NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL DEMANDS FOR GRANTS GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
|---|---|---|---|
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| LO9700 ACQU 014202- A08 | ISITION OF LAND FOR SOLAR POWER PLA Loans and Advances | NT AT MUZAFFARGR | AG 178,000,000 | 350,734,000 |
|---|---|---|---|---|
| 014202- A085 | Loans to Non Financial Institutions | 178,000,000 | 350,734,000 | |
| Total- LO9800 LAND DISTT JHANG | ACQUISITION OF LAND FOR SOLAR POWER PLANT AT MUZAFFARGRAG ACQUISITION FOR INSTALLATION OF 600 | MW SOLAR POWER P | 178,000,000 LANT AT TEHSIL A | 350,734,000 THARA HAZARI |
| 014202- A08 | Loans and Advances | 1,133,000,000 | 1,425,000,000 | 633,002,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,133,000,000 | 1,425,000,000 | 633,002,000 |
| Total- | LAND ACQUISITION FOR | 1,133,000,000 | 1,425,000,000 | 633,002,000 |
| INSTALLATION OF 600 MW SOLAR POWER PLANT AT TEHSIL ATHARA HAZARI DISTT JHANG | ||||
| 014202 | Total- Trasfer To Non-Financial | 6,361,000,000 | 6,361,000,000 | 18,269,961,000 |
| Institutions | ||||
| 0142 | Total- Transfers (Others) | 6,361,000,000 | 6,361,000,000 | 18,269,961,000 |
| 014 | Total- Transfers | 6,361,000,000 | 6,361,000,000 | 18,269,961,000 |
| 01 | Total- General Public Service | 6,361,000,000 | 6,361,000,000 | 18,269,961,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | 6,361,000,000 | 6,361,000,000 | 18,269,961,000 |
NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL DEMANDS FOR GRANTS GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | ||
|---|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| ACCOUNTANT GENERAL PAKISTAN REV | Rs ENUES SUB-OFFI | Rs CE, PESHAWAR | Rs | ||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0142 | Transfers (Others): | ||||
| 014202 PR3129 | Trasfe ELEC | r To Non-Financial Institutions : TRIFICATION WORKS AT DIFFERENT VALLEYS | OF DISTRICT CHITRAL (PESCO) | ||
| 014202 | - A08 | Loans and Advances | 964,036,000 | 964,036,000 | 1,824,360,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 964,036,000 | 964,036,000 | 1,824,360,000 |
| Total- | ELECTRIFICATION WORKS AT | 964,036,000 | 964,036,000 | 1,824,360,000 | |
| DIFFERENT VALLEYS OF DISTRICT CHITRAL (PESCO) | |||||
| PR3130 CHITR | ESTA AL (PES | B OF 132 KV GRID SYS. ALONG WITH UPG RAD CO) | IATION OF EXTG.3 | 3KV GRID SYS. TO | 132KV IN DISTT. |
| 014202 | - A08 | Loans and Advances | 151,459,000 | 151,459,000 | 10,001,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 151,459,000 | 151,459,000 | 10,001,000 |
| Total- | ESTAB OF 132 KV GRID SYS. ALONG | 151,459,000 | 151,459,000 | 10,001,000 | |
| WITH UPG RADIATION OF EXTG.33KV GRID SYS. TO 132KV IN DISTT. CHITRAL (PESCO) | |||||
| PR3131 | EVACUATION OF POWER FROM 220-KV/132-KV GRID | STATION SAWABI (PESCO) | |||
| 014202 | - A08 | Loans and Advances | 260,849,000 | 260,849,000 | 110,793,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 260,849,000 | 260,849,000 | 110,793,000 |
| Total- | EVACUATION OF POWER FROM | 260,849,000 | 260,849,000 | 110,793,000 | |
| 220-KV/132-KV GRID STATION SAWABI (PESCO) | |||||
| PR7018 | SUPPLY OF POWER TO RASHAKAI ECONOMIC ZONE | KPK | |||
| 014202 | - A08 | Loans and Advances | 61,265,000 | 61,265,000 | 934,787,000 |
| 014202 | - A085 | Loans to Non Financial Institutions | 61,265,000 | 61,265,000 | 934,787,000 |
| Total- | SUPPLY OF POWER TO RASHAKAI ECONOMIC ZONE KPK | 61,265,000 | 61,265,000 | 934,787,000 | |
| PR7019 | SUPPLY OF POWER TO HATTAR SPECIAL ECONOMIC ZONE KPK | ||||
| 014202 | - A08 | Loans and Advances | 94,589,000 | 94,589,000 | 340,011,000 |
NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL DEMANDS FOR GRANTS GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
|---|---|---|---|
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
| 014202- | A085 Loans to Non Financial Institutions | 94,589,000 | 94,589,000 | 340,011,000 |
|---|---|---|---|---|
| SPECIAL ECONOMIC ZONE KPK Total- SUPPLY OF POWER TO HATTAR | 94,589,000 | 94,589,000 | 340,011,000 | |
| 014202 | Total- Trasfer To Non-Financial Institutions | 1,532,198,000 | 1,532,198,000 | 3,219,952,000 |
| 0142 | Total- Transfers (Others) | 1,532,198,000 | 1,532,198,000 | 3,219,952,000 |
| 014 | Total- Transfers | 1,532,198,000 | 1,532,198,000 | 3,219,952,000 |
| 01 | Total- General Public Service | 1,532,198,000 | 1,532,198,000 | 3,219,952,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR | 1,532,198,000 | 1,532,198,000 | 3,219,952,000 |
NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL DEMANDS FOR GRANTS GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
|---|---|---|---|
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 01 | General Public Service: | |||||
|---|---|---|---|---|---|---|
| 014 | Transfers: | |||||
| 0142 | Transfers (Others): | |||||
| 014202 HD020 | Trasfe 1 INSTA | r To No LLATI | n-Financial Institutions : ON OF 2X600 MW (NET) COAL FIRED | POWER PROJECT JAMSHORO (GENCO- | I) | |
| 014202 | - A08 | Loans and Advances | 9,000,000,000 | 9,000,000,000 | 11,000,000,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 9,000,000,000 | 9,000,000,000 | 11,000,000,000 | |
| Total- | INSTALLATION OF 2X600 MW (NET) | 9,000,000,000 | 9,000,000,000 | 11,000,000,000 | ||
| HD534 | 1 SECO | COAL JAMS NDARY | FIRED POWER PROJECT HORO (GENCO-I) TRANSMISSION AND LINE AND GIR | D STATION PLAN FOR 2021-2022(HARSCO) | ||
| 014202 | - A08 | Loans and Advances | 500,000,000 | 500,000,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 500,000,000 | 500,000,000 | ||
| Total- | SECONDARY TRANSMISSION AND LINE | 500,000,000 | 500,000,000 | |||
| KA138 | 6 500 K | AND G 2021-2 V MATI | IRD STATION PLAN FOR 022(HARSCO) ARI-MORO-R.Y.KHAN T/L | |||
| 014202 | - A08 | Loans and Advances | 16,000,000,000 | |||
| 014202 | - A085 | Loans to Non Financial Institutions | 16,000,000,000 | |||
| Total- | 500 KV | MATIARI-MORO-R.Y.KHAN T/L | 16,000,000,000 | |||
| SK0072 | SECONDARY | TRANSMISSION LINES AND GRID STATION FOR 2021-20 | 22 TO 2023-2024 (SE | PCO) | ||
| 014202 | - A08 | Loans and Advances | 500,000,000 | 500,000,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 500,000,000 | 500,000,000 | ||
| Total- | SECO AND G 2023-2 | NDARY TRANSMISSION LINES RID STATION FOR 2021-2022 TO 024 (SEPCO) | 500,000,000 | 500,000,000 | ||
| 0 | 14202 | Total- | Trasfer To Non-Financial Institutions | 10,000,000,000 | 10,000,000,000 | 27,000,000,000 |
| 0 | 142 | Total- | Transfers (Others) | 10,000,000,000 | 10,000,000,000 | 27,000,000,000 |
| 0 | 14 | Total- | Transfers | 10,000,000,000 | 10,000,000,000 | 27,000,000,000 |
| 0 | 1 | Total- | General Public Service | 10,000,000,000 | 10,000,000,000 | 27,000,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI | 10,000,000,000 | 10,000,000,000 | 27,000,000,000 |
| NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES B GOVERNMENT No of Posts | Y THE FEDERAL 2023-2024 | DEMAND 2023-2024 | S FOR GRANTS 2024-2025 |
|---|---|---|---|
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 01 | General Public Service: | |||||
|---|---|---|---|---|---|---|
| 014 | Transfers: | |||||
| 0142 | Transfers (Others): | |||||
| 014202 QA311 | Trasfe 2 CONS | r To No TRUCT | n-Financial Institutions : ION OF 132-KV MASHKAY G/S WITH | ALLIED 132-KV NAI | -MASHKAY T/LINE | (QESCO) |
| 014202 | - A08 | Loans and Advances | 105,816,000 | 105,816,000 | ||
| 014202 | - A085 | Loans to Non Financial Institutions | 105,816,000 | 105,816,000 | ||
| QA410 | Total- 1 CONS | CONS G/S W T/LINE TRUCT | TRUCTION OF 132-KV MASHKAY ITH ALLIED 132-KV NAI-MASHKAY (QESCO) ION OF 132 KV GRID STATION ATK | 105,816,000 HAN MEHTERZAI WIT | 105,816,000 H ALLIED T/LINE | |
| 014202 | - A08 | Loans and Advances | 64,556,000 | 64,556,000 | 207,500,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 64,556,000 | 64,556,000 | 207,500,000 | |
| Total- | CONSTRUCTION OF 132 KV GRID | 64,556,000 | 64,556,000 | 207,500,000 | ||
| STATION ATKHAN MEHTERZAI WITH ALLIED T/LINE | ||||||
| QA410 PANJG | 4 INTER OOR G | CONNECTION OF ISOLATED MAKRAN NE /STATION | TWORK AT BASIMA | VIA NAG G/STATION FROM | ||
| 014202 | - A08 | Loans and Advances | 2,536,471,000 | 2,536,471,000 | 2,500,000,000 | |
| 014202 | - A085 | Loans to Non Financial Institutions | 2,536,471,000 | 2,536,471,000 | 2,500,000,000 | |
| Total- | INTER MAKR NAG G G/STA | CONNECTION OF ISOLATED AN NETWORK AT BASIMA VIA /STATION FROM PANJGOOR TION | 2,536,471,000 | 2,536,471,000 | 2,500,000,000 | |
| 0 | 14202 | Total- | Trasfer To Non-Financial Institutions | 2,706,843,000 | 2,706,843,000 | 2,707,500,000 |
| 0 | 142 | Total- | Transfers (Others) | 2,706,843,000 | 2,706,843,000 | 2,707,500,000 |
| 0 | 14 | Total- | Transfers | 2,706,843,000 | 2,706,843,000 | 2,707,500,000 |
| 0 | 1 | Total- | General Public Service | 2,706,843,000 | 2,706,843,000 | 2,707,500,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 2,706,843,000 | 2,706,843,000 | 2,707,500,000 | ||
| TOTAL | - DEMAND | 157,313,555,000 | 152,294,542,000 | 206,911,413,000 | ||
| (In Foreign Exchange) | (2,605,615,000) | |||||
| (Own Resources) (Foreign Aid) | (2,605,615,000) | |||||
| (In Local Currency) | (157,313,555,000) _________________ | (152,294,542,000) ________________ | (204,305,798,000) _________________ |
DEMANDS FOR GRANTS
NO. 129.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMAND NO. 129 ( FC12E14 / FC15E14 )
EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2025 for EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT. Total Rs. 745,317,642,000 (Charged) Rs. 617,000,000,000 (Voted) Rs. 128,317,642,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF FINANCE AND REVENUE .
| 2023-2024 Budget Estimate Rs | 2023-2024 Revised Estimate Rs | 2024-2025 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 014 | Transfers | 700,522,753,000 | 700,522,753,000 | 745,317,642,000 |
| Total | 700,522,753,000 | 700,522,753,000 | 745,317,642,000 | |
| (Charged) | 658,644,140,000 | 658,644,140,000 | 617,000,000,000 | |
| (Voted) | 41,878,613,000 _________________ | 41,878,613,000 _________________ | 128,317,642,000 ________________ | |
| OBJECT CLASSIFICATION | ||||
| A05 | Grants, Subsidies and Write off Loans | 2,000,000,000 | 2,000,000,000 | |
| A08 | Loans and Advances | 698,522,753,000 | 698,522,753,000 | 745,317,642,000 |
| (Charged) | 658,644,140,000 | 658,644,140,000 | 617,000,000,000 | |
| (Voted) | 39,878,613,000 | 39,878,613,000 | 128,317,642,000 | |
| Total | 700,522,753,000 | 700,522,753,000 | 745,317,642,000 | |
| (Charged) | 658,644,140,000 | 658,644,140,000 | 617,000,000,000 | |
| (Voted) | 41,878,613,000 | 41,878,613,000 | 128,317,642,000 | |
| (In Foreign Exchange) | _________________ (700,522,753,000) | _________________ | ________________ (745,317,642,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (700,522,753,000) | (745,317,642,000) | ||
| (In Local Currency) | (700,522,753,000) |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of | Posts 2023-2024 | 2023-2024 | 2024-2025 | ||
|---|---|---|---|---|---|
| 2023-24 2 | 024-25 Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 01 | General Public Service: | ||||
| 014 | Transfers: | ||||
| 0141 | Transfers (Inter-Governmental): | ||||
| 014101 | TO PROVINCES : | ||||
| ID8871 | PUNJAB PROGRAMME LOAN | ||||
| 014101 | - A08 | Loans and Advances | 54,592,500,000 | 54,592,500,000 | |
| (Charged) | 54,592,500,000 | 54,592,500,000 | |||
| 014101 | - A082 | Provinces | 54,592,500,000 | 54,592,500,000 | |
| (Charged) | 54,592,500,000 | 54,592,500,000 | |||
| Total- | PUNJAB PROGRAMME LOAN | 54,592,500,000 | 54,592,500,000 | ||
| (In Foreign Exchange) | (54,592,500,000) | ||||
| (Foreign Aid) | (54,592,500,000) | ||||
| (In Local Currency) | _________________ | (54,592,500,000) _________________ | |||
| ID8873 | KPK PROGRAMME LOAN | ||||
| 014101 | - A08 | Loans and Advances | 35,510,000,000 | 35,510,000,000 | |
| (Charged) | 35,510,000,000 | 35,510,000,000 | |||
| 014101 | - A082 | Provinces | 35,510,000,000 | 35,510,000,000 | |
| (Charged) | 35,510,000,000 | 35,510,000,000 | |||
| Total- | KPK PROGRAMME LOAN | 35,510,000,000 | 35,510,000,000 | ||
| (In Foreign Exchange) | (35,510,000,000) | ||||
| (Foreign Aid) | (35,510,000,000) | ||||
| (In Local Currency) | (35,510,000,000) | ||||
| ID8986 | SINDH | _________________ | _________________ | ||
| 014101 | - A08 | Loans and Advances | 266,691,250,000 | 266,691,250,000 | 334,000,000,000 |
| (Charged) | 266,691,250,000 | 266,691,250,000 | 334,000,000,000 | ||
| 014101 | - A082 | Provinces | 266,691,250,000 | 266,691,250,000 | 334,000,000,000 |
| (Charged) | 266,691,250,000 | 266,691,250,000 | 334,000,000,000 | ||
| Total- | SINDH | 266,691,250,000 | 266,691,250,000 | 334,000,000,000 | |
| (In Foreign Exchange) | (266,691,250,000) | (334,000,000,000) | |||
| (Foreign Aid) | (266,691,250,000) | (334,000,000,000) | |||
| (In Local Currency) | _________________ | (266,691,250,000) _________________ |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
|---|---|---|---|
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| ID8987 PUNJAB | ||||
|---|---|---|---|---|
| 014101- A08 | Loans and Advances | 125,977,300,000 | 125,977,300,000 | 123,000,000,000 |
| (Charged) | 125,977,300,000 | 125,977,300,000 | 123,000,000,000 | |
| 014101- A082 | Provinces | 125,977,300,000 | 125,977,300,000 | 123,000,000,000 |
| (Charged) | 125,977,300,000 | 125,977,300,000 | 123,000,000,000 | |
| Total- | PUNJAB | 125,977,300,000 | 125,977,300,000 | 123,000,000,000 |
| (In Foreign Exchange) | (125,977,300,000) | (123,000,000,000) | ||
| (Foreign Aid) | (125,977,300,000) | (123,000,000,000) | ||
| (In Local Currency) | (125,977,300,000) __________________ | |||
| ID8988 KHYBER PAKHTUNKHWA | ||||
| 014101- A08 | Loans and Advances | 138,269,800,000 | 138,269,800,000 | 131,000,000,000 |
| (Charged) | 138,269,800,000 | 138,269,800,000 | 131,000,000,000 | |
| 014101- A082 | Provinces | 138,269,800,000 | 138,269,800,000 | 131,000,000,000 |
| (Charged) | 138,269,800,000 | 138,269,800,000 | 131,000,000,000 | |
| Total- | KHYBER PAKHTUNKHWA | 138,269,800,000 | 138,269,800,000 | 131,000,000,000 |
| (In Foreign Exchange) | (138,269,800,000) | (131,000,000,000) | ||
| (Foreign Aid) | (138,269,800,000) | (131,000,000,000) | ||
| (In Local Currency) | (138,269,800,000) | |||
| ID8989 BALOCHISTAN | ||||
| 014101- A08 | Loans and Advances | 37,603,290,000 | 37,603,290,000 | 29,000,000,000 |
| (Charged) | 37,603,290,000 | 37,603,290,000 | 29,000,000,000 | |
| 014101- A082 | Provinces | 37,603,290,000 | 37,603,290,000 | 29,000,000,000 |
| (Charged) | 37,603,290,000 | 37,603,290,000 | 29,000,000,000 | |
| Total- | BALOCHISTAN | 37,603,290,000 | 37,603,290,000 | 29,000,000,000 |
| (In Foreign Exchange) | (37,603,290,000) | (29,000,000,000) | ||
| (Foreign Aid) | (37,603,290,000) | (29,000,000,000) | ||
| (In Local Currency) | (37,603,290,000) | |||
| 014101 | Total- TO PROVINCES | ________________ 658,644,140,000 | __________________ 658,644,140,000 | ________________ 617,000,000,000 |
| 014110 OTHERS : | ||||
| IB0688 40 MW | DOWARIAN | |||
| 014110- A08 | Loans and Advances | 50,000,000 | 50,000,000 | 10,000,000 |
| 014110- A086 | Loans to Others | 50,000,000 | 50,000,000 | 10,000,000 |
| Total- | 40 MW DOWARIAN | 50,000,000 | 50,000,000 | 10,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||
| (In Foreign Exchange) | (50,000,000) | (10,000,000) | ||
| (Foreign Aid) | (50,000,000) | (10,000,000) | ||
| (In Local Currency) | (50,000,000) | |||
| IB5368 22 MW | /JAGRAN-IV HYDRO POWER PROJECT AJK | _________________ | _________________ | |
| 014110- A08 | Loans and Advances | 50,000,000 | 50,000,000 | |
| 014110- A086 | Loans to Others | 50,000,000 | 50,000,000 | |
| Total- | 22 MW/JAGRAN-IV HYDRO POWER PROJECT AJK | 50,000,000 | 50,000,000 | |
| (In Foreign Exchange) | (50,000,000) | |||
| (Foreign Aid) | (50,000,000) | |||
| (In Local Currency) | (50,000,000) | |||
| ID8222 48 MW | JAGRAN HYDRO POWER PROJECT AJK | _________________ | _________________ | |
| 014110- A08 | Loans and Advances | 50,000,000 | 50,000,000 | 450,000,000 |
| 014110- A086 | Loans to Others | 50,000,000 | 50,000,000 | 450,000,000 |
| Total- | 48 MW JAGRAN HYDRO POWER PROJECT AJK | 50,000,000 | 50,000,000 | 450,000,000 |
| (In Foreign Exchange) | (50,000,000) | (450,000,000) | ||
| (Foreign Aid) | (50,000,000) | (450,000,000) | ||
| (In Local Currency) | (50,000,000) | |||
| ID8994 AJK | _________________ | _______________ | ||
| 014110- A05 | Grants, Subsidies and Write off Loans | 2,000,000,000 | 2,000,000,000 | |
| 014110- A052 | Grants Domestic | 2,000,000,000 | 2,000,000,000 | |
| Total- | AJK | 2,000,000,000 | 2,000,000,000 | |
| (In Foreign Exchange) | (2,000,000,000) | |||
| (Foreign Aid) | (2,000,000,000) | |||
| (In Local Currency) | (2,000,000,000) | |||
| 014110 | Total- OTHERS | _________________ 2,150,000,000 | _________________ 2,150,000,000 | ________________ 460,000,000 |
| 0141 | Total- Transfers (Inter-Governmental) | 660,794,140,000 | 660,794,140,000 | 617,460,000,000 |
| 0142 Transf | ers (Others): | |||
| 014202 Trasfe | r To Non-Financial Institutions : |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| IB0783 CAREC ADBAD | ACCOUNTANT GENERAL CORRIDOR DEVELOPMENT INVESTMENT PR | PAKISTAN REVENUES OGRAMME TRANCHE-I PROJECTS | ||
| 014202- A08 | Loans and Advances | 2,000,000,000 | 2,000,000,000 | 2,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 2,000,000,000 | 2,000,000,000 | 2,000,000,000 |
| Total- | CAREC CORRIDOR DEVELOPMENT INVESTMENT PROGRAMME TRANCHE-I PROJECTS ADB | 2,000,000,000 | 2,000,000,000 | 2,000,000,000 |
| (In Foreign Exchange) | (2,000,000,000) | (2,000,000,000) | ||
| (Foreign Aid) | (2,000,000,000) | (2,000,000,000) | ||
| (In Local Currency) | (2,000,000,000) | |||
| IB0784 CONST ECONOMIC | _ RUCTION OF KKH PHASE-II HAVELIAN-THAK | _________________ OT (118.057 KM) P | _________________ ART OF CHINA PAK | _______________ ISTAN |
| 014202- A08 | Loans and Advances | 300,000,000 | 300,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 300,000,000 | 300,000,000 | |
| Total- | CONSTRUCTION OF KKH PHASE-II | 300,000,000 | 300,000,000 | |
| HAVELIAN-THAKOT (118.057 KM) PART OF CHINA PAKISTAN ECONOMIC | ||||
| (In Foreign Exchange) | (300,000,000) | |||
| (Foreign Aid) | (300,000,000) | |||
| (In Local Currency) | (300,000,000) | |||
| IB0785 PESHA KM) REVISED | _ WAR KARACHI MOTORWAY (PKM) PROJECT | _________________ CONSTRUCTION O | _________________ F SUKKUR-MULTA | _______________ N SECTION (392 |
| 014202- A08 | Loans and Advances | 500,000,000 | 500,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 500,000,000 | 500,000,000 | |
| Total- | PESHAWAR KARACHI MOTORWAY | 500,000,000 | 500,000,000 | |
| (PKM) PROJECT CONSTRUCTION OF SUKKUR-MULTAN SECTION (392 KM) REVISED | ||||
| (In Foreign Exchange) | (500,000,000) | |||
| (Foreign Aid) | (500,000,000) | |||
| (In Local Currency) | (500,000,000) | |||
| IB0786 REHAB RAINS & | _ ILITATION OF NATIONAL HIGHWAYS NETWO | _________________ RK DAMAGED DUE | _________________ TO UNPRECEDEN | _______________ TED MONSOON |
| 014202- A08 | Loans and Advances | 200,000,000 | 200,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 200,000,000 | 200,000,000 | |
| Total- | REHABILITATION OF NATIONAL HIGHWAYS NETWORK DAMAGED DUE TO UNPRECEDENTED MONSOON RAINS & | 200,000,000 | 200,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate Rs | Revised Estimate Rs | Budget Estimate Rs | |
| ACCOUNTANT GENERAL (In Foreign Exchange) (Foreign Aid) | PAKISTAN REVEN (200,000,000) (200,000,000) | UES | ||
| (In Local Currency) | (200,000,000) | |||
| IB0787 WIDEN WEST ROAD | _ ING AND STRENGTHENING OF NATIONAL HI | _________________ GHWAY N-70 (RAKH | _______________ I GAJJ BEWATA) | _________________ 32.651 KM (EAST |
| 014202- A08 | Loans and Advances | 250,000,000 | 250,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 250,000,000 | 250,000,000 | |
| Total- | WIDENING AND STRENGTHENING OF | 250,000,000 | 250,000,000 | |
| NATIONAL HIGHWAY N-70 (RAKHI GAJJ BEWATA) 32.651 KM (EAST WEST ROAD | ||||
| (In Foreign Exchange) | (250,000,000) | |||
| (Foreign Aid) | (250,000,000) | |||
| (In Local Currency) | (250,000,000) | |||
| IB0788 CONST CORRIDOR (A | _ RUCTION OF ADDITIONAL CARRIAGE WAY S DB) | _________________ HIKARPUR-RANJA | _______________ NPUR SECTION O | _________________ N N-55 CAREC |
| 014202- A08 | Loans and Advances | 3,000,000,000 | 3,000,000,000 | 7,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 3,000,000,000 | 3,000,000,000 | 7,500,000,000 |
| Total- | CONSTRUCTION OF ADDITIONAL | 3,000,000,000 | 3,000,000,000 | 7,500,000,000 |
| CARRIAGE WAY | ||||
| SHIKARPUR-RANJANPUR SECTION ON N-55 CAREC CORRIDOR (ADB) | ||||
| (In Foreign Exchange) | (3,000,000,000) | (7,500,000,000) | ||
| (Foreign Aid) | (3,000,000,000) | (7,500,000,000) | ||
| (In Local Currency) | (3,000,000,000) | |||
| IB0789 CONST TUNNELS AT | _ RUCTION OF ATHMUQAM- SHARDRA KEL TA KAHORI | _________________ OBAT ROAD SECT | _______________ ION (109.2 KM) IN | _________________ CLUDING TWO |
| 014202- A08 | Loans and Advances | 540,000,000 | 540,000,000 | 200,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 540,000,000 | 540,000,000 | 200,000,000 |
| Total- | CONSTRUCTION OF ATHMUQAM- SHARDRA KEL TAOBAT ROAD | 540,000,000 | 540,000,000 | 200,000,000 |
| SECTION (109.2 KM) INCLUDING TWO | ||||
| TUNNELS AT KAHORI |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|
| 2023-24 2024-25 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVEN | UES | ||
| (540,000,000) (In Foreign Exchange) | (200,000,000) | ||
| (540,000,000) (Foreign Aid) | (200,000,000) | ||
| (In Local Currency) | (540,000,000) | ||
| IB0800 CONST | __________________ RUCTION OF MALAKAND TUNNEL (PHASE-I) | _________________ | _______________ |
| 014202- A08 | Loans and Advances 400,000,000 | 400,000,000 | 100,000,000 |
| 014202- A085 | Loans to Non Financial Institutions 400,000,000 | 400,000,000 | 100,000,000 |
| Total- | CONSTRUCTION OF MALAKAND TUNNEL (PHASE-I) 400,000,000 | 400,000,000 | 100,000,000 |
| (In Foreign Exchange) (400,000,000) | (100,000,000) | ||
| (Foreign Aid) (400,000,000) | (100,000,000) | ||
| (In Local Currency) | (400,000,000) | ||
| IB0801 CONST | __________________ RUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (AD | _________________ B) | _______________ |
| 014202- A08 | Loans and Advances 1,000,000,000 | 1,000,000,000 | 3,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions 1,000,000,000 | 1,000,000,000 | 3,000,000,000 |
| Total- | CONSTRUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (ADB) 1,000,000,000 | 1,000,000,000 | 3,000,000,000 |
| (In Foreign Exchange) (1,000,000,000) | (3,000,000,000) | ||
| (Foreign Aid) (1,000,000,000) | (3,000,000,000) | ||
| (In Local Currency) | (1,000,000,000) | ||
| IB0802 D.G KH | __________________ AN-D.I KHAN (ACW) (N-55)-245 KMS CAREC CORRIDOR ADB | _________________ | _______________ |
| 014202- A08 | Loans and Advances 1,000,000,000 | 1,000,000,000 | 3,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions 1,000,000,000 | 1,000,000,000 | 3,000,000,000 |
| Total- | D.G KHAN-D.I KHAN (ACW) (N-55)-245 KMS CAREC CORRIDOR ADB 1,000,000,000 | 1,000,000,000 | 3,000,000,000 |
| (In Foreign Exchange) (1,000,000,000) | (3,000,000,000) | ||
| (Foreign Aid) (1,000,000,000) | (3,000,000,000) | ||
| (In Local Currency) __________________ | (1,000,000,000) _________________ | _______________ |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts 2023-2024 2023-2024 | 2024-2025 | |
|---|---|---|
| 2023-24 2024-25 Budget Estimate Revised Estimate | Budget Estimate | |
| Rs Rs | Rs | |
| IB0804 IMPRO | ACCOUNTANT GENERAL PAKISTAN REVENUES VEMENT AND WIDENING OF N-45 (130.22 KM) | |
| 014202- A08 | Loans and Advances 400,000,000 400,000,000 | 100,000,000 |
| 014202- A085 | Loans to Non Financial Institutions 400,000,000 400,000,000 | 100,000,000 |
| Total- | IMPROVEMENT AND WIDENING OF N-45 (130.22 KM) 400,000,000 400,000,000 | 100,000,000 |
| (In Foreign Exchange) (400,000,000) | (100,000,000) | |
| (Foreign Aid) (400,000,000) | (100,000,000) | |
| (In Local Currency) (400,000,000) | ||
| IB0805 KHYBE | ___________________________________ R PASS ECONOMIC CORRIDOR PROJECT REVISED WORLD BANK | _______________ |
| 014202- A08 | Loans and Advances 2,000,000,000 2,000,000,000 | 3,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions 2,000,000,000 2,000,000,000 | 3,000,000,000 |
| Total- | KHYBER PASS ECONOMIC CORRIDOR PROJECT REVISED WORLD BANK 2,000,000,000 2,000,000,000 | 3,000,000,000 |
| (In Foreign Exchange) (2,000,000,000) | (3,000,000,000) | |
| (Foreign Aid) (2,000,000,000) | (3,000,000,000) | |
| (In Local Currency) (2,000,000,000) | ||
| IB3287 CONST | ___________________________________ RUCTION OF CHAKDARA CHITRAL ROAD PROJECT (N-45) SECTION III KALKATAK | _______________ CHITRAL (48KM) |
| 014202- A08 | Loans and Advances | 100,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 |
| Total- | CONSTRUCTION OF CHAKDARA | 100,000,000 |
| CHITRAL ROAD PROJECT (N-45) SECTION III KALKATAK CHITRAL (48KM) | ||
| (In Foreign Exchange) | (100,000,000) | |
| (Foreign Aid) | (100,000,000) | |
| IB3294 RELOC DAMS ON RIV | ___________________________________ ATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTR ER | _______________ UCTION OF |
| 014202- A08 | Loans and Advances | 5,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 5,000,000,000 |
| Total- | RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF DAMS ON RIVER | 5,000,000,000 |
| (In Foreign Exchange) | (5,000,000,000) | |
| (Foreign Aid) ___________________________________ | (5,000,000,000) _______________ |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE
DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
|---|---|---|---|
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
IB3623 EXTENSION AND AUGMENTATION OF 500KV AND 2 KV TRANSFORMERS AT THE EXISTING GRID STATION FOR REMOVAL OF NTDC
| 014202- A08 | Loans and Advances | 3,500,000,000 |
|---|---|---|
| 014202- A085 | Loans to Non Financial Institutions | 3,500,000,000 |
| Total- | EXTENSION AND AUGMENTATION OF 500KV AND 2 KV TRANSFORMERS AT THE EXISTING GRID STATION FOR REMOVAL OF NTDC | 3,500,000,000 |
| (In Foreign Exchange) | (3,500,000,000) | |
| (Foreign Aid) | (3,500,000,000) | |
| IB3624 220 KV | _____________________ GUJRANWALA-II SUBSTATION | _____________________________ |
| 014202- A08 | Loans and Advances | 50,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 50,000,000 |
| Total- | 220 KV GUJRANWALA-II SUBSTATION | 50,000,000 |
| (In Foreign Exchange) | (50,000,000) | |
| (Foreign Aid) | (50,000,000) | |
