Page 601

SECTION VI

CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

2024-2025 Budget Estimate (Rupees in Thousand) Demand presented on behalf of the Capital Outlay on Maritime Affairs Division Development Expenditure on Capital Account. 132. Capital Outlay on Maritime Affairs Division 5,300,000 Total : 5,300,000

Page 603

NO. 132.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

DEMANDS FOR GRANTS DEMAND NO. 132 ( FC12C51 )

CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2025 to defray the Salaries and Other Expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION.

Voted

Rs. 5,300,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF MARITIME AFFAIRS .

FUNCTIONAL CLASSIFICATION 2023-2024 Budget Estimate Rs 2023-2024 Revised Estimate Rs 2024-2025 Budget Estimate Rs
045 Construction and Transport 241,616,000 197,696,000 5,300,000,000
046 Communications 2,058,384,000 2,087,304,000
063 Water Supply 272,262,000 272,262,000
Total 2,572,262,000 2,557,262,000 5,300,000,000
OBJECT CLASSIFICATION
A01 Employees Related Expenses 79,624,000 79,624,000
A011 Pay 46,528,000 46,528,000
A011-1 Pay of Officers (33,600,000) (33,600,000)
A011-2 Pay of Other Staff (12,928,000) (12,928,000)
A012 Allowances 33,096,000 33,096,000
A012-1 Regular Allowances (33,096,000) (33,096,000)
A02 Project Pre-Investment Analysis 93,794,000
A03 Operating Expenses 7,500,000 7,500,000 50,000,000
A09 Physical Assets 205,500,000 205,500,000
A12 Civil works 2,261,638,000 2,246,638,000 5,156,206,000
A13 Repairs and Maintenance 18,000,000 18,000,000
Total 2,572,262,000 2,557,262,000 5,300,000,000
(In Foreign Exchange) (Own Resources) (15,000,000)
(Foreign Aid) (15,000,000)
(In Local Currency) (2,557,262,000) __________________ (2,557,262,000) _________________ (5,300,000,000) _______________
Page 604

NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

DEMANDS FOR GRANTS III. - DETAILS are as follows :-

No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04 Economic Affairs:
045 Construction and Transport:
0453 Water Transport:
045301 KA138 HARB PORT 5 ESTA OUR AU AND SHIPPPING : BLISHMENT OF EXPORT ORIENTED FISHERIE TORITY S & INFRASTRUCTURE AT KORANGI FISHERIES
045301 - A12 Civil works 734,206,000
045301 - A124 Building and Structures 734,206,000
Total- ESTABLISHMENT OF EXPORT 734,206,000
ORIENTED FISHERIES & INFRASTRUCTURE AT KORANGI FISHERIES HARBOUR AUTORITY
KA138 9 ANCIL IARY FACILIES AT GPA HOUSING COMPLEX GAWADAR
045301 - A03 Operating Expenses 50,000,000
045301 - A039 General 50,000,000
Total- ANCILIARY FACILIES AT GPA HOUSING COMPLEX GAWADAR 50,000,000
KA708 3 MODIFICATION OF AUCTION HALL KORANGI FISHERIES HARBOUR KARACHI
045301 - A12 Civil works 5,000,000
045301 - A124 Building and Structures 5,000,000
Total- MODIFICATION OF AUCTION HALL KORANGI FISHERIES HARBOUR KARACHI 5,000,000
(In Foreign Exchange) (5,000,000)
(Foreign Aid) (5,000,000)
KA708 KARAC 4 ESTA HI _ BLISHMENT OF COLD STORAGE AND FREEZI ______________________________ NG TUNNELS AT KORANGI FISHE __________________ RIES HARBOUR
045301 - A12 Civil works 5,000,000
045301 - A124 Building and Structures 5,000,000
Total- ESTABLISHMENT OF COLD STORAGE AND FREEZING TUNNELS AT KORANGI FISHERIES HARBOUR KARACHI 5,000,000
(In Foreign Exchange) (5,000,000)
(Foreign Aid) __ (5,000,000) ______________________________
Page 605
NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION DEMAND S FOR GRANTS
No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7085 ESTABLISHMENT OF BUSINESS PARK AT KORANGI FISHERIES HARBOUR KARACHI

045301- A12 Civil works 5,000,000
045301- A124 Building and Structures 5,000,000
Total- ESTABLISHMENT OF BUSINESS PARK AT KORANGI FISHERIES HARBOUR KARACHI 5,000,000
(In Foreign Exchange) (5,000,000)
(Foreign Aid) (5,000,000)
045301 _ Total- PORT AND SHIPPPING __________________________ 15,000,000 _______________________ 784,206,000
0453 Total- Water Transport 15,000,000 784,206,000
045 Total- Construction and Transport 15,000,000 784,206,000
046 Comm unications:
0461 Comm unications:

