Page 201
Output Key Performance Targets Achieved Planned Targets Medium Term Targets
Indicators 2024-25 2025-26 2026-27 2027-28 2028-29
1 2 3 4 5 6 7
• The financial closure will be completed after completion of requisite compliances of the SPA by the seller and purchaser by Nov. 2025. • SPA was accordingly executed. • As per terms of Bid Documents, EVE Holding has deposited 10% of sale proceeds with PC. Planned Targets • The financial closure will be completed after completion of requisite compliances of the SPA by the seller and purchaser. • New FPT of Bo D of FWBL is in process with SBP. • Financial closure expected by
March 152026
Privatisation of House Building Finance 1stAttempt • Finalization & approval of Due diligence. • Finalization & approval of ITB & SPA. • Depositing of Bid Offer • Approval of Reference Price by Federal Cabinet. • Opening of Bid Offer • Acceptance / Rejection of Bid Offer by Federal Cabinet • Financial closure. 2ndAttempt • Hiring of new FA. 1stAttempt • Buy Side Due Diligence completed. • ITB & SPA finalized. , Completed 1stAttempt • Bid offer received. • Federal Cabinet approved the Reference Price. • Bid opening session was held. • PMRC informed PC of its withdrawal from the bid process. • PC Board approved to recommend to CCOP that the negotiated sale • EOI for investors • Bidding • Financial closure. - -
Page 202
Output Key Performance Targets Achieved Planned Targets Medium Term Targets
Indicators 2024-25 2025-26 2026-27 2027-28 2028-29
1 2 3 4 5 6 7
• EOI for investors • Bidding • Financial closure. process for privatisation of HBFCL may be terminated • PC Board also directed to reinitiate the process for hiring of new FA for the HBFCL transaction Planned Targets 2ndAttempt _(privatisation_process reinitiated.) • Hiring of new FA.
Zarai Taraqiati Bank Ltd. (ZTBL) • Hiring of FA. • Finalization & approval of Due diligence. • EOI for Investors • Bidding • Financial closure. - Completed • Hiring of FA. • Finalization & approval of Due diligence. • EOI for Investors • Bidding. • Financial closure. - -
Roosevelt Hotel, NY-USA Transaction 1stAttempt • Finalization & approval of Due diligence. • Approval of Transaction Structure by Federal Cabinet. 2ndAttempt • Hiring of New FA. • Finalization & approval of Due diligence. • Approval of Transaction Structure by Federal Cabinet. • Marketing preparation. • Pre-qualification of IPs. 1stAttempt • Transaction Structure approved by the Federal Cabinet. • FA i.e. Consortium of Jones Lang La Salle (JLL) Americas, Inc has resigned as FA. 2ndAttempt • The process for hiring of new FA was initiated. 2ndAttempt • The hiring of FA process was annulled. Planned Targets • Hiring of New FA. • Finalization & approval of Due diligence. • Approval of Transaction Structure by Federal Cabinet. • Marketing preparation. • Pre- qualification of IPs. • Finalization& approv al of JV agreement. • Approval of Reference Price by Federal Cabinet. • Financial closure. - -
Page 203
Output Key Performance Targets Achieved Planned Targets Medium Term Targets
Indicators 2024-25 2025-26 2026-27 2027-28 2028-29
1 2 3 4 5 6 7
• Finalization & approval of JV agreement. • Approval of Reference Price by Federal Cabinet. • Financial closure.
DISCOs Batch- I (IESCO, FESCO & GEPCO) • Appointment of FA • EOI for Investors • Bidding • Financial closure. • FA appointed. • EOI for Investors • Bidding • Financial closure. - -
Pakistan Re- Insurance Co. Ltd. (Pak Re) • Approval of Mode of Privatisation from Federal Cabinet. • Appointment of FA • EOI for Investors • Bidding • Financial closure. - • Approval of Mode of Privatisation from Federal Cabinet. • Appointment of FA • EOI for Investors • Bidding • Financial closure. - -
State Life Insurance Corporation (SLIC) • Approval of Mode of Privatisation from Federal Cabinet. • Appointment of FA • EOI for Investors • Bidding • Financial closure. - • Approval of Mode of Privatisation from Federal Cabinet. • Appointment of FA • EOI for Investors • Bidding • Financial closure. -
Pakistan Engineering Company (PECO) • Resolution of legacy issues by stakeholders. • Appointment of FA • Finalization & approval of Due diligence. • Pre-Qualification of IPs. • Finalization & approval of ITB & SPA. • Approval of Reference Price by Federal Cabinet. •Financial closure. - • Resolution of legacy issues by stakeholders, still pending. • Subsequent to resolution of legacy issues, process for initiating privatisation process will be obtained from comptent fora. - -
DISCOs Batch - II (HESCO & SEPCO) • Appointment of FA • Finalization & approval of Due diligence. • EOI for Investors • Bidding - Completed • Appointment of FA. Planned Targets • EOI for Investors • Bidding • Financial closure. - -
Page 204
Output Key Performance Targets Achieved Planned Targets Medium Term Targets
Indicators 2024-25 2025-26 2026-27 2027-28 2028-29
1 2 3 4 5 6 7
• Financial closure. • Finalization & approval of Due diligence.
DISCOs Batch - III (PESCO & HAZECO) • Appointment of FA • EOI for Investors • Bidding • Financial closure. - - • Appointment of FA. • EOI for Investors. • Bidding • Financial closure. -
DISCOs Batch - IV (LESCO & MEPCO) • Appointment of FA • EOI for Investors • Bidding • Financial closure. - - - • Appointment of FA. • EOI for Investors. • Bidding • Financial closure.
Guddu Power Plant (747 MW) • Resolution of issues by stakeholders. • Appointment of FA • Finalization & approval of Due diligence. • Finalization & approval of ITB & SPA. • Pre-Qualification of IPs. • Approval of Reference Price by Federal Cabinet. • Financial closure. - • Resolution of issues by stakeholders. • Appointment of FA. • Finalization & approval of Due diligence. • Pre- Qualification of IPs. • Finalization & approval of ITB & SPA. • Approval of Reference Price by Federal Cabinet. • Financial closure. - -
Nandipur Power Plant (425 MW) • Resolution of issues by stakeholders. • Appointment of FA • Finalization & approval of Due diligence. • Pre-Qualification of IPs. • Finalization & approval of ITB & SPA. • Approval of Reference Price by Federal Cabinet. • Financial closure. - • Resolution of issues by stakeholders. • Appointment of FA. • Finalization & approval of Due diligence. • Pre- Qualification of IPs. • Finalization & approval of ITB & SPA. • Approval of Reference Price by Federal Cabinet. • Financial closure. - -
Page 205