| IB3625 600 MW | _____________________ SOLAR POWER PLANT NEAR MUZAFFARGARH | _____________________________ |
| 014202- A08 | Loans and Advances | 20,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 20,000,000 |
| Total- | 600 MW SOLAR POWER PLANT NEAR MUZAFFARGARH | 20,000,000 |
| (In Foreign Exchange) | (20,000,000) | |
| (Foreign Aid) | (20,000,000) | |
| IB3626 600 MW | _____________________ SOLAR POWER PLANT NEAR TRIMMUR JHANG | _____________________________ |
| 014202- A08 | Loans and Advances | 20,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 20,000,000 |
| Total- | 600 MW SOLAR POWER PLANT NEAR TRIMMUR JHANG | 20,000,000 |
| (In Foreign Exchange) | (20,000,000) | |
| (Foreign Aid) _____________________ | (20,000,000) _____________________________ |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE
DEMANDS FOR GRANTS
| FEDERAL GOVERNMENT No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | 2023-2024 Revised Estimate | 2024-2025 Budget Estimate | |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| IB3627 1200 M | W SOLAR POWER PLANT NEAR HAVELLI BHAD | UR SHAH | ||
| 014202- A08 | Loans and Advances | 10,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | ||
| Total- | 1200 MW SOLAR POWER PLANT NEAR HAVELLI BHADUR SHAH | 10,000,000 | ||
| (In Foreign Exchange) | (10,000,000) | |||
| (Foreign Aid) | (10,000,000) | |||
| IB3628 220 KV | ___ NAG SHAH GRID STATION | ___________________ | ||
| 014202- A08 | Loans and Advances | 50,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 50,000,000 | ||
| Total- | 220 KV NAG SHAH GRID STATION | 50,000,000 | ||
| (In Foreign Exchange) | (50,000,000) | |||
| (Foreign Aid) | (50,000,000) | |||
| IB3629 INSTIT INDUSTRIAL) | ___ UTION OF SVCS AT 220 KV INDUSTRIAL (REVIS | ___________________ ED NAME 250 MVR SV | ______________ S AT 132 KV QU | ______________ ETTA |
| 014202- A08 | Loans and Advances | 10,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | ||
| Total- | INSTITUTION OF SVCS AT 220 KV INDUSTRIAL (REVISED NAME 250 MVR SVS AT 132 KV QUETTA INDUSTRIAL) | 10,000,000 | ||
| (In Foreign Exchange) | (10,000,000) | |||
| (Foreign Aid) | (10,000,000) | |||
| IB3630 INTER | ___ LINKING OF 765 KV MANSEHRA WITH 220 KV MA | ___________________ NSEHRA | ||
| 014202- A08 | Loans and Advances | 10,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | ||
| Total- | INTERLINKING OF 765 KV MANSEHRA WITH 220 KV MANSEHRA | 10,000,000 | ||
| (In Foreign Exchange) | (10,000,000) | |||
| (Foreign Aid) | (10,000,000) | |||
| IB3631 REINF | ___ ORCEMENT OF SAHIWAL ALONGWITH 2X 500 K | ___________________ V LINE BAY | ||
| 014202- A08 | Loans and Advances | 10,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | ||
| Total- | REINFORCEMENT OF SAHIWAL | 10,000,000 | ||
| ALONGWITH 2X 500 KV LINE BAY | ||||
| (In Foreign Exchange) | (10,000,000) | |||
| (Foreign Aid) ____ | ___________________ | _____________ | (10,000,000) ______________ |
| NO. 129.- FC1 | 2E14 EXTERNAL DEVELOPMENT LOANS AND A FEDERAL GOVERNMENT | DVANCES BY THE | DEMAND | S FOR GRANTS |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | 2023-2024 Revised Estimate | 2024-2025 Budget Estimate | |
| Rs | Rs | Rs | ||
| IB3632 2ND S | ACCOUNTANT GENERAL PA OURCE OF SUPPLY TO 500 KV SHEIKH MUHAMM | KISTAN REVENUES ADI | ||
| 014202- A08 | Loans and Advances | 10,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | ||
| Total- | 2ND SOURCE OF SUPPLY TO 500 KV SHEIKH MUHAMMADI | 10,000,000 | ||
| (In Foreign Exchange) | (10,000,000) | |||
| (Foreign Aid) | (10,000,000) | |||
| IB3633 220 MV | ___ AR SVS AT 132 KV KHUZDAR | ___________________ | ||
| 014202- A08 | Loans and Advances | 10,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | ||
| Total- | 220 MVAR SVS AT 132 KV KHUZDAR | 10,000,000 | ||
| (In Foreign Exchange) | (10,000,000) | |||
| (Foreign Aid) | (10,000,000) | |||
| IB3634 AUGM | ___ ENTATION OF REMAINING 2X 160 MVA TRANSF | ___________________ ORMERS WITH 2X 250 | ______________ MVA YOUSAF | ______________ WALA |
| 014202- A08 | Loans and Advances | 10,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | ||
| Total- | AUGMENTATION OF REMAINING 2X 160 | 10,000,000 | ||
| MVA TRANSFORMERS WITH 2X 250 MVA YOUSAF WALA | ||||
| (In Foreign Exchange) | (10,000,000) | |||
| (Foreign Aid) | (10,000,000) | |||
| IB3635 AFD S CAPACITY BU | ___ UPPORT TO PPIB FOR TARIFF BASED BIDDING ILDING | ___________________ AND REVIEW OF FEAS | ______________ IBILITY STUDIE | ______________ S AND |
| 014202- A08 | Loans and Advances | 51,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 51,000,000 | ||
| Total- | AFD SUPPORT TO PPIB FOR TARIFF BASED BIDDING AND REVIEW OF | 51,000,000 | ||
| FEASIBILITY STUDIES AND CAPACITY BUILDING |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE
DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|
| 2023-24 2024-25 Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVEN (In Foreign Exchange) | UES | (51,000,000) | |
| (Foreign Aid) | (51,000,000) | ||
| IB5430 ELECT | __________________ RICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT (M | ________________ EPCO) | |
| 014202- A08 | Loans and Advances 3,000,000,000 | 3,000,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions 3,000,000,000 | 3,000,000,000 | |
| Total- | ELECTRICITY DISTRIBUTION 3,000,000,000 | 3,000,000,000 | |
| EFFICIENCY IMPROVEMENT PROJECT (MEPCO) | |||
| (In Foreign Exchange) (3,000,000,000) | |||
| (Foreign Aid) (3,000,000,000) | |||
| (In Local Currency) | (3,000,000,000) | ||
| IB5431 THERM JAMSHORO | __________________ AL FOR INSTALLATION OF NEW COAL FIRED POWER PLANT H | ________________ AVING CAPACITY | ________________ 2X660 MW AT |
| 014202- A08 | Loans and Advances 3,000,000,000 | 3,000,000,000 | 12,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions 3,000,000,000 | 3,000,000,000 | 12,000,000,000 |
| Total- | THERMAL FOR INSTALLATION OF NEW COAL FIRED POWER PLANT HAVING CAPACITY 2X660 MW AT JAMSHORO 3,000,000,000 | 3,000,000,000 | 12,000,000,000 |
| (In Foreign Exchange) (3,000,000,000) | (12,000,000,000) | ||
| (Foreign Aid) (3,000,000,000) | (12,000,000,000) | ||
| (In Local Currency) | (3,000,000,000) | ||
| IB5432 500 KV | __________________ FAISALABAD NEW 2X750 NOW 500 KV FAISALABAD WEST | ||
| 014202- A08 | Loans and Advances 200,000,000 | 200,000,000 | 10,000,000 |
| 014202- A085 | Loans to Non Financial Institutions 200,000,000 | 200,000,000 | 10,000,000 |
| Total- | 500 KV FAISALABAD NEW 2X750 NOW 500 KV FAISALABAD WEST 200,000,000 | 200,000,000 | 10,000,000 |
| (In Foreign Exchange) (200,000,000) | (10,000,000) | ||
| (Foreign Aid) (200,000,000) | (10,000,000) | ||
| (In Local Currency) | (200,000,000) | ||
| IB5433 DI KHA | __________________ N-ZHOB T/L AND ZHOB S/S | ||
| 014202- A08 | Loans and Advances 90,300,000 | 90,300,000 | 900,000,000 |
| 014202- A085 | Loans to Non Financial Institutions 90,300,000 | 90,300,000 | 900,000,000 |
| Total- | DI KHAN-ZHOB T/L AND ZHOB S/S 90,300,000 | 90,300,000 | 900,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | |
| ACCOUNTANT GENERAL P | Rs AKISTAN REVENUES | Rs | Rs | |
| (In Foreign Exchange) | (90,300,000) | (900,000,000) | ||
| (Foreign Aid) | (90,300,000) | (900,000,000) | ||
| (In Local Currency) | (90,300,000) | |||
| IB5434 220KV | __ MIRPUR KHAS G/S & T/L | _____________ | _______________ | |
| 014202- A08 | Loans and Advances | 153,000,000 | 153,000,000 | 1,700,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 153,000,000 | 153,000,000 | 1,700,000,000 |
| Total- | 220KV MIRPUR KHAS G/S & T/L | 153,000,000 | 153,000,000 | 1,700,000,000 |
| (In Foreign Exchange) | (153,000,000) | (1,700,000,000) | ||
| (Foreign Aid) | (153,000,000) | (1,700,000,000) | ||
| (In Local Currency) __ | (153,000,000) _____________ | _______________ | ||
| IB5435 GUDDU-SIBBI T/L | ||||
| 014202- A08 | Loans and Advances | 60,000,000 | 60,000,000 | 300,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 60,000,000 | 60,000,000 | 300,000,000 |
| Total- | GUDDU-SIBBI T/L | 60,000,000 | 60,000,000 | 300,000,000 |
| (In Foreign Exchange) | (60,000,000) | (300,000,000) | ||
| (Foreign Aid) | (60,000,000) | (300,000,000) | ||
| (In Local Currency) | (60,000,000) | |||
| IB5436 UPGRA | __ DATION OF NTDC SCADA SYSTEM | _____________ | _______________ | |
| 014202- A08 | Loans and Advances | 664,000,000 | 664,000,000 | 7,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 664,000,000 | 664,000,000 | 7,000,000,000 |
| Total- | UPGRADATION OF NTDC SCADA SYSTEM | 664,000,000 | 664,000,000 | 7,000,000,000 |
| (In Foreign Exchange) | (664,000,000) | (7,000,000,000) | ||
| (Foreign Aid) | (664,000,000) | (7,000,000,000) | ||
| (In Local Currency) | (664,000,000) | |||
| IB5437 EVACU | __ ATION OF POWER FROM 500 MW WIND POWE | ____________________ R PLANTS JHIMPIR & | _____________ GHARO CLUST | _______________ ERS |
| 014202- A08 | Loans and Advances | 100,000,000 | 100,000,000 | 400,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | 100,000,000 | 400,000,000 |
| Total- | EVACUATION OF POWER FROM 500 MW WIND POWER PLANTS JHIMPIR & GHARO CLUSTERS | 100,000,000 | 100,000,000 | 400,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE
DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | |
| ACCOUNTANT GENERAL | Rs PAKISTAN REVEN | Rs UES | Rs | |
| (In Foreign Exchange) | (100,000,000) | (400,000,000) | ||
| (Foreign Aid) | (100,000,000) | (400,000,000) | ||
| (In Local Currency) | (100,000,000) | |||
| IB5438 ADVAN | _ CE METERING PROJECT FOR IESCO | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 1,000,000,000 | 1,000,000,000 | 3,808,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,000,000,000 | 1,000,000,000 | 3,808,000,000 |
| Total- | ADVANCE METERING PROJECT FOR IESCO | 1,000,000,000 | 1,000,000,000 | 3,808,000,000 |
| (In Foreign Exchange) | (1,000,000,000) | (3,808,000,000) | ||
| (Foreign Aid) | (1,000,000,000) | (3,808,000,000) | ||
| (In Local Currency) | (1,000,000,000) | |||
| IB5439 200 KV | _ JAUHARABAD G/S | _______________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 150,000,000 | 150,000,000 | 1,800,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 150,000,000 | 150,000,000 | 1,800,000,000 |
| Total- | 200 KV JAUHARABAD G/S | 150,000,000 | 150,000,000 | 1,800,000,000 |
| (In Foreign Exchange) | (150,000,000) | (1,800,000,000) | ||
| (Foreign Aid) | (150,000,000) | (1,800,000,000) | ||
| (In Local Currency) | (150,000,000) | |||
| IB5440 500 KV | _ LAHORE NORTH | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 959,000,000 | 959,000,000 | 6,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 959,000,000 | 959,000,000 | 6,000,000,000 |
| Total- | 500 KV LAHORE NORTH | 959,000,000 | 959,000,000 | 6,000,000,000 |
| (In Foreign Exchange) | (959,000,000) | (6,000,000,000) | ||
| (Foreign Aid) | (959,000,000) | (6,000,000,000) | ||
| (In Local Currency) | (959,000,000) | |||
| IB5442 ELECT | _ RICITY TRANS & TRADE PRO CASA | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 3,513,000,000 | 3,513,000,000 | 3,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 3,513,000,000 | 3,513,000,000 | 3,500,000,000 |
| Total- | ELECTRICITY TRANS & TRADE PRO CASA | 3,513,000,000 | 3,513,000,000 | 3,500,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUE | S | ||
| (In Foreign Exchange) | (3,513,000,000) | (3,500,000,000) | ||
| (Foreign Aid) | (3,513,000,000) | (3,500,000,000) | ||
| (In Local Currency) | (3,513,000,000) | |||
| IB5443 220 KV | _ TRANSMISSION LINE REINFORCEMENT OF I | ___________________ SLAMABAD BURHAN | _______________ TRANSMISSION | _______________ LINE |
| 014202- A08 | Loans and Advances | 100,000,000 | 100,000,000 | 1,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | 100,000,000 | 1,500,000,000 |
| Total- | 220 KV TRANSMISSION LINE REINFORCEMENT OF ISLAMABAD BURHAN TRANSMISSION LINE | 100,000,000 | 100,000,000 | 1,500,000,000 |
| (In Foreign Exchange) | (100,000,000) | (1,500,000,000) | ||
| (Foreign Aid) | (100,000,000) | (1,500,000,000) | ||
| (In Local Currency) _ | _________________ | (100,000,000) ______________ | _______________ | |
| IB5445 500 KV | CHAKWAL G/S ALONG WITH ALLIED T/LS | |||
| 014202- A08 | Loans and Advances | 10,000,000 | 10,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | 10,000,000 | |
| Total- | 500 KV CHAKWAL G/S ALONG WITH ALLIED T/LS | 10,000,000 | 10,000,000 | |
| (In Foreign Exchange) | (10,000,000) | |||
| (Foreign Aid) | (10,000,000) | |||
| (In Local Currency) | (10,000,000) | |||
| IB5446 EVACU | _ ATION OF POWER FROM TERBELLA 5TH EXT | ___________________ ENSION | _______________ | _______________ |
| 014202- A08 | Loans and Advances | 100,000,000 | 100,000,000 | 1,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | 100,000,000 | 1,500,000,000 |
| Total- | EVACUATION OF POWER FROM TERBELLA 5TH EXTENSION | 100,000,000 | 100,000,000 | 1,500,000,000 |
| (In Foreign Exchange) | (100,000,000) | (1,500,000,000) | ||
| (Foreign Aid) | (100,000,000) | (1,500,000,000) | ||
| (In Local Currency) | (100,000,000) | |||
| IB5447 CONVE | _ RSION FROM 220 KV AIS GRID STATIONS IN | ___________________ GIS GRID STATIONS | _______________ | _______________ |
| 014202- A08 | Loans and Advances | 4,000,000,000 | 4,000,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 4,000,000,000 | 4,000,000,000 | |
| Total- | CONVERSION FROM 220 KV AIS GRID STATIONS IN GIS GRID STATIONS | 4,000,000,000 | 4,000,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE
DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||
| (In Foreign Exchange) | (4,000,000,000) | |||
| (Foreign Aid) | (4,000,000,000) | |||
| (In Local Currency) | (4,000,000,000) | |||
| IB5449 220 KV | _ BUND ROAD | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 100,000,000 | ||
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | ||
| Total- | 220 KV BUND ROAD | 100,000,000 | ||
| (In Foreign Exchange) | (100,000,000) | |||
| (Foreign Aid) | (100,000,000) | |||
| IB5452 500 KV | _ ISLAMABAD WEST | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 700,000,000 | 700,000,000 | 3,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 700,000,000 | 700,000,000 | 3,500,000,000 |
| Total- | 500 KV ISLAMABAD WEST | 700,000,000 | 700,000,000 | 3,500,000,000 |
| (In Foreign Exchange) | (700,000,000) | (3,500,000,000) | ||
| (Foreign Aid) | (700,000,000) | (3,500,000,000) | ||
| (In Local Currency) | (700,000,000) | |||
| IB5453 ENHAN OF EXISTING | _ CEMENT IN TRANSFORMATION CAPACITY O GRID | _________________ F NTDC SYSTEM B | _________________ Y EXTENSION & AU | _______________ GMENTATION |
| 014202- A08 | Loans and Advances | 1,915,000,000 | 1,915,000,000 | 3,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,915,000,000 | 1,915,000,000 | 3,500,000,000 |
| Total- | ENHANCEMENT IN TRANSFORMATION | 1,915,000,000 | 1,915,000,000 | 3,500,000,000 |
| CAPACITY OF NTDC SYSTEM BY EXTENSION & AUGMENTATION OF EXISTING GRID | ||||
| (In Foreign Exchange) | (1,915,000,000) | (3,500,000,000) | ||
| (Foreign Aid) | (1,915,000,000) | (3,500,000,000) | ||
| (In Local Currency) | (1,915,000,000) | |||
| IB5454 ENTER | _ PRISE RESOURCE PLANNING AUTOMATION | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 215,313,000 | 215,313,000 | 2,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 215,313,000 | 215,313,000 | 2,000,000,000 |
| Total- | ENTERPRISE RESOURCE PLANNING AUTOMATION | 215,313,000 | 215,313,000 | 2,000,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE
DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 ACCOUNTANT GENERAL P (In Foreign Exchange) | Budget Estimate Rs AKISTAN REVEN (215,313,000) | Revised Estimate Rs UES | Budget Estimate Rs (2,000,000,000) | |
| (Foreign Aid) | (215,313,000) | (2,000,000,000) | ||
| (In Local Currency) | (215,313,000) | |||
| IB5456 EVACU | __ ATION OF POWER FROM 2160MW DASU HPP | ________________ STAGE I | ||
| 014202- A08 | Loans and Advances | 2,446,000,000 | 2,446,000,000 | 18,973,642,000 |
| 014202- A085 | Loans to Non Financial Institutions | 2,446,000,000 | 2,446,000,000 | 18,973,642,000 |
| Total- | EVACUATION OF POWER FROM 2160MW DASU HPP STAGE I | 2,446,000,000 | 2,446,000,000 | 18,973,642,000 |
| (In Foreign Exchange) | (2,446,000,000) | (18,973,642,000) | ||
| (Foreign Aid) | (2,446,000,000) | (18,973,642,000) | ||
| (In Local Currency) | (2,446,000,000) | |||
| IB5458 220 KV | __ ARIFWALA SUBSTATION | _______________ | ||
| 014202- A08 | Loans and Advances | 10,000,000 | 10,000,000 | 2,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | 10,000,000 | 2,000,000,000 |
| Total- | 220 KV ARIFWALA SUBSTATION | 10,000,000 | 10,000,000 | 2,000,000,000 |
| (In Foreign Exchange) | (10,000,000) | (2,000,000,000) | ||
| (Foreign Aid) | (10,000,000) | (2,000,000,000) | ||
| (In Local Currency) | (10,000,000) | |||
| IB5459 220 KV | __ HEAD FAQIRAN G/S ALONG WITH ALLIED T/L | |||
| 014202- A08 | Loans and Advances | 10,000,000 | 10,000,000 | 20,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | 10,000,000 | 20,000,000 |
| Total- | 220 KV HEAD FAQIRAN G/S ALONG WITH ALLIED T/L | 10,000,000 | 10,000,000 | 20,000,000 |
| (In Foreign Exchange) | (10,000,000) | (20,000,000) | ||
| (Foreign Aid) | (10,000,000) | (20,000,000) | ||
| (In Local Currency) | (10,000,000) | |||
| IB5460 220 KV | __ LARKANA SUBSTATION | |||
| 014202- A08 | Loans and Advances | 10,000,000 | 10,000,000 | 25,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | 10,000,000 | 25,000,000 |
| Total- | 220 KV LARKANA SUBSTATION | 10,000,000 | 10,000,000 | 25,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 ACCOUNTANT GENERAL | Budget Estimate Rs PAKISTAN REVENU | Revised Estimate Rs ES | Budget Estimate Rs | |
| (In Foreign Exchange) | (10,000,000) | (25,000,000) | ||
| (Foreign Aid) | (10,000,000) | (25,000,000) | ||
| (In Local Currency) | (10,000,000) | |||
| IB5461 220 KV | __ MASTUNG G/S ALONG WITH ALLIED T/LS | _________________ | _______________ | |
| 014202- A08 | Loans and Advances | 10,000,000 | 10,000,000 | 25,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | 10,000,000 | 25,000,000 |
| Total- | 220 KV MASTUNG G/S ALONG WITH ALLIED T/LS | 10,000,000 | 10,000,000 | 25,000,000 |
| (In Foreign Exchange) | (10,000,000) | (25,000,000) | ||
| (Foreign Aid) | (10,000,000) | (25,000,000) | ||
| (In Local Currency) __ | (10,000,000) _________________ | _______________ | ||
| IB5462 500 KV | VEHARI GRID STATION | |||
| 014202- A08 | Loans and Advances | 100,000,000 | 100,000,000 | 815,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | 100,000,000 | 815,000,000 |
| Total- | 500 KV VEHARI GRID STATION | 100,000,000 | 100,000,000 | 815,000,000 |
| (In Foreign Exchange) | (100,000,000) | (815,000,000) | ||
| (Foreign Aid) | (100,000,000) | (815,000,000) | ||
| (In Local Currency) | (100,000,000) | |||
| IB5463 INSTAL | __ LATION OF PILOT BATTERY ENERGY STORA | ________________ GE SYSTEM BESS | _________________ AT 220 KV JHIMPIR | _______________ G/STATION |
| 014202- A08 | Loans and Advances | 200,000,000 | 200,000,000 | 2,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 200,000,000 | 200,000,000 | 2,000,000,000 |
| Total- | INSTALLATION OF PILOT BATTERY | 200,000,000 | 200,000,000 | 2,000,000,000 |
| ENERGY STORAGE SYSTEM BESS AT 220 KV JHIMPIR G/STATION | ||||
| (In Foreign Exchange) | (200,000,000) | (2,000,000,000) | ||
| (Foreign Aid) | (200,000,000) | (2,000,000,000) | ||
| (In Local Currency) | (200,000,000) | |||
| IB5464 EVACU | __ ATION OF POWER FROM SUKI KINARI KOHA | ________________ LA MAHAL HPPS N | _________________ TDC | _______________ |
| 014202- A08 | Loans and Advances | 2,800,000,000 | 2,800,000,000 | 5,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 2,800,000,000 | 2,800,000,000 | 5,000,000,000 |
| Total- | EVACUATION OF POWER FROM SUKI KINARI KOHALA MAHAL HPPS NTDC | 2,800,000,000 | 2,800,000,000 | 5,000,000,000 |
| NO. 129.- FC1 | 2E14 EXTERNAL DEVELOPMENT LOANS AND FEDERAL GOVERNMENT | ADVANCES BY TH | E DEMAN | DS FOR GRANTS |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget | 2023-2024 Revised | 2024-2025 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVEN | UES | ||
| (In Foreign Exchange) | (2,800,000,000) | (5,000,000,000) | ||
| (Foreign Aid) | (2800000000) | (5000000000) | ||
| (In Local Currency) | ,,, | (2,800,000,000) | ,,, | |
| IB5466 AFD S CAPACITY BU | _ UPPORT TO PPIB FOR TARIFF BASED BIDDIN ILDING | _________________ G AND REVIEW OF | _________________ FEASIBILITY STUD | _______________ IES AND |
| 014202- A08 | Loans and Advances | 112,000,000 | 112,000,000 | |
| 014202- A085 | Loans to Non Financial Institutions | 112,000,000 | 112,000,000 | |
| Total- | AFD SUPPORT TO PPIB FOR TARIFF BASED BIDDING AND REVIEW OF FEASIBILITY STUDIES AND CAPACITY BUILDING | 112,000,000 | 112,000,000 | |
| (In Foreign Exchange) | (112,000,000) | |||
| (Foreign Aid) | (112,000,000) | |||
| (In Local Currency) | (112,000,000) | |||
| IB5467 500 22 | _ 0 KV SIALKOT SUB STATION NTDC | _________________ | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 10,000,000 | 10,000,000 | 2,500,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 10,000,000 | 10,000,000 | 2,500,000,000 |
| Total- | 500 220 KV SIALKOT SUB STATION NTDC | 10,000,000 | 10,000,000 | 2,500,000,000 |
| (In Foreign Exchange) | (10,000,000) | (2,500,000,000) | ||
| (Foreign Aid) | (10,000,000) | (2,500,000,000) | ||
| (In Local Currency) | (10,000,000) | |||
| IB5468 220KV | _ DHARKI RAHIM YAR KHAN BHAWALPUR D/C | _________________ T/L NTDC | _________________ | _______________ |
| 014202- A08 | Loans and Advances | 1,000,000 | 1,000,000 | 3,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,000,000 | 1,000,000 | 3,000,000,000 |
| Total- | 220KV DHARKI RAHIM YAR KHAN BHAWALPUR D/C T/L NTDC | 1,000,000 | 1,000,000 | 3,000,000,000 |
| (In Foreign Exchange) | (1,000,000) | (3,000,000,000) | ||
| (Foreign Aid) | (1,000,000) | (3,000,000,000) | ||
| (In Local Currency) | (1,000,000) | |||
| IB5469 CONST | _ RUCTION OF MUZAFFARABAD - MANSEHRA | _________________ ROAD (26.6 KM AP | _________________ PROX) | _______________ |
| 014202- A08 | Loans and Advances | 100,000,000 | 100,000,000 | 5,220,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |
|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | 100,000,000 | 5,220,000,000 |
| Total- | CONSTRUCTION OF MUZAFFARABAD - MANSEHRA ROAD (26.6 KM APPROX) | 100,000,000 | 100,000,000 | 5,220,000,000 |
| (In Foreign Exchange) | (100,000,000) | (5,220,000,000) | ||
| (Foreign Aid) | (100,000,000) | (5,220,000,000) | ||
| (In Local Currency) | (100,000,000) | |||
| IB9407 PROVI FEDERAL GO | _ SION FOR DEVELOPMENT EXPENDITURE OF VERNMENT | _________________ DEVELOPMENT LO | _________________ ANS AND ADVANC | _______________ ES BY THE |
| 014202- A08 | Loans and Advances | 1,000,000,000 | 1,000,000,000 | 4,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,000,000,000 | 1,000,000,000 | 4,000,000,000 |
| Total- | PROVISION FOR DEVELOPMENT EXPENDITURE OF DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT | 1,000,000,000 | 1,000,000,000 | 4,000,000,000 |
| (In Foreign Exchange) | (1,000,000,000) | (4,000,000,000) | ||
| (Foreign Aid) | (1,000,000,000) | (4,000,000,000) | ||
| (In Local Currency) | (1,000,000,000) | |||
| IB9436 REHAB DAMAGED BR | _ ILITATION & RECONSTRUCTION OF N-5 FRO IDGES | _________________ M MORO TO RANIP | _________________ UR KM. 318-404 (NB | _______________ C/SBC) & 32 X |
| 014202- A08 | Loans and Advances | 1,300,000,000 | 1,300,000,000 | 6,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 1,300,000,000 | 1,300,000,000 | 6,000,000,000 |
| Total- | REHABILITATION & RECONSTRUCTION | 1,300,000,000 | 1,300,000,000 | 6,000,000,000 |
| OF N-5 FROM MORO TO RANIPUR KM. 318-404 (NBC/SBC) & 32 X DAMAGED BRIDGES | ||||
| (In Foreign Exchange) | (1,300,000,000) | (6,000,000,000) | ||
| (Foreign Aid) | (1300000000) | (6000000000) | ||
| (In Local Currency) | ,,, | (1,300,000,000) | ,,, | |
| IB9446 CHINA HALA-MORO 6 | _ AIDED PROJECTS OF PAKISTAN NATIONAL 6 KM | _________________ HIGHWAY N-5 SEC | _________________ TIONAL REHABILIT | _______________ ATION |
| 014202- A08 | Loans and Advances | 100,000,000 | 100,000,000 | 1,000,000,000 |
| 014202- A085 | Loans to Non Financial Institutions | 100,000,000 | 100,000,000 | 1,000,000,000 |
| Total- | CHINA AIDED PROJECTS OF PAKISTAN NATIONAL HIGHWAY N-5 SECTIONAL REHABILITATION HALA-MORO 66 KM | 100,000,000 | 100,000,000 | 1,000,000,000 |
NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE DEMANDS FOR GRANTS
FEDERAL GOVERNMENT
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
|---|---|---|---|
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| (In Foreign Exchange) (Foreign Aid) (In Local Currency) | (100,000,000) (100,000,000) | (100,000,000) | (1,000,000,000) (1,000,000,000) | |
|---|---|---|---|---|
| 014202 | Total- Trasfer To Non-Financial Institutions | _________________ 39,728,613,000 | _________________ 39,728,613,000 | ________________ 127,857,642,000 |
| 0142 | Total- Transfers (Others) | 39,728,613,000 | 39,728,613,000 | 127,857,642,000 |
| 014 | Total- Transfers | 700,522,753,000 | 700,522,753,000 | 745,317,642,000 |
| 01 | Total- General Public Service | 700,522,753,000 | 700,522,753,000 | 745,317,642,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 700,522,753,000 | 700,522,753,000 | 745,317,642,000 | |
| (Charged) | 658,644,140,000 | 658,644,140,000 | 617,000,000,000 | |
| (Voted) | 41,878,613,000 | 41,878,613,000 | 128,317,642,000 | |
| (In Foreign Exchange) (Own Resources) | (700,522,753,000) | (745,317,642,000) | ||
| (Foreign Aid) | (700,522,753,000) | (745,317,642,000) | ||
| (In Local Currency) | (700,522,753,000) | |||
| TOTAL - DEMAND | 700,522,753,000 | 700,522,753,000 | 745,317,642,000 | |
| (Charged) | 658,644,140,000 | 658,644,140,000 | 617,000,000,000 | |
| (Voted) | 41,878,613,000 | 41,878,613,000 | 128,317,642,000 | |
| (In Foreign Exchange) | _________________ (700,522,753,000) | _________________ | ________________ (745,317,642,000) | |
| (Own Resources) | ||||
| (Foreign Aid) | (700,522,753,000) | (745,317,642,000) | ||
| (In Local Currency) | _________________ | (700,522,753,000) _________________ |
SECTION IV
MINISTRY OF HOUSING AND WORKS
| 2024-2025 Budget Estimate |
|---|
(Rupees in Thousand) Demand presented on behalf of the Ministry of Housing and Works Development Expenditure on Capital Account
| 130. | Capital Outlay on Civil Works | Total : | 28,188,072 28,188,072 |
|---|
NO. 130.- CAPITAL OUTLAY ON CIVIL WORKS
DEMANDS FOR GRANTS
DEMAND NO. 130 ( FC12C28 )
CAPITAL OUTLAY ON CIVIL WORKS
I. ESTIMATES of the Amount required in the year ending 30 June , 2025 for CAPITAL OUTLAY ON CIVIL WORKS.
Voted
Rs. 28,188,072,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF HOUSING AND WORKS .