046101 ADMINISTRATION :

KA7317 IMPROVEMENT OF OFFICIAL CONTROL SYSTEM AND STRENGTHENING TESTING SERVICES OF MFD

046101- A01 Employees Related Expenses 79,624,000 79,624,000
046101- A011 Pay 46,528,000 46,528,000
046101- A011-1 Pay of Officers (33,600,000) (33,600,000)
046101- A011-2 Pay of Other Staff (12,928,000) (12,928,000)
046101- A012 Allowances 33,096,000 33,096,000
046101- A012-1 Regular Allowances (33,096,000) (33,096,000)
046101- A03 Operating Expenses 7,500,000 7,500,000
046101- A032 Communications 60,000 60,000
046101- A033 Utilities 900,000 900,000
046101- A038 Travel & Transportation 1,800,000 1,800,000
046101- A039 General 4,740,000 4,740,000
046101- A09 Physical Assets 105,500,000 105,500,000
046101- A092 Computer Equipment 4,000,000 4,000,000
046101- A095 Purchase of Transport 16,000,000 16,000,000
046101- A096 Purchase of Plant and Machinery 85,500,000 85,500,000
046101- A13 Repairs and Maintenance 18,000,000 18,000,000
046101- A130 Transport 4,000,000 4,000,000
046101- A131 Machinery and Equipment 2,100,000
Page 606
NO. 132.- FC1 2C51 CAPITAL OUTLAY ON MARITIME AFFAIR No of 2023-24 Posts 2024-25 S DIVISION 2023-2024 Budget Estimate Rs DEMAND 2023-2024 Revised Estimate Rs S FOR GRANTS 2024-2025 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
046101- A132 Furniture and Fixture 14,000,000 11,900,000
Total- IMPROVEMENT OF OFFICIAL CONTROL SYSTEM AND STRENGTHENING TESTING SERVICES OF MFD 210,624,000 210,624,000
046101 Total- ADMINISTRATION 210,624,000 210,624,000
0461 Total- Communications 210,624,000 210,624,000
046 Total- Communications 210,624,000 210,624,000
04 Total- Economic Affairs 225,624,000 210,624,000 784,206,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 225,624,000 210,624,000 784,206,000
(In Foreign Exchange) (Own Resources) (15,000,000)
(Foreign Aid) (15,000,000)
(In Local Currency) (210,624,000) (210,624,000) (784,206,000)
Page 607

NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

MARITIME AFFAIRS DIVISION DEMAND S FOR GRANTS
No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04 Economic Affairs:
045 Construction and Transport:
0453 Water Transport:
045301 PORT AND SHIPPPING :
GR013 GAWA 4 SURV DAR EY AND FEASIBILITY STUDY FOR CONSTRUCTION OF EASTBAY EXPRESSWAYS P HASE-II OF
045301 - A02 Project Pre-Investment Analysis 93,794,000
045301 - A021 Feasibility Studies 93,794,000
Total- SURVEY AND FEASIBILITY STUDY FOR 93,794,000
CONSTRUCTION OF EASTBAY EXPRESSWAYS PHASE-II OF GAWADAR
GR013 (MUGS 5 MODERNIZATION AND UPGRADATION OF GADDA BRI) AND NI SHIP BREAKING AND RECYCLING INDUSTRY
045301 - A12 Civil works 4,172,000,000
045301 - A125 Other Works 4,172,000,000
Total- MODERNIZATION AND UPGRADATION OF GADDANI SHIP BREAKING AND RECYCLING INDUSTRY (MUGSBRI) AND 4,172,000,000
GR013 6 BLUE ECONOMY CENTRE
045301 - A12 Civil works 250,000,000
045301 - A125 Other Works 250,000,000
Total- BLUE ECONOMY CENTRE 250,000,000
GR901 GWAD 8 CONS AR TRUCTION OF GROYNE WALL/BREAK WATER & ALLIED WORKS AT EAST BAY (DE MI ZER)
045301 - A12 Civil works 226,616,000 197,696,000
045301 - A125 Other Works 226,616,000 197,696,000
Total- CONSTRUCTION OF GROYNE WALL/BREAK WATER & ALLIED WORKS AT EAST BAY (DEMI ZER) GWADAR 226,616,000 197,696,000
0 45301 Total- PORT AND SHIPPPING 226,616,000 197,696,000 4,515,794,000
0 453 Total- Water Transport 226,616,000 197,696,000 4,515,794,000
0 45 Total- Construction and Transport 226,616,000 197,696,000 4,515,794,000
Page 608
NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION DEMAND S FOR GRANTS
No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
046 Communications:
0461 046101 GR021 Communications: ADMINISTRATION : 0 SEWERAGE TREATMENT PLANT FOR GPA HOUSI NG COMPLEX GWADAR
046101 - A12 Civil works 101,990,000 115,990,000
046101 - A125 Other Works 101,990,000 115,990,000
Total- SEWERAGE TREATMENT PLANT FOR GPA HOUSING COMPLEX GWADAR 101,990,000 115,990,000
GR021 1 PERIM ETRIC SECURITY SYSTEM FOR GWADAR PORT
046101 - A09 Physical Assets 100,000,000 100,000,000
046101 - A096 Purchase of Plant and Machinery 100,000,000 100,000,000
Total- PERIMETRIC SECURITY SYSTEM FOR GWADAR PORT 100,000,000 100,000,000
GR021 2 MAINTENANCE DREDGING OF GWADAR PORT
046101 - A12 Civil works 1,645,770,000 1,660,690,000
046101 - A123 Embankment and Drainage Works 1,645,770,000 1,660,690,000
Total- MAINTENANCE DREDGING OF GWADAR PORT 1,645,770,000 1,660,690,000
0 46101 Total- ADMINISTRATION 1,847,760,000 1,876,680,000
0 461 Total- Communications 1,847,760,000 1,876,680,000
0 46 Total- Communications 1,847,760,000 1,876,680,000
0 4 Total- Economic Affairs 2,074,376,000 2,074,376,000 4,515,794,000
06 Housing And Community Amenities:
063 Water Supply:
0631 063107 GR008 Water Water 8 WATE Supply: supply network (transportation & d : R SUPPLY LINE FOR GWADAR FREE ZONE FROM 1.2 MGD DESALINATION PLANT TO GPA
063107 - A12 Civil works 140,558,000 140,558,000
063107 - A123 Embankment and Drainage Works 140,558,000 140,558,000
Total- WATER SUPPLY LINE FOR GWADAR 140,558,000 140,558,000
GR008 9 WATE FREE ZONE FROM 1.2 MGD DESALINATION PLANT TO GPA R SUPPLY LINE FOR NORTH FREE ZONE G WADAR FROM AIRPORT WATER WORKS
063107 - A12 Civil works 131,704,000 131,704,000
063107 - A123 Embankment and Drainage Works 131,704,000 131,704,000
Total- WATER SUPPLY LINE FOR NORTH FREE ZONE GWADAR FROM AIRPORT WATER WORKS 131,704,000 131,704,000
Page 609
NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION DEMAND S FOR GRANTS
No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