Medium Term Performance Based Budget FY 2026-2027 to 2028-29

Output Key Performance Indicators Targets Achieved 2024-25 Planned Targets 2025-26 Medium Term Targets 2026-27 2027-28 2028-29
1 2 3 4 5 6 7
Islamabad International Airport • Appointment of FA • Finalization & approval of Due diligence. • EOI for Investors • Bidding • Financial closure - • Appointment of FA • Finalization & approval of Due diligence. • EOI for Investors • Bidding • Financial closure - -
Jinnah International Airport (Karachi) • Appointment of FA • EOI for Investors • Bidding • Financial closure - - • Appointment of FA. • EOI for Investors • Bidding • Financial closure -
Allama Iqbal International Airport (Lahore • Appointment of FA • EOI for Investors • Bidding • Financial closure - - • Appointment of FA. • EOI for Investors • Bidding • Financial closure -
Postal Life Insurance Company Ltd. (PLICL) • Appointment of FA • EOI for Investors • Bidding • Financial closure - - - • Appointment of FA. • EOI for Investors • Bidding • Financial closure
Page 206

Railways Division:

PAO: Secretary

1. Goal: To contribute towards provision of safe, reliable, affordable, environment friendly and competitive passenger and freight services.

2. Policy: Our policy is to invest, build and improve railway system mainly focusing on business

Development and operations, rolling stock availability, infrastructure development and improved governance.

3. Outcomes: Improved safety, reliability and affordability of railway system in services.

4. Budget by Outputs: Rs. In 000’

Office Actual Budget Medium Term Budget
Outputs Expenditure
Responsible 2024-25 2025-26 2026-27 2027-28 2028-29
Railways Policies Formulation and Implementation Railways Division 391,194 457,832 478,151 530,269 590,190
Railways Services Pakistan Railways (CEO / Sr. GM) 64,038,078 70,000,000 70,000,000
Pak railways infrastructure & equipment development services - Other Infrastructure Additional General Manager (Infrastructure) 6,865,638 7,660,000 - - -
Pak railways infrastructure & equipment development services-Signaling Additional General Manager 383,790 80,000 - - -
Pak railways infrastructure & equipment development services-Track Additional General Manager Infrastructure 15,414,924 10,175,000 - - -
Governance Director General Mo R 159,985 120,000
Pak railways infrastructure & equipment development services - Regional Development Additional General Manager 49,323 -
Business Development Additional General Manager 299,696 3,160,000
Pak railways infrastructure & equipment development services - Rolling Stock Additional General Manager 10,289,635 1,220,000
Development 40,658,000
Total 97,892,263 92,872,832 111,136,151 530,269 590,190
Page 207