| 2023-2024 Budget Estimate Rs | 2023-2024 Revised Estimate Rs | 2024-2025 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 045 | Construction and Transport | 41,880,872,000 | 86,038,750,000 | 28,188,072,000 |
| Total | 41,880,872,000 | 86,038,750,000 | 28,188,072,000 | |
| OBJECT CLASSIFICATION | ||||
| A03 | Operating Expenses | 2,447,346,000 | 2,351,805,000 | 1,663,025,000 |
| A12 | Civil works | 39,433,526,000 | 83,686,945,000 | 26,525,047,000 |
| Total | 41,880,872,000 | 86,038,750,000 | 28,188,072,000 |
NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | ||
|---|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | ||
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 04 | Economic Affairs: | ||||
| 045 | Construction and Transport: | ||||
| 0457 | Construction (Works): | ||||
| 045701 IB3461 | Administration : ESTABLISHMENT OF NATIONAL INSTITUTE OF MANA | GEMENT (NIM) IN SAARC BUILDING ISLAMABAD | |||
| 045701 | - A03 | Operating Expenses | 3,652,000 | 3,652,000 | |
| 045701 | - A039 | General | 3,652,000 | 3,652,000 | |
| 045701 | - A12 | Civil works | 56,181,000 | 56,181,000 | |
| 045701 | - A124 | Building and Structures | 56,181,000 | 56,181,000 | |
| Total- | ESTABLISHMENT OF NATIONAL INSTITUTE OF MANAGEMENT (NIM) IN SAARC BUILDING ISLAMABAD | 59,833,000 | 59,833,000 | ||
| IB3463 SERVI | STREN CES PA | GTHENING OF TRAINING FACILITIES OF PAKIS S | TAN ADMINISTRATIVE | SERVICE OFFICERS AT CIVIL | |
| 045701 | - A03 | Operating Expenses | 6,862,000 | 4,252,000 | |
| 045701 | - A039 | General | 6,862,000 | 4,252,000 | |
| 045701 | - A12 | Civil works | 105,572,000 | 65,422,000 | |
| 045701 | - A124 | Building and Structures | 105,572,000 | 65,422,000 | |
| Total- | STRENGTHENING OF TRAINING | 112,434,000 | 69,674,000 | ||
| FACILITIES OF PAKISTAN | |||||
| ADMINISTRATIVE SERVICE OFFICERS AT CIVIL SERVICES PAS | |||||
| IB3524 COMPL | CONST EX | RUCTION OF ADDITIONAL FLOORS PROVISION OF FACILITIES AND | REHABILITATION OF PAK PWD | ||
| 045701 | - A03 | Operating Expenses | 18,310,000 | ||
| 045701 | - A039 | General | 18,310,000 | ||
| 045701 | - A12 | Civil works | 281,690,000 | ||
| 045701 | - A124 | Building and Structures | 281,690,000 | ||
| Total- | CONSTRUCTION OF ADDITIONAL | 300,000,000 | |||
| FLOORS PROVISION OF FACILITIES AND REHABILITATION OF PAK PWD COMPLEX | |||||
| IB5317 | CONSTRUCTION OF HAJJ COMPLEX LAHORE | ||||
| 045701 | - A03 | Operating Expenses | 38,753,000 | 30,517,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045701- A039 | General | 38,753,000 | 30,517,000 | |
| 045701- A12 | Civil works | 634,952,000 | 596,199,000 | 469,483,000 |
| 045701- A124 | Building and Structures | 634,952,000 | 596,199,000 | 469,483,000 |
| Total- IB5318 ESTAB | CONSTRUCTION OF HAJJ COMPLEX LAHORE LISHMENT OF RECYCLING PLANT FOR SHAHE | 634,952,000 ED QURAN PAPERS I | 634,952,000 N ISLAMABAD | 500,000,000 |
| 045701- A03 | Operating Expenses | 10,073,000 | ||
| 045701- A039 | General | 10,073,000 | ||
| 045701- A12 | Civil works | 165,048,000 | 154,975,000 | |
| 045701- A124 | Building and Structures | 165,048,000 | 154,975,000 | |
| Total- | ESTABLISHMENT OF RECYCLING PLANT FOR SHAHEED QURAN PAPERS IN ISLAMABAD | 165,048,000 | 165,048,000 | |
| IB5351 124 CO | L ON CIVIL WORK CONSTRUCTION OF REC/DE | C SARGODHA | ||
| 045701- A03 | Operating Expenses | 6,981,000 | 26,806,000 | |
| 045701- A039 | General | 6,981,000 | 26,806,000 | |
| 045701- A12 | Civil works | 107,392,000 | 412,387,000 | |
| 045701- A124 | Building and Structures | 107,392,000 | 412,387,000 | |
| Total- | 124 COL ON CIVIL WORK | 114,373,000 | 439,193,000 | |
| CONSTRUCTION OF REC/DEC SARGODHA | ||||
| IB5352 124 CO | L ON CIVIL WORK CONSTRUCTION OF DEC O | KARA | ||
| 045701- A03 | Operating Expenses | 932,000 | 6,360,000 | |
| 045701- A039 | General | 932,000 | 6,360,000 | |
| 045701- A12 | Civil works | 14,336,000 | 97,846,000 | |
| 045701- A124 | Building and Structures | 14,336,000 | 97,846,000 | |
| Total- | 124 COL ON CIVIL WORK CONSTRUCTION OF DEC OKARA | 15,268,000 | 104,206,000 | |
| IB5353 124 CO | L ON CIVIL WORK CONSTRUCTION OF REC/DE | C LAYYAH | ||
| 045701- A03 | Operating Expenses | 927,000 | 8,974,000 | |
| 045701- A039 | General | 927,000 | 8,974,000 | |
| 045701- A12 | Civil works | 14,259,000 | 138,056,000 | |
| 045701- A124 | Building and Structures | 14,259,000 | 138,056,000 | |
| Total- | 124 COL ON CIVIL WORK | 15,186,000 | 147,030,000 |
| NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| IB5354 124 CO | CONSTRUCTION OF REC/DEC LAYYAH L ON CIVIL WORK CONSTRUCTION OF REC/ | DEC JHELUM | ||
|---|---|---|---|---|
| 045701- A03 | Operating Expenses | 6,219,000 | 10,819,000 | |
| 045701- A039 | General | 6,219,000 | 10,819,000 | |
| 045701- A12 | Civil works | 95,683,000 | 166,451,000 | |
| 045701- A124 | Building and Structures | 95,683,000 | 166,451,000 | |
| Total- | 124 COL ON CIVIL WORK CONSTRUCTION OF REC/DEC JHELUM | 101,902,000 | 177,270,000 | |
| IB5355 124 CO | L ON CIVIL WORK CONSTRUCTION OF DEC | ATTOCK | ||
| 045701- A03 | Operating Expenses | 6,180,000 | 10,570,000 | |
| 045701- A039 | General | 6,180,000 | 10,570,000 | |
| 045701- A12 | Civil works | 95,074,000 | 162,610,000 | |
| 045701- A124 | Building and Structures | 95,074,000 | 162,610,000 | |
| Total- | 124 COL ON CIVIL WORK CONSTRUCTION OF DEC ATTOCK | 101,254,000 | 173,180,000 | |
| IB5363 124 CO GUJRANWAL | L ON CIVIL WORK CONSTRUCTION OF CAR A | PET ROAD FROM KOT SHER TO JAJOKI | DISTRICT | |
| 045701- A03 | Operating Expenses | 15,258,000 | 15,258,000 | 23,670,000 |
| 045701- A039 | General | 15,258,000 | 15,258,000 | 23,670,000 |
| 045701- A12 | Civil works | 234,742,000 | 234,742,000 | 364,156,000 |
| 045701- A124 | Building and Structures | 234,742,000 | 234,742,000 | 364,156,000 |
| Total- | 124 COL ON CIVIL WORK CONSTRUCTION OF CARPET ROAD FROM KOT SHER TO JAJOKI DISTRICT GUJRANWALA | 250,000,000 | 250,000,000 | 387,826,000 |
IB5496 124-COL ON CIVIL WORK ROAD FROM LALAMUSA TO NOONA WALI BHAGO AND MALWANA WITH LINK INFRASTRUCTURE
| 045701- A03 | Operating Expenses | 21,362,000 | 23,978,000 | 3,052,000 |
|---|---|---|---|---|
| 045701- A039 | General | 21,362,000 | 23,978,000 | 3,052,000 |
| 045701- A12 | Civil works | 328,638,000 | 368,871,000 | 46,948,000 |
| 045701- A124 | Building and Structures | 328,638,000 | 368,871,000 | 46,948,000 |
| Total- | 124-COL ON CIVIL WORK ROAD FROM LALAMUSA TO NOONA WALI BHAGO AND MALWANA WITH LINK | 350,000,000 | 392,849,000 | 50,000,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | DEMAN 2023-2024 Budget 2023-2024 Revised | DS FOR GRANTS 2024-2025 Budget |
|---|---|---|---|
| Estimate Estimate | Estimate | ||
| Rs Rs | Rs | ||
| IB5497 124-CO | ACCOUNTANT GENERAL P INFRASTRUCTURE L ON CIVIL WORK CONSTRUCTION OF RAILW | AKISTAN REVENUES AY UNDERPASS GOJRA | |
| 045701- A03 | Operating Expenses | 30,516,000 30,516,000 | 20,415,000 |
| 045701- A039 | General | 30,516,000 30,516,000 | 20,415,000 |
| 045701- A12 | Civil works | 469,484,000 469,484,000 | 314,070,000 |
| 045701- A124 | Building and Structures | 469,484,000 469,484,000 | 314,070,000 |
| Total- | 124-COL ON CIVIL WORK | 500,000,000 500,000,000 | 334,485,000 |
| CONSTRUCTION OF RAILWAY UNDERPASS GOJRA | |||
| 045701 | Total- Administration | 2,420,250,000 3,113,235,000 | 1,572,311,000 |
| 045702 Buildings and Structures : IB2232 CONSTRUCTION OF OFFICE OF THE NAB SUKKUR A | T AIRPORT ROAD SUKKUR | ||
| 045702- A03 | Operating Expenses | 1,831,000 1,831,000 | 10,118,000 |
| 045702- A039 | General | 1,831,000 1,831,000 | 10,118,000 |
| 045702- A12 | Civil works | 28,169,000 28,169,000 | 155,667,000 |
| 045702- A124 | Building and Structures | 28,169,000 28,169,000 | 155,667,000 |
| Total- | CONSTRUCTION OF OFFICE OF THE | 30,000,000 30,000,000 | 165,785,000 |
| NAB SUKKUR AT AIRPORT ROAD | |||
| IB2235 CONST | SUKKUR RUCTION OF BRIDGE OVER RIVER RAVI AT M | AL FATYANA DISTRICT TOBA TEK SINGH | |
| 045702- A03 | Operating Expenses | 6,103,000 6,103,000 | |
| 045702- A039 | General | 6,103,000 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 93,897,000 | |
| Total- | CONSTRUCTION OF BRIDGE OVER | 100,000,000 100,000,000 | |
| IB2239 CONST | RIVER RAVI AT MAL FATYANA DISTRICT TOBA TEK SINGH RUCTION OF OFFICES FOR INTELLIGENCE BU | REAU ALONG-WITH CPEC | |
| 045702- A03 | Operating Expenses | 6,897,000 6,897,000 | 9,155,000 |
| 045702- A039 | General | 6,897,000 6,897,000 | 9,155,000 |
| 045702- A12 | Civil works | 106,112,000 106,112,000 | 140,845,000 |
| 045702- A124 | Building and Structures | 106,112,000 106,112,000 | 140,845,000 |
| Total- | CONSTRUCTION OF OFFICES FOR | 113,009,000 113,009,000 | 150,000,000 |
| INTELLIGENCE BUREAU ALONG-WITH |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| IB2240 DUALI | ACCOUNTANT GENERAL P CPEC ZATION AND IMPROVEMENT OF MANDRA TO C | AKISTAN REVENU HAKWAL ROAD (6 | ES 4 KM) | |
| 045702- A12 | Civil works | 200,000,000 | 450,000,000 | 940,214,000 |
| 045702- A124 | Building and Structures | 200,000,000 | 450,000,000 | 940,214,000 |
| Total- | DUALIZATION AND IMPROVEMENT OF | 200,000,000 | 450,000,000 | 940,214,000 |
| MANDRA TO CHAKWAL ROAD (64 KM) | ||||
| IB2241 DUALI | ZATION AND IMPROVEMENT OF SOHAWA TO C | HAKWAL ROAD (7 | 0 KM) | |
| 045702- A12 | Civil works | 782,000,000 | 782,000,000 | |
| 045702- A124 | Building and Structures | 782,000,000 | 782,000,000 | |
| Total- | DUALIZATION AND IMPROVEMENT OF SOHAWA TO CHAKWAL ROAD (70 KM) | 782,000,000 | 782,000,000 | |
| IB2244 REPLA SHAHEED-E-M | CEMENT OF OLD AND UNSERVICEABLE ELEV ILLAT SECRETARIAT | ATORS WITH NEW | ELEVATORS AT | |
| 045702- A03 | Operating Expenses | 3,273,000 | ||
| 045702- A039 | General | 3,273,000 | ||
| 045702- A12 | Civil works | 50,358,000 | ||
| 045702- A124 | Building and Structures | 50,358,000 | ||
| Total- | REPLACEMENT OF OLD AND UNSERVICEABLE ELEVATORS WITH NEW ELEVATORS AT SHAHEED-E-MILLAT SECRETARIAT | 53,631,000 | ||
| IB2251 WIDEN MASHANI MC | ING / REHABILITATION / CONSTRUCTION OF 0 | 8 NOS ROADS IN U | C MANDA KHEL UC | QAMAR |
| 045702- A03 | Operating Expenses | 6,103,000 | 3,052,000 | |
| 045702- A039 | General | 6,103,000 | 3,052,000 | |
| 045702- A12 | Civil works | 93,897,000 | 46,948,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 46,948,000 | |
| Total- | WIDENING / REHABILITATION / | 100,000,000 | 50,000,000 | |
| CONSTRUCTION OF 08 NOS ROADS IN UC MANDA KHEL UC QAMAR MASHANI MC | ||||
| IB2252 WIDEN KOT | ING / REHABILITATION / CONSTRUCTION OF 0 | 5 ROADS IN UC PAKI SHAH MARDIAN | UC NAMAL UC | |
| 045702- A03 | Operating Expenses | 6,103,000 | 3,052,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate | |
|---|---|---|---|---|---|
| Rs | Rs | Rs | |||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||||
| 045702- A039 | General | 6,103,000 | 3,052,000 | ||
| 045702- A12 | Civil works | 93,897,000 | 46,948,000 | ||
| 045702- A124 | Building and Structures | 93,897,000 | 46,948,000 | ||
| Total- | WIDENING / REHABILITATION / | 100,000,000 | 50,000,000 | ||
| CONSTRUCTION OF 05 ROADS IN UC PAKI SHAH MARDIAN UC NAMAL UC KOT | |||||
| IB2253 WIDEN PAI KHEL | ING / REHABILITATION / CONSTRUCTION OF 0 | 7 NOS ROADS IN UC | SHAHBAZ KHEL | UC ROKHRI UC | |
| 045702- A03 | Operating Expenses | 6,103,000 | 3,052,000 | ||
| 045702- A039 | General | 6,103,000 | 3,052,000 | ||
| 045702- A12 | Civil works | 93,897,000 | 46,948,000 | ||
| 045702- A124 | Building and Structures | 93,897,000 | 46,948,000 | ||
| Total- | WIDENING / REHABILITATION / CONSTRUCTION OF 07 NOS ROADS IN UC SHAHBAZ KHEL UC ROKHRI UC PAI KHEL | 100,000,000 | 50,000,000 | ||
| IB2257 CONSTRUCTION OF OFFICER'S MESS AT NAB (L) | COMPLEX LAHORE | ||||
| 045702- A03 | Operating Expenses | 3,052,000 | |||
| 045702- A039 | General | 3,052,000 | |||
| 045702- A12 | Civil works | 46,948,000 | |||
| 045702- A124 | Building and Structures | 46,948,000 | |||
| Total- | **CONSTRUCTION OF OFFICER'S MESS AT NAB (L) | COMPLEX LAHORE** | 50,000,000 | ||
| IB2259 CONST BHIMER NALL | RUCTION OF INDUSTRIAL AREA ROAD FROM AH | GT ROAD TO GHAZI CHAK INCLUDING | BRIDGES ON | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 15,036,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 15,036,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 231,317,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 231,317,000 | |
| Total- | CONSTRUCTION OF INDUSTRIAL AREA ROAD FROM GT ROAD TO GHAZI CHAK INCLUDING BRIDGES ON BHIMER NALLAH | 100,000,000 | 100,000,000 | 246,353,000 |
IB2264 CONSTRUCTION OF SERVICE MORE FLYOVER AND INDUSTRIAL AREA LINK ROAD GUJRAT DISTRICT
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| GUJRAT-II | ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| 045702- A03 | Operating Expenses | 5,188,000 | 13,724,000 | |
| 045702- A039 | General | 5,188,000 | 13,724,000 | |
| 045702- A12 | Civil works | 79,812,000 | 211,142,000 | |
| 045702- A124 | Building and Structures | 79,812,000 | 211,142,000 | |
| Total- | CONSTRUCTION OF SERVICE MORE | 85,000,000 | 224,866,000 | |
| FLYOVER AND INDUSTRIAL AREA LINK ROAD GUJRAT DISTRICT GUJRAT-II | ||||
| IB2267 CONSTRUCTION OF 20 BEDDED HOSPITAL AT VILLA | GE LATIFAL DISTRICT | CHAKWAL | ||
| 045702- A03 | Operating Expenses | 10,991,000 | 10,991,000 | 6,103,000 |
| 045702- A039 | General | 10,991,000 | 10,991,000 | 6,103,000 |
| 045702- A12 | Civil works | 169,086,000 | 169,086,000 | 93,897,000 |
| 045702- A124 | Building and Structures | 169,086,000 | 169,086,000 | 93,897,000 |
| Total- | CONSTRUCTION OF 20 BEDDED | 180,077,000 | 180,077,000 | 100,000,000 |
| IB2268 WIDEN KHUSHAB | HOSPITAL AT VILLAGE LATIFAL DISTRICT CHAKWAL ING/REHABILITATION OF ROAD FROM QUAIDA | BAD TO WARCHHA VIA FATEHPUR DISTRICT | ||
| 045702- A03 | Operating Expenses | 610,000 | 610,000 | 9,155,000 |
| 045702- A039 | General | 610,000 | 610,000 | 9,155,000 |
| 045702- A12 | Civil works | 9,390,000 | 9,390,000 | 140,845,000 |
| 045702- A124 | Building and Structures | 9,390,000 | 9,390,000 | 140,845,000 |
| Total- | WIDENING/REHABILITATION OF ROAD | 10,000,000 | 10,000,000 | 150,000,000 |
| FROM QUAIDABAD TO WARCHHA VIA FATEHPUR DISTRICT KHUSHAB | ||||
| IB2271 CONST | RUCTION / REHABILITATION OF FLOOD AFFE | CTED ROAD DISTRICT | MUZAFFARGARH-I | |
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 6,103,000 |
| 045702- A039 | General | 9,155,000 | 9,155,000 | 6,103,000 |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 | 93,897,000 |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 | 93,897,000 |
| Total- | CONSTRUCTION / REHABILITATION OF FLOOD AFFECTED ROAD DISTRICT MUZAFFARGARH-I | 150,000,000 | 150,000,000 | 100,000,000 |
IB2273 CONSTRUCTION OF 2ND FLOOR OF BOLAN HOSTEL AT CIVIL SERVICES ACADEMY WALTON LAHORE
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | DEMAND 2023-2024 Budget Estimate 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| 045702- A03 | Operating Expenses | 488,000 488,000 | |
| 045702- A039 | General | 488,000 488,000 | |
| 045702- A12 | Civil works | 7,512,000 7,512,000 | |
| 045702- A124 | Building and Structures | 7,512,000 7,512,000 | |
| Total- | CONSTRUCTION OF 2ND FLOOR OF BOLAN HOSTEL AT CIVIL SERVICES ACADEMY WALTON LAHORE | 8,000,000 8,000,000 | |
| IB2285 CONST PESHAWAR | RUCTION OF AUDITORIUM BACHELOR HOSTEL AND OFFICERS MESS FOR NAB (KP | ) AT | |
| 045702- A03 | Operating Expenses | 4,203,000 4,203,000 | 6,103,000 |
| 045702- A039 | General | 4,203,000 4,203,000 | 6,103,000 |
| 045702- A12 | Civil works | 64,657,000 64,657,000 | 93,897,000 |
| 045702- A124 | Building and Structures | 64,657,000 64,657,000 | 93,897,000 |
| Total- | CONSTRUCTION OF AUDITORIUM | 68,860,000 68,860,000 | 100,000,000 |
| IB2296 CONST | BACHELOR HOSTEL AND OFFICERS MESS FOR NAB (KP) AT PESHAWAR RUCTION OF BUILDING FOR GIRLS COLLEGE | AT KACHI BAIG SARYAB ROAD QUET | TA |
| 045702- A03 | Operating Expenses | 3,662,000 3,662,000 | 12,007,000 |
| 045702- A039 | General | 3,662,000 3,662,000 | 12,007,000 |
| 045702- A12 | Civil works | 56,338,000 56,338,000 | 184,720,000 |
| 045702- A124 | Building and Structures | 56,338,000 56,338,000 | 184,720,000 |
| Total- | CONSTRUCTION OF BUILDING FOR | 60,000,000 60,000,000 | 196,727,000 |
| GIRLS COLLEGE AT KACHI BAIG | |||
| SARYAB ROAD QUETTA | |||
| IB2311 CONSTRUCTION OF BRIDGE OVER RIVER KOTIRA AN BALOCHISTAN | D 17 KMS ROAD IN UC LOHI DISTRICT | LASBELA | |
| 045702- A03 | Operating Expenses | 12,678,000 12,678,000 | |
| 045702- A039 | General | 12,678,000 12,678,000 | |
| 045702- A12 | Civil works | 195,040,000 195,040,000 | |
| 045702- A124 | Building and Structures | 195,040,000 195,040,000 | |
| Total- | CONSTRUCTION OF BRIDGE OVER RIVER KOTIRA AND 17 KMS ROAD IN UC LOHI DISTRICT LASBELA BALOCHISTAN | 207,718,000 207,718,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget | 2023-2024 Revised | 2024-2025 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB2360 CONST | ACCOUNTANT GENERAL PAKISTAN REVENUES RUCTION OF DHUDIAL BY PASS DISTRICT CHAKWAL | |||
| 045702- A03 | Operating Expenses | 4,272,000 | 4,272,000 | 21,715,000 |
| 045702- A039 | General | 4,272,000 | 4,272,000 | 21,715,000 |
| 045702- A12 | Civil works | 65,728,000 | 65,728,000 | 334,082,000 |
| 045702- A124 | Building and Structures | 65,728,000 | 65,728,000 | 334,082,000 |
| Total- | CONSTRUCTION OF DHUDIAL BY PASS | 70,000,000 | 70,000,000 | 355,797,000 |
| DISTRICT CHAKWAL | ||||
| IB3250 CONSTRUCTION OF OFFICE BUILDING OF IB IN DIPLOMATIC ENCLAVE ISLAMABAD | ||||
| 045702- A03 | Operating Expenses | 9,155,000 | ||
| 045702- A039 | General | 9,155,000 | ||
| 045702- A12 | Civil works | 140,845,000 | ||
| 045702- A124 | Building and Structures | 140,845,000 | ||
| Total- | CONSTRUCTION OF OFFICE BUILDING OF IB IN DIPLOMATIC ENCLAVE ISLAMABAD | 150,000,000 | ||
| IB3257 CONSTRUCTION OF OFFICE FOR IB AT DASSU | ||||
| 045702- A03 | Operating Expenses | 2,746,000 | ||
| 045702- A039 | General | 2,746,000 | ||
| 045702- A12 | Civil works | 42,254,000 | ||
| 045702- A124 | Building and Structures | 42,254,000 | ||
| Total- | CONSTRUCTION OF OFFICE FOR IB AT DASSU | 45,000,000 | ||
| IB3258 CONSTRUCTION OF OFFICE FOR IB AT MASTUNG | ||||
| 045702- A03 | Operating Expenses | 2,136,000 | ||
| 045702- A039 | General | 2,136,000 | ||
| 045702- A12 | Civil works | 32,864,000 | ||
| 045702- A124 | Building and Structures | 32,864,000 | ||
| Total- | CONSTRUCTION OF OFFICE FOR IB AT MASTUNG | 35,000,000 | ||
| IB3259 CONSTRUCTION OF OFFICE FOR IB AT PISHIN | ||||
| 045702- A03 | Operating Expenses | 1,526,000 | ||
| 045702- A039 | General | 1,526,000 | ||
| 045702- A12 | Civil works | 23,474,000 | ||
| 045702- A124 | Building and Structures | 23,474,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMA 2023-2024 Revised Estimate | NDS FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | CONSTRUCTION OF OFFICE FOR IB AT PISHIN | 25,000,000 | ||
| IB3272 CONSTRUCTION OF OFFICE FOR IB AT DISTRICT CHA | MAN | |||
| 045702- A03 | Operating Expenses | 1,526,000 | ||
| 045702- A039 | General | 1,526,000 | ||
| 045702- A12 | Civil works | 23,474,000 | ||
| 045702- A124 | Building and Structures | 23,474,000 | ||
| Total- | CONSTRUCTION OF OFFICE FOR IB AT DISTRICT CHAMAN | 25,000,000 | ||
| IB3273 CONSTRUCTION OF NAB COMPLEX LAHORE (2ND REVISED PC-I) | ||||
| 045702- A03 | Operating Expenses | 3,052,000 | ||
| 045702- A039 | General | 3,052,000 | ||
| 045702- A12 | Civil works | 46,948,000 | ||
| 045702- A124 | Building and Structures | 46,948,000 | ||
| Total- | CONSTRUCTION OF NAB COMPLEX LAHORE (2ND REVISED PC-I) | 50,000,000 | ||
| IB3274 CONSTRUCTION OF 12 NOS. APARTMENTS IN MINISTER'S ENCLAVE ISLAMABAD | ||||
| 045702- A03 | Operating Expenses | 8,100,000 | ||
| 045702- A039 | General | 8,100,000 | ||
| 045702- A12 | Civil works | 124,622,000 | ||
| 045702- A124 | Building and Structures | 124,622,000 | ||
| Total- | CONSTRUCTION OF 12 NOS. | 132,722,000 | ||
| IB3354 CONST | APARTMENTS IN MINISTER'S ENCLAVE ISLAMABAD RUCTION OF OPERATION THEATRE AT CENTR | AL HOSPITAL AT MINGORA SWAT | (REVISED PC-1) | |
| 045702- A03 | Operating Expenses | 4,050,000 | 4,050,000 | 8,019,000 |
| 045702- A039 | General | 4,050,000 | 4,050,000 | 8,019,000 |
| 045702- A12 | Civil works | 62,301,000 | 62,301,000 | 123,362,000 |
| 045702- A124 | Building and Structures | 62,301,000 | 62,301,000 | 123,362,000 |
| Total- | CONSTRUCTION OF OPERATION | 66,351,000 | 66,351,000 | 131,381,000 |
| THEATRE AT CENTRAL HOSPITAL AT MINGORA SWAT (REVISED PC-1) |
IB3436 CONST. OF ROAD FROM CHAAL TO DHOLAN MORR VIA NONAR MUSALMANIA KILLA AHMEDABAD (PHASE-I & II)
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | DEMAND 2023-2024 Budget Estimate 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| 045702- A03 | Operating Expenses | 29,184,000 | |
| 045702- A039 | General | 29,184,000 | |
| 045702- A12 | Civil works | 448,984,000 | |
| 045702- A124 | Building and Structures | 448,984,000 | |
| Total- | CONST. OF ROAD FROM CHAAL TO DHOLAN MORR VIA NONAR MUSALMANIA KILLA AHMEDABAD (PHASE-I & II) | 478,168,000 | |
| IB3621 CONST PAKISTAN | RUCTION OF ELECTION ACADEMY AND OTHER OFFICES OF ELECTION COMMISSION OF | ||
| 045702- A03 | Operating Expenses | 24,413,000 | |
| 045702- A039 | General | 24,413,000 | |
| 045702- A12 | Civil works | 375,587,000 | |
| 045702- A124 | Building and Structures | 375,587,000 | |
| Total- | CONSTRUCTION OF ELECTION | 400,000,000 | |
| ACADEMY AND OTHER OFFICES OF ELECTION COMMISSION OF PAKISTAN | |||
| IB5137 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAM (SAP) (H&W) (KPK) | |||
| 045702- A12 | Civil works | 9,251,531,000 | |
| 045702- A124 | Building and Structures | 9,251,531,000 | |
| Total- | SUSTAINABLE DEVELOPMENT GOALS | 9,251,531,000 | |
| IB5179 CONST | ACHIEVEMENT PROGRAM (SAP) (H&W) (KPK) RUCTION OF RAILWAYS UNDERPASS JAHNIA | N DISTRICT KHANEWAL | |
| 045702- A03 | Operating Expenses | 40,469,000 12,141,000 | 15,258,000 |
| 045702- A039 | General | 40,469,000 12,141,000 | 15,258,000 |
| 045702- A12 | Civil works | 622,604,000 186,781,000 | 234,742,000 |
| 045702- A124 | Building and Structures | 622,604,000 186,781,000 | 234,742,000 |
| Total- | CONSTRUCTION OF RAILWAYS | 663073000 198922000 | 250000000 |
| UNDERPASS JAHNIAN DISTRICT KHANEWAL | ,, ,, | ,, | |
| IB9005 CONST JAGEER VIA K | RUCTION OF METALLED ROAD FROM KOT RA HUDIAN AND | DHA KISHEN ROAD (PAJIAN BYPASS) | TO GOHAR |
| 045702- A03 | Operating Expenses | 610,000 | 1,831,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A039 | General | 610,000 | 1,831,000 | |
| 045702- A12 | Civil works | 9,390,000 | 28,169,000 | |
| 045702- A124 | Building and Structures | 9,390,000 | 28,169,000 | |
| Total- | CONSTRUCTION OF METALLED ROAD FROM KOT RADHA KISHEN ROAD (PAJIAN BYPASS) TO GOHAR JAGEER VIA KHUDIAN AND | 10,000,000 | 30,000,000 | |
| IB9007 CONSTRUCTION OF METALLED ROAD FROM GANDA DISTRICT KASUR (54 | SINGH TO KANGAN P | UR ALONG DEPA | LPUR CANAL | |
| 045702- A03 | Operating Expenses | 614,000 | 1,831,000 | |
| 045702- A039 | General | 614,000 | 1,831,000 | |
| 045702- A12 | Civil works | 9,454,000 | 28,169,000 | |
| 045702- A124 | Building and Structures | 9,454,000 | 28,169,000 | |
| Total- IB9119 REHAB DISTRICT | CONSTRUCTION OF METALLED ROAD FROM GANDA SINGH TO KANGAN PUR ALONG DEPALPUR CANAL DISTRICT KASUR (54 ILITATION/UPGRADATION SAKRAN DUREJI R | 10,068,000 OAD DIFFERENT REA | CHES (PHASE-1 K | 30,000,000 M 16 TO 50) |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 2,399,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 2,399,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 36,912,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 36,912,000 |