063107 Total- Water supply network (transportation & d 272,262,000 272,262,000
0631 Total- Water Supply 272,262,000 272,262,000
063 Total- Water Supply 272,262,000 272,262,000
06 Total- Housing And Community Amenities 272,262,000 272,262,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA 2,346,638,000 2,346,638,000 4,515,794,000
TOTAL - DEMAND 2,572,262,000 2,557,262,000 5,300,000,000
(In Foreign Exchange) (15,000,000)
(Own Resources)
(Foreign Aid) (15,000,000)
(In Local Currency) (2,557,262,000) __________________ (2,557,262,000) _________________ (5,300,000,000) _______________
Page 611

SECTION VII

MINISTRY OF RAILWAYS

2024-2025 Budget Estimate (Rupees in Thousand)

Demand presented on behalf of the
Ministry of Railways
Development Expenditure on Capital Account.
133. Capital Outlay on Railways Division 45,000,000
Total : 45,000,000
Page 613

NO. 133.- CAPITAL OUTLAY ON RAILWAYS DIVISION

DEMANDS FOR GRANTS

DEMAND NO. 133

( FC12C33 )

CAPITAL OUTLAY ON RAILWAYS DIVISION

I. ESTIMATES of the Amount required in the year ending 30 June , 2025 for CAPITAL OUTLAY ON RAILWAYS DIVISION.

Voted

Rs. 45,000,000,000

II. FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the MINISTRY OF RAILWAYS .

2023-2024 Budget Estimate Rs 2023-2024 Revised Estimate Rs 2024-2025 Budget Estimate Rs
FUNCTIONAL CLASSIFICATION
014 Transfers 31,727,000,000 32,193,348,000 44,649,000,000
045 Construction and Transport 1,273,000,000 629,159,000 351,000,000
Total 33,000,000,000 32,822,507,000 45,000,000,000
OBJECT CLASSIFICATION
A03 Operating Expenses 430,000,000 152,507,000 101,000,000
A11 Investments 32,570,000,000 32,670,000,000 44,899,000,000
Total 33,000,000,000 32,822,507,000 45,000,000,000
(In Foreign Exchange) (24,826,132,000) (25,877,000,000)
(Own Resources) (24,496,132,000) (25,676,000,000)
(Foreign Aid) (330,000,000) (201,000,000)
(In Local Currency) (8,173,868,000) _________________ (32,822,507,000) __________________ (19,123,000,000) _______________
Page 614

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION

DEMANDS FOR GRANTS

III. - DETAILS are as follows :-

No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL P AKISTAN REVENUES
04 Economic Affairs:
045 Construction and Transport:
0454 Railway Trasport:
04540 IB365 ROOM 1 Railway Tras 2 RENOVATION S AT OFFICE O port : AND CONSTRUCTION OF OFFICES WO F THE MENS BARRACKS AND MULTI PURPOSE TRAINING
04540 1- A03 Operating Expenses 230,000,000 152,507,000 101,000,000
04540 1- A039 General 230,000,000 152,507,000 101,000,000
Total- RENO OFFIC MULTI OFFIC VATION AND CONSTRUCTION OF ES WOMENS BARRACKS AND PURPOSE TRAINING ROOMS AT E OF THE 230,000,000 152,507,000 101,000,000
(In Foreign Exchange) (230,000,000) (101,000,000)
(Foreign Aid) (230,000,000) (101,000,000)
(In Loc al Currency) __ ( ____________________ 152,507,000) ________________
045401 Total- Railway Trasport 230,000,000 152,507,000 101,000,000
0454 Total- Railway Trasport 230,000,000 152,507,000 101,000,000
045 Total- Construction and Transport 230,000,000 152,507,000 101,000,000
04 Total- Economic Affairs 230,000,000 152,507,000 101,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES 230,000,000 152,507,000 101,000,000
(In (O Foreign Exchange) wn Resources) (230,000,000) (101,000,000)
(Foreign Aid) (230,000,000) (101,000,000)
(In Local Currency) (152,507,000)
Page 615

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION

APITAL OUTLAY ON RAILWAYS DIVISION DEMAND S FOR GRANTS
No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Estimate Revised Estimate Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
01 General Public Service:
014 Transfers:
0143 Investments:
014302 KA085 Non-Financial Institutions : 3 ESSENTIAL TRACK SAFETY WORKS ON KIAMARI-HYDERABAD SECTION IN KARACHI DIVISION
014302 - A11 Investments 500,000,000
014302 - A111 Investment Local 500,000,000
Total- ESSENTIAL TRACK SAFETY WORKS ON KIAMARI-HYDERABAD SECTION IN KARACHI DIVISION 500,000,000
(In Foreign Exchange) (400,000,000)
(Own Resources) (400,000,000)
(In Local Currency) (100,000,000)
KA085 OF TR 4 RECO AINS O __________________________________________________ NSTRUCTION OF RAILWAY BRIDGE NO.4 (5X23') TO ENHANCE BRIDGE SAFETY AND PUNCTUALITY N
014302 - A11 Investments 294,000,000
014302 - A111 Investment Local 294,000,000
Total- RECONSTRUCTION OF RAILWAY BRIDGE NO.4 (5X23') TO ENHANCE BRIDGE SAFETY AND PUNCTUALITY OF TRAINS ON 294,000,000
KA085 SARHA 5 UP-G D JUM RADATION OF THE SIGNALLING SYSTEM BY PROVIDING COMPUTER BASED INTER LOCKING AT MA GOTH BADAL
014302 - A11 Investments 200,000,000
014302 - A111 Investment Local 200,000,000
Total- UP-GRADATION OF THE SIGNALLING 200,000,000
SYSTEM BY PROVIDING COMPUTER BASED INTER LOCKING AT SARHAD JUMMA GOTH BADAL
(In Foreign Exchange) (190,000,000)
(Own Resources) (190,000,000)
(In Local Currency) (10,000,000) __________________________________________________
Page 616