5.Key Performance Indicators/Targets

Outputs Key Performance Delivered Target Planned Target Medium Term Target
Indicators 2024-25 2025-26 2026-27 2027-28 2028-29
Railway Policy Formulation Policies Formulation and Implementation (Numbers) - - - - -
Railways Services Freight Traffic to be handled (Billion Tonn Kilometers) - - - - -
Passenger Traffic to be handled (Billion Passenger Kilometers) - - - - -
Freight Revenue (Rs. in Billion) - - - - -
Passenger Revenue (Rs. in Billion) - - - - -
Other Revenue Receipts (Rs. in Billion) - - - - -
Total Revenue (Rs. in Billion) - - - - -
Improvement in punctuality of Passenger Services (%) - - - - -
Track safety works Kms 28 48 175 250 47
Construction of new track 0 0 77 202 201
Up-gradation of track 0 0 277 602 319
Up-gradation of stations 0 1 0 0 0
Construction of new stations 0 4 4 0 0
Rehabilitation of bridges 27 45 96 830 67
Platform shelters 0 0 1 07 13
Up gradation of signaling system 7 10 0 0 0
Infrastructure development - Track Rehabilitation of tracks (KMs) - - - - -
Page 208

Medium Term Performance Based Budget FY 2026-2027 to 2028-29

Infrastructure development - Stations Rehabilitation of Existing Stations (Numbers) 0 0 1 0 0
Infrastructure development- Bridges Rehabilitation of Bridges (Nos) 27 45 96 830 67
Infrastructure development- Shelters Provision of platform Shelters (Nos) 0 0 1 07 13
Infrastructure development - Signaling Up gradation of signaling system (KM) 7 10 0 0 0
Up gradation of Signaling System (No.of Stations) - - - - -
Infrastructure development - Electrical power Meterization of 26000 meters (%) - - - - -
Rolling stock availability Rehabilitation of accidental locomotives 0 01 01 0 0
Special repair of locomotives 08 01 14 0 0
Procurement of New Coaches (Numbers) 10 32 142 0 0
Procurement of New Wagons (Numbers) 250 130 0 0 0
Repair and Maintenance of Power Van, AC and Economy class coaches (Nos) 0 153 0 0 0
Repair and maintenance of wagons 0 153 0 0 0
Business Development and Operations Establishment of Dry Ports / Terminals (Numbers) 0 0 0 0 0
Governance Introduction of ERP (%) 25 25 25 0 0
Training and Developments (Numbers) 70 50 60 65 0
Monitoring and Evaluation Reports 60 60 60 60 60
Page 209

Religious Affairs and Inter-faith Harmony:

PAO: Secretary

1. Goal: to take steps for maximum facilitation of Pakistani Hajjaj. To highlight importance of seerah by conducting national seerat conference. Conduct of dawah competitions. Crescent sighting activities. Interfaith harmony conferences and festivals to be conducted during fy-2026-27. To take care of minorities.

2. Policy: with the aim to facilitate Hajjaj in Pakistan and kingdom of Saudi Arabia. ziarat policy: to facilitate the Pakistani zaireen who intends to visit Iran , Iraq and Syria.

3. Outcome: services delivery with respect to religious activities to Pakistani citizens irrespective of their faith or religion (Muslims and minorities).

4. Budget by Output In Rs.000’

Output Office Actual Expenditure Budget Medium Term Budget
Responsible 2024-25 2025-26 2026-27 2027-28 2028-29
Facilitation and arrangement services for Hajjaj Hajj Wing 859,240 1,680,921 1,051,382 1,165,983 1,297,739
Policy making and administration Main Secretariat 639,271 690,786 744,076 825,180 918,426
Celebration of religious festivals of minorities Interfaith Harmony Wing 175,315 178,000 180,000 199,620 222,177
Financial assistance in shape of cash transfers, small development schemes, scholarships for minorities Interfaith Harmony Wing 99,757 85,000 100,000 110,900 123,432
Facilitation and management of Muslim pilgrimages beyond Pakistan except Hajj, and coordination with Muslim countries and organizations on Islamic matters Dawah and Ziarat wing 0 12,080 10,000 11,090 12,343
Moon Sighting Services Research and Reference Wing 5,955 6,500 6,000 6,654 7,406
Development 312,000
Total 1,779,538 2,653,287 2,403,458 2,319,427 2,581,522
Page 210

5.Key performance Indicators/Targets:

Outputs Key Performance Indicators Target Achieved 2024-25 Planned Target 2025-26 Medium Term Budget 2026-27 2027-28 2028-29
Facilitation and arrangement services of Hujjaj Training for Hujjaj on Manasik-e-Hajj & Administrative aspects of Hajj (as %age of total Hajj quota) 100% 100% 100% 100% 100%
Number of airports to be included under road to makkah 2 3 3 3 3
No. of Hujjaj 115,283 179,210 179,210 179,210 179,210
Books of Manasik e Hajj Pak Hajj App Pak Hajj App Pak Hajj App Pak Hajj App Pak Hajj App
%age compliance with SPA 100% 100% 100% 100% 100%
%age of Complaints and inquiry resolution 100% 100% 100% 100% 100%
Financial assistance in shape of cash Number of beneficiaries - cash transfers 1,528 2,500 2,700 2,900 3,500
transfers, small development schemes, Number of beneficiaries - scholarships 2,236 3,000 3,200 3,500 4,000
scholarships for minorities Number of beneficiaries - small development schemes 32 30 60 60 65
Celebration of religious festivals of Number of participants in Religious Festivals 5,500 5,400 5,500 5,500 5,500
minorities Conference to be held on (Date of holding conference) Number of conferences on sectarian harmony 4 4 4 4 4
Moon sighting services No. of Ruet e Hilal Committee Meetings 12 12 12 12 12
%age of Harmony in Eid and Ramzan announcement 100% 100% 100% 100% 100%
Policy making and Administration Number of competitions arranged seerat literature 9 9 9 9 9
Page 211

Medium Term Performance Based Budget FY 2026-2027 to 2028-29

Seerat conference to be held on (Date of holding conference) 12th Rabi UI Awal 12th Rabi UI Awal 12th Rabi UI Awal 12th Rabi UI Awal 12th Rabi UI Awal
Conference to be held on (Date of holding conference) Number of conferences on sectarian harmony - - - - -
Publications of Maqalat-e-Seerat (Number of copies printed and distributed) 500 600 500 500 500
Page 212

Science and Technology Division:

PAO: Secretary

1. Goal: Provision of proper infrastructure, technical and financial support for development of Science and Technology sector in Pakistan along with standardization of science and technology related processes and products.

2. Policy: National Science Technology and Innovation Policy 2022

3. Outcome: Promotion of applied research in scientific and technological fields, prescription of standards & measures for quality control of manufactured goods, and promotion of metrology standards, testing and quality assurance system

4. Budget by Output: In Rs.000’

Outputs Office Responsible Actual Expenditure 2024-25 Budget 2025-26 Medium Term Budget 2026-27 2027-28 2028-29
Promotion of Standards and Quality Assurance. D.G, Pakistan National Accreditation Council (PNAC), D.G, National Physical Standard Laboratory (NPSL) & D.G, Pakistan Halal Authority (PHA) 8,951,852 701,913 598,649 663,902 738,923
Promotion of Alternate Energy and Water Quality. Chairman, Pakistan Council of Research in Water Resources (PCRWR) & D.G, Pakistan Council of Renewable Energy & Technologies (PCRET). 224,651 190,293 166,184 184,298 205,124
Promotion of Higher Education in the field of Science and Technology Rector, National University of Science & Technology (NUST) and Rector, COMSATS University Islamabad (CUI). 6,629,581 6,158,203 5,575,992 6,183,775 6,882,542
Formulation/Impl ementation of Policy Frame Work and Provision of Admin Supports. Ministry of Science & Technology (Main Secretariat) & Chairman, Pakistan Council for Science & Technology (PCST) 1,093,989 2,698,842 3,166,352 3,511,484 3,908,282
Research and Development for Socio Economic Development Chairman, Pakistan Council of Scientific & Industrial Research (PCSIR), 9,414,494 9,097,335 5,540,054 6,143,920 6,838,183
Page 213
D.G, National Institute of Electronics (NIE), Chairman, Council for Works & Housing Research (CWHR) & D.G, National Institute of Oceanography (NIO)
Popularization of Science. Chairman, Pakistan Science Foundation (PSF). 1,860,329 481,532 448,947 497,882 554,143
Liaison with International Organizations for the Development of Science and Technology Main Secretariat and Joint Scientific Advisor IL 585,804 477,398 477,398 529,434 589,260
Development 3,567,000
Total 20,374,546 19,805,516 19,540,576 17,714,696 19,716,456

5.Key Performance Indicators/Targets:

Outputs Key Performance Idit Targets Achieved Targets Planned Medium Term Target
ncaors 2024-25 2025-26 2026-27 2027-28 2028-29
Promotion of No. of Testing and Calibration
Standards and Quality Laboratories Accredited by PNAC 271 281 286 291 296
Assurance No. of Inspection Bodies Accredited by PNAC 17 18 19 20 21
No. of Medical Lab. Accreditation by PNAC 21 22 23 24 25
No. of Halal Certification Bodies by PNAC 12 13 14 15 16
Certification Bodies (PNAC) 12 13 14 15 16
Proficiency Testing (PNAC) 1 1 1 1 1
Product Certification (PNAC) 1 1 1 1 1
Certification of Persons (PNAC) 3 4 5 5 4
Trainings/Courses/Seminars/ Webinars (PNAC) 12 12 12 12 12
No. of Testing & Calibration Services Provided by NPSL/NMIP 2,768 2,900 3,000 3,300 3,500
Physical Working Standards Fabricated/ Calibrated and Reference Materials Developed (NPSL/NMIP) 11 15 20 21 20
No. of Training/Workshop Organized byNPSL/NMIP 19 12 16 20 020
Page 214
Outputs Key Performance Idit Targets Achieved Targets Planned Medium Term Target
ncaors 2024-25 2025-26 2026-27 2027-28 2028-29
On-site Calibrations by NPSL/ NMIP 53 70 80 100 100
No. of Public/Private Sectors Clients Served (NPSL/NMIP) 372 450 450 500 550
International Traceability of Equipment (NPSL/NMIP) 23 12 15 0 15
Traceability of in-house Equipment (NPSL/NMIP) 90 80 100 120 120
PT Program Organized by NPSL/NMIP 4 12 0 0 0
Participation in International ILC / PT Programs (NPSL/NMIP) 5 3 5 3 4
No. Need based Projects (NPSL/NMIP) 0 4 0 0 0
Consultancies Provided by NPSL/NMIP 2 7 3 5 6
Paper Published (International), NPSL/NMIP 1 4 0 0 0
Paper Published (National), NPSL/NMIP 0 4 0 0 0
Technical Reports (NPSL/NMIP) 4 10 4 6 6
Students Supervised (NPSL/NMIP) 7 12 12 12 15
Mo Us Signed by NPSL/NMIP 2 4 2 0 2
Testing of Building Materials by CWHR 35 35 100 100 100
Promotion of Alternate Energy Provide Consultancy/ technical services to Public/Private sector organizations in the field of renewable energy technologies (PCRET) 0 5 7 8 2
Impact factor Journals publications in the field of Advance PV Technologies (PCRET) 1 3 3 4 3
Collaboration/signing of Mo Us with National/ International Universities/ Organizations/ Companies (PCRET) 1 3 5 4 2
PV Panel testing services to Public/Private Sector (PCRET) 0 0 15 15 30
MS research projects carried out at PCRET lab (PCRET) 4 4 5 6 0
Arrangement of renewable energy seminars/ conferences (PCRET) 2 3 2 2 3
Training programs to installers/users of renewable energy applications (PCRET) 1 3 3 4 4
Number of projects with international financial/ technical 1 2 3 3 3
Page 215