| Total- | REHABILITATION/UPGRADATION | 100,000,000 | 100,000,000 | 39,311,000 |
| IB9120 CONST DISTRICT KHU | SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-1 KM 16 TO 50) DISTRICT RUCTION OF BLACK TOP ROAD FROM RCD T ZDAR | OWARDS KILLI ABDUL | HANAN TEHSIL | WADH |
| 045702- A03 | Operating Expenses | 3,357,000 | 3,357,000 | 5,067,000 |
| 045702- A039 | General | 3,357,000 | 3,357,000 | 5,067,000 |
| 045702- A12 | Civil works | 51,643,000 | 51,643,000 | 77,957,000 |
| 045702- A124 | Building and Structures | 51,643,000 | 51,643,000 | 77,957,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 55,000,000 | 55,000,000 | 83,024,000 |
| FROM RCD TOWARDS KILLI ABDUL |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget | 2023-2024 Revised | 2024-2025 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB9121 CONST | ACCOUNTANT GENERAL P HANAN TEHSIL WADH DISTRICT KHUZDAR RUCTION OF 25 KM BT ROAD FROM ZEEDI TO | AKISTAN REVENUES GORU DHAL KHUNJ KHUZDAR | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 5,249,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 5,249,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 80,751,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 80,751,000 |
| Total- | CONSTRUCTION OF 25 KM BT ROAD | 100,000,000 | 100,000,000 | 86,000,000 |
| FROM ZEEDI TO GORU DHAL KHUNJ KHUZDAR | ||||
| IB9124 CONSTRUCTION OF INTERNAL ROADS IN QUETTA | ||||
| 045702- A03 | Operating Expenses | 3,967,000 | 3,967,000 | 5,700,000 |
| 045702- A039 | General | 3,967,000 | 3,967,000 | 5,700,000 |
| 045702- A12 | Civil works | 61,033,000 | 61,033,000 | 87,700,000 |
| 045702- A124 | Building and Structures | 61,033,000 | 61,033,000 | 87,700,000 |
| Total- | CONSTRUCTION OF INTERNAL ROADS | 65,000,000 | 65,000,000 | 93,400,000 |
| IN QUETTA | ||||
| IB9125 CONST | RUCTION OF BLACK TOP ROAD AND TUFF TIL | ES IN NA-266 QUETTA | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 4,761,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 4,761,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 73,239,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 73,239,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 100,000,000 | 100,000,000 | 78,000,000 |
| AND TUFF TILES IN NA-266 QUETTA | ||||
| IB9126 CONSTRUCTION OF SOLAR TUBE WELLS AND STRE | ET LIGHTS IN NA-2 | 66 QUETTA | ||
| 045702- A03 | Operating Expenses | 2,222,000 | 2,222,000 | 5,681,000 |
| 045702- A039 | General | 2,222,000 | 2,222,000 | 5,681,000 |
| 045702- A12 | Civil works | 34,178,000 | 34,178,000 | 87,395,000 |
| 045702- A124 | Building and Structures | 34,178,000 | 34,178,000 | 87,395,000 |
| Total- | CONSTRUCTION OF SOLAR TUBE | 36,400,000 | 36,400,000 | 93,076,000 |
| WELLS AND STREET LIGHTS IN NA-266 QUETTA | ||||
| IB9127 CONSTRUCTION OF GIRLS MIDDLE SCHOOL AT KHALAQ HAJI ABDUL | BASIT QUETTA | |||
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 2,869,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A039 | General | 9,155,000 | 9,155,000 | 2,869,000 |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 | 44,131,000 |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 | 44,131,000 |
| Total- | CONSTRUCTION OF GIRLS MIDDLE SCHOOL AT KHALAQ HAJI ABDUL BASIT QUETTA | 150,000,000 | 150,000,000 | 47,000,000 |
| IB9128 CHAGHI DEVELOPMENT PACKAGE(HOME SOLAR PU IRRIGATION TUFF TILES STREET | MPING STATION WATER ELECTRICITY | ROADS | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 3,052,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 3,052,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 46,948,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 46,948,000 |
| Total- | CHAGHI DEVELOPMENT | 100,000,000 | 100,000,000 | 50,000,000 |
| PACKAGE(HOME SOLAR PUMPING STATION WATER ELECTRICITY ROADS IRRIGATION TUFF TILES STREET | ||||
| IB9129 NUSHKI DEVELOPMENT PACHAGE (ROADS ELECTRICITY) NA-268 | ||||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 3,052,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 3,052,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 46,948,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 46,948,000 |
| Total- | NUSHKI DEVELOPMENT PACHAGE | 100,000,000 | 100,000,000 | 50,000,000 |
| (ROADS ELECTRICITY) NA-268 | ||||
| IB9130 CONST | RUCTION ON 19 KM BLACK TOP ROAD CHING | EE TO KANKOO KAKR KHURASAAN DISTRICT ZOHB | ||
| 045702- A03 | Operating Expenses | 4,914,000 | 4,914,000 | 12,207,000 |
| 045702- A039 | General | 4,914,000 | 4,914,000 | 12,207,000 |
| 045702- A12 | Civil works | 75,606,000 | 75,606,000 | 187,793,000 |
| 045702- A124 | Building and Structures | 75,606,000 | 75,606,000 | 187,793,000 |
| Total- | CONSTRUCTION ON 19 KM BLACK TOP | 80,520,000 | 80,520,000 | 200,000,000 |
| ROAD CHINGEE TO KANKOO KAKR KHURASAAN DISTRICT ZOHB | ||||
| IB9131 CONST (PACKAGE-I) | RUCTION OF 18 KM BLACK TOP ROAD N-50 MURGHA FAQIRZAI | DISTRICT KILLI SAIFULLAH | ||
| 045702- A03 | Operating Expenses | 5,396,000 | 5,396,000 | 12,207,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||
| 045702- A039 | General | 5,396,000 | 5,396,000 | 12,207,000 |
| 045702- A12 | Civil works | 83,014,000 | 83,014,000 | 187,793,000 |
| 045702- A124 | Building and Structures | 83,014,000 | 83,014,000 | 187,793,000 |
| Total- | CONSTRUCTION OF 18 KM BLACK TOP | 88,410,000 | 88,410,000 | 200,000,000 |
| IB9132 CONST (PACKAGE-II) | ROAD N-50 MURGHA FAQIRZAI DISTRICT KILLI SAIFULLAH (PACKAGE-I) RUCTION OF 15 KM BLACK TOP ROAD N-50 | MURGHA FAQIRZAI | DISTRICT KILLI SAIFULLAH | |
| 045702- A03 | Operating Expenses | 7,262,000 | 7,262,000 | 12,207,000 |
| 045702- A039 | General | 7,262,000 | 7,262,000 | 12,207,000 |
| 045702- A12 | Civil works | 111,718,000 | 111,718,000 | 187,793,000 |
| 045702- A124 | Building and Structures | 111,718,000 | 111,718,000 | 187,793,000 |
| Total- | CONSTRUCTION OF 15 KM BLACK TOP | 118,980,000 | 118,980,000 | 200,000,000 |
| ROAD N-50 MURGHA FAQIRZAI DISTRICT KILLI SAIFULLAH (PACKAGE-II) | ||||
| IB9133 REHAB GUJRAT DING | ILITATION / IMPROVEMENT OF ROADS MAIN A | GT ROAD GUJRAT | LALAMUSA (GHAKH | RI STOP) TO |
| 045702- A03 | Operating Expenses | 61,193,000 | 61,193,000 | |
| 045702- A039 | General | 61,193,000 | 61,193,000 | |
| 045702- A12 | Civil works | 941,427,000 | 941,427,000 | |
| 045702- A124 | Building and Structures | 941,427,000 | 941,427,000 | |
| Total- | REHABILITATION / IMPROVEMENT OF ROADS MAIN GT ROAD GUJRAT LALAMUSA (GHAKHRI STOP) TO GUJRAT DINGA | 1,002,620,000 | 1,002,620,000 | |
| IB9134 CONST NOSHKI | RUCTION OF BLACK TOP ROAD SANGET ABAD VIA ZANGI ABAD TO BHATOO LAND | HI DISTRICT | ||
| 045702- A03 | Operating Expenses | 4,990,000 | 4,990,000 | 4,419,000 |
| 045702- A039 | General | 4,990,000 | 4,990,000 | 4,419,000 |
| 045702- A12 | Civil works | 76,775,000 | 76,775,000 | 67,983,000 |
| 045702- A124 | Building and Structures | 76,775,000 | 76,775,000 | 67,983,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 81,765,000 | 81,765,000 | 72,402,000 |
| SANGET ABAD VIA ZANGI ABAD TO |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | DEMAND 2023-2024 Budget Estimate Rs 2023-2024 Revised Estimate Rs | S FOR GRANTS 2024-2025 Budget Estimate Rs |
|---|---|---|---|
| IB9136 DEVEL MASHKHEL A | ACCOUNTANT GENERAL P BHATOO LANDHI DISTRICT NOSHKI OPMENT SCHEME FOR COMMUNITY HOME SO ND BASIMA | AKISTAN REVENUES LAR ENERGY SYSTEM IN VARIOUS UC | S OF TEHSIL |
| 045702- A03 | Operating Expenses | 9,155,000 9,155,000 | 9,155,000 |
| 045702- A039 | General | 9,155,000 9,155,000 | 9,155,000 |
| 045702- A12 | Civil works | 140,845,000 140,845,000 | 140,845,000 |
| 045702- A124 | Building and Structures | 140,845,000 140,845,000 | 140,845,000 |
| Total- | DEVELOPMENT SCHEME FOR | 150,000,000 150,000,000 | 150,000,000 |
| COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL MASHKHEL AND BASIMA |
| IB9137 DEVELOPMENT SCHEME FOR COMMUNITY HOME WASHUK DISTRICT WASHUK | SOLAR ENERGY SYSTEM IN VARIOUS UC | S OF TEHSIL | ||
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 8,239,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 8,239,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 126,761,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 126,761,000 |
| Total- | DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL WASHUK DISTRICT WASHUK | 100,000,000 | 100,000,000 | 135,000,000 |
| IB9143 CONST WASHUK 045702- A03 | RUCTION OF BLACK TOP ROAD KAMANRO Operating Expenses | D TO MOKCHAH WAS 6,103,000 | HUK MASHKHEL R 6,103,000 | OAD DISTRICT 10,008,000 |
|---|---|---|---|---|
| 045702- A039 | General | 6,103,000 | 6,103,000 | 10,008,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 153,975,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 153,975,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD KAMANROD TO MOKCHAH WASHUK MASHKHEL ROAD DISTRICT WASHUK | 100,000,000 | 100,000,000 | 163,983,000 |
| IB9149 REHAB DISTRICT | ILITATION UPGRADATION SAKRAN | DUREJI ROAD DIFFERENT REACHES (PHASE-I K | M 50 TO 75) | |
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 2,125,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 2,125,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 32,697,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 32,697,000 |
| Total- IB9150 CONST | REHABILITATION UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I KM 50 TO 75) DISTRICT RUCTION OF BLACK TOP ROAD FROM RCD T | 100,000,000 O HINAMI BENT TEHSI | 100,000,000 L WAD DISTRICT | 34,822,000 KHUZDAR |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 12,207,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 12,207,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 187,793,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 187,793,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 100,000,000 | 100,000,000 | 200,000,000 |
| FROM RCD TO HINAMI BENT TEHSIL | ||||
| WAD DISTRICT KHUZDAR | ||||
| IB9151 CONST KHUZDAR | RUCTION OF BLACK TOP ROAD MARVI TOWARDS MADRESSA TOOK TEHSIL WAD | DISTRICT | ||
| 045702- A03 | Operating Expenses | 3,662,000 | 3,662,000 | 11,937,000 |
| 045702- A039 | General | 3,662,000 | 3,662,000 | 11,937,000 |
| 045702- A12 | Civil works | 56,338,000 | 56,338,000 | 183,649,000 |
| 045702- A124 | Building and Structures | 56,338,000 | 56,338,000 | 183,649,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD MARVI TOWARDS MADRESSA TOOK | 60,000,000 | 60,000,000 | 195,586,000 |
| TEHSIL WAD DISTRICT KHUZDAR | ||||
| IB9152 KHAR | AN DEVELOPMENT PACKAGE (SOLAR PUMPIN | G-HOME SOLAR KITS | -ROADS-ELECTRICITY-WATER | |
| 045702- A03 | Operating Expenses | 3,687,000 | 3,687,000 | 2,548,000 |
| 045702- A039 | General | 3,687,000 | 3,687,000 | 2,548,000 |
| 045702- A12 | Civil works | 56,721,000 | 56,721,000 | 39,199,000 |
| 045702- A124 | Building and Structures | 56,721,000 | 56,721,000 | 39,199,000 |
| Total- | KHARAN DEVELOPMENT PACKAGE | 60,408,000 | 60,408,000 | 41,747,000 |
| (SOLAR PUMPING-HOME SOLAR KITS-ROADS-ELECTRICITY-WATER | ||||
| IB9153 DEVELOPMENT PACKAGE SHANGLA ROADS-WATER | SUPPLY ETC | |||
| 045702- A03 | Operating Expenses | 61,033,000 | 43,706,000 | |
| 045702- A039 | General | 61,033,000 | 43,706,000 | |
| 045702- A12 | Civil works | 938,967,000 | 672,411,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMANDS FOR GRANTS 2023-2024 Revised Estimate 2024-2025 Budget Estimate |
|---|---|---|---|
| Rs | Rs Rs | ||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | ||
| 045702- A124 | Building and Structures | 938,967,000 | 672,411,000 |
| Total- | DEVELOPMENT PACKAGE SHANGLA ROADS-WATER SUPPLY ETC | 1,000,000,000 | 716,117,000 |
| IB9154 DEVELOPMENT SCHEME FOR INSTALLATION OF SO WATER SUPPLY CUM | LAR ENERGY SYSTEM OF EXISTING TUBE WELL FOR | ||
| 045702- A03 | Operating Expenses | 6,761,000 | |
| 045702- A039 | General | 6,761,000 | |
| 045702- A12 | Civil works | 104,009,000 | |
| 045702- A124 | Building and Structures | 104,009,000 | |
| Total- IB9155 CONST PLACES TEHS | DEVELOPMENT SCHEME FOR INSTALLATION OF SOLAR ENERGY SYSTEM OF EXISTING TUBE WELL FOR WATER SUPPLY CUM RUCTION OF PCC ROAD/STREET-BLACK TO IL | 110,770,000 P ROAD-RETAINING | WALL/BREAST WALL AT VARIOUS |
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 6,103,000 |
| 045702- A039 | General | 9,155,000 | 9,155,000 6,103,000 |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 93,897,000 |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 93,897,000 |
| Total- | CONSTRUCTION OF PCC | 150,000,000 | 150,000,000 100,000,000 |
| ROAD/STREET-BLACK TOP ROAD-RETAINING WALL/BREAST WALL AT VARIOUS PLACES TEHSIL | |||
| IB9156 COMMUNITY BASED DEVELOPMENT SCHEMES FOR SYSTEM IN VARIOUS KILLIS OF | INSTALLATION OF | COMMUNITY HOMES SOLAR | |
| 045702- A03 | Operating Expenses | 7,629,000 | 7,629,000 |
| 045702- A039 | General | 7,629,000 | 7,629,000 |
| 045702- A12 | Civil works | 117,371,000 | 117,371,000 |
| 045702- A124 | Building and Structures | 117,371,000 | 117,371,000 |
| Total- | COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOMES SOLAR SYSTEM IN VARIOUS KILLIS OF | 125,000,000 | 125,000,000 |
| IB9157 DEVEL SARANAN NA | OPMENT SCHEME FOR WATER SUPPLY CUM NABAD AND PISHIN | AGRICULTURE IN VARIOUS KILLIS OF TEHSIL |
| NO. 130.- FC1 045702- A03 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 ACCOUNTANT GENERAL P Operating Expenses | 2023-2024 Budget Estimate Rs AKISTAN REVENUES 5,493,000 | DEMAND 2023-2024 Revised Estimate Rs 5,493,000 | S FOR GRANTS 2024-2025 Budget Estimate Rs |
|---|---|---|---|---|
| 045702- A039 | General | 5,493,000 | 5,493,000 | |
| 045702- A12 | Civil works | 84,507,000 | 84,507,000 | |
| 045702- A124 | Building and Structures | 84,507,000 | 84,507,000 | |
| Total- IB9158 CONST NAWAN KILLI | DEVELOPMENT SCHEME FOR WATER SUPPLY CUM AGRICULTURE IN VARIOUS KILLIS OF TEHSIL SARANAN NANABAD AND PISHIN RUCTION OF 24 KM BLACK TOP ROAD IN NAW KILLI KOTWAL | 90,000,000 AN KILLI KOTWAL AN | 90,000,000 D SURROUNDIN | G AREAS OF |
| 045702- A03 | Operating Expenses | 5,441,000 | 5,441,000 | 8,062,000 |
| 045702- A039 | General | 5,441,000 | 5,441,000 | 8,062,000 |
| 045702- A12 | Civil works | 83,709,000 | 83,709,000 | 124,029,000 |
| 045702- A124 | Building and Structures | 83,709,000 | 83,709,000 | 124,029,000 |
| Total- | CONSTRUCTION OF 24 KM BLACK TOP ROAD IN NAWAN KILLI KOTWAL AND SURROUNDING AREAS OF NAWAN KILLI KILLI KOTWAL | 89,150,000 | 89,150,000 | 132,091,000 |
| IB9159 VARIOUS DEVELOPMENT WORKS I.E BLACK TOP R CENTER IN SUB DIVISION | OADS FLOOD PROTECTION WALL AND | COMMUNITY | ||
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 1,831,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 1,831,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 28,169,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 28,169,000 |
| Total- | VARIOUS DEVELOPMENT WORKS I.E | 100,000,000 | 100,000,000 | 30,000,000 |
| IB9160 CONST | BLACK TOP ROADS FLOOD PROTECTION WALL AND COMMUNITY CENTER IN SUB DIVISION RUCTION OF BLACK TOP ROAD LALA LEHA | D CROSS VIA HUMA | RI ROSH SHOB (30K | M) |
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 6,103,000 |
| 045702- A039 | General | 9,155,000 | 9,155,000 | 6,103,000 |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 | 93,897,000 |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 | 93,897,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD LALA LEHAD CROSS VIA HUMARI | 150,000,000 | 150,000,000 | 100,000,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget | 2023-2024 Revised | 2024-2025 Budget | |
| Estimate | Estimate | Estimate | ||
| Rs | Rs | Rs | ||
| IB9475 DEC J | ACCOUNTANT GENERAL PA ROSH SHOB (30KM) AFFARABAD & MASTUNG | KISTAN REVENUES | ||
| 045702- A03 | Operating Expenses | 12,207,000 | 12,207,000 | 20,683,000 |
| 045702- A039 | General | 12,207,000 | 12,207,000 | 20,683,000 |
| 045702- A12 | Civil works | 187,793,000 | 187,793,000 | 318,204,000 |
| 045702- A124 | Building and Structures | 187,793,000 | 187,793,000 | 318,204,000 |
| Total- | DEC JAFFARABAD & MASTUNG | 200,000,000 | 200,000,000 | 338,887,000 |
| IB9476 CONSTRUCTION OF DEC OFFICE SAHIWAL | ||||
| 045702- A03 | Operating Expenses | 15,258,000 | 15,258,000 | 14,943,000 |
| 045702- A039 | General | 15,258,000 | 15,258,000 | 14,943,000 |
| 045702- A12 | Civil works | 234,742,000 | 234,742,000 | 229,893,000 |
| 045702- A124 | Building and Structures | 234,742,000 | 234,742,000 | 229,893,000 |
| Total- | CONSTRUCTION OF DEC OFFICE SAHIWAL | 250,000,000 | 250,000,000 | 244,836,000 |
| IB9477 CONSTRUCTION OF DEC OFFICE RAJANPUR | ||||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 6,140,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 6,140,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 94,460,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 94,460,000 |
| Total- | CONSTRUCTION OF DEC OFFICE | 100,000,000 | 100,000,000 | 100,600,000 |
| RAJANPUR | ||||
| IB9478 CONSTRUCTION OF REC / DECS OFFICE FAISALABAD | ||||
| 045702- A03 | Operating Expenses | 18,310,000 | 18,310,000 | 42,701,000 |
| 045702- A039 | General | 18,310,000 | 18,310,000 | 42,701,000 |
| 045702- A12 | Civil works | 281,690,000 | 281,690,000 | 656,940,000 |
| 045702- A124 | Building and Structures | 281,690,000 | 281,690,000 | 656,940,000 |
| Total- | CONSTRUCTION OF REC / DECS OFFICE FAISALABAD | 300,000,000 | 300,000,000 | 699,641,000 |
| IB9479 CONSTRUCTION OF ELECTION COMMISSION OFFICE A | T NAROWAL | |||
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 8,336,000 |
| 045702- A039 | General | 9,155,000 | 9,155,000 | 8,336,000 |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 | 128,238,000 |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 | 128,238,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | CONSTRUCTION OF ELECTION COMMISSION OFFICE AT NAROWAL | 150,000,000 | 150,000,000 | 136,574,000 |
| IB9480 DEC GAWADAR & LASBELLA | ||||
| 045702- A03 | Operating Expenses | 12,207,000 | 12,207,000 | 20,328,000 |
| 045702- A039 | General | 12,207,000 | 12,207,000 | 20,328,000 |
| 045702- A12 | Civil works | 187,793,000 | 187,793,000 | 312,733,000 |
| 045702- A124 | Building and Structures | 187,793,000 | 187,793,000 | 312,733,000 |
| Total- | DEC GAWADAR & LASBELLA | 200,000,000 | 200,000,000 | 333,061,000 |
| IB9481 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AG OF TEHSIL BESIMA | RICULTURE CUM | WATER SUPPLY IN VARIOUS KILLIS | ||
| 045702- A03 | Operating Expenses | 28,271,000 | 13,570,000 | 1,221,000 |
| 045702- A039 | General | 28,271,000 | 13,570,000 | 1,221,000 |
| 045702- A12 | Civil works | 434,946,000 | 208,774,000 | 18,779,000 |
| 045702- A124 | Building and Structures | 434,946,000 | 208,774,000 | 18,779,000 |
| Total- | PUBLIC SECTOR DEVELOPMENT | 463,217,000 | 222,344,000 | 20,000,000 |
| IB9482 DEVEL REDUCED CO | PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS OF TEHSIL BESIMA OPMENT SCHEMES IN PLANTAK BASIMA ASF ST OF RS | ANDABAD DISTRICT WASHUK (4 SCHEMES) (AT | ||
| 045702- A03 | Operating Expenses | 17,503,000 | 17,503,000 | 6,301,000 |
| 045702- A039 | General | 17,503,000 | 17,503,000 | 6,301,000 |
| 045702- A12 | Civil works | 269,280,000 | 269,280,000 | 96,941,000 |
| 045702- A124 | Building and Structures | 269,280,000 | 269,280,000 | 96,941,000 |
| Total- | DEVELOPMENT SCHEMES IN PLANTAK | 286,783,000 | 286,783,000 | 103,242,000 |
| IB9483 PUBLI HOME SOLAR | BASIMA ASFANDABAD DISTRICT WASHUK (4 SCHEMES) (AT REDUCED COST OF RS C SECTOR DEVELOPMENT PROGRAM FOR AG ENERGY SYSTEM | RICULTURE CUM | WATER SUPPLY AND | COMMUNITY |
| 045702- A03 | Operating Expenses | 30,516,000 | 29,906,000 | 1,221,000 |
| 045702- A039 | General | 30,516,000 | 29,906,000 | 1,221,000 |
| 045702- A12 | Civil works | 469,484,000 | 460,094,000 | 18,779,000 |
| 045702- A124 | Building and Structures | 469,484,000 | 460,094,000 | 18,779,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | 2023-2024 Revised Estimate | 2024-2025 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | PUBLIC SECTOR DEVELOPMENT | 500,000,000 | 490,000,000 | 20,000,000 |
| PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY HOME SOLAR ENERGY SYSTEM | ||||
| IB9484 PUBLI HOME SOLAR | C SECTOR DEVELOPMENT PROGRAM FOR AG ENERGY SYSTEM | RICULTURE CUM WATER SUPPLY AND | COMMUNITY | |
| 045702- A03 | Operating Expenses | 15,258,000 | 15,258,000 | 5,493,000 |
| 045702- A039 | General | 15,258,000 | 15,258,000 | 5,493,000 |
| 045702- A12 | Civil works | 234,742,000 | 234,742,000 | 84,507,000 |
| 045702- A124 | Building and Structures | 234,742,000 | 234,742,000 | 84,507,000 |
| Total- | PUBLIC SECTOR DEVELOPMENT | 250,000,000 | 250,000,000 | 90,000,000 |
| PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY HOME SOLAR ENERGY SYSTEM | ||||
| IB9485 RECON 2200 RFT RCC | DITIONING WORK ON DUREJI ROAD AND PRO CAUSEWAY | TECTION WORK SORH ROAD AND IMPROVEMENT | ||
| 045702- A03 | Operating Expenses | 15,083,000 | 15,083,000 | |
| 045702- A039 | General | 15,083,000 | 15,083,000 | |
| 045702- A12 | Civil works | 232,050,000 | 232,050,000 | |
| 045702- A124 | Building and Structures | 232,050,000 | 232,050,000 | |
| Total- | RECONDITIONING WORK ON DUREJI | 247,133,000 | 247,133,000 | |
| IB9486 DEVEL | ROAD AND PROTECTION WORK SORH ROAD AND IMPROVEMENT 2200 RFT RCC CAUSEWAY OPMENT SCHEMES IN PIRHYAN ARI PEER BA | RAK BEHLOOR DISTRICT HUB (04 SCHEMES) | ||
| 045702- A03 | Operating Expenses | 29,519,000 | 29,519,000 | 6,295,000 |
| 045702- A039 | General | 29,519,000 | 29,519,000 | 6,295,000 |
| 045702- A12 | Civil works | 454,141,000 | 454,141,000 | 96,842,000 |
| 045702- A124 | Building and Structures | 454,141,000 | 454,141,000 | 96,842,000 |
| Total- | DEVELOPMENT SCHEMES IN PIRHYAN | 483,660,000 | 483,660,000 | 103,137,000 |
| ARI PEER BARAK BEHLOOR DISTRICT HUB (04 SCHEMES) | ||||
| IB9487 DEVELOPMENT SCHEMES IN KALAT SURAB & MASTUNG DISTRICTS | ||||
| 045702- A03 | Operating Expenses | 60,423,000 | 23,790,000 | 3,052,000 |
| 045702- A039 | General | 60,423,000 | 23,790,000 | 3,052,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A12 | Civil works | 929,577,000 | 365,993,000 | 46,948,000 |
| 045702- A124 | Building and Structures | 929,577,000 | 365,993,000 | 46,948,000 |
| Total- | DEVELOPMENT SCHEMES IN KALAT | 990,000,000 | 389,783,000 | 50,000,000 |
| SURAB & MASTUNG DISTRICTS | ||||
| IB9488 COMMUNITY BASED DEVELOPMENT SCHEMES FOR SYSTEM IN VARIOUS KILLIS OF | INSTALLATION OF | COMMUNITY HOME | SOLAR | |
| 045702- A03 | Operating Expenses | 6,714,000 | 6,714,000 | 2,417,000 |
| 045702- A039 | General | 6,714,000 | 6,714,000 | 2,417,000 |
| 045702- A12 | Civil works | 103,286,000 | 103,286,000 | 37,183,000 |
| 045702- A124 | Building and Structures | 103,286,000 | 103,286,000 | 37,183,000 |
| Total- | COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR SYSTEM IN VARIOUS KILLIS OF | 110,000,000 | 110,000,000 | 39,600,000 |
| IB9489 INSTA SHAH 02 NOS | KKATION OF SOLAR ENERGY BASED IRRIGATI AT | ON \TUBE WELL 0 | 3-NOS AT SUB DIVISION MIRAN | |
| 045702- A03 | Operating Expenses | 12,207,000 | 12,207,000 | |
| 045702- A039 | General | 12,207,000 | 12,207,000 | |
| 045702- A12 | Civil works | 187,793,000 | 187,793,000 | |
| 045702- A124 | Building and Structures | 187,793,000 | 187,793,000 | |
| Total- IB9490 CONST KHEL BAZAR | INSTAKKATION OF SOLAR ENERGY BASED IRRIGATION \TUBE WELL 03-NOS AT SUB DIVISION MIRAN SHAH 02 NOS AT RUCTION OF BLACK TOP ROADS: I) MUHAMM | 200,000,000 AD KHEL CHOWK | 200,000,000 TO MAIN FACTORY | NWTD II) DATA |
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 | |