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION

RAILWAYS DIVISION DEMAND S FOR GRANTS
No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA0856 ESSE SECTION IN NTIAL TRACK SAFETY WORKS ON SHAHDARA - SHIEKHUPURA - FAISALABAD - KHANEWAL
014302- A11 Investments 200,000,000
014302- A111 Investment Local 200,000,000
Total- ESSENTIAL TRACK SAFETY WORKS ON SHAHDARA - SHIEKHUPURA - FAISALABAD - KHANEWAL SECTION IN 200,000,000
(In Foreign Exchange) (150,000,000)
(Own Resources) (150,000,000)
(In Local Currency) (50,000,000)
KA0857 REHA __________________________________________________ BILITATION & STRENGHTENING OF WEAK BRIDGES ON PAKISTAN RAILWAYS SYSTEM
014302- A11 Investments 200,000,000
014302- A111 Investment Local 200,000,000
Total- REHABILITATION & STRENGHTENING 200,000,000
KA0858 ESSE OF WEAK BRIDGES ON PAKISTAN RAILWAYS SYSTEM NTIAL TRACK SAFETY WORKS ON SHERSHAH - KUNDIAN SECTION IN MULTAN DIVISION
014302- A11 Investments 200,000,000
014302- A111 Investment Local 200,000,000
Total- ESSENTIAL TRACK SAFETY WORKS ON SHERSHAH - KUNDIAN SECTION IN MULTAN DIVISION 200,000,000
(In Foreign Exchange) (150,000,000)
(Own Resources) (150,000,000)
(In Local Currency) (50,000,000)
KA0859 ESSE __________________________________________________ NTIAL TRACK SAFETY WORKS ON ROHRI - SIBI SECTION IN SUKKUR DIVISION
014302- A11 Investments 200,000,000
014302- A111 Investment Local 200,000,000
Total- ESSENTIAL TRACK SAFETY WORKS ON ROHRI - SIBI SECTION IN SUKKUR DIVISION 200,000,000
(In Foreign Exchange) (150,000,000)
(Own Resources) (150,000,000)
(In Local Currency) (50,000,000) __________________________________________________
Page 617

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION

RAILWAYS DIVISION DEMAND S FOR GRANTS
No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1263 ACQUISITION OF LAND FOR RAIL CONNECTIVITY FROM GAWADAR TO MASTUNG VIA BESIMA AND

BESIMA

014302- A11 Investments 2,210,000,000
014302- A111 Investment Local 2,210,000,000
Total- ACQUISITION OF LAND FOR RAIL CONNECTIVITY FROM GAWADAR TO MASTUNG VIA BESIMA AND BESIMA 2,210,000,000
KA1273 ACQU KHARLACHI ISITION OF LAND FOR RAIL CONNECTIVITY WITH AFGHANISTAN FROM KOHAT (ZERO POINT) TO
014302- A11 Investments 200,000,000
014302- A111 Investment Local 200,000,000
Total- ACQUISITION OF LAND FOR RAIL CONNECTIVITY WITH AFGHANISTAN FROM KOHAT (ZERO POINT) TO KHARLACHI 200,000,000
KA1326 REPL DELIVERY ACEMENT OF ROOF MOUNTED A.C PLANTS IN PASSENGER COACHES FOR BETTER SERVICE
014302- A11 Investments 100,000,000
014302- A111 Investment Local 100,000,000
Total- REPLACEMENT OF ROOF MOUNTED A.C PLANTS IN PASSENGER COACHES FOR BETTER SERVICE DELIVERY 100,000,000
(In Foreign Exchange) (75,000,000)
(Own Resources) (75,000,000)
(In Local Currency) (25,000,000)
KA1363 INSTA _ LLATION AND COMMISSIONING OF SOLAR S ____________________________________ YSTEM AT 155 NOS RAILWAY STATIONS _____________
014302- A11 Investments 1,000,000 50,000,000
014302- A111 Investment Local 1,000,000 50,000,000
Total- INSTALLATION AND COMMISSIONING 1,000,000 50,000,000
KA1364 INDIG OF SOLAR SYSTEM AT 155 NOS RAILWAY STATIONS ENOUS DEVELOPMENT OF WIRELESS BASE D BLOCK INSTRUMENT INTERLOCKING SYSTEM AND
014302- A11 Investments 100,000,000 70,374,000
014302- A111 Investment Local 100,000,000 70,374,000
Total- INDIGENOUS DEVELOPMENT OF 100,000,000 70,374,000
WIRELESS BASED BLOCK INSTRUMENT INTERLOCKING SYSTEM AND
Page 618
NO. 133.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2023-24 Posts 2024-25 N 2023-2024 Budget Estimate DEMAN 2023-2024 Revised Estimate DS FOR GRANTS 2024-2025 Budget Estimate
Rs Rs Rs
KA1366 REHA ACCOUNTANT GENERAL PAKISTAN RE BILITATION OF 300 KVA DG SETS VENUES SUB-OFFICE, KARACHI
014302- A11 Investments 574,160,000 574,160,000
014302- A111 Investment Local 574,160,000 574,160,000
Total- REHABILITATION OF 300 KVA DG SETS 574,160,000 574,160,000
KA1367 CONS (INCLUDING) TRUCTION OF NEW TRACK & UP-GRADATION / REHABILITATION OF TRACK FROM CHAMAN YARD
014302- A11 Investments 592,000,000 122,403,000 975,000,000
014302- A111 Investment Local 592,000,000 122,403,000 975,000,000
Total- CONSTRUCTION OF NEW TRACK & UP-GRADATION / REHABILITATION OF TRACK FROM CHAMAN YARD (INCLUDING) 592,000,000 122,403,000 975,000,000
(In Foreign Exchange) (500,000,000)
(Own Resources) (500,000,000)
(In Local Currency) (592,000,000) (122,403,000) (475,000,000)
KA7109 CHINA __ -PAKISTAN ECONOMIC CORRIDOR SUPPORT ________________ PROJECT (CPECS __________________ P) AT MINISTRY OF ______________ RAILWAYS
014302- A11 Investments 60,000,000 42,000,000 50,000,000
014302- A111 Investment Local 60,000,000 42,000,000 50,000,000
Total- CHINA-PAKISTAN ECONOMIC 60,000,000 42,000,000 50,000,000
CORRIDOR SUPPORT PROJECT
(CPECSP) AT MINISTRY OF RAILWAYS
KA7111 PRELIMINARY DESIGN / DRAWINGS FOR UPGRADA ESTABLISHMENT OF TION/REHABILITATION OF MAIN LINE (ML-1) AND
014302- A11 Investments 468,634,000 1,651,949,000 20,000,000
014302- A111 Investment Local 468,634,000 1,651,949,000 20,000,000
Total- PRELIMINARY DESIGN / DRAWINGS 468,634,000 1,651,949,000 20,000,000
FOR UPGRADATION/REHABILITATION OF MAIN LINE (ML-1) AND ESTABLISHMENT OF
KA7113 PROCUREMENT OF EQUIPMENT FOR IMPROVED SECURITY AND ANT I-TERRORISM MEASURES
014302- A11 Investments 139,168,000