Medium Term Performance Based Budget FY 2026-2027 to 2028-29

Outputs Key Performance Idit Targets Achieved Targets Planned Medium Term Target
ncaors 2024-25 2025-26 2026-27 2027-28 2028-29
cooperation/ organizations related to renewable energy (PCRET)
Patents filed in the field of renewable energy technologies (PCRET) 1 1 2 2 1
Prototype development of renewable energy products (PCRET) 0 3 3 5 3
Promotion of Papers to be published by NUST 1,900 2,000 2,100 2,200 2,300
Higher Education Industrial linkage established by NUST 700 900 1,000 1,200 1,400
in the field of Science and No of Patent/Copy rights/trademarks filed by NUST 1,370 1,500 1,600 1,700 1,800
Technology No of Research Articles to be presented in conferences by NUST 300 310 320 340 360
Formulation / Implementation No. of S&T Policy studies / Technical Reports (PCST) 2 5 5 5 5
of Policy Frame- No. of Technology Foresight Reports (PCST) 1 1 2 2 2
work and Provision of Admin Support Development & Maintenance of S&T Databases 2 2 2 2 2
Research and Development for Civil Engineering Conference, Exhibitions, symposia etc. (CWHR) 0 3 3 3 3
Socio Economic Other Activities Related to joint Collaboration (CWHR) 0 3 3 3 3
Development Skill Development and Training to Organizations (CWHR) 3 3 3 3 3
Paper Publication (CWHR) 1 1 4 4 4
Non Destructive Testing , Contract Research and Consultancy Services (CWHR 100 100 250 250 250
Dissemination of R & D Products (CWHR) 1 5 8 8 8
To coordinate and maintain liaison with international organization and institute for arranging training or experts services (NIO) 4 5 6 6 6
To undertake mission oriented multi-disciplinary research in Pakistan maritime zones (NIO) 4 6 7 7 7
Procurement of specialized instruments and equipment, transfer of marine technology, and development of cooperative research program (NIO) - 2 2 2 2
No. of Clients Served by PCSIR 21,617 22,000 24,000 24,500 25,000
Page 216
Outputs Key Performance Targets Achieved Targets Planned Medium Term Target
Indicators 2024-25 2025-26 2026-27 2027-28 2028-29
Number of Process developed (PCSIR) 240 275 280 285 290
Number of Process leased-out (PCSIR) 118 120 123 125 128
Number of testing/ calibration services provided by PCSIR 61,473 64,000 66,000 69,000 70,000
Number of Patents filed (PCSIR) 31 32 32 33 33
Number of Patents obtained (PCSIR) 5 5 5 5 6
Number of Students supervised (PCSIR) 919 930 935 940 945
Number of consultancies provided to the industry (PCSIR) 1,019 1,025 1,035 1,050 1,055
Number of Feasibility / technical reports prepared (PCSIR) 344 350 355 360 365
Number of Papers published (International) (PCSIR) 121 140 150 155 165
Number of Papers published (National) (PCSIR) 43 50 55 60 62
Number of analytical Equipment Developed (PCSIR) 164 210 220 225 230
Exhibition/ conference/ Seminars organized by PCSIR 250 265 275 282 282
Mo Us signed with industries/ academia (PCSIR) 23 40 40 40 42
Interaction with Industries (PCSIR) 1,818 2,400 2,500 2,600 2,800
Popularization of Science No. of research and development organizations to be provided with support (PSF) 73 81 85 86 88
Number of international organizations engaged 24 32 35 38 40
Number of international exchange visits 15 22 25 28 30
No. of Research Initiatives to by undertaken by PSF 9 50 51 55 57
Financial Support to Conferences/ Workshops/ Symposium by PSF 19 57 58 59 60
Search & Supply of S&T Documents to universities, R&D Organizations etc by PASTIC 64,202 60,000 62,000 63,000 64,000
No. of Users served by PASTIC for Document Supply Service. 4,739 4,500 4,600 4,700 4,800
No. of clients served by PASTIC Library physically 3,132 3,200 3,300 3,400 3,500
No. of online users served by Library (PASTIC) 445,305 450,000 500,000 550,000 600,000
Users served under TISC patent (query based) (PASTIC) 156 180 200 220 240
Page 217
Outputs Key Performance Targets Achieved Targets Planned Medium Term Target
Indicators 2024-25 2025-26 2026-27 2027-28 2028-29
No. of Events (Seminars, Symposia, Exhibitions) organized by PASTIC 30 30 30 30 30
No. of online Issues of Technology Roundup (PASTIC) 6 6 6 6 6
Organizing capacity building activities on modern research tools and techniques by PASTIC 3,040 3,100 3,200 3,300 3,400
No. of Printing jobs completed by PASTIC. 25 30 30 30 30
No. of organizations served regarding printing services by PASTIC 13 15 15 15 15
No. of records entered in Pakistan Science Abstracts, NJA (PASTIC) 30,500 32,000 34,000 36,000 38,000
No. of Abstract Books/Book published etc. by PASTIC 2 8 8 8 8
No. of records created in Technology databases (PASTIC) 29,605 30,000 31,000 32,000 33,000
No. of specimens identified, curated, documented/catalogued digitally documented for database and preservation in PMNH Laboratory 56,208 61,000 62,000 68,000 54,000
No. of collaborations/ Mo US signed between national and international organizations by PMNH 6 7 7 7 7
No. of visit in the different areas of the country for collection of natural history specimens by PMNH 12 22 23 23 13
No. of research articles/ books/ monographs published in national and international journals by PMNH 108 118 147 165 188
Workshops / Symposia / Training on Taxidermy / Medicinal Plants / Gemstone / Ore-minerals Identifications by PMNH 104 142 156 181 186
Development/maintenance of dioramas/displays for public education by PMNH 43 58 67 87 92
No of schools/colleges/ universities students and general public visiting PMNH 200,000 230,000 260,000 300,000 320,000
Impart of education through lectures, public display (PMNH) 20 21 23 28 23
Page 218

Water Resources Division:

PAO: Secretary

1. Goal: By 2050, make Pakistan water secure while preserving the ecosystem

2. Policy: To carve knowledge products befitting the needs of water resource management

3. Outcome: As a sole research organization on water, provide solutions to key water resource issues through action and adaptive research I n collaboration with sectoral stakeholders

4. Budget by Outputs: In Rs. 000’

Output Office Actual Expenditure Budget Medium Term Budget
Resonsible
p 2024-25 2025-26 2026-27 2027-28 2028-29
Admin support / Policy development and approval / technical support Main Secretariat 515,951 640,537 665,650 738,206 821,623
Climate resilient Water infrastructure development WAPDA and Provincial Irrigation departments for federally funded projects 110,376,524 59,630,120 50,500 103,086,000
Research & development / capacity building PCIW and Research Institute 21,279 64,433 71,456 79,531
Sustainable water resource management, monitoring & flood mitigation services IRSA and WAPDA for the purposes of water management and CEA/CFFC for coordination of Flood irrigation services 106,646,214 76,210,312 2,493,432 2,765,216 3,077,686
Promotion of energy and Water Conservation and Water Quality (Research) Pakistan Council of Research in Water Resources 803,198 960,000 1,017,981 1,128,941 1,256,511
Total 218,363,166 137,491,469 107,327,496 4,703,819 5,235,351
Page 219