| 045702- A039 | General | 9,155,000 | 9,155,000 | |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 | |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROADS: I) MUHAMMAD KHEL CHOWK TO MAIN FACTORY NWTD II) DATA KHEL BAZAR | 150,000,000 | 150,000,000 |
IB9491 CONSTRUCTION OF INTERNAL BLACK TOP ROADS AT TEHSIL & DISTRICT CHAMAN
| NO. 130.- FC1 045702- A03 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 ACCOUNTANT GENERAL P Operating Expenses | 2023-2024 Budget Estimate Rs AKISTAN REVENU 29,296,000 | DEMAND 2023-2024 Revised Estimate Rs ES 24,466,000 | S FOR GRANTS 2024-2025 Budget Estimate Rs 4,883,000 |
|---|---|---|---|---|
| 045702- A039 | General | 29,296,000 | 24,466,000 | 4,883,000 |
| 045702- A12 | Civil works | 450,704,000 | 376,395,000 | 75,117,000 |
| 045702- A124 | Building and Structures | 450,704,000 | 376,395,000 | 75,117,000 |
| Total- IB9492 PUBLI ENERGY | CONSTRUCTION OF INTERNAL BLACK TOP ROADS AT TEHSIL & DISTRICT CHAMAN C SECTOR DEVELOPMENT PROGRAM FOR BO | 480,000,000 RING OF TUBE WE | 400,861,000 LL AND INSTALLATI | 80,000,000 ON OF SOLAR |
| 045702- A03 | Operating Expenses | 16,479,000 | 16,479,000 | 5,932,000 |
| 045702- A039 | General | 16,479,000 | 16,479,000 | 5,932,000 |
| 045702- A12 | Civil works | 253,521,000 | 253,521,000 | 91,268,000 |
| 045702- A124 | Building and Structures | 253,521,000 | 253,521,000 | 91,268,000 |
| Total- | PUBLIC SECTOR DEVELOPMENT PROGRAM FOR BORING OF TUBE WELL AND INSTALLATION OF SOLAR ENERGY | 270,000,000 | 270,000,000 | 97,200,000 |
| IB9493 URABA DISTRCIT TOA | N SEWERAGE/DRAINAGE PCC AND TUFF TI B TEK | LE STRET FOR ZONE-D GOJRA CITY TE | HSIL GOJRA | |
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 15,258,000 | 15,258,000 | |
| 045702- A039 | General | 15,258,000 | 15,258,000 | |
| 045702- A12 | Civil works | 234,742,000 | 234,742,000 | |
| 045702- A124 | Building and Structures | 234,742,000 | 234,742,000 | |
| Total- IB9494 CONST | URABAN SEWERAGE/DRAINAGE PCC AND TUFF TILE STRET FOR ZONE-D GOJRA CITY TEHSIL GOJRA DISTRCIT TOAB TEK RUCTION OF INTERNAL ROADS IN KUCHLA | 250,000,000 AK AND SURROUND | 250,000,000 ING AREAS DISTRIC | T QUETTA. |
| 045702- A03 | Operating Expenses | 23,974,000 | 23,974,000 | 3,748,000 |
| 045702- A039 | General | 23,974,000 | 23,974,000 | 3,748,000 |
| 045702- A12 | Civil works | 368,836,000 | 368,836,000 | 57,664,000 |
| 045702- A124 | Building and Structures | 368,836,000 | 368,836,000 | 57,664,000 |
| Total- | CONSTRUCTION OF INTERNAL ROADS IN KUCHLAAK AND SURROUNDING AREAS DISTRICT QUETTA. | 392,810,000 | 392,810,000 | 61,412,000 |
NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB9495 CONST DISTRICT | RUCTION OF INTERNAL ROADS AT PANJPAI AGHBARG CHASHMA & SURROUNDING | AREAS OF | ||
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 21,800,000 | 21,800,000 | 4,186,000 |
| 045702- A039 | General | 21,800,000 | 21,800,000 | 4,186,000 |
| 045702- A12 | Civil works | 335,390,000 | 335,390,000 | 64,402,000 |
| 045702- A124 | Building and Structures | 335,390,000 | 335,390,000 | 64,402,000 |
| Total- IB9496 CONST RS 265.843 M | CONSTRUCTION OF INTERNAL ROADS AT PANJPAI AGHBARG CHASHMA & SURROUNDING AREAS OF DISTRICT RUCTION OF PARK AT CAR BAZAR UC-06 D N ONLY | 357,190,000 ISTRICT CENTRAL K | 357,190,000 ARACHI (AT REDUCE | 68,588,000 D COST OF |
| 045702- A03 | Operating Expenses | 16,225,000 | 16,225,000 | 15,468,000 |
| 045702- A039 | General | 16,225,000 | 16,225,000 | 15,468,000 |
| 045702- A12 | Civil works | 249,618,000 | 249,618,000 | 237,965,000 |
| 045702- A124 | Building and Structures | 249,618,000 | 249,618,000 | 237,965,000 |
| Total- | CONSTRUCTION OF PARK AT CAR | 265,843,000 | 265,843,000 | 253,433,000 |
| IB9497 CONST | BAZAR UC-06 DISTRICT CENTRAL KARACHI (AT REDUCED COST OF RS 265.843 MN ONLY RUCTION OF PARK NEAR AL-KHAIR SCHOO | L UC-09 DISTRICT CENTRAL KARACHI | ||
| 045702- A03 | Operating Expenses | 3,920,000 | 3,920,000 | 3,920,000 |
| 045702- A039 | General | 3,920,000 | 3,920,000 | 3,920,000 |
| 045702- A12 | Civil works | 60,313,000 | 60,313,000 | 60,313,000 |
| 045702- A124 | Building and Structures | 60,313,000 | 60,313,000 | 60,313,000 |
| Total- | CONSTRUCTION OF PARK NEAR | 64,233,000 | 64,233,000 | 64,233,000 |
| IB9498 CONST | AL-KHAIR SCHOOL UC-09 DISTRICT CENTRAL KARACHI RUCTION OF DAUD GROUND BEHIND MAKH | DOOMIN MASJID UC | -10 DISTRICT CENTRAL KARACHI | |
| 045702- A03 | Operating Expenses | 8,164,000 | 8,164,000 | 8,164,000 |
| 045702- A039 | General | 8,164,000 | 8,164,000 | 8,164,000 |
| 045702- A12 | Civil works | 125,600,000 | 125,600,000 | 125,600,000 |
| 045702- A124 | Building and Structures | 125,600,000 | 125,600,000 | 125,600,000 |
| Total- | CONSTRUCTION OF DAUD GROUND BEHIND MAKHDOOMIN MASJID UC-10 | 133,764,000 | 133,764,000 | 133,764,000 |
| NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| IB9499 CONST | DISTRICT CENTRAL KARACHI RUCTION OF PARK ASIAN FOOTBALL GROU | ND UC-07 DISTRICT | CENTRAL KARACHI | |
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 6,073,000 | 6,073,000 | 6,070,000 |
| 045702- A039 | General | 6,073,000 | 6,073,000 | 6,070,000 |
| 045702- A12 | Civil works | 93,424,000 | 93,424,000 | 93,378,000 |
| 045702- A124 | Building and Structures | 93,424,000 | 93,424,000 | 93,378,000 |
| Total- | CONSTRUCTION OF PARK ASIAN | 99,497,000 | 99,497,000 | 99,448,000 |
| IB9500 CONST | FOOTBALL GROUND UC-07 DISTRICT CENTRAL KARACHI RUCTION OF COMPUTER INSTITUTE BEHIND | UC-06 DISTRICT CENTRAL KARACHI | ||
| 045702- A03 | Operating Expenses | 2,832,000 | 2,832,000 | 2,832,000 |
| 045702- A039 | General | 2,832,000 | 2,832,000 | 2,832,000 |
| 045702- A12 | Civil works | 43,566,000 | 43,566,000 | 43,566,000 |
| 045702- A124 | Building and Structures | 43,566,000 | 43,566,000 | 43,566,000 |
| Total- | CONSTRUCTION OF COMPUTER | 46,398,000 | 46,398,000 | 46,398,000 |
| IB9501 CONST | INSTITUTE BEHIND UC-06 DISTRICT CENTRAL KARACHI RUCTION OF CRICKET STADIUM AT ST-15 SE | CTOR 5A-4 DISTRICT CENTRAL KARACHI | ||
| 045702- A03 | Operating Expenses | 3,524,000 | 3,524,000 | 3,524,000 |
| 045702- A039 | General | 3,524,000 | 3,524,000 | 3,524,000 |
| 045702- A12 | Civil works | 54,216,000 | 54,216,000 | 54,216,000 |
| 045702- A124 | Building and Structures | 54,216,000 | 54,216,000 | 54,216,000 |
| Total- | CONSTRUCTION OF CRICKET STADIUM AT ST-15 SECTOR 5A-4 DISTRICT CENTRAL KARACHI | 57,740,000 | 57,740,000 | 57,740,000 |
IB9502 CONSTRUCTION OF IT & COMPUTER DIPLOMA CENTER AT ST-22 GULSHAN SAEED DISTRICT CENTRAL KARACHI
| 045702- A03 | Operating Expenses | 5,037,000 | 5,037,000 | 5,037,000 |
|---|---|---|---|---|
| 045702- A039 | General | 5,037,000 | 5,037,000 | 5,037,000 |
| 045702- A12 | Civil works | 77,488,000 | 77,488,000 | 77,488,000 |
| 045702- A124 | Building and Structures | 77,488,000 | 77,488,000 | 77,488,000 |
| Total- | CONSTRUCTION OF IT & COMPUTER DIPLOMA CENTER AT ST-22 GULSHAN SAEED DISTRICT CENTRAL KARACHI | 82,525,000 | 82,525,000 | 82,525,000 |
NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
IB9503 REHABILITATION OF MIAN EXISTING NALA FROM SATTAR SHAH PARK TO ODIAN PLAZA VIA NISHAT CHOWCK HYDERABAD
| 045702- A03 | Operating Expenses | 16,479,000 | 16,479,000 | 16,479,000 |
|---|---|---|---|---|
| 045702- A039 | General | 16,479,000 | 16,479,000 | 16,479,000 |
| 045702- A12 | Civil works | 253,521,000 | 253,521,000 | 253,521,000 |
| 045702- A124 | Building and Structures | 253,521,000 | 253,521,000 | 253,521,000 |
| Total- | REHABILITATION OF MIAN EXISTING NALA FROM SATTAR SHAH PARK TO ODIAN PLAZA VIA NISHAT CHOWCK HYDERABAD | 270,000,000 | 270,000,000 | 270,000,000 |
IB9504 CONSTRUCTION OF GOVERNMENT GIRLS DEGREE COLLEGE BUILDINGS & LIBRARY WITH FURNITURE#S AT GOVERNMENT BOYS
| 045702- A03 | Operating Expenses | 29,296,000 | 29,296,000 | 30,125,000 |
|---|---|---|---|---|
| 045702- A039 | General | 29,296,000 | 29,296,000 | 30,125,000 |
| 045702- A12 | Civil works | 450,704,000 | 450,704,000 | 463,460,000 |
| 045702- A124 | Building and Structures | 450,704,000 | 450,704,000 | 463,460,000 |
| Total- | CONSTRUCTION OF GOVERNMENT GIRLS DEGREE COLLEGE BUILDINGS & LIBRARY WITH FURNITURE#S AT GOVERNMENT BOYS | 480,000,000 | 480,000,000 | 493,585,000 |
IB9505 CONSTRUCTION OF WATER SUPPLY LINE (24# DIA) FROM HUSSAINABAD FILTER PLANT TO KOHSAR WATER PUMPING STATION
| 045702- A03 | Operating Expenses | 45,775,000 | 45,775,000 | 45,775,000 |
|---|---|---|---|---|
| 045702- A039 | General | 45,775,000 | 45,775,000 | 45,775,000 |
| 045702- A12 | Civil works | 704,225,000 | 704,225,000 | 704,225,000 |
| 045702- A124 | Building and Structures | 704,225,000 | 704,225,000 | 704,225,000 |
| Total- | CONSTRUCTION OF WATER SUPPLY LINE (24# DIA) FROM HUSSAINABAD FILTER PLANT TO KOHSAR WATER PUMPING STATION | 750,000,000 | 750,000,000 | 750,000,000 |
IB9506 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS KILLIS OF DISTRICT
| 045702- A03 | Operating Expenses | 30,508,000 | 30,508,000 | 1,831,000 |
|---|---|---|---|---|
| 045702- A039 | General | 30,508,000 | 30,508,000 | 1,831,000 |
| 045702- A12 | Civil works | 469,348,000 | 469,348,000 | 28,169,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| ACCOUNTANT GENERAL P | Rs AKISTAN REVENU | Rs ES | Rs | |
| 045702- A124 | Building and Structures | 469,348,000 | 469,348,000 | 28,169,000 |
| Total- | PUBLIC SECTOR DEVELOPMENT | 499,856,000 | 499,856,000 | 30,000,000 |
| PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS KILLIS OF DISTRICT | ||||
| IB9507 RESTORATION/ REHABILITATION OF FLOOD DAMAG OF TEHSIL AND | ED AGRICULTURE | TUBE WELLS IN VARIOUS KILLIS | ||
| 045702- A03 | Operating Expenses | 15,258,000 | 15,258,000 | 1,831,000 |
| 045702- A039 | General | 15,258,000 | 15,258,000 | 1,831,000 |
| 045702- A12 | Civil works | 234,742,000 | 234,742,000 | 28,169,000 |
| 045702- A124 | Building and Structures | 234,742,000 | 234,742,000 | 28,169,000 |
| Total- | RESTORATION/ REHABILITATION OF | 250,000,000 | 250,000,000 | 30,000,000 |
| IB9508 PUBLI VARIOUS KILL | FLOOD DAMAGED AGRICULTURE TUBE WELLS IN VARIOUS KILLIS OF TEHSIL AND C SECTOR DEVELOPMENT PROGRAM FOR CO IS OF DISTRICT | MMUNITY HOME SOLAR ENERGY SYSTEM IN | ||
| 045702- A03 | Operating Expenses | 30,508,000 | 30,508,000 | 3,052,000 |
| 045702- A039 | General | 30,508,000 | 30,508,000 | 3,052,000 |
| 045702- A12 | Civil works | 469,348,000 | 469,348,000 | 46,948,000 |
| 045702- A124 | Building and Structures | 469,348,000 | 469,348,000 | 46,948,000 |
| Total- | PUBLIC SECTOR DEVELOPMENT | 499,856,000 | 499,856,000 | 50,000,000 |
| PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS KILLIS OF DISTRICT | ||||
| IB9509 PUBLI OF DISTRICT | C SECTOR DEVELOPMENT PROGRAM FOR AG PISHIN | RICULTURE CUM | WATER SUPPLY IN VARIOUS KILLIS | |
| 045702- A03 | Operating Expenses | 15,258,000 | 15,258,000 | 3,052,000 |
| 045702- A039 | General | 15,258,000 | 15,258,000 | 3,052,000 |
| 045702- A12 | Civil works | 234,742,000 | 234,742,000 | 46,948,000 |
| 045702- A124 | Building and Structures | 234,742,000 | 234,742,000 | 46,948,000 |
| Total- | PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS OF DISTRICT PISHIN | 250,000,000 | 250,000,000 | 50,000,000 |
NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| LAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| IB9510 COMMUNITY HOME SOLAR ENERGY SYSTEM IN TE CHAGHI DISTRICT | HSIL AMORI TAFTAN | DALBANDIN CHILGHAZAI AND | ||
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 12,207,000 | 12,207,000 | 3,052,000 |
| 045702- A039 | General | 12,207,000 | 12,207,000 | 3,052,000 |
| 045702- A12 | Civil works | 187,793,000 | 187,793,000 | 46,948,000 |
| 045702- A124 | Building and Structures | 187,793,000 | 187,793,000 | 46,948,000 |
| Total- | COMMUNITY HOME SOLAR ENERGY | 200,000,000 | 200,000,000 | 50,000,000 |
| IB9511 CONST | SYSTEM IN TEHSIL AMORI TAFTAN DALBANDIN CHILGHAZAI AND CHAGHI DISTRICT RUCTION OF PCC ROADS AND DRAIN AT DI | STRICT TANK | ||
| 045702- A03 | Operating Expenses | 36,283,000 | 32,180,000 | 5,279,000 |
| 045702- A039 | General | 36,283,000 | 32,180,000 | 5,279,000 |
| 045702- A12 | Civil works | 558,207,000 | 495,065,000 | 81,211,000 |
| 045702- A124 | Building and Structures | 558,207,000 | 495,065,000 | 81,211,000 |
| Total- | CONSTRUCTION OF PCC ROADS AND | 594,490,000 | 527,245,000 | 86,490,000 |
| DRAIN AT DISTRICT TANK | ||||
| IB9512 INSTA RS 150 MN | LLATION OF PRESSURE PUMPS AT VARIOUS | PLACES OF DISTRICT TANK (AT REDUCED COST OF | ||
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 | |
| 045702- A039 | General | 9,155,000 | 9,155,000 | |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 | |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 | |
| Total- | INSTALLATION OF PRESSURE PUMPS | 150,000,000 | 150,000,000 | |
| IB9513 CONST | AT VARIOUS PLACES OF DISTRICT TANK (AT REDUCED COST OF RS 150 MN RUCTION OF ROAD FROM ESSA MORR TO S | IDDIQUEPURA | ||
| 045702- A03 | Operating Expenses | 24,413,000 | 5,371,000 | 29,184,000 |
| 045702- A039 | General | 24,413,000 | 5,371,000 | 29,184,000 |
| 045702- A12 | Civil works | 375,587,000 | 82,629,000 | 448,984,000 |
| 045702- A124 | Building and Structures | 375,587,000 | 82,629,000 | 448,984,000 |
| Total- | CONSTRUCTION OF ROAD FROM ESSA MORR TO SIDDIQUEPURA | 400,000,000 | 88,000,000 | 478,168,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| IB9514 CONST | ACCOUNTANT GENERAL PAKISTAN REVENUES RUCTION OF CARPET ROAD FROM MARI BHINDRAN TO GHUMAN WALA DISTRICT | GUJRANWALA | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 1,831,000 | 31,703,000 |
| 045702- A039 | General | 6,103,000 | 1,831,000 | 31,703,000 |
| 045702- A12 | Civil works | 93,897,000 | 28,169,000 | 487,737,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 28,169,000 | 487,737,000 |
| Total- | CONSTRUCTION OF CARPET ROAD | 100,000,000 | 30,000,000 | 519,440,000 |
| FROM MARI BHINDRAN TO GHUMAN WALA DISTRICT GUJRANWALA | ||||
| IB9515 DEVELOPMENT SCHEMES IN DISTRICT KACHHI JHAL | MAGSI AND NASEERABAD (10 NO.S | SCHEMES) | ||
| 045702- A03 | Operating Expenses | 30,514,000 | 30,514,000 | 7,934,000 |
| 045702- A039 | General | 30,514,000 | 30,514,000 | 7,934,000 |
| 045702- A12 | Civil works | 469,441,000 | 469,441,000 | 122,053,000 |
| 045702- A124 | Building and Structures | 469,441,000 | 469,441,000 | 122,053,000 |
| Total- | DEVELOPMENT SCHEMES IN DISTRICT | 499,955,000 | 499,955,000 | 129,987,000 |
| KACHHI JHAL MAGSI AND | ||||
| NASEERABAD (10 NO.S SCHEMES) | ||||
| IB9516 CONST JHAL MAGSI | RUCTION OF BLACK TOP ROAD FROM REHABILITATION BAND | MAHMOOD TO BARI | JA DISTRICT | |
| 045702- A03 | Operating Expenses | 15,258,000 | 15,258,000 | 4,883,000 |
| 045702- A039 | General | 15,258,000 | 15,258,000 | 4,883,000 |
| 045702- A12 | Civil works | 234,742,000 | 234,742,000 | 75,117,000 |
| 045702- A124 | Building and Structures | 234,742,000 | 234,742,000 | 75,117,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD FROM REHABILITATION BAND MAHMOOD TO BARIJA DISTRICT JHAL MAGSI | 250,000,000 | 250,000,000 | 80,000,000 |
| IB9517 CONST DALSAR 23 K | RUCTION OF BLACK TOP ROAD FROM GAWA M | K TO BULLO VIA GOBURD SHAH BAIG | KALAT | |
| 045702- A03 | Operating Expenses | 21,362,000 | 21,362,000 | |
| 045702- A039 | General | 21,362,000 | 21,362,000 | |
| 045702- A12 | Civil works | 328,638,000 | 328,638,000 | |
| 045702- A124 | Building and Structures | 328,638,000 | 328,638,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 350,000,000 | 350,000,000 | |
| FROM GAWAK TO BULLO VIA GOBURD |
| NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
SHAH BAIG KALAT DALSAR 23 KM
| IB9518 CONST MARKET 5KM | RUCTION OF TUFF TILES PAVEMENT WITH | SOLAR STREET LIGHTS SEWERAGE LINE OF SOORO | |
|---|---|---|---|
| 045702- A03 | Operating Expenses | 4,272,000 | 4,272,000 |
| 045702- A039 | General | 4,272,000 | 4,272,000 |
| 045702- A12 | Civil works | 65,728,000 | 65,728,000 |
| 045702- A124 | Building and Structures | 65,728,000 | 65,728,000 |
| Total- | CONSTRUCTION OF TUFF TILES PAVEMENT WITH SOLAR STREET LIGHTS SEWERAGE LINE OF SOORO MARKET 5KM | 70,000,000 | 70,000,000 |
| IB9519 CONST MARKET 3KM | RUCTION OF TUFF TILES PAVEMENT WITH SOLAR STREET LIGHTS SEWERAGE LINE | OF BULLO | ||
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 1,831,000 | 1,831,000 | |
| 045702- A039 | General | 1,831,000 | 1,831,000 | |
| 045702- A12 | Civil works | 28,169,000 | 28,169,000 | |
| 045702- A124 | Building and Structures | 28,169,000 | 28,169,000 | |
| Total- IB9520 CONST TOILETS BLO | CONSTRUCTION OF TUFF TILES PAVEMENT WITH SOLAR STREET LIGHTS SEWERAGE LINE OF BULLO MARKET 3KM RUCTION OF STADIUM COMPLEX WITH CRIC CK & | 30,000,000 KET / FOOTBALL G | 30,000,000 ROUNDS CHANGING | ROOMS |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- | CONSTRUCTION OF STADIUM | 100,000,000 | 100,000,000 | |
| IB9521 MISSIN | COMPLEX WITH CRICKET / FOOTBALL GROUNDS CHANGING ROOMS TOILETS BLOCK & G FACILITIES TOILETS OF VARIOUS SCHOO | LS OF MAND | ||
| 045702- A03 | Operating Expenses | 4,883,000 | 977,000 | 3,906,000 |
| 045702- A039 | General | 4,883,000 | 977,000 | 3,906,000 |
| 045702- A12 | Civil works | 75,117,000 | 15,023,000 | 60,094,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A124 | Building and Structures | 75,117,000 | 15,023,000 | 60,094,000 |
| Total- | MISSING FACILITIES TOILETS OF VARIOUS SCHOOLS OF MAND | 80,000,000 | 16,000,000 | 64,000,000 |
| IB9522 CONSTRUCTION OF TEACHERS HOSTEL IN MAND | ||||
| 045702- A03 | Operating Expenses | 3,052,000 | 3,052,000 | 1,221,000 |
| 045702- A039 | General | 3,052,000 | 3,052,000 | 1,221,000 |
| 045702- A12 | Civil works | 46,948,000 | 46,948,000 | 18,779,000 |
| 045702- A124 | Building and Structures | 46,948,000 | 46,948,000 | 18,779,000 |
| Total- | CONSTRUCTION OF TEACHERS HOSTEL IN MAND | 50,000,000 | 50,000,000 | 20,000,000 |
| IB9523 CONSTRUCTION OF BLACK TOP ROAD FROM DALSAR TO MANDIG | ||||
| 045702- A03 | Operating Expenses | 4,272,000 | 4,272,000 | |
| 045702- A039 | General | 4,272,000 | 4,272,000 | |
| 045702- A12 | Civil works | 65,728,000 | 65,728,000 | |
| 045702- A124 | Building and Structures | 65,728,000 | 65,728,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 70,000,000 | 70,000,000 | |
| IB9524 REHAB SIALKOT | FROM DALSAR TO MANDIG ILITATION / IMPROVEMENT OF ROAD FROM G | ULBAHAR TO MARAKIWAL VIA DAIT AND KAROL | ||
| 045702- A03 | Operating Expenses | 10,791,000 | 2,158,000 | 21,129,000 |
| 045702- A039 | General | 10,791,000 | 2,158,000 | 21,129,000 |
| 045702- A12 | Civil works | 166,014,000 | 33,203,000 | 325,061,000 |
| 045702- A124 | Building and Structures | 166,014,000 | 33,203,000 | 325,061,000 |
| Total- | REHABILITATION / IMPROVEMENT OF | 176,805,000 | 35,361,000 | 346,190,000 |
| ROAD FROM GULBAHAR TO | ||||
| IB9525 SOLAR PACKAGE-III I | MARAKIWAL VIA DAIT AND KAROL SIALKOT IZATTION OF HOMES AT VARIOUS VILLAGES II IV V | OF TRIBAL DISTRICT NORTH WAZIRIS | RAN | |
| 045702- A03 | Operating Expenses | 12,207,000 | 12,207,000 | 2,441,000 |
| 045702- A039 | General | 12,207,000 | 12,207,000 | 2,441,000 |
| 045702- A12 | Civil works | 187,793,000 | 187,793,000 | 37,559,000 |
| 045702- A124 | Building and Structures | 187,793,000 | 187,793,000 | 37,559,000 |
| Total- | SOLARIZATTION OF HOMES AT | 200,000,000 | 200,000,000 | 40,000,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | DEMAND 2023-2024 Budget 2023-2024 Revised | S FOR GRANTS 2024-2025 Budget |
|---|---|---|---|
| Estimate Estimate | Estimate | ||
| Rs Rs | Rs | ||
| IB9526 100 NO | ACCOUNTANT GENERAL PA VARIOUS VILLAGES OF TRIBAL DISTRICT NORTH WAZIRISRAN PACKAGE-III III IV V S WATER BORE FOR TUEB WELL AT DISTRICT | KISTAN REVENUES SOUTH WAZIRSITAN | |
| 045702- A03 | Operating Expenses | 24,968,000 24,968,000 | 6,020,000 |
| 045702- A039 | General | 24,968,000 24,968,000 | 6,020,000 |
| 045702- A12 | Civil works | 384,117,000 384,117,000 | 92,620,000 |
| 045702- A124 | Building and Structures | 384,117,000 384,117,000 | 92,620,000 |
| Total- | 100 NOS WATER BORE FOR TUEB | 409,085,000 409,085,000 | 98,640,000 |
| IB9527 SOLAR AGAINST APP | WELL AT DISTRICT SOUTH WAZIRSITAN IZATION OF HOMES AT DISTRICT SOUTH WAZI ROVED COST | RISRAN (AT REDUCED COST OF RS 3 | 40.915 MN |
| 045702- A03 | Operating Expenses | 20,807,000 20,807,000 | 2,988,000 |
| 045702- A039 | General | 20,807,000 20,807,000 | 2,988,000 |
| 045702- A12 | Civil works | 320,108,000 320,108,000 | 45,972,000 |
| 045702- A124 | Building and Structures | 320,108,000 320,108,000 | 45,972,000 |
| Total- | SOLARIZATION OF HOMES AT | 340,915,000 340,915,000 | 48,960,000 |
| DISTRICT SOUTH WAZIRISRAN (AT REDUCED COST OF RS 340.915 MN AGAINST APPROVED COST | |||
| IB9528 CONSTRUCTION OF BLACK TOP ROAD PCC STREET A UPPER SOUTH | ND JEEPABLE TRACKS AT TRIBAL DISTRICT | ||
| 045702- A03 | Operating Expenses | 45,775,000 30,517,000 | 3,052,000 |
| 045702- A039 | General | 45,775,000 30,517,000 | 3,052,000 |
| 045702- A12 | Civil works | 704,225,000 469,483,000 | 46,948,000 |
| 045702- A124 | Building and Structures | 704,225,000 469,483,000 | 46,948,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 750,000,000 500,000,000 | 50,000,000 |
| PCC STREET AND JEEPABLE TRACKS AT TRIBAL DISTRICT UPPER SOUTH | |||
| IB9529 CONSTRUCTION OF DIFFERENT ROADS IN MARDAN | |||
| 045702- A03 | Operating Expenses | 45,775,000 45,775,000 | |
| 045702- A039 | General | 45,775,000 45,775,000 | |
| 045702- A12 | Civil works | 704,225,000 704,225,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A124 | Building and Structures | 704,225,000 | 704,225,000 | |
| Total- | CONSTRUCTION OF DIFFERENT ROADS IN MARDAN | 750,000,000 | 750,000,000 | |
| IB9530 CONSTRUCTION OF BLACK TOP ROAD FROM LARZAR TO BARZAR | ||||
| 045702- A03 | Operating Expenses | 4,272,000 | 4,272,000 | |
| 045702- A039 | General | 4,272,000 | 4,272,000 | |
| 045702- A12 | Civil works | 65,728,000 | 65,728,000 | |
| 045702- A124 | Building and Structures | 65,728,000 | 65,728,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 70,000,000 | 70,000,000 | |
| FROM LARZAR TO BARZAR | ||||
| IB9531 CONST LOWER KURR | RUCTION OF 05 NUMBERS VETERINARY DISP UM | ENSARY AT VARIOUS PLACES OF UP | PER AND | |
| 045702- A03 | Operating Expenses | 3,418,000 | 3,418,000 | |
| 045702- A039 | General | 3,418,000 | 3,418,000 | |
| 045702- A12 | Civil works | 52,582,000 | 52,582,000 | |
| 045702- A124 | Building and Structures | 52,582,000 | 52,582,000 | |
| Total- IB9532 CONST | CONSTRUCTION OF 05 NUMBERS VETERINARY DISPENSARY AT VARIOUS PLACES OF UPPER AND LOWER KURRUM RUCTION OF BRIDGES/CULVERT AT VARIOUS | 56,000,000 PLACES DISTRIC | 56,000,000 T UPPER AND LOW | ER KURRUM |
| 045702- A03 | Operating Expenses | 9,765,000 | 9,765,000 | 6,103,000 |
| 045702- A039 | General | 9,765,000 | 9,765,000 | 6,103,000 |
| 045702- A12 | Civil works | 150,235,000 | 150,235,000 | 93,897,000 |
| 045702- A124 | Building and Structures | 150,235,000 | 150,235,000 | 93,897,000 |
| Total- | CONSTRUCTION OF | 160,000,000 | 160,000,000 | 100,000,000 |
| IB9533 CONST | BRIDGES/CULVERT AT VARIOUS PLACES DISTRICT UPPER AND LOWER KURRUM RUCTION OF 03 NO GOVT PRIMARY SCHOOLS | AT VARIOUS PLA | CES DISTRICT KURRUM | |
| 045702- A03 | Operating Expenses | 3,052,000 | 3,052,000 | |
| 045702- A039 | General | 3,052,000 | 3,052,000 | |
| 045702- A12 | Civil works | 46,948,000 | 46,948,000 | |
| 045702- A124 | Building and Structures | 46,948,000 | 46,948,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- IB9534 CONST | CONSTRUCTION OF 03 NO GOVT PRIMARY SCHOOLS AT VARIOUS PLACES DISTRICT KURRUM RUCTION OF 03 NO DISPENSARY AT VARIOUS P | 50,000,000 LACES DISTRIC | 50,000,000 T KURRUM | |
| 045702- A03 | Operating Expenses | 2,502,000 | 2,502,000 | |