KA1366 REHABILITATION OF 300 KVA DG SETS

Page 619
NO. 133.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVIS No of 2023-24 Posts 2024-25 ION 2023-2024 Budget Estimate DEMAN 2023-2024 Revised Estimate DS FOR GRANTS 2024-2025 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
014302- A111 Investment Local 139,168,000
Total- PROCUREMENT OF EQUIPMENT FOR IMPROVED SECURITY AND ANTI-TERRORISM MEASURES 139,168,000
KA7114 PROC PASSENGER UREMENT/MANUFACTURE OF 820 HIGH CA COACHES PACITY BOGIE FREIGHT WAGONS AND 230
014302- A11 Investments 17,639,132,000 16,893,691,000 11,157,000,000
014302- A111 Investment Local 17,639,132,000 16,893,691,000 11,157,000,000
Total- PROCUREMENT/MANUFACTURE OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER COACHES 17,639,132,000 16,893,691,000 11,157,000,000
(In Foreign Exchange) (17,439,132,000) (10,500,000,000)
(Own Resources) (17,439,132,000) (10,500,000,000)
(In Local Currency) (200,000,000) (16,893,691,000) (657,000,000)
KA7115 PROJ ECT MANAGEMENT UNIT (PMU) IN MINISTRY _________________ OF RAILWAYS (2N __________________ D REVISED) _______________
014302- A11 Investments 410,000,000 85,000,000 300,000,000
014302- A111 Investment Local 410,000,000 85,000,000 300,000,000
Total- PROJECT MANAGEMENT UNIT (PMU) IN 410,000,000 85,000,000 300,000,000
KA7120 REPL MINISTRY OF RAILWAYS (2ND REVISED) ACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL #NAME?
014302- A11 Investments 1,277,670,000 537,007,000 600,000,000
014302- A111 Investment Local 1,277,670,000 537,007,000 600,000,000
Total- REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL #NAME? 1,277,670,000 537,007,000 600,000,000
(In Foreign Exchange) (1,000,000,000) (550,000,000)
(Own Resources) (1,000,000,000) (550,000,000)
(In Local Currency) (277,670,000) (537,007,000) (50,000,000)
KA7121 STRENGTHENING OF PLANNING DEVELOPMENT DIRECTORATE MINISTRY OF MINISTRY _________________ MONITORING AND E __________________ VALUATION (PD&M _______________ E)
014302- A11 Investments 60,000,000 45,000,000 50,000,000
Page 620
NO. 133.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISI No of 2023-24 Posts 2024-25 ON 2023-2024 Budget Estimate Rs DEMAN 2023-2024 Revised Estimate Rs DS FOR GRANTS 2024-2025 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
014302- A111 Investment Local 60,000,000 45,000,000 50,000,000
Total- STRENGTHENING OF PLANNING 60,000,000 45,000,000 50,000,000
DEVELOPMENT MONITORING AND EVALUATION (PD&ME) DIRECTORATE MINISTRY OF MINISTRY
KA7129 SPEC RUNNING IAL REPAIR OF 100 NOS DE LOCOMOTIVES FOR IMPROVING THE REHABILITEE/AVAILABILITY OF
014302- A11 Investments 2,000,000,000 2,000,000,000 600,000,000
014302- A111 Investment Local 2,000,000,000 2,000,000,000 600,000,000
Total- SPECIAL REPAIR OF 100 NOS DE 2,000,000,000 2,000,000,000 600,000,000
LOCOMOTIVES FOR IMPROVING THE REHABILITEE/AVAILABILITY OF RUNNING
(In Foreign Exchange) (1,800,000,000) (550,000,000)
(Own Resources) (1,800,000,000) (550,000,000)
(In Local Currency) (200,000,000) (2,000,000,000) (50,000,000)
KA7130 SPEC __ IAL REPAIR OF 600 PASSENGER COACHES A _________________ ND 1200 BOGIE WA _________________ GONS
014302- A11 Investments 769,000,000 1,099,650,000
014302- A111 Investment Local 769,000,000 1,099,650,000
Total- SPECIAL REPAIR OF 600 PASSENGER COACHES AND 1200 BOGIE WAGONS 769,000,000 1,099,650,000
(In Foreign Exchange) (400,000,000)
(Own Resources) (400,000,000)
(In Local Currency) (369,000,000) (1,099,650,000)
KA7132 PC-II PROJECT __ FOR COMMERCIAL AND FINANCIAL FEASIBIL _________________ ITY STUDY FOR THE _________________ SUB-PROJECT UN ______________ DER ML-I
014302- A11 Investments 17,847,000 6,844,000
014302- A111 Investment Local 17,847,000 6,844,000
Total- PC-II FOR COMMERCIAL AND FINANCIAL FEASIBILITY STUDY FOR THE SUB-PROJECT UNDER ML-I PROJECT 17,847,000 6,844,000
Page 621
NO. 133.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMANDS FOR GRANTS
No of 2023-24 Posts 2024-25 2023-2024 Budget Estimate 2023-2024 Revised Estimate 2024-2025 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA7133 UP-G PORT NEAR RADATION OF PAKISTAN RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF DRY
014302- A03 Operating Expenses 200,000,000
014302- A039 General 200,000,000
014302- A11 Investments 1,000,000,000
014302- A111 Investment Local 1,000,000,000
Total- UP-GRADATION OF PAKISTAN RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF DRY PORT NEAR 200,000,000 1,000,000,000
(In Foreign Exchange) (100,000,000) (100,000,000)
(Foreign Aid) (100,000,000) (100,000,000)
(In Local Currency) (100,000,000) (900,000,000)
KA7136 UMBR __ ELLA PCII FOR FEASIBITY STUDIES AND TRA _________________ NSACTION ADVISO ______________ RY SERVICES _________________