5. Key Performance Indicator/ Targets

Outputs Key Performance Indicators Target Achieved 2024-25 Planned Target 2025-26 Mi 2026-27 d-Term Target 2027-28 2028-29
Climate resilient Water Number of Small Dams to be completed -
infrastructure development Number of Medium Dams to be started In Process
Number of Large Dams to be started In Process
Sustainable water resource management, monitoring & flood mitigation services Technical evaluation of Water Sector Projects i.e. Irrigation, Drainage, Dams and Hydropower projects by DSC and Civil & Power Engineering Wings of Office of CEA/CFFC. -
Promotion of No. of R&D Projects 14
energy and Water Operation of Research Farms (7 Nos.) 7
Conservation and Water Training of Farmers/end users/community (persons) 250
Quality (Research) Desertification Control and rainwater harvesting activities (Nos.) 70
Capacity Building of staff of Water Supply Agencies and professionals (Persons) 400
Monitoring of Bottled Water throughout the country (no. of Quarters per year) 4
Monitoring Water Quality Health of Major Rivers (Nos.) 3
Annual Report, Newsletter, Brief Handouts, Research Reports, Paper and Publications (No.) 35
PNC-IHP meetings (Nos.). 1
Fabrication and distribution of technologies like microbiological testing kits. etc. (Nos 7000
Groundwater Investigation Services (Nos.). 45
National Water Quality Monitoring throughout field laboratories (No. of Samples) Drinking/Waste Water Testing 16000
Page 220

National Assembly:

PAO: Secretary

1. Goal: Smooth functioning of legislation

2. Policy: 3. Outcomes: 4. Budget by Outputs In Rs. 000’

Output Office Actual Expenditure 2024-25 Budget 2025-26 Medium Term Budget 2026-27 2027-28 2028-29
Overall effectiveness of the National Assembly Main secretariat 4,295,602 8,328,550 8,984,385 9,963,683 11,089,579
Committee effectiveness / Public Accounts Committees / Research etc. Main Secretariat 5,154,362 7,961,575 8,020,295 8,894,507 9,899,586
Total 9,449,965 12,736,752 17,004,680 18,858,190 20,989,166

5.Planned and delivered Key performance targets

Outputs Key Performance Indicators Target Achieved 2024-25 Planned Target 2025-26 Medium Term Target 2026-27 2027-28 2028-29
Overall effectiveness of Meeting of National Assembly (In days) 50 130 130 130 130
the National Facilitation to MNAs (No.of MNAs) 300 310 310 310 310
Assembly Bills passed (Numbers) 71 90 95 100 100
Resolutions (Numbers) 13 35 40 45 45
Notices (Numbers) 226 250 300 330 330
Questions received in Sectt (Numbers) 2057 5500 6000 6500 6500
Motions (Numbers) 86 235 275 300 300
Committee effectiveness / Meeting of Public Accounts Committees (Numbers) 14 50 60 65 65
Public Accounts Committees / Monitoring and Implementation committee (Numbers) 4 10 11 12 12
Research etc. Sub committees of PAC (numbers) 13 9 10 11 11
Standing Committee / sub- Committees meetings (Numbers) 28 300 350 360 360
Research and information for parliamentarians in Pakistan Institute for Parliamentary Services (PIPS) on different issues (Numbers) 306 250 290 300 300
Research papers, Digest/Books and research studies conducted by National Assembly Secretariat (Numbers) 208 245 250 260 260
Page 221

The Senate:

PAO: Secretary

1. Goal: Effective promulgation of constitutional framework

2. Policy: 3. Outcome:

4. Budget by Output In Rs. 000’

Output Office Actual Expenditure 2024-25 Budget 2025-26 Medium Term Budget 2026-27 2027-28 2028-29
Administrative services to legislation (Senate) Senate Secretariat 4,928,876 6,174,623 6,452,907 7,156,274 7,964,933
Overall effectiveness of the Senate Senate Secretariat 1,857,998 2,880,057 3,217,202 3,567,877 3,971,047
Total 6,786,874 9,054,680 9,670,109 10,724,151 11,935,980

5.Key performance Indicators/targets

Outputs Key Performance Indicators Target Achieved 2024-25 Planned Target 2025-26 Med 2026-27 ium Term T 2027-28 arget 2028-29
Overall effectiveness of the Senate Number of days, the Senate shall meet during a year 112 110 110 110 110
Number of Senator to be facilitated 100 100 100 100 100
Number of Chairmen Standing Committees to be facilitated 40 40 40 40 40
Page 222

National Anti-Money Laundering and Counter

PAO: Chairman

1. Goal: The National Anti-Money Laundering and Counter Financing of Terrorism Authority supervises, coordinates and promotes policies to protect the financial system against Money Laundering, Terrorist Financing and implementation of Targeted Financial Sanctions related to proliferation financing.