| 045702- A039 | General | 2,502,000 | 2,502,000 | |
| 045702- A12 | Civil works | 38,498,000 | 38,498,000 | |
| 045702- A124 | Building and Structures | 38,498,000 | 38,498,000 | |
| Total- IB9535 CONST | CONSTRUCTION OF 03 NO DISPENSARY AT VARIOUS PLACES DISTRICT KURRUM RUCTION OF BLACK TOP ROAD AT VARIOUS PL | 41,000,000 ACES OF DISTR | 41,000,000 ICT UPPER AND LO | WER KURRUM |
| 045702- A03 | Operating Expenses | 22,765,000 | 22,765,000 | 2,930,000 |
| 045702- A039 | General | 22,765,000 | 22,765,000 | 2,930,000 |
| 045702- A12 | Civil works | 350,235,000 | 350,235,000 | 45,070,000 |
| 045702- A124 | Building and Structures | 350,235,000 | 350,235,000 | 45,070,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD AT VARIOUS PLACES OF DISTRICT UPPER AND LOWER KURRUM | 373,000,000 | 373,000,000 | 48,000,000 |
| IB9536 CONST | RUCTION OF WATER STORAGE DAMS KOH-E-C | HILTAN AND ASSOCIATED AREA | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- | CONSTRUCTION OF WATER STORAGE DAMS KOH-E-CHILTAN AND ASSOCIATED AREA | 100,000,000 | 100,000,000 | |
| IB9537 ESTABLISHMENT COMMUNITY HALL AT LOUD KAREZ | ||||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 3,784,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 3,784,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 58,216,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 58,216,000 |
| Total- | ESTABLISHMENT COMMUNITY HALL AT LOUD KAREZ | 100,000,000 | 100,000,000 | 62,000,000 |
| NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
| IB9538 IMPROVEMENT OF SEWAGE SYSTEM TUFF TILES | AND BLACK TOP IN DIFFERENT AREA QUETTA-3 | |||
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 3,296,000 |
| 045702- A039 | General | 9,155,000 | 9,155,000 | 3,296,000 |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 | 50,704,000 |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 | 50,704,000 |
| Total- IB9539 INSTA DASHT MIAN | IMPROVEMENT OF SEWAGE SYSTEM TUFF TILES AND BLACK TOP IN DIFFERENT AREA QUETTA-3 LLATION OF SOLAR KITS FOR ELECTRIFICA | 150,000,000 TION DIGARI MERGE | 150,000,000 D ZEDCO SIMDIGI Z | 54,000,000 ARGHOON |
| 045702- A03 | Operating Expenses | 12,207,000 | 12,207,000 | 4,394,000 |
| 045702- A039 | General | 12,207,000 | 12,207,000 | 4,394,000 |
| 045702- A12 | Civil works | 187,793,000 | 187,793,000 | 67,606,000 |
| 045702- A124 | Building and Structures | 187,793,000 | 187,793,000 | 67,606,000 |
| Total- | INSTALLATION OF SOLAR KITS FOR | 200,000,000 | 200,000,000 | 72,000,000 |
| ELECTRIFICATION DIGARI MERGED ZEDCO SIMDIGI ZARGHOON DASHT MIAN |
| IB9540 INSTA QUETTA-3 | LLATION OF SOLAR TUBE WELLS FOR PROVISION OF CLEAN AND SAFE DRINGKIN WATER | |||
|---|---|---|---|---|
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- IB9541 CONST DIFFERENT S | INSTALLATION OF SOLAR TUBE WELLS FOR PROVISION OF CLEAN AND SAFE DRINGKIN WATER QUETTA-3 RUCTION OF ADDITIONAL CLASS ROOMS CHOOLS DISTRCIT | 100,000,000 & EXAMINATION CEN | 100,000,000 TRE/MULTIPURPOSE | HALL AT |
| 045702- A03 | Operating Expenses | 6,103,000 | 2,136,000 | 3,967,000 |
| 045702- A039 | General | 6,103,000 | 2,136,000 | 3,967,000 |
| 045702- A12 | Civil works | 93,897,000 | 32,864,000 | 61,033,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 32,864,000 | 61,033,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMANDS 2023-2024 Revised Estimate | FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | CONSTRUCTION OF ADDITIONAL | 100,000,000 | 35,000,000 | 65,000,000 |
| CLASS ROOMS & EXAMINATION CENTRE/MULTIPURPOSE HALL AT DIFFERENT SCHOOLS DISTRCIT | ||||
| IB9542 BLACK | TOP ROAD AT VARIOUS PLACES IN KHUZDAR | CITY | ||
| 045702- A03 | Operating Expenses | 12,207,000 | 12,207,000 | 5,220,000 |
| 045702- A039 | General | 12,207,000 | 12,207,000 | 5,220,000 |
| 045702- A12 | Civil works | 187,793,000 | 187,793,000 | 80,301,000 |
| 045702- A124 | Building and Structures | 187,793,000 | 187,793,000 | 80,301,000 |
| Total- | BLACKTOP ROAD AT VARIOUS | 200,000,000 | 200,000,000 | 85,521,000 |
| IB9543 CUTTI WORKS DIST | PLACES IN KHUZDAR CITY NG AND IMPROVEMENT IF KACHA ROAD HIGH RCIT | WAY TO ARANJI VI | A AWAK INCLUDING | STRUCTURE |
| 045702- A03 | Operating Expenses | 15,258,000 | 15,258,000 | 3,052,000 |
| 045702- A039 | General | 15,258,000 | 15,258,000 | 3,052,000 |
| 045702- A12 | Civil works | 234,742,000 | 234,742,000 | 46,948,000 |
| 045702- A124 | Building and Structures | 234,742,000 | 234,742,000 | 46,948,000 |
| Total- | CUTTING AND IMPROVEMENT IF | 250,000,000 | 250,000,000 | 50,000,000 |
| IB9544 CONST | KACHA ROAD HIGHWAY TO ARANJI VIA AWAK INCLUDING STRUCTURE WORKS DISTRCIT RUCTION/REHABILITATION OF BLACK TOP R | OAD IN 07 KILLIS OF DISTRICT NUSHKI | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 2,197,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 2,197,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 33,803,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 33,803,000 |
| Total- | CONSTRUCTION/REHABILITATION OF | 100,000,000 | 100,000,000 | 36,000,000 |
| IB9545 AGRIC | BLACK TOP ROAD IN 07 KILLIS OF DISTRICT NUSHKI ULTURE LAND LEVELINGTRACTOR HOURS DI | STRICT NOSHKI | ||
| 045702- A03 | Operating Expenses | 3,052,000 | 3,052,000 | |
| 045702- A039 | General | 3,052,000 | 3,052,000 | |
| 045702- A12 | Civil works | 46,948,000 | 46,948,000 | |
| 045702- A124 | Building and Structures | 46,948,000 | 46,948,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | AGRICULTURE LAND | 50,000,000 | 50,000,000 | |
| LEVELINGTRACTOR HOURS DISTRICT NOSHKI | ||||
| IB9546 CONSTRUCTION OF BLACK TOP ROAD AND DRAINAGE SYSTEM KILLIS SA | HIBZADA DISTRICT NOSHKI | |||
| 045702- A03 | Operating Expenses | 3,052,000 | 3,052,000 | |
| 045702- A039 | General | 3,052,000 | 3,052,000 | |
| 045702- A12 | Civil works | 46,948,000 | 46,948,000 | |
| 045702- A124 | Building and Structures | 46,948,000 | 46,948,000 | |
| Total- | CONSTRUCTION OF BLACK TOP ROAD AND DRAINAGE SYSTEM KILLIS SAHIBZADA DISTRICT NOSHKI | 50,000,000 | 50,000,000 | |
| IB9547 CONSTRUCTION OF BLACK TOP ROAD FROM MEERA DISTRICT KHARAN | N KALAT TO MATTI AND KOTAN TO SYED AMEER | |||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- IB9548 SOLAR | CONSTRUCTION OF BLACK TOP ROAD FROM MEERAN KALAT TO MATTI AND KOTAN TO SYED AMEER DISTRICT KHARAN IZATION OF EXISTING TUBEWELLS/BORES FO | 100,000,000 R AGRICULTURE PU | 100,000,000 RPOSE IN VARIO | US KILLIS OF |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 2,197,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 2,197,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 33,803,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 33,803,000 |
| Total- | SOLARIZATION OF EXISTING | 100,000,000 | 100,000,000 | 36,000,000 |
| IB9549 CONST | TUBEWELLS/BORES FOR AGRICULTURE PURPOSE IN VARIOUS KILLIS OF RUCTION OF BASIC HEALTH UNIT (BHU) BUIL | DING AT NOTAN CITY | HURMANHGI | |
| 045702- A03 | Operating Expenses | 2,441,000 | 2,441,000 | |
| 045702- A039 | General | 2,441,000 | 2,441,000 | |
| 045702- A12 | Civil works | 37,559,000 | 37,559,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A124 | Building and Structures | 37,559,000 | 37,559,000 | |
| Total- | CONSTRUCTION OF BASIC HEALTH | 40,000,000 | 40,000,000 | |
| UNIT (BHU) BUILDING AT NOTAN CITY HURMANHGI | ||||
| IB9550 CONSTRUCTION/INSTALLATION OF FENCING FOR AN DISTRICT CHAGHI | IMAL PARK AND R | EST HOUSE AT PO | STI KAREZ | |
| 045702- A03 | Operating Expenses | 3,662,000 | 3,662,000 | |
| 045702- A039 | General | 3,662,000 | 3,662,000 | |
| 045702- A12 | Civil works | 56,338,000 | 56,338,000 | |
| 045702- A124 | Building and Structures | 56,338,000 | 56,338,000 | |
| Total- | CONSTRUCTION/INSTALLATION OF | 60,000,000 | 60,000,000 | |
| IB9551 COMM VARIOUS KIL | FENCING FOR ANIMAL PARK AND REST HOUSE AT POSTI KAREZ DISTRICT CHAGHI UNITY HOME SOLAR ENERGY SYSTEM & AGRI LIS OF | CULTURE CUM WATER SUPPLY SCHEMES IN | ||
| 045702- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 3,296,000 |
| 045702- A039 | General | 9,155,000 | 9,155,000 | 3,296,000 |
| 045702- A12 | Civil works | 140,845,000 | 140,845,000 | 50,704,000 |
| 045702- A124 | Building and Structures | 140,845,000 | 140,845,000 | 50,704,000 |
| Total- | COMMUNITY HOME SOLAR ENERGY | 150,000,000 | 150,000,000 | 54,000,000 |
| IB9552 CONST AT DISTRICT | SYSTEM & AGRICULTURE CUM WATER SUPPLY SCHEMES IN VARIOUS KILLIS OF RUCTION OF 17 NO. WATER SUPPLY SCHEME | S ALONG SOLAR | SYSTEM OF VARIOUS LOCATIONS | |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- | CONSTRUCTION OF 17 NO. WATER SUPPLY SCHEMES ALONG SOLAR | 100,000,000 | 100,000,000 | |
| SYSTEM OF VARIOUS LOCATIONS AT DISTRICT |
IB9553 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | DEMAN 2023-2024 Budget Estimate 2023-2024 Revised Estimate | DS FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|
| Rs Rs | Rs | ||
| VARIOUS KILL | ACCOUNTANT GENERAL P IS TEHSIL DUKI | AKISTAN REVENUES | |
| 045702- A03 | Operating Expenses | 24,412,000 24,412,000 | 5,732,000 |
| 045702- A039 | General | 24,412,000 24,412,000 | 5,732,000 |
| 045702- A12 | Civil works | 375,567,000 375,567,000 | 88,190,000 |
| 045702- A124 | Building and Structures | 375,567,000 375,567,000 | 88,190,000 |
| Total- | PUBLIC SECTOR DEVELOPMENT | 399,979,000 399,979,000 | 93,922,000 |
| IB9554 CONST | PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS KILLIS TEHSIL DUKI RUCTION OF ROAD AND PCC STREET AT DIS | TRCIT LAKKI MARWAT | |
| 045702- A03 | Operating Expenses | 21,362,000 3,631,000 | 17,883,000 |
| 045702- A039 | General | 21,362,000 3,631,000 | 17,883,000 |
| 045702- A12 | Civil works | 328,638,000 55,869,000 | 275,117,000 |
| 045702- A124 | Building and Structures | 328,638,000 55,869,000 | 275,117,000 |
| Total- | CONSTRUCTION OF ROAD AND PCC STREET AT DISTRCIT LAKKI MARWAT | 350,000,000 59,500,000 | 293,000,000 |
| IB9555 CONSTRUCTION OF FLOOD PROTECTION BAND AND | FLOOD SAFETY WALL AT DISTRCIT | LAKKI MARWAT | |
| 045702- A03 | Operating Expenses | 12,207,000 12,207,000 | |
| 045702- A039 | General | 12,207,000 12,207,000 | |
| 045702- A12 | Civil works | 187,793,000 187,793,000 | |
| 045702- A124 | Building and Structures | 187,793,000 187,793,000 | |
| Total- | CONSTRUCTION OF FLOOD | 200,000,000 200,000,000 | |
| IB9556 INSTA | PROTECTION BAND AND FLOOD SAFETY WALL AT DISTRCIT LAKKI MARWAT LLATION OF PRESSURE PUMPS AND WATER S | UPPLY SCHEMES AT DISTRICT LAKKI MARWAT | |
| 045702- A03 | Operating Expenses | 12,207,000 12,207,000 | |
| 045702- A039 | General | 12,207,000 12,207,000 | |
| 045702- A12 | Civil works | 187,793,000 187,793,000 | |
| 045702- A124 | Building and Structures | 187,793,000 187,793,000 | |
| Total- | INSTALLATION OF PRESSURE PUMPS AND WATER SUPPLY SCHEMES AT DISTRICT LAKKI MARWAT | 200,000,000 200,000,000 |
IB9557 REHABILITATION OF INFRASTRUCTURE WORKS (CONSTRUCTIN OF ROAD WATERLINE SEWERAGE
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | 2023-2024 Revised Estimate | 2024-2025 Budget Estimate | |
| Rs | Rs | Rs | ||
| SYSTEM PAR | ACCOUNTANT GENERAL P KS & | AKISTAN REVENUES | ||
| 045702- A03 | Operating Expenses | 45,775,000 | 45,775,000 | 45,775,000 |
| 045702- A039 | General | 45,775,000 | 45,775,000 | 45,775,000 |
| 045702- A12 | Civil works | 704,225,000 | 704,225,000 | 704,225,000 |
| 045702- A124 | Building and Structures | 704,225,000 | 704,225,000 | 704,225,000 |
| Total- | REHABILITATION OF | 750,000,000 | 750,000,000 | 750,000,000 |
| INFRASTRUCTURE WORKS (CONSTRUCTIN OF ROAD WATERLINE SEWERAGE SYSTEM PARKS & | ||||
| IB9558 REHABILITATION OF INFRASTRUCTURE WORKS (CO SEWERAGE PUBLIC PARKS | NSTRUCTIN OF ROAD | S FOORPATH WATER SUPPY | ||
| 045702- A03 | Operating Expenses | 45,775,000 | 45,775,000 | 45,775,000 |
| 045702- A039 | General | 45,775,000 | 45,775,000 | 45,775,000 |
| 045702- A12 | Civil works | 704,225,000 | 704,225,000 | 704,225,000 |
| 045702- A124 | Building and Structures | 704,225,000 | 704,225,000 | 704,225,000 |
| Total- | REHABILITATION OF | 750,000,000 | 750,000,000 | 750,000,000 |
| INFRASTRUCTURE WORKS | ||||
| IB9559 IMPRO PLAYGROUND | (CONSTRUCTIN OF ROADS FOORPATH WATER SUPPY SEWERAGE PUBLIC PARKS VEMENT / REHABILITATION OF DIFFERENT RO IN | ADS WATER SUPPLY | SEWERAGE PARKS AND | |
| 045702- A03 | Operating Expenses | 45,775,000 | 45,775,000 | 45,775,000 |
| 045702- A039 | General | 45,775,000 | 45,775,000 | 45,775,000 |
| 045702- A12 | Civil works | 704,225,000 | 704,225,000 | 704,225,000 |
| 045702- A124 | Building and Structures | 704,225,000 | 704,225,000 | 704,225,000 |
| Total- | IMPROVEMENT / REHABILITATION OF | 750,000,000 | 750,000,000 | 750,000,000 |
| DIFFERENT ROADS WATER SUPPLY | ||||
| IB9560 INFRA | SEWERAGE PARKS AND PLAYGROUND IN STRUCTURE DEVELOPMENT IN TEHSIL YAZMA | N DISTRICT BAHAWALPUR | ||
| 045702- A03 | Operating Expenses | 45,775,000 | 45,775,000 | 16,479,000 |
| 045702- A039 | General | 45,775,000 | 45,775,000 | 16,479,000 |
| 045702- A12 | Civil works | 704,225,000 | 704,225,000 | 253,521,000 |
| 045702- A124 | Building and Structures | 704,225,000 | 704,225,000 | 253,521,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| Total- | INFRASTRUCTURE DEVELOPMENT IN | 750,000,000 | 750,000,000 | 270,000,000 |
| IB9561 INFRA | TEHSIL YAZMAN DISTRICT BAHAWALPUR STRUCTURE DEVELOPMENT IN DISTRICT GUJ | RAT | ||
| 045702- A03 | Operating Expenses | 33,568,000 | 5,707,000 | 41,060,000 |
| 045702- A039 | General | 33,568,000 | 5,707,000 | 41,060,000 |
| 045702- A12 | Civil works | 516,432,000 | 87,793,000 | 631,690,000 |
| 045702- A124 | Building and Structures | 516,432,000 | 87,793,000 | 631,690,000 |
| Total- | INFRASTRUCTURE DEVELOPMENT IN DISTRICT GUJRAT | 550,000,000 | 93,500,000 | 672,750,000 |
| IB9562 INFRASTRUCTURE DEVELOPMENT IN DISTRICT GUJRAT | ||||
| 045702- A03 | Operating Expenses | 12,207,000 | 12,207,000 | |
| 045702- A039 | General | 12,207,000 | 12,207,000 | |
| 045702- A12 | Civil works | 187,793,000 | 187,793,000 | |
| 045702- A124 | Building and Structures | 187,793,000 | 187,793,000 | |
| Total- | INFRASTRUCTURE DEVELOPMENT IN | 200,000,000 | 200,000,000 | |
| IB9563 CONST | DISTRICT GUJRAT RUCTION OF CAT-D HOSPITAL AT AZAM WAR | SAK TEHSIL BIRMAL SWTD WANA | ||
| 045702- A03 | Operating Expenses | 21,362,000 | 21,362,000 | 24,413,000 |
| 045702- A039 | General | 21,362,000 | 21,362,000 | 24,413,000 |
| 045702- A12 | Civil works | 328,638,000 | 328,638,000 | 375,587,000 |
| 045702- A124 | Building and Structures | 328,638,000 | 328,638,000 | 375,587,000 |
| Total- | CONSTRUCTION OF CAT-D HOSPITAL | 350,000,000 | 350,000,000 | 400,000,000 |
| AT AZAM WARSAK TEHSIL BIRMAL | ||||
| SWTD WANA | ||||
| IB9564 MANSEHRA WATER SUPPLY SCHEME | ||||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- | MANSEHRA WATER SUPPLY SCHEME | 100,000,000 | 100,000,000 | |
| IB9565 CONSTRUCTION OF LINK ROAD FROM RAILWAY STATION TO SIALKOT | PHATAK 2 KM | |||
| 045702- A03 | Operating Expenses | 1,221,000 | ||
| 045702- A039 | General | 1,221,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | 2023-2024 Revised Estimate | 2024-2025 Budget Estimate | |
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A12 | Civil works | 18,779,000 | ||
| 045702- A124 | Building and Structures | 18,779,000 | ||
| Total- | CONSTRUCTION OF LINK ROAD FROM RAILWAY STATION TO SIALKOT PHATAK 2 KM | 20,000,000 | ||
| IB9566 CONST GHULAM HAI | RUCTION OF ASPHALT ROAD FROM MIRPURK RDER | HAS MIRWAH ROAD | TO JHULURI VIA | VILLAGE SYED |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- IB9567 CONST | CONSTRUCTION OF ASPHALT ROAD FROM MIRPURKHAS MIRWAH ROAD TO JHULURI VIA VILLAGE SYED GHULAM HAIRDER RUCTION OF 50 NOS. SOLAR WATER SUPPLY | 100,000,000 SCHEMES IN DISTRIC | 100,000,000 T KHUZDAR | |
| 045702- A03 | Operating Expenses | 6,103,000 | 1,038,000 | 23,680,000 |
| 045702- A039 | General | 6,103,000 | 1,038,000 | 23,680,000 |
| 045702- A12 | Civil works | 93,897,000 | 15,962,000 | 364,307,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 15,962,000 | 364,307,000 |
| Total- | CONSTRUCTION OF 50 NOS. SOLAR | 100,000,000 | 17,000,000 | 387,987,000 |
| IB9568 CONST | WATER SUPPLY SCHEMES IN DISTRICT KHUZDAR RUCTION OF B/T ROAD IN MUNICIPLE CORPO | RATION KHUZDAR | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 4,512,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 4,512,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 69,413,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 69,413,000 |
| Total- | CONSTRUCTION OF B/T ROAD IN | 100,000,000 | 100,000,000 | 73,925,000 |
| IB9569 REHAB DISTRICT SIA | MUNICIPLE CORPORATION KHUZDAR ILITATION / IMPROVEMENT OF ROAD FROM D LKOT | UGRI TO SATRA SINDHWAN TEHSIL DASKA | ||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 4,725,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 4,725,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 72,695,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 72,695,000 |
| Total- | REHABILITATION / IMPROVEMENT OF ROAD FROM DUGRI TO SATRA SINDHWAN TEHSIL DASKA DISTRICT SIALKOT | 100,000,000 | 100,000,000 | 77,420,000 |
| IB9570 GUJRANWALA RAJBAN BRIDGE TO JANDIALA DHAB | WALA (06 KM) | |||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- | GUJRANWALA RAJBAN BRIDGE TO | 100,000,000 | 100,000,000 | |
| JANDIALA DHABWALA (06 KM) | ||||
| IB9571 CONST | RUCTION OF CARPET ROAD FROM MARI BHIN | DRAN TO GHUMMAN | WALA DISTRICT | GUJRANWALA |
| 045702- A03 | Operating Expenses | 6,103,000 | 1,221,000 | 29,298,000 |
| 045702- A039 | General | 6,103,000 | 1,221,000 | 29,298,000 |
| 045702- A12 | Civil works | 93,897,000 | 18,779,000 | 450,732,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 18,779,000 | 450,732,000 |
| Total- | CONSTRUCTION OF CARPET ROAD FROM MARI BHINDRAN TO GHUMMAN | 100,000,000 | 20,000,000 | 480,030,000 |
| WALA DISTRICT GUJRANWALA | ||||
| IB9572 REHABILITATION / CONSTRUCTION / RAISING OF RO SHAH ROAD TEHSIL | AD FROM SHAHPUR C | ITY TO BANGLA | HUSSAIN | |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- | REHABILITATION / CONSTRUCTION / RAISING OF ROAD FROM SHAHPUR CITY TO BANGLA HUSSAIN SHAH ROAD TEHSIL | 100,000,000 | 100,000,000 | |
| IB9573 REPAI | RING OF ROADS IN TANDLIANWALA FAISALABAD | |||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 9,155,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 9,155,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | DEMA 2023-2024 Budget Estimate 2023-2024 Revised Estimate | NDS FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|
| Rs Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| 045702- A12 | Civil works | 93,897,000 93,897,000 | 140,845,000 |
| 045702- A124 | Building and Structures | 93,897,000 93,897,000 | 140,845,000 |
| Total- | REPAIRING OF ROADS IN | 100,000,000 100,000,000 | 150,000,000 |
| TANDLIANWALA FAISALABAD | |||
| IB9574 URBAN SEWERAGE / DRAINAGE PCC AND TUFF TILE DISTRICT TOBA TEK | STREET FOR ZONE-D GOJRA CITY | TEHSIL GOJRA | |
| 045702- A03 | Operating Expenses | 6,103,000 6,103,000 | 18,578,000 |
| 045702- A039 | General | 6,103,000 6,103,000 | 18,578,000 |
| 045702- A12 | Civil works | 93,897,000 93,897,000 | 285,811,000 |
| 045702- A124 | Building and Structures | 93,897,000 93,897,000 | 285,811,000 |
| Total- | URBAN SEWERAGE / DRAINAGE PCC AND TUFF TILE STREET FOR ZONE-D GOJRA CITY TEHSIL GOJRA DISTRICT TOBA TEK | 100,000,000 100,000,000 | 304,389,000 |
| IB9575 URBAN SEWERAGE / DRAINAGE PCC AND TUFF TILE DISTRICT TOBA TEK | STREET FOR ZONE-D GOJRA CITY | TEHSIL GOJRA | |
| 045702- A03 | Operating Expenses | 6,103,000 6,103,000 | |
| 045702- A039 | General | 6,103,000 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 93,897,000 | |
| Total- | URBAN SEWERAGE / DRAINAGE PCC AND TUFF TILE STREET FOR ZONE-D GOJRA CITY TEHSIL GOJRA DISTRICT TOBA TEK | 100,000,000 100,000,000 | |
| IB9576 CONST KASUR | RUCTION OF OVERHEAD BRIDGE ON RAILWAY TRACK IN TEHSIL KOT RADHA KISHEN DISTRICT | ||
| 045702- A03 | Operating Expenses | 6,103,000 6,103,000 | |
| 045702- A039 | General | 6,103,000 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 93,897,000 | |
| Total- | CONSTRUCTION OF OVERHEAD BRIDGE ON RAILWAY TRACK IN TEHSIL KOT RADHA KISHEN DISTRICT KASUR | 100,000,000 100,000,000 | |
| IB9577 CONST MULTAN | RUCTION OF CARPET ROAD IN DIFFERENT U | CS AND CONTONMENT BOARD ARE | AS DISTRICT |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 12,023,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 12,023,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 184,977,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 184,977,000 |
| Total- | CONSTRUCTION OF CARPET ROAD IN DIFFERENT UCS AND CONTONMENT BOARD AREAS DISTRICT MULTAN | 100,000,000 | 100,000,000 | 197,000,000 |
| IB9578 CONST MAQEEM PUR | RUCTION OF CARPET ROAD FROM BASTI GU DISTRICT | LBAHAR WALA - MATOTALI VIA BHADI | WALA - BASTI | |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | |
| 045702- A039 | General | 6,103,000 | 6,103,000 | |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | |
| Total- | CONSTRUCTION OF CARPET ROAD FROM BASTI GULBAHAR WALA - MATOTALI VIA BHADI WALA - BASTI MAQEEM PUR DISTRICT | 100,000,000 | 100,000,000 | |
| IB9579 CONSTRUCTION OF ROAD FROM BHAGWAL AWAN T LINK INFRASTRUCTURE | O DABOLA VIA KOTLI | BHUTTA RORAS | ROAD WITH | |
| 045702- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 16,446,000 |
| 045702- A039 | General | 6,103,000 | 6,103,000 | 16,446,000 |
| 045702- A12 | Civil works | 93,897,000 | 93,897,000 | 253,014,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 93,897,000 | 253,014,000 |
| Total- | CONSTRUCTION OF ROAD FROM | 100,000,000 | 100,000,000 | 269,460,000 |
| IB9580 CONST WITH LINK INF | BHAGWAL AWAN TO DABOLA VIA KOTLI BHUTTA RORAS ROAD WITH LINK INFRASTRUCTURE RUCTION OF ROAD FROM JURIYAN KALAN T RASTRUCTURE | O MALKE KALAN VIA | OLAKH AWAN & | MALO CHAK |
| 045702- A03 | Operating Expenses | 6,103,000 | 1,221,000 | 21,168,000 |
| 045702- A039 | General | 6,103,000 | 1,221,000 | 21,168,000 |
| 045702- A12 | Civil works | 93,897,000 | 18,779,000 | 325,655,000 |
| 045702- A124 | Building and Structures | 93,897,000 | 18,779,000 | 325,655,000 |
| Total- | CONSTRUCTION OF ROAD FROM | 100,000,000 | 20,000,000 | 346,823,000 |
| JURIYAN KALAN TO MALKE KALAN VIA |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS |
|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget 2023-2024 Revised | 2024-2025 Budget | |
| Estimate Estimate | Estimate | ||
| Rs Rs | Rs | ||
| IB9581 CONST AND CONTON | ACCOUNTANT GENERAL P OLAKH AWAN & MALO CHAK WITH LINK INFRASTRUCTURE RUCTION OF SEWERAGE SOLING RE-SOLING MENT | AKISTAN REVENUES DRAIN AND SLUDGE CARRIER IN DIF | FERENCT UCS |
| 045702- A03 | Operating Expenses | 6,103,000 1,221,000 | 29,692,000 |
| 045702- A039 | General | 6,103,000 1,221,000 | 29,692,000 |
| 045702- A12 | Civil works | 93,897,000 18,779,000 | 456,808,000 |
| 045702- A124 | Building and Structures | 93,897,000 18,779,000 | 456,808,000 |
| Total- | CONSTRUCTION OF SEWERAGE | 100,000,000 20,000,000 | 486,500,000 |
| IB9582 CONST BAHAWALPU | SOLING RE-SOLING DRAIN AND SLUDGE CARRIER IN DIFFERENCT UCS AND CONTONMENT RUCTION OF METTALED ROAD 20 FEET WIDE R (10 KM) | BHATTA CHOWK TO AHMADPUR DISTRICT | |
| 045702- A03 | Operating Expenses | 6,103,000 1,038,000 | 18,555,000 |
| 045702- A039 | General | 6,103,000 1,038,000 | 18,555,000 |
| 045702- A12 | Civil works | 93,897,000 15,962,000 | 285,482,000 |
| 045702- A124 | Building and Structures | 93,897,000 15,962,000 | 285,482,000 |