014302- A11 Investments 100,000,000 190,000,000 210,000,000
014302- A111 Investment Local 100,000,000 190,000,000 210,000,000
Total- UMBRELLA PCII FOR FEASIBITY 100,000,000 190,000,000 210,000,000
STUDIES AND TRANSACTION
KA7137 ESTA ADVISORY SERVICES BLISHMENT OF BUSINESS DEVELOPMENT AN D HR SUPPORT UNIT AT PAKISTAN RAILWAYS
014302- A11 Investments 50,000,000 8,200,000 30,000,000
014302- A111 Investment Local 50,000,000 8,200,000 30,000,000
Total- ESTABLISHMENT OF BUSINESS 50,000,000 8,200,000 30,000,000
DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS
KA7138 COLL MODEL) ABORATION OF PAKISTAN RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX
014302- A11 Investments 20,000,000 25,000,000 25,000,000
014302- A111 Investment Local 20,000,000 25,000,000 25,000,000
Total- COLLABORATION OF PAKISTAN 20,000,000 25,000,000 25,000,000
RAILWAYS WITH DIFFERENT
ACADEMIC INSTITUTES (TRIPLE HELIX MODEL)
KA7139 PROCUREMENT AND INSTALLATION OF MACHINERY AT SIGNAL WORKSHOP
014302- A11 Investments 288,460,000 253,475,000
014302- A111 Investment Local 288,460,000 253,475,000
Page 622
NO. 133.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMANDS FOR GRANTS
No of 2023-24 Posts 2024-25 2023-2024 Budget Estimate 2023-2024 Revised Estimate 2024-2025 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
Total- PROCUREMENT AND INSTALLATION 288,460,000 253,475,000
OF MACHINERY AT SIGNAL WORKSHOP
KA7141 REHABILITATION OF KPT AND RAIL CONNECTIVITY (PHASE-1)
014302- A11 Investments 693,432,000 570,650,000
014302- A111 Investment Local 693,432,000 570,650,000
Total- REHABILITATION OF KPT AND RAIL 693,432,000 570,650,000
CONNECTIVITY (PHASE-1)
KA7142 REHABILITATION OF TRACK BETWEEN REHMANI N SECTION (SUKKUR DIVISION PH-4) AGAR - BAKRANI ROAD ON DADU-HABIB KOT
014302- A11 Investments 2,000,000 4,400,000 10,000,000
014302- A111 Investment Local 2,000,000 4,400,000 10,000,000
Total- REHABILITATION OF TRACK BETWEEN REHMANI NAGAR - BAKRANI ROAD ON DADU-HABIB KOT SECTION (SUKKUR DIVISION PH-4) 2,000,000 4,400,000 10,000,000
KA7143 REHA (PESHAWAR BILITATION OF TRACK BETWEEN BARULI-SO HAN BRIDGE ON KUNDIAN - ATTOCK CITY SECTION
014302- A11 Investments 2,000,000 50,000 10,000,000
014302- A111 Investment Local 2,000,000 50,000 10,000,000
Total- REHABILITATION OF TRACK BETWEEN BARULI-SOHAN BRIDGE ON KUNDIAN - 2,000,000 50,000 10,000,000
ATTOCK CITY SECTION (PESHAWAR
KA7145 RECO MMISSIONING OF 5 ACCIDENTAL LOCOMOTIV ES
014302- A11 Investments 500,000,000 369,500,000 150,000,000
014302- A111 Investment Local 500,000,000 369,500,000 150,000,000
Total- RECOMMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES 500,000,000 369,500,000 150,000,000
(In Foreign Exchange) (477,000,000) (120,000,000)
(Own Resources) (477,000,000) (120,000,000)
(In Local Currency) (23,000,000) (369,500,000) (30,000,000)
KA7148 REHA SECTION __ BILITATION OF TRACK BETWEEN SAMA SATT ________________ A AND BAHAWAL __________________ NAGAR ON SAMA S ______________ ATTA AMRUKA
014302- A11 Investments 50,000,000 14,105,000 115,000,000
Page 623
NO. 133.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2023-24 Posts 2024-25 N 2023-2024 Budget Estimate DEMAND 2023-2024 Revised Estimate S FOR GRANTS 2024-2025 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
014302- A111 Investment Local 50,000,000 14,105,000 115,000,000
Total- REHABILITATION OF TRACK BETWEEN SAMA SATTA AND BAHAWALNAGAR ON SAMA SATTA AMRUKA SECTION 50,000,000 14,105,000 115,000,000
(In Foreign Exchange) (40,000,000) (100,000,000)
(Own Resources) (40,000,000) (100,000,000)
(In Local Currency) (10,000,000) (14,105,000) (15,000,000)
KA7309 ESTA __ BILISHMENT PF QASIM RAIL FREIGHT TERMIN _________________ AL AT LOADOUT S _________________ TATION KARACHI
014302- A11 Investments 300,000,000
014302- A111 Investment Local 300,000,000
Total- ESTABILISHMENT PF QASIM RAIL FREIGHT TERMINAL AT LOADOUT STATION KARACHI 300,000,000
(In Foreign Exchange) (150,000,000)
(Own Resources) (150,000,000)
(In Local Currency) (150,000,000)
KA7310 REHA __ BILITATION AND OVERHAULING OF TRACK M _________________ AINTENANCE MAC _________________ HINES / CRANES
014302- A11 Investments 500,000,000 875,000 1,500,000,000
014302- A111 Investment Local 500,000,000 875,000 1,500,000,000
Total- REHABILITATION AND OVERHAULING OF TRACK MAINTENANCE MACHINES / CRANES 500,000,000 875,000 1,500,000,000
(In Foreign Exchange) (480,000,000) (1,400,000,000)
(Own Resources) (480,000,000) (1,400,000,000)
(In Local Currency) (20,000,000) (875,000) (100,000,000)
KA7311 IMPR __ OVE SAFETY THROUGH BETTER COMMUNICA _________________ TION SYSTEM _________________
