secretary, Information and Broadcasting Division 902,057
107 Development Expenditure of Information Technology & Telecommunication Division Secretary, Information Technology and Telecommunication Division 9,361,056
108 Development Expenditure of Interior Division Secretary, Interior Division 21,048,715
109 Development Expenditure of Inter-Provincial Coordination Division Secretary, Inter Provincial Coordination Division 3,734,736
110 Development Expenditure of Kashmir Affairs and Gilgit Baltistan Division Secretary, Kashmir Affairs and Gilgit-Baltistan Division 37,920,000
111 Development Expenditure of Law and Justice Division Secretary, Law and Justice Division 6,027,351
112 Development Expenditure of Narcotics Control Division Secretary, Narcotics Control Division 489,393
113 Development Expenditure of National Food Security & Research Division Secretary, National Food Security and Research Division 12,017,280
114 Development Expenditure of National Health Services, Regulation and Coordination Division Secretary, National Health Services, Regulations and Coordination Division 21,722,506
115 Development Expenditure of Planning, Development and Special Initiatives Division Secretary, Planning, Development and Special Initiatives Division 106,243,558
116 Development Expenditure of Science and Technology Division Secretary, Science and Technology Division 8,341,000
117 Development Expenditure of Water Resource Division Secretary, Water Resources Division 92,472,692
118 Capital Outlay on Development of Atomic Energy Chairman, Pakistan Atomic Energy Commission 27,000,000
119 Capital Outlay on Development of Pakistan Nuclear Regulatory Authority Chairman, Pakistan Nuclear Regulatory Authority 200,000
120 Capital Outlay on Petroleum Division Secretary, Petroleum Division 3,249,540
121 Capital Outlay on Federal Investments Secretary, Information and Broadcasting Division 699,069
122 Development Loans and Advances By the Federal Secretary, Power Division 9,949,048
Government Secretary, Information and Broadcasting Division 298,557
Secretary, Communications Division 91,558,472
Secretary, Kashmir Affairs and Gilgit-Baltistan Division 29,539,903
123 External Development Loans and Advances Secretary, Kashmir Affairs and Gilgit-Baltistan Division 2,500,000
(Voted) Secretary, Power Division 40,174,000
Secretary, Communications Division 22,191,528
Secretary, Water Resources Division 11,000,000
123 External Development Loans and Advances By the Federal Government (Charged) Secretary, Economic Affairs Division 237,850,000
124 Capital Outlay on Civil Works Secretary, Housing and Works Division 25,157,005
125 Capital Outlay on Industrial Development Secretary, Industries and Production Division 2,916,082
Page 223

Rs. '000

Demand No Demand Name Principal Accounting Officer Amount 2021-22
126 Capital Outlay on Maritime Affairs Division Secretary, Maritime Affairs Division 4,461,911
127 Capital Outlay on Pakistan Railways Secretary, Railways Division 30,025,590
A Staff Household & Allowances of The President (public) Secretary to the President (President's Secretariat - Public) 405,000
85A Provision for Pay & Pension Secretary, Finance Division 160,000,000
B Staff Household & Allowances of The President (personal) Military Secretary to the President (President's Secretariat - Personal) 615,000
C Servicing of Foreign Debt Secretary, Economic Affairs Division 302,505,602
D Foreign Loans Repayment Secretary, Economic Affairs Division 1,427,592,000
E Repayment of Short Term Foreign Credits Secretary, Economic Affairs Division 74,404,800
F Audit Additional Auditor General 5,952,900
G Servicing of Domestic Debt Secretary, Finance Division 2,757,175,636
H Repayment of Domestic Debt Secretary, Finance Division 21,617,346,647
I Supreme Court Registrar, Supreme Court of Pakistan 2,810,000
J Islamabad High Court Registrar, Islamabad High Court 1,086,000
K Election Secretary, Election Commission of Pakistan 3,827,000
L Federal Ombudsman Secretariat For Protection Against Harrasment of Women at Work Place Federal Ombudsman, for protection against harassment of women at workplace 77,000
M Wafaqi Mohtasib Secretary, Wafaqi Mohtasib 837,000
N Federal Tax Ombudsman Federal Tax Ombudsman 279,000
Total 31,879,655,876
Page 224

SUMMARY OF THE MEDIUM TERM BUDGET BY OBJECT CLASSIFICATION (R&D)

Actual Expenditure 2018-19 2019-20 Budget 2020-21 2021-22 For 2022-23 Rs. '000 ecasts 2023-24
A01 Employee Related Expenses 723,710,928 765,018,805 760,119,421 785,233,776 772,272,460 776,525,893
A02 Project Pre-Investment Analysis 507,123 425,442 1,665,383 2,838,179 301,843 204,475
A03 Operating Expenses 718,085,742 889,747,149 878,130,350 876,489,878 538,819,594 557,391,551
A04 Employees Retirement Benefits 452,112,287 506,281,148 478,525,208 486,519,876 508,011,046 535,340,474
A05 Grants, Subsidies & Write off Loans 849,792,240 1,349,021,706 1,197,014,146 2,238,088,853 1,066,715,217 1,038,487,381
A06 Transfers 12,224,610 42,993,986 11,019,595 17,038,724 7,683,195 7,769,048
A07 Interest Payment 2,061,458,701 2,631,628,622 2,946,955,150 3,059,701,238 3,109,316,436 3,227,354,676
A08 Loans and Advances 468,006,326 407,568,196 493,792,081 518,827,605 294,620,000 332,475,000
A09 Physical Assets 338,704,633 339,753,830 384,509,792 430,717,111 403,599,999 413,486,706
A10 Principal Repayments 43,291,711,065 16,712,314,142 11,512,548,601 23,119,418,447 24,400,960,000 26,889,239,680
A11 Investments 22,959,363 15,836,103 37,589,418 64,853,075 66,200,000 72,750,000
A12 Civil Works 173,772,405 179,647,176 204,878,262 273,124,175 217,318,189 234,130,529
A13 Repairs & Maintenance 13,603,849 13,511,228 6,877,224 6,804,939 5,197,334 5,233,280
Grand Total 49,126,649,273 23,853,747,533 18,913,624,631 31,879,655,876 31,391,015,314 34,090,388,693