| Total- | CONSTRUCTION OF METTALED ROAD 20 FEET WIDE BHATTA CHOWK TO AHMADPUR DISTRICT BAHAWALPUR (10 KM) | 100,000,000 17,000,000 | 304,037,000 |
| IB9583 CONSTRUCTION / WIDENING OF KACHA PAKKA NOOR SHAH ROAD DISTRICT SAHIWAL | |||
| 045702- A03 | Operating Expenses | 6,103,000 6,103,000 | 34,776,000 |
| 045702- A039 | General | 6,103,000 6,103,000 | 34,776,000 |
| 045702- A12 | Civil works | 93,897,000 93,897,000 | 535,014,000 |
| 045702- A124 | Building and Structures | 93,897,000 93,897,000 | 535,014,000 |
| Total- | CONSTRUCTION / WIDENING OF | 100,000,000 100,000,000 | 569,790,000 |
| KACHA PAKKA NOOR SHAH ROAD DISTRICT SAHIWAL | |||
| IB9584 CONST LADHY WALA | / REHB. OF METALLED ROAD OF KHAIRPUR T & BASTI | AMAY WALI ROAD MOUZA JINDO SHAH CHAK | |
| 045702- A03 | Operating Expenses | 12,207,000 48,827,000 | 25,270,000 |
| 045702- A039 | General | 12,207,000 48,827,000 | 25,270,000 |
| 045702- A12 | Civil works | 187,793,000 751,173,000 | 388,770,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMANDS 2023-2024 Revised Estimate | FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045702- A124 | Building and Structures | 187,793,000 | 751,173,000 | 388,770,000 |
| Total- | CONST / REHB. OF METALLED ROAD | 200,000,000 | 800,000,000 | 414,040,000 |
| IB9585 CONST | OF KHAIRPUR TAMAY WALI ROAD MOUZA JINDO SHAH CHAK LADHY WALA & BASTI RUCTION OF IB OFFICES (03) AT GHALLANAI T | D MOHMAND KOHAT | AND D.I KHAN | |
| 045702- A03 | Operating Expenses | 3,052,000 | 3,052,000 | 8,789,000 |
| 045702- A039 | General | 3,052,000 | 3,052,000 | 8,789,000 |
| 045702- A12 | Civil works | 46,948,000 | 46,948,000 | 135,211,000 |
| 045702- A124 | Building and Structures | 46,948,000 | 46,948,000 | 135,211,000 |
| Total- IB9586 INSTA | CONSTRUCTION OF IB OFFICES (03) AT GHALLANAI TD MOHMAND KOHAT AND D.I KHAN LLATION OF PRESSURE PUMPS / TUBEWELLS I | 50,000,000 N DISTRICT BANNU | 50,000,000 | 144,000,000 |
| 045702- A03 | Operating Expenses | 45,775,000 | 45,775,000 | 38,451,000 |
| 045702- A039 | General | 45,775,000 | 45,775,000 | 38,451,000 |
| 045702- A12 | Civil works | 704,225,000 | 704,225,000 | 591,549,000 |
| 045702- A124 | Building and Structures | 704,225,000 | 704,225,000 | 591,549,000 |
| Total- | INSTALLATION OF PRESSURE PUMPS / TUBEWELLS IN DISTRICT BANNU | 750,000,000 | 750,000,000 | 630,000,000 |
| IB9587 CONSTRUCTION OF AUDITORIUM AT NIM PESHAWAR | ||||
| 045702- A03 | Operating Expenses | 7,324,000 | 7,324,000 | |
| 045702- A039 | General | 7,324,000 | 7,324,000 | |
| 045702- A12 | Civil works | 112,676,000 | 112,676,000 | |
| 045702- A124 | Building and Structures | 112,676,000 | 112,676,000 | |
| Total- | CONSTRUCTION OF AUDITORIUM AT | 120,000,000 | 120,000,000 | |
| IB9588 UPGRA STRENGTHEN | NIM PESHAWAR DATION OF INFRASTRUCTURE (SOLARIZATION ING OF | ) OF ACADEMIC BLOCKS BOUNDARY | WALL AND | |
| 045702- A03 | Operating Expenses | 3,943,000 | 3,943,000 | |
| 045702- A039 | General | 3,943,000 | 3,943,000 | |
| 045702- A12 | Civil works | 60,665,000 | 60,665,000 | |
| 045702- A124 | Building and Structures | 60,665,000 | 60,665,000 | |
| Total- | UPGRADATION OF INFRASTRUCTURE | 64,608,000 | 64,608,000 |
| NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| (SOLARIZATION) OF ACADEMIC BLOCKS BOUNDARY WALL AND STRENGTHENING OF | |||
|---|---|---|---|
| IB9589 UPGRADATION OF NCRD COMPLEX (PHASE-III) A | T CHAK SHAHZAD ISLAMABAD | ||
| 045702- A03 | Operating Expenses | 2,197,000 | 2,197,000 |
| 045702- A039 | General | 2,197,000 | 2,197,000 |
| 045702- A12 | Civil works | 33,800,000 | 33,800,000 |
| 045702- A124 | Building and Structures | 33,800,000 | 33,800,000 |
| Total- | UPGRADATION OF NCRD COMPLEX (PHASE-III) AT CHAK SHAHZAD ISLAMABAD | 35,997,000 | 35,997,000 |
| IB9700 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME ( | SAP) (H&W) PUNJAB | ||
| 045702- A12 | Civil works | 26,229,295,000 | |
| 045702- A124 | Building and Structures | 26,229,295,000 | |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME (SAP) (H&W) PUNJAB | 26,229,295,000 | |
| IB9701 SUSTA | INABLE DEVELOPMENT GOALS ACHIEVEM | ENT PROGRAMME ( | SAP) (H&W) SINDH |
| 045702- A12 | Civil works | 8,296,719,000 | |
| 045702- A124 | Building and Structures | 8,296,719,000 | |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME (SAP) (H&W) SINDH | 8,296,719,000 | |
| IB9702 SUSTA | INABLE DEVELOPMENT GOALS ACHIEVEM | ENT PROGRAMME ( | SAP) (H&W) BALOCHISTAN |
| 045702- A12 | Civil works | 2,495,782,000 | |
| 045702- A124 | Building and Structures | 2,495,782,000 | |
| Total- | SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME (SAP) (H&W) BALOCHISTAN | 2,495,782,000 | |
| 045702 | Total- Buildings and Structures | 34,920,518,000 | 77,707,055,000 23,828,459,000 |
| 045720 Others IB3526 REHAB | : ILITATION / CONSTRUCTION OF ROADS A | T LATIFABAD HYDERABAD CITY 6 NOS SCHEMES | |
| 045720- A03 | Operating Expenses | 12,207,000 | 12,207,000 3,052,000 |
| 045720- A039 | General | 12,207,000 | 12,207,000 3,052,000 |
| 045720- A12 | Civil works | 187,793,000 | 187,793,000 46,948,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045720- A124 | Building and Structures | 187,793,000 | 187,793,000 | 46,948,000 |
| Total- | REHABILITATION / CONSTRUCTION OF | 200,000,000 | 200,000,000 | 50,000,000 |
| IB3527 REFUR | ROADS AT LATIFABAD HYDERABAD CITY 6 NOS SCHEMES BISHMENT AND REHABILITATION OF GOVERN | MENT OWNED BUILDINGS AT ISLAMA | BAD | |
| 045720- A03 | Operating Expenses | 6,103,000 | 24,718,000 | 30,516,000 |
| 045720- A039 | General | 6,103,000 | 24,718,000 | 30,516,000 |
| 045720- A12 | Civil works | 93,897,000 | 380,282,000 | 469,484,000 |
| 045720- A124 | Building and Structures | 93,897,000 | 380,282,000 | 469,484,000 |
| Total- | REFURBISHMENT AND | 100,000,000 | 405,000,000 | 500,000,000 |
| REHABILITATION OF GOVERNMENT OWNED BUILDINGS AT ISLAMABAD | ||||
| IB3528 REFUR COLONY ISLA | BISHMENT OF EXISTING FACILITIES & PROVIS MABAD | ION OF ADDITION | AL FACILITIES AT P | M STAFF |
| 045720- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 8,239,000 |
| 045720- A039 | General | 6,103,000 | 6,103,000 | 8,239,000 |
| 045720- A12 | Civil works | 93,897,000 | 93,897,000 | 126,761,000 |
| 045720- A124 | Building and Structures | 93,897,000 | 93,897,000 | 126,761,000 |
| Total- | REFURBISHMENT OF EXISTING | 100,000,000 | 100,000,000 | 135,000,000 |
| FACILITIES & PROVISION OF ADDITIONAL FACILITIES AT PM STAFF COLONY ISLAMABAD | ||||
| IB3529 REFUR | BISHMENT OF PM OFFICE ISLAMABAD | |||
| 045720- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 9,956,000 |
| 045720- A039 | General | 6,103,000 | 6,103,000 | 9,956,000 |
| 045720- A12 | Civil works | 93,897,000 | 93,897,000 | 153,174,000 |
| 045720- A124 | Building and Structures | 93,897,000 | 93,897,000 | 153,174,000 |
| Total- | REFURBISHMENT OF PM OFFICE | 100,000,000 | 100,000,000 | 163,130,000 |
| IB3541 DEVEL | ISLAMABAD OPMENT SCHEMES IN DISTRICT KACHHI JHAL | MAGSI AND NASEERABAD(17 NOS SCHEMES) | ||
| 045720- A03 | Operating Expenses | 1,053,000 | 1,053,000 | |
| 045720- A039 | General | 1,053,000 | 1,053,000 | |
| 045720- A12 | Civil works | 16,197,000 | 16,197,000 | |
| 045720- A124 | Building and Structures | 16,197,000 | 16,197,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMANDS FOR GRANTS 2023-2024 Revised Estimate 2024-2025 Budget Estimate |
|---|---|---|---|
| Rs | Rs Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | |||
| Total- IB3542 PAVEM | DEVELOPMENT SCHEMES IN DISTRICT KACHHI JHAL MAGSI AND NASEERABAD(17 NOS SCHEMES) ENT OF STREETS SOLING SYSTEM IN 15 DIFF | 17,250,000 ERENT AREAS OF | 17,250,000 GUJRANWALA |
| 045720- A03 | Operating Expenses | 16,784,000 | 16,784,000 9,897,000 |
| 045720- A039 | General | 16,784,000 | 16,784,000 9,897,000 |
| 045720- A12 | Civil works | 258,216,000 | 258,216,000 152,270,000 |
| 045720- A124 | Building and Structures | 258,216,000 | 258,216,000 152,270,000 |
| Total- | PAVEMENT OF STREETS SOLING SYSTEM IN 15 DIFFERENT AREAS OF GUJRANWALA | 275,000,000 | 275,000,000 162,167,000 |
| IB3543 CONSTRUCTION OF CARPETED ROAD FROM DHILLA GUJRANWALA AND | N WAL PHATTAK | TO AIMANABAD TOWN DISTRICT | |
| 045720- A03 | Operating Expenses | 6,725,000 | 6,725,000 6,494,000 |
| 045720- A039 | General | 6,725,000 | 6,725,000 6,494,000 |
| 045720- A12 | Civil works | 103,461,000 | 103,461,000 99,906,000 |
| 045720- A124 | Building and Structures | 103,461,000 | 103,461,000 99,906,000 |
| Total- | CONSTRUCTION OF CARPETED ROAD | 110,186,000 | 110,186,000 106,400,000 |
| FROM DHILLAN WAL PHATTAK TO AIMANABAD TOWN DISTRICT GUJRANWALA AND | |||
| IB3545 PROVIDING WATER SUPPLY SEWERAGE LINES CC T OF NAWABSHAH | OPPING SOLAR LIGHTS IN VARIOUS WARDS / UCS | ||
| 045720- A03 | Operating Expenses | 6,103,000 | 6,103,000 3,052,000 |
| 045720- A039 | General | 6,103,000 | 6,103,000 3,052,000 |
| 045720- A12 | Civil works | 93,897,000 | 93,897,000 46,948,000 |
| 045720- A124 | Building and Structures | 93,897,000 | 93,897,000 46,948,000 |
| Total- | PROVIDING WATER SUPPLY | 100,000,000 | 100,000,000 50,000,000 |
| SEWERAGE LINES CC TOPPING SOLAR LIGHTS IN VARIOUS WARDS / UCS OF NAWABSHAH | |||
| IB3548 IMPROVEMENT/REHABILITATION OF DIFFERENT RO SYSTEM IN VARIOUS UNION | ADS/STREETS INCLUDING WATER & SEWERAGE | ||
| 045720- A03 | Operating Expenses | 9,155,000 | 9,155,000 3,052,000 |
| 045720- A039 | General | 9,155,000 | 9,155,000 3,052,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| ACCOUNTANT GENERAL P | Rs AKISTAN REVENU | Rs ES | Rs | |
| 045720- A12 | Civil works | 140,845,000 | 140,845,000 | 46,948,000 |
| 045720- A124 | Building and Structures | 140,845,000 | 140,845,000 | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF | 150,000,000 | 150,000,000 | 50,000,000 |
| IB3549 IMPRO SYSTEM IN VA | DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION VEMENT/REHABILITATION OF DIFFERENT RO RIOUS UNION | ADS/STREETS INCLUDING WATER & SEWERAGE | ||
| 045720- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 3,052,000 |
| 045720- A039 | General | 9,155,000 | 9,155,000 | 3,052,000 |
| 045720- A12 | Civil works | 140,845,000 | 140,845,000 | 46,948,000 |
| 045720- A124 | Building and Structures | 140,845,000 | 140,845,000 | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF | 150,000,000 | 150,000,000 | 50,000,000 |
| IB3550 IMPRO SYSTEM IN VA | DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION VEMENT/REHABILITATION OF DIFFERENT RO RIOUS UNION | ADS/STREETS INCLUDING WATER & SEWERAGE | ||
| 045720- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 3,052,000 |
| 045720- A039 | General | 9,155,000 | 9,155,000 | 3,052,000 |
| 045720- A12 | Civil works | 140,845,000 | 140,845,000 | 46,948,000 |
| 045720- A124 | Building and Structures | 140,845,000 | 140,845,000 | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF | 150,000,000 | 150,000,000 | 50,000,000 |
| DIFFERENT ROADS/STREETS | ||||
| IB3553 IMPRO SYSTEM AT D | INCLUDING WATER & SEWERAGE SYSTEM IN VARIOUS UNION VEMENT/REHABILITATION OF DIFFERENT RO ISTRICT | ADS/STREETS INCLUDING WATER & SEWERAGE | ||
| 045720- A03 | Operating Expenses | 9,155,000 | 9,155,000 | 3,052,000 |
| 045720- A039 | General | 9,155,000 | 9,155,000 | 3,052,000 |
| 045720- A12 | Civil works | 140,845,000 | 140,845,000 | 46,948,000 |
| 045720- A124 | Building and Structures | 140,845,000 | 140,845,000 | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF | 150,000,000 | 150,000,000 | 50,000,000 |
| DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMANDS | FOR GRANTS | |
|---|---|---|---|---|
| No of 2023-24 Posts 2024-25 | 2023-2024 Budget | 2023-2024 Revised | 2024-2025 Budget | |
| Estimate | Estimate | Estimate | ||
| IB3555 IMPRO SYSTEM AT V | ACCOUNTANT GENERAL P SYSTEM AT DISTRICT VEMENT/REHABILITATION OF DIFFERENT ROA ARIOUS MAIN | Rs AKISTAN REVENU DS /STREETS INC | Rs ES LUDING WATER & S | Rs EWERAGE |
| 045720- A03 | Operating Expenses | 12,207,000 | 12,207,000 | 3,052,000 |
| 045720- A039 | General | 12,207,000 | 12,207,000 | 3,052,000 |
| 045720- A12 | Civil works | 187,793,000 | 187,793,000 | 46,948,000 |
| 045720- A124 | Building and Structures | 187,793,000 | 187,793,000 | 46,948,000 |
| Total- | IMPROVEMENT/REHABILITATION OF | 200,000,000 | 200,000,000 | 50,000,000 |
| IB3556 DEVEL SHAHEED | DIFFERENT ROADS /STREETS INCLUDING WATER & SEWERAGE SYSTEM AT VARIOUS MAIN OPMENT SCHEMES UNDER PRIME MINISTERS | PROGRAMME IN SINDH- LARKANA SUKKUR AND | ||
| 045720- A03 | Operating Expenses | 18,310,000 | 18,310,000 | 3,052,000 |
| 045720- A039 | General | 18,310,000 | 18,310,000 | 3,052,000 |
| 045720- A12 | Civil works | 281,690,000 | 281,690,000 | 46,948,000 |
| 045720- A124 | Building and Structures | 281,690,000 | 281,690,000 | 46,948,000 |
| Total- | DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- LARKANA SUKKUR AND SHAHEED | 300,000,000 | 300,000,000 | 50,000,000 |
| IB3557 DEVEL MIRPURKHAS | OPMENT SCHEMES UNDER PRIME MINISTERS DIVISIONS | PROGRAMME IN SINDH- HYDERABAD | AND | |
| 045720- A03 | Operating Expenses | 12,207,000 | 12,207,000 | 3,052,000 |
| 045720- A039 | General | 12,207,000 | 12,207,000 | 3,052,000 |
| 045720- A12 | Civil works | 187,793,000 | 187,793,000 | 46,948,000 |
| 045720- A124 | Building and Structures | 187,793,000 | 187,793,000 | 46,948,000 |
| Total- | DEVELOPMENT SCHEMES UNDER | 200,000,000 | 200,000,000 | 50,000,000 |
| PRIME MINISTERS PROGRAMME IN SINDH- HYDERABAD AND MIRPURKHAS DIVISIONS | ||||
| IB3563 CONSTRUCTION OF BLACK TOP ROAD CHINKINDIK TO MASKEECHAH | DISTRICT CHAGHI | |||
| 045720- A03 | Operating Expenses | 8,289,000 | 8,289,000 | 6,106,000 |
| 045720- A039 | General | 8,289,000 | 8,289,000 | 6,106,000 |
| 045720- A12 | Civil works | 127,518,000 | 127,518,000 | 93,933,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PA | KISTAN REVENUES | |||
| 045720- A124 | Building and Structures | 127,518,000 | 127,518,000 | 93,933,000 |
| Total- | CONSTRUCTION OF BLACK TOP ROAD | 135,807,000 | 135,807,000 | 100,039,000 |
| CHINKINDIK TO MASKEECHAH DISTRICT CHAGHI | ||||
| IB3567 19 NOS | DEVELOPMENT SCHEMES IN DISTRICT BADIN | |||
| 045720- A03 | Operating Expenses | 1,831,000 | 610,000 | 610,000 |
| 045720- A039 | General | 1,831,000 | 610,000 | 610,000 |
| 045720- A12 | Civil works | 28,169,000 | 9,390,000 | 9,390,000 |
| 045720- A124 | Building and Structures | 28,169,000 | 9,390,000 | 9,390,000 |
| Total- | 19 NOS DEVELOPMENT SCHEMES IN | 30,000,000 | 10,000,000 | 10,000,000 |
| DISTRICT BADIN | ||||
| IB3568 11 NOS | DEVELOPMENT SCHEMES IN DISTRICT BADIN | |||
| 045720- A03 | Operating Expenses | 3,052,000 | 610,000 | 610,000 |
| 045720- A039 | General | 3,052,000 | 610,000 | 610,000 |
| 045720- A12 | Civil works | 46,948,000 | 9,390,000 | 9,390,000 |
| 045720- A124 | Building and Structures | 46,948,000 | 9,390,000 | 9,390,000 |
| Total- | 11 NOS DEVELOPMENT SCHEMES IN | 50,000,000 | 10,000,000 | 10,000,000 |
| DISTRICT BADIN | ||||
| IB3569 15 NOS | DEVELOPMENT SCHEMES IN DISTRICT BADIN | |||
| 045720- A03 | Operating Expenses | 2,441,000 | 610,000 | 610,000 |
| 045720- A039 | General | 2,441,000 | 610,000 | 610,000 |
| 045720- A12 | Civil works | 37,559,000 | 9,390,000 | 9,390,000 |
| 045720- A124 | Building and Structures | 37,559,000 | 9,390,000 | 9,390,000 |
| Total- | 15 NOS DEVELOPMENT SCHEMES IN | 40,000,000 | 10,000,000 | 10,000,000 |
| IB3570 CONST | DISTRICT BADIN RUCTION OF METALED ROADS IN TALUKA LAK | HI DISTRICT SHIKARPUR SINDH (09 | SCHEMES) | |
| 045720- A03 | Operating Expenses | 6,103,000 | 610,000 | 610,000 |
| 045720- A039 | General | 6,103,000 | 610,000 | 610,000 |
| 045720- A12 | Civil works | 93,897,000 | 9,390,000 | 9,390,000 |
| 045720- A124 | Building and Structures | 93,897,000 | 9,390,000 | 9,390,000 |
| Total- | CONSTRUCTION OF METALED ROADS | 100,000,000 | 10,000,000 | 10,000,000 |
| IN TALUKA LAKHI DISTRICT SHIKARPUR SINDH (09 SCHEMES) |
IB3571 CONSTRUCTION OF BLACK TOP ROADS PURANA DUKI AND RABBAT VILLAGES DISTRICT DUKI
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 | 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES | ||||
| 045720- A03 | Operating Expenses | 1,831,000 | 1,831,000 | 7,385,000 |
| 045720- A039 | General | 1,831,000 | 1,831,000 | 7,385,000 |
| 045720- A12 | Civil works | 28,169,000 | 28,169,000 | 113,615,000 |
| 045720- A124 | Building and Structures | 28,169,000 | 28,169,000 | 113,615,000 |
| Total- IB3576 DEVEL SCHEMES) | CONSTRUCTION OF BLACK TOP ROADS PURANA DUKI AND RABBAT VILLAGES DISTRICT DUKI OPMENT SCHEMES IN THAMBO & DMJAMALI | 30,000,000 DISTRICT NASEERABA | 30,000,000 D (2 NOS DEVE | 121,000,000 LOPMENT |
| 045720- A03 | Operating Expenses | 610,000 | 610,000 | |
| 045720- A039 | General | 610,000 | 610,000 | |
| 045720- A12 | Civil works | 9,390,000 | 9,390,000 | |
| 045720- A124 | Building and Structures | 9,390,000 | 9,390,000 | |
| Total- | DEVELOPMENT SCHEMES IN THAMBO & DMJAMALI DISTRICT NASEERABAD (2 NOS DEVELOPMENT SCHEMES) | 10,000,000 | 10,000,000 | |
| IB3591 CONSTRUCTION OF SOLINGS/NALL AND TUFF TILE I BAHAWALPUR (02 NOS | N DIFFERENT UCS OF | TEHSIL YAZMAN DISTRICT | ||
| 045720- A03 | Operating Expenses | 4,577,000 | 335,000 | |
| 045720- A039 | General | 4,577,000 | 335,000 | |
| 045720- A12 | Civil works | 70,423,000 | 5,159,000 | |
| 045720- A124 | Building and Structures | 70,423,000 | 5,159,000 | |
| Total- | CONSTRUCTION OF SOLINGS/NALL AND TUFF TILE IN DIFFERENT UCS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (02 NOS | 75,000,000 | 5,494,000 | |
| IB3595 CONST (12 NOS | RUCTION OF METALED ROADS AND BRIDGES | IN DIFFERENT AREAS | OF DISTRICT BAHAWALPUR | |
| 045720- A03 | Operating Expenses | 6,990,000 | ||
| 045720- A039 | General | 6,990,000 | ||
| 045720- A12 | Civil works | 107,536,000 | ||
| 045720- A124 | Building and Structures | 107,536,000 | ||
| Total- | CONSTRUCTION OF METALED ROADS AND BRIDGES IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (12 NOS | 114,526,000 |
NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS
| CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES
IB3596 CONSTRUCTION OF SOLING IN DIFFERENT AREAS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (20 NOS SCHEMES)
| 045720- A03 | Operating Expenses | 8,979,000 |
|---|---|---|
| 045720- A039 | General | 8,979,000 |
| 045720- A12 | Civil works | 138,139,000 |
| 045720- A124 | Building and Structures | 138,139,000 |
| Total- | CONSTRUCTION OF SOLING IN | 147,118,000 |
| DIFFERENT AREAS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (20 NOS SCHEMES) |
IB3599 CONSTRUCTION OF PCC ROAD AND INFRASTRUCTURE DEVELOPMENT AT DIFFERENT UNION COUNCIL DISTRICT
| 045720- A03 | Operating Expenses | 6,103,000 | 6,103,000 | 9,276,000 |
|---|---|---|---|---|
| 045720- A039 | General | 6,103,000 | 6,103,000 | 9,276,000 |
| 045720- A12 | Civil works | 93,897,000 | 93,897,000 | 142,702,000 |
| 045720- A124 | Building and Structures | 93,897,000 | 93,897,000 | 142,702,000 |
| Total- | CONSTRUCTION OF PCC ROAD AND INFRASTRUCTURE DEVELOPMENT AT DIFFERENT UNION COUNCIL DISTRICT | 100,000,000 | 100,000,000 | 151,978,000 |
| IB3602 REHAB 045720- A03 | ILITATION & IMPROVEMENT OF ROAD IN DI Operating Expenses | STRICT CHAKWAL (1 6,422,000 | 2 NOS SCHEMES) 6,422,000 | |
| 045720- A039 | General | 6,422,000 | 6,422,000 | |
| 045720- A12 | Civil works | 98,795,000 | 98,795,000 | |
| 045720- A124 | Building and Structures | 98,795,000 | 98,795,000 | |
| Total- | REHABILITATION & IMPROVEMENT OF ROAD IN DISTRICT CHAKWAL (12 NOS SCHEMES) | 105,217,000 | 105,217,000 |
IB3603 DEVELOPMENT SCHEMES OF INFRASTRUCTURE AND PUBLIC WORKS IN DIFFERENT UCS OF DISTRICT GUJRAT
| 045720- A03 | Operating Expenses | 6,103,000 | 2,746,000 | 3,052,000 |
|---|---|---|---|---|
| 045720- A039 | General | 6,103,000 | 2,746,000 | 3,052,000 |
| 045720- A12 | Civil works | 93,897,000 | 42,254,000 | 46,948,000 |
| 045720- A124 | Building and Structures | 93,897,000 | 42,254,000 | 46,948,000 |
| Total- | DEVELOPMENT SCHEMES OF | 100,000,000 | 45,000,000 | 50,000,000 |
| NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate |
| Rs | Rs | Rs | |
| ACCOUNTANT GENERAL PAKISTAN REVENUES |
| INFRASTRUCTURE AND PUBLIC WORKS IN DIFFERENT UCS OF DISTRICT GUJRAT | ||||
|---|---|---|---|---|
| IB3604 DEVELOPMENT SCHEMES IN DIFFERENT UCS OF DISTRICT GUJRAT-II ( | 38 NOS DEVELOPMENT SCHEMES) | |||
| 045720- A03 | Operating Expenses | 6,103,000 | 2,746,000 | 10,498,000 |
| 045720- A039 | General | 6,103,000 | 2,746,000 | 10,498,000 |
| 045720- A12 | Civil works | 93,897,000 | 42,254,000 | 161,504,000 |
| 045720- A124 | Building and Structures | 93,897,000 | 42,254,000 | 161,504,000 |
| Total- | DEVELOPMENT SCHEMES IN DIFFERENT UCS OF DISTRICT GUJRAT-II (38 NOS DEVELOPMENT SCHEMES) | 100,000,000 | 45,000,000 | 172,002,000 |
| IB3606 MISCE SARGODHA | LLANEOUS DEVELOPMENT SCHEMES IN TEHSIL KOT MOMIN & TEHSIL SARGODHA | DISTRICT | ||
| 045720- A03 | Operating Expenses | 15,258,000 | 15,258,000 | 6,103,000 |
| 045720- A039 | General | 15,258,000 | 15,258,000 | 6,103,000 |
| 045720- A12 | Civil works | 234,742,000 | 234,742,000 | 93,897,000 |
| 045720- A124 | Building and Structures | 234,742,000 | 234,742,000 | 93,897,000 |
| Total- | MISCELLANEOUS DEVELOPMENT | 250,000,000 | 250,000,000 | 100,000,000 |
| SCHEMES IN TEHSIL KOT MOMIN & TEHSIL SARGODHA DISTRICT SARGODHA | ||||
| IB3607 CONSTRUCTION OF ROAD/PCC/TUFF PAVER/NALL RUKHAN DISTRICT | AH/SOLING/DRAIN/CULVERTS IN CHAK | 105 SB & | ||
| 045720- A03 | Operating Expenses | 21,362,000 | 21,362,000 | 5,564,000 |
| 045720- A039 | General | 21,362,000 | 21,362,000 | 5,564,000 |
| 045720- A12 | Civil works | 328,638,000 | 328,638,000 | 85,602,000 |
| 045720- A124 | Building and Structures | 328,638,000 | 328,638,000 | 85,602,000 |
| Total- | CONSTRUCTION OF ROAD/PCC/TUFF PAVER/NALLAH/SOLING/DRAIN/CULVE RTS IN CHAK 105 SB & RUKHAN DISTRICT | 350,000,000 | 350,000,000 | 91,166,000 |
| IB3608 CONSTRUCTION OF ROAD/PCC/TUFF | ||||
| 045720- A03 | Operating Expenses | 30,516,000 | 91,546,000 | 26,789,000 |
| 045720- A039 | General | 30,516,000 | 91,546,000 | 26,789,000 |
| NO. 130.- FC1 | 2C28 CAPITAL OUTLAY ON CIVIL WORKS No of 2023-24 Posts 2024-25 ACCOUNTANT GENERAL | 2023-2024 Budget Estimate Rs PAKISTAN REVEN | DEMAN 2023-2024 Revised Estimate Rs UES | DS FOR GRANTS 2024-2025 Budget Estimate Rs |
|---|---|---|---|---|
| 045720- A12 | Civil works | 469,484,000 | 1,408,454,000 | 412,137,000 |
| 045720- A124 | Building and Structures | 469,484,000 | 1,408,454,000 | 412,137,000 |
| Total- | CONSTRUCTION OF ROAD/PCC/TUFF | 500,000,000 | 1,500,000,000 | 438,926,000 |
| 045720 | Total- Others | 4,540,104,000 | 5,218,460,000 | 2,787,302,000 |
| 0457 | Total- Construction (Works) | 41,880,872,000 | 86,038,750,000 | 28,188,072,000 |
| 045 | Total- Construction and Transport | 41,880,872,000 | 86,038,750,000 | 28,188,072,000 |
| 04 | Total- Economic Affairs | 41,880,872,000 | 86,038,750,000 | 28,188,072,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 41,880,872,000 | 86,038,750,000 | 28,188,072,000 | |
| TOTAL - DEMAND | 41,880,872,000 | 86,038,750,000 | 28,188,072,000 |
SECTION V
MINISTRY OF INDUSTRIES AND PRODUCTION
2024-2025 Budget Estimate (Rupees in Thousand)
| Demands presented on behalf of the Ministry of | ||
|---|---|---|
| Industries and Production | ||
| Development Expendiutre on Capital Account. | ||
| 131. Capital Outlay on Industrial Development | 4,918,758 | |
| Total : | 4,918,758 |
DEMANDS FOR GRANTS
NO. 131.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMAND NO. 131 ( FC12C32 )
CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
I. ESTIMATES of the Amount required in the year ending 30 June , 2025 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.