2. Policy: To protect Pakistan from the threats posed by Money Laundering and Financing of Terrorism and Proliferation. We hope to achieve this by implementing a robust and well-coordinated AML/CFT/CP regime; thereby, strengthening the financial sector and economy, as well as ensuring safety and security in Pakistan and globally . 3. Outcome: Pakistan's exit from FAT and compliance of FAT standards by synergizing national effort and providing consistency and permanence in the field of Anti-Money Laundering, Terror Financing and predicate offences (Human and Drug trafficking, Hawala/Hundi and Tax Evasions).

4. Budget by Output In Rs. 000’

Output Office Actual Expenditure 2024-25 Budget 2025-26 Medium Term Budget 2026-27 2027-28 2028-29
NATIONAL ANTI- MONEY NATIONAL ANTI- 200,000 202,225 227,595 253,312
LAUNDERING & COUNTER MONEY LAUNDERIN
Financing of terrorism authority G & COUNTER
Total 200,000 202,225 227,595 253,312

5.Key performance Indicators/targets

Outputs Key Performance Idit Target Achieved Planned Target Medium Term Target
ncaors 2024-25 2025-26 2026-27 2027-28 2028-29
NATIONAL ANTI- MONEY LAUNDERING Continuity of efforts against ML/TF
& COUNTER Financing of terrorism authority Compliance of FATF Standards
Coordination among LEAs & Relevant agencies
Implementation of National Action Plan derived from National Risk Assessment
Page 223

Special Investment Facilitation Council

PAO: Secretary

1. Goal: To act as Single Window, for multi-domain cooperation in relevant field with GCC countries, in particular, and other countries in general, for facilitation of investment and development of enabling policy environment.

2. Policy: All economic and investment related policies

3. Outcome: GDP growth, increase in exports and forex, speedy industrial development

4. Budget by Output In Rs. 000’

Output Office Actual Expenditure 2024-25 Budget 2025-26 Medium Term Budget 2026-27 2027-28 2028-29
Special Investment facilitation services Special Investment facilitation Council - 843,382 354,365 392,991 437,399
Development 480,000
Total 843,382 834,365 392,991 437,399

5.Key performance Indicators/targets

Outputs Key Performance Indicators Target Achieved 2024-25 Planned Target 2025-26 Medium Term Target 2026-27 2027-28 2028-29
Investment Promotion Facilitation & Local Seminars/Conference Achieved 12 conferences on going on going on going
Foreign Seminars - - - - -
Marketing Material including development of Documentary, broachers, flyers, pitch books etc. - - - - -
Enhanced opportunitie domestic foreign investment s and direct Facilitation in 8 targeted sectors of economy 8 Cf On going On going Ongoing
Ease of Business creating c desks Doing by ountry Establishment of 6country/regional desk Achieved onerences On going On going On going
Showcasing Investment Opportunitie of s Two domestic and two international events for investment for promotion -Establishing 6 country Continuation of remaining Continuation of remaining Continuation of remaining
Page 224
desks activities of activities of activities of
-Facilitation in eight 8 targeted the previous year- the previous year the previous year
sectors of Facilitation in Facilitation in Facilitation in
economy- eight 8 eight 8 eight 8
Recruitment of 77 targeted targeted targeted
Project staff sectors of sectors of sectors of
economy economy economy
- Investment - Investment - Investment
promotion promotion promotion
through six through six through six
(6) country desks (6) country desks (6) country desks
Page 225

Cannabis Control Regulatory Authority

PAO: Secretary

1. Goal: To achieve economic dividends community development and job creation by converting the informal economy into a legal, formal economy.

2. Policy: To Provide a legal road map for the control and regularization of the cannabis industry in the country, as per the UN Single Convention on Narcotics Drugs, 1961; Pakistan being a signatory to the convention region.

3. Outcome: The initiative has significant social values in reducing illicit drug trafficking and uplifting the socio-economic status of the cultivation.

4. Budget by Output In Rs. 000’

Output Office Actual Expenditure 2024-25 Budget 2025-26 Medium Term Budget 2026-27 2027-28 2028-29
CANNABIS CONTROL & REGULATORY services CANNABIS CONTROL & REGULATO RY AUTHORITY - 200,000 250,225 277,500 308,857
Total 200,000 250,225 277,500 308,857

5.Key performance Indicators/targets

Outputs Key Performance Target Achieved Planned Target Medium Term Target
Indicators 2024-25 2025-26 2026-27 2027-28 2028-29
CANNABIS CONTROL & REGULATORY Issuing of licenses - - 200 500 1000
services Regularization of cultivation and extraction of cannabis (Estimated area in acres) - - 25,000 50,000 70,000
Export of Cannabis derivatives(US$/Billion) - - 1.5-2.0 4-6 6-8
Creation of Jobs - - 7,000 10,000 50,000