014302- A11 Investments 200,000,000 10,280,000 839,000,000
014302- A111 Investment Local 200,000,000 10,280,000 839,000,000
Total- IMPROVE SAFETY THROUGH BETTER 200,000,000 10,280,000 839,000,000
COMMUNICATION SYSTEM
KA7312 CONSTRUCTION OF LEFT GUIDE BUND OF SHERSH (MULTAN DIVISION) AH RAILWAY BRIDGE NO.1 ON SHERSHAH-KUNDIAN
014302- A11 Investments 150,000,000 295,000,000 197,000,000
Page 624
NO. 133.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISI No of 2023-24 Posts 2024-25 ON 2023-2024 Budget Estimate DEMAND 2023-2024 Revised Estimate S FOR GRANTS 2024-2025 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
014302- A111 Investment Local 150,000,000 295,000,000 197,000,000
Total- CONSTRUCTION OF LEFT GUIDE BUND 150,000,000 295,000,000 197,000,000
KA7313 IMME OF SHERSHAH RAILWAY BRIDGE NO.1 ON SHERSHAH-KUNDIAN (MULTAN DIVISION) DIATE TRACK SAFETY WORKS ON TANDO AD AM-ROHRI SECTION IN SUKKUR DIVISION
014302- A11 Investments 1,000,000,000 584,000,000 2,660,000,000
014302- A111 Investment Local 1,000,000,000 584,000,000 2,660,000,000
Total- IMMEDIATE TRACK SAFETY WORKS ON TANDO ADAM-ROHRI SECTION IN SUKKUR DIVISION 1,000,000,000 584,000,000 2,660,000,000
(In Foreign Exchange) (800,000,000) (660,000,000)
(Own Resources) (800,000,000) (660,000,000)
(In Local Currency) (200,000,000) (584,000,000) (2,000,000,000)
KA7314 IMME __ DIATE TRACK SAFETY WORKS ON ROHRI-KH ________________ ANPUR SECTION IN __________________ SUKKUR DIVISION
014302- A11 Investments 1,000,000,000 345,000,000 3,000,000,000
014302- A111 Investment Local 1,000,000,000 345,000,000 3,000,000,000
Total- IMMEDIATE TRACK SAFETY WORKS ON ROHRI-KHANPUR SECTION IN SUKKUR DIVISION 1,000,000,000 345,000,000 3,000,000,000
(In Foreign Exchange) (800,000,000) (2,000,000,000)
(Own Resources) (800,000,000) (2,000,000,000)
(In Local Currency) (200,000,000) (345,000,000) (1,000,000,000)
KA9603 CONS __ TRUCTION OF LINK ROAD FROM NAROWAL ________________ RAILWAY STATION __________________ TO SIALKOT PHATT ______________ AK
014302- A11 Investments 200,000,000
014302- A111 Investment Local 200,000,000
Total- CONSTRUCTION OF LINK ROAD FROM 200,000,000
NAROWAL RAILWAY STATION TO SIALKOT PHATTAK
KA9608 REHABILITATION AND IMPROVEMENT OF KOTRI JA TRACK BETWEEN MSHORO RAIL LINK / PC-I OF REHABILITATION OF
014302- A11 Investments 893,606,000 533,106,000 846,000,000
014302- A111 Investment Local 893,606,000 533,106,000 846,000,000
Total- REHABILITATION AND IMPROVEMENT OF KOTRI JAMSHORO RAIL LINK / PC-I OF REHABILITATION OF TRACK BETWEEN 893,606,000 533,106,000 846,000,000
Page 625
NO. 133.- FC1 2C33 CAPITAL OUTLAY ON RAILWAYS DIVISIO No of 2023-24 Posts 2024-25 N 2023-2024 Budget Estimate DEMAN 2023-2024 Revised Estimate DS FOR GRANTS 2024-2025 Budget Estimate
Rs Rs Rs
ACCOUNTANT GENERAL PAKISTAN RE VENUES SUB-OF FICE, KARACHI
(In Foreign Exchange) (350,000,000) (561,000,000)
(Own Resources) (350,000,000) (561,000,000)
(In Local Currency) (543,606,000) (533,106,000) (285,000,000)
KA9609 CONV __ ERSION OF BREAKING SYSTEM OF 328 NOS O ________________ F MBFRS FROM V _________________ ACCUM BRAKE TO _______________ AIR BRAKE
014302- A11 Investments 400,000,000 43,262,000 641,000,000
014302- A111 Investment Local 400,000,000 43,262,000 641,000,000
Total- CONVERSION OF BREAKING SYSTEM 400,000,000 43,262,000 641,000,000
OF 328 NOS OF MBFRS FROM VACCUM BRAKE TO AIR BRAKE
(In Foreign Exchange) (380,000,000) (510,000,000)
(Own Resources) (380,000,000) (510,000,000)
(In Local Currency) (20,000,000) (43,262,000) (131,000,000)
KA9697 IMME __ DIATE TRACK SAFETY WORK IN KARACHI AND ________________ SUKKUR _________________ _______________
014302- A11 Investments 868,891,000 1,122,891,000
014302- A111 Investment Local 868,891,000 1,122,891,000
Total- IMMEDIATE TRACK SAFETY WORK IN KARACHI AND SUKKUR 868,891,000 1,122,891,000
KA9906 REPLACEMENT OF TRACK MACHINE
014302- A11 Investments 400,000,000
014302- A111 Investment Local 400,000,000
Total- REPLACEMENT OF TRACK MACHINE 400,000,000
(In Foreign Exchange) (380,000,000)
(Own Resources) (380,000,000)
(In Local Currency) (20,000,000)
KA9997 THAR CONNECTIVIT __ COAL RAIL CONNECTIVITY WITH EXISTING R Y WITH PORT ________________ AILWAY NETWOR _________________ K INCLUDING LAST _______________ MILE
014302- A11 Investments 4,695,476,000 15,110,000,000
014302- A111 Investment Local 4,695,476,000 15,110,000,000
Total- THAR COAL RAIL CONNECTIVITY WITH EXISTING RAILWAY NETWORK INCLUDING LAST MILE CONNECTIVITY WITH PORT 4,695,476,000 15,110,000,000
Page 626
NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION DEMAND S FOR GRANTS
No of Posts 2023-2024 2023-2024 2024-2025
2023-24 2024-25 Budget Revised Budget
Estimate Estimate Estimate
Rs Rs Rs

ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

(In For (Own (In Loc eign Exchange) Resources) al Currency) (4,695,476,000) (7,110,000,000) (7,110,000,000) (8,000,000,000)
014302 Total- Non-Financial Institutions _________________ 31,727,000,000 _________________ 32,193,348,000 _______________ 44,649,000,000
0143 Total- Investments 31,727,000,000 32,193,348,000 44,649,000,000
014 Total- Transfers 31,727,000,000 32,193,348,000 44,649,000,000
01 Total- General Public Service 31,727,000,000 32,193,348,000 44,649,000,000
04 Economic Affairs:
045 Construction and Transport:
0454 04540 KA13 Railwa 1 Railwa 76 RECO y Trasport: y Trasport : NSTRUCTION/REHABILITATION OF ASSET S DAMAGED DURING THE FLOOD 2010
04540 1- A11 Investments 100,000,000 130,170,000
04540 1- A111 Investment Local 100,000,000 130,170,000
KA13 YAD P Total- 77 IMPR IPRI KA RECO OF AS FLOO OVEME RACHI NSTRUCTION/REHABILITATION SETS DAMAGED DURING THE D 2010 NT OF TERMINAL FACILITIES AND E 100,000,000 NHANCING SECURIT 130,170,000 Y ARRANGEMENT IN MARSHILING
04540 1- A11 Investments 943,000,000 346,482,000 250,000,000
04540 1- A111 Investment Local 943,000,000 346,482,000 250,000,000
Total- IMPROVEMENT OF TERMINAL 943,000,000 346,482,000 250,000,000
FACILITIES AND ENHANCING SECURITY ARRANGEMENT IN MARSHILING YAD PIPRI KARACHI
045401 Total- Railway Trasport 1,043,000,000 476,652,000 250,000,000
0454 Total- Railway Trasport 1,043,000,000 476,652,000 250,000,000
045 Total- Construction and Transport 1,043,000,000 476,652,000 250,000,000
04 Total- Economic Affairs 1,043,000,000 476,652,000 250,000,000
Total- ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI 32,770,000,000 32,670,000,000 44,899,000,000

(In Foreign Exchange)

(24,596,132,000)

(25,776,000,000)

Page 627
NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION No of 2023-24 Posts 2024-25 2023-2024 Budget Estimate Rs DEMAN 2023-2024 Revised Estimate Rs DS FOR GRANTS 2024-2025 Budget Estimate Rs
ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
(Own Resources) (24,496,132,000) (25,676,000,000)
(Foreign Aid) (100,000,000) (100,000,000)
(In Local Currency) (8,173,868,000) (32,670,000,000) (19,123,000,000)
TOTAL - DEMAND 33,000,000,000 32,822,507,000 45,000,000,000
(In Foreign Exchange) (24,826,132,000) (25,877,000,000)
(Own Resources) (24,496,132,000) (25,676,000,000)
(Foreign Aid) (330,000,000) (201,000,000)
(In Local Currency) (8,173,868,000) _________________ (32,822,507,000) __________________ (19,123,000,000) _______________