Voted Rs. 4,918,758,000
II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INDUSTRIES AND PRODUCTION .
| 2023-2024 Budget Estimate Rs | 2023-2024 Revised Estimate Rs | 2024-2025 Budget Estimate Rs | ||
|---|---|---|---|---|
| FUNCTIONAL CLASSIFICATION | ||||
| 044 | Mining and Manufacturing | 13,000,000,000 | 1,922,520,000 | 4,918,758,000 |
| Total | 13,000,000,000 | 1,922,520,000 | 4,918,758,000 | |
| OBJECT CLASSIFICATION | ||||
| A01 | Employees Related Expenses | 231,971,000 | 134,120,000 | 222,456,000 |
| A011 | Pay | 231,971,000 | 134,120,000 | 222,456,000 |
| A011- | 1 Pay of Officers | (179,256,000) | (115,980,000) | (148,605,000) |
| A011- | 2 Pay of Other Staff | (52,715,000) | (18,140,000) | (73,851,000) |
| A02 | Project Pre-Investment Analysis | 50,000,000 | 91,000,000 | |
| A03 | Operating Expenses | 145,178,000 | 104,301,000 | 545,186,000 |
| A05 | Grants, Subsidies and Write off Loans | 10,448,171,000 | 258,504,000 | 217,582,000 |
| A09 | Physical Assets | 1,299,240,000 | 842,400,000 | 1,964,137,000 |
| A12 | Civil works | 760,440,000 | 461,920,000 | 1,939,397,000 |
| A13 | Repairs and Maintenance | 65,000,000 | 30,275,000 | 30,000,000 |
| Total | 13,000,000,000 | 1,922,520,000 | 4,918,758,000 |
NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
DEMANDS FOR GRANTS
III. - DETAILS are as follows :-
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 | |||
|---|---|---|---|---|---|---|
| 2023-24 2024-25 | Budget Estimate | Revised Estimate | Budget Estimate | |||
| Rs | Rs | Rs | ||||
| ACCOUNTANT GENERAL | PAKISTAN REVENUES | |||||
| 04 | Economic Affairs: | |||||
| 044 | Mining | and Manufacturing: | ||||
| 0441 044101 IB5262 | Manufacturing: Support for Industrial Development : SUPPORT FOR INDUSTRIAL DEVELOPMENT STREN | GTHENING THE ENGINEERING INDUSTRY | ||||
| 044101 | - A01 | Employees Related Expenses | 58,000,000 | 25,000,000 | 80,000,000 | |
| 044101 | - A011 | Pay | 15 19 | 58,000,000 | 25,000,000 | 80,000,000 |
| 044101 | - A011- | 1 Pay | of Officers (15) (13) | (58,000,000) | (25,000,000) | (65,000,000) |
| 044101 | - A011- | 2 Pay | of Other Staff (6) | (15,000,000) | ||
| 044101 | - A03 | Operating Expenses | 8,000,000 | 8,000,000 | 102,000,000 | |
| 044101 | - A032 | Communications | 1,000,000 | |||
| 044101 | - A037 | Consultancy and Contractual Work | 4,000,000 | 4,000,000 | 28,000,000 | |
| 044101 | - A038 | Travel & Transportation | 5,000,000 | |||
| 044101 | - A039 | General | 4,000,000 | 4,000,000 | 68,000,000 | |
| 044101 | - A09 | Physical Assets | 4,000,000 | 4,000,000 | 18,000,000 | |
| 044101 | - A092 | Computer Equipment | 4,000,000 | 4,000,000 | 14,000,000 | |
| 044101 | - A096 | Purchase of Plant and Machinery | 2,000,000 | |||
| 044101 | - A097 | Purchase of Furniture and Fixture | 2,000,000 | |||
| Total- | SUPPORT FOR INDUSTRIAL | 70,000,000 | 37,000,000 | 200,000,000 | ||
| DEVELOPMENT STRENGTHENING THE ENGINEERING INDUSTRY | ||||||
| IB9598 | PRIME | MINISTER'S YOUTH PROGRAMME FOR SMALL LOANS | ||||
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 10,000,000,000 | |||
| 044101 | - A052 | Grants Domestic | 10,000,000,000 | |||
| Total- | PRIME PROG | MINISTER'S YOUTH RAMME FOR SMALL LOANS | 10,000,000,000 | |||
| 0 | 44101 | Total- | Support for Industrial Development | 10,070,000,000 | 37,000,000 | 200,000,000 |
| 0 | 441 | Total- | Manufacturing | 10,070,000,000 | 37,000,000 | 200,000,000 |
| 0 | 44 | Total- | Mining and Manufacturing | 10,070,000,000 | 37,000,000 | 200,000,000 |
| 0 | 4 | Total- | Economic Affairs | 10,070,000,000 | 37,000,000 | 200,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES | 10,070,000,000 | 37,000,000 | 200,000,000 |
| NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
| 04 | Economic Affairs: | |||||
|---|---|---|---|---|---|---|
| 044 | Mining | and Manufacturing: | ||||
| 0441 | Manufacturing: | |||||
| 044101 | Support for Industrial Development : | |||||
| LO117 | 5 NATIONAL BUSINESS DEVELOPMENT PROGRAM FOR SME'S | |||||
| 044101 | - A01 | Employees Related Expenses | 47,024,000 | 36,605,000 | ||
| 044101 | - A011 | Pay | 39 | 47,024,000 | 36,605,000 | |
| 044101 | - A011-1 | Pay of Officers | (29) | (41,198,000) | (34,705,000) | |
| 044101 | - A011-2 | Pay of Other Staff | (10) | (5,826,000) | (1,900,000) | |
| 044101 | - A03 | Operating Expenses | 30,000,000 | 25,525,000 | ||
| 044101 | - A037 | Consultancy and Contractual Work | 3,250,000 | 2,695,000 | ||
| 044101 | - A039 | General | 26,750,000 | 22,830,000 | ||
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 222,976,000 | 14,000,000 | ||
| 044101 | - A052 | Grants Domestic | 222,976,000 | 14,000,000 | ||
| Total- | NATIONAL BUSINESS DEV PROGRAM FOR SME'S | ELOPMENT | 300,000,000 | 76,130,000 | ||
| LO118 | 0 PRODU | CT DEV. CENTRE FOR COMPOSITES BASED SPORTS GOOD SIALKOT | ||||
| 044101 | - A01 | Employees Related Expenses | 18,170,000 | 5,720,000 | 27,111,000 | |
| 044101 | - A011 | Pay | 51 56 | 18,170,000 | 5,720,000 | 27,111,000 |
| 044101 | - A011-1 | Pay of Officers | (4) (6) | (3,990,000) | (2,900,000) | (4,200,000) |
| 044101 | - A011-2 | Pay of Other Staff | (47) (50) | (14,180,000) | (2,820,000) | (22,911,000) |
| 044101 | - A03 | Operating Expenses | 11,680,000 | 1,600,000 | 29,089,000 | |
| 044101 | - A039 | General | 11,680,000 | 1,600,000 | 29,089,000 | |
| 044101 | - A05 | Grants, Subsidies and Write off Loans | 4,000,000 | |||
| 044101 | - A052 | Grants Domestic | 4,000,000 | |||
| 044101 | - A09 | Physical Assets | 12,000,000 | 1,000,000 | 46,237,000 | |
| 044101 | - A096 | Purchase of Plant and Machinery | 10,000,000 | 15,680,000 | ||
| 044101 | - A098 | Purchase of Other Assets | 2,000,000 | 1,000,000 | 30,557,000 | |
| Total- | PRODUCT DEV. CENTRE F COMPOSITES BASED SPO SIALKOT | OR RTS GOOD | 45,850,000 | 8,320,000 | 102,437,000 | |
| LO118 | 2 BUSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION | |||||
| 044101 | - A01 | Employees Related Expenses | 9,151,000 | 8,868,000 | 6,955,000 |
| NO. 131.- FC12 | C32 CAPITAL OUTLAY ON I | NDUSTRIAL DEVE No of 2023-24 Posts 2024-25 | LOPMENT 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|---|
| ACCOUNTANT GENERAL PAKISTAN R | Rs EVENUES SUB-OF | Rs FICE, LAHORE | Rs | ||
| 044101- A011 | Pay | 8 8 | 9,151,000 | 8,868,000 | 6,955,000 |
| 044101- A011-1 | Pay of Officers | (4) (8) | (6,946,000) | (6,663,000) | (6,955,000) |
| 044101- A011-2 | Pay of Other Staff | (4) | (2,205,000) | (2,205,000) | |
| 044101- A03 | Operating Expenses | 2,859,000 | 2,728,000 | 4,241,000 | |
| 044101- A032 | Communications | 100,000 | 100,000 | ||
| 044101- A033 | Utilities | 250,000 | 250,000 | ||
| 044101- A034 | Occupancy Costs | 888,000 | 881,000 | ||
| 044101- A038 | Travel & Transportation | 400,000 | 400,000 | ||
| 044101- A039 | General | 1,221,000 | 1,097,000 | 4,241,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 2,450,000 | 2,450,000 | ||
| 044101- A052 | Grants Domestic | 2,450,000 | 2,450,000 | ||
| 044101- A09 | Physical Assets | 100,000 | 100,000 | ||
| 044101- A098 | Purchase of Other Assets | 100,000 | 100,000 | ||
| 044101- A12 | Civil works | 440,000 | 40,000 | ||
| 044101- A124 | Building and Structures | 440,000 | 40,000 | ||
| Total- | BUSINESS SKILL DEV. CEN WOMEN AT VARIOUS LOCA | TRE FOR TION | 15,000,000 | 14,186,000 | 11,196,000 |
| LO1280 INDUSTRIAL DESIGN AND AUTOMATION CENTRE | |||||
| 044101- A01 | Employees Related Expenses | 14,000,000 | 6,500,000 | 16,000,000 | |
| 044101- A011 | Pay | 18 18 | 14,000,000 | 6,500,000 | 16,000,000 |
| 044101- A011-1 | Pay of Officers | (5) (5) | (5,000,000) | (5,000,000) | (7,000,000) |
| 044101- A011-2 | Pay of Other Staff | (13) (13) | (9,000,000) | (1,500,000) | (9,000,000) |
| 044101- A03 | Operating Expenses | 4,000,000 | 1,000,000 | 5,000,000 | |
| 044101- A039 | General | 4,000,000 | 1,000,000 | 5,000,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 3,000,000 | 1,500,000 | 4,000,000 | |
| 044101- A052 | Grants Domestic | 3,000,000 | 1,500,000 | 4,000,000 | |
| 044101- A09 | Physical Assets | 19,000,000 | 71,125,000 | 115,000,000 | |
| 044101- A091 | Purchase of Building | 1,125,000 | 1,125,000 | 2,500,000 | |
| 044101- A092 | Computer Equipment | 13,675,000 | 13,700,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 70,000,000 | 94,600,000 | ||
| 044101- A097 | Purchase of Furniture and Fixture | 4,200,000 | 4,200,000 | ||
| 044101- A12 | Civil works | 160,000,000 | 160,000,000 | ||
| 044101- A124 | Building and Structures | 160,000,000 | 160,000,000 | ||
| Total- INDUSTRIAL DESIGN AND AUTOMATION CENTRE | 200,000,000 | 80,125,000 | 300,000,000 |
| NO. 131.- FC12 | C32 CAPITAL OUTLAY ON INDUSTRIAL DEVE No of 2023-24 Posts 2024-25 | LOPMENT 2023-2024 Budget Estimate | DEMAND 2023-2024 Revised Estimate | S FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| LO1299 1000 IN | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OF DUSTRIAL STITCHING UNITS ALL ACROSS PAKISTAN | FICE, LAHORE | ||
| 044101- A01 | Employees Related Expenses | 15,500,000 | 13,500,000 | 15,500,000 |
| 044101- A011 | Pay 14 | 15,500,000 | 13,500,000 | 15,500,000 |
| 044101- A011-1 | Pay of Officers (7) | (14,000,000) | (12,000,000) | (13,500,000) |
| 044101- A011-2 | Pay of Other Staff (7) | (1,500,000) | (1,500,000) | (2,000,000) |
| 044101- A03 | Operating Expenses | 13,000,000 | 13,000,000 | 23,196,000 |
| 044101- A038 | Travel & Transportation | 3,500,000 | 3,500,000 | |
| 044101- A039 | General | 9,500,000 | 9,500,000 | 23,196,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 2,500,000 | 2,500,000 | 38,458,000 |
| 044101- A052 | Grants Domestic | 2,500,000 | 2,500,000 | 38,458,000 |
| 044101- A09 | Physical Assets | 135,140,000 | 69,535,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 135,140,000 | 69,535,000 | |
| Total- | 1000 INDUSTRIAL STITCHING UNITS | 166,140,000 | 98,535,000 | 77,154,000 |
| ALL ACROSS PAKISTAN LO1303 ACQUISITION OF LAND FOR ESTABLISHMENT OF S | ME FACILITATION | CENTRES AT VARIO | US LOCATIONS | |
| 044101- A01 | Employees Related Expenses | 10,215,000 | ||
| 044101- A011 | Pay 6 | 10,215,000 | ||
| 044101- A011-1 | Pay of Officers (4) | (8,715,000) | ||
| 044101- A011-2 | Pay of Other Staff (2) | (1,500,000) | ||
| 044101- A03 | Operating Expenses | 2,000,000 | 2,000,000 | 18,500,000 |
| 044101- A039 | General | 2,000,000 | 2,000,000 | 18,500,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 98,000,000 | 166,456,000 | 43,859,000 |
| 044101- A052 | Grants Domestic | 98,000,000 | 166,456,000 | 43,859,000 |
| 044101- A09 | Physical Assets | 16,900,000 | ||
| 044101- A091 | Purchase of Building | 5,150,000 | ||
| 044101- A092 | Computer Equipment | 3,050,000 | ||
| 044101- A095 | Purchase of Transport | 4,500,000 | ||
| 044101- A097 | Purchase of Furniture and Fixture | 3,000,000 | ||
| 044101- A098 | Purchase of Other Assets | 1,200,000 | ||
| 044101- A12 | Civil works | 572,873,000 | ||
| 044101- A124 | Building and Structures | 572,873,000 | ||
| Total- ACQUISITION OF LAND FOR | 100,000,000 | 168,456,000 | 662,347,000 | |
| ESTABLISHMENT OF SME | ||||
| FACILITATION CENTRES AT VARIOUS LOCATIONS |
| NO. 131.- FC12 | C32 CAPITAL OUTLAY ON | INDUSTRIAL DEVE No of 2023-24 Posts 2024-25 | LOPMENT 2023-2024 Budget Estimate R | DEMAND 2023-2024 Revised Estimate R | S FOR GRANTS 2024-2025 Budget Estimate R |
|---|---|---|---|---|---|
| LO1644 SUPPO | ACCOUNTANT GEN RT CENTRE FOR DENTAL | ERAL PAKISTAN R AND SURGICAL EQ | s EVENUES SUB-OF UIPMENT'S (SCDS | s FICE, LAHORE ) SIALKOT | s |
| 044101- A01 | Employees Related Expenses | 9,000,000 | 6,500,000 | 8,000,000 | |
| 044101- A011 | Pay | 3 3 | 9,000,000 | 6,500,000 | 8,000,000 |
| 044101- A011-1 | Pay of Officers | (3) (2) | (9,000,000) | (6,500,000) | (5,000,000) |
| 044101- A011-2 | Pay of Other Staff | (1) | (3,000,000) | ||
| 044101- A03 | Operating Expenses | 3,000,000 | 1,563,000 | 5,000,000 | |
| 044101- A039 | General | 3,000,000 | 1,563,000 | 5,000,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 5,000,000 | 1,000,000 | 5,000,000 | |
| 044101- A052 | Grants Domestic | 5,000,000 | 1,000,000 | 5,000,000 | |
| 044101- A09 | Physical Assets | 93,000,000 | 39,000,000 | 121,000,000 | |
| 044101- A092 | Computer Equipment | 14,000,000 | 14,000,000 | ||
| 044101- A096 | Purchase of Plant and Machinery | 76,000,000 | 39,000,000 | 104,000,000 | |
| 044101- A097 | Purchase of Furniture and | Fixture | 3,000,000 | 3,000,000 | |
| 044101- A12 | Civil works | 90,000,000 | 11,500,000 | 111,000,000 | |
| 044101- A124 | Building and Structures | 90,000,000 | 11,500,000 | 111,000,000 | |
| Total- | SUPPORT CENTRE FOR DENTAL AND | 200,000,000 | 59,563,000 | 250,000,000 | |
| SURGICAL EQUIPMENT'S SIALKOT LO1645 RESEARCH REGULATORY INSIG | (SCDS) HTS & ADVOCACY | ASSISTANCE FOR | SMES | ||
| 044101- A01 | Employees Related Expenses | 15,255,000 | 11,039,000 | 16,275,000 | |
| 044101- A011 | Pay | 10 10 | 15,255,000 | 11,039,000 | 16,275,000 |
| 044101- A011-1 | Pay of Officers | (6) (6) | (13,755,000) | (10,469,000) | (15,275,000) |
| 044101- A011-2 | Pay of Other Staff | (4) (4) | (1,500,000) | (570,000) | (1,000,000) |
| 044101- A03 | Operating Expenses | 8,500,000 | 8,500,000 | 7,460,000 | |
| 044101- A034 | Occupancy Costs | 3,600,000 | 3,600,000 | 3,960,000 | |
| 044101- A039 | General | 4,900,000 | 4,900,000 | 3,500,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 56,245,000 | 25,398,000 | 56,265,000 | |
| 044101- A052 | Grants Domestic | 56,245,000 | 25,398,000 | 56,265,000 | |
| Total- | RESEARCH REGULATORY | INSIGHTS & | 80,000,000 | 44,937,000 | 80,000,000 |
| ADVOCACY ASSISTANCE | FOR SMES | ||||
| LO3121 SME BUSINESS FACILITATION CENTRE (SMEBFC) M | ULTAN | ||||
| 044101- A01 | Employees Related Expenses | 8,671,000 | 6,372,000 | ||
| 044101- A011 | Pay | 13 | 8,671,000 | 6,372,000 | |
| 044101- A011-1 | Pay of Officers | (8) | (6,367,000) | (5,954,000) | |
| 044101- A011-2 | Pay of Other Staff | (5) | (2,304,000) | (418,000) | |
| 044101- A03 | Operating Expenses | 10,339,000 | 5,315,000 |
| NO. 131.- FC1 | 2C32 CAPITAL OUTLAY ON INDUSTRIAL DEV No of 2023-24 Posts 2024-25 | ELOPMENT 2023-2024 Budget Estimate | DEMAN 2023-2024 Revised Estimate | DS FOR GRANTS 2024-2025 Budget Estimate |
|---|---|---|---|---|
| Rs | Rs | Rs | ||
| ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | ||||
| 044101- A039 | General | 10,339,000 | 5,315,000 | |
| 044101- A05 | Grants, Subsidies and Write off Loans | 4,000,000 | 700,000 | |
| 044101- A052 | Grants Domestic | 4,000,000 | 700,000 | |
| Total- | SME BUSINESS FACILITATION CENTRE | 23,010,000 | 12,387,000 | |
| LO9644 NATIO KNOWLEDGE | (SMEBFC) MULTAN NAL STRATEGIC PROGRAM FOR ACQUISITIO | N OF IND TECH-NSPAIT INCLUDING FEASIBILITY- | ||
| 044101- A01 | Employees Related Expenses | 35,000,000 | 12,852,000 | 35,000,000 |
| 044101- A011 | Pay 17 28 | 35,000,000 | 12,852,000 | 35,000,000 |
| 044101- A011- | 1 Pay of Officers (8) (13) | (20,000,000) | (5,957,000) | (20,000,000) |
| 044101- A011- | 2 Pay of Other Staff (9) (15) | (15,000,000) | (6,895,000) | (15,000,000) |
| 044101- A03 | Operating Expenses | 28,000,000 | 10,234,000 | 30,000,000 |
| 044101- A039 | General | 28,000,000 | 10,234,000 | 30,000,000 |
| 044101- A05 | Grants, Subsidies and Write off Loans | 50,000,000 | 44,500,000 | 70,000,000 |
| 044101- A052 | Grants Domestic | 50,000,000 | 44,500,000 | 70,000,000 |
| 044101- A09 | Physical Assets | 122,000,000 | 32,140,000 | 335,000,000 |
| 044101- A092 | Computer Equipment | 10,000,000 | 7,000,000 | 20,000,000 |
| 044101- A095 | Purchase of Transport | 15,000,000 | 9,000,000 | |
| 044101- A096 | Purchase of Plant and Machinery | 82,000,000 | 13,140,000 | 290,000,000 |
| 044101- A097 | Purchase of Furniture and Fixture | 5,000,000 | 5,000,000 | 8,000,000 |
| 044101- A098 | Purchase of Other Assets | 10,000,000 | 7,000,000 | 8,000,000 |
| 044101- A13 | Repairs and Maintenance | 65,000,000 | 30,275,000 | 30,000,000 |
| 044101- A133 | Buildings and Structure | 65,000,000 | 30,275,000 | 30,000,000 |
| Total- | NATIONAL STRATEGIC PROGRAM FOR ACQUISITION OF IND TECH-NSPAIT INCLUDING FEASIBILITY- KNOWLEDGE | 300,000,000 | 130,001,000 | 500,000,000 |
| 044101 | Total- Support for Industrial Development | 1,430,000,000 | 692,640,000 | 1,983,134,000 |
| 0441 | Total- Manufacturing | 1,430,000,000 | 692,640,000 | 1,983,134,000 |
| 044 | Total- Mining and Manufacturing | 1,430,000,000 | 692,640,000 | 1,983,134,000 |
| 04 | Total- Economic Affairs | 1,430,000,000 | 692,640,000 | 1,983,134,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE | 1,430,000,000 | 692,640,000 | 1,983,134,000 |
| NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
| 04 | Economic Affairs: | ||||
|---|---|---|---|---|---|
| 044 | Mining and Manufacturing: | ||||
| 0441 | Manufacturing: | ||||
| 044101 KA137 | Support for Industrial Development : 3 DEVELOPMENT OF KARACHI INDUSTRIAL PARK | (KIP) AT 1500 ACRES | PSM LAND KARACHI | ||
| 044101 | - A02 | Project Pre-Investment Analysis | 50,000,000 | 91,000,000 | |
| 044101 | - A021 | Feasibility Studies | 50,000,000 | 91,000,000 | |
| 044101 | - A03 | Operating Expenses | 209,000,000 | ||
| 044101 | - A037 | Consultancy and Contractual Work | 209,000,000 | ||
| Total- | DEVELOPMENT OF KARACHI | 50,000,000 | 91,000,000 | 209,000,000 | |
| INDUSTRIAL PARK (KIP) AT 1500 ACRES PSM LAND KARACHI | |||||
| KA137 SETUP | 4 ESTA AT KT | BLISHMENT OF HIGH TENSILE SHEET MET DMC | AL DIES MANUFACTURING AND TITANIUM COATING | ||
| 044101 | - A09 | Physical Assets | 90,000,000 | 6,500,000 | 205,000,000 |
| 044101 | - A091 | Purchase of Building | 5,000,000 | ||
| 044101 | - A096 | Purchase of Plant and Machinery | 90,000,000 | 6,500,000 | 200,000,000 |
| 044101 | - A12 | Civil works | 60,000,000 | 380,000 | 18,130,000 |
| 044101 | - A124 | Building and Structures | 60,000,000 | 380,000 | 18,130,000 |
| KA7198 | Total- ESTA | ESTABLISHMENT OF HIGH TENSILE SHEET METAL DIES MANUFACTURING AND TITANIUM COATING SETUP AT KTDMC BLISHMENT OF 132 KV GRID STATION AT B | 150,000,000 IN QASIM INDUSTRIA | 6,880,000 L PARK KARACHI | 223,130,000 |
| 044101 | - A03 | Operating Expenses | 11,000,000 | 11,000,000 | 11,000,000 |
| 044101 | - A037 | Consultancy and Contractual Work | 11,000,000 | 11,000,000 | 11,000,000 |
| 044101 | - A09 | Physical Assets | 824,000,000 | 619,000,000 | 1,105,000,000 |
| 044101 | - A096 | Purchase of Plant and Machinery | 824,000,000 | 619,000,000 | 1,105,000,000 |
| 044101 | - A12 | Civil works | 165,000,000 | 165,000,000 | 187,494,000 |
| 044101 | - A125 | Other Works | 165,000,000 | 165,000,000 | 187,494,000 |
| Total- | ESTABLISHMENT OF 132 KV GRID STATION AT BIN QASIM INDUSTRIAL PARK KARACHI | 1,000,000,000 | 795,000,000 | 1,303,494,000 | |
| 0 | 44101 | Total- Support for Industrial Development | 1,200,000,000 | 892,880,000 | 1,735,624,000 |
| 0 | 441 | Total- Manufacturing | 1,200,000,000 | 892,880,000 | 1,735,624,000 |
| 0 | 44 | Total- Mining and Manufacturing | 1,200,000,000 | 892,880,000 | 1,735,624,000 |
| 0 | 4 | Total- Economic Affairs | 1,200,000,000 | 892,880,000 | 1,735,624,000 |
| Total- ACCOUNTANT GENERAL PAKISTAN REVENUES | 1,200,000,000 | 892,880,000 | 1,735,624,000 | ||
| SUB-OFFICE, KARACHI |
NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT
| INDUSTRIAL DEVELOPMENT | DEMAND | S FOR GRANTS | |
|---|---|---|---|
| No of Posts | 2023-2024 | 2023-2024 | 2024-2025 |
| 2023-24 2024-25 | Budget | Revised | Budget |
| Estimate | Estimate | Estimate | |
| Rs | Rs | Rs |
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
| 04 | Economic Affairs: | |||||
|---|---|---|---|---|---|---|
| 044 | Mining | and Manufacturing: | ||||
| 0441 | Manufacturing: | |||||
| 044101 LS0109 | Suppo ESTAB | rt for Industrial Development : LISHMENT OF HUB SPECIAL ECONOMIC Z | ONE LASBELA | |||
| 044101 | - A01 | Employees Related Expenses | 2,200,000 | 1,164,000 | 7,400,000 | |
| 044101 | - A011 | Pay | 29 29 | 2,200,000 | 1,164,000 | 7,400,000 |
| 044101 | - A011- | 1 Pay | of Officers (12) (12) | (1,000,000) | (832,000) | (2,960,000) |
| 044101 | - A011- | 2 Pay | of Other Staff (17) (17) | (1,200,000) | (332,000) | (4,440,000) |
| 044101 | - A03 | Operating Expenses | 12,800,000 | 13,836,000 | 100,700,000 | |
| 044101 | - A032 | Communications | 100,000 | 100,000 | 200,000 | |
| 044101 | - A037 | Consultancy and Contractual Work | 6,000,000 | 6,000,000 | 32,000,000 | |
| 044101 | - A038 | Travel & Transportation | 1,500,000 | 1,500,000 | 2,500,000 | |
| 044101 | - A039 | General | 5,200,000 | 6,236,000 | 66,000,000 | |
| 044101 | - A09 | Physical Assets | 2,000,000 | |||
| 044101 | - A097 | Purchase of Furniture and Fixture | 2,000,000 | |||
| 044101 | - A12 | Civil | works | 285,000,000 | 285,000,000 | 889,900,000 |
| 044101 | - A121 | Road | s Highways and Bridges | 180,000,000 | 180,000,000 | 150,000,000 |
| 044101 | - A123 | Embankment and Drainage Works | 105,000,000 | 105,000,000 | 80,000,000 | |
| 044101 | - A124 | Building and Structures | 259,900,000 | |||
| 044101 | - A125 | Other Works | 400,000,000 | |||
| Total- | ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA | 300,000,000 | 300,000,000 | 1,000,000,000 | ||
| 0 | 44101 | Total- | Support for Industrial Development | 300,000,000 | 300,000,000 | 1,000,000,000 |
| 0 | 441 | Total- | Manufacturing | 300,000,000 | 300,000,000 | 1,000,000,000 |
| 0 | 44 | Total- | Mining and Manufacturing | 300,000,000 | 300,000,000 | 1,000,000,000 |
| 0 | 4 | Total- | Economic Affairs | 300,000,000 | 300,000,000 | 1,000,000,000 |
| Total- | ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA | 300,000,000 | 300,000,000 | 1,000,000,000 | ||
| TOTAL | - DEMAND | 13,000,000,000 | 1,922,520,000 | 4,918,758,